Common Council Meeting - Third Monday — Agenda Packet
City of Pewaukee · Waukesha County · Common Council · meeting of May 18, 2026 · Agenda packets
Open the original document More from City of Pewaukee
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Office of the Clerk/Treasurer
W240 N3065 Pewaukee Road
Pewaukee WI 53072
Phone: 262-691-0770
COMMON COUNCIL
MEETING NOTICE AND AGENDA
Monday, May 18, 2026
6:30 PM
Pewaukee City Hall Common Council Chambers
W240N3065 Pewaukee Road, Pewaukee, WI
1. Call to Order and Pledge of Allegiance
2. Public Hearing
2.1 PUBLIC HEARING, Discussion, and Possible Action Regarding Greenhill/Yench Road
Reconstruction Project [Wagner]
1. Approve Preliminary Resolution 26-05-12 Declaring Intent to Exercise Special Assessment
Powers Authorizing the Construction of Greenhill/Yench Area Rehabilitation, Drainage,
Utility and Related Facilities.
2. Approve Resolution 26-05-13 Declaring Official Intent to Reimburse Expenditures
Greenhill/Yench Rehabilitation, Drainage Improvements, and Miscellaneous Improvements.
3. Accept the Preliminary Engineers Report
4. Award the Contract to the Lowest Qualified Bidder, Musson Brothers, Inc., in the Amount of
$774,412.50.
3. Public Comment - Please limit your comments to two minutes. If further time for discussion is needed,
please contact your District Alderperson prior to the meeting.
4. Consent Agenda
4.1 Approve the Appointment of Doug Brahm to the Fire Commission - Term Ending 5/1/2031
(Replacing Lloyd Bertram) [Chief Bierce]
4.2 Approval of the Accounts Payable Listing Submitted May 18, 2026 [Tarczewski]
5. Public Comment - Please limit your comments to two minutes. If further time for discussion is needed,
please contact your District Alderperson prior to the meeting.
6. Adjournment
Kelly Tarczewski
Clerk/Treasurer
May 14, 2026
NOTICE
It is possible that members of other governmental bodies of the municipality may be in attendance to gather information that may form a
quorum at the above stated meeting. No action will be taken by any governmental body other than the governmental body specifically referred
to above in this notice.
Any person who has a qualifying disability under the Americans with Disabilities Act that requires the meeting or materials at the meeting to be
in an accessible format must contact the Clerk/Treasurer, Kelly Tarczewski, at (262) 691-0770 three business days prior to the meeting so that
arrangements may be made to accommodate your request.
Page 1 of 68
Page 2 of 68
City of Pewaukee - New Agenda Item
Agenda Language:
PUBLIC HEARING, Discussion, and Possible Action Regarding Greenhill/Yench Road
Reconstruction Project [Wagner]
2. Approve Preliminary Resolution 26-05-XX Declaring Intent to Exercise Special
Assessment Powers Authorizing the Construction of Greenhill/Yench Area
Rehabilitation, Drainage, Utility and Related Facilities.
3. Approve Resolution 26-05-XX Declaring Official Intent to Reimburse Expenditures
Greenhill/Yench Rehabilitation, Drainage Improvements, and Miscellaneous
Improvements.
4. Accept the Preliminary Engineers Report
5. Award the Contract to the Lowest Qualified Bidder, Musson Brothers, Inc., in the
Amount of $774,412.50.
Sub Item Agenda Language:
Background Provided By:
Magdelene Wagner
Background:
In 2024 and as part of the 2026 budget, the Common Council authorized the road
rehabilitation project for Greenhill/Yench Area.
This road reconstruction includes Greenhill Court, Greenhill Drive, and Yench Road
(STH 16 to Lynndale Road (CTH JK)). The PASER rating of all these roads is a 2.
Recall that PASER ratings are rated from 1 to 10 with 10 being a newly paved road.
Included in the packet are a few pictures of the roadway.
The project consists of removing all the existing asphalt and stone base, repair any
unstable subgrade, place new stone base, place new asphalt, culvert replacement, and
ditch regrading. A new curb and gutter will be placed on the East side of Yench Road
from Lyndale Road to Greenhill Drive due to the steep grade of the roadway and
preservation of the trees along the route. New storm sewer will be placed to
accommodate the new curb and gutter which will outlet to the existing ditches along
Yench Road and Greenhill Drive.
The project public information meeting, held on March 12, 2026 at City Hall, was well
attended by the residents.
The project was publicly bid in accordance with all State regulations. The project had
one bidder. Musson Brothers, Inc was the sole bid at $774,412.50. While we only
received one bid, the bid is in alignment with the anticipated cost for the project. We
have worked with them in the past and have no objections to awarding this contract to
Page 3 of 68
the sole bidder. See attached bid summary.
Since 1984, the City has assessed road projects and curb extensions to the benefited
properties with their address or driveway on the roadway being paved. The road and
curb assessments are capped for all residential properties at the rate of $3,411 (2026)
and $1,079 (2026) each for lowland/conservancy lots.
Assessments are allowed to be calculated one of three ways: front footage, acreage, or
unit. The analysis was completed using all three methods and it was determined the
unit was the most fair and equitable for the assessment district. With the cul-de-sacs
and corner lots, the differences in the front footage do not equitably distribute the cost.
There are several properties with significant acreages with only one residential home
so it also did not equitably distribute the cost. The unit appeared to be the most fair and
equitable since all properties within the assessment district have one home, are
expected to have the same use on the system, and are zoned similarly. This method
was selected for the assessing method.
Due to some of the lots being larger and could potentially subdivide, we included
deferred assessments for some properties. The deferred assessments will only
become active if the lot further subdivides within 5 years of the final assessment
resolution. The deferred assessment rate is not capped.
The project will be funded in part by the Local Road Improvement Program (LRIP).
LRIP funds total $30,934.31 and are allocated to the road construction costs reducing
the amount assessed to the property owners.
The preliminary Engineers Report was complied using the bids and assessment notices
were mailed to the affected properties. The road assessment is $14,154.58 per unit
which is capped at $3,411 per unit (24% of the cost). There is one lot zoned lowland
conservancy which has a cap of $1,079 per unit (7.6% of the cost). The installation of a
new curb along the East side of Yench Road is also assessed at 50% of the cost. The
other 50% of the cost is allocated to the Storm Water Utility. The curb assessment is
$5,077.02 per unit which is capped at $3,411 per unit (67% of the cost).
The City of Pewaukee allows assessments to be paid over 10 years with any unpaid
balance accruing simple, annual interest. The assessments will be finalized after the
project is complete and closed out. As which time the final resolution would be passed
by the Council levying the final assessment values. Properties will have the option to
pay the assessment in full (avoiding all interest charges) by October 31st of the year the
final resolution is sent to the affected parcels, or it will automatically begin a 10-year
payment plan which is a special charge on the annual tax bill and interest accrues on
any unpaid balance. Interest rate will be determined by the 2026 borrowing.
Access will be maintained, but residents should expect delays during the construction.
Driveways will be ramped for access. When curbs are constructed at driveways or
culverts replaced, the contractor will work with the resident for access. Any driveway
Page 4 of 68
removal will be replaced in kind (Concrete = concrete; asphalt = asphalt). Access will
be maintained unless otherwise coordinated with the homeowner. Any impediments
(landscaping, sprinkler systems, dog fences, etc.) within the City's right of way will need
to be marked or removed prior to construction.
Fiscal Impact:
The total cost of the project is the construction cost, engineering, administration, and
contingency. The construction cost is estimated at $774,412,50. The engineering,
administration, and contingency is estimated at $232,323.75. The total estimated cost
of the project is $1,006,736.25 and is split into the following budgets.
City: The project cost allocated to the City is $639,581.28. The curb project costs
allocated to the City is $20,308.08. The total allocated to the City is $659,889.36. The
2026 Budget allocated is $1,050,000.
Storm Water Utility: The project cost allocated to the SWU is $346,846.89. The 2026
Budget allocated is $500,000.
Recommended Motion:
Council approve the preliminary engineers report and award the Greenhill/Yench Road
Reconstruction project to the lowest qualified bidder, Musson Brothers, Inc., in the
amount of $774,412.50.
Page 5 of 68
Page 6 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Preliminary Report of the Engineer
On the Proposed Greenhill Court, Greenhill Drive, and Yench Road
Curb Installation and Pavement Reconstruction Assessments
In the City of Pewaukee
In accordance with the resolution passed by the Common Council of the City of Pewaukee, we
herewith submit our report on assessments for the reconstruction of Greenhill Court, Greenhill
Drive, and Yench Road, curb installation along Yench Road, drainage improvements along
Greenhill Court, Greenhill Drive, and Yench Road to be made in the City of Pewaukee. All data
shown here is based on bid prices.
