Common Council Meeting - First Monday — Agenda Packet
City of Pewaukee · Waukesha County · Common Council · meeting of May 4, 2026 · Agenda packets
Open the original document More from City of Pewaukee
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Office of the Clerk/Treasurer
W240 N3065 Pewaukee Road
Pewaukee WI 53072
Phone: 262-691-0770
COMMON COUNCIL
MEETING NOTICE AND AGENDA
Monday, May 4, 2026
6:30 PM
Pewaukee City Hall Common Council Chambers
W240N3065 Pewaukee Road, Pewaukee, WI
1. Call to Order and Pledge of Allegiance
2. Public Comment - Please limit your comments to two minutes. If further time for discussion is needed,
please contact your District Alderperson prior to the meeting.
3. Consent Agenda
3.1 Approve Resolution 26-05-10 Related to the Contact Information for Open Records Requests
[Tarczewski]
3.2 Approve Accounts Payable Listing Submitted May 4th, 2026 [Tarczewski]
4. Miscellaneous Items
4.1 Discussion and Possible Action to Retain a Search Firm for the Recruitment of a City Administrator
[Bergersen]
4.2 Discussion and Possible Action to Approve Resolution 26-05-11 Adopting a New Logo for the City
of Pewaukee and Parks and Recreation Department. [Fuchs]
5. Water & Sewer Utility
5.1 Discussion and Possible Action Regarding Proposals to Conduct Groundwater Well Siting Study
[Wagner/Mueller]
5.2 Discussion regarding an Excerpt-AWWA Beyond the Replacement Era: Balancing Compounding
Infrastructure Needs With Household Affordability [Wagner/Mueller]
6. Engineering
6.1 Discussion and Possible Action Regarding Cedar Gables Development [Wagner]
1. Approve the Phase 2 Stockpiling Agreement Amendment 1 and Establish an Additional Financial
Guarantee of $52,030.00.
2. Approve the Third Reduction of Letter of Credit from $1,224,961.05 to $394,828.46 (A Reduction
of $830,132.60).
7. Public Comment - Please limit your comments to two minutes. If further time for discussion is needed,
please contact your District Alderperson prior to the meeting.
8. Closed Session – You are hereby notified that the Common Council and staff of the City of Pewaukee
will convene into closed session after all regular scheduled business has been concluded and upon
Page 1 of 73
motion duly made and seconded and acted upon by roll-call vote as required under 19.85(1)(a), Stats.
The purpose of the closed session is for the following:
• For conferring with legal counsel for the governmental body who is rendering oral or written
advice concerning strategy to be adopted by the body with respect to litigation in which it is or is
likely to become involved pursuant to §19.85(1)(g); specifically to be discussed is the Lindsay
Road Balmer Park Utility Extension project.
You are further notified that at the conclusion of the Closed Session, the Common Council may convene
into open session pursuant to 19.85(2), Stats., for possible additional discussion and action concerning
any matters discussed in closed session and for adjournment.
9. Adjournment
Kelly Tarczewski
Clerk/Treasurer
May 1, 2026
NOTICE
It is possible that members of other governmental bodies of the municipality may be in attendance to gather information that may form a
quorum at the above stated meeting. No action will be taken by any governmental body other than the governmental body specifically referred
to above in this notice.
Any person who has a qualifying disability under the Americans with Disabilities Act that requires the meeting or materials at the meeting to be
in an accessible format must contact the Clerk/Treasurer, Kelly Tarczewski, at (262) 691-0770 three business days prior to the meeting so that
arrangements may be made to accommodate your request.
Page 2 of 73
Public Records – Resolution 26-05-10 Page 1 of 1
STATE OF WISCONSIN CITY OF PEWAUKEE WAUKESHA COUNTY
RESOLUTION 26-05-10
NOTICE REGARDING INSPECTION OF PUBLIC RECORDS
Except as otherwise provided, any person has a ri ght to inspect public records and to make or
receive a copy of any public records as provided in Chapter 19, Subchapter II, Wisconsin Statutes, and
applicable municipal ordinances.
Requests to inspect public records must be made to the City Clerk/Treasurer at the Pewaukee City
Hall, W240 N3065 Pewaukee Road, Pewaukee, Wisconsin, 53072.
Public records may be requested, inspected and copies obtained during normal business hours
Monday through Friday, 8:00 a.m. to 4:30 p.m. In some cases, records may require retrieval from
archives and therefore may not be immediately available for inspection.
The cost of photocopying shall be .10¢ per page, pl us sales tax, which has been calculated to be
the actual, necessary, and direct cost of reproduction. In some cases, additional charges may apply, such
as to recover costs for locating a record, mailing or shipping costs, or photographing and photographic
processing costs, and in some cases, prepayment may also be required, as allowed by law.
Pursuant to the requirements of Section 19.34(1), Wisconsin Statutes, the following is a list of the
holders of any “local public office” as that term is defined and used therein:
Steve Bierce – Mayor Kelly Tarczewski – Clerk/Treasurer
Phil Vetterkind – Alderman District #1
Rich Reinbold – Alderman District #1
Colleen Brown – Alderman, District #2
Magdelene Wagner – Engineer/Public Works
Director
Bobby Kewan – Information Technology Director
Spencer Tabbert – Alderman, District #2 Kevin Bierce – Fire Chief
Brian Dziwulski – Alderman, District #3
Jerry Wamser – Alderman, District #3
Nick Phalin – Parks & Recreation Director
Jane Mueller – Utility Manager
Scott Klein – Administrator
Julia Anderson – Employee Services Director
Lieutenant Marc Moonen - Police Services C/O
Waukesha County Sheriff’s Department
Rhett Tuff – Assessor
Nick Fuchs – Planner & Community Development
Director / Building Services
Passed and adopted by the City of Pewaukee this 4
th day of May 2026.
______________________________
S t e v e B i e r c e , M a y o r
Attest:
____________________________________
Kelly Tarczewski, Clerk/Treasurer
Page 3 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
1/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
770.23
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
AIRGAS USA
145703
400
04/17/2026
46.40
51420
53300
CLERK/TREASURER - MILEAGE
AMI HURD
145704
400
04/17/2026
9.99
51410
52260
ADMINISTRATOR - TELEPHONE & CELL
AT&T MOBILITY CC
145705*#
400
04/17/2026
31.99
51420
52260
CLERK/TREASURER - TELEPHONE & CELL
31.99
51450
52260
IT - PHONE & CELL
565.73
52210
52270
FIRE ADMINISTRATION - MDC AIR CARDS
41.98
52400
52260
BUILDING SERVICES - PHONE & CELL
65.00
53110
52260
ENGINEERING - PHONE & CELL
746.68
CHECK 400 145705 TOTAL FOR FUND 100:
89.95
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
BOUCHER CHEVROLET
145706
400
04/17/2026
80.00
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
COLE MANUFACTURING CORP
145708
400
04/17/2026
3.20
51420
53470
CLERK/TREASURER - NOTICES &
PUBLICATIONS
CONLEY MEDIA
145709*#
400
04/17/2026
69.00
52230
53950
FIRE PROTECTIVE SERVICES - NEW
EQUIPMENT
CONWAY SHIELD
145710
400
04/17/2026
3,365.21
53100
53420
HIGHWAY - FUEL
COREY OIL
145711
400
04/17/2026
882.00
51930
52150
INSURANCE CONSULTANT
DIVERSIFIED BENEFIT SERVICES, INC.
145712
400
04/17/2026
9.18
55200
52410
PARKS - BUILDING REPAIRS & MAINT
ELLIOTTS ACE HARDWARE
145713*#
400
04/17/2026
2,000.00
00000
23173
BEB24-0053
Halen Homes LLC
145714
400
04/17/2026
2,000.00
00000
23173
BEB24-0052
Halen Homes LLC
145715
400
04/17/2026
2,000.00
00000
23173
BEB24-0054
Halen Homes LLC
145716
400
04/17/2026
2,000.00
00000
23173
BEB24-0055
Halen Homes LLC
145717
400
04/17/2026
2,527.20
55200
52260
PARKS - TELEPHONE & INTERNET
IS OUTFITTERS
145719
400
04/17/2026
58.56
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
JX ENTERPRISES, INC.
145720
400
04/17/2026
1,801.56
53100
53400
HIGHWAY - OPERATING SUPPLIES
KIMBALL MIDWEST
145721*#
400
04/17/2026
Page 4 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
2/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
17,850.00
51420
52130
CLERK/TREASURER - OTHER ACCOUNTING
SERVI
LAUTERBACH & AMEN, LLP
145722
400
04/17/2026
440.40
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
LIFE-ASSIST INC
145723
400
04/17/2026
173.35
55200
52410
PARKS - BUILDING REPAIRS & MAINT
MARK'S PLUMBING PARTS
145724
400
04/17/2026
122.24
55200
52410
PARKS - BUILDING REPAIRS & MAINT
295.59
CHECK 400 145724 TOTAL FOR FUND 100:
258.53
51600
53400
CITY HALL - OPERATING SUPPLIES
MENARDS
145725*#
400
04/17/2026
44.45
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
23.98
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
46.36
55200
52410
PARKS - BUILDING REPAIRS & MAINT
25.47
55200
52410
PARKS - BUILDING REPAIRS & MAINT
26.34
55200
52410
PARKS - BUILDING REPAIRS & MAINT
8.49
55200
52420
PARKS - GROUNDS MAINTENANCE
9.45
55200
53400
PARKS - OPERATING SUPPLIES
124.98
55200
53950
PARKS - NEW EQUIPMENT
568.05
CHECK 400 145725 TOTAL FOR FUND 100:
41.31
51430
53430
EMPLOYEE SERVICES - SERVICE RECOGNITION
MICHAELIS GABBEY
145726
400
04/17/2026
68.73
53100
53400
HIGHWAY - OPERATING SUPPLIES
MID-AMERICAN RESEARCH CHEMICAL
145727
400
04/17/2026
626.06
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
MILLER-BRADFORD & RISBERG, INC
145728
400
04/17/2026
254.46
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
880.52
CHECK 400 145728 TOTAL FOR FUND 100:
4,307.80
51300
52100
ATTORNEY'S FEES
MUNICIPAL LAW & LITIGATION GROUP
S.
145729*#
400
04/17/2026
6,977.70
51300
52100
ATTORNEY'S FEES
458.20
51430
52100
ATTORNEY'S FEES
444.70
51430
52100
ATTORNEY'S FEES
974.80
51530
52100
ATTORNEY'S FEES
65.00
51535
52100
ATTORNEY'S FEES
1,883.50
52100
52100
ATTORNEY'S FEES
2,562.40
52100
52100
ATTORNEY'S FEES
35.00
52210
52100
ATTORNEY'S FEES
Page 5 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
3/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
547.80
55200
52100
ATTORNEY'S FEES
261.20
55200
52100
ATTORNEY'S FEES
1,541.80
56300
52100
ATTORNEY'S FEES
448.10
56300
52100
ATTORNEY'S FEES
20,508.00
CHECK 400 145729 TOTAL FOR FUND 100:
19.09
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
NAPA
145730*#
400
04/17/2026
96.50
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
4.69
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
16.64
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
136.92
CHECK 400 145730 TOTAL FOR FUND 100:
19.99
53100
53400
HIGHWAY - OPERATING SUPPLIES
NAPA AUTOMOTIVE SUPPLY OF SUSSEX
145731
400
04/17/2026
600.00
51980
59910
CONTINGENCY APPROPRIATION
PETER RHODE
145733
400
04/17/2026
361.88
55200
52440
PARKS - VEHICLE REPAIR & MAINT
POMP'S TIRE SERVICE, INC.
145734
400
04/17/2026
356.02
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
PROHEALTH PHARMACY WAUKESHA
145735
400
04/17/2026
159.40
51600
52410
CITY HALL - BUILDING REPAIRS & MAINT
QUALITY ELECTRIC SERVICE
145736
400
04/17/2026
17,018.00
51930
55110
WORKER'S COMPENSATION
R&R INSURANCE SERVICES
145737
400
04/17/2026
84.15
53100
53410
HIGHWAY - UNIFORMS
RANDY CHMIEL
145738
400
04/17/2026
1,010.53
53100
53400
HIGHWAY - OPERATING SUPPLIES
SIGNARAMA
145739*#
400
04/17/2026
35.00
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
SOFT WATER, INC.
