Plan Commission — Agenda Packet
City of Pewaukee · Waukesha County · Plan Commission · meeting of Mar 19, 2026 · Agenda packets
Open the original document More from City of Pewaukee
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Planning Department
W240 N3065 Pewaukee Road
Pewaukee WI 53072
Phone: 262-691-0770
PLAN COMMISSION
MEETING NOTICE AND AGENDA
Thursday, March 19, 2026
6:00 PM
Pewaukee City Hall Common Council Chambers
W240N3065 Pewaukee Road, Pewaukee, WI
1. Call to Order and Pledge of Allegiance
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 October 16, 2025
2.2 November 20, 2025
3. New Business
3.1 Discussion and Possible Action Regarding an Offer to Donate Approximately 4.39 Acres of Land
Located Along the East Side of Redford Boulevard/CTH F Approximately 625 Feet South of Beaver
Court (PWC 0872997)
3.2 Discussion and Action Regarding the Site and Building Plans for Spring Creek Church Located at
N35 W22000 Capitol Drive for the Purpose of a Proposed Parking Lot Expansion and Relocating
the Existing Athletic Field (PWC 0909999005)
3.3 Discussion and Action Regarding the Site and Building Plans for Lake Pewaukee Sanitary District
Located at N25 W27534 Oak Street for the Purpose of a Building Addition to the Existing Facility
(PWC 0935979001)
3.4 Discussion Regarding Updating the City Zoning Code as Presented by Foth Infrastructure &
Environment LLC
4. Adjournment
Ami Hurd
Deputy Clerk
Community Development Coordinator
3/12/2026
NOTICE
It is possible that members of other governmental bodies of the municipality may be in attendance to gather information that may form a quorum at the above
stated meeting. No action will be taken by any governmental body other than the governmental body specifically referred to above in this notice.
Any person who has a qualifying disability under the Americans with Disabilities Act that requires the meeting or materials at the meeting to be in an accessible
format must contact the City Planner/Community Development Director Nick Fuchs, at (262) 691-6007 three business days prior to the meeting so that
arrangements may be made to accommodate your request.
Page 1 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, October 16, 2025
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, J. Endl, D. Kiser, D. Linsmeier, and A. Schoenemann.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public Works
Director M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for the Pledge
of Allegiance.
2. Preliminary Plats
2.1 Discussion and Action Regarding a Preliminary Plat for the Single-Family Rental Portion of
the Willow Run Subdivision Development, as Submitted by Land by Label (PWC
0941988104 & PWC 0944994)
Mr. Fuchs stated the Preliminary Plat included 25 lots with an average lot size of 11,236
square feet. He recommended approval with the conditions that they must obtain DNR
approval of the wetland impacts and exemptions, SEWRPC concurrence of the delineation,
any remaining wetlands and setback be placed within outlots, signs are to be staff reviewed,
Engineering approval of grading, erosion control, utilities, and stormwater, and a sump pump
condition that they are not discharging onto neighboring properties or into the streets. Mr.
Fuchs added that they also mimicked a few conditions from Waukesha County’s comment
letter, and he noted condition 4 could be deleted, as it referenced lots in the other subdivision.
Ms. Wagner requested adding a condition that the drainage easements be located in outlots.
Commissioner Brown referred to the wetlands on Lot 6 and questioned if there were any
concerns from Engineering regarding fencing off the wetland so that it could not be built on
and she questioned if the lot would have a water easement. Ms. Wagner pointed out that there
was a condition that all wetlands be encompassed in outlots, so it would change Lot 6 to carve
that piece out.
Mr. Fuchs stated the preference was to have both the wetlands and setbacks in outlots, as it
makes them more noticeable. The City also has the option to require cedar posts to note the
wetland areas at a specified distance.
Additional discussion took place regarding the wetlands as relates to the outlots and
easements. Mr. Fuchs noted that the City’s ordinance requires natural resources to be in an
outlot.
Chairman Bierce stated he viewed this portion as a giant multi-family area and felt the
architecture of the homes should go before the Plan Commission. He felt these rental homes
Page 2 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 2
would be owned by people who are transitory and do not have a vested interest in keeping
them, and he felt they would deteriorate quickly.
Ms. Cialdini reviewed the plans and noted that landscape was added along the northern and
southern property boundaries and to screen the stormwater facilities. The goal was to be
consistent with the garden-style development, but not mimic or copy the architecture. Ms.
Cialdini mentioned that the siding would be cement board siding, but there would be no
masonry. She noted there would be four floor plans, with two ranch-style floor plans and two
two-story floor plans, both with three-bedroom and two-bedroom options and all with a two-
car attached garage.
Commissioner Brown questioned the walkways, and Ms. Cialdini noted that no sidewalk was
planned around the looped road surrounding these homes. A sidewalk was added to the west
side of the spine road in order to create some connectivity to the Veridian development to the
south and to the park.
Ms. Wagner suggested a sidewalk on at least one side of the main road, especially if a
connection to Fieldhack Drive would be made in the future if the gate was removed.
Discussion took place regarding the possibility of a sidewalk and the maintenance
requirements related to it. Ms. Wagner noted the City has not adopted a sidewalk policy, but
it would be brought forward to the Public Works Commission and Council to create the
policy.
Commissioner Schoenemann felt it did not have to be a City responsibility and suggested it be
a part of the HOA for the homeowners to clear their area. She suggested adding a sidewalk on
the south curve of Road B.
Ms. Cialdini noted that they added sidewalks because they were asked to add sidewalks, and
prior to the sidewalks there was a trail connection with asphalt pavement and crushed stone.
She noted they were open to the trail again if there was no longer a desire to have sidewalks
because of the potential maintenance issues. Ms. Wagner noted that the sidewalk was
currently proposed to be located in the City right-of-way.
Chairman Bierce questioned if there would be a way for people to walk around the gate and he
suggested a there be a clear and safely marked path along the gate for people to walk.
Commissioner Kiser suggested having walking paths instead of sidewalks, and requiring the
developer to design and maintain it, so that the City does not have to have a policy.
Further discussion took place regarding the maintenance and location of the sidewalks.
A motion was made and seconded (D. Kiser, A. Schoenemann) to concur with staff
recommendations as discussed, as well as adding a walking path managed by the
developer, to get from Fieldhack Drive to Road C, located out of the right-of-way, using
any hardscape that the developer chooses to construct it with, according to City
standards.
Page 3 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 3
After a brief discussion, the motion was modified (D. Kiser, A. Schoenemann) to concur
with staff recommendations as discussed, directing staff to work with the developer for a
connector path or road from Fieldhack Drive past the gate to Road A, preferably out of
the right-of-way. Motion Passed: 6-For, 0-Against.
2.2 Discussion and Action Regarding a Preliminary Plat for the Single-Family For-Sale Portion of
the Willow Run Subdivision Development, Located at N12 W26506 Golf Road, as Submitted
by Veridian Homes (PWC 0944994)
Mr. Fuchs stated the Preliminary Plat included 147 lots, with a mean lot size of 14,376 square
feet. Many of the same conditions are included that were included in the previous plat. He
suggested discussing condition 4 regarding whether the setbacks for wetlands needed to be in
an outlot or easement. Mr. Fuchs stated the staff report also included Waukesha County’s
comments, and staff recommended approval. Ms. Wagner pointed out that drainage
easements were to be located in outlots.
Commissioner Schoenemann liked the narrowing of the road as a calming feature and felt
three of them were needed on the road, not just one. She suggested one at the four-way stop
and one at the base entrance at a minimum.
Commissioner Schoenemann also suggested enhancing the landscaping by the entrance, and
she felt the sign further up was disconnected. She also referred to the location of the CBU
mailbox clusters and felt it was a dangerous location for it. She suggested pulling it back so
that it was not in such a busy area. Commissioner Endl noted that they were on the left side of
the road, so for people coming home from work it would be on the opposite side of the road
that people would be driving on.
Ben Lang with Veridian Homes noted that the USPS is now requiring more parcel boxes at
each CBU. He confirmed that all other deliveries would be done directly to the front door.
The location of the CBU’s is only conceptual in nature at this time, and they will work
directly with the Postmaster to determine where they want it to be.
Ms. Wagner noted that there would be issues with snowplowing if the CBU’s are too close to
the road. She stated other subdivisions with CBU’s have pull-offs to accommodate the cars,
or a few parking stalls. Chairman Bierce assumed there would be backups onto the road if
over 70 homes per mailbox cluster were picking their mail up after work. Mr. Lang noted that
they would try to break them up in the final design so that every 30 to 40 homes would have a
cluster of boxes.
Commissioner Brown questioned the number of monument signs. Ms. Cialdini stated there
was one overarching brand for the development, but she did believe there needed to be a
distinguishing identity for each community. A monument sign was planned for the entry at
Golf Road and the spine road, and Veridian has a second monument sign entering the single-
family area. Another monument sign was planned for the entrance of the garden-style
apartments so there were different signs to understand the different locations within the
development.
Chairman Bierce did not believe the traffic calming features would work and felt they would
Page 4 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 4
only make things worse by narrowing the road and causing cars to drive closer to each other
while still going faster. He felt the young people would be living in the apartments and they
would drive faster than anyone else, causing massive accidents.
Commissioner Linsmeier felt traffic calming measures like bump outs really did slow people
down because it makes the road so narrow.