The report consists of the following Schedules:
Schedule “A”: Summary of options for assessments and related costs.
Schedule “B”: Legal descriptions, dated January and March 2026, and map, dated March
2026, of all parcels within the assessment districts.
Schedule “C”: Estimated assessment for each parcel affected.
The properties against which the assessments are proposed are benefited and the improvements
constitute an exercise of Police Powers.
Magdelene J. Wagner, P.E.
Director of Public Works
City of Pewaukee
W240N3065 Pewaukee Road
Pewaukee, WI 53072
May 18, 2026
Prepared by:
Brian G. Leightner, P.E.
Civil Engineer
April 28, 2026
Page 7 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Schedule “A” – Greenhill Court, Greenhill Drive, and Yench Road
The City of Pewaukee is considering the pavement reconstruction of Greenhill Court, Greenhill
Drive, and Yench Road. The improvements consist of road reconstruction, curb installation,
drainage installation and repair, and related facilities.
The project will be funded in part by the Local Roads Improvement Program (LRIP). Federal
funds received from this program total $30,934.31. This federal funding will be allocated to the
road construction costs.
The costs of road improvements will be apportioned to all property owners abutting the street
with direct or indirect access. The costs of the road improvements will first be reduced by the
LRIP funds. The City of Pewaukee caps the road assessments to agricultural, single-family,
duplex residential, and residential condominium properties, excluding deferred assessments in
the event of future lot subdivisions. Properties with uses limited by the floodplain district have an
additional reduced assessment cap. All other properties shall pay the full road assessment.
Fifty percent of the curb installation costs for the usable curb along Yench Road will be
apportioned to all property owners abutting that curb. The City of Pewaukee caps these separate
curb assessments to single-family, duplex residential, and residential condominium properties.
All other properties shall pay the full curb assessment.
Drainage improvements and fifty percent of the curb installation costs for the usable curb along
Yench Road will be paid by the Storm Water Management Utility.
It is recommended that the costs for improvements in Greenhill Court, Greenhill Drive, and
Yench Road be determined on a unit basis.
Page 8 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
UNIT RATE COMPUTATIONS
Road Reconstruction Unit Rate – Greenhill Court, Greenhill Drive, and Yench Road
Estimated Assessable Road Construction Costs (see attached breakdown) $ 491,985.60
Engineering, Administration, & Contingencies $ 147,595.68
Total Estimated Road Reconstruction Costs $ 639,581.28
Local Roads Improvement Program Grant Funding (Deduct) $ (30,934.31)
Total Estimated Road Reconstruction Assessable Costs $ 608,646.97
$ 608,646.97
43 units = $ 14,154.58/unit
Use $ 14,154.58/unit as the Road Reconstruction Unit Rate
1.
Curb Installation Unit Rate – Yench Road
Estimated Assessable Curb Construction Costs (see attached breakdown) $ 15,621.60
Engineering, Administration, & Contingencies $ 4,686.48
Total Estimated Assessable Curb Construction Costs $ 20,308.08
$ 20,308.08
4 units = $ 5,077.02/unit
Use $ 5,077.02/unit as the Curb Installation Unit Rate
1.
Storm Water Management – Greenhill Court, Greenhill Drive, and Yench Road
Estimated Storm Water Utility Costs (see attached breakdown) $ 266,805.30
Engineering, Administration, & Contingencies $ 80,041.59
Total Estimated Storm Water Utility Costs $ 346,846.89
1 A maximum amount of $ 3,411.00 (2026 Pavement Cap) will be assessed to agricultural, single-family, duplex
residential, and residential condominium properties. A maximum amount of $ 1,079.00 (2026 Pavement Cap) will be
assessed to properties with uses limited by the floodplain district.
Page 9 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
COST SUMMARY
Cost Summary
Total Project Costs $ 1,006,736.25
Local Roads Improvement Program Grant Funding (Deduct) $ (30,934.31)
Total Assessable Road Costs (Deduct) $ (72,710.00)
Total Assessable Curb Costs (Deduct) $ (13,644.00)
Total Deferred Assessable Road Costs (Deduct) $ (297,246.18)
Total Storm Water Utility Costs (Deduct) $ (346,846.89)
Net Non-Assessable & City Costs (Deduct) $ 245,354.87
Page 10 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Computation of Costs
Total Estimated Reconstruction Project Costs
Item
No. Description
Estimated
Quantity Unit
Unit Bid
Price
Total Bid
Price
1 Inlet Protection, Complete 1 EACH $ 55.00 $ 55.00
2 Silt Fence, Complete 800 LF $ 2.00 $ 1,600.00
3 Ditch Checks, Complete 80 EACH $ 45.00 $ 3,600.00
4 Culvert Pipe Checks, Complete 18 EACH $ 14.00 $ 252.00
5 Temporary Traffic Control,
Complete
1 LS $ 3,950.00 $ 3,950.00
6 Sawing Asphalt Full Depth,
Complete
450 LF $ 4.00 $ 1,800.00
7 Sawing Concrete Full Depth,
Complete
30 LF $ 8.00 $ 240.00
8 Concrete Curb & Gutter, 30-
Inch, Mountable, Complete
850 LF $ 31.00 $ 26,350.00
9 Concrete Driveway, 6-Inch,
Complete
650 SF $ 14.00 $ 9,100.00
10 Geogrid Reinforcement, Tensar
HX 165, Complete
4380 SY $ 3.40 $ 14,892.00
11 Turf Reinforcement Mat,
Complete
60 SY $ 22.00 $ 1,320.00
12 Site Clearing and Grubbing,
Complete
1 LS $ 6,500.00 $ 6,500.00
13 Earthwork, Unclassified
Excavation, Complete
1 LS $238,000.00 $ 238,000.00
14 Earthwork, Excavation Below
Subgrade, Complete
1460 CY $ 20.50 $ 29,930.00
15 Crushed Aggregate Base Course,
Shoulder, Gradation No. 3, 3.5-
Inch Thick, Complete
1800 SY $ 11.50 $ 20,700.00
16 Crushed Aggregate Base Course,
Gradation No. 4, 10-Inch Thick,
Complete
10950 SY $ 8.20 $ 89,790.00
17 Asphaltic Concrete Binder
Pavement, 3 LT 58-28 S, 3.25-
Inch Thick, Complete
8635 SY $ 12.50 $ 107,937.50
18 Asphaltic Concrete Surface
Pavement, 5 LT 58-28 S, 1.75-
Inch Thick, Complete
8635 SY $ 8.20 $ 70,807.00
19 Asphaltic Concrete Driveways, 5
LT 58-28 S, 3-Inch Thick,
Complete
625 SY $ 35.00 $ 21,875.00
Page 11 of 68
Total Estimated Reconstruction Project Costs – Continued
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Item
No. Description
Estimated
Quantity Unit
Unit Bid
Price
Total Bid
Price
20 Landscaping Imported
Pulverized Topsoil, Fertilize,
Seed, and Temporary Erosion
Control Blanket, Complete
6400 SY $ 7.80 $ 49,920.00
21 Storm Manhole Inlet, Type A
48-Inch, Complete
4 VF $ 975.00 $ 3,900.00
22 Reinforced Concrete Pipe, 30-
Inch, Complete
82 LF $ 169.00 $ 13,858.00
23 Apron Endwall, RCP, 30-Inch,
Complete
1 EACH $ 1,980.00 $ 1,980.00
24 Corrugated Metal Pipe, 12-Inch,
Complete
29 LF $ 36.50 $ 1,058.50