145740
400
04/17/2026
6,989.33
00000
45110
COURT PENALTIES
STATE OF WI COURT FINES & ASSMTS
145742
400
04/17/2026
257.00
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
STRYKER SALES CORPORATION
145743
400
04/17/2026
194.90
55200
52230
PARKS - WATER
VILLAGE OF PEWAUKEE
145745
400
04/17/2026
1,201.88
53100
52210
HIGHWAY - ELECTRICITY
WE ENERGIES
145746*#
400
04/17/2026
455.96
53100
52220
GAS FOR HEAT (NATURAL GAS)
1,657.84
CHECK 400 145746 TOTAL FOR FUND 100:
Page 6 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
4/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
1,995.00
55200
52410
PARKS - BUILDING REPAIRS & MAINT
WHITLOW'S SECURITY SPECIALISTS
145747
400
04/17/2026
249.24
55200
52420
PARKS - GROUNDS MAINTENANCE
2,244.24
CHECK 400 145747 TOTAL FOR FUND 100:
6,025.00
54155
52990
SHARP SHOOTER DEER MANAGEMENT
WILDLIFE MANAGEMENT SERVICES
145749
400
04/17/2026
389.00
51420
53400
CLERK/TREASURER - OPERATING SUPPLIES
WISCONSIN LEGAL BLANK
145750#
400
04/17/2026
134.75
51440
53120
ELECTIONS - PRINTING
523.75
CHECK 400 145750 TOTAL FOR FUND 100:
210.00
53100
53730
HIGHWAY - ROAD REPAIRS
WOLF PAVING
145751
400
04/17/2026
213.65
00000
44300
BUILDING PERMITS
ACCURATE BASEMENT REPAIR
145752
400
04/24/2026
442.00
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
AIR ONE EQUIPMENT
145753
400
04/24/2026
398.88
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
AIRGAS USA
145754
400
04/24/2026
290.42
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
668.46
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
1,357.76
CHECK 400 145754 TOTAL FOR FUND 100:
5,842.00
55300
53120
RECREATION PROGRAM - PROGRAM PRINTING
AMERICAN LITHO
145756
400
04/24/2026
205.40
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
BATTERIES PLUS LLC
145757*#
400
04/24/2026
151.50
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
BIG JIM'S SMALL ENG SERV
145758
400
04/24/2026
16,790.00
51450
52480
IT - SOFTWARE MAINTENANCE & UPDATES
BS&A SOFTWARE
145759*#
400
04/24/2026
444.00
52400
53400
BUILDING SERVICES - OPERATING SUPPLIES
17,234.00
CHECK 400 145759 TOTAL FOR FUND 100:
2,594.50
51430
52100
ATTORNEY'S FEES
BUELOW VETTER BUIKEMA OLSON &
VLIET
145760
400
04/24/2026
325.00
51430
52100
ATTORNEY'S FEES
2,919.50
CHECK 400 145760 TOTAL FOR FUND 100:
Page 7 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
5/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
76.26
51430
53480
EMPLOYEE SERVICES - SAFETY PERSONAL
PROT
CINTAS CORP
145762*#
400
04/24/2026
275.00
53110
52190
ENGINEERING - OUTSIDE ENGINEERING
CORRE
145764
400
04/24/2026
2,873.00
51600
52400
CITY HALL - JANITORIAL SUPPLIES
DAN PLAUTZ CLEANING SERVICE
145765
400
04/24/2026
205.34
51930
52150
INSURANCE CONSULTANT
DIVERSIFIED BENEFIT SERVICES, INC.
145766
400
04/24/2026
131.24
53110
53400
ENGINEERING - OPERATING SUPPLIES
ELIZABETH BROWN
145767*#
400
04/24/2026
38.48
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
ELLIOTTS ACE HARDWARE
145768*#
400
04/24/2026
** VOIDED **
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
FIRE SERVICE INC
145770
400
04/24/2026
** VOIDED **
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
** VOIDED **
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
494.25
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
GEAR WASH
145771
400
04/24/2026
50.78
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
GRAINGER
145772
400
04/24/2026
175.00
52210
52410
FIRE ADMINISTRATION - BUILDING REPAIRS
&
HARTLAND OVERHEAD DOOR
145774
400
04/24/2026
80.00
51450
52190
IT - OTHER PROFESSIONAL SERVICES
HEARTLAND BUSINESS SYSTEMS
145775
400
04/24/2026
336.46
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
HINKLEY SPRINGS
145776
400
04/24/2026
1,493.85
52230
52430
FIRE PROTECTIVE SERVICES - EQUIP REPAIR
INTERSTATE POWER SYSTEMS
145777
400
04/24/2026
3,607.35
52230
52440
FIRE PROTECTIVE SERVICES - VEHICLE
REPAI
5,101.20
CHECK 400 145777 TOTAL FOR FUND 100:
15,407.99
53620
52800
RECYCLE - GARBAGE COLLECTION
JOHNS DISPOSAL SERVICE
145778#
400
04/24/2026
585.00
53635
52900
SERVICE FEES
15,992.99
CHECK 400 145778 TOTAL FOR FUND 100:
976.92
55200
52410
PARKS - BUILDING REPAIRS & MAINT
KMB ELECTRIC
145779
400
04/24/2026
1,246.35
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
LIFE-ASSIST INC
145780
400
04/24/2026
Page 8 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
6/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
88.80
52230
53450
FIRE PROTECTIVE SERVICES - EMS
OPERATING
1,335.15
CHECK 400 145780 TOTAL FOR FUND 100:
490.00
55300
52190
RECREATION PROGRAM - CONTRACTED
SERVICES
MARY FIRNROHR
145782
400
04/24/2026
65.66
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
MENARDS
145783*#
400
04/24/2026
329.98
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
4.98
53100
53400
HIGHWAY - OPERATING SUPPLIES
68.01
55200
52410
PARKS - BUILDING REPAIRS & MAINT
20.43
55200
52410
PARKS - BUILDING REPAIRS & MAINT
(26.07)
55200
52410
PARKS - BUILDING REPAIRS & MAINT
462.99
CHECK 400 145783 TOTAL FOR FUND 100:
260.41
53100
52430
HIGHWAY - EQUIP REPAIR & MAINT
MILLER-BRADFORD & RISBERG, INC
145784
400
04/24/2026
121.08
55300
53300
RECREATION PROGRAM - MILEAGE
NICK PHALIN
145785
400
04/24/2026
117.00
51430
52150
EMPLOYEE SERVICES - EMPLOYMENT EXAMS
OCCUPATIONAL HEALTH CENTERS
145787
400
04/24/2026
7.09
51420
53400
CLERK/TREASURER - OPERATING SUPPLIES
ODP BUSINESS SOLUTIONS LLC
145788#
400
04/24/2026
325.66
51600
52400
CITY HALL - JANITORIAL SUPPLIES
73.58
51600
52400
CITY HALL - JANITORIAL SUPPLIES
148.88
51600
52400
CITY HALL - JANITORIAL SUPPLIES
555.21
CHECK 400 145788 TOTAL FOR FUND 100:
61.00
51430
52150
EMPLOYEE SERVICES - EMPLOYMENT EXAMS
PROHEALTH CARE MEDICAL GROUP
145789#
400
04/24/2026
1,095.00
52210
52150
FIRE ADMINISTRATION - EMPLOYMENT
EXAMINA
1,156.00
CHECK 400 145789 TOTAL FOR FUND 100:
1,629.00
53110
53400
ENGINEERING - OPERATING SUPPLIES
SPECIAL EDITIONS, INC
145791*#
400
04/24/2026
69.97
52210
53400
FIRE ADMINISTRATION - OPERATING
SUPPLIES
UNIFIRST CORP
145792
400
04/24/2026
201.73
55300
53110
RECREATION PROGRAM - POSTAGE
USPS
145793
400
04/24/2026
33.50
55200
52230
PARKS - WATER
VILLAGE OF PEWAUKEE
145794*#
400
04/24/2026
Page 9 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
7/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 100 GENERAL FUND
22.02
55200
52240
PARKS - SEWER
27.00
55200
52950
PARKS - PUBLIC FIRE PROTECTION CHARGE
82.52
CHECK 400 145794 TOTAL FOR FUND 100:
1,951.08
00000
45110
COURT PENALTIES
WAUKESHA CO TREASURER
145795#
400
04/24/2026
840.00
55300
52190
RECREATION PROGRAM - CONTRACTED
SERVICES
2,791.08
CHECK 400 145795 TOTAL FOR FUND 100:
180.00
52100
53400
POLICE - OPERATING SUPPLIES
WI DEPT OF JUSTICE-TIME
145797
400
04/24/2026
161,610.59
Total for fund 100 GENERAL FUND
Page 10 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
8/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 230 STORM WATER MANAGEMENT
64.87
53650
52260
TELEPHONE & CELL
AT&T MOBILITY CC
145705*#
400
04/17/2026
900.78
53650
53400
OPERATING SUPPLIES
KIMBALL MIDWEST
145721*#
400
04/17/2026
138.10
53650
52100
ATTORNEY'S FEES
MUNICIPAL LAW & LITIGATION GROUP
S.
145729*#
400
04/17/2026
324.29
53650
53400
OPERATING SUPPLIES
SIGNARAMA
145739*#
400
04/17/2026
600.95
53650
52210
ELECTRICITY
WE ENERGIES
145746*#
400
04/17/2026
227.97
53650
52220
GAS FOR HEAT (NATURAL GAS)
828.92
CHECK 400 145746 TOTAL FOR FUND 230:
240.00
53652
53520
DITCH & CULVERT MAINT - DITCH
MAINTENANC
ALL-WAYS CONTRACTORS, INC
145755
400
04/24/2026
34.74
53650
52430
EQUIPMENT REPAIR & MAINT
BUMPER TO BUMPER
145761
400
04/24/2026
8.65
53650
52430
EQUIPMENT REPAIR & MAINT
323.80
53650
52430
EQUIPMENT REPAIR & MAINT
49.70
53650
52430
EQUIPMENT REPAIR & MAINT
416.89
CHECK 400 145761 TOTAL FOR FUND 230:
176.10
53651
52201
STORM SEWER MAINT - DIGGER'S HOTLINE
CORE & MAIN LP
145763
400
04/24/2026
131.25
53650
53410
UNIFORMS & PROTECTIVE EQUIPMENT
ELIZABETH BROWN
145767*#
400
04/24/2026
1,629.00
53650
53400
OPERATING SUPPLIES
SPECIAL EDITIONS, INC
145791*#
400
04/24/2026
4,850.20
Total for fund 230 STORM WATER MANAGEMENT
Page 11 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
9/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 240 AMERICAN RESCUE PLAN
857.50
00000
57101
ARPA FUNDS SOLAR PANELS
MUNICIPAL LAW & LITIGATION GROUP
S.
145729*#
400
04/17/2026
857.50
Total for fund 240 AMERICAN RESCUE PLAN
Page 12 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
10/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 250 TOURISM & CONVENTION
72,315.00
56700
53920
MARKETING PROMOTION & ADVERTISING
WAUKESHA PEWAUKEE CVB
145796
400
04/24/2026
72,315.00
Total for fund 250 TOURISM & CONVENTION
Page 13 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
11/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 420 CAPTIAL ROAD PROJECTS
213.10
57570
58210
SPRIGDALE ESTATES - GLENWOOD
CONLEY MEDIA
145709*#
400
04/17/2026
30.00
57426
58210
LEXINGTON/TACOMA PH 1
MUNICIPAL LAW & LITIGATION GROUP
S.