Commissioner Brown referred to the sidewalks and felt they were necessary, as the main road
would be a major thoroughfare and there would be a significant amount of traffic. She did not
believe the City should maintain the sidewalks.
Ms. Wagner recommended sidewalks be in place so that we do not continue to have the same
issues that we have in existing subdivisions with a similar layout to this. She mentioned the
biggest complaint she receives is on major thoroughfares such as this. There is a demand for
pedestrians to be out walking and the safest place for them is not in the road.
Chairman Bierce questioned who would be responsible if the sidewalk cracked and questioned
if that burden would be put on the homeowner. Mr. Lang noted they would create a
maintenance agreement between the HOA, the single family, and the management company
for the single-family for rent and multi-family and they would all be responsible for the open
space sidewalk.
Commissioner Kiser felt the sidewalks needed to be exclusively within the development and
out of the right-of-way so that pedestrians could get from Road B all the way to Golf Road.
Ms. Cialdini stated they would agree to the maintenance obligation of snow removal from the
sidewalk if it was in the right-of-way. She also noted there were street trees so that every yard
would have a tree in the single-family rentals. If the sidewalks are left in the right-of-way,
they would agree to maintain them and do snow removal, and it would allow them to maintain
the street trees adjacent to the right-of-way. If the sidewalks are moved out of the right-of-
way and into the lots, that would shrink yard space, and there would be no room left for
landscaping. Mr. Lang highly recommended putting the sidewalks in the right-of-way and
they would work with Maggie and Nick to come up with a policy for snow removal and long-
term maintenance.
Ms. Wagner mentioned that she would add discussion to the Public Works Committee
meeting agenda to format a sidewalk policy.
Mr. Lang then referred to the wetland setbacks and stated if they put all of the wetlands that
they are not to planning to fill into outlots, that would work on every single lot. If the 75 foot
setback for the navigable stream is required to be in an outlet, it would impact a handful of
homes in the southwest corner of the western loop. Mr. Lang noted that they would be open
to doing an easement and noting it on the plat, so the homeowners were aware of the setbacks.
Mr. Fuchs stated the City prefers to have everything in the outlots.
Discussion took place regarding the quality of the exterior materials. Chairman Bierce felt the
City needed to be very careful with this development, and strict about the material being used,
Page 5 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 5
so that it does not end up in disrepair. He suggested including a condition in the covenants for
no vinyl on the houses.
Commissioner Kiser was concerned about the narrowing of the roadways and was concerned
about plow maintenance. The roads would narrow to 20 feet wide, and a plow blade is 10 to
11 feet. Ms. Wagner noted that it would not be an issue, and she felt that out of all of the
traffic calming options, this would have the least impact to operations.
Commissioner Brown stated she was concerned about a number of lots that were encroaching
the wetlands. Mr. Lang discussed the individual lots and noted the various setbacks.
Discussion took place regarding the location of the wetlands and setbacks as it relates to
outlots and easements.
A motion was made and seconded (S. Bierce, D. Kiser) to approve the Preliminary Plat
contingent on the staff conditions in the staff report, the sidewalks being out of the right-
of-way, and the drainage easements being placed within outlots. Motion failed: 2-For, 4-
Against (C. Brown, J. Endl, D. Linsmeier, A. Schoenemann).
A motion was made and seconded (C. Brown, D. Linsmeier) to approve the Preliminary
Plat contingent on the conditions in the staff report, the sidewalks being in the right-of-
way, and the drainage easements being placed within outlots. Motion passed: 4-For, 2-
Against (S. Bierce, D. Kiser).
3. The Glen at Springdale Mixed-Use Residential Development Located at W220 N2475 Springdale
Road, as Requested by Cornerstone Development/Esser Farm (PWC 0916997)
3.1 Discussion and Action and Public Hearing to Rezone the Subject Property from Rs-6 Single-
Family Residential, A-2 Agricultural, and LC Lowland Conservancy to Rs-6 Single-Family
Residential, Rm-1 Multi-Family Planned Unit Development, and LC Lowland Conservancy
Mr. Fuchs stated this was a single- and multi-family development with 48 single-family lots
and an average lot size of 16,226 square feet. The applicant is also proposing 84
condominiums within 15 four-family and 12 two-family buildings. The condominium portion
of the development includes a clubhouse, swimming pool, and sport courts. Mr. Fuchs noted
there was a recommendation to extend the path in the development further to have more
access for the condominium buildings to access the amenities, as well as extending to lots 34
through 36. There were also conditions for lighting and landscaping details to be submitted
for staff approval, engineering conditions, and utility approval. There was a sump pump
condition as well, and signage would have to be reviewed by staff. Mr. Fuchs recommended
approval and noted that they would have to address Waukesha County’s comments as well.
Chairman Bierce opened the public hearing at 8:35pm.
Andrew Kanehl (W221 N2670 Lindenwood Court) questioned what point the project was at
with planning. He was concerned about the high density of the condos and did not believe
this went along with the rest of the area. Mr. Kanehl made various suggestions as to how the
roads and neighborhood could be designed.
Page 6 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 6
Joe Orendorf with Cornerstone Development referred to the entrances and noted that the
entrance could not line up with the boulevard. Ms. Wagner added that Waukesha County was
only allowing one entrance.
Leslie Gesme (W220 N2624 Maplewood Lane) stated she did not like the idea of condos,
especially coming into Maplewood Lane where children are playing in the road. She
questioned if there would be a housing study, traffic study, wildlife study, or sewer study. Ms.
Gesme did not believe condos would jive with the community makeup and she was worried
about the transient people in and out of the rentals.
Dan McLaughlin (N23 W22273 Briarwood Lane) stated he was worried about the water and
drainage, as the field holds a lot of water when it rains. He questioned where the water would
go if this gets developed. Mr. McLaughlin questioned where the construction traffic would go
and did not want to see the trucks in the neighborhood.
Baron Brunke (N27 W22633 Burningwood Lane) stated he was looking forward to this
development. He stated he was thoroughly searching the market to downsize and live in a
condo. He felt that architecturally, Cornerstone had very nice buildings and would fit well
into any single-family development. Mr. Brunke did not believe density would be an issue
with a four-unit condo and he felt it would be older people owning them.
Jeff Esser (W220 N2475 Springdale Road) stated his family has owned the property since
1947. He pointed out that the southeast corner of property used to be plowed and was dry
most of the time. He stated the area is now wetlands but was not wetlands when it was a farm.
Janet Binder (W223 N2559 Glenwood Lane) was concerned that people driving on
Willowood Lane would drive up her driveway because people frequently mistake her
driveway for a road. She was also concerned about the water at the end of the farm field and
questioned what the future would bring. Ms. Binder was also concerned about the traffic and
speeding cars. She requested a separation between her side and the new development.
Chairman Bierce closed the public hearing at 9:00pm.
Ms. Wagner referred to the stormwater and noted they had not yet received a plan, but it
would be required. She also mentioned that Waukesha County required a traffic study on
Springdale Road, but not on the local roadways in Springdale Estates. She discussed the
wetlands on the property and the culverts in the area as relates to water backing up.
Commissioner Brown referred to lots 37 through 39 on the northwest end and felt the
residents in that area would appreciate buffer, so she felt the current vegetation should stay.
She stated she was not opposed to the development and felt it was a great layout, but she did
agree with the water issues.
Commissioner Linsmeier mentioned that construction traffic should come off Springdale
Road. Ms. Wagner stated they would post “no construction traffic” signs on Glenwood Lane
and temporary weight restrict them. She noted that in the past they have done temporary
barricades across roadways so there was no access into the existing subdivision.
Page 7 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 7
Commissioner Endl mentioned that she lives in Five Fields and there are multiple condos and
apartment complexes in the subdivision and they are not an issue. She stated there is an 87
unit complex on one side of the road and a 60 to 70 unit apartment complex on the other side
and there are zero traffic issues.
Commissioner Schoenemann felt that because Springdale was already so dense with single-
family, a condo solution was far better in the area than single-family. She stated she was fond
of Cornerstone Development subdivisions, as they were tastefully laid out with the
landscaping and positioning of the homes.
Maria Zampola-Stafford (N22 W22251 Meadowood Court) stated she was concerned about
the cornfield holding water. She felt the mature trees would help with the flooding and
wanted to keep them on the tree line.
Commissioner Schoenemann felt the clubhouse had one characteristic style, but the condos
looked different as far as shake siding, vertical slat siding, and gables. Mr. Orendorf
confirmed that they would tie the buildings together.
Ms. Wagner referred to the sidewalk and requested some clarification. Mr. Orendorf noted
that they did not add the sidewalk to the six lots near the existing subdivision because there
were no paved sidewalks in Springdale Estates, and instead it would start after that in the
condo area. He stated they were not opposed to putting it in other areas. Commissioner
Brown felt it was a good separation between the single-family homes and the condos. Ms.
Wagner recommended adding the sidewalks.
A motion was made and seconded (A. Schoenemann, J. Endl) to recommend approval of
the Rezoning, Conditional Use, and Preliminary Plat for The Glen at Springdale with
the staff recommendations, excluding the trail extension. Motion Passed: 6-For, 0-Against.
3.2 Discussion and Action Regarding a Recommendation to the Common Council for a
Conditional Use Residential Planned Unit Development to Allow for a Multi-Family
Residential Development Upon the Subject Property
Action taken in item 3.1.