25 Corrugated Metal Pipe, 15-Inch,
Complete
58 LF $ 20.50 $ 1,189.00
26 Apron Endwall, CMP, 12-Inch,
Complete
2 EACH $ 312.00 $ 624.00
27 Apron Endwall, CMP, 15-Inch,
Complete
4 EACH $ 433.00 $ 1,732.00
28 Corrugated Metal Arch Pipe, 17-
Inch × 13-Inch, Complete
282 LF $ 62.00 $ 17,484.00
29 Corrugated Metal Arch Pipe, 21-
Inch × 15-Inch, Complete
55 LF $ 46.50 $ 2,557.50
30 Corrugated Metal Arch Pipe, 35-
Inch × 24-Inch, Complete
33 LF $ 76.00 $ 2,508.00
31 Apron Endwall, CMP, 17-Inch ×
13-Inch, Complete
20 EACH $ 354.00 $ 7,080.00
32 Apron Endwall, CMP, 21-Inch ×
15-Inch, Complete
4 EACH $ 407.00 $ 1,628.00
33 Apron Endwall, CMP, 35-Inch ×
24-Inch, Complete
2 EACH $ 590.00 $ 1,180.00
34 Apron Endwall, RCP, 14-Inch ×
23-Inch, Complete
2 EACH $ 1,080.00 $ 2,160.00
35 Apron Endwall, RCP, 19-Inch ×
30-Inch, Complete
2 EACH $ 1,300.00 $ 2,600.00
36 RCPE 14-Inch × 23-Inch,
Complete
40 LF $ 146.00 $ 5,840.00
37 RCPE 19-Inch × 30-Inch,
Complete
51 LF $ 165.00 $ 8,415.00
Subtotal of Contract $ 774,412.50
Engineering, Administration, & Contingencies $ 232,323.75
Total Project Costs $1,006,736.25
Total Project Costs = $ 1,006,736.25
Page 12 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Total Estimated Road Reconstruction & Assessable Costs
Item
No. Description
Estimated
Quantity Unit
Unit Bid
Price
Total Bid
Price
2 Silt Fence, Complete 800 LF $ 2.00 $ 1,600.00
3 Ditch Checks, Complete 40 EACH $ 45.00 $ 1,800.00
5 Temporary Traffic Control,
Complete
0.64 LS $ 3,950.00 $ 2,528.00
6 Sawing Asphalt Full Depth,
Complete
450 LF $ 4.00 $ 1,800.00
7 Sawing Concrete Full Depth,
Complete
30 LF $ 8.00 $ 240.00
9 Concrete Driveway, 6-Inch,
Complete
650 SF $ 14.00 $ 9,100.00
10 Geogrid Reinforcement, Tensar
HX 165, Complete
4380 SY $ 3.40 $ 14,892.00
12 Site Clearing and Grubbing,
Complete
0.3 LS $ 6,500.00 $ 1,950.00
13 Earthwork, Unclassified
Excavation, Complete
0.55 LS $238,000.00 $130,900.00
14 Earthwork, Excavation Below
Subgrade, Complete
1460 CY $ 20.50 $ 29,930.00
15 Crushed Aggregate Base Course,
Shoulder, Gradation No. 3, 3.5-
Inch Thick, Complete
1800 SY $ 11.50 $ 20,700.00
16 Crushed Aggregate Base Course,
Gradation No. 4, 10-Inch Thick,
Complete
8650.5 SY $ 8.20 $ 70,934.10
17 Asphaltic Concrete Binder
Pavement, 3 LT 58-28 S, 3.25-
Inch Thick, Complete
8635 SY $ 12.50 $107,937.50
18 Asphaltic Concrete Surface
Pavement, 5 LT 58-28 S, 1.75-
Inch Thick, Complete
8635 SY $ 8.20 $ 70,807.00
19 Asphaltic Concrete Driveways, 5
LT 58-28 S, 3-Inch Thick,
Complete
625 SY $ 35.00 $ 21,875.00
20 Landscaping Imported Pulverized
Topsoil, Fertilize, Seed, and
Temporary Erosion Control
Blanket, Complete
640 SY $ 7.80 $ 4,992.00
Subtotal of Contract $491,985.60
Engineering, Administration, & Contingencies $147,595.68
Total Project Costs $639,581.28
Local Roads Improvement Program Grant Funding (Deduct) $(30,934.31)
Total Estimated Road Reconstruction Assessable Costs $608,646.97
Page 13 of 68
Total Estimated Road Reconstruction & Assessable Costs – Continued
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Total Estimated Road Reconstruction & Assessable Costs = $ 608,646.97
Total Units abutting the Road = 43 units
1.
Computation of Unit Cost:
$ 608,646.97
43 units = $ 14,154.58/unit
Use $ 14,154.58/unit as the Road Reconstruction Unit Rate
2.
1 Includes potential future units in deferred assessments.
2 A maximum amount of $ 3,411.00 (2026 Pavement Cap) will be assessed to agricultural, single-family, duplex
residential, and residential condominium properties. A maximum amount of $ 1,079.00 (2026 Pavement Cap) will be
assessed to properties with uses limited by the floodplain district.
Page 14 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Total Estimated Yench Road Curb Installation & Assessable Costs
Item
No. Description
Estimated
Quantity Unit
Unit Bid
Price
Total Bid
Price
3 Ditch Checks, Complete 4 EACH $ 45.00 $ 180.00
5 Temporary Traffic Control,
Complete
0.02 LS $ 3,950.00 $ 79.00
8 Concrete Curb & Gutter, 30-Inch,
Mountable, Complete
348.5 LF $ 31.00 $10,803.50
11 Turf Reinforcement Mat, Complete 6 SY $ 22.00 $ 132.00
12 Site Clearing and Grubbing,
Complete
0.1 LS $ 6,500.00 $ 650.00
13 Earthwork, Unclassified
Excavation, Complete
0.01 LS $238,000.00 $ 2,380.00
16 Crushed Aggregate Base Course,
Gradation No. 4, 10-Inch Thick,
Complete
109.5 SY $ 8.20 $ 897.90
20 Landscaping Imported Pulverized
Topsoil, Fertilize, Seed, and
Temporary Erosion Control
Blanket, Complete
64 SY $ 7.80 $ 499.20
Subtotal of Contract $15,621.60
Engineering, Administration, & Contingencies $ 4,686.48
Total Project Costs $20,308.08
Total Estimated Yench Road Curb Installation & Assessable Costs = $ 20,308.08
Total Units abutting the Yench Road Curb = 4 units
Computation of Unit Cost:
$ 20,308.08
4 units = $ 5,077.02/unit
Use $ 5,077.02/unit as the Yench Road Curb Installation Unit Rate
1.
1 A maximum amount of $ 3,411.00 (2026 Pavement Cap) will be assessed to single-family, duplex residential, and
residential condominium properties.
Page 15 of 68
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Total Estimated Storm Water Utility Costs
Item
No. Description
Estimated
Quantity Unit
Unit Bid
Price
Total Bid
Price
1 Inlet Protection, Complete 1 EACH $ 55.00 $ 55.00
3 Ditch Checks, Complete 36 EACH $ 45.00 $ 1,620.00
4 Culvert Pipe Checks, Complete 18 EACH $ 14.00 $ 252.00
5 Temporary Traffic Control,
Complete
0.34 LS $ 3,950.00 $ 1,343.00
8 Concrete Curb & Gutter, 30-Inch,
Mountable, Complete
501.5 LF $ 31.00 $ 15,546.50
11 Turf Reinforcement Mat,
Complete
54 SY $ 22.00 $ 1,188.00
12 Site Clearing and Grubbing,
Complete
0.6 LS $ 6,500.00 $ 3,900.00
13 Earthwork, Unclassified
Excavation, Complete
0.44 LS $238,000.00 $104,720.00
16 Crushed Aggregate Base Course,
Gradation No. 4, 10-Inch Thick,
Complete
2190 SY $ 8.20 $ 17,958.00
20 Landscaping Imported Pulverized
Topsoil, Fertilize, Seed, and
Temporary Erosion Control
Blanket, Complete
5696 SY $ 7.80 $ 44,428.80
21 Storm Manhole Inlet, Type A 48-
Inch, Complete
4 VF $ 975.00 $ 3,900.00
22 Reinforced Concrete Pipe, 30-
Inch, Complete
82 LF $ 169.00 $ 13,858.00
23 Apron Endwall, RCP, 30-Inch,
Complete
1 EACH $ 1,980.00 $ 1,980.00
24 Corrugated Metal Pipe, 12-Inch,
Complete
29 LF $ 36.50 $ 1,058.50
25 Corrugated Metal Pipe, 15-Inch,
Complete
58 LF $ 20.50 $ 1,189.00
26 Apron Endwall, CMP, 12-Inch,
Complete
2 EACH $ 312.00 $ 624.00
27 Apron Endwall, CMP, 15-Inch,
Complete
4 EACH $ 433.00 $ 1,732.00
28 Corrugated Metal Arch Pipe, 17-
Inch × 13-Inch, Complete
282 LF $ 62.00 $ 17,484.00
29 Corrugated Metal Arch Pipe, 21-
Inch × 15-Inch, Complete
55 LF $ 46.50 $ 2,557.50
30 Corrugated Metal Arch Pipe, 35-
Inch × 24-Inch, Complete