145729*#
400
04/17/2026
330.10
57564
58210
HICKORY GROVE ESTATES
215.40
57564
58210
HICKORY GROVE ESTATES
488.50
57568
58210
LEXINGTON/TAKOMA PH 2
1,064.00
CHECK 400 145729 TOTAL FOR FUND 420:
2,237.00
56700
58200
QUIET ZONE - WEYER ROAD
R.A. SMITH & ASSOC., INC.
145790#
400
04/24/2026
2,761.50
56710
58200
QUIET ZONE - GREEN ROAD
2,940.50
56730
58200
QUIET ZONE - WATERTOWN ROAD
7,939.00
CHECK 400 145790 TOTAL FOR FUND 420:
9,216.10
Total for fund 420 CAPTIAL ROAD PROJECTS
Page 14 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
12/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 490 CAPTIAL EQUIPMENT
115,850.12
57620
58100
PARKS - CAPITAL EQUIPMENT
SPARTAN TURF PRODUCTS
145741
400
04/17/2026
115,850.12
Total for fund 490 CAPTIAL EQUIPMENT
Page 15 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
13/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 600 WATER UTILITY
90.00
10921
52230
ADMIN & GEN OPS-PHONE, INTERNET CELL
AT&T MOBILITY CC
145705*#
400
04/17/2026
7.16
10652
52400
TREATMENT MAINT-MAINT OF TREATMENT
EQUIP
ELLIOTTS ACE HARDWARE
145713*#
400
04/17/2026
4,300.65
10641
53410
TREATMENT OPS-CHEMICALS
HAWKINS, INC.
145718
400
04/17/2026
379.26
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
MENARDS
145725*#
400
04/17/2026
34.33
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
2.41
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
5.17
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
(23.98)
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
397.19
CHECK 400 145725 TOTAL FOR FUND 600:
6,015.20
00107
12814
LINDSAY WATER - PARK TO SWAN
MUNICIPAL LAW & LITIGATION GROUP
S.
145729*#
400
04/17/2026
9,437.40
00107
12814
LINDSAY WATER - PARK TO SWAN
152.15
10923
52100
ATTORNEY'S FEES
166.80
10923
52100
ATTORNEY'S FEES
15,771.55
CHECK 400 145729 TOTAL FOR FUND 600:
15.72
10676
52400
TRANS & DIST MAINT-MAINT OF METERS
NAPA
145730*#
400
04/17/2026
124.00
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
NORTHERN LAKE SERVICE, INC
145732
400
04/17/2026
372.00
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
496.00
CHECK 400 145732 TOTAL FOR FUND 600:
101.66
10663
53400
TRANS & DIST OPS-METER SUPPLIES
USA BLUEBOOK
145744
400
04/17/2026
2.99
10663
53400
TRANS & DIST OPS-METER SUPPLIES
104.65
CHECK 400 145744 TOTAL FOR FUND 600:
43.90
10678
52100
TRANS & DIST MAINT-SCADA MAINT
BATTERIES PLUS LLC
145757*#
400
04/24/2026
1,164.50
10903
52401
CUSTOMER ACCTS OPS-CUST RECORDS BILL
EXP
BS&A SOFTWARE
145759*#
400
04/24/2026
Page 16 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
14/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 600 WATER UTILITY
38.13
10921
53100
ADMIN & GEN EXPS OPS-OFFICE SUPPLIES
CINTAS CORP
145762*#
400
04/24/2026
4.58
10678
52400
TRANS & DIST MAINT-MISC PLANT REPAIRS
ELLIOTTS ACE HARDWARE
145768*#
400
04/24/2026
243.60
10673
52400
TRANS & DIST MAINT-TRANS& DISTR MAINS
FERGUSON WATERWORKS #1476
145769#
400
04/24/2026
25.83
10675
52400
TRANS & DIST MAINT-MAINT OF SERVICES
269.43
CHECK 400 145769 TOTAL FOR FUND 600:
222.98
10678
52100
TRANS & DIST MAINT-SCADA MAINT
GRANITE TELECOMMUNICATIONS LLC
145773*#
400
04/24/2026
106.99
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
MENARDS
145783*#
400
04/24/2026
106.99
10611
52310
SOURCE MAINT-BUILDINGS AND GROUNDS
213.98
CHECK 400 145783 TOTAL FOR FUND 600:
93.00
10642
52310
TREATMENT OPS-WATER TESTING & LAB EXPS
NORTHERN LAKE SERVICE, INC
145786
400
04/24/2026
23,233.42
Total for fund 600 WATER UTILITY
Page 17 of 73
CHECK DISBURSEMENT REPORT FOR PEWAUKEE
15/15
Page
:
04/29/2026 10:21 AM
User: FIORENTINO
DB: City Of Pewaukee
CHECK DATE FROM 04/16/2026 - 04/28/2026
Amount
Dept
Account
Description
Payee
Check #
Bank
Check Date
Fund: 650 SEWER UTILITY
89.93
10921
52230
ADMIN & GEN OPS PHONE INTERNET CELL
AT&T MOBILITY CC
145705*#
400
04/17/2026
1,551.40
01827
52343
SEWER SERVICE CHARGE SANITARY DISTIRCT
#
BROOKFIELD, TOWN OF
145707
400
04/17/2026
66.48
01827
53400
SUPPLIES AND EXPENSES
MENARDS
145725*#
400
04/17/2026
897.60
01852
52382
OPS - ATTORNEY - SEWER
MUNICIPAL LAW & LITIGATION GROUP
S.
145729*#
400
04/17/2026
152.15
10923
52100
ATTORNEY'S FEES
166.80
10923
52100
ATTORNEY'S FEES
1,216.55
CHECK 400 145729 TOTAL FOR FUND 650:
45.00
10930
53200
ADMIN & GEN OPS- MEMBERSHIP & CONT EDU
WI DNR
145748
400
04/17/2026
48.95
01832
52400
MAINTENANCE OF PUMPING EQIUPMENT
BATTERIES PLUS LLC
145757*#
400
04/24/2026
1,164.50
10903
52401
CUSTOMER ACCTS OPS CUST RECORDS BILL
EXP
BS&A SOFTWARE
145759*#
400
04/24/2026
38.13
10921
53100
ADMIN & GEN OPS-OFFICE SUPPLIES
CINTAS CORP
145762*#
400
04/24/2026
222.97
01831
52100
SCADA/TELEMETRY MAINT
GRANITE TELECOMMUNICATIONS LLC
145773*#
400
04/24/2026
1,436.93
01831
52400
MAINTENANCE OF COLLECTION SYSTEM
MACQUEEN EQUIPMENT
145781
400
04/24/2026
24,718.13
01827
52342
SEWER SERVICE CHARGE - VILLAGE OF PEWAU
VILLAGE OF PEWAUKEE
145794*#
400
04/24/2026
30,598.97
Total for fund 650 SEWER UTILITY
'#'-INDICATES CHECK DISTRIBUTED TO MORE THAN ONE DEPARTMENT
'*'-INDICATES CHECK DISTRIBUTED TO MORE THAN ONE FUND
418,531.90
TOTAL - ALL FUNDS
Page 18 of 73
City of Pewaukee - New Agenda Item
Agenda Language:
Discussion and Possible Action to adopt a new logo for the City of Pewaukee and Parks
and Recreation Department (Fuchs)
Sub Item Agenda Language:
Background Provided By:
Nick Fuchs
Background:
The Common Council first discussed the adoption of a new City and Parks and
Recreation logo at their September 15, 2025, meeting.
At their November 17, 2025, meeting, the Common Council then approved a scope of
services agreement with Saturn Lounge to create logo options for the City and Parks
and Recreation Department.
Attached are options presented by Saturn Lounge. Staff is recommending adoption of
Option 1C for the City logo and Option 1 for the Parks and Recreation logo.
Note the Parks and Recreation Board will be reviewing the new logo at their May 13th
meeting.
Fiscal Impact:
Recommended Motion:
A motion to adopt Option 1C for the City logo and Option 1 for the Parks and Recreation
logo.
Page 19 of 73
CITY OF PEWAUKEE
LOGO OPTIONS
SATURN LOUNGE
MARCH, 2026
Page 20 of 73
SATURN LOUNGE
MARCH, 2026
OPTION 1
A B C
Page 21 of 73
CITY OF PEWAUKEE
LOGO MOCKUPS
SATURN LOUNGE
MARCH, 2026
Page 22 of 73
SATURN LOUNGE
MARCH, 2026
OPTION 1
A B C
Page 23 of 73
SATURN LOUNGE
MARCH, 2026
OPTION 1
A B C
Page 24 of 73
SATURN LOUNGE
MARCH, 2026
OPTION 1
A B C
Page 25 of 73
SATURN LOUNGE
MARCH, 2026
OPTION 1
A B C
Page 26 of 73
PEWAUKEE
PARKS & RECREATION
LOGO OPTIONS
SATURN LOUNGE
APRIL, 2026
Page 27 of 73
SATURN LOUNGE
APRIL, 2026
OPTION 1
Page 28 of 73
Resolution 25-05-11 New Logo Page 1 of 3
WAUKESHA COUNTY CITY OF PEWAUKEE STATE OF WISCONSIN
RESOLUTION NO. 25-05-11
A RESOLUTION ADOPTING AN OFFICIAL MUNICIPAL LOGO AND BRAND
IDENTITY FOR THE CITY OF PEWAUKEE, WAUKESHA COUNTY, WISCONSIN
WHEREAS, the City of Pewaukee (the “Municipality”) is authorized under Wisconsin law to
manage its municipal affairs and promote the general welfare, economic
development, and identity of the community; and
WHEREAS, the Municipality desires to establish a modern, consistent, and recognizable visual
identity to be used in communications, signage, marketing, and official materials;
and
WHEREAS, the Municipality undertook a branding initiative that included Common Council,
city staff, and professional design services; and
WHEREAS, the proposed logo and brand elements have been reviewed by municipal staff and
the Common Council, and are recommended for adoption; and
WHEREAS, adoption of an official logo will promote consistency, professionalism, and
recognition of the Municipality in its operations and outreach;
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Pewaukee,
Wisconsin, as follows:
SECTION 1: Adoption of Official Logo
The Municipality hereby adopts the City of Pewaukee and Parks & Recreation logos
attached hereto as Exhibit A as the official logos of the City of Pewaukee and Parks &
Recreation Department.
SECTION 2. Purpose and Use
The Official Logo shall serve as the primary visual identity of the Municipality and may
be used on, including but not limited to:
• Official publications and communications
• Municipal websites and digital media
• Signage, vehicles, uniforms, and facilities
Page 29 of 73
Resolution 25-05-11 New Logo Page 2 of 3
• Marketing, tourism, and economic development materials
SECTION 3: Brand Guidelines
The City Administrator or other official designated by the Administrator or Common
Council is authorized to develop and maintain brand guidelines governing the proper use,
reproduction, color standards, and placement of these logos. All municipal departments
shall comply with such guidelines.
SECTION 4: Transition and Implementation
Municipal staff are directed to implement the logos in an orderly and cost-effective
manner. Existing materials bearing prior logos may continue to be used until supplies are
exhausted or replacement is practical.
SECTION 5: Prior Logos and Seal
Nothing in this Resolution replaces or modifies the official municipal seal unless
expressly provided by ordinance. Any previously used logos are hereby retired as official
branding elements upon implementation of this Resolution.
SECTION 6: Authorization
The City Administrator is authorized to take all actions necessary to implement this
Resolution, including reproduction, licensing (if applicable), and distribution of the logos.
SECTION 7: Effective Date
This Resolution shall take effect immediately upon passage and posting of publication as
provided by law.
Passed and adopted this 4th day of May, 2025.
