Plan Commission — Agenda Packet
City of Pewaukee · Waukesha County · Plan Commission · meeting of May 21, 2026 · Agenda packets
Open the original document More from City of Pewaukee
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Planning Department
W240 N3065 Pewaukee Road
Pewaukee WI 53072
Phone: 262-691-0770
PLAN COMMISSION
MEETING NOTICE AND AGENDA
Thursday, May 21, 2026
6:00 PM
Pewaukee City Hall Common Council Chambers
W240N3065 Pewaukee Road, Pewaukee, WI
1. Call to Order and Pledge of Allegiance
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 January 15, 2026
2.2 March 19, 2026
3. Items for Discussion and Action
3.1 Discussion and Action Regarding a Recommendation to the Common Council for a Conditional Use
Permit for Solveig Spa Skola to Allow for a Spa Service Business to be Located at N27 W23960
Paul Road (PWC 0918998024)
3.2 Discussion and Action Regarding the Site and Building Plans for TI Investors of Pewaukee/Amazon
for the Purpose of Constructing an 8-Foot Tall Chain-Link Fence on Property Located at W232
N2950 Roundy Circle East (PWC 0917994030)
3.3 Discussion and Action Regarding the Site and Building Plans for Cold Noses Sanctuary for the
Purpose of Constructing an Addition to an Accessory Structure on Property Located at N47
W26699 Lynndale Road (PWC 0882999001)
4. Adjournment
Ami Hurd
Deputy Clerk
Community Development Coordinator
May 14, 2026
NOTICE
It is possible that members of other governmental bodies of the municipality may be in attendance to gather information that may form a quorum at the above
stated meeting. No action will be taken by any governmental body other than the governmental body specifically referred to above in this notice.
Any person who has a qualifying disability under the Americans with Disabilities Act that requires the meeting or materials at the meeting to be in an accessible
format must contact the City Planner/Community Development Director Nick Fuchs, at (262) 691-6007 three business days prior to the meeting so that
arrangements may be made to accommodate your request.
Page 1 of 35
Plan Commission meeting minutes ~ January 15 th, 2026 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, January 15, 2026
In attendance:
Mayor S. Bierce, J. Endl, D. Kiser, D. Linsmeier, A. Schoenemann, and S. Sullivan.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public Works Director
M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for the Pledge of
Allegiance.
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 August 21, 2025
2.2 September 18, 2025
A motion was made and seconded (D. Kiser, D. Linsmeier) to approve the August 21st, 2025
and September 18th, 2025 Plan Commission meeting minutes. Motion Passed: 6-For, 0-Against.
3. Items for Discussion and Action
3.1 Discussion and Action Regarding the Site and Building Plans for Samuel and Megan Steiner for
the Purpose of Constructing a Detached Garage and Detached 5,400 Square Foot Accessory
Structure Upon Property Located at N43 W23700 Fieldstone Road (PWC 0870998004)
Mr. Fuchs stated the applicant was constructing a new single-family home on the property and
was requesting a detached garage connected to the house by a roof structure, and a 5,400 square
foot accessory building to be utilized for the agricultural use on the property. He noted that due
to the square footage of the accessory building, it required Plan Commission approval and he
recommended approval.
Rob Miller with Rob Miller Homes stated the garage would be in-kind with the home, but the
outbuilding would not be similar. It was planned to be metal with cedar post wraps and a metal
roof. Mr. Fuchs noted that the Plan Commission did approve a metal accessory building back in
2022 and felt the agricultural use was a consideration as to why the metal building was
acceptable.
Chairman Bierce was concerned about a rusty building when others were spending millions of
dollars on homes in the area. Mr. Miller stated they would build something that was a long-term
investment and his clients did not want to look at a rusty building either. He felt the accessory
structure complimented the home.
A motion was made and seconded (D. Kiser, S. Sullivan) to approve the Site and Building
Plans for Samuel and Megan Steiner. Motion Passed: 6-For, 0-Against.
Page 2 of 35
Plan Commission meeting minutes ~ January 15 th, 2026 Page 2
3.2 Discussion and Action Regarding a Recommendation to the Common Council for a Conditional
Use Permit to Allow for the Construction of a New Boathouse Upon Property Located at N27
W27074 Woodland Drive as Requested by Brian and Beth Bautz (PWC 0933119)
Mr. Fuchs stated the proposed boathouse was about 294 square feet and 15 feet in height with
fiber cement siding. He stated staff was recommending approval but noted a portion was
encroaching into the floodplain so there was a condition that the homeowners would have to
comply with section 207-13B of the City’s Floodplain Zoning Ordinance as to how the
boathouse needed to be constructed.
Mr. Bautz noted that his home was approximately 12 feet from his neighbors’ houses on either
side. He stated they were in need of boat storage, and the boathouse would be a shell of a
building to put things in.
Chairman Bierce referred to the right elevation and noted it included some windows, but he
stated the left elevation was just walls. Mr. Bautz stated they spoke with the neighbors, and the
neighbors preferred taller trees for screening.
Kate Marlin (N26 W27066 Prospect Avenue) stated her parents live next door to the subject
property but were unable to attend the meeting. She stated she had some concerns about the
boathouse. She stated the City’s ordinance requires that boathouses be designed in order to
minimize the impact to adjacent properties. She felt the applicant had not minimized the
impacts, as there were no alternate design analyses, and no transparency east or west, so there
would be no way to determine if the impact to the adjacent properties was mitigated or
evaluated. Ms. Marlin felt the boathouse would create a substantial visual obstruction and felt it
was more of a shoreline outbuilding rather than an accessory water-dependent structure. Ms.
Marlin felt the combined width, height, enclosure, roof form, and shoreline placement all created
a masking of the shoreline.
Chairman Bierce felt the City had approved other boathouses substantially larger than this one,
and he did not know how we could say no to this one. Ms. Marlin did not believe that meant
they should continue to approve the boathouses just because others were approved in the past.
A motion was made and seconded (A. Schoenemann, D. Linsmeier) to recommend
approval of the Conditional Use Permit for a boathouse for Brian and Beth Bautz. Motion
Passed: 6-For, 0-Against.
3.3 Discussion and Action Regarding a Recommendation to the Common Council for a Conditional
Use Permit to Allow for an Animal Sanctuary Upon Property Located at N47 W26699 Lynndale
Road as Requested by Cold Noses Sanctuary (PWC 0882999001)
Mr. Fuchs stated the proposal was for an animal sanctuary and hobby farm use to include dogs,
cats, horses, goats, and donkeys. The animals could potentially be adopted or live the rest of
their lives on the farm. There are also plans to host fundraising events, field trips, and
educational programs. Mr. Fuchs noted that there were quite a few conditions listed in the staff
report, specifically related to the quantity of animals allowed, the capacity of events, and
conditions related to the current buildings on the property. Mr. Fuchs recommended approval
subject to the staff conditions.
Page 3 of 35
Plan Commission meeting minutes ~ January 15 th, 2026 Page 3
Thalia Haseotes, President of Cold Noses Sanctuary, noted it was a non-profit, so they do
fundraise, but she would be making a substantial donation herself.
Commissioner Schoenemann questioned the quantity of animals. Mr. Fuchs stated the City’s
ordinance speaks to horses but not much else, so it was a matter of going off of conversations
with the applicant. If they decide to increase the number of animals, they can come back to the
Plan Commission to amend the Conditional Use Permit to request additional animals. Ms.
Haseotes added that the point of a sanctuary was to not jam in as many animals as possible and
the point was for the animals to have quite a bit of space and be comfortable and peaceful.
Ms. Haseotes referred to the waste and stated the dog and cat waste would be collected every day
in bags and kept in a dumpster that would be picked up every week. For the horses, donkeys,
and goats there would be a manure pit and would be picked up depending on how many animals
they had.
Ms. Haseotes pointed out that all of the animals would have special needs with impairments that
would make it difficult for them to be outside or be adopted easily.
Kent Rice (W272 N4791 Yench Road) stated he lives adjacent to the pasture and he felt the
former owner of the property would be thrilled with this application for his property. Mr. Rice
stated he would be happy to help out.
A motion was made and seconded (D. Kiser, D. Linsmeier) to recommend approval of the
Conditional Use Permit for Cold Noses Sanctuary with the staff recommendations listed in
the staff report. Motion Passed: 6-For, 0-Against.