33 LF $ 76.00 $ 2,508.00
31 Apron Endwall, CMP, 17-Inch ×
13-Inch, Complete
20 EACH $ 354.00 $ 7,080.00
Page 16 of 68
Total Estimated Road Reconstruction & Assessable Costs – Continued
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill Preliminary Report Schedule A.docx
Item
No. Description
Estimated
Quantity Unit
Unit Bid
Price
Total Bid
Price
32 Apron Endwall, CMP, 21-Inch ×
15-Inch, Complete
4 EACH $ 407.00 $ 1,628.00
33 Apron Endwall, CMP, 35-Inch ×
24-Inch, Complete
2 EACH $ 590.00 $ 1,180.00
34 Apron Endwall, RCP, 14-Inch ×
23-Inch, Complete
2 EACH $ 1,080.00 $ 2,160.00
35 Apron Endwall, RCP, 19-Inch ×
30-Inch, Complete
2 EACH $ 1,300.00 $ 2,600.00
36 RCPE 14-Inch × 23-Inch,
Complete
40 LF $ 146.00 $ 5,840.00
37 RCPE 19-Inch × 30-Inch,
Complete
51 LF $ 165.00 $ 8,415.00
Subtotal of Contract $266,805.30
Engineering, Administration, & Contingencies $ 80,041.59
Total Project Costs $346,846.89
Total Estimated Storm Water Utility Costs = $ 346,846.89
Page 17 of 68
Page 18 of 68
Page 19 of 68
LEGEND
WAUKESHA COUNTY, WISCONSINCITY OF PEWAUKEEROAD ASSESSMENT & CURB ASSESSMENTGREENHILL DRIVE, GREENHILL COURT & YENCH ROADROAD RECONSTRUCTIONRD-26-57563
DATE: MARCH 31, 2026
LYNNDALE ROAD
S.T.H. "16"
YENCH ROADYENCH ROAD
GREENHILL
GREENHILL
S.T.H. "16"
DRIVE
COURT
TOWN OF LISBONCITY OF PEWAUKEE
LEGENDROAD & CURB ASSESSMENTAREA BOUNDARYAREA BOUNDARYROAD ASSESSMENT
Page 20 of 68
May 18, 2026
PREPARED April 28, 2026
SCHEDULE C
PRELIMINARY ASSESSMENT ROLL
GREENHILL DRIVE, GREENHILL COURT, YENCH ROAD
RD-26-57563
CITY OF PEWAUKEE
NO. OWNER'S NAME AND ADDRESS TAX KEY NO. DESCRIPTION UNIT COST/UNIT ASSESSMENT ASSESSMENT CAP
1 RUEBEN N KUGEL PWC 0885001 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 6,822.00$
NANCY G KUGEL Curb Installation 1 5,077.02$ 5,077.02$ 3,411.00$
W272N4792 YENCH RD
PEWAUKEE WI 53072
2 STEVEN D JACOBS PWC 0885002 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 6,822.00$
CONNIE M JACOBS Curb Installation 1 5,077.02$ 5,077.02$ 3,411.00$
W272N4787 YENCH RD
PEWAUKEE WI 53072
3 EDWARD A HENNING PWC 0885003 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 6,822.00$
ABBY A HENNING Curb Installation 1 5,077.02$ 5,077.02$ 3,411.00$
W272N4748 YENCH RD
PEWAUKEE WI 53072-1826
4 JOSEPH S WARTZENLUFT PWC 0885004 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 6,822.00$
ELIZABETH A WARTZENLUFT Curb Installation 1 5,077.02$ 5,077.02$ 3,411.00$
N47W27215 GREENHILL DR
PEWAUKEE WI 53072
5 DONALD J DORFF PWC 0885005 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
ANGELA DORFF
N47W27181 GREENHILL DR
PEWAUKEE WI 53072
6 JAMES D SCHUMACHER PWC 0885006 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
MELISSA L SCHUMACHER
N47W27143 GREENHILL DR
PEWAUKEE WI 53072
7 DAVID S STROMBERG PWC 0885007 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
STEPHANIE C STROMBERG Road Reconstruction - Deferred 1 14,154.58$ 14,154.58$ 14,154.58$ D
N47W27115 GREENHILL CT
PEWAUKEE WI 53072
8 AARON FRANK PWC 0885008 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
MELISSA FRANK
W271N4717 GREENHILL CT
PEWAUKEE WI 53072-1845
9 WADE B BAKER PWC 0885009 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
SHANNON E BAKER
W271N4780 GREENHILL CT
PEWAUKEE WI 53072-1845
TOTAL ASSESSMENT
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill-Yench Preliminary Assessment Roll Page 1 of 3
Page 21 of 68
May 18, 2026
PREPARED April 28, 2026
SCHEDULE C
PRELIMINARY ASSESSMENT ROLL
GREENHILL DRIVE, GREENHILL COURT, YENCH ROAD
RD-26-57563
CITY OF PEWAUKEE
NO. OWNER'S NAME AND ADDRESS TAX KEY NO. DESCRIPTION UNIT COST/UNIT ASSESSMENT ASSESSMENT CAP TOTAL ASSESSMENT
10 ROBERT VOLZ PWC 0885010 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
2712 N PARK DR
MILWAUKEE WI 53222-4037
11 JOHN K BROWN PWC 0885011 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
DEBRA M BROWN
N47W27100 GREENHILL CT
PEWAUKEE WI 53072-1841
12 RYAN NELSON PWC 0885012 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
ELISE NELSON Road Reconstruction - Deferred 1 14,154.58$ 14,154.58$ 14,154.58$ D
N47W27080 GREENHILL CT
PEWAUKEE WI 53072-1841
13 DAVID BARISAS PWC 0885013 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
DIANE BARISAS
N47W27030 GREENHILL DR
PEWAUKEE WI 53072
14 CATHERINE E STEINER PWC 0885014 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
N47W27010 GREENHILL DR
PEWAUKEE WI 53072
15 JOAN WINTERSBERGER TRUST PWC 0885015 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
W272N4642 YENCH RD
PEWAUKEE WI 53072
16 RICE LIVING TRUST PWC 0885996003 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
W272N4791 YENCH RD
PEWAUKEE WI 53072-1825
17 YENCH LLC PWC 0885996006 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
3055 N BROOKFIELD RD Road Reconstruction - Deferred 16 14,154.58$ 226,473.28$ 226,473.28$ D
BROOKFIELD WI 53045-3336
18 JOAN WINTERSBERGER TRUST PWC 0885998 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
JOAN WINTERSBERGER Road Reconstruction - Deferred 1 14,154.58$ 14,154.58$ 14,154.58$ D
W272N4642 YENCH RD
PEWAUKEE WI 53072
19 JOAN WINTERSBERGER PWC 0885999 Road Reconstruction 1 14,154.58$ 14,154.58$ 1,079.00$ 1,079.00$
SIEGFRIED & JOAN WINTERSBERGER TRUST
W272N4642 YENCH RD
PEWAUKEE WI 53072
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill-Yench Preliminary Assessment Roll Page 2 of 3
Page 22 of 68
May 18, 2026
PREPARED April 28, 2026
SCHEDULE C
PRELIMINARY ASSESSMENT ROLL
GREENHILL DRIVE, GREENHILL COURT, YENCH ROAD
RD-26-57563
CITY OF PEWAUKEE
NO. OWNER'S NAME AND ADDRESS TAX KEY NO. DESCRIPTION UNIT COST/UNIT ASSESSMENT ASSESSMENT CAP TOTAL ASSESSMENT
20 TROY HENDRICKS PWC 0885999001 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
LAUREN HENDRICKS Road Reconstruction - Deferred 1 14,154.58$ 14,154.58$ 14,154.58$ D
N47W27044 GREENHILL DR
PEWAUKEE WI 53072-1836
21 DUANE & DARLENE STRONG TRUST PWC 0885999002 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
N47W27152 GREENHILL DR Road Reconstruction - Deferred 1 14,154.58$ 14,154.58$ 14,154.58$ D
PEWAUKEE WI 53072
22 THOMAS P FALSETTI PWC 0885999004 Road Reconstruction 1 14,154.58$ 14,154.58$ 3,411.00$ 3,411.00$
JUDITH T FALSETTI
N47W27184 GREENHILL DR
PEWAUKEE WI 53072
TOTAL IN AID OF ROAD RECONSTRUCTION 22 72,710.00$
TOTAL IN AID OF CURB INSTALLATION 4 13,644.00$
TOTAL IN AID OF ROAD RECONSTRUCTION - DEFERRED 21 297,246.18$ D
D - Deferred Assessment. Assessment is activated by further development (CSM, plat, rezoning, etc.). Actual assessment will be based on development.
The properties against which contributions in aid of construction are proposed are benefited and the improvements constitute an exercise in Police Powers.