FOR THE COMMON COUNCIL OF THE CITY OF
PEWAUKEE, WAUKESHA COUNTY , WISCONSIN
ATTEST: _______________________
Steve Bierce, Mayor
____________________________
Kelly Tarczewski, Clerk/Treasurer
Page 30 of 73
Resolution 25-05-11 New Logo Page 3 of 3
Exhibit A
City Logo
Parks & Recreation Logo
Page 31 of 73
City of Pewaukee - New Agenda Item
Agenda Language:
Discussion and possible action regarding Proposals to Conduct Groundwater Well
Siting Study [Wagner/Mueller]
Sub Item Agenda Language:
Background Provided By:
Jane Mueller/Rob Kincaid
Background:
Last year, the Water Utility conducted the Water Supply Alternatives Analysis to
determine how the City of Pewaukee will provide safe and affordable drinking water to
the community, now and into the next 30 to 50 years.
The Common Council directed staff to continue to look at two options for the drinking
water source: 1) request a Great Lakes Surface Water Diversion. 2) Continue to support
the groundwater supply.
Staff recently met with two hydrogeologic consultants who conduct well siting
throughout Wisconsin to discuss our current and future water supply needs for the
community.
INTERA Incorporated — Mr. Pat Jurcek, P.G. senior hydrogeologist
COLLIER Geophysics - Dr. John Jansen, P.G. Ph.D., principal hydrogeologist
Both hydrogeologists have experience siting wells in southeast Wisconsin and
Waukesha County. Dr. Jansen has sited wells for the City of Pewaukee in the past as
well as a recent well siting for the Village of Pewaukee.
The City requested that the consultant identify at least two well sites. The City provided
the previous 1995 Regional Reconnaissance Study to use as a basis for their reports.
They will update the reports with new data sets that have been compiled since the
original study was conducted. Illustrations of the location of major bedrock formations,
fracture traces and regional aquifers will be incorporated into the report.
INTERA Incorporated Proposal:
1) Data Collection $ 3,580
2) Photo-lineament Analysis $ 5,560
3) Delineation of Potential Contaminant Sources $ 5,975
4) Evaluation of Cambrian Deep Sandstone Potential Well Sites $ 5,530
5) Inventory of Potential Contaminant Sources $ 5,770
6) Report preparations $14,950
Page 32 of 73
Final Project Cost Estimate $41,365
COLLIER Geophysics
Phase 1- Updating the 1995 report and maps including gravity data to help determine
favorable locations for sandstone aquifer wells. Use available data to identify two well
sited to meet City;s immediate needs. $20,000
Phase 2- Evaluate the Feasibility of Developing a Regional Welll Field in the Rock
Bedrock Valley. $17,500
Project Cost Estimate $37,500
Should the City wish to continue to pursue the Groundwater study, additional field work
will need to be conducted to see if these sites are viable. Additional anticipated
reconnaissance costs:
*Geophysical exploration-electrical resistivity tomography (ERT), time domain
electromagnetic conduction (TEM) and/or seismic refraction tomography (SRT).
Determined by the # of samples needed $30,000 - $50,000
*Test boring and test wells-boring and drilling tests conducted of favorable sites to
confirm capacity and quality of water available.
Determined by the # of well sites $50,000 - $100,00 per site.
The Pubilc Works Committee recommended approval of this item.
Fiscal Impact:
Recommended Motion:
Common Council approve the proposal from COLLIERS Geophysical to prepare a Well
Siting Study for the City of Pewaukee for a cost not to exceed $37,500.
Page 33 of 73
April 20, 2026
To:
Rob Kincaid
Assistant Utility Manager
City Of Pewaukee Water and Sewer Utility
Via email : kincaid@pewaukee.wi.us
Re: Proposal to site two municipal wells and evaluate the feasibility of developing a
regional well field
Dear Mr. Kincaid:
Thank you for contacting us to discuss siting two new municipal wells for the City of
Pewaukee (the City). As we discussed, the City of Pewaukee is interested in developing
additional sand and gravel or dolomite aquifer wells within their projected service area, if
possible. The City is also interested in siting one or more sandstone aquifer wells to pair
with any shallow well developed or to provide the needed capacity if no shallow well
sites can be found. The City is also interested in looking at options for a regional water
supply and would like to determine if there is the potential for a regional water supply
from a bedrock valley aquifer located just west of the City. This proposal outlines an
approach to evaluate both of these options and provide the information required to
provide two wells within the City for immediate needs and evaluate the viability of
developing a new regional source of water that can be incorporated into planning for
other long-term water options available for the region.
To respond to your request, Collier Consulting (Collier) is pleased to provide you with
this proposal to conduct well site exploration activities for the City. Collier will partner
with our teaming partner Spheros Environmental (Spheros) to provide data management,
data visualization, and technical support for the project. Spheros (formerly LRE) has
recently hired a midlevel hydrogeologist in Milwaukee who will be supporting this
project.
Background
Previous exploration studies conducted for the City identified several areas with potential
for sand and gravel and dolomite wells, collectively known as the shallow aquifer, as well
as developed deep sandstone aquifer wells in the Deep Sandstone Aquifer. I have
Box 1137
590 East South Loop
Stephenville, TX 76401
Office: (254) 968-8721
Fax: (254) 968-8725
www.collierconsulting.com
Page 34 of 73
personally conducted several well siting projects for the City over the last 30 years that
have led to the development of several dolomite aquifer wells and paired well
installations of sandstone and dolomite wells on the same site or on adjacent sites.
A notable study is a regional reconnaissance study of groundwater resources in the City I
completed in 1995 for Ted Zoricha and Associates (TZA, 1995). Much of the basic
information of the hydrogeology of the area was compiled for that study. There are new
data sets that should be incorporated into the maps developed for the 1995 report to
improve the understanding of the subsurface and identify the most favorable well sites on
the available land. This study proposes to update the information produced by that study
to identify the potential to develop additional shallow aquifer wells as well as new
methods to select sandstone well locations to avoid subsurface hazards such as
PreCambrian mounds that reduce the thickness of the sandstone and reduce the yield of a
well or drilling into the Waukesha fault plane that has caused the collapse of two wells in
the City.
Figure 1 is a recent bedrock elevation map for Waukesha County that illustrates the
location of a major bedrock valley, the Rock Bedrock Valley, that trends southwest to
northeast across the county within a few miles of the City. The Rock Bedrock Valley has
been used as an aquifer for many other municipal water systems in the area including
Hartland, Oconomowoc, Jackson and Slinger. It represents a regional aquifer with the
capacity to supply millions of gallons per day to a properly designed well field. The map
also indicates the presence a smaller bedrock valley that enters the City on its west side
and trends to the east in the central part of the City. This tributary valley has been used to
support a high capacity municipal well for the Village of Pewaukee and may contain
similar permeable units capable of supporting additional high capacity wells within the
City boundaries.
Figure 2 is a map of fracture traces prepared for the 1995 TZA study. It indicates areas
interpreted to have underlying fracture zones in the dolomite bedrock that are potentially
capable of supporting high capacity municipal wells. The City produces water from 5
wells in the dolomite aquifer that range in capacity from 30 to 521 gpm. Additional high
capacity wells can be developed in the dolomite aquifer within the City if suitable well
sites can be identified.
Successfully siting a high capacity municipal well in the sand and gravel or dolomite
aquifer within the City will require geophysical exploration and test borings on available
land in suitable areas within the City. Given the rate of development over the last 20
years, the number of suitable well sites is likely to be limited and efforts to identity and
preserve these sites will be important for the current and future water supply needs of the
City.
In addition to the shallow aquifer, the City also has the option to develop additional wells
in the sandstone aquifer. Sandstone wells are more expensive to drill and pump, but they
are less susceptible to contamination from surface sources. They are likely to produce
water with elevated radium and are often paired with shallow aquifer wells to blend down
Page 35 of 73
the radium and increase the volume of water that can be pumped from a single well site.
The city produces water from 7 sandstone wells that range in depth from 1,000 to 1,415
feet deep with capacities from 130 to 752 gpm. The sandstone aquifer is known to vary
in thickness and there are areas with knobs of impermeable quartzite or granite on the
surface the basement rock that protrude into the aquifer and reduce the thickness of the
sandstone and reduce the capacity of wells in those locations. The sandstone is also split
by the Waukesha Fault and at least on City well was drilled into the fault zone and
ultimately collapsed.
Siting a successful sandstone well requires selecting a site that is far enough from
existing sandstone wells to minimize interference between the wells as well as avoiding
mounds on the basement surface or drilling into the Waukesha Fault. Figure 3 shows the
distribution of gravity data in Waukesha County from a UWM MS thesis (Brukardt,
1983). The regional gravity data can be used to identify potential mounds on the
basement rock surface as well as identify the location of the Waukesha Fault Zone as
shown on Figure 4. This can significantly increase the probability of drilling a high
yielding sandstone well with a stable borehole. Previous work for the Village of
Pewaukee has identified a correlation between the gravity readings and thickness of the
sandstone and the specific yield of sandstone wells. Similar analysis will be used to
identify favorable sandstone well locations within the City.
Page 36 of 73
Figure 1: Bedrock topography of Waukesha County
Page 37 of 73
Figure 2 Map of fracture traces in the City of Pewaukee prepared for the 1995 TZA
study
Page 38 of 73
Figure 3 Gravity data in Waukesha County from Brukardt, 1983.
Page 39 of 73
Figure 4: Modeled Elevation of Basement Surface from Gravity Data in
Southeastern Wisconsin (Skalbeck 2008)
Project Work Plan
For the sake of efficiency and clarity, this project has been divided into two distinct
tracts. Phase 1 will focus on identifying two well sites for municipal wells to meet your
immediate needs. Phase 2 will be a feasibility study to evaluate the potential to develop
a regional well field in the Rock Bedrock Valley just west of the City limits.
Development of this aquifer will require cooperation between the City and other
municipal entities but will provide a source of water with enough capacity to service
several municipalities and provide an economy of scale to diffuse the impact of the
capital costs and any current or future treatment requirements. This option should be
considered as a potential long term source of water and as a alternative or back up to
other regional options such as the expansion of Lake Michigan water.
Phase 1: Site Two Municipal Wells within the City Limits
Phase 1: Task 1 Geologic Reconnaissance Work Plan
The work will focus on updating the 1995 Reconnaissance report and maps to identify
viable options for well sites in the shallow or deep sandstone aquifer. The preference will
be to identify potential shallow aquifer wells that could be paired with sandstone aquifer
wells on the same well site. Phase 1 will also use regional gravity data to identify
favorable areas for sandstone aquifer wells. The gravity data will be used to determine
favorable locations for sandstone aquifer wells to minimize the risk of hitting shallow
PreCambrian basement rock that thins the available sandstone and causes reduced well
capacity, such as was encountered at Village of Pewaukee Well 5, find areas of the
sandstone likely to have greater thickness and higher specific capacity for wells, and map
the location of the Waukesha Fault trace to avoid hitting large fracture zones and
incompetent rock such as was encountered in City of Pewaukee Well 5.
Page 40 of 73
The City will be asked to provide a map of parcels that are available, or potentially
available to the City. New well data in the area will be used to update the depth to
bedrock map and bedrock elevation map. The Fracture Trace analysis map will be
updated around sites identified as being potentially available to the City.
The potentially available parcels identified by the City will be overlaid on the maps to
identify candidate exploration areas for dolomite or sand and gravel wells. A geophysical
exploration program will be designed based on the size, number and site conditions and
number of exploration sites. The exploration efforts will depend upon the specific target
and site conditions and are expected to consist of some combination of electrical
resistivity tomography (ERT), time domain electromagnetic conduction (TEM) and/or
seismic refraction tomography (SRT). The scope and cost of the geophysical exploration
program cannot be determined until the number of sites and areas to be studied has been
identified. Based on similar exploration efforts, the geophysical exploration for shallow
wells can be expected to be cost between $30,000 and $50,000. The results will be
summarized in a report with updated maps.
If the shallow well exploration identifies promising sites, test borings and test wells will
be required to confirm the capacity and quality of water available. The report for the
shallow well geophysical exploration work will include the location and construction
details for test borings to confirm the results and identify locations for test wells and
production wells. The number and costs of the test borings cannot be determined until the
geophysical work is completed, but based on previous studies in the area it can be
expected to cost between $50,000 and $100,000, including drilling and oversite costs
depending on the number and depths of the borings. This estimate will be revised as site
information becomes available.