3.4 Discussion and Action Regarding the Site and Building Plans for Border States for the Purpose
of Locating an Eight-Foot Tall Fence With Barbed Wire Upon Property Located at W227 N2837
Duplainville Road (PWC 0914973)
Mr. Fuchs stated the applicant was looking to enclose a portion of the property with an eight foot
tall chain link fence with three strands of barbed wire on top. The fence would be internal to the
site and views would be limited, but there is a single-family residential property that abuts this,
so there is a condition to add a few evergreen plantings to help screen from the house.
Chairman Bierce did not like the idea of installing barbed wire fences in the City, but he did not
believe anyone would be bothered by it other than the residential property that abuts this. He
suggested plantings be added to cover up the fence from the neighbor’s view on the east side and
should be wrapped around to where the other fence starts.
A motion was made and seconded (D. Kiser, S. Sullivan) to concur with staff
recommendations and approve the Site and Building Plans for Border States, with staff
approving the landscaping plan. Motion Passed: 6-For, 0-Against.
3.5 Discussion and Action Regarding the Site and Building Plans for American Transmission
Company for the Purpose of Locating Two Chiller Plants and Mechanical Equipment Adjacent
to the Southwest Corner of the Building Located at W234 N2000 Ridgeview Parkway Court
(PWC 0953983)
Page 4 of 35
Plan Commission meeting minutes ~ January 15 th, 2026 Page 4
Mr. Fuchs stated the application included the mechanical equipment, generator, dry cooler, and
chiller plants. They have also included a 20 foot security light and a 16 foot tall mesh security
fence surrounding the equipment. Mr. Fuchs noted that the Zoning Board of Appeals approved a
variance for the property for the 45 foot setback in the M-4 District with a reduction to 27 feet.
Mr. Fuchs recommended approval.
Commissioner Kiser stated the decibels needed to be 60 at the property line, according to the
City’s code. Mr. Fuchs noted the 72 and 78 decibel levels listed on the plan were about 10 feet
from the equipment, so it would be less than that at the property line.
A motion was made and seconded (D. Kiser, S. Sullivan) to concur with the staff
recommendations, and the 60 decibels at the property line, to approve the Site and
Building Plans for American Transmission Company. Motion Passed: 6-For, 0-Against.
3.6 Discussion and Action Regarding the Site and Building Plans for Terex for the Purpose of
Installing Overhead Doors and an Overhead Lift Upon Property Located at N4 W22610
Bluemound Road (PWC 0963999016)
Mr. Fuchs stated the applicant was proposing to add overhead doors on the west and east
elevations of the existing building and install an overhead crane behind the building. The crane
would be approximately 35 to 40 feet in height. Mr. Fuchs recommended the chain link fenced
be repaired, as there were a number of broken slats. In addition, the applicant will be submitting
a revised landscape plan to enhance the landscaping with more than just the proposed
arborvitaes. Mr. Fuchs referred to the yellow crane and stated the applicant would be willing to
paint it a different color to help it blend in more.
The applicant mentioned that the crane would be slightly taller than the building. They currently
unload their product inside the building, but they are not safe being on a semitrailer and they
need more height to lift the product off the flatbed trailers.
The applicant stated they tried to put the crane as far away from Bluemound Road as they could,
and they were concerned about the aesthetic from Eastmound Drive. Commissioner Kiser
suggested the applicant expand their building and put the crane inside or cover it with a roof. He
suggested covering it with a roof so it would look seamless to the outside and purposeful, instead
of a structure in the back.
Mr. Fuchs added that the area on the north side was a separate property, so they would need to
combine the two properties, but the applicant does not own it. A Certified Survey map would be
required to combine the properties. Chairman Bierce felt the crane would look better in the new
location.
A motion was made and seconded (D. Linsmeier, S. Sullivan) to approve the overhead
doors for Terex. Motion Passed: 6-For, 0-Against.
4. Adjournment
A motion was made and seconded (D. Kiser, D. Linsmeier) to adjourn the meeting at 6:58pm.
Motion Passed: 6-For, 0-Against.
Page 5 of 35
Plan Commission meeting minutes ~ January 15 th, 2026 Page 5
Respectfully Submitted
Ami Hurd,
Deputy Clerk/
Community Development Coordinator
Page 6 of 35
Plan Commission meeting minutes ~ March 19, 2026 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, March 19, 2026
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, J. Endl, D. Kiser, A. Schoenemann, and S. Sullivan (left at 6:59pm).
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public Works
Director M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for the Pledge
of Allegiance.
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 October 16, 2025
2.2 November 20, 2025
A motion was made and seconded (D. Kiser, C. Brown) to approve the October 16, 2025
and November 20, 2025 Plan Commission meeting minutes. Motion Passed: 5-For, 0-Against,
1-Abstain (A. Schoenemann).
3. New Business
3.1 Discussion and Possible Action Regarding an Offer to Donate Approximately 4.39 Acres of
Land Located Along the East Side of Redford Boulevard/CTH F Approximately 625 Feet
South of Beaver Court (PWC 0872997)
Mr. Fuchs stated a property owner had requested to donate a 4.39 acre piece of land that was
entirely floodplain and wetland. The City would not have a specific use in mind, but there
were no objections to the City accepting it. Common Council approved the acceptance of the
donation at their February 16th, 2026 meeting. Mr. Fuchs noted he did make a site visit and it
was very wet, but he did not see anything of issue or any contamination.
A motion was made and seconded (C. Brown, S. Sullivan) to approve the land donation.
Motion Passed: 6-For, 0-Against.
3.2 Discussion and Action Regarding the Site and Building Plans for Spring Creek Church
Located at N35 W22000 Capitol Drive for the Purpose of a Proposed Parking Lot Expansion
and Relocating the Existing Athletic Field (PWC 0909999005)
Mr. Fuchs stated Spring Creek Church was requesting to add a 174 space parking lot to the
west of the existing parking lot near the athletic field, which would then be moved further
north on the property. He noted that the parking spaces conform to City standards, and the
Page 7 of 35
Plan Commission meeting minutes ~ March 19, 2026 Page 2
greenspace calculations were within the City’s ordinance. Mr. Fuchs referred to the lighting
plan and suggested the applicants go with the options for the motion sensors and dimming. He
added that there was also a condition for final Engineering Department approval, and he
recommended approval.
Commissioner Schoenemann questioned the landscaping and asked where the trees were
going. Brad Seubert with Harwood Engineering noted there would be trees along the
expansion and a few more to buffer the athletic field.
Commissioner Brown questioned if there would be stripping for the kids crossing the parking
lot. Jeremy Rusch with Spring Creek Church stated they were relocating the soccer field and
putting it in the northwest corner to protect the kids from the parking lot. He added that the
outdoor space is not used when coming directly from the facility, but they would have painted
walkways for pedestrians.
Chairman Bierce was concerned that in the past the City and Spring Creek Church had a
difficult time coming to an agreement on storm water management. The church would be
expanding the storm water pond and eliminating greenspace, and Chairman Bierce had a
problem with this being put on staff and did not want to spend the next 20 years in court. The
Executive Pastor of Operations at Spring Creek Church stated they wanted to start fresh with
the City and the previous pastor was now retired. He stated they would do what they were
told and they wanted to work well with the City.
A motion was made and seconded (D. Kiser, C. Brown) to approve the Site and Building
Plans for Spring Creek Church with staff comments. Motion Passed: 6-For, 0-Against.
3.3 Discussion and Action Regarding the Site and Building Plans for Lake Pewaukee Sanitary
District Located at N25 W27534 Oak Street for the Purpose of a Building Addition to the
Existing Facility (PWC 0935979001)
Mr. Fuchs stated LPSD was proposing a 6,922 square foot addition to their building located on
Oak Street, as well as a new lift station. The addition would consist of office space and
storage, with six overhead doors on the east side of the building. Mr. Fuchs recommended
approval conditioned on final Engineering Department approval.
Tom Koepp, with Lake Pewaukee Sanitary District, stated a sewer study was done, and it
showed the flows at the stations were not up to par for future flows. Mr. Koepp noted they
attempted to relocate to a better location, but the neighbors were not in favor. He felt this
location would eliminate the need for a bigger station by the Beer Depot. He mentioned that
they applied for a clean water loan from the DNR and were awarded funds for the entire
project, including the building.
Chairman Bierce felt LPSD did a great job and had no issues with this. Commissioner Brown
felt this was a great pivot from what was previously proposed. She questioned if any storage
was being added, as she felt there was a lot of stuff outside, and even though it was hidden,
she felt it needed to be cleared out.
Page 8 of 35
Plan Commission meeting minutes ~ March 19, 2026 Page 3
Commissioner Schoenemann felt this was a great plan. She referred to the lighting plan and
questioned the need for lights on the building in the back facing the existing homes if there
were no sidewalks in that area. Mr. Koepp answered that they needed the ability to access
their equipment in the middle of the night if needed. He stated there was no intention for the
lighting to even reach their back fence or the back of their property.