3.3 Discussion and Action Regarding a Preliminary Plat for the Purpose of Developing a Single-
Family Residential Subdivision Upon the Subject Property
Action taken in item 3.1
3.4 Discussion and Action Regarding the Site and Building Plans for a Multi-Family Residential
Development Upon the Subject Property
A motion was made and seconded (C. Brown, D. Linsmeier) to table the Site and
Building Plans for The Glen at Springdale. Motion Passed: 6-For, 0-Against.
4. Adjournment
Page 8 of 54
Plan Commission meeting minutes ~ October 16, 2025 Page 8
A motion was made and seconded (D. Kiser, C. Brown) to adjourn the meeting at 9:38pm.
Motion Passed: 6-For, 0-Against.
Respectfully Submitted
Ami Hurd
Deputy Clerk/
Community Development Coordinator
Page 9 of 54
Plan Commission meeting minutes ~ November 20, 2025 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, November 20, 2025
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, J. Endl, D. Linsmeier, and S. Sullivan.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public Works Director
M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order and requested everyone stand for the Pledge of
Allegiance.
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 May 15, 2025
2.2 June 12, 2025
2.3 July 17, 2025
A motion was made and seconded (C. Brown, D. Linsmeier) to approve the May 15th, 2025,
June 12th, 2025, and July 17th, 2025 Plan Commission meeting minutes. Motion Passed: 3-For,
0-Against, 2-Abstain (Endl, Linsmeier).
3. Items for Discussion and Possible Action
3.1 Discussion and Action Regarding the Site and Building Plans for The Glen at Springdale for a
Multi-Family Residential Development Upon Property Located at W220 N2475 Springdale
Road as Requested by Cornerstone Development (PWC 0916997)
Mr. Fuchs stated the Plan Commission previously approved the Rezoning, Conditional Use
Permit, and Preliminary Plat at their October 15th meeting. The Site and Building Plans were
tabled for further review at that meeting. There have been no significant changes to the plan
other than the siding on the clubhouse was changed to horizontal siding to better match the
condos. Mr. Fuchs recommended approval with the conditions that it be subject to staff review
of the lighting and landscaping plans, and final Engineering review and approval.
Chairman Bierce referred to the sidewalks near condo buildings 6 and 7 and felt they were not
matching like for like. He requested the plantings be spruced up between the two buildings. Joe
Orendorf and John Whalen with Cornerstone Development noted that they chatted with the
neighbors in the area and they would address the buffers.
Commissioner Brown felt the entrance sign was underwhelming and she was used to a
monument sign with a subdivision this nice. Mr. Whalen noted he liked the understated look
because it was classic and timeless and he noted he would send pictures of their current signs on
different sites.
Page 10 of 54
Plan Commission meeting minutes ~ November 20, 2025 Page 2
Ms. Wagner referred to the grading plan, and it appeared that they were grading up to the
property line on some of the lots, so she suggested having the Engineer pull back the contours in
order to preserve the tree line.
Chairman Bierce referred to the intersections and questioned if there would be streetlights. Ms.
Wagner stated they do have them at other entrances, but they would have to determine if they
would be paid for by the City or by the HOA. Mr. Whalen confirmed that they would submit a
photometric plan to show what kind of illuminations were needed.
Chairman Bierce referred to the sidewalks, and Mr. Orendorf clarified that the site as a whole
was not designed with sidewalks because of the City’s previous thinking. They do have an
asphalt trail that connects Briarwood Lane and winds through to the clubhouse to serve more of
the condo owners that would have access to the clubhouse. He added that the single family
would not have access to the clubhouse.
Discussion then took place regarding the design of the sign. Chairman Bierce felt the sign would
need to go back to Plan Commission. Commissioner Brown felt the current sign would not be
bad as an internal sign, but she was used to a stone-type monument sign at the main entrance.
After further discussion, the Plan Commission agreed that the sign could be approved at the staff
level.
A motion was made and seconded (D. Linsmeier, S. Sullivan) to approve the Site and
Building Plans for The Glen at Springdale contingent on the lighting, landscape, and
Engineering approval. Motion Passed: 5-For, 0-Against.
3.2 Discussion and Action Regarding the Site and Building Plans for Lake Country Eye Surgery
Center for an Ambulatory Surgery Center Upon Property Located at W238 N1670 Busse Road
(PWC 0954998013)
Mr. Fuchs stated an eye surgery center would be a permitted use in the B-6 District. The
proposed single-story building was approximately 10,600 square feet with 78 parking spaces.
The 40 percent green space requirement was being met, as were the setbacks. Mr. Fuchs noted
the conditions that an agreement was to be approved by the Engineering Department for the
allowance of signage, landscaping, and parking to encroach the sanitary sewer easement, final
Engineering review of grading, erosion control, and stormwater, and the sign to be reviewed by
staff and subject to a sign permit.
Commissioner Brown questioned the four handicapped parking spots and felt with the expected
clientele that they should have more handicapped parking than that. Kerry Hardin with Collins
Engineers stated the four spots were striped for van stalls. The code is more for mobility issues,
but she noted they could look at additional stalls.
Ms. Hardin added that they have a monument sign that will be submitted for a sign permit, but
they do not currently have a rendering.
A motion was made and seconded (C. Brown, S. Sullivan) to approve the Site and Building
Plans for Lake Country Eye Surgery Center contingent on final Engineering approvals, the
Page 11 of 54
Plan Commission meeting minutes ~ November 20, 2025 Page 3
agreement for encroachments, the sign being subject to staff review, and applying for a
sign permit. Motion Passed: 5-For, 0-Against.
3.3 Discussion and Action Regarding a Mitigation Plan for the James and Susan Taylor Residence
Located at N37 W26725 Kopmeier Drive (PWC 0894013)
Ms. Wagner stated the property was exceeding the allowable 27.5 percent impervious area. She
was recommending approval, with the final calculations and report being recorded with
Waukesha County.
A motion was made and seconded (D. Linsmeier, J. Endl) to approve the Mitigation Plan
for the James and Susan Taylor residence. Motion Passed: 5-For, 0-Against.
3.4 Discussion Regarding a Conceptual Review Application for a Multi-Tenant Medical Service and
Office Development Upon Property Located at W240 N2687 Pewaukee Road (PWC 0924995)
Mr. Fuchs stated the property was zoned B-6, and the applicant was proposing a 35,000 square
foot multi-tenant building with a potential future expansion area that would allow for a 20,000
square foot building. The applicant was looking at multi-service medical offices or medical type
uses. Mr. Fuchs mentioned that the proposed use did meet current zoning district and future land
use designations.
Brian Adamson with ICAP Development stated he was open to the B-4 District. He noted that it
would not be a fully speculative project, as they did have a specialty medical group looking to
occupy almost half of the first building, so they would be designing this with that user, and
complimentary users, in mind. Mr. Adamson added that each user would go through the
Business Plan of Operation approval. They were not anticipating any conditional uses, or any
ambulance use or 24 hour needs.
Commissioner Brown was concerned about the B-5 District, as it would open up the potential for
vape shops and tattoo parlors. She requested the property be rezoned to B-4.
Commissioner Sullivan felt this was the most agreeable use for this property, but he felt it should
be rezoned to address the medical use. Commissioner Linsmeier agreed and felt it would be a
great use of the property.
Mr. Adamson referred to the entrances and noted that they intentionally pushed them as far away
from the intersections as possible. He added that there would only be a right-in right-out on
Watertown Road, but there would be a full access point on STH 164. Mr. Adamson referred to
the possibility of a public road going through with previous applications and he noted that was
not something they were anticipating. They wanted to keep the road behind the building but
understood that people would probably use it as a cut through.
Ms. Wagner mentioned that they were looking to put a trail on Watertown Road along the north
side of the property, so they would need to have a conversation about that if the project were to
move forward.
Page 12 of 54
Plan Commission meeting minutes ~ November 20, 2025 Page 4
No action was taken.
4. Adjournment
A motion was made and seconded (C. Brown, J. Endl) to adjourn the meeting at 7:04pm. Motion
Passed: 5-For, 0-Against.
Respectfully Submitted
Ami Hurd
Deputy Clerk/
Community Development Coordinator
Page 13 of 54
Page 14 of 54
PWC 0867103
PWC 0867024
PWC 0867105
PWC 0905116
PWC 0872003
PWC 0867108
PWC 0867033
PWC 0872998
PWC 0872014
PWC 0869997
PWC 0866035
PWC 0872001
PWC 0867031
PWC 0867125
PWC 0872018
PWC 0867032
PWC 0866036
PWC 0866032
PWC 0905111 PWC 0867023
PWC 0867104
PWC 0866117
PWC 0867040
PWC 0872997
PWC 0867036
PWC 0867035
PWC 0866039
PWC 0867099
PWC 0872996
PWC 0866034
PWC 0867098
N41W22834
N41W22829
N40W22870
N41W22839
W228N4063
N41W22831
W229N4032
N43W23243
N40W22869
N40W22917
N43W23195
N42W22855
N41W22841
N42W22876
N40W22890
N43W23219
W234N4580
N42W22889
N43W23207
W229N4015
N40W22930
W229N4011
N42W22777
N42W22888
N42W22891
N41W22798
N42W22833
N41W22817
W228N4009
W233N4050
W228N4043
N41W22835
N40W22957
N40W22850N40W22950
N41W22822
N42W22854
N41W22816
N42W22832
N41W22812
HATTIE CT
SUNSET DR
COUNTY ROAD F
COUNTY ROAD F
COUNTY ROAD F
COUNTY ROAD F
PWC 0872997
SE Wisc Reg Planning Comm, SEWRPC, Vantor, LIS, FEMA, SEWRPC
1/29/2026, 3:49:13 PM
0 0.06 0.110.03 mi
0 0.09 0.180.04 km
1:4,590
Page 15 of 54
City of Pewaukee - New Agenda Item
Agenda Language:
Discussion and Possible Action Regarding an Offer to Donate Approximately 4.39 Acres
of Land Located along the East Side of Redford Boulevard (County Road F) and
Approximately 625 Feet South of Beaver Court (PWC 0872997)
Sub Item Agenda Language:
Background Provided By:
Nick Fuchs
Background:
Robert and Lois Severson, representing the Robert and Lois I Severson Revocable
Trust, contacted the City of Pewaukee regarding the possible donation of their land
located along Redford Boulevard, approximately 625 feet south of Beaver Court.