Task 1 will also include an analysis of existing data to select promising sandstone well
locations. The regional gravity data and well logs will be used to produce a map of
favorable sandstone well site. Sandstone well locations will be found on or near potential
shallow aquifer well sites if possible. If no favorable shallow well sites are identified, the
regional data will be used to find the most favorable sandstone well sites on potentially
available land that is favorably positioned to existing watermains and infrastructure. An
area of particular interest is the southern portion of the City near the border with the City
of Waukesha. The conversion of the City of Waukesha from groundwater to surface
water has caused an recovery of 100 to 200 feet in water levels in the sandstone aquifer
and has made areas in the southern part of the City of Pewaukee much more favorable for
sandstone well development. We will use the available data to identify potential
sandstone well locations with an emphasis of collocating shallow wells with sandstone
wells, if possible. Sites will be chosen to reduce potential interference with existing or
potential future sandstone wells and maximize the expected thickness of the sandstone
and capacity of the wells.
Page 41 of 73
The estimated cost of Phase 1, Task 1 is $20,000 not to exceed, to be billed at our
standard rates. The estimated costs of the subsequent geophysical exploration and test
drilling have been provided in the text above but are subject to change based on the
specific drilling targets, number and depth of borings, and the driller selected.
Phase 2: Evaluate the Feasibility of Developing a Regional Well Field in the Rock
Bedrock Valley
Phase 2 will be a high level feasibility study of the options to develop a regional well
field in a Rock Bedrock Valley Aquifer west of the City. Regional geologic maps of the
depth to bedrock, bedrock elevation, and regional gravity data will be used to delineate
the limits of the Rock bedrock valley (Figure 1) west of the City. Areas of open land or
potentially available land will be identified on the map as possible well field areas. Well
logs from existing wells will be used to construct geologic cross sections crossing the
bedrock valley in locations that appear favorable for well field development. The
geologic cross sections will be used to identify areas with permeable sand and gravel
deposits that are covered by low permeability confining units.
Phase 2, Task 1: High Level Evaluation of the Feasibility of Developing a Regional
Well field
This task will include a review of available regional geologic reports to map the shape of
the Rock Bedrock Valley adjacent to the City. This review will include published
geologic maps, a review of the regional gravity data, and the construction of
approximately three geologic cross-sections to illustrate the hydrostatigraphy of the
aquifer system in the bedrock valley. The cross sections will delineate the layers of
permeable sand and gravel aquifer material and the low permeability confining units
above and below the aquifer units that separate the aquifer. The confining units will
provide isolation between the pumping wells and shallower domestic wells and surface
water resources and reduce the risk of contamination from surface sources.
The project will start with a meeting with the City and their invited guests to establish the
vision for the project and identify the areas to focus on in terms of areas to explore, and
discuss potential impacts to shallow aquifers and surface water to evaluate and potential
partners to consider. The results will be presented in a concise high level report, that
identifies the potential well locations, potential well yield and water quality, parcels of
potentially available land that could be suitable for well field development, and a
discussion of the advantages and disadvantages of a regional well field. The report will
also include a discussion of the steps that would be required to develop the well
field. Strategies to acquire and preserve the land would also be discussed, such as
locating the well field on existing or future public lands such as parks or sports
complexes, or identifying specific well sites within land planned for development to set
aside the future well sites and allow development of the site for other uses.
Page 42 of 73
It should be noted that Task 2 should be completed soon before more potential sites are
lost to development and to allow enough time for discussions with regional partners to
evaluate the implications and advantages of the formation of a regional groundwater
utility to complement the existing surface water utility in the County. The new
groundwater utility could be used to supply areas of Waukesha County where a regional
surface water utility may not be possible or practical. The groundwater source can also be
used as a backup to serve the surface water service area if there is ever an interruption of
the surface water source or changes in economic or political conditions
We anticipate there will be a need for on-going technical support to the City if this option
is pursued. Collier and Spheros will be available as needed to provide analysis,
recommendations, and support in negotiation with other municipalities or regulatory
agencies as needed on an ongoing basis at our normal billing rates with the scope of each
effort to be defined In a concise scope of work and approved by the city.
The estimated cost of Phase 2, Task 1 is $15,000 not to exceed, to be billed at our
standard rates. The estimated costs of the subsequent support services will be billed at
our standard rates based on scopes of work approved by the City.
Closure
Collier and Spheros appreciate the opportunity provide this proposal. We are prepared to
start working within 2 weeks of notice to proceed and we anticipate requiring
approximately 30 days to complete Phase 1 and an additional4 to 6 weeks to complete
Phase 2, assuming that both phases are approved. Approved. We will require input from
the city as to the availability of land for Phase1 and the areas of potential interest for the
regional well field in Phase 2, potential future partners to be considered, and the
availability of land, and the preferred water transportation corridors.
We trust this information meets your needs and look forward to working with you and the
City to locate new municipal well sites and evaluate regional water supply options. If
this is acceptable, please sign and return the attached professional services agreement.
Please let us know if we can answer any questions or provide more information.
Sincerely,
John Jansen, P.G., Ph.D.
Principal Hydrogeologist
Collier Consulting, Inc.
john@collierconsulting.com
Page 43 of 73
Geophysical Project Cost Estimate
Project Name:
Proposal Number:
Prepared By:
Proposal Date:
Estimate Type:
Completed For:
Client Phone Number
Via Email
Client:
Project Location:
Project Description:
Line Item Estimated Cos
t
Task 1. City Well Reconnaissance Study 20,000.00$
Task 2.Regional Wellfield Analysis 17,500.00$
Additional Support TBD
Total:
37,500.00$
Scope of Work:
-
-
-
-
-
Notice to Proceed
Client:
Authorized by:
Signature:
Date:
PRICING
Comment
The detail of the analysis is limited to the detail of available information and any additional data collection authorized by the Village.
Field work and additonal support TBD
Collier and Spheros propose to conduct a Task 1 well siting study for the City of Pewaukee to site two municipal wells within the City boundaries and evaluate the
feasibility of developing a regional well field outside the City limits. The Task 1 study consists of a study to site one to two new municipal wells within the City limits
to meet projected water needs. The City wishes to explore the feasible options to drill new wells in the sand and gravel , dolomite, or sandstone aquifers on sites
potentially available to the City. Ideally a single site can be identified that can support both a shallow sand and gravel or dolomite well and a deep sandstone
aquifer well. Individual well sites will be needed if a single dual aquifer site can not be identified. The City wishes to avoid sandstone aquifer well sites that lie
above mounds of PreCambiran rock that will reduce the yield of a sandstone well and also avoid sites above the Waukesha Fault that can result in unstable
boreholes in sandstone wells. The Collier team proposes to collect and reinterpret existing geologic reports and geophysical data collected for previous studies,
including gravity data collected by the USGS and UWM, to map the Waukesha Fault and identify favorable and available sites for shallow wells and/or deep
sandstone wells. The results will be used to up date a geological reconnaissance study prepare for the City in 1995. Colller will compile this data, review it to
identify favorable sites for shallow well exploration or siting a deep sandstone well. The cost estimate includes a budget for site visits and meetings with the
Village and their engineers to discuss options and a cornice report describing the results with recommendations for subsequent geophysical exploration. Estimated
costs to conduct geophysical exploration and test drilling support for shallow aquifer wells and permitting and drilling support for sandstone wells will be provided as
project needs are identified. The Task 2 regional well field evaluation project will consist of a review of regional geologic reports and geophysical data to identify
potential well field sites and support the City with design and negotiations to evaluate the potential role of a groundwater wells field as part of a long term water
supply for the region. The deliverable of the project will be a report describing the methods used and the relevant findings. Collier and Spheros will be available
as needed to support negotiations and planning for the development of a regional water utility or wellfield.
Key Assumptions and Limitations - (Quote valid for 90 days)
kincaid@pewaukee.wi.us
(262)691-0804
City of Pewaukee, WI
City of Pewaukee
Data review to site well
City of Pewaukee Well Siting
John Jansen
3/20/2026
Time and Materials Cost Estimate
Rob Kincaid
3085
City of Pewaukee
This notice to proceed authorizes Collier Geophysics, LLC. to complete the scope of work at the estimated cost presented above and must be completed and
signed prior to the start and performance of any work. Upon signing, Client agrees to the General Terms and Conditions of Collier Geophysics.
(Name and Title)
Access provided to the site by the client - cost for permitting is not included
Work area needs to be safe and navigable for staff and equipment.
Field work cannot be completed during inclement weather; crew and equipment safety will affect where lines are placed
Actual field parameters may be altered on-site by the field geophysicist to optimize the investigation
7711 W. 6th Ave., Suite G
Lakewood, CO 80214
Office: 720.487.9200
www.colliergeophysics.com
SDVOSB
Collier Consulting, Inc. Geophysical Project Cost Estimate
Page 44 of 73
COLLIER GEOPHYSICS’ (COLLIER) GENERAL TERMS AND CONDITIONS
FEE PAYMENT
1) COLLIER will submit invoices to Client monthly foll owing any month of significant
activity or at key project milestones, and a final invoice upon completion of services.
Invoices will show charges based on current COLLIER Fee Schedules or other
agreed-upon basis, and will include a detailed separation of charges and supporting
information.
2) Payment is due upon receipt of invoice. On accounts past due by forty -five (45)
days, Client will pay a finance charge of 1.5 percent per month dating from the
invoice date.
3) In the event Client requires expert -witness testimony, Client will pay COLLIER all
past due balances before COLLIER will proceed to prepare for or offer testimony.
4) Client will pay the balance stated on the invoice unless Client notifies COLLIER
of the particular item that is alleged to be incorrect within fifteen (15) days from the
invoice date. Client will remit the balance of undisputed items in a timely manner
while a disputed item is being reviewed.
5) In the event Client fails to pay COLLIER within forty -five (45) days following
invoice date, COLLIER may consider that a breach of the consulting agreement and
all duties of COLLIER may be suspended or terminated, and work product may be
withheld, without liability of any kind to COLLIER.
OWNERSHIP OF DOCUMENTS AND CONFIDENTIALITY
1) All reports, field data and notes, laboratory test data, calculations, estimates, and
other documents prepared in the course o f consulting service shall remain the
property of COLLIER . Client agrees that all reports and other work COLLIER
furnished to Cli ent or Client's agents which are not paid for, will be returned upon
demand and will not be used for any purpose whatsoever.
2) Documents provided to COLLIER by Client will be returned to Client, upon
request, at the completion of work at Client's cost.
3) Reuse of reports or other materials by Client or others, on extensions or
modifications of the project or on other sites, w ithout written permission from
COLLIER or adaptation by COLLIER for the intended purpose, shall be at the user's
sole risk, withou t liability on the part of COLLIER, and Client agrees to indemnify
and hold COLLIER harmless from all claims, damages and expenses, including
attorney's fees.
4) COLLIER shall maintain Client's project data and reports in strictest confidence,
and will release such information to others only upon written permission from Client.
DISPUTES
1) Client will pay all collection expe nses or litigation fees, including attorney fees,
that COLLIER incurs in collecting any delinquent amount Client owes.
2) If the Client institutes a suit against COLLIER which is dismissed or for which
judgment is rendered for COLLIER, Client will pay COLLIER for all costs of defense
including attorney fees, expert witness fees and court costs.
INSURANCE AND INDEMNIFICATION
1) COLLIER will carry Workers Compensation, General Liability, Automobile
Liability, Excess Umbrella-Form Liability and Professional Liability insurance policies
in amounts which COLLIER considers adequate. Certificates of insurance will be
provided to Client upon request. Within the terms and conditions of the insurance,
COLLIER agrees to indemnify Client against loss caused by a ctions of COLLIER, its
employees or its subcontractors. COLLIER will not be responsible for liability
beyond the limits and condi tions reflected herein and in the Certificate of the
Insurance. At Client's request, COLLIER will seek additional insurance c overage or
limits for specific projects, and will bill Client for the additional premium cost.