A motion was made and seconded (C. Brown, D. Kiser) to approve the Site and Building
Plans for Lake Pewaukee Sanitary District including the condition of final Engineering
Department approval of grading, erosion control, storm water and utility plans. Motion
Passed: 5-For, 0-Against, 1-Abstain (S. Sullivan).
3.4 Discussion Regarding Updating the City Zoning Code as Presented by Foth Infrastructure &
Environment LLC
Mr. Fuchs stated staff has been working with Foth in review of the City’s current Zoning
Ordinance
Orrin Sumwalt and Mark Lyons with Foth introduced themselves and noted the process started
with a review of the City’s ordinance and how it was working. Mr. Sumwalt felt the City’s
ordinance was very text heavy with standards that were buried in text. The goal was to make
things easier to find. The City’s current code uses a pyramidal zoning with districts allowing
uses in other zoning districts, and Mr. Sumwalt felt there was a better way to present that.
Terms in the ordinance were not consistently defined and some of the land uses were not
defined or consistent, and it was suggested that land use definitions be separate from the
general definitions. Mr. Sumwalt stated the goal was to create a zoning matrix, also known as
a consolidated land use table, and pull the list of uses from each of the zoning districts and
consolidate that information into a land use matrix. He then described the matrix and what it
would look like.
Mr. Lyons referred to Article 5 in the code and stated they would make sure every single item
in the table had a definition, standards, and any additional information that breaks down the
information even further. The supplemental information would be easy to find and
specifically match exact definitions per use in the exact same order.
Mr. Sumwalt stated they were proposing changes for permitted uses, and they wanted to
include an interpretation of what it was similar to. For Conditional Use Permits, if it is not
listed, they did not want it to be allowed, which is different than what the current code says.
Discussion then took place regarding allowing or prohibiting specific uses, such as smoke
shops and adult establishments, in certain areas of the City.
Commissioner Sullivan left the meeting at this point (6:59pm).
Mr. Sumwalt noted that Foth would come back to the Plan Commission with a formal draft
ordinance and make recommendations on what should be included in the matrix. The Plan
Commission would then make the final recommendations to the Council. Mr. Fuchs noted the
goal was to show the Plan Commission at a high level, and they could come back as many
Page 9 of 35
Plan Commission meeting minutes ~ March 19, 2026 Page 4
times as they wanted to have working meetings on drafts.
Commissioner Schoenemann questioned what the City’s biggest liability was as far as
conflicts or gaps in the City’s code. Mr. Sumwalt stated procedurally, the City was probably
doing Conditional Use Permits the correct way, but we do not have the correct language in the
code to reflect the state statutes. He stated Foth was proposing to remove the special
conditional uses so that someone could not freestyle their own Conditional Use. If the use is
not listed in the code, then it would not be allowed, unless a text amendment was proposed to
get the use allowed. By removing the unspecified Conditional Uses, it removes the burden of
the City having to prove that the applicant should not be allowed to do something.
Mr. Sumwalt added that there were some districts that had the potential for consolidating, as
there are currently a lot of districts. He mentioned possibly combining the two agriculture
districts or consolidating the six “M” manufacturing/industrial districts. Mr. Lyons felt there
were very few differences between some of the districts, and he noted that when compared to
communities of similar size, the City was on the high end for the number of districts.
Mr. Fuchs felt it would be beneficial to put together a final draft, and when the Plan
Commission is able to review it, they can then make changes and suggestions to certain
sections if needed.
No action was taken.
4. Adjournment
A motion was made and seconded (D. Kiser, C. Brown) to adjourn the meeting at 7:50pm.
Motion Passed: 6-For, 0-Against.
Respectfully Submitted,
Ami Hurd
Deputy Clerk
Community Development Coordinator
Page 10 of 35
Office of the Planner & Community Development Director
W240 N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
Phone (262) 691-0770 Fax (262) 691-1798
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of May 21, 2026
Date: May 11, 2026
Project Name: Solveig Spa Skola, LLC Conditional Use
Project Address/Tax Key No.: N27W23960 Paul Road / PWC 0918998024
Applicant: Solveig Spa Skola LLC
Property Owner: WEST WIND LLC
Current Zoning: B-6 Mixed Use Business District
2050 Land Use Map Designation: Office Commercial
Use of Surrounding Properties: Stormwater pond to the north, office to the south and west, and
industrial to the east
Project Description/Analysis
The applicant filed a Conditional Use Permit to locate a spa and educational/training business use
within an existing 400 square foot tenant space located at N27W23960 Paul Road, Suite 3.
The proposed use includes several different services. The business provides spa services such as
massage therapy, facials, body wraps, skin care, and other wellness type treatments. The applicant also
indicated that they will teach Cardiopulmonary Resuscitation (CPR) and Basic Life Support (BLS).
Additionally, the business teaches massage therapy to clients pursuing a license in massage therapy.
The applicant also stated that they intend to work with a State Examiner to teach and assist students in
becoming certified in several state licensed occupations, such as massage therapy, cosmetology, nail
technicians, and estheticians.
Hours of operations are from 8:00 a.m. to 8:00 p.m. Monday through Thursday and 8:00 a.m. to 5:00
p.m. on Fridays and Saturdays. The business is closed on Sundays. Currently the business is solely
owner operated but there are plans to hire a receptionist in the future. According to the applicant, it is
anticipated to have three to four clients and three to four students per day.
The site has approximately 67 parking spaces that are shared by all tenants. Staff is not aware of any
existing parking issues. Moreover, the subject use is not anticipated to add substantial parking demand
to the site.
The property is zoned B-6, which permits the uses allowed in the B-4 and B-5 districts, including
conditional uses. Although spa services and related operations are not specifically listed in those
districts, the B-6 District also allows, as a conditional use, “[a]ny retail, service or office use that is
compatible with those uses listed above as determined by the Plan Commission.”
Page 11 of 35
Planner & Community Development Director Nick Fuchs
Note the B-6 District intent states, “[t]he B-6 Mixed-Use Business District is intended to provide for
the orderly and attractive grouping of buildings which encompass more than one type of non-industrial
business use which are compatible from a traffic, density and general use standpoint.” Staff finds the
proposed use is most similar to and compatible with B-4 District office type uses.
Staff Recommendation
Staff recommends approval of the Conditional Use Permit for Solveig Spa Skola, LLC, to be located
within Suite 3 of N27W23960 Paul Road.
Page 12 of 35
Solveig Spa Skola, LLC
This space is approximately 400 SQ FT in Suite 3 at WWI N27 W23960 Paul Road,
Pewaukee, WI 53072.
The services that I will provide at WWI N27 W23960 Paul Road is a Scandinavian spa
services to include massage therapies to offer
a variety of relaxation and wellness treatments, primarily focusing on massage therapy and
teaching potential students to become licensed in massage therapy. It is a place that will
offer a Swedish massage that primarily target muscle manipulation for pain relief and
overall relaxation and rejuvenation, facials, body wraps, and other wellness experiences,
often incorporating skin care and therapeutic treatment for wellness.
And secondly, I will teach CPR/BLS. Being a registered nurse of approximately 40 years, I
am also certified in CPR/BLS and certified in teaching these very important life skills.
Also, I will be working with the State of Wisconsin to be a State Examiner for students to be
licensed in a variety of state licensed occupations, e.g. massage therapy, cosmetology, nail
technicians, and esthetician. These services will be provided to where the State of
Wisconsin wants the students to complete the state examinations. The reason I am telling
you that I will be working with the State of Wisconsin is because the State is very strict, and
they will be monitoring my skill set very closely.
Page 13 of 35
. t~
Suite 3 * WWI N27 W23960 Paul Road 53012..
·',/?.."':-.c __ ; __ ·-_,--__ f';-c:f:F O _,,,·"--" ,.:L_· __ ,"',':: L;::_ .{ ,:.,_,t.,_,; r.--,,:~-~ .. :c7'•':.·0v.::c .l~~ --·--<_---, .. J .... :,::-,_1/c_ P.~_.,,,_.:,~, ... ,·_._·: __ G 1> .... "l':.c .tc· <_(_: '.(A'"'-,,~ . .Y--~-.: <>:,:.¢,:>.:{"_.:ff ~Pi'~, .. ~ •r." :t:<> < c: -· "<<?. . ;_ -"-">"•~:~>;··--_ •
0
:,--f/.-.. ? .G':-f,F·y_;-:,.-,:~~-t -_,:JC, ,,:."c:,!-S __ ..;_..:'>"!_ --~-. 2-· "·";'\"'.?"' •·. y_-..-,_--,,"-:-0
,..... ________ --:·· ···· 11· 2"
Available
SUITE 3
400SQ. FT.