The subject property is approximately 4.39 acres. According to FEMA mapping, it is
designated as Zone AE 100-year floodplain and a high-risk Special Flood Hazard Area
(SFHA). Accordingly, the property is zoned F-1 Floodplain District and designated as
Floodplains, Lowland, & Upland Conservancy and Other Natural Areas on the City's
Year 2050 Land Use / Transportation Plan.
The Wisconsin Department of Natural Resources Surface Water Data Viewer mapping
shows the property as entirely wetland. As such, no development of the property is
anticipated.
It is anticipated the City would be responsible for transfer and recording fees. The
transfer may be accomplished via Quit Claim Deed.
Fiscal Impact:
The Waukesha County Register of Deeds charges a recording fee of $30 for Deeds.
The property is assessed at $11,000 and the 2025 property tax bill was in the amount of
$103.02.
Additional costs are not anticipated.
Recommended Motion:
A motion to accept the offer to acquire the subject property with transfer and recording
fees to be paid by the City.
Page 16 of 54
State Bar of Wisconsin Form 3-2003
QUIT CLAIM DEED
Document Number Document Name
("Grantor," whether one or more),
Recording Area
Name and Return Address
Parcel Identification Number (PIN)
This homestead property.
(is) (is not)
Dated .
(SEAL) (SEAL)
* *
(Signatures may be authenticated or acknowledged. Both are not necessary.)
NOTE: THIS IS A STANDARD FORM. ANY MODIFICATIONS TO THIS FORM SHOULD BE CLEARLY IDENTIFIED.
FORM NO. 3-2003QUIT CLAIM DEED
* Type name below signatures.
© 2003 STATE BAR OF WISCONSIN
THIS DEED, made between
Grantor quit claims to Grantee the following described real estate, together with the
rents, profits, fixtures and other appurtenant interests, in
("Grantee," whether one or more).
and
County, State of Wisconsin ("Property") (if more space is needed, please attach
addendum):
(SEAL) (SEAL)
* *
AUTHENTICATION
STATE OF WISCONSIN
) ss.
COUNTY
)
).
TITLE: MEMBER STATE BAR OF WISCONSIN
authorized by Wis. Stat. § 706.06)
to me known to be the person(s) who executed the foregoing
instrument and acknowledged the same.
THIS INSTRUMENT DRAFTED BY:
Notary Public, State of Wisconsin
My Commission (is permanent) (expires: )
,
*
*
Signature(s)
authenticated on
Personally came before me on
(If not,
the above-named
ACKNOWLEDGMENT
Page 17 of 54
WY: Surface Water Data Viewer (SWDV_VS_App)
Service Layer Credits:
DNR Basic Feature VTL (WTM): Wisconsin Department of Natural Resources, GIS Section, Latest Leaf Off: ,
Surface Water (Cached): WiDNR, USGS, and other data, Wetland Inventory NWI (Dynamic): Calvin Lawrence,
Dennis Weise, Nina Rihn´
Date Printed: 1/29/2026 3:47 PM
Map
Location
Notes:
Map projection: NAD 1983 HARN Wisconsin TM
Legend: (some map layers may not be displayed)
This map is a product generated by a DNR web mapping application.
This map is for informational purposes only and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. The user is solely responsible for verifying the
accuracy of information before using for any purpose. By using this product for any purpose user agrees to be bound by all disclaimers found here: https:/ /dnr.wisconsin.gov/legal.
Wetland Class Areas
Rivers and Streams
Intermittent Streams
Rivers and Streams
Intermittent Streams
24K Streams and Rivers
Latest Leaf Off Index
Latest Leaf Off Imagery
Map:
0 140 280 Feet
0 40 80 Meters
Page 18 of 54
PWC 0872998
PWC 0872014
PWC 0869997
PWC 0867037
PWC 0867125
PWC 0872018 PWC 0866117
PWC 0872997
PWC 0867036
PWC 0867035
PWC 0872996
N43W23195
W234N4580
N40W22930N40W22950
Rs-2
LC
UC
F-1
Rs-5
COUNTY ROAD F
COUNTY ROAD F
COUNTY ROAD F
COUNTY ROAD F
PWC 0872997
SE Wisc Reg Planning Comm, SEWRPC, Microsoft, Vantor
1/29/2026, 3:50:17 PM
0 0.03 0.060.01 mi
0 0.06 0.110.03 km
1:2,754
Page 19 of 54
Office of the Planner & Community Development Director
W240 N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
Phone (262) 691-0770, Fax (262) 691-1798
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of March 19, 2026
Date: March 11, 2026
Project Name: Spring Creek Church Site & Building Plan Review
Project Address/Tax Key No.: N35W22000 / PWC 0909999005
Applicant: Spring Creek Church
Property Owner: GARFIELD BAPTIST CHURCH
Current Zoning: I-1 Urban Institutional, A-1 Agricultural District and LC Lowland Conservancy
District
2050 Land Use Map Designation: Governmental / Institutional, Medium Density Residential, and
Flood Plains, Lowland & Upland Conservancy and Other Natural Resource Areas
Use of Surrounding Properties: Agriculture to the north, office and residential to the south across
from Capitol Dr, and railroad tracks and storage facility to the west a
Project Description
The applicant filed a Site & Building Plan Review Application requesting approval of a parking lot
expansion and relocation of existing athletic fields for the property located at N35W22000 Capitol
Drive. This new parking lot is located within the existing athletic fields. The applicant is proposing to
relocate the field area to the northwest corner of the property.
The church property currently has 1,067 parking spaces, including 58 ADA accessible spaces. The
proposed expansion adds 174 parking spaces. As such, the project will result in a total of 1,241 parking
spaces including the 58 ADA accessible spaces.
The project will add 1.48 acres of impervious surface. The site is approximately 53.9 acres. The total
impervious area onsite is 17.66 acres or 33%. The site calculations provided do not account for the
requirement that floodplain and wetland areas do not comprise of more than 20% of the total green
space requirement. As such, staff is recommending that the greenspace and impervious surface
calculation on the site plan be revised as required by Section 340-2.10D(4). It appears that the
minimum greenspace requirement of 40% is met.
The Zoning Ordinance suggests that churches provide a minimum of one parking space for each two
seats. According to the applicant. Spring Creek Church has a maximum capacity of 1,650 occupants,
which equates to 825 parking spaces. As such, the church is providing substantially more parking than
suggested.
The I-1 District requires that parking and loading areas be adequately screened as determined by the
Plan Commission. Furthermore, Section 340-8.1C.(3) states that all off-street parking, “…shall be
provided with accessory landscape or decorative fence screening that will block from the view of
Page 20 of 54
Planner & Community Development Director Nick Fuchs
motorists or pedestrians on adjacent streets at least the lower ½ of vehicles parked within the off-street
parking area.”
The applicant is proposing to plant eleven deciduous trees and two ornamental trees around the
perimeter of the parking lot. The parking lot does not contain any interior plantings or landscape
islands; however, that is consistent with the existing parking lot.
The primary screening of the parking lot already exists with a staggering row of evergreens located to
the south of the parking area along the south property line. With that said, Capitol Drive is
significantly higher than the site and it’s not feasible to fully screen the parking lot.
The I-1 District also requires that parking areas be a minimum of 30-feet from a street right-of-way.
The drive extending from the existing parking lot drive is closer than 30-feet; however, the nearest
portion of the parking lot is about 45-feet. This is consistent with previous approvals. Moreover, the
drive is in compliance with the required minimum 10-foot paving setback of Section 340-8.1C.(3).
Parking spaces are a minimum of 10’ x 18’ (180 square feet) in conformance with Section 340-8.1A.
of the Zoning Code. The applicant has indicated that paving will meet or exceed the minimums set
forth in Section 340-8.1C.(1) of the Zoning Code.
The light poles are seventeen feet high from grade to the top of poles. The applicant is aware that the
peak height, including the fixture, may not exceed 20 feet. Staff recommends that the applicant provide
lighting with options for motions sensors and dimming as indicated in their responses to staff
comments.
The applicant is also proposing to expand the existing storm water management pond to accommodate
the new parking lot. Final Engineering Department approval of grading, erosion control, utilities, and
storm water management plans shall be obtained prior to any land disturbance.
Recommendation
Staff recommends a motion to approve the Site & Building Plan Review Application for Spring Creek
Church, subject to the conditions in this report.