COLLIER will require that its field subcontractors are insured to the same levels
required of COLLIER by Client.
2) COLLIER's professional liability will be limited to the value of the consulting
services performed.
3) COLLIER will not be responsible for any loss or liability related to negligence of
Client others employed by Client, or from negligence by any person for whose
conduct we are not legally responsible.
4) Neither the Client nor COLLIER , their respective officers, directors, partners,
employees, contractors or sub -consultants shall be liable to the other or shall make
any claim for any incidental, indirect or consequential damages arising out of or
connected in any way to the Project or to this Agreement. This mutual waiver of
consequential damages shall include, but is not lim ited to, loss of use, loss of profit,
loss of business, loss of income, loss of reputation and any other consequential
damages that either party may have incurred from any cause of action including
negligence, strict liability, breach of contract and breac h of strict or implied warranty.
Both the Client and COLLIER shall require similar waivers of consequential
damages protecting all the entities or persons named herein in all contracts and
subcontracts with others involved in this project.
CUSTODY OF MATERIALS
1) In the course of work, COLLIER may take custody of and transport soil and/or
water samples from Client's site. Upon the completion of evaluation and/or testing
of such samples, COLLIER reserves the right to return the samples to Client at
Client's expense, and Client agrees to accept such samples and the responsibility
for their proper and legal disposal.
2) At no tim e, under any circumstances, will COLLIER personnel represent
COLLIER or themselves as generators of waste, hazardous or otherwise, which
may have to be removed from or disposed of on a site, and COLLIER personnel will
not sign hazardous waste manifests on behalf of Client.
SUBCONTACTORS
1) On occasion, COLLIER engages the specialized services of individual
consultants or ot her companies to participate in a project. When considered
necessary, these firms or other consultants will be used with Clie nt's approval. The
cost of such services plus a fifteen (15) percent service charge will be included in
our invoice.
2) Alternatively, at Client's request, COLLIER will recommend contractor(s) or
specialist(s) for Client to enter into direct contract(s ) with. Invoices for these outside
services will be issued to Client for direct payment to the contractor(s). COLLIER
review and approval of each invoice will be provided on request. Under either
alternative, COLLIER does not guarantee and is not respon sible for the
performance of the contractor(s) or the accuracy of their results.
CHANGES TO THE APPROVED SCOPE OF WORK
Once a scope of work is approved and signed, the Client must submit any changes
or modifications to the scope of work to C OLLIER in writ ing. COLLIER agrees to
provide a response to change orders in a timely manner. Any changes or
modifications to the approved scope of work will be at an additional cost, above and
beyond the approved scope of work. The additional cost must be agreed upon an d
a written change order approved by COLLIER and the Client prior to the start of any
new tasks.
STANDBY TIME
COLLIER will not co nduct on -site work during inclement weather, extreme
temperatures or other atmospheric conditions that jeopardize the health and safety
of personnel and/or equipment. In the event that COLLIER incurs standby time due
to inclement weather, delays by client and/or other on- site contractors working for
the Client, and/or other conditions outside the control of COLLIER, Client agrees to
pay 75% of personnel rates, 100% or equipment rates, and 100% of expenses.
GEOPHYSICAL & GEOLOGICAL INSTRUMENTATION SERVICES
COLLIER is equipped to provide specialized geophysical and geo logical
instrumentation services according to project needs. Fees for these equipment
services will be based on use charges at standard rates published by COLLIER plus
fees for consulting ser vices. Client agrees to be responsible for any equipment
stuck downhole and the recovery thereof.
RIGHT OF ENTRY
Client will furnish right -of-entry on the site for COLLIER to conduct the work.
COLLIER will take reasonable precautions to minimize damage t o the land from use
of its equipment but has not included in the fee the cost for restoration of damage
that may result from site operations. If COLLIER is required to restore the land to its
former condition, this will be arranged and the cost plus fifteen (15) percent will be
added to our fee.
DAMAGE TO SUBSURFACE STRUCTURES
Reasonable care will be exercised in locating subsu rface structures in the vicinity of
proposed subsurface explorations. This will include contact with the local agency
coordinating subsurface utility information (i.e., "Call Before You Dig" service) and a
review of plans provided by Client for the project site. COLLIER shall rely upon any
information provided by Client or Client's agent or representative. If the locations of
underground structures are not known accurately or cannot be confirmed, then
there will be a degree of risk to Client associated w ith conducting the work. In the
absence of confirmed underground structure locations, Client agrees to accept the
risk of damage and possible costs associated with repair and restoration of damage
resulting from the work.
PETROLEUM PRODUCTS AND HAZARDOUS MATERIALS
If, at any time, evidence of the existence or possible existence of hazardous
materials is discovered, COLLIER reserves the right to renegotiate any consulting
agreement, the fees for our services and our continued involvement in the project.
COLLIER will notify Client as soon as possible should unanticipated hazardous
materials or suspected hazardous materials be discovered. Client agrees to
compensate COLLIER for the cost of any and all measures that, in our professional
onsite judgment are ju stified to protect the health and safety of our personnel,
Client's employees , the public, and/or the environment. In addition, C lient waives
any claims against COLLIER and, to the full extent permitted by law, agrees to
indemnify, defend and hold COLLIER harmless from any and all claims, damages
and liability, including but not limited to cost of defense, in any way connected with
the hazardous materials.
Conflicting Terms
These general terms and conditions shall govern and control, unless specifically
provided to the contrary in any attached proposal or s upplemental agreement. The
fact that additional terms or provisions appear in one or the other document shall
not, in and of itself, create a conflict.
STANDARD OF CARE
In accepting our proposal for consulting services, Client acknowledges the inherent
risks associated with any geological investigation. In performing professional
services, COLLIER will use th e degree of care and skill ordinarily exercised under
similar circumstances by members of the pr ofession practicing in the same or
similar localities. COLLIER makes no express or implied warranty beyond our
commitment to conform to this high standard of professional practice.
Page 45 of 73
INTERA Incorporated
101 West Kirkwood Ave., Suite 316
Bloomington, IN 47404
+1 (812) 219 6442
INTERA.com
April 10, 2026
Mr. Rob Kincaid
Assistant Utility Manager
City of Pewaukee Water and Sewer Utility
RE: Proposal For Municipal Well Siting Study, City of Pewaukee, Wisconsin
Dear Mr. Kincaid,
INTERA has prepared this proposal to conduct a municipal well siting study and long-term water supply
planning study for the City (the City) of Pewaukee, Wisconsin. As we understand, the City desires to add
locate and develop municipal well site(s) with a minimum capacity of 500 gallons per minute (gpm) in
either the shallow unconsolidated sand and gravel, fractured Silurian Niagaran Dolomite or Cambrian
Deep Sandstone aquifers. The City desires that the proposed study be used for short or near-term
planning to identify and develop high-capacity municipal well sites prior to land use restraints due to
rapid residential and commercial development in the greater Pewaukee area. In addition, the proposed
study will also be used for long-term water supply planning to help the City determine if obtaining water
supply from Lake Michigan is the best option for future water supply.
Background Information
The City operates twelve municipal wells that are co nstructed in the unconsolidated sand and gravel,
Silurian Niagaran and Cambrian deep sandstone aquifers (Figure 1). Two of the City’s deep sandstone
wells have had issues with collapsed formation which may be related to the Waukesha Fault and high
radionuclide concentrations are also present in some of the sandstone wells. Elevated PFAS and chloride
concentrations are also present in some of the City’s shallow wells. In addition, the City has been
experiencing rapid residential and commercial development which can make it challenging to locate and
develop high capacity shallow sand and gravel wells.
In 1995, a Task 1 geologic reconnaissance study (TZA , 1995), was conducted in the Pewaukee area to
identify potential high capacity sand and gravel and fractured dolomite well exploration areas. Potential
sand and gravel well exploration areas were focused on land parcels that overlapped a buried, bedrock
valley system, whereas fractured dolomite well exploration areas were selected based on the results of
an aerial photo-lineament/fracture trace analysis. Many of the delineated exploration areas are likely no
longer available due to unfavorable land use or close proximity to potential contaminant sources.
Therefore, INTERA recommends that an updated Task 1 well siting study be conducted incorporating new
data sources (i.e. well construction reports, regional hydrogeologic studies, LIDAR data) to identify
potential high capacity well sites. The recommended study area will cover the City of Pewaukee boundary
and adjacent areas (approximately 2-3 miles beyond City boundary).
Based on our extensive high-capacity well siting experience, the objectives of our proposed Task 1 study
will be:
Page 46 of 73
Mr. Rob Kincaid
April 10, 2026
Page 2
Further delineation of the regional scale pre-glacial buried bedrock valley and tributary system in
Pewaukee and surrounding areas. The results of this analysis will be used to delineate potential
high-capacity sand and gravel test well locations with specific recommendations designed to
further assess aquifer capacity and water quality.
Conduct an updated photo-lineament analysis utilizing historical and current aerial photographs
to identify potential areas associated with bedrock fracture zone(s) and faults in the Silurian
Niagaran dolomite bedrock aquifer. The results of this analysis will be used to delineate potential
high capacity fractured dolomite test well locations with specific recommendations designed to
further assess aquifer capacity and water quality.
Conduct a detailed analysis of the Precambrian surface utilizing regional studies (Skalbeck, J.D.,
and Others, 2006 and 2014) which utilized aeromagnetic, gravity and well log data to identify
areas with where overlying deep sandstone aquifer has: 1) good potential for favorable water
capacity production and aquifer water quality; and sufficiently offset from the Waukesha Fault to
avoid issues with collapsed sandstone formation.
Identify known and potential environmental contaminant sources to help safeguard the potable
water supply and to meet all Wisconsin Department of Natural Resources well setback criteria.
INTERA’s proposed hydrogeological assessment will be led by Mr. Pat Jurcek, P.G., senior hydrogeologist
who has over 34 years of experience conducting numerous municipal and industrial high capacity well
siting studies throughout Wisconsin and North America (including the previous 1995 well siting study) .
Mr. Jurcek is also familiar with the Wisconsin Department of Natural Resources (WDNR) requirements and
regulations for developing municipal potable high capacity sand and gravel wells. A copy of Mr. Jurc ek’s
resume is included in the INTERA Midwest Water Supply SOQ (submitted with this proposal). Mr. Jurcek
will also utilize other staff and resources at INTERA to complete the proposed study in a timely and
efficient manner.
Proposed Task 1 Hydrogeological Assessment Study Methodology
A summary of the proposed scope of work and cost estimate is provided below.
Delineation of buried, bedrock valley system:
In addition to utilizing previous exploration studies results, INTERA will obtain the GIS files
associated with the Wisconsin Geologic and Natural History Survey (WGNHS) southeastern
Wisconsin bedrock topography map (Evans, T.J., and Others, 2004). Selected domestic and high
capacity well construction reports would be then used to further refine the above initial bedrock
valley trend and to evaluate potential areas for the presence of permeable sand and gravel
deposits capable of sustaining high capacity well(s). Starting with a regional bedrock topography
map (to incorporate bedrock valley and tributary trends beyond City limits) and then adding
updated subsurface data has been utilized by INTERA to produce a higher resolution map of the
bedrock topographic surface in other well siting studies conducted in southeastern Wisconsin (see
Figure 2).
Photo-lineament analysis:
INTERA will obtain historical and current aerial photographs of the Pewaukee area along with
Light Detection and Ranging (LIDAR) maps to identify potential subsurface bedrock fracture and
Page 47 of 73
Mr. Rob Kincaid
April 10, 2026
Page 3
fault zones. Subsurface bedrock fracture zones and associated weathering features often result
in surface topographic depressions and concentrated water seepage features which can be
delineated. Initially, INTERA will utilize the previous photo -lineament analysis results and utilize
the higher resolution aerial photographs and LIDAR maps to provide an updated assessment of
potential bedrock fracture zone areas.