$566. Mo.
t,_ ____________________ . 19' 211
17
1
711
~.·
~$flit~ • ◊~lei; <;O~MJ~elAJ.;
.• .. ;c•;• c-0 .• A•.O>hC '"· YY;.·;.J<»/• 7.,~ul~~~tlfi'~~~~t~~~.~~r::~~i~~~~< ... ,,.~.•,FMh. ,,y·;.<•0•.·>cc•.;·."';C•J
1025 W. Glen Oaks Lane, Suite 202 Mequon, WI 53092 262.241.8740 www.mikkelsonbuilders.com
Page 14 of 35
Office of the Planner & Community Development Director
W240 N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
Phone (262) 691-0770 Fax (262) 691-1798
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of May 21, 2026
Date: May 11, 2026
Project Name: Amazon Fence Site & Building Plan Review
Project Address/Tax Key No.: W232N2950 Roundy Circle E / PWC 0917994030
Applicant: Patriot Fence & Construction
Property Owner: TI INVESTORS OF PEWAUKEE LLC
Current Zoning: M-4 Industrial Park District
2050 Land Use Map Designation: Manufacturing/Fabrication/Warehousing
Use of Surrounding Properties: Railroad tracks and multi-family residential to the north, industrial to
the south and west, and HWY F and industrial to the east.
Project Description/Analysis
The applicant filed a Site & Building Plan Review Application to install a fence upon property located
at W232N2950 Roundy Circle E. Section 340-2.9B(5) of the Zoning Code requires that all accessory
structures in nonresidential districts require Plan Commission approval of a Site & Building Plan
Review Application.
The applicant is proposing an eight-foot-tall black chain-link style fence that encloses the parking lot
on the east side of the building. The fence is about 50-feet from north property line, 160 feet from east
property line, and over 200 feet from the south property line.
The applicant provided a landscaping concept for Plan Commission consideration. If acceptable, staff
recommends that a complete and detailed landscape plan be provided for staff review and approval.
The final landscape plan must show the entire site/planting area and include a plant schedule listing the
quantities, planting sizes, and types of plants that will be installed. Note the M-4 District requires that
”[a]ll parking and loading areas shall be adequately screened as determined by the Plan Commission.”
The proposed landscaping will extend along the entire length of the fence, except along the north side
as indicated by the applicant.
Recommendation
Staff recommends approval of the subject Site & Building Plan Review Application to allow for the
installation of the fence as presented.
Page 15 of 35
FROM:
J. Biehl
(920)264-3252 (cell)
COMPANY
jae@PatriotFencing.com
ADDRESS
Kleen Maintenance Co. LLC dba
ATTENTION
PATRIOT JOB #
PROJECT
ADDRESS
Phone/Fax:
(262)521-0029
Shop Drawings
Billing:
PO Box 596 Sussex, WI 53089
Product Data
Shipping:
926 Silvernail Rd. Pewaukee, WI 53072
Samples
Email:
info@PatriotFencing.com
QUANTITY
DESCRIPTION
PAGES/FILES
THESE ARE TRANSMITTED as checked below:
For approval
For color selection
Other: ____________
COMMENTS:
RESPONSE:
SITE SUPERINTENDANT
CHAIN LINK FENCE
Amazon Pewaukee - PERM
Other:
X
X
X
SUBMITTAL COVER LETTER
Modern Construction and Facility Maintenance Services
W232N2950 ROUNDY CIR E - PEWAUKEE
WE ARE SENDING YOU:
11/28/2025
PROJECT MANAGER
Anna Stevens
DATE
2511-11
(704) 765
-
9937 / 704
-
838
-
9717 mobile
astevens@moderncfm.com
Page 16 of 35
Page 17 of 35
Page 18 of 35
B
C
A
D
E
10'-00" MAX
DEPTH
DEPTH
DEPTH
1" GAP
Page 19 of 35
12-00"
48"
7'-08"
4'-00"
4"
BULLDOG
HINGES (1 PAIR)
STRONG ARM
LATCH
1-7/8" SPSV20 WELDED FRAME
FABRIC:
BLACK
9 GAUGE
2" MESH
2-7/8 "SPSV BLACK 40 TERMINAL POST
2-7/8"SPSV40 BLACK TERMINAL POST
1 EACH
Page 20 of 35
X
96"
Page 21 of 35
Page 22 of 35
Chain link fence accessories: [ASTM F
626] Provide items required to complete
fence system. Galvanize each ferrous
metal item and finish to match framing.
Post caps: PVC-coated formed steel, cast
malleable iron, or aluminum alloy weather
tight closure cap for tubular posts. Provide
one cap for each post. Cap to have
provision for barbed wire when necessary.
“C” shaped line post without top rail or
barbed wire supporting arms do not require
post caps. (Where top rail is used, provide
tops to permit passage of top rail.)
Top rail and brace rail ends: PVC-coated
pressed steel per ASTM F626, for
connection of rail and brace to terminal
posts.
Sleeves: Lengths of top rails to be
connected using 6" (152 mm) PVC-coated
sleeves that allow for expansion or
contraction of the rail.
Tie Wire: PVC-coated 9 gauge [0.148"
(3.76 mm)] galvanized steel or aluminum
for attachment of chain link fabric to posts
and rails. Hog rings attach fabric to tension
wire to be 12 1/2 GA [0.0985" (2.502 mm)].
Brace and tension (stretcher bar) bands:
PVC-coated pressed steel.
Tension wire: PVC applied to metallic
coated steel wire: Per ASTM F 1664
Class 2a, 6 gauge, [0.192” (4.88mm)]
diameter core wire with tensile strength
of 75,000 psi (517 MPa).
Truss rods & tightener: PVC-coated
steel rods with minimum diameter of
5/16” (7.9 mm). Capable of withstanding
a tension of minimum 2,000 lbs.
Barbed wire: PVC-coated per ASTM F
1665 Class 2a steel wire double-strand,
13-3/4 gauge, [0.083” (2.10 mm)] twisted
line wire with galvanized steel, 4 point
barbs (without PVC finish) spaced
approximately 5” (127 mm) on center.
Barbed wire supporting arms: PVC-
coated pressed steel arms with
provisions for attaching 3 rows of barbed
wire. Arms shall withstand 250 lb. (113.5
kg) downward pull at outermost end of
arm without failure.
o
Provide [6 strands double “V”
arms].
o
Provide intermediate arms with
hole for passage of tension wire.
Nuts and bolts are galvanized but not
vinyl coated. Cans of PVC touch up
paint are available to color coat nuts and
bolts if desired.
Poly
mer
-
Coated Steel Chain Link
Accessories
ASTM F626, Federal Specification RR-F-191 /4D, AASH
TO M-181-98
Page 23 of 35
Page 24 of 35
Page 25 of 35
Office of the Planner & Community Development Director
W240 N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
Phone (262) 691-0770 Fax (262) 691-1798
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of May 21, 2026
Date: May 11, 2026
Project Name: Cold Noses Sanctuary Site & Building Plan Review
Project Address/Tax Key No.: N47W26699 Lynndale Road / PWC 0882999001
Applicant: Cold Noses Sanctuary Property LLC
Property Owner: Cold Noses Sanctuary Property LLC
Current Zoning: A-1 Agricultural District, UC Upland Conservancy District, and F-1 Floodplain
District
2050 Land Use Map Designation:
Use of Surrounding Properties:
Project Description/Analysis
The applicant filed a Site & Building Plan Review Application requesting approval of an addition to an
existing accessory structure upon property located at N47W26699 Lynndale Road.
The applicant recently received approval of a Conditional Use Permit for the Cold Noses Sanctuary
business use. As part of that approval, the Plan Commission and Common Council approved a
condition requiring new buildings and additions receive Plan Commission approval of a Site &
Building Plan Review Application.
The proposed modifications are to the accessory structure located directly behind the residential
dwelling near the east property line. This building will be used to house the cats on the property.
The project includes an addition to the north end of the building as well as two entryway features on
the west side of the building. The entryways and the addition will include stainless steel wire mesh
screening. The addition is about 315 square feet and each entryway is about 68 square feet.
Recommendation
Staff recommends approval of the Site & Building Plan Review Application for Cold Noses Sanctuary
to modify the existing accessory structure as proposed.