Page 21 of 54
ARCHITECTURE | ENGINEERING | INTERIORS | PLANNING | LANDSCAPE ARCHITECTURE
Nick Fuchs, Director
City of Pewaukee Planning & Community Development
W240 N3065 Pewaukee Road
Pewaukee, WI 53072
Project Narrative
January 5, 2026
To meet the needs of the growing congregation at Spring Creek Church, an
expansion to the west parking lot is proposed to accommodate the increasing
parish member numbers. This parking expansion project will also include a
relocation of the existing athletic field currently to the northwest corner of the
property currently located within the proposed west parking lot expansion extents.
A storm water management plan will also be developed and submitted as required
for planning commission approval.
The existing number of parking spaces is 1,067 which includes 58 ADA parking
spaces. The number of parking spaces after proposed improvements is 1,241
spaces. The West Parking Lot Expansion work is anticipated to begin in April 2026
and be completed by June 2026.
Along with the parking expansion, the existing stormwater wet pond will be
expanded to provide the necessary stormwater quantity and quality requirements.
Sincerely,
Zimmerman Architectural Studios
Page 22 of 54
PROJECTLOCATION &GENERAL NOTES
LEGEND:
WWEE OHWOHWGASGASSANSANSANSTSTST
WATERMAINUTILITYEXISTING:BURIED ELECTRICGAS LINESANITARY SEWEROVERHEAD WIRESTORM SEWERUTILITY POLELIGHT POLESANITARY MANHOLEFIRE HYDRANTWATER VALVESTORM SEWER STRUCTUREPROPOSED:WWEE GASGASSANSANSANSTSTST
WATERMAINELECTRICAL LINEGAS LINESANITARY SEWERSTORM SEWERWATER VALVESTORM SEWER STRUCTUREFLARED END SECTION
GRADINGEXISTING:
PROPOSED:
MAJOR CONTOURMINOR CONTOUR100.00EXISTEXISTING SPOT ELEVATION
160160MAJOR CONTOURMINOR CONTOUR100.00SPOT ELEVATION(FINISHED GRADE, TOP OF PAVEMENT, FLANGE OF CURB)100.00DOOR ELEVATIONDOOR100.00GROUND GRADE AT BUILDINGGR100.00E/P100.50T/CSPOT ELEVATION(T/C - TOP OF CURB, E/P - EDGE OF PAVEMENT)100.00B/W100.50T/WRETAINING WALL SPOT ELEVATION(T/W - GROUND GRADE AT TOP OF WALL, B/W - GROUNDGRADE AT BOTTOM)
DRAINAGE FLOW DIRECTIONEMERGENCY OVERFLOW ROUTE100.00B/W12" FESFLARED END SECTION(PIPE SIZE, INVERT ELEVATION)
SITEEXISTING:XEXISTING PARKING COUNTEXISTING SIGNEXISTING ADA PARKING SPACEPROPOSED:XPARKING COUNTADA PARKING SPACESIGNTRUNCATED DOMESPAVEMENT MARKING DIRECTIONAL ARROWS
1.THE EXISTING SITE INFORMATION ON THIS PLAN WAS TAKEN FROM A SITE SURVEY PROVIDED BYCAPITOL SURVEY ENTERPRISES. THE ENGINEER MAKES NO WARRANTY OR REPRESENTATIONWITH REFERENCE TO THE ACCURACY AND COMPLETENESS OF THE EXISTING CONDITIONSINDICATED OR NOT INDICATED ON THE ENGINEERING PLANS PROVIDED. VERIFY THE LOCATION OFALL EXISTING SITE CONDITIONS INCLUDING UNDERGROUND UTILITIES, UNDERGROUND UTILITYELEVATIONS, BUILDING SETBACKS AND EXISTING BUILDING LOCATIONS. THE CONTRACTOR SHALLINFORM THE OWNER AND ENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WITHWORK. QUESTIONS REGARDING THE EXISTING SURVEY SHALL BE DIRECTED TO THE PARTIESLISTED ABOVE.2.BEFORE PROCEEDING WITH ANY UTILITY CONSTRUCTION, EXCAVATE EACH EXISTING LATERAL TOBE CONNECTED TO (VERIFYING ELEVATION, LOCATION AND SIZE). SHOULD THE EXISTING UTILITYNOT BE AS INDICATED ON THE PLAN, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY FOREVALUATION.3.ALL UTILITY CONSTRUCTION SHALL ADHERE TO THE STANDARD SPECIFICATIONS FOR SEWER ANDWATER CONSTRUCTION IN WISCONSIN (2003), AS WELL AS, THE MUNICIPAL CONSTRUCTIONSTANDARDS AND THE DEPT. OF SAFETY AND PROFESSIONAL SERVICES SEC. 382-387.4.ALL PERMITS MUST BE RECEIVED FROM THE MUNICIPALITY AND WDNR (IF REQUIRED) PRIOR TOTHE START OF CONSTRUCTION. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALLAPPLICABLE PERMITS ARE RECEIVED PRIOR TO STARTING CONSTRUCTION.5.NOTIFY THE PUBLIC WORKS INSPECTION DEPT. AT LEAST 48 HOURS BEFORE STARTINGCONSTRUCTION.6.BACKFILL REQUIREMENTS AND ROADWAY/SIDEWALK RESTORATION SHALL ADHERE TO LOCALSTANDARDS (GRANULAR BACKFILL UNDER OR WITHIN 5' OF CURBS, SIDEWALK, OR PAVEMENT.SPOIL MAY BE USED ELSEWHERE. SLURRY BACKFILL WILL BE REQUIRED IN PUBLIC ROADWAYS.)7.PROPOSED STORM SEWER SHALL BE PVC, ASTM D-3034, SDR 35 WITH RUBBER ELASTOMERICJOINTS CONFORMING TO ASTM D-3212 (UNLESS OTHERWISE NOTED).8.A MEANS TO LOCATE BURIED UNDERGROUND EXTERIOR NONMETALLIC UTILITIES MUST BEPROVIDED. PROVIDE TRACER WIRE OR OTHER METHODS IN ORDER TO BE LOCATED IN ACCORDWITH THE PROVISIONS SECTIONS 182.0715(2R) OF THE STATE STATUTES.9.UTILITY TRENCHES SHALL BE MECHANICALLY COMPACTED IN ACCORDANCE WITH THE STANDARDSPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN.10.ALL MANHOLES, CATCH BASINS, INLETS, VALVES BOXES, ETC WITHIN THE PROJECT AREA SHALLBE RESET AND ADJUSTED TO MATCH FINISH GRADE.11.ALL EXCAVATED OR STRIPPED MATERIALS NOT BEING REPLACED IN UTILITY TRENCHES OR BEINGUSED FOR FILL SHALL BE REMOVED FROM THE SITE, UNLESS OTHERWISE DIRECTED BY THE
OWNER.12.MATCH PROPOSED CONCRETE CURB AND GUTTER, SIDEWALK AND PAVEMENT TO EXISTING INELEVATION AND ALIGNMENT.13.REMOVAL OF CURB AND GUTTER, SIDEWALK AND PAVEMENT SHALL BE IN ACCORDANCE WITH THESTANDARD SPECIFICATIONS OF THE WISCONSIN D.O.T.14.ALL CONCRETE FOR CURB AND GUTTER, ROADWAY AND SIDEWALKS MUST CONFORM TO THESTANDARD SPECIFICATIONS FOR READY MIXED CONCRETE. MINIMUM 28 DAY COMPRESSIVESTRENGTH TEST MUST EQUAL 4000 PSI.15.PROTECT ALL PROPERTY CORNERS.16.REPAIR ANY DAMAGE TO EXISTING UTILITIES OR SITE IMPROVEMENTS. DOCUMENT ALL EXISTINGDAMAGE PRIOR TO START OF CONSTRUCTION AND NOTIFY CONSTRUCTION MANAGER OF ANYFINDINGS.17.AS-BUILTS ARE TO BE PROVIDED TO THE CLIENT TRACKING ANY CHANGES THAT OCCURREDDURING CONSTRUCTION.