P:\City\Road Construction Projects\2026.006.E_Greenhill Subd\Assessments\Preliminary\Greenhill-Yench Preliminary Assessment Roll Page 3 of 3
Page 23 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
CATHERINE E STEINER
N47W27010 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 24 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JAMES D SCHUMACHER
N47W27143 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 25 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
DAVID BARISAS
N47W27030 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 26 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
STEVEN D JACOBS
W272N4787 YENCH RD
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 27 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JOAN WINTERSBERGER TRUST
W272N4642 YENCH RD
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 28 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
THOMAS P FALSETTI
N47W27184 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 29 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
DONALD J DORFF
N47W27181 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 30 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
TROY HENDRICKS
N47W27044 GREENHILL DR
PEWAUKEE WI 53072-1836
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 31 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
DUANE & DARLENE STRONG TRUST
N47W27152 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 32 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JOHN K BROWN
N47W27100 GREENHILL CT
PEWAUKEE WI 53072-1841
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 33 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
WADE B BAKER
W271N4780 GREENHILL CT
PEWAUKEE WI 53072-1845
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 34 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
RYAN NELSON
N47W27080 GREENHILL CT
PEWAUKEE WI 53072-1841
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 35 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JOANNE MARKLUND
N47W27335 LYNNDALE RD
PEWAUKEE WI 53072-1749
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 36 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
RUEBEN N KUGEL
W272N4792 YENCH RD
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 37 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
EDWARD A HENNING
W272N4748 YENCH RD
PEWAUKEE WI 53072-1826
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 38 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JOAN WINTERSBERGER
W272N4642 YENCH RD
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 39 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
ROBERT VOLZ
2712 N PARK DR
MILWAUKEE WI 53222-4037
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 40 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
RICE LIVING TRUST
W272N4791 YENCH RD
PEWAUKEE WI 53072-1825
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 41 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
YENCH LLC
3055 N BROOKFIELD RD
BROOKFIELD WI 53045-3336
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 42 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
AARON FRANK
W271N4717 GREENHILL CT
PEWAUKEE WI 53072-1845
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 43 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JOSEPH S WARTZENLUFT
N47W27215 GREENHILL DR
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 44 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
JOAN WINTERSBERGER TRUST
W272N4642 YENCH RD
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 45 of 68
Magdelene Wagner, P.E., Director of Public Works
Department of Public Works
Engineering Division
W240N3065 Pewaukee Road • Pewaukee, WI 53072
Phone: (262) 691-0804 • Fax: (262) 691-5729
Email: publicworks@pewaukee.wi.us
February 20, 2026
DAVID S STROMBERG
N47W27115 GREENHILL CT
PEWAUKEE WI 53072
Subject: 2026 Greenhill Subdivision Street Improvements
Public Information Meeting
Dear Sir or Madam,
An Open House will be conducted to obtain public comments regarding the 2026 Greenhill Subdivision Street
Improvements project on Thursday, March 12, 2026, from 5:00 p.m. to 6:30 p.m., in the City Hall Common
Council Chambers. The Open House will provide the opportunity for an informal one-on-one discussion with
City Staff regarding the proposed road improvements. No formal presentations will be made during this time.
The project involves the reconstruction of Yench Road, Greenhill Drive and Greenhill Court, culvert
replacements and ditch grading. Extension of sanitary sewer or water main is not planned as a part of this
project.
A draft of the proposed plan will be available at the meeting for discussion of the potential impacts of the
proposed project on adjacent properties. A draft of the preliminary plan will be posted by March 9, 2026, on
the City’s website at https://www.cityofpewaukee.us/700/Greenhill-Subdivision.
Participants are encouraged to make verbal comments and/or submit written comments for consideration by
the Design Team in the preparation of final design plans. Comments must be received by March 13, 2026.
The improvements are planned to occur within the City’s street right-of-way which is 66 feet wide
(approximately 33 feet from the centerline of the road to the property line). If you have any items or
landscaping placed within the right-of-way that may be damaged during the project, please have them
removed. The project is anticipated to begin in early June with completion in early fall.
If you have any questions or are unable to attend the meeting, please feel free to contact me or Magdelene
Wagner, P.E., Director of Public Works, at (262) 691-0804.
Sincerely,
Richard J. Wirtz, P.E., CFM
Chief Engineer-Utilities
Cc: Magdelene Wagner, P.E., Public Works Director
Michaelis Gabbey, P.E., Chief Engineer-Streets and Development
Brian Leightner, P.E., Civil Engineer
Ryan Trzinski, P.E., Robert E. Lee & Assoc., Inc.
Page 46 of 68
Page 47 of 68
Page 48 of 68
Page 49 of 68
Page 50 of 68
Page 51 of 68
Resolution 26-05-12 Greenhill/Yench Road Rehabilitation Comfort Resolution Page 1 of 1
STATE OF WISCONSIN CITY OF PEWAUKEE WAUKESHA COUNTY
RESOLUTION 26-05-12
RESOLUTION DECLARING OFFICIAL INTENT TO REIMBURSE EXPENDITURES
GREENHILL/YENCH REHABILITATION, DRAINAGE IMPROVEMENTS, AND
MISCELLANEOUS IMPROVEMENTS
WHEREAS, the City of Pewaukee, Waukesha County, Wisconsin (the” City”) owns and
operates a roadway system and drainage system, (the “System”) as a public entity; and
WHERAS, the City expects to receive a loan (the “Loan”) to finance the Project and
expects to issue tax-exempt bonds (the “Bonds”) to the Program in evidence of the Loan; and
WHEREAS, it is necessary, desirable, and in the best interests of the city to seek interim
financing to fund project costs until the Loan becomes available and the Bonds can be issued.
Section 1. Expenditure of Funds. The City shall make expenditures as needed from its
funds on hand to pay the costs of the Project until Bond proceeds become available.
Section 2. Declaration of Offici al Intent. The City hereby officially declares its intent to
reimburse said expenditures with proceeds of the Bonds for the Greenhill/Yench Road
Rehabilitation Project.
Section 3. Unavailability of Long-Term F unds. No funds for payment of the Project
from sources other than the Bonds are, or are reasonably expected to be reserved, allocated on a
long-term basis, or otherwise set aside by the City pursuant to its budget or financial policies.
Section 4. Public Availability of Official Intent Resolution. This Resolution shall be
made available for public inspection at the City office within 30 days after its approval in
compliance with applicable State law governing the availability of records of official acts,
including Subchapter II of Chapter 19, and shall remain available for public inspection until the
bonds are issued.
Section 5. Effective Date. This Resolu tion shall be effective upon its adoption and
approval.
Adopted this 18th day of May 2026.
C I T Y O F P E W A U K E E
__________________________
ATTEST: Steve Bierce, Mayor
____________________________
Kelly Tarczewski, Clerk/Treasurer
Page 52 of 68
Resolution 26-05-13 Greenhill/Yench Area Road Reconditioning Pa ge 1 of 2
STATE OF WISCONSIN CITY OF PEWAUKEE WAUKESHA COUNTY
RESOLUTION 26-05-13
PRELIMINARY RESOLUTION
DECLARING INTENT TO EXERCISE SPECIAL ASSESSMENT POWERS
AUTHORIZING THE CONSTRUCTION OF GREENHILL/YENCH AREA
REHABILITATION, DRAINAGE, UTILITY AND RELATED FACILITIES
UNDER SECTION 66.0703, WISCONSIN STATUTES
WHEREAS , The Common Council of the City of Pewaukee has determined that the
pavement within the Greenhill/Yench Area are in need of rehabilitation and drainage
improvements; and
WHEREAS, The Common Council of the City of Pewaukee has determined that all
property owners abutting the roadways within Greenhill/Yench Area project should share in the
cost of such improvements.
NOW, THEREFORE, BE IT HEREBY RESOLVED: That the Common Council of
the City of Pewaukee determines that it is in the best interest of the City and in the exercise of its
police power under Section 66.0703, Wisconsin Statutes, to levy special assessments upon the
following described property for special benefits conferred upon such properties by the
improvements of the pavement reconditioning:
Greenhill Court, from Greenhill Drive north erly to its termini, approximately 512 feet
and;
Greenhill Drive, from Yench Road easterly to its termini, approximately 1,355 feet and;
Yench Road, from Lyndale Road (CTH JK) sout herly to its termini, approximately 1,275
feet and;
Before such improvements are made, the City Engineer is directed to prepare a report consisting
of:
a. Preliminary plans and specifications for said improvements.
b. An estimate of the entire cost of the proposed reconstruction improvements
c. A schedule of the proposed assessment against each affected parcel and a statement
that all property is benefited.
d. The formula for assessing.
The exact amount of the assessment and the method of permitted payments will be determined at
the public hearing, prior to the Final Resolution.