Page 26 of 35
Cold Noses Sanctuary Office Phone: 262-361-0107
N47 W26699 Lynndale Rd. Cellular: 508-648-9115
Pewaukee, WI. 53072 thalia@coldnosessanctuary.org
Website: www.coldnosessanctuary.org Tax ID: 33-2026609
April 24th 2026
Site Plan Approval Feline Building “Estéban’s Estuary”
This site plan approval is to expedite an addition and alteration to an existing structure that
will be brought up to commercial status. Prior to obtaining occupancy there will be
additional site plan approval process for a new driveway and other site improvements that
will be crucial to the operation of the facility.
The purpose of this space will be a community living for up to 12 cats to live comfortably.
Reading nooks and couches for volunteers to interact, along with a prep sink and storage
space. Catio outdoor screened porch for enrichment.
Approximate cost of building improvement will be in the range of $300k to $375k.
Recap of the Cold Noses Sanctuary
On February 2, 2026, The City Common Council granted a Cold Noses Animal Sanctuary a
Conditional Use Permit to develop a rescue sanctuary for special-needs animals.
Cold Noses Sanctuary is a non-profit organization that will help rescue special needs
animals (mainly dogs, cats, horses, goats and donkeys) from high-kill shelters and other
emergency situations. Often, these animals need time, tenderness, and someone to make
them feel safe for them to live out their lives in peace. As is often the case with all animals,
special needs animals bring out the best in people and demonstrate resilience and
perseverance to others facing their own challenges.
Cold Noses Sanctuary will be a place where animals are healing, and many will live out
their lives here. Our hope is that we will be find forever homes for some of these animals
through interactions with the public. Adoptions and fostering are not a regularly occurring
part of our program, but we would expect them to happen occasionally. This is an
opportunity for an animal to find their own forever family and thus open more space for us
to help another. We will have adoption and foster applications, check Veterinary references
and keep in close contact with our fosters and adopters with a “take back” policy if they
cannot keep the animal for any reason.
Page 27 of 35
Cold Noses Sanctuary Office Phone: 262-361-0107
N47 W26699 Lynndale Rd. Cellular: 508-648-9115
Pewaukee, WI. 53072 thalia@coldnosessanctuary.org
Website: www.coldnosessanctuary.org Tax ID: 33-2026609
Daily Activities
Daily this will run as a small-scale hobby farm with an onsite caretaker, volunteers, and
animals. The activities set forth fall well within the scope of agritourism, as defined by
Wisconsin Department of Agriculture. 1We will be a working farm, and the education and
agritourism will be a source of revenue generation for our sanctuary. At all times- even at
our busiest, tranquility and calmness will be sought to be maintained for the well-being of
our resident animals. We are not a zoo, and therefore we will neither force nor guarantee
animal encounters with the public. Part of our educational program is to show that these
animals are living their lives and deserve to have a say in their daily interactions.
This is ultimately the safest way to interact. The animals will be housed in secure buildings
and have access to fenced yards (dogs), pastures (farm animals), and an enclosed “Catio”
for the cats. We adhere to the standards provided by the Association of Shelter
Veterinarians for minimum space requirements. Additionally, we follow protocol for
standards for 1 acre per horse and 1 acre per 1-3 goats and .5 acre per donkey.
The sanctuary will be run daily by the live-in resident. (Lead Sanctuary Manager) There will
be a core group of volunteers as the animal population grows, to help with the care and
public outreach. We will work with several Veterinarians who will come to the farm on a
regular schedule to oversee care processes and diagnose any conditions. Farriers will work
with our livestock to ensure hoof health.
Page 28 of 35
1a
e1
DOOR TAG
WINDOW TAG
WALL TAG
EMERGENCY EXIT SIGN
EXISTING CONSTRUCTION
NEW CONSTRUCTION
6"
( 6" )
TYPICAL DIMENSION
FINISH TO FINISH
DIMENSION SHOWING
FRAMING TO FRAMING
FIRE EXTINGUISHER
PROJECT KEYED NOTE ?
101
JOB NUMBER:
DRAWN BY:
SHEET NUMBER:
© 2024 STRUCRITE , INC.
ISSUED DATE:
707 N. Grand Ave. - Suite 102
Waukesha, WI 53186
262.549.3222 - www.srdinc.biz
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE DESIGN
PROFESSIONAL AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF STRUCRITE, INC.
DESIGNER/
SUPERVISING PROFESSIONAL
SHEET TITLE:
REVISIONS
SYMBOLS LEGEND LOCATION MAP VICINITY MAP ABBREVIATIONS SHEET INDEX
SPECIFICATIONS
GENERAL NOTES
4/23/2026 5:06:09 PM
25160
bec
G1.0
Cold Noses
Feline Facility
N47W26699 Lynndale Rd
Pewaukee, WI
COVER PAGE
04.17.2026
Cold Noses Feline Facility
N47W26699 Lynndale Rd
Pewaukee, WI
StrucRite, Inc.
Boyd E. Coleman, P.E.
President, Engineer
707 N. Grand Ave. - Suite 102
Waukesha, WI 53186
262.549.3222
SITE PLAN APPROVAL
SITE PLAN APPROVAL
1-GENERAL
G1.0 COVER PAGE
G1.2 PRESENTATION
2-CIVIL
C1.01 EXISTING CONDITIONS
C1.02 SITE LAYOUT
C1.03 GRADING & EROSION CONTROL
3-ARCHITECTURAL
A1.1 MAIN LEVEL PLAN
A2.0 EXTERIOR ELEVATIONS
1. ALL WORK SHALL COMPLY WITH ALL LOCAL, STATE & NA TIONAL CODES HAVING
JURISDICTION OVER THIS PROJECT.
2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH BUILDING REGULATIONS AND IN
A QUALITY WORKMANSHIP MANNER
3. DO NOT SCALE DRAWINGS
4. SEE GENERAL CONDITIONS OF THE CONTRACT FOR FULL SCOPE OF PROJECT
5. UNLESS NOTED OTHERWISE, ALL DETAILS, SECTION AND NOTES ON THE
DRAWINGS ARE INTENDED TO BE TYPICAL FOR SIMILAR SIT UATIONS ELSEWHERE
6. THE PLANS AND SPECIFICATIONS ARE INTENDED TO GIV E A DESCRIPTION OF THE
WORK. NO DEVIATION FROM THE PLANS AND SPECIFICATION S SHALL BE MADE
WITHOUT THE WRITTEN CONSENT OF STRUCRITE, INC.
7. ANY DISCREPANCIES WITHIN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO
THE ATTENTION OF STRUCRITE, INC. IN WRITING.
8. THE TERMS "NOT IN CONTRACT" OR "BY OWNER" OR "BY OTHERS" DO NOT
PRECLUDE OTHER WORK ASSOCIATED WITH THE CONTRACT WH ICH MUST OCCUR
IN THE VICINITY OF THE AREA OR THROUGH THE SPACE.
9. BEFORE COMMENCING WORK, THE CONTRACTOR SHALL VER IFY ALL DIMENSIONS
AND CONDITIONS IN THE FIELD. ANY DISCREPANCIES BETW EEN EXISTING
CONDITIONS AND THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE
ATTENTION OF STRUCRITE, INC PRIOR TO BIDDING.
10. IF FIELD CONDITIONS NECESSITATE ANY CHANGES OR MODIFICATIONS, THE
CHANGES OR MODIFICATIONS MUST BE APPROVED BY STRUCR ITE, INC. PRIOR TO
PROCEEDING WITH WORK.
11. ALL CHANGE ORDERS MUST BE APPROVED BY THE OWNER PRIOR TO
PROCEEDING WITH ANY WORK. FAILURE TO FOLLOW THIS ST EP MIGHT RESULT IN
NON-PAYMENT.
12. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CLEAN-UP.