GENERAL NOTES AND SPECIFICATIONS:CIVIL SHEET INDEX:C1.10PROJECT LOCATION AND GENERAL NOTESC1.11SITE PLAN OVERALLC1.12SITE PLAN NORTHC1.13SITE PLAN SOUTHC1.20GRADING PLAN NORTHC1.21GRADING PLAN SOUTHC1.30EROSION CONTROL PLAN NORTHC1.31EROSION CONTROL PLAN SOUTHC5.00CONSTRUCTION DETAILS
PROJECT LOCATION
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
C1.10
1" = 150'
Page 23 of 54
SANSANSANSANSANSANSANSAN
W
ST
STSTSTST
ST
ST
ST
ST
ST
ST
STST
STST
STST
STSTST
STST STSTSTSTSTSTST ST
ST
STSTST ST
ST
ST
ST
ST
ST
ST
STST
ST
ST
ST
ST
ST
ST
E E
E
E
E
E
E
E
E E EE
E
E
EEEEEEE
E
EE
EE
E E E E EEEEE
W
WWWW
STST
EFOEFO
FOE E E E E E E E E E
FOFOFOFOFOFOFO
FOFOFO
FOGASGASGASGASGASGASGASGAS
GAS
GAS
GASGAS
GAS
FOFOFOFOFOFOFOFOFO
FO
FOFOFO
EEEE
E
E
E
E
E
STSTSTSTSTSTSTSTST
STST
STSTSTSTSTST
EE
EE
EEEEEE
E E
E
E
E
E
E
E
E E EE
E
E
EEE
EEEE
E
EE
EE
STST
STSTSTSTST
STSTST
ST
WWWWWW
W
WW
W
WWWWWWWWWWWWWWWWWW
W
W
W
W
W
W
WWW
WWW
W
W
W
WW
GAS
GAS
GAS
STSTSTSTSTSTSTSTSTST
STSTSTST
ST
ST
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
FO
FO
W
WWWW
WWWW
WW WWW
WWW
STSTSTSTSTST ST STST
ST
ST
ST
ST
ST
ST
ST
ST
832STSTSTSTSTSTSTSTSTSTSTSTSTST
STSTST
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
CAPITOL DR
EXISTINGBUILDING
GUMINA RD
DENOTES EXISTINGPROPERTY BOUNDARY(TYP)
DENOTES EXISTINGPROPERTY BOUNDARY(TYP)
DENOTES EXISTINGPROPERTY BOUNDARY(TYP)
DENOTES EXISTINGWETLAND BOUNDARY
DENOTES EXISTINGWET POND
SITE PLAN -OVERALL
C1.11
1" = 60'
DENOTES EXISTINGSTORM SEWER
DENOTES EXISTINGELECTRICDENOTES PROPOSEDSTORM SEWER
DENOTES PROPOSEDSTORM SEWER
DENOTES EXISTINGSTORM SEWER
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
RR TRACKS
- TOTAL PROJECT LIMITS AREA 8.09 AC- TOTAL DISTURBED AREA 8.09 AC- ADDITIONAL IMPERVIOUS AREA 1.48 AC
DENOTES EXISTINGWETLAND BOUNDARY
EXISTING BUILDINGEXISTING PLAYGROUND- TOTAL PROPERTY AREA 53.898 AC- TOTAL PROPERTY IMPERVIOUS AREA 17.66 AC
(33%)
DENOTES PROPOSEDWET POND EXPANSION
- TOTAL PROPERTY GREENSPACE (INCLUDING WETLANDS) 36.23 AC- TOTAL PROPERTY WETLANDS 11.19 AC- TOTAL PROPERTY GREENSPACE EXCLUDING WETLANDS 25.04 AC- 40% TOTAL PROPERTY GREENSPACE REQUIREMENT (53.898 AC x 40%) = 21.56 AC- 20% TOTAL GREENSPACE FROM FLOODPLAIN AND - TOTAL PROPERTY GREENSPACE INCLUDING MAX(54%)
WETLANDS FROM 40% GREENSPACE REQUIREMENTS
(21.56 AC x 20%) = 4.312 AC
20% WETLANDS FROM GREENSPACE REQUIREMENTS
(25.04 AC + 4.312 AC) = 29.35 AC
Page 24 of 54
STSTSTSTSTSTSTST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSTSTSTST
STSTSTSTST
STSTSTSTST
STSTSTSTSTSTST
STSTSTSTST
ST
STSTSTSTSTSTSTSTSTSTST
STSTSTSTST ST
ST
ST
ST
STSTSTSTSTST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSTSTST
SANSAN
EE E E E E E
E
E
EE
E
E
EEE
E
STSTST
EE E E E E E
E
E
E
E
E
E
EEE
E
ST
WWWWWWWWWWW
W
W
W
W
W
WW
W
W
W
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
WW
WW
W
WW
WWW
WW
W
W
WW
W
W
W
W
W
WWWWW
STSTSTSTSTSTSTSTSTSTST
STST
STSTSTSTSTSTSTSTST
ST
ST
ST
ST
SANSANSANSANSANSAN
ST
WW
W
WWWWW
W
W
WWWWWWW
W
W
WWW WWWWWWWSTSTSTST
ST
ST
ST
ST
STST
832
STSTSTSTSTSTSTSTSTST STSTST
ST
ST
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
PROPOSED SPORTS FIELD
EXISTING WET POND
EXISTING PARKINGLOT (TO REMAIN)
DENOTES EXISTINGWETLAND BOUNDARY (TYP)
DENOTES EXISTINGWETLAND BOUNDARY (TYP)
EXISTING 50' SANITARYAND WATERMAINEASEMENT
DENOTES EXISTINGPROPERTY BOUNDARY (TYP)
SITE PLAN - NORTH
C1.12
1" = 30'
MATCH LINESEE SHEET C1.13
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
PROPOSED WETPOND EXPANSION
Page 25 of 54
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSANSAN
WWW
STSTST
STSTST
STSTST
STSTST
ST
ST STSTSTSTST
STST
E E EE
EE
E
E
E
E
E
EE
E
E
E
EE E E
STSTSTST
WWWW
FOFO
EEE
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTST
STSTSTSTSTSTSTSTSTSTSTST
E
E
E
E
E E EE
EE
E
E
E
E
E
E
E
E
E
E
EE E E
STST
STST
STSTSTSTST
STSTSTSTST
STSTST
SANSAN
SANSAN
STGAS
GAS
GAS
GAS
GAS
GAS
GAS
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
ST
STSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTST
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
DENOTES PROPOSEDREGULAR DUTY ASPHALTPAVEMENT (TYP)
DENOTES PROPOSEDREGULAR DUTY ASPHALTPAVEMENT (TYP)
EXISTINGBUILDINGEXISTING PARKING LOT(TO REMAIN)
PROPOSED REGULAR DUTY ASPHALT PAVEMENT
MATCH INTO EXISTINGPAVEMENT
SAWCUT EXISTING PAVEMENT(FULL DEPTH) AND CREATE BUTTJOINT WHERE PROPOSED MEETSEXISTING
MATCH INTO EXISTINGPAVEMENT
SITE PLAN - SOUTH
C1.13
1" = 30'
EXISTING BUIDLING
EXISTINGPLAYGROUND
DENOTES EXISTINGPROPERTY BOUNDARY (TYP)
EXISTING 50' SANITARY ANDWATERMAIN EASEMENT
MATCH LINESEE SHEET C1.12
CAPITOL DR
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITSDENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
DENOTES PARKING LOTAND SPORTS FIELDPROJECT LIMITS
Page 26 of 54
842
840
841
841
842
843
845
844
836
836
837
837838
STSTSTSTSTSTST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSTSTSTST
STSTSTST
STSTSTSTST
STSTSTSTSTST
STSTSTSTST
ST
STSTSTSTSTSTSTSTSTSTST
STSTSTSTST ST
ST
ST
ST
STSTSTSTSTST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
SANSAN
E E E E E
E
E
E
EE
E
E
E
EE
839840840841842
843
844
845
845
846
846
846
847
847
848848850851852
853
853
854
854
855
855
STST
E E E E E
E
E
E
EE
E
E
E
EE
ST
832
832
833
833
834
834
835
835
836
836
837
837838
838
839
839
839
840
840
841
842
WWWWWWWWWWW
W
W
W
W
W
W
W
W
W
W
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
WW
WW
W
WW
WW
W
WWWWWW
WWW
W
W
WWWWW
STSTSTSTSTSTSTSTST
STST
STSTSTSTSTSTSTSTST
ST
ST
ST
ST
SANSANSANSANSAN
ST
831831
831
831
832
832832832832832
833833
833833833
833
833 833
834
834834
834
834834
835
835
835
835835 835836836836
836
837837
837
837
838
838
839
839
840
840
841
841
842
842
842
843
843843843
843
843
844
844
844844
844
844
844
844 844
845
845
845
845 845
845
846
846
846
846
846
846 846
847
847
847847 847
848
848
848
848
848848
848849 849
849
849850
850
851
851
852
852
853
853
853854
854
854
854
855
855
855855
856
856
856
857
WW
W
WWWWW
W
W
WWWWWWW
W
W
WWW WWWWWWWSTSTSTST
ST
ST
ST
ST
STST
832
830826828
830828826
826828830
826830
851
847
831833835837
839