Page 53 of 68
Resolution 26-05-13 Greenhill/Yench Area Road Reconditioning Pa ge 2 of 2
Upon receiving the report of the City Engineer, the Clerk shall publish a Class I notice to be
given stating the nature of the proposed work, the general boundary lines of the proposed
assessment district, a small map and the place and time at which the report can be inspected and
the time of the public hearing for interested parties to appear and comment. The Clerk shall also
mail the notices to the post-office address of every interested party at least 10 days before the
hearing. The public hearing shall be held at the City Hall, W240N3065 Pewaukee Road not less
than 10 and not more than 40 days after such publication.
SEVERABILITY
The several sections of this Resolution shall be declared to be severable. If any section shall be
declared by a decision of a court of competent jurisdiction to be invalid, such decision shall not
affect the validity of the other provisions of the Resolution.
ADOPTED THIS 18th Day of May, 2026.
CITY OF PEWAUKEE
__________________________________
ATTEST: Steve Bierce – Mayor
_________________________________
Kelly Tarczewski – Clerk/Treasurer
Page 54 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
1/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
335.79
51430
52150
EMPLOYEE SERVICES - EMPLOYMENT EXAMS
ADP SCREENING & SELECTION SERVICES
145798
400
05/01/2026
2,100.00
51510
52120
AUDIT SERVICES
BAKER TILLY US LLP
145802*#
400
05/01/2026
272.01
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
BIG JIM'S SMALL ENG SERV
145803
400
05/01/2026
136.08
55200
53480
PARKS - SAFETY EQUIPMENT
BRENNAN BERG
145804
400
05/01/2026
440.00
55300
52190
RECREATION PROGRAM - CONTRACTED
SERVICES
CHERRIE LARSON
145805
400
05/01/2026
109.76
53100
53400
HIGHWAY - OPERATING SUPPLIES
CINTAS
145806*#
400
05/01/2026
50.00
00000
45110
COURT PENALTIES
CITY OF PEWAUKEE
145808
400
05/01/2026
2,569.50
51450
52480
IT - SOFTWARE MAINTENANCE & UPDATES
ELEVITY GORDON FLESCH CO INC
145810
400
05/01/2026
7,422.52
51450
52480
IT - SOFTWARE MAINTENANCE & UPDATES
9,992.02
CHECK 400 145810 TOTAL FOR FUND 100:
5.52
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
ELLIOTTS ACE HARDWARE
145811#
400
05/01/2026
2.75
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
45.98
55200
53950
PARKS - NEW EQUIPMENT
66.98
55200
53950
PARKS - NEW EQUIPMENT
121.23
CHECK 400 145811 TOTAL FOR FUND 100:
750.00
52210
52150
FIRE ADMINISTRATION - EMPLOYMENT
EXAMINA
FIRE & POLICE SELECTION, INC
145812
400
05/01/2026
727.76
51420
52430
CLERK/TREASURER - EQUIP REPAIR & MAINT
FORWARD TS
145813*#
400
05/01/2026
43.06
52400
53400
BUILDING SERVICES - OPERATING SUPPLIES
100.18
53110
53400
ENGINEERING - OPERATING SUPPLIES
98.16
55300
53400
RECREATION PROGRAM - OPERATING SUPPLIES
969.16
CHECK 400 145813 TOTAL FOR FUND 100:
5,953.05
56300
52190
PLANNER - OTHER PROFESSIONAL SERVICES
FOTH INFRASTRUCTURE &
ENVIRONMENT
145814*#
400
05/01/2026
65.00
51450
52190
IT - OTHER PROFESSIONAL SERVICES
JAMES IMAGING SYSTEMS
145816
400
05/01/2026
680.00
56110
53420
FORESTRY - TREE REPLANTING
JOHNSON'S NURSERY
145817
400
05/01/2026
Page 55 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
2/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
3,420.74
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
KMB ELECTRIC
145818#
400
05/01/2026
10,533.36
51980
59910
CONTINGENCY APPROPRIATION
562.49
52210
52410
FIRE ADMINISTRATION - BUILDING REPAIRS
&
14,516.59
CHECK 400 145818 TOTAL FOR FUND 100:
7,465.22
52230
53420
FIRE PROTECTIVE SERVICES - FUEL
KWIK TRIP INC.
145819
400
05/01/2026
862.50
51430
53430
EMPLOYEE SERVICES - SERVICE RECOGNITION
LA CABANA CORTEZ
145820
400
05/01/2026
1,353.40
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
LIFE-ASSIST INC
145821
400
05/01/2026
928.49
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
193.85
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
2,475.74
CHECK 400 145821 TOTAL FOR FUND 100:
40.42
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
MENARDS
145822*#
400
05/01/2026
85.08
53100
53400
HIGHWAY - OPERATING SUPPLIES
50.52
55200
52410
PARKS - BUILDING REPAIRS & MAINT
92.98
55200
52410
PARKS - BUILDING REPAIRS & MAINT
26.97
55200
52420
PARKS - GROUNDS MAINTENANCE
45.43
55200
53950
PARKS - NEW EQUIPMENT
39.79
55200
53950
PARKS - NEW EQUIPMENT
381.19
CHECK 400 145822 TOTAL FOR FUND 100:
1,060.00
55300
52190
RECREATION PROGRAM - CONTRACTED
SERVICES
MOSAIC CREATIVE STUDIOS, LLC
145824
400
05/01/2026
3.69
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
NAPA
145825
400
05/01/2026
96.50
52230
53400
FIRE PROTECTIVE SERVICES - OPERATING
SUP
100.19
CHECK 400 145825 TOTAL FOR FUND 100:
30.56
51420
53400
CLERK/TREASURER - OPERATING SUPPLIES
ODP BUSINESS SOLUTIONS LLC
145827
400
05/01/2026
187.00
55200
52410
PARKS - BUILDING REPAIRS & MAINT
PORT-A-JOHN
145829
400
05/01/2026
187.00
55200
52410
PARKS - BUILDING REPAIRS & MAINT
187.00
55200
52410
PARKS - BUILDING REPAIRS & MAINT
Page 56 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
3/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
561.00
CHECK 400 145829 TOTAL FOR FUND 100:
486.93
51420
52430
CLERK/TREASURER - EQUIP REPAIR & MAINT
QUADIENT LEASING USA, INC
145830
400
05/01/2026
17,687.76
53110
52190
ENGINEERING - OUTSIDE ENGINEERING
RUEKERT & MIELKE, INC.