NORTH
AC AIR CONDITIONING
ACS ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADDM ADDENDUM
ADJ ADJUSTABLE
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISH FLOOR
ATL ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT
AUX AUXILIARY
AVG AVERAGE
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BLKHD BULKHEAD
BM BEAM
BO_ BOTTOM OF (ITEM)
BO BY OTHERS
BS BOTH SIDES
BT JNT BUTT JOINT
BTWN BETWEEN
CAS CARD ACCESS SYSTEM
CB CATCH BASIN
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CG CORNER GUARD
CH COAT HOOK
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
CONC CONCRETE
CONT CONTINUE, CONTINUOUS
CORR CORRIDOR
CPT CARPET
CRS COURSE, COURSES
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DBL DOUBLE
DEFS ERECT APPLIED EXTERIOR
FINISH SYSTEM
DEMO DEMOLITION
DEP DEPRESSED
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DN DOWN
DR OPNGDOOR OPENING
DS DOWNSPOUT
DT DRAIN TILE
DW DISHWASHER
DWG DRAWING
DWR DRAWER
EA EACH
EIFS EXTERIOR INSULATION FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL/ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EP ELECTRICAL PANEL
EQ EQUAL
EQUP EQUIPMENT
ES ELECTRIC STRIKE
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXH FN EXHAUST FAN
EXIST EXISTING
EXP EXPANSION
EXPO EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FGL FIBERGLASS
FHC FIRE HOSE CABINET
FN FINISH
FIXT FIXTURE
FL FLOOR LINE
FLR FLOOR
FLUOR FLUORESCENT
FO_ FACE OF (ITEM)
FOF FACE OF FINISH
FOM FACE OF MASONRY
FP FIRE PROOF, FIRE PROTECTION
FR FRAME
FT FOOT OR FEET
FTG FOOTING
FURG FURRING
FV FIELD VERIFY
GA GAGE
GAL GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GL GLASS
GYP BD GYPSUM BOARD
HB HOSE BIB
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORZ HORIZONTAL
HP HORSE POWER
HR HOUR
HTR HEATER
HVAC HEATING, VENTILATION & AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDE, INCLUDING
INT INTERIOR
JAN JANITOR
JNT JOINT
KO KNOCK OUT
KS KNEE SPACE
L LENGTH, LONG
LAV LAVATORY
LBS POUND(S)
LKR LOCKER
LT WT LIGHT WEIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MFR MANUFACTURER
MH MANHOLE
HD MIDDLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OV OVER
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
PED PEDESTAL
PERIM PERIMETER
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL JNT PANEL JOINT
POC POINT OF CONNECTION
PR PAIR
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PT PAINT
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER WITH
RECEPTACLE
PTM PAINT TO MATCH
QT QUARRY TILE
R RADIUS
R RISER
RA RETURN AIR
RD ROOF DRAIN
REF REFRIGERATOR
REFL REFLECTED
REINF REINFORCED
REQD REQUIRED
REV REVISION
RFI REQUEST FOR INFORMATION
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RTU ROOF TOP UNIT
SAB SOUND ATTENUATION BATTS
SAG SUPPLY AIR GRILL
SC SOLID CORE
SCHED SCHEDULE
SD SOAP DISPENSER
SECT SECTION
SHR SHOWER
SHT SHEET
SHT MTLSHEET METAL
SHV SHELF, SHELVING
SIM SIMILAR
S&P SHELF & POLE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS SOLID SURFACE
SSK SERVICE SINK
STC SOUND TRANSMISSION
COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T TREAD
TEMP TEMPORARY
T&G TONGUE & GROOVE
THK THICKNESS
TLT TOILET
TO_ TOP OF (ITEM)
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
UCR UNDERCOUNTER REFRIG.
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UR URINAL
VAV VARIABLE AIR VOLUME
VB VAPOR BARRIER
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VR VAPOR RETARDER
VWC VINYL WALL COVERERING
w/ WITH
WC WATERCLOSET
WD WOOD
WF WIDE FLANGE
WH WATER HEATER
w/o WITHOUT
WS WORKSTATION
WWF WELDED WIRE FABRIC
WWM WEEDED WIRE MESH
YD YARD(S)
13. GENERAL AND SUB CONTRACTS SHALL EXERCISE ALL REASONABLE
PRECAUTIONS FOR THE PROTECTION OF PERSONS AND PROPE RTY ON THE SITE.
ALL SAFETY PROVISIONS AND APPLICABLE LAWS FOR BUILD ING AND CONSTUCTION
CODES SHALL BE OBSERVED.
14. GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS T O STRUCRITE INC. FOR
APPROVAL BEFORE PROCEEDING WITH ANY FABRICATION OR INSTALLATION.
15. MANUFACTURES DIRECTIONS FOR APPLICATION, INSTAL LATION AND METHODS
SHALL BE FOLLOWED ARE HEREWITH MADE PART OF THE CON STRUCTION
DOCUMENTS.
16. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY TO BE PRESSURE
TREATED
PLUMBING WORK
A. REQUIREMENTS
1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH STATE AND LOCAL CODES.
2. SEPARATE PLANS SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL AS THE PLUMBING
WORK IS NOT A PART OF THIS PLAN.
3. ALL PENETRATIONS THROUGH RATED CONSTRUCTION SYSTEMS SHALL USE A U.L. APPROVED
METHOD.
HEATING AND VENTILATION WORK
A. REQUIREMENTS
1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH STATE AND LOCAL CODES.
2. SEPARATE PLANS AND CALCULATIONS SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL
AS THE HEATING AND VENTILATING WORK IS NOT A PART O F THIS PLAN.
3. ALL PENETRATIONS THROUGH RATED CONSTRUCTION SYSTEMS SHALL USE A U.L. APPROVED
METHODS.
ELECTRICAL WORK
A. REQUIREMENTS
1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH ST ATE AND LOCAL CODES.
2. SEPARATE PLANS AND CALCULATIONS SHALL BE SUBMITTED TO STATE AND LOCAL AGENCIES BY
CONTRACTOR FOR APPROVAL AS THE ELECTRICAL WORK IS N OT A PART OF THIS PLAN.
3. ALL PENETRATIONS THROUGH RATED CONSTRUCTION SYSTEMS SHALL BE OF U.L. APPROVED
METHODS
B. AUTOMATIC SMOKE DETECTION SYSTEM (NOTE: DO NOT INC LUDE UNLESS REQUIRED)
1. SMOKE DETECTION SYSTEM SHALL COMPLY WITH LOCAL, STA TE, AND FEDERAL CODES, AND
N.F.P.A. STANDARDS 71, 72B, 72C, 72D, 72E.
2. AUTOMATIC DETECTION PRODUCTS SHALL BE AN APPROVED S YSTEM, MEETING FEDERAL, STATE
AND LOCAL CODES.
3. ALL SMOKE DETECTORS SHALL BE BOTH AUDIBLE AND VISUA L AS REQUIRED BY THE A.D.A.
FIRE EXTINGUISHERS
A. REQUIREMENTS
1. CONTRACTOR TO FURNISH AND INSTALL EXTINGUISHERS PER LOCAL, STATE, AND FEDERAL
CODES, AND N.F.P.A. NO.10 -1978.
2. MOUNT FIRE EXTINGUISHER NOT HIGHER THAN 48" ABOVE F INISH FLOOR UNLESS LOCAL
REGULATIONS REQUIRE DIFFERENT HEIGHT.
3. ALL FIRE EXTINGUISHERS AND CABINETS TO MEET THE REQ UIREMENTS OF THE A.D.A.
GYPSUM BOARD
A. ALL GYPSUM BOARD SHALL BE AS MANUFACTURED BY U.S. G YPSUM, NATIONAL GYPSUM OR EQUAL.
PROVIDE JOINT TAPE, JOINT COMPOUND, TEXTURE MATERIA LS, AND INSTALLATION ACCESSORIES
AS REQUIRED FOR COMPLETE INSTALLATION IN ACCORDANCE WITH ASTM C840, GA201, GA216,
GA600, AND U.S.G. “GYPSUM CONSTRUCTION HANDBOOK. ”
B. PROVIDE CONTROL JOINTS PER THESE REQUIREMENTS.
C. GYPSUM BOARD SHALL CONFORM TO THE FOLLOWING STANDA RDS WHERE REQUIRED:
1. FIRE RATED: ASTM C36, TYPE X OR C, UL RATED, 48 INC H BY 5/8 INCH THICK, MAXIMUM
PERMISSIBLE LENGTH;
2. MOISTURE RESISTANT: ASTM C630, TYPE X OR C, UL RATE D, 48 INCH BY 5/8 INCH THICK,
MAXIMUM PERMISSIBLE LENGTH.
D. ERECT BOARD VERTICALLY, WITH ENDS AND EDGES OCCURRING OVER FIRM BEARING. STAGGER
END JOINTS TO OCCUR AT DIFFERENT LOCATIONS ON OPPOS ITE SIDES OF WALL. ERECT EXTERIOR
SHEATHING HORIZONTALLY.
E. PROVIDE M.R. DRYWALL AT ALL FRP, CERAMIC WALL TILE, PORCELAIN WALL TILE, COOLER PANEL,
FREEZER PANEL AND DAMP/WET LOCATIONS.