840838836834832831
851850849848850849848847846
851
849
847
846845846 844843
845
844
830826
MATCH±842.36MATCH±842.61MATCH±MATCH±
STSTSTSTSTSTSTSTST STSTST
RIM839.00
RIM838.75
834835835833831830826
29"x45" FES831.50
29"x45" FES830.55
835.30
835.30
835.30835.30
ST
STRIM835.31834.5330" FES831.00
30" FES830.80
Pipe - 100
100Pipe - 101101
Pipe - 102
Pipe - 300Pipe - 201200Pipe - 200
Storm Structure Table#100101102
Structure DetailsCATCH BASIN W/R-1772 LIDRIM = 838.75Pipe - 101 = 833.89Pipe - 100 = 833.89CATCH BASINRIM = 839.00Pipe - 102 = 835.04Pipe - 101 = 835.04CATCH BASINRIM = 841.75Pipe - 103 = 836.82Pipe - 102A = 837.75Pipe - 102 = 836.82
102A103200
CATCH BASINRIM = 843.50Pipe - 102A = 838.99CATCH BASINRIM = 843.00Pipe - 103 = 839.75OUTLET CONTROL STRUCTURERIM = 835.31Pipe - 201 = 831.00Pipe - 200 = 831.00
Storm Pipe TablePipe NamePipe - 100Pipe - 101Pipe - 102Pipe - 102APipe - 103Pipe - 200Pipe - 201Pipe - 300
Size2424241215303036
MaterialHDPEHDPEHDPEHDPEHDPEHDPEHDPERCP
Length2646178124293211730
Slope2.50%2.50%1.00%1.00%1.00%0.97%0.00%3.13%
Description
29"x45" ELLIPTICAL PIPE
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
GRADING PLAN -NORTH
C1.20
1" = 30'
PROPOSED SPORTS FIELD
EXISTING WET POND
DENOTES EXISTINGWETLAND BOUNDARY (TYP)
DENOTES EXISTINGWETLAND BOUNDARY (TYP)
DENOTES EXISTINGPROPERTY BOUNDARY (TYP)
PROPOSED WETPOND EXPANSION
MATCH LINESEE SHEET C1.21
24" FESI.E.= 833.24
REMOVE AND REPLACEEXISTING PAVEMENT ASREQUIRED TO INSTALLPROPOSED UTILITIES.SLURRY BACKFILLREQUIRED WITHINROADWAY
PARKING LOT CONTAINS ANUNDERDRAIN SYSTEM.CONTRACTOR TORE-ROUTE/RECONNECT ANYUNDERDRAINS THAT AREIMPACTED DURINGCONSTRUCTION
Page 27 of 54
842
837836
838
838837
838
836835
839
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSAN
837
838
838
838
SANSAN
WWW
838
STSTST
STST
STST
STST
ST
ST STSTSTSTST
STST
E E EE
EE
E
E
E
E
E
EE
E
E
E
EE E
STSTSTST
838839840
842
842
843
843
844
844
845
845
846
846846846846
847847
847
847 847
848
848 848
849
849
849
850
851852853
WWWFOFO
EEE
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTST
STSTSTSTSTSTSTSTSTSTSTST
E
E
E
E
E E EE
EE
E
E
E
E
E
E
E
E
E
E
EE E
STST
STST
STSTSTSTST
STSTSTSTST
STSTST
SANSAN
SANSAN
832832
833
833
834
834
835
835
835835
836
836
836
836
836
837
837
837
837
838
838
838
839
840840
841841842
STGAS
GAS
GAS
GAS
GAS
GAS
GAS
STSTSTSTSTSTSTSTSTSTSTSTST
842843 843
844 844
845
845 845
846 846
846
846
846
846
846
846
846 847
847
847 847
847
847
847
847
848
848
848
848
848849
849
849
850
STSTSTSTSTSTSTST
846
847
845843 843844
846
847.50847.23
847.40846.76846.75845.90845.79844.90845.37845.05
845.07
845.06MATCH±843.95
MATCH±844.30845.04
843.52
842.07842.38
MATCH±842.36MATCH±842.61MATCH±843.10MATCH±843.86843.27843.75842.76842.28843.98843.51842.88 844.10
845.76
847.00
847.50
847.50
MATCH±842.91MATCH±839.80
MATCH±839.12
842.64
846845844843
845 844
847
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTST RIM843.50RIM841.75
RIM843.00844845846
Pipe - 102A102A102Pipe - 103
103
Pipe - 102
Storm Structure Table#100101102
Structure DetailsCATCH BASIN W/R-1772 LIDRIM = 838.75Pipe - 101 = 833.89Pipe - 100 = 833.89CATCH BASINRIM = 839.00Pipe - 102 = 835.04Pipe - 101 = 835.04CATCH BASINRIM = 841.75Pipe - 103 = 836.82Pipe - 102A = 837.75Pipe - 102 = 836.82
102A103200
CATCH BASINRIM = 843.50Pipe - 102A = 838.99CATCH BASINRIM = 843.00Pipe - 103 = 839.75OUTLET CONTROL STRUCTURERIM = 835.31Pipe - 201 = 831.00Pipe - 200 = 831.00
Storm Pipe TablePipe NamePipe - 100Pipe - 101Pipe - 102Pipe - 102APipe - 103Pipe - 200Pipe - 201Pipe - 300
Size2424241215303036
MaterialHDPEHDPEHDPEHDPEHDPEHDPEHDPERCP
Length2646178124293211730
Slope2.50%2.50%1.00%1.00%1.00%0.97%0.00%3.13%
Description
29"x45" ELLIPTICAL PIPE
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
GRADING PLAN -SOUTH
C1.21
1" = 30'
MATCH LINESEE SHEET C1.20REMOVE AND REPLACEEXISTING PAVEMENT ASREQUIRED TO INSTALLPROPOSED UTILITIES.SLURRY BACKFILLREQUIRED WITHINROADWAY
EXISTINGBUILDING
EXISTING BUIDLING
EXISTINGPLAYGROUND
CAPITOL DR
CAUTION! UTILITIES. VERIFYEXACT LOCATION ANDELEVATION PRIOR TOSTARTING CONSTRUCTION
CAUTION! UTILITIES. VERIFYEXACT LOCATION ANDELEVATION PRIOR TOSTARTING CONSTRUCTION
PARKING LOT CONTAINS ANUNDERDRAIN SYSTEM.CONTRACTOR TORE-ROUTE/RECONNECT ANYUNDERDRAINS THAT AREIMPACTED DURINGCONSTRUCTION
Page 28 of 54
842
840
841
841
842
843
845
844
836
836
837
837
839840840841842
843
844
845
845
846
846
846
847
847
848848850851852
853
853
854
854
855
855
832
832
833
833
834
834
835
835
836
836
837
837838
838
839
839
839
840
840
841
842
WWWWWWWWW
W
W
W
WW
W
W
WWWWWWWWWWWWWWWWWWWWWWWWWWW
W
W
W
W
W
W
W
W
WW
WW
W
W
W
WWWW
WW
W
W
WWW
SANSANSANSAN
831831
831
831
832
832832832832832
833833
833833833
833
833 833
834
834834
834
834834
835
835
835
835835 835836836836
836
837837
837
837838839
840
841
842
842
843843843
843
843
844844
844
844
844
844 844
845
845
845
845 845
845
846
846
846
846
846
846 846
847
847
847847 847
848
848
848
848
848848
848849 849
849
849850
850
850
851
851
852
852
852
853
853
853
853854
854
854
854
855
855
855855
856
856
856
857
W
W
WWWW
W
WWWWWW
W
WW
WWWWW
832
830826828
830828826
826828830
826830
851
847
831833835837
839
840838836834832831
851850849848850849848847846
851
849
847
846845 844843
845
844
830826
STSTSTSTSTSTSTSTST
834835835833831830826
ST
SILT FILTER FENCEEROSION MATDITCH CHECKINLET SEDIMENT GUARD
®
®
NO SCALE14 CURLEX® SEDIMENT LOG® DETAIL (NO BLANKET)
®
STAKE DETAIL(BARE SOIL) (WITH TRENCH)NO SCALE44
®
®
NOTE: TRENCH OPTION IS MOST APPLICABLE IN LOOSE,UNCONSOLIDATED SOILS
®
ANCHOR DETAIL (PLAN VIEW)OPTIONAL OVERLAPPING JOINTNO SCALE74
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
DENOTESPROPOSED TYPE AINLET PROTECTION(TYP)
DENOTES EROSION MAT (TYPE 1, CLASS A) WITHACCELERATED DEGRADABLE NETTING. NORTHAMERICAN GREEN S75 (OR APPROVED EQUIV.)
DENOTES PROPOSEDLIGHT RIP RAP W/GEOFABRIC LINER DENOTES EROSION MAT FORCONCENTRATED FLOWSNORTH AMERICAN GREENSC150 (OR APPROVED EQUIV.)
DENOTES EROSION MAT (TYPE 1, CLASS A) WITHACCELERATED DEGRADABLE NETTING. NORTHAMERICAN GREEN S75 (OR APPROVED EQUIV.)