Evaluation of Cambrian Deep Sandstone Potential Well Sites:
In addition to further delineating the trend of the Waukesha Fault in the study area, INTERA will
utilize regional studies (Skalbeck, J.D., and others, 2006 and 2014) which utilized aerial
aeromagnetic and gravity data to infer the underlying Precambrian granite surface. From
experience deep sandstone well yields and water quality (i.e. high radionuclide, TDS and chloride
concentrations) often correlates with the presence of ridges and depressions on the underlying
Precambrian surface. Data from the above studies will be used to generate a detailed map of the
inferred Precambrian surface in the study area which will also include sandstone well log data and
water quality to identify potential deep sandstone wells that are sufficiently offset from the
Waukesha Fault, and Precambrian ridges and depressions. Figure 3 summarizes the inferred
Precambrian surface in southeastern Wisconsin (Skalbeck J.D., and Others, 2006 and 2014) which
illustrates the trend of the Waukesha Fault and the highly variable Precambrian surface.
Inventory of Potential Contaminant Sources:
Initially, INTERA will review the 2025 potential contaminant source inventory conducted by Strand
Associates for the City. State and federal databases will be accessed to obtain updated
information on known environmental contaminant sources in the study area. The objective will
be to locate all known potential contaminant sources within the study area to minimize the
potential of groundwater contamination and to determine all WDNR contam inant well setback
distances at potential designated well site(s).
Maps and data compiled from above will be summarized in a brief technical report that will also provide
a map with recommended specific, designated areas that the City can utilize to try and obtain exploration
easements to develop high capacity well site(s). After potential well exploration site(s) have been secured,
a program can be designed to proceed with site specific testing to further evaluate aquifer water
production capacity and water quality.
Page 48 of 73
Mr. Rob Kincaid
April 10, 2026
Page 4
Project Cost Estimate
The proposed scope of work will be conducted as lump sum with the costs listed for phase of the
proposed project.
Project Cost Estimate, Municipal Well Siting Study, City of Pewaukee, Wisconsin
Project Phase Cost
1. Data Collection $3,580
2. Photo-lineament Analysis $5,560
3. Delineation of buried, bedrock valley system $5,975
4. Evaluation of Cambrian Deep Sandstone Potential Well Sites $5,530
5. Inventory of Potential Contaminant Sources $5,770
6. Report Preparation $14,950
Final Project Cost Estimate $41,365
INTERA appreciates the opportunity to submit this proposal to conduct this very important water supply
study for the City of Pewaukee, Wisconsin. Please contact INTERA if you have any questions or need
additional information,
Sincerely,
INTERA Incorporated
Patrick J. Jurcek, P.G.
Senior Hydrogeologist
Page 49 of 73
Mr. Rob Kincaid
April 10, 2026
Page 5
Figure 1: Municipal Well Location Map, City of Pewaukee, Wisconsin
Page 50 of 73
Mr. Rob Kincaid
April 10, 2026
Page 6
Figure 2: Regional Bedrock Surface Topography (right) and Detailed Bedrock Surface Topography
(left), Big Bend, Wisconsin
Page 51 of 73
Mr. Rob Kincaid
April 10, 2026
Page 7
Figure 3: Comparison of Precambrian Basement Topography, SE Wisconsin based on 2-3 and 4-D
profile models and well logs (A) and Based on 3-D model and Well log Data (B)
Page 52 of 73
Mr. Rob Kincaid
April 10, 2026
Page 8
REFERENCES
Evans T.J., Massie-Ferch, K.,M., and Peters, R., M., 2004: Preliminary Bedrock Topography Map of
Walworth, Racine, Kenosha, Milwaukee, Waukesha, Ozaukee and Washington Counties, Wisconsin
Geological and Natural History Survey (WGNHS) Open-File Report 2004-19
Skalbeck, J.D., Couch, J.N., Helgesen, R.S., and Swosinski, D.S., 2006: Coupled Modeling of Gravity and
Aeromagnetic Data to Estimate Subsurface Basement Topography in Southeastern Wisconsin,
Geoscience Wisconsin, Volume 17, WGNHS, pp 53-64
Skalbeck, J.D., Koski, A.J., and Peterson, M., T., 2014: Estimation of Precambrian Basement Topography
in Central and Southeastern Wisconsin from 3-D Modeling of Gravity and Aeromagnetic Data,
Journal of Applied Geophysics No. 106, Elsevier, p 187-195
Ted Zorich and Associates (TZA), 1995: Report on Task 1.0 Geologic Reconnaissance Investigation for
Municipal Well Siting Study, report submitted to Sanitary District No.3, Town of Pewaukee,
Wisconsin
Page 53 of 73
City of Pewaukee - New Agenda Item
Agenda Language:
Discussion regarding an Excerpt-AWWA Beyond the Replacement Era: Balancing
Compounding Infrastructure Needs With Household Affordability [Wagner/Mueller]
Sub Item Agenda Language:
Background Provided By:
Jane Mueller
Background:
This is an excerpt of a report gathered from AWWA. This recognizes the struggle that
Utilities across the country are struggling with aging infrastructure, regulatory
compliance and affordablility.
If you would like a copy of the full report you can contact me.
Fiscal Impact:
Recommended Motion:
No action required. This is for informational purposes only.
Page 54 of 73
Page 55 of 73
Page 56 of 73
Page 57 of 73
Page 58 of 73
Page 59 of 73
Page 60 of 73
City of Pewaukee - New Agenda Item
Agenda Language:
Discussion and Possible Action Regarding Cedar Gables Development [Wagner]
1. Approve the Phase 2 Stockpiling Agreement Amendment 1 and Establish an
Additional Financial Guarantee of $52,030.00.
2. Approve the Third Reduction of Letter of Credit from $1,224,961.05 to $394,828.46
(A Reduction of $830,132.60).
Sub Item Agenda Language:
Background Provided By:
Magdelene Wagner
Background:
Cedar Gables is requesting to allow grading on Phase 2 of the development. They
currently have a stockpile agreement for up to 60,000 CY of fill. They have secured
additional fill for the site and would like to grade the site while they receive additional fill
for the site. The proposed amendment will allow the grading and filling of the site to
final grades for the Phase 2 development. Due to the additional grading on the site, an
additional financial guarantee will be required. The additional guarantee is
recommended to be $52,030. Currently, Phase 2 has a bond and letter of credit for a
value of $146,409.30. Adding the additional guarantee will increase the value to
$198,439.30. Staff is recommending approval of the amendment and guarantee value
contingent on City Attorney approval.
The Cedar Gables Developer is requesting a letter of credit reduction for the Phase 1
sanitary sewer and water main installed. Currently, the Phase 1 development has a
letter of credit value of $1,224,961.05 and a bond value of $368,092.00 for a total
financial guarantee of $1,593,053.05. The requested reduction of $830,132.60 will
leave a total value of $762,920.46. This is adequate to finish the development so Staff
is recommending the reduction.
Fiscal Impact:
Recommended Motion:
Council approve the Amendment to the Stockpile Agreement and establish the financial
guarantee at $52,030 contingent upon City Attorney and City Engineer approval.
Page 61 of 73
Council approve the Third Reduction of Letter of Credit from $1,224,961.05 to
$394,828.46 (A Reduction of $830,132.60).
Page 62 of 73
From: Mark Cecchini
To: Wagner, Magdelene
Cc: bob rappropertiesllc.com
Subject: Cedar Gables - Phase I utilities -LOC reduction 4-27-2026
Date: Monday, April 27, 2026 2:39:05 PM
Attachments: Cedar Gables LOC Reduction - 4-27-26.pdf
26046-002 Apr2026.pdf
Hi Maggie,
Please see attached Letter of Credit reduction request – this is basically just for Edgerton’s
Utility work as completed to the end of this month on Phase I for $922,369.55.
Note: I had requested Edgerton to send their requests early so we could get it into your
office in time for the Common Council.
P.S. Note: On their request – they have Phase II Utilities in the total contract – and they
have removed the Offsite work that was previously completed - so this is just for the Phase
I Utilities to date.
Thank you,
Mark T. Cecchini
Cedar Gables, LLC
13965 W Burleigh Rd, Suite 101
Brookfield, WI 53005
Cell / Text: (262) 498-1542
mark@rappropertiesllc.com
Page 63 of 73
CEDAR GABLES LLC
13965 W. Burleigh Rd, Suite 101
Brookfield, WI 53005
(262) 505-6650
City of Pewaukee DATE: 4/27/2026
W240N3065 Pewaukee Road RE: Cedar Cables, LLC – LOC
Pewaukee, WI 53072 Dated December 23, 2024
Attn: Magdelene Wagner
• Original Letter of Credit – Phase I : 12/23/2024 : $ 1,822,905.55
• City Reduction of Letter of Credit –
Completed Offsite Sanitary : 1/20/2026 : ($ 229,852.50)
• Balance of 12/23/2024 LOC remaining : $ 1,593,05 3.05
• City requested additional Bonding items for approvals and
commencement of Phase 1 Utilities and Building permits:
o Edgerton 1/27/2026 quote:
Watermain loop connection : $ 90,000.00
Cul-de sac in lieu of “t” intersection : ( $ 24,450.00)
Completion of Phase II pond : $ 119,463.00
TOTAL ADD : $ 185,013.00
• 1 0% RETIANER ADD : $ 18,501.30
CURRENT LOC/BOND AMOUNT : $ 1,796,567 .35
• Requested partial reduction : City of Pewaukee / Cedar Gables Letter of Credit:
o Edgerton Contractors – Phase 1 Utility work completed to date:
AIA DOC G703 : 26046-002 : 04/30/2026 : $ 922,369.55
o LESS 10% CITY RETAINAGE : ($ 92,236.95)
TOTAL LETTER OF CREDIT REDUCTION REQUEST: $ 830,132.60
REMAINING CITY LOC/BOND AMOUNT 5/04/2026: $ 966,434.75
Page 64 of 73
Page 65 of 73
Page 66 of 73
April 27, 2026
Sent via email to
bob@RAPPropertiesLLC.com
Robert A. Patch, Member
RAP Properties, LLC
13965 W Burleigh Rd, Suite 101
Brookfield, WI 53005
(262) 505-6650
RE: SUBJECT: Bond Letter for Phase 2
PROJECT NAME: Cedar Gables Condominiums
Edgerton Project No.: 26046
Dear Mr. Patch,
Edgerton Contractors has provided the following attached sequence drawing for phase 2
fill operations at the Cedar Gables project.
We have previously provided cost to complete the North pond. Below is a summary of
additional costs to develop a diversion berm on the east end of the property per the P2
North Parcel Sequencing plan.
Phase 2
• Creation of East Property Diversion Ditch
o Place cut & fills to establish ditch, respread topsoil, seeding and matting
o $21,800
• Seed & Fertilize Site
o 54,475 SY
o $25,500.00
• This excludes the pond area
Thank you,
Eric Bertram
General Manager
Page 67 of 73
FIRST AMENDMENT TO
STOCKPILING OF FILL MATERIAL
AGREEMENT – PHASE 2
THIS FIRST AMENDMENT TO STOCKPILING OF FILL MATERIAL AGREEMENT
(“Amendment”) is made as of May 4, 2026, by CEDAR GABLES LLC, a Wisconsin limited
liability company (“DEVELOPER”), and the CITY OF PEWAUKEE in the County of
Waukesha and the State of Wisconsin (the “CITY”). This Amendment amends the Stockpiling of
Fill Material Agreement dated as of December 3, 202 45, between the CITY and DEVELOPER
(the “Stockpiling Agreement”) for the real property known as Cedar Gables Condominium
located at N18W22670 Watertown Road. Capitalized terms and phrases not otherwise defined in
this Amendment have the meanings given to them in the Stockpiling Agreement.
WITNESSETH:
WHEREAS, the Developer has requested the City authorize and permit grad inge the existing
stockpile and additional fill material to brought to the Property; and
WHEREAS, the City recognizes that timing is a factor to be considered and is willing to allow
Developer, at its risk, to perform grading as requested upon the condition, however, that the
Developer agrees to those certain the terms and conditions as more fully hereinafter set forth, and
WHEREAS, the Developer did not include the Phase 2 grading in the Developer’s Agreement or
Letter of Credit for Phase 1 or the Stockpiling of Fill Material or financial guarantee for Phase 2,
and
WHEREAS, the City has reviewed the Developer’s Phase 2 Filling, Grading, and Sequence of
Construction Operation plan (Exhibit B).