F. USE SCREWS WHEN FASTENING TO METAL FRAMING AND SCRE WS OR NAILS TO WOOD STUDDING.
STAGGER FASTENERS OPPOSITE EACH OTHER ON ADJACENT E NDS AND EDGES, SPACED AS
RECOMMENDED IN “GYPSUM CONSTRUCTION HANDBOOK. ” DO NOT ATTACH TO TOP TRACK ON
PARTITIONS EXTENDING FROM FLOOR TO STRUCTURE ABOVE.
G. ON FIRE RATED ASSEMBLIES, SEAL PENETRATIONS AND MAK E AIR -TIGHT.
H. MAXIMUM TOLERANCE FROM TRUE FLATNESS: 1/8 INCH IN 1 0 FEET IN ANY DIRECTION.
SEALANTS
A. CAULK AROUND ALL WINDOWS, DOORS, VENT OPENINGS, WHERE DIFFERENT MATERIALS MEET, ROOF
OPENINGS, EAVES, SOFFITS, JOINTS, COUNTERTOPS, DOOR FRAMES, ETC. AND AS REQUIRED FOR A
WATERTIGHT CONNECTION. PROVIDE CAULK PER MANUFACTU RERS RECOMMENDATIONS. CAULK TO
BE TREMCO DYMERIC FOR FOOD PROCESSING FACILITIES OR FOOD PREP/FOOD STORAGE AREAS.
CAULK TO BE INSTALLED AFTER FINISH IS APPLIED TO SU RFACES PER MANUFACTURER.
NORTH
No. DATE DESCRIPTION
Page 29 of 35
2024 STRUCRITE, INC. ©
707 N. Grand Ave. - Suite 102
Waukesha, WI 53186
262.549.3222 - www.srdinc.biz
4/23/2026 5:06:15 PM
Cold Noses Feline Facility
N47W26699 Lynndale Rd
Pewaukee, WI
4 NORTHWEST
1 SOUTHWEST
3 NORTHEAST
2 SOUTHEAST
3/32" = 1'-0" 5 SITE - ROOF LEVEL
Page 30 of 35
4/16/2026
C1.01
122 Wisconsin Street, West Bend, WI 53095262.346.7800 www.parishse.com
BID SETCOLD NOSES SANCTUARY LLC.N47W26699 LYNNDALE RD.PEWAUKEE, WI 53072
\SR-63-25\
EXISTINGCONDITIONSPLANWWSEPNKJP
Page 31 of 35
4/16/2026
C1.02
122 Wisconsin Street, West Bend, WI 53095262.346.7800 www.parishse.com
BID SETCOLD NOSES SANCTUARY LLC.N47W26699 LYNNDALE RD.PEWAUKEE, WI 53072
\SR-63-25\
PHASE 1 SITELAYOUTEPNEPNKJP
Page 32 of 35
4/23/2026
C1.03
122 Wisconsin Street, West Bend, WI 53095262.346.7800 www.parishse.com
BID SETCOLD NOSES SANCTUARY LLC.N47W26699 LYNNDALE RD.PEWAUKEE, WI 53072
\SR-63-25\
PHASE 1GRADING ANDEROSIONCONTROLEPNEPNKJP
DIGGERS HOTLINEDial or (800)242-8511www.DiggersHotline.com
Page 33 of 35
DW
DW
GENERAL PLAN NOTES:
1. SEE SHEET A5.0 FOR ALL TYPICAL MOUNTING HEIGHTS AND DOOR CLEARANCES.
2. NOT USED
19' - 2 3/4"
8' - 0"
6
A2.0
CAT HOUSE
MECHANICAL
16' - 7"
1
2
3' - 9 1/4"
3
3
44
5
6
101 102
104
105
FIELD VERIFY
8' - 8" 18' - 0"
5' - 4 3/4"
36' - 1" 16' - 1 1/4"
NOTE :
FIELD VERIFY ALL REQUIRED DMENSIONS
18' - 11 1/2"
78
9
10
GATE
CONCRETE
PAVING
12
13 14
15
A
B
C
D
E
F
1 2 3 4
3' - 6"
HOSE BIBB
17
3' - 6 1/2" 2' - 4 3/8" 19' - 8 3/4"
3' - 6" 4' - 0"
ADJUST SITE GRADING TO RELOCATE CULVERT
ALONG ENTIRE WEST EDGE OF BUILDING
6" CONC PAVING
FIBERMESH OR WWM
6" GRANULAR BASE
GATE
19' - 5 7/8"
16' - 0"
GATE
pitch to floor drain
5 6
18
CATIO 19
pitch to floor drain JOHNSON POCKET DOOR W/ VISION LITE;
MODIFY EXTG WALL AS REQ'D
103
B
AAA A
A
A
A A A
4" CONCRETE SLAB
FIBERMESH OR WWM
ON 6" GRANULAR BASE
6" CONC PAVING
FIBERMESH OR WWM
6" GRANULAR BASE
CJ
CJ
20
106
18
8' - 0 1/4" 8' - 11 1/4" 19' - 0 3/4" 8' - 11 1/4" 7' - 2 3/4"
7' - 7 1/2"
10' - 3 1/2"
11
DS
DS
DS DS
A
B
C
D
E
F
1 2 3 4
16
5 6
DS
DS
8' - 3 1/4"
• ROOFING CONTRACTOR TO INSTALL ALL ROOFING AND INSUL ATION PER
MANUFACTURER'S DETAILS AND SPECIFICATIONS (TYP). P ROVIDE ALL
REQUIRED MATERIALS AND ACCESSORIES FOR A COMPLETE, WATER -
TIGHT SYSTEM.
• ROOFING CONTRACTOR TO PROVIDE AND INSTALL FLASHING FOR ALL
ROOF PENETRATIONS PER ROOFMANUFACTURER'S REQUIREMEN TS.
• ROOF PENETRATIONS TO BE PAINTED TO MATCH ROOF COLOR .
• SEE MECHANICAL DRAWINGS FOR LOCATIONS AND SIZE OF A LL ROOF
PENETRATIONS AND CURBS REQUIRED FOR MECH. EQUIPMENT .
• COORDINATE ALL ROOF OPENINGS AND PENETRATIONS WITH
PLUMBING, MECHANICAL, AND ELECTRICAL CONTRACTORS.
• ROOF -TOP EQUIPMENT NOT SHOWN. SEE MECHANICAL FOR ACTUAL
EQUIPMENT AND LOCATIONS, TYPICAL.
= INDICATES DIRECTION OF ROOF SLOPE; VERIFY AND MAT CH
EXISTING CONDITION
DS = DOWNSPOUT LOCATION
GENERAL ROOF PLAN NOTES:
_:12
ALL DEMOLITION BY GENERAL CONTRACTOR UNLESS OTHERWI SE NOTED.
GENERAL CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. LOCATIONS OF
WALLS, DOORS, AND OTHER ITEMS HAVE BEEN FIELD MEASU RED FOR GENERAL
LAYOUT ONLY. REPORT ANY DISCREPANCIES TO STRUCRITE , INC. FOR
CLARIFICATION PRIOR TO THE START OF WORK.
IF FLOORS, WALLS, OR CEILINGS ARE DAMAGED DURING RE MOVAL, THE
CONTRACTOR RESPONSIBLE SHALL PATCH / REPAIR AS REQU IRED TO MATCH
EXISTING OR NEW MATERIAL SURFACES.
AT ALL REMOVAL WORK, INCLUDING FLOORS, WALLS, DOORS , CEILINGS, ETC.,
PATCH ALL WORK AT REMOVAL & NEW CONNECTION; PAINT AS REQUIRED.
AT MECHANICAL WORK, WHERE REMOVAL OF PIPES, CONDUIT , DUCTWORK, ETC.
HAS LEFT AN OPENING OR HOLD THROUGH THE WALL, FLOOR , OR CEILING; FILL &
PATCH OPENING TO MATCH THE ADJACENT CONSTRUCTION AN D FINISH AS
REQUIRED.
BEFORE COMMENCING WITH DEMOLITION WORK, REVIEW W/ O WNER WHICH ITEMS
ARE TO BE SALVAGED AND TURNED OVER THE OWNER, IN AD DITION TO THOSE
LISTED ON THE PLANS. ANY ITEM NOT WANTED BY THE OW NER SHALL BE
REMOVED FROM THE JOB SITE BY THE GENERAL CONTRACTOR AND DISPOSED OF
IN THE PROPER AND LEGAL MANNER.
SEE MECHANICAL DRAWINGS FOR DESCRIPTION OF REQUIRED MECHANICAL
DEMOLITIONS.