145832*#
400
05/01/2026
352.00
55200
52430
PARKS - EQUIP REPAIR & MAINT
SPARTAN TURF PRODUCTS
145834
400
05/01/2026
620.00
55300
52190
RECREATION PROGRAM - CONTRACTED
SERVICES
STACI JOERS
145836
400
05/01/2026
159.41
52210
52260
FIRE ADMINISTRATION - PHONE & CELL
TDS
145838
400
05/01/2026
292.03
52210
52260
FIRE ADMINISTRATION - PHONE & CELL
451.44
CHECK 400 145838 TOTAL FOR FUND 100:
285.93
53100
53480
HIGHWAY - SAFETY EQUIPMENT
TODD TENNYSON
145839
400
05/01/2026
21.06
52210
52260
FIRE ADMINISTRATION - PHONE & CELL
VERIZON
145841
400
05/01/2026
6,667.51
52210
52450
FIRE ADMINISTRATION - TRUNKED RADIO
OPER
WAUKESHA CO TREASURER
145842
400
05/01/2026
500.00
00000
23175
BOB25-0032
Westridge Builders
145844
400
05/01/2026
1,020.00
53100
52400
HIGHWAY - CONTRACTED JANITORIAL
A&M CLEANING SOLUTIONS
145845*#
400
05/07/2026
60.00
55200
53900
PARKS - EQUIPMENT PURCHASED WITH
DONATIO
ALL-WAYS CONTRACTORS, INC
145847
400
05/07/2026
720.00
55300
53400
RECREATION PROGRAM - OPERATING SUPPLIES
AMERICAN LITHO
145848
400
05/07/2026
1,272.40
51430
53480
EMPLOYEE SERVICES - SAFETY PERSONAL
PROT
AMERICAN RED CROSS
145849
400
05/07/2026
78.66
55300
53300
RECREATION PROGRAM - MILEAGE
AMY WHITE
145850
400
05/07/2026
63.04
53100
53400
HIGHWAY - OPERATING SUPPLIES
BIEBEL'S TRUE VALUE AND JUST ASK
RE
145851
400
05/07/2026
660.00
51450
52190
IT - OTHER PROFESSIONAL SERVICES
BLUEBEAM, INC
145853
400
05/07/2026
922.28
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
BREDAN MECHANICAL SYSTEMS INC
145854
400
05/07/2026
43.13
51430
53430
EMPLOYEE SERVICES - SERVICE RECOGNITION
BRIAN LEIGHTNER
145855
400
05/07/2026
13.38
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
BUMPER TO BUMPER
145857
400
05/07/2026
Page 57 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
4/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
571.48
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
BURKE TRUCK & EQUIPMENT
145858*#
400
05/07/2026
1,101.46
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
1,672.94
CHECK 400 145858 TOTAL FOR FUND 100:
71.05
52400
53300
BUILDING SERVICES - MILEAGE & FUEL
CHARLIE DWYER
145859
400
05/07/2026
20.50
51450
52190
IT - OTHER PROFESSIONAL SERVICES
ELEVITY GORDON FLESCH CO INC
145861
400
05/07/2026
5,927.25
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
HARTLAND OVERHEAD DOOR
145863
400
05/07/2026
4,159.00
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
10,086.25
CHECK 400 145863 TOTAL FOR FUND 100:
8,175.90
51450
52190
IT - OTHER PROFESSIONAL SERVICES
IS OUTFITTERS
145865#
400
05/07/2026
1,302.50
51980
59910
CONTINGENCY APPROPRIATION
9,478.40
CHECK 400 145865 TOTAL FOR FUND 100:
50.00
54155
52990
SHARP SHOOTER DEER MANAGEMENT
JIM CIURLIK
145867
400
05/07/2026
1,870.80
53635
52900
SERVICE FEES
JOHNSON'S NURSERY
145868
400
05/07/2026
174.00
00000
46721
PARK RECREATION PROGRAMS
KATHERINE BROWN
145869
400
05/07/2026
38.08
52400
53430
BUILDING SERVICES - ADDRESS TILES
LANGE ENTERPRISES, INC
145870
400
05/07/2026
17,850.00
51420
52130
CLERK/TREASURER - OTHER ACCOUNTING
SERVI
LAUTERBACH & AMEN, LLP
145871
400
05/07/2026
10.74
53100
52410
HIGHWAY - BLDG REPAIRS & MAINT
MENARDS
145874#
400
05/07/2026
12.54
55200
52410
PARKS - BUILDING REPAIRS & MAINT
12.45
55200
52410
PARKS - BUILDING REPAIRS & MAINT
58.15
55200
52420
PARKS - GROUNDS MAINTENANCE
251.40
55200
52420
PARKS - GROUNDS MAINTENANCE
345.28
CHECK 400 145874 TOTAL FOR FUND 100:
188.50
52400
52980
BUILDING SERVICES - TRAINING
MIKE HADLEY
145875
400
05/07/2026
285.00
52400
52980
BUILDING SERVICES - TRAINING
98.35
52400
52980
BUILDING SERVICES - TRAINING
764.15
52400
53300
BUILDING SERVICES - MILEAGE & FUEL
Page 58 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
5/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
94.91
52400
53480
BUILDING SERVICES - PERSONAL PROTECTIVE
1,430.91
CHECK 400 145875 TOTAL FOR FUND 100:
405.00
51430
52700
EMPLOYEE SERVICES - EMPLOYEE WELLNESS
PR
MOTION CONNECTED
145876
400
05/07/2026
121.44
51420
53400
CLERK/TREASURER - OPERATING SUPPLIES
ODP BUSINESS SOLUTIONS LLC
145878
400
05/07/2026
33.63
51420
53400
CLERK/TREASURER - OPERATING SUPPLIES
155.07
CHECK 400 145878 TOTAL FOR FUND 100:
600.00
51430
52980
EMPLOYEE SERVICES - TRAINING
PARTNER2LEARN, LLC
145879
400
05/07/2026
163.33
53100
53730
HIGHWAY - ROAD REPAIRS
PAYNE & DOLAN
145880
400
05/07/2026
50.00
54155
52990
SHARP SHOOTER DEER MANAGEMENT
PETER LAUBER
145881
400
05/07/2026
61.00
51430
52150
EMPLOYEE SERVICES - EMPLOYMENT EXAMS
PROHEALTH CARE MEDICAL GROUP
145882
400
05/07/2026
2,125.00
51450
52190
IT - OTHER PROFESSIONAL SERVICES
QUALITY POWER SOLUTIONS
145883
400
05/07/2026
720.00
55300
52190
RECREATION PROGRAM - CONTRACTED
SERVICES
SEAT OF THE PANTS PRODUCTIONS LLC
145884
400
05/07/2026
38.38
53100
52420
HIGHWAY - GROUNDS MAINTENANCE
SITEONE LANDSCAPE SUPPLY LLC
145885
400
05/07/2026
4,819.74
00000
45110
COURT PENALTIES
STATE OF WI COURT FINES & ASSMTS
145886
400
05/07/2026
179.96
53100
52400
HIGHWAY - CONTRACTED JANITORIAL
SUPPLYZONE
145887*#
400
05/07/2026
150.00
54155
52990
SHARP SHOOTER DEER MANAGEMENT
TERRY LOFY
145888
400
05/07/2026
40.00
00000
46720
PARK RESERVATION FEES
VILLAGE OF PEWAUKEE
145889
400
05/07/2026
1,447.60
00000
45110
COURT PENALTIES
WAUKESHA CO TREASURER
145891
400
05/07/2026
135,395.90
Total for fund 100 GENERAL FUND
Page 59 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
6/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 230 STORM WATER MANAGEMENT
240.00
53652
53520
DITCH & CULVERT MAINT - DITCH
MAINTENANC
ALL-WAYS CONTRACTORS, INC
145800
400
05/01/2026
54.89
53650
53400
OPERATING SUPPLIES
CINTAS
145806*#
400
05/01/2026
100.18
53650
53400
OPERATING SUPPLIES
FORWARD TS
145813*#
400
05/01/2026
70.86
53650
52190
OUTSIDE ENGINEERING
RUEKERT & MIELKE, INC.
145832*#
400
05/01/2026
235.37
53650
52190
OUTSIDE ENGINEERING
1,408.25
53650
52190
OUTSIDE ENGINEERING
860.70
53650
52190
OUTSIDE ENGINEERING
234.61
53650
52190
OUTSIDE ENGINEERING
2,809.79
CHECK 400 145832 TOTAL FOR FUND 230:
2,476.03
53652
53510
DITCH & CULVERT MAINT - CULVERT
REPLACEM
SITEONE LANDSCAPE SUPPLY LLC
145833
400
05/01/2026
2,476.03
53652
53520
DITCH & CULVERT MAINT - DITCH
MAINTENANC
4,952.06
CHECK 400 145833 TOTAL FOR FUND 230:
193.74
53651
52201
STORM SEWER MAINT - DIGGER'S HOTLINE
USA BLUEBOOK
145840*#
400
05/01/2026
94.09
53651
52201
STORM SEWER MAINT - DIGGER'S HOTLINE
287.83
CHECK 400 145840 TOTAL FOR FUND 230:
1,108.80
53652
53510
DITCH & CULVERT MAINT - CULVERT
REPLACEM
WESTERN CULVERT & SUPPLY
145843
400
05/01/2026
510.00
53650
52400
CONTRACTED JANITORIAL
A&M CLEANING SOLUTIONS
145845*#
400
05/07/2026
319.44
53650
52430
EQUIPMENT REPAIR & MAINT
BURKE TRUCK & EQUIPMENT
145858*#
400
05/07/2026
3,690.00
53655
53510
CATCH BASIN MAINT - CATCH BASIN
CLEANING
CRETEX SPECIALTY PRODUCTS
145860
400
05/07/2026
46.99
53650
52430
EQUIPMENT REPAIR & MAINT
LINCOLN CONTRACTORS
145872
400
05/07/2026
303.57
53650
52430
EQUIPMENT REPAIR & MAINT
MACQUEEN EQUIPMENT
145873
400
05/07/2026
89.99
53650
52400
CONTRACTED JANITORIAL
SUPPLYZONE
145887*#
400
05/07/2026
Page 60 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
7/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 230 STORM WATER MANAGEMENT
3,562.50
53650
52430
EQUIPMENT REPAIR & MAINT
WINTER EQUIPMENT COMPANY
145894
400
05/07/2026
18,076.04
Total for fund 230 STORM WATER MANAGEMENT
Page 61 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
8/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 420 CAPTIAL ROAD PROJECTS
1,458.21
57568
58210
LEXINGTON/TAKOMA PH 2
AECOM TECHNICAL SERVICES, INC
145799
400
05/01/2026
18,650.25
57563
58210
GREENHILL/YENCH
ROBERT E LEE & ASSOCIATES, INC
145831
400
05/01/2026
199.00
57426
58210
LEXINGTON/TACOMA PH 1
RUEKERT & MIELKE, INC.