NOW THEREFORE, the Stockpiling Agreement is amended as follows:
1. Section I of the Stockpiling Agreement is amended to add Item 2 as follows:
2. To permit the Developer to perform all rough grading work on the Property,
including but not limited to, the installation of silt fencing and other erosion control
measures, general grading of the site and construction of storm water management ponds
(collectively the “Grading”), upon the terms and conditions set forth below as follows
and as perin compliance with Exhibit B.
2. Section II of the Stockpiling Agreement is amended as follows (the deletion is stricken and the
additions is double-underlined):
1. All Grading and Stockpiling shall be done at the Developer’s risk.
Page 68 of 73
Grading and Stockpiling of Fill Material Agreement Page 2
2. All Grading and Stockpiling shall comply with the attached site grading, drainage
and soil erosion plan (Exhibit B) and related specifications as approved by the City
Engineer. All plans for such Stockpiling have been or will be prepared on behalf of the
Developer by a professional engineer licensed by the State of Wisconsin.
3. The City shall be reimbursed by the Developer for all costs incurred by the City in
relation to the Grading and Stockpiling. These costs shall include, but not be limited to,
plan review, inspection and related overhead costs. Said reimbursement shall be
guaranteed by the Developer as set forth and required in Paragraph 9 below.
5. The Grading and Stockpiling shall be performed with proper control of soil
erosion and with minimum siltation of existing drainage facilities. Any damage to the
existing drainage facilities, including siltation removal, shall be immediately repaired by
the Developer. As appropriate, by virtue of delay in the development process, vegetative
cover shall be re -established by the Developer and/or effective erosion control measures
shall be installed and continually maintained by the Developer where vegetation has been
removed, covered or destroyed.
6. In the event installation of improvements and/or buildings on the lots does not
begin as of 9/ 15/2025 06/01/2026, for any reason whatsoever, all of the graded or
disturbed area shall have vegetative cover re- established by the Developer to an extent as
to be determined by the City. In the event vegetative c over is not established by
10/1/2025 10/01/2026 the City shall arrange for such work to be done, which shall be
paid by the Developer.
9. To assure compliance with the conditions set forth in this agreement, including,
but not limited to, the establishment of positive soil erosion control measures,
performance hereunder shall be guaranteed with a bank Letter of Credit or Bond by the
Developer with the City in the amount of $ 15,000.00 52,030.00 which shall be submitted
prior to the commencement of any activity on the Property by the Developer with respect
to the Grading and Stockpiling. In the event Developer does not comply with or fully
perform this agreement, the City is authorized to stabilize the site or to take other action
to correct the Developer’s violations hereof by using the Bank Letter of Credit or Bond
for such purposes. Upon completion of the performance of this agreement, the deposit,
or remaining balance of the deposit, if any, shall be returned to the Developer. In the
event said Bank Letter of credit or Bond is insufficient in amount to pay all costs related
to performance of and compliance with this agreement, the Developer shall remit
payment of all owed amounts to the City within ten (10) days of receipt of the City’s
invoice to the Developer.
3. In the event of any conflict between the provisions of this Amendment and the provisions of
the Stockpiling Agreement , the terms and provisions of this Amendment control. Except as
expressly provided in this Amendment, the terms , covenants and provisions of the Stockpiling
Agreement remain unmodified and in full force and effec t. This Amendment may be executed in
multiple counterparts, with all such counterparts together constituting a complete instrument.
Delivery of an executed counterpart of a signature page to this Amendment by telecopy,
Page 69 of 73
Grading and Stockpiling of Fill Material Agreement Page 3
facsimile or other electronic means shall be effective as delivery of a manually executed
counterpart of this Amendment. Each person signing below represents and warrants that he or
she has the power and authority to execute this Amendment.
Page 70 of 73
Grading and Stockpiling of Fill Material Agreement Page 4
CEDAR GABLES LLC., by Mark T. Cecchini, Authorized Agent
STATE OF WISCONSIN )
) ss.
WAUKESHA COUNTY )
Personally came before me this _____ day of _____________, 20__, the above -named
Mark T. Cecchini , as Authorized Agent of CEDAR GABLES LLC., to me known to be the
persons who executed the foregoing instrument and who acknowledged the same.
Notary Public, State of Wisconsin.
My Commission expires:
CITY OF PEWAUKEE
WAUKESHA COUNTY, WISCONSIN
Steve Bierce, Mayor
Kelly Tarczewski, Municipal Clerk
STATE OF WISCONSIN )
) ss.
WAUKESHA COUNTY )
Personally came before me this _____ day of _____________, 20___, the above named
Steve Bierce, Mayor, and Kelly Tarczewski, Municipal Clerk/Treasurer , of the above named
municipal corporation, to me known to be the persons who executed the foregoing instrument
and to me known to be such individual and Municipal Clerk/Treasurer of said municipal
corporation and acknowledged that they executed the foregoing instrument as such officers as
the deed of said municipal corporation by its authority and pursuant to the authorization by the
Governing Body of the City of Pewaukee from their meeting on the 4
th day of May, 2026.
Notary Public, State of Wisconsin.
My Commission expires:
Page 71 of 73
5.338 54.128
54.628 54.728
ELIP LIOSPOT
.detibihorp si .cnI ,srotcartnoC notregdE yb ytirohtua ro tnesnoc nettirw desserpxe tuohtiw sgniward eseht fo ,elohw ni ro trap ni ,noitaretla ro ypoc ,esU .wal thgirypoc .S.U yb detcetorp era sngised dna sgniwarD - 6202 THGIRYPOC
daoR nayR .W 545 45135 IW ,keerC kaO 3444.467.414 su.notregde.www
338438
828 338
438
928
728
238
238728
438
638
338
438
638
438
638738
638
638
338
928 338 438
438
438 638
438
638
438
638
738638
638
638
638 838738
838
238638
738838
038
538
538
538
538
538
538
538538
038538
538
038
538
538
538
538
538
538
3 FO 2 SELBAG RADEC
BB
AA
IW ,EEKUAWEP
08
GNICNEUQES 2 ESAHP
0 ELACS
E AERA ).CA 3.3( YS 057,51 YC 573,4 :PIRTS LIOSPOT YC 001,82 :LLIF
D AERA ).CA 3.2( YS 009,01 YC 072,3 :PIRTS LIOSPOT YC 004,71 :LLIF
C AERA ).CA 4.2( YS 677,11 YC 072,3 :PIRTS LIOSPOT YC 003,81 :LLIF
B AERA ).CA 8.0( YS 029,3 YC 090,1 :PIRTS LIOSPOT YC 006,2 :LLIF
A AERA ).CA 3.3( YS 250,61 YC 054,4 :PIRTS LIOSPOT YC 050,52 :LLIF
62 GDLB 00.738 :EFF
02 GDLB
00.938 :EFF
91 GDLB 00.938 :EFF61 GDLB 00.738 :EFF
22 GDLB
00.738 :EFF
42 GDLB 05.638 :EFF
21 GDLB 00.638 :EFF
11 GDLB
00.638 :EFF
71 GDLB 00.838 :EFF 81 GDLB 00.938 :EFF
32 GDLB 05.638 :EFF
51 GDLB 00.738 :EFF
52 GDLB 00.738 :EFF
41 GDLB00.738 :EFF
12 GDLB
00.838 :EFF
31 GDLB 00.638 :EFF
DNOP ).CA 9.1( YS 020,9 YC 005,2 :PIRTS LIOSPOT YC 052,7 :TUC YC 005,9 :LLIF YC 052,4 :RENIL YALC
ELAWS54.138 :LE
00.63800.638
33.638
33.638
33.638
33.638
33.638
33.638 00.638
00.638
00.638
00.638
38.538 38.538
05.53805.538
00.538
00.538
33.538
33.538
33.538
33.538
00.538
00.538
00.538 00.538
33.53833.53833.638 33.638
00.63800.638 00.63800.63800.63800.638
33.638 33.638 33.638 33.638
00.738 00.738
33.73833.738
00.83800.83800.83800.838
33.838 33.838 33.838 33.838
33.838
33.838
00.838
00.838
33.738
33.738
00.738
00.738
00.638
00.638
33.638
33.638
38.53838.538
05.538
05.538
ELAWS
ELAWS
ELAWSELAWS
ELAWS
ELAWS
ELAWS
PH 473.438 :LE
PH373.438 :LE
PL 716.238 :LEPL016.238 :LE
PH233.538 :LE PH 055.538 :LE
PL 414.438 :LEPH426.538 :LE
ENOTS FO POT @ DAOR
ENOTS FO POT @ DAOR
72 GDLB
00.738 :EFF
VLZVLZ62/72/476042
:YB NWARD :YB DEKCEHC :ETAD:# TCEJORP
DNOP HTRON54.128 :LE MTB
'B' PART TNEMIDES
52.438 :LE YAWLLIPS 52.138 :MTB
'C' PART TNEMIDES
52.338 :LE YAWLLIPS
52.038 :MTB
CEDAR GABLES PHASE 2 SEQUENCEING
Sequence of Construction Operations:
1) Clear Trees for Silt Fence
2) Reinstall Silt Fence
3) Strip & Stockpile Pond Topsoil
4) Dewatering, Excavation, and Clay Liner installation of
Pond, respread topsoil, seed & restore
5) Strip Topsoil and stockpile, excavation and topsoil
respread of Area B diversion ditch, seed & restore ditch line
6) Strip topsoil and stockpile in Area A
7) Place previously approved stockpile material in Area A
8) Stabilize & Fill Area A
9) Strip Topsoil Area D, respread topsoil in Area A, stockpile
remaining material
10) Stabilize & Fill Area D
11) Strip Topsoil Area E, respread topsoil in Area D, stockpile
remaining material
12) Stabilize & Fill Area E
13) Strip Topsoil Area C, respread topsoil in Area E, stockpile
remaining material
14) Stabilize & Fill Area C
15) Topsoil respread Area C from Stockpile, export remaining
(if any)
Proposed Start May 2026
Proposed Restoration September 2026
*Exact Locations of each area are approximate
TOPSOIL
STOCKPILE
STEPS 5 to 13
A AERA ).CA 3.3( YS 250,61 YC 054,4 :PIRTS LIOSPOT YC 050,52 :LLIF
638
438
52 GDLB 00.738 :EFF33.638
33.638 00.638
00.638
ELA
LEGEND
Indicates Flow
Pattern as built
00.638
Elevation at corners
to ensure drainage
Page 72 of 73
DNUORG LANIGIRO
DNUORG LANIGIRO
.detibihorp si .cnI ,srotcartnoC notregdE yb ytirohtua ro tnesnoc nettirw desserpxe tuohtiw sgniward eseht fo ,elohw ni ro trap ni ,noitaretla ro ypoc ,esU .wal thgirypoc .S.U yb detcetorp era sngised dna sgniwarD - 6202 THGIRYPOC
daoR nayR .W 545 45135 IW ,keerC kaO 3444.467.414 su.notregde.www
1:4
1:5.3
%0.0
1:4 1:5.4
1:5.4
%52.0-
'B-B' NOITCES
'A-A' NOITCES
3 FO 3 SELBAG RADEC IW ,EEKUAWEP
010 ELACS
VLZVLZ62/72/476042
:YB NWARD :YB DEKCEHC :ETAD:# TCEJORP
25
67
038
838
638
438
238
828
48
08
27
86
46
06
65
84
44
04
63
23
82
42
02
61
21
8
4
0
038
838
638
438
238
828
48
08
67
27
86
46
06
65
25
84
44
04
63
23
82
42
02
61
21
8
4
0
Page 73 of 73
Source: City of Pewaukee website. First collected Oct 7, 2026.