GENERAL DEMOLITION NOTES:
45' -0"
EXIT DISTANCE
LIFE SAFETY GENERAL NOTES:
1. MEANS OF EGRESS ILLUMINATION SHALL BE PROVIDED TO M EET CURRENT CODES.
ELECTRICAL CONTRACTOR RESPONSIBLE FOR DESIGN AND SU BMITTAL TO STATE.
2. AN EXTERIOR LIGHT SHALL BE PROVIDED AT EXIT DOORS A ND BE PROVIDED WITH
EMERGENCY POWER PER CURRENT CODES AND BE INCLUDED IN EGRESS
ILLUMINATION PLANS.
3. FIRE EXTINGUISHERS SHALL BE INSTALLED IN LOCATIONS AS NOTED ON PLANS
BELOW. EXTINGUISHERS ARE TO BE MOUNTED TO ADJACENT WALL OR COLUMN
USING STANDARD MANUFACTURER'S BRACKET OR EQUIVALENT. FOR WALL MOUNT
LOCATIONS ATTACH BRACKET TO STUDS OR BLOCKING ONLY. EXTINGUISHERS TO
MEET CURRENT BUILDING CODE AND NFPA 10.
JOB NUMBER:
DRAWN BY:
SHEET NUMBER:
© 2024 STRUCRITE , INC.
ISSUED DATE:
707 N. Grand Ave. - Suite 102
Waukesha, WI 53186
262.549.3222 - www.srdinc.biz
SHEET TITLE:
REVISIONS
4/23/2026 5:06:06 PM
25160
ks
A1.1
MAIN LEVEL PLAN
04.17.2026
SITE PLAN APPROVAL
Cold Noses Feline Facility
N47W26699 Lynndale Rd
Pewaukee, WI
NORTH 3/8" = 1'-0" 1 1st LEVEL
3/16" = 1'-0" 2 ROOF LEVEL
KEYNOTE LEGEND
KEY # KEYNOTE TEXT
1 REMOVE INTERIOR FINISHES
2 REMOVE EXTERIOR SIDING, WINDOWS & DOORS
3 REMOVE CURB AT DOOR
4 INFILL WINDOW
5 VERIFY INTEGRITY OF FRAMED OPENINGS
6 NEW CEMENT-BD SIDING & EXTERIOR SHEATHING ON EXTG. WALL STUDS
7 REMOVE HYDRANT & DRAIN; INFILL FLOOR
8 3.5" BATT BETWEEN EXTG. STUDS, 1.5" RIGID INSUL BE TWEEN NEW FURRING
9 NEW GYP BD WALLS & CEILING
10 REPLACE ATTIC ACCESS PANEL
11 REPLACE w/ NEW SHINGLE ROOF, GUTTER & DS
12 S.S. SINK/DRAINBOARD
13 WATER HEATER
14 FURNACE
15 PET DOOR BELOW
16 CONTINUOUS RIDGE VENT
17 EPOXY FLOOR FINISH
18 GATE CONTROL MEETS ACCESSIBILITY REQ. FROM EACH S IDE
19 INFILL DOOR
20 COORDINATE DOOR WITH RETURN AIR GRILLE OPENING
3/16" = 1'-0" 3 1st Level - Life Safety Plan
No. DATE DESCRIPTION
Page 34 of 35
ELEVATION GENERAL NOTES:
1. NOT USED
1st LEVEL
100' - 0"
DS DS
1
5
6
RETURN RETAINING WALL
AS REQ FOR GRADES
EXISTING ROOF FRAMING PROPOSED ROOF FRAMING
DS
HORIZ 2x6 & VERT 2x6 PERIMETER,
w/ CEMENT BD. TRIM OVER MESH GATE GATE
3' - 6"
11 11
DS
NOTCH COLUMN
FOR SIDE WALL BEAM
SHINGLES OWENS CORNING -
OAKRIDGE SHINGLE - DRIFTWOOD
LP SMARTSIDE REDWOOD RED
LP SMARTSIDE EXPERT FINISH
TRIM IN SNOWSCAPE WHITE
ENTRY ENCLOSURES TO BE SCREENED
WITH 3/8" SQUARE STAINLESS STEEL WIRE
MESH
1st LEVEL
100' - 0"
DS
HORIZ 2x6 & VERT 2x6 PERIMETER,
CEMENT BD. TRIM OVER MESH
SEE DETAIL 10
ATTACH MESH TO HORIZ 2x6
3' - 6"
1st LEVEL
100' - 0"
ROOF LEVEL
108' - 0"
1
2
3
4
5
6
DS DS
1
7
8
6
HORIZ 2x6 & VERT 2x6 PERIMETER,
w/ CEMENT BD. TRIM OVER MESH.
SEE DETAIL
3' - 6"
7' - 0 1/8"
CUT NEW RAFTERS @ OVERHANG TO MATCH EXISTING FASCIA DEPTH
RETURN RETAINING WALL
AS REQ FOR GRADES
6"
2' - 0"
CATIO TO BE SCREENED WITH 3/8" SQUARE
STAINLESS STEEL WIRE MESH
1st LEVEL
100' - 0"
DS
2x6, 2" ABOVE SLAB
HORIZ 2x6 & VERT 2x6 PERIMETER,
w/ CEMENT BD. TRIM OVER MESH
-SEE DETAIL
DS DS
9
6' - 6" 6' - 7 1/2" 6' - 6"
S1.0
10
3' - 6"
S1.0
9
S1.0
8
CAT DOOR
7' - 0"
1' - 4 5/8"
6' - 3"
1' - 0"
ENTRY ENCLOSURE TO BE SCREENED WITH
3/8" SQUARE STAINLESS STEEL WIRE MESH
CATIO TO BE SCREENED WITH 3/8" SQUARE
STAINLESS STEEL WIRE MESH
EXTG. FLOOR SLAB
EXTG. CMU CURB
EXTG. STUDS 3.5" STUD AT 2x FURRING TO EXISTING
EPOXY FLOOR COATING
SEE ASSEMBLY
R10.4 FOUNDATION INSULATION TO 4 FEET BELOW FINISH FLOOR. PROTECT
WITH CEMENTITIOUS COATING OR CONTINUE SIDING WHERE EXPOSED
GREATER THAN 8" ABOVE GRADE.
FLASHING
1/2" 5 1/2" 5/8"
3 1/2" 2"
2" FURRING & INSUL
@ SIDING
1st LEVEL
100' - 0"
ROOF LEVEL
108' - 0"
VERIFY
7' - 0 5/8" 1' - 0"
12
13
14
JOB NUMBER:
DRAWN BY:
SHEET NUMBER:
© 2024 STRUCRITE , INC.
ISSUED DATE:
707 N. Grand Ave. - Suite 102
Waukesha, WI 53186
262.549.3222 - www.srdinc.biz
SHEET TITLE:
REVISIONS
4/23/2026 5:06:08 PM
25160
ks
A2.0
EXTERIOR ELEVATIONS
04.17.2026
SITE PLAN APPROVAL
Cold Noses Feline Facility
N47W26699 Lynndale Rd
Pewaukee, WI
KEYNOTE LEGEND
KEY # KEYNOTE TEXT
1 REPLACE w/ NEW SHINGLE ROOF, GUTTER & DS
2 VERIFY INTEGRITY OF FRAMED OPENINGS
3 NEW CEMENT-BD SIDING & EXTERIOR SHEATHING ON EXTG. WALL STUDS
4 NEW FOUNDATION INSULATION ON ALL CMU; FURRING & SI DING ABOVE MTL
FLASHING AT 8" ABOVE GRADE
5 EXTEND ROOF OVER DECK & ENTRANCE STOOP
6 VERIFY CONDITION OF FRAMING & SHEATHING
7 CONTINUOUS RIDGE VENT
8 STEP FLASHING & CONTINUE SIDING BELOW
9 INFILL WINDOW
10 INFILL DOOR
11 2x4 WALL, EAVE TO VESTIBULE ROOF
12 COORDINATE DOOR WITH RETURN AIR GRILLE OPENING
13 PASS-THRU WINDOW
14 LP CLOSED VENTED SOFFIT w/ BAFFLES IN EVERY CAVIT Y
1/4" = 1'-0" 1 WEST ELEVATION
1/4" = 1'-0" 2 SOUTH ELEVATION
1/4" = 1'-0" 3 EAST ELEVATION
1/4" = 1'-0" 4 NORTH ELEVATION
1 1/2" = 1'-0" 5 WALL DETAIL
3/8" = 1'-0" 6 SECTION E-W
No. DATE DESCRIPTION
Page 35 of 35
Source: City of Pewaukee website. First collected Oct 7, 2026.