145832*#
400
05/01/2026
199.00
57566
58210
JOSEPH ROAD NEW CONTRACT
995.00
57567
58210
SHADY LANE NEW CONTRACT
8,710.30
57568
58210
LEXINGTON/TAKOMA PH 2
910.75
57570
58210
SPRIGDALE ESTATES - GLENWOOD
11,014.05
CHECK 400 145832 TOTAL FOR FUND 420:
17,110.73
57558
58210
WATERTOWN
STRAND ASSOCIATES, INC
145837*#
400
05/01/2026
48,233.24
Total for fund 420 CAPTIAL ROAD PROJECTS
Page 62 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
9/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 440 BIKE & PEDESTRIAN
2,040.90
53550
58220
FIELDHACK PATH
STRAND ASSOCIATES, INC
145837*#
400
05/01/2026
7,476.32
57600
58210
LINDSAY RD-BALMER TO SPRTS COMPLEX
9,517.22
CHECK 400 145837 TOTAL FOR FUND 440:
9,517.22
Total for fund 440 BIKE & PEDESTRIAN
Page 63 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
10/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 490 CAPTIAL EQUIPMENT
7,067.35
57621
58100
CAPITAL EQUIPMENT/BUILDING
PLAYPOWER LT FARMINGTON INC
145828
400
05/01/2026
350.00
57160
58100
IT - CAPITAL EQUIPMENT
BS&A SOFTWARE
145856
400
05/07/2026
7,417.35
Total for fund 490 CAPTIAL EQUIPMENT
Page 64 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
11/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 600 WATER UTILITY
24.74
10678
52100
TRANS & DIST MAINT-SCADA MAINT
AT&T MOBILITY
145801*#
400
05/01/2026
312.41
10921
52230
ADMIN & GEN OPS-PHONE, INTERNET CELL
337.15
CHECK 400 145801 TOTAL FOR FUND 600:
525.00
10923
52120
ADMIN & GEN OPS-AUDIT/ACCOUNTANT
BAKER TILLY US LLP
145802*#
400
05/01/2026
8,110.00
10678
52400
TRANS & DIST MAINT-MISC PLANT REPAIRS
DORNER CO
145809
400
05/01/2026
4,046.48
10923
52170
ADMIN & GEN OPS-OUTSIDE ENGINEERING
FOTH INFRASTRUCTURE &
ENVIRONMENT
145814*#
400
05/01/2026
254.06
10633
52400
PUMP MAINT-MAINT AND REPAIR
GRAINGER
145815
400
05/01/2026
150.92
10633
52400
PUMP MAINT-MAINT AND REPAIR
404.98
CHECK 400 145815 TOTAL FOR FUND 600:
6,360.00
00346
18566
METERS
MIDWEST METER INC.
145823
400
05/01/2026
31.00
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
NORTHERN LAKE SERVICE, INC
145826*#
400
05/01/2026
124.00
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
155.00
CHECK 400 145826 TOTAL FOR FUND 600:
12,851.50
00107
18150
BLUEMOUND RD. FOSTER CT TO BUSSE RD
RUEKERT & MIELKE, INC.
145832*#
400
05/01/2026
339.46
10678
52100
TRANS & DIST MAINT-SCADA MAINT
1,024.87
10678
52100
TRANS & DIST MAINT-SCADA MAINT
14,215.83
CHECK 400 145832 TOTAL FOR FUND 600:
26,019.55
00107
12818
PFAS TREATMET
STRAND ASSOCIATES, INC
145837*#
400
05/01/2026
3,067.22
00107
12818
PFAS TREATMET
4,105.69
10923
52170
ADMIN & GEN OPS-OUTSIDE ENGINEERING
33,192.46
CHECK 400 145837 TOTAL FOR FUND 600:
387.48
10665
52450
TRANS & DIST OPS-DIGGERS HOTLINE WATER
USA BLUEBOOK
145840*#
400
05/01/2026
94.10
10665
52450
TRANS & DIST OPS-DIGGERS HOTLINE WATER
481.58
CHECK 400 145840 TOTAL FOR FUND 600:
Page 65 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
12/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 600 WATER UTILITY
36.48
10921
52331
ADMIN & GEN OPS-ANSWERING SERVICE
ALL CITY COMMUNICATIONS INC.
145846*
400
05/07/2026
34.20
10921
53300
ADMIN & GEN OPS-MILEAGE
BIERCE, STEVE
145852#
400
05/07/2026
427.86
10930
53200
ADMIN & GEN OPS-UTILITY MEMB & CONT
EDUC
462.06
CHECK 400 145852 TOTAL FOR FUND 600:
54.99
10626
53400
PUMPING OPS-MISC EXPENSE
ELLIOTTS ACE HARDWARE
145862
400
05/07/2026
6,093.30
10641
53410
TREATMENT OPS-CHEMICALS
HAWKINS, INC.
145864
400
05/07/2026
1,324.03
10621
53900
PUMPING OPS-FUEL TO POWER GENERATOR
JACOBUS ENERGY LLC
145866
400
05/07/2026
31.83
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
NORTHERN LAKE SERVICE, INC
145877
400
05/07/2026
93.00
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
124.83
CHECK 400 145877 TOTAL FOR FUND 600:
4,453.00
10652
52900
TREATMENT MAINT-WRT RADIUM TREATMENT
WATER REMEDIATION TECHNOLOGY
145890
400
05/07/2026
20.00
10921
53100
ADMIN & GEN EXPS OPS-OFFICE SUPPLIES
WI DEPARTMENT FINANCIAL
INSTITUTION
145893
400
05/07/2026
80,397.17
Total for fund 600 WATER UTILITY
Page 66 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
13/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 650 SEWER UTILITY
24.74
01831
52100
SCADA/TELEMETRY MAINT
AT&T MOBILITY
145801*#
400
05/01/2026
312.41
10921
52230
ADMIN & GEN OPS PHONE INTERNET CELL
337.15
CHECK 400 145801 TOTAL FOR FUND 650:
525.00
10923
52120
ADMIN & GEN OPS-AUDITOR/ACCOUNTANT
BAKER TILLY US LLP
145802*#
400
05/01/2026
13,820.50
00221
29102
CITY OF BROOKFIELD NOTE PAYABLE
CITY OF BROOKFIELD
145807#
400
05/01/2026
9,254.78
00221
29102
CITY OF BROOKFIELD NOTE PAYABLE
840.15
01880
56100
INTEREST/LONG TERM DEBT
707.63
01880
56100
INTEREST/LONG TERM DEBT
24,623.06
CHECK 400 145807 TOTAL FOR FUND 650:
74.78
01834
52400
MAINTENANCE OF GENERAL PLANT STRUCTURE
MENARDS
145822*#
400
05/01/2026
1,400.00
01831
52400
MAINTENANCE OF COLLECTION SYSTEM
NORTHERN LAKE SERVICE, INC
145826*#
400
05/01/2026
339.47
01831
52100
SCADA/TELEMETRY MAINT
RUEKERT & MIELKE, INC.
145832*#
400
05/01/2026
1,024.88
01831
52100
SCADA/TELEMETRY MAINT
1,364.35
CHECK 400 145832 TOTAL FOR FUND 650:
6,853.00
00107
12831
Gun Club Sewer Study
STAAB CONSTRUCTION CORP
145835
400
05/01/2026
2,268.51
00107
12837
KOPMEIER SEWER PIPE REPAIR
STRAND ASSOCIATES, INC
145837*#
400
05/01/2026
451.06
10923
52170
ADMIN & GEN OPS-OUTSIDE ENGINEERING
2,719.57
CHECK 400 145837 TOTAL FOR FUND 650:
366.34
10665
52450
DIGGERS HOTLINE SEWER
USA BLUEBOOK
145840*#
400
05/01/2026
94.09
10665
52450
DIGGERS HOTLINE SEWER
460.43
CHECK 400 145840 TOTAL FOR FUND 650:
36.48
10921
52331
ADMIN & GEN OPS-ANSWERING SERVICE
ALL CITY COMMUNICATIONS INC.
145846*
400
05/07/2026
29,334.00
01827
52344
SEWER SERVICE CHARGE - WCC
WAUKESHA WATER UTILITY
145892
400
05/07/2026
Page 67 of 68
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
14/14
Page
:
05/14/2026 09:28 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/29/2026 - 05/14/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 650 SEWER UTILITY
67,727.82
Total for fund 650 SEWER UTILITY
'#'-INDICATES CHECK DISTRIBUTED TO MORE THAN ONE DEPARTMENT
'*'-INDICATES CHECK DISTRIBUTED TO MORE THAN ONE FUND
366,764.74
TOTAL - ALL FUNDS
Page 68 of 68