DENOTESPROPOSED DITCHCHECK (TYP)
DENOTESPROPOSED DITCHCHECK (TYP)
DENOTESPROPOSED DITCHCHECK (TYP)
1.WDNR PERMIT COVERAGE IS REQUIRED. POST WDNR CERTIFICATE OF PERMIT COVERAGE ON SITE AND MAINTAIN UNTILCONSTRUCTION ACTIVITIES HAVE CEASED, THE SITE IS STABILIZED, AND A NOTICE OF TERMINATION IS FILED WITHWDNR.2.KEEP A COPY OF THE CURRENT EROSION CONTROL PLAN ON SITE THROUGHOUT THE DURATION OF THE PROJECT.3.SUBMIT PLAN REVISIONS OR AMENDMENTS TO THE ENGINEER AT LEAST 5 DAYS PRIOR TO FIELD IMPLEMENTATION.4.CONTRACTOR IS RESPONSIBLE FOR ROUTINE SITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS AND WITHIN 24 HOURSAFTER A RAINFALL EVENT OF 0.5 INCHES OR GREATER. KEEP INSPECTION REPORTS ON-SITE AND MAKE THEM AVAILABLEUPON REQUEST.5.INSPECT AND MAINTAIN ALL INSTALLED EROSION CONTROL PRACTICES UNTIL THE CONTRIBUTING DRAINAGE AREA HASBEEN STABILIZED.6.WHEN POSSIBLE: PRESERVE EXISTING VEGETATION (ESPECIALLY ADJACENT TO SURFACE WATERS), MINIMIZELAND-DISTURBING CONSTRUCTION ACTIVITY ON SLOPES OF 20% OR MORE, MINIMIZE SOIL COMPACTION, AND PRESERVETOPSOIL.7.REFER TO THE WDNR STORMWATER CONSTRUCTION TECHNICAL STANDARDS AThttp://dnr.wi.gov/topic/stormwater/standards/const_standards.html.8.INSTALL PERIMETER EROSION CONTROLS, (IF REQUIRED) AND TRACKOUT CONTROL PRACTICES PRIOR TO ANYLAND-DISTURBING ACTIVITIES, INCLUDING CLEARING AND GRUBBING. USE WDNR TECHNICAL STANDARD 1057 FORTRACKOUT CONTROL AT CONSTRUCTION ENTRANCE(S) (IF REQUIRED).9.INSTALL INLET PROTECTION PRIOR TO LAND-DISTURBING ACTIVITIES IN THE CONTRIBUTING DRAINAGE AREA AND/ORIMMEDIATELY UPON INLET INSTALLATION. COMPLY WITH WDNR TECHNICAL STANDARD STORM DRAIN INLET PROTECTIONFOR CONSTRUCTION SITES #1060.10.STAGE CONSTRUCTION GRADING ACTIVITIES TO MINIMIZE THE CUMULATIVE EXPOSED AREA. CONDUCT TEMPORARYGRADING FOR EROSION CONTROL PER WDNR TECHNICAL STANDARD TEMPORARY GRADING PRACTICES FOR EROSIONCONTROL #1067.11.PERMITTING OF GROUNDWATER DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. GROUNDWATERDEWATERING IS SUBJECT TO A DNR WASTEWATER DISCHARGE PERMIT AND A DNR HIGH CAPACITY WELL APPROVAL IFCUMULATIVE PUMP CAPACITY IS 70 GPM OR MORE.12.PROVIDE ANTI-SCOUR PROTECTION AND MAINTAIN NON-EROSIVE FLOW DURING DEWATERING. PERFORM DEWATERINGOF ACCUMULATED SURFACE RUNOFF IN ACCORDANCE WITH WDNR TECHNICAL STANDARD DE-WATERING #1061.13.COMPLETE AND STABILIZE WET POND PRIOR TO MASS LAND DISTURBANCE TO CONTROL RUNOFF DURINGCONSTRUCTION. REMOVE SEDIMENT AS NEEDED TO MAINTAIN 3 FEET OF DEPTH TO THE OUTLET, AND PROPERLYDISPOSE OF SEDIMENT REMOVED DURING MAINTENANCE (REFER TO NR 528). CONSTRUCT AND MAINTAIN THE SEDIMENTBASIN PER WDNR TECHNICAL STANDARD SEDIMENT BASIN #1064 AND SEDIMENT TRAP # 1063.14.INSTALL AND MAINTAIN SILT FENCING PER WDNR TECHNICAL STANDARD SILT FENCE #1056. REMOVE SEDIMENT FROMBEHIND SILT FENCES AND SEDIMENT BARRIERS BEFORE SEDIMENT REACHES A DEPTH THAT IS EQUAL TO ONE-HALF OFTHE FENCE AND/OR BARRIER HEIGHT.15.REPAIR BREAKS AND GAPS IN SILT FENCES AND BARRIERS IMMEDIATELY. REPLACE DECOMPOSING STRAW BALES(TYPICAL BALE LIFE IS 3 MONTHS). LOCATE, INSTALL, AND MAINTAIN STRAW BALES PER WDNR TECHNICAL STANDARDDITCH CHECKS #1062.16.INSTALL AND MAINTAIN FILTER SOCKS IN ACCORDANCE WITH WDNR TECHNICAL STANDARD INTERIM MANUFACTUREDPERIMETER CONTROL AND SLOPE INTERRUPTION PRODUCTS # 1071.17.IMMEDIATELY STABILIZE STOCKPILES AND SURROUND STOCKPILES AS NEEDED WITH SILT FENCE OR OTHER PERIMETERCONTROL IF STOCKPILES WILL REMAIN INACTIVE FOR 7 DAYS OR LONGER.18.IMMEDIATELY STABILIZE ALL DISTURBED AREAS THAT WILL REMAIN INACTIVE FOR 14 DAYS OR LONGER.- BETWEEN SEPTEMBER 15 AND OCTOBER 15: STABILZE WITH MULCH, TACKIFIER, AND A PERENNIAL SEED MIXED WITH WINTER WHEAT, ANNUAL OATS, OR ANNUAL RYE, AS APPROPRIATE FOR REGION AND SOIL TYPE- CONSTRUCTION OR STABILIZATION ACTIVITIES BETWEEN NOVEMBER 1 AND MAY 1 WILL COMPLY WITH THE WINTERCONSTRUCTION SITE EROSION CONTROL REQUIREMENTS FOUND IN THE CITY OF PEWAUKEE TECHNICAL STANDARDS.19.STABILIZE AREAS OF FINAL GRADING WITHIN 7 DAYS OF REACHING FINAL GRADE.20.SWEEP/CLEAN UP ALL SEDIMENT/TRASH THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSBEFORE THE END OF THE SAME WORKDAY OR AS DIRECTED BY THE WDNR/MUNCIPALITY. SEPARATE SWEPT MATERIALS(SOILS AND TRASH) AND DISPOSE OF APPROPRIATELY.21.CONTRACTOR IS RESPONSIBLE FOR CONTROLLING DUST PER WDNR TECHNICAL STANDARD DUST CONTROL ONCONSTRUCTION SITES # 1068.22.PROPERLY DISPOSE OF ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANINGWASTES, OR OTHER CONSTRUCTION MATERIALS) AND DO NOT ALLOW THESE MATERIALS TO BE CARRIED BY RUNOFFINTO THE RECEIVING CHANNEL.25. FOR NON-CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED SLOPES 4:1 OR GREATER (OR AS SHOWN ON THEPLAN), PROVIDE CLASS I TYPE TYPE A (WITH ACCELERATED DEGRADABLE NETTING) EROSION CONTROL MATTING.SELECT EROSION MATTING FROM WDOT’S PRODUCT ACCEPTABILITY LIST (PAL); INSTALL AND MAINTAIN PER WDNRTECHNICAL STANDARD NON-CHANNEL EROSION MAT #1052.23.FOR CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED AREAS (OR AS SHOWN ON THE PLANS), PROVIDE NORTHAMERICAN GREEN SC150 (OR APPROVED EQUAL) EROSION CONTROL MATTING. INSTALL AND MAINTAIN PER WDNRTECHNICAL STANDARD CHANNEL EROSION MAT #1053.24.MAKE PROVISIONS FOR WATERING DURING THE FIRST 8 WEEKS FOLLOWING SEEDING OR PLANTING OF DISTURBEDAREAS WHENEVER MORE THAN 7 CONSECUTIVE DAYS OF DRY WEATHER OCCUR.25.INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES (SUCH AS TEMPORARY SEDIMENT BASINS, DITCHCHECKS, EROSION CONTROL MATTING, SILT FENCING, FILTER SOCKS, WATTLES, SWALES, ETC.), OR AS DIRECTED BYWDNR/MUNICIPALITY26.NOTICE OF TERMINATION: WHEN THE SITE HAS BEEN FULLY STABILIZED AND ALL STORMWATER DISCHARGES FROM THESITE AUTHORIZED UNDER THE NOI PERMIT HAVE BEEN ELIMINATED, A NOTICE OF TERMINATION SHALL BE FILED WITHTHE DNR. CONTRACTOR SHALL SUBMIT A COMPLETED NOTICE OF TERMINATION APPLICATION IN ACCORDANCE WITHTHE PERMIT REQUIREMENTS PRIOR TO FINAL PAYMENT.
EROSION CONTROLPLAN - NORTH
C1.30
1" = 40'
DENOTESPROPOSED SILTFENCE (TYP)
DENOTESPROPOSED SILTFENCE (TYP)
MATCH LINESEE SHEET C1.31
DENOTES PROPOSEDMEDIUM RIP RAP W/GEOFABRIC LINER
Page 29 of 54
842
837836
838
838837
838
836835
839
SANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSAN
837
838
838 838
837
838SANSAN
WW
838
836
837 837837
838
838
838
839
839
840
842
842
843
843
844
844
845
845
846
846846846846
847847
847
847 847848 848
849
849
850
851852
WWWWW
832832
833
833
834
834
835
835
835835
836
836
836
836
836
837
837
837
838
838839
840840
841841842
842843 843
844 844
845
845 845
846 846
846
846
846
846
847
847 847
847
847
847
848
848
848849
849
WW
846
847
845843 843844
846
846845844843
845 844
847
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTST844845846
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
DENOTESPROPOSED TYPE AINLET PROTECTION(TYP)
DENOTES EROSION MAT FORCONCENTRATED FLOWSNORTH AMERICAN GREENSC150 (OR APPROVED EQUIV.)
DENOTESPROPOSED DITCHCHECK (TYP)
DENOTESPROPOSED TYPE AINLET PROTECTION(TYP) DENOTESPROPOSED TYPE AINLET PROTECTION(TYP)
DENOTESPROPOSED SILTFENCE
EXISTINGBUILDING
DENOTESPROPOSED DITCHCHECK (TYP)
DENOTESPROPOSEDBIO-LOG (TYP)
DENOTESPROPOSEDBIO-LOG (TYP)
SILT FILTER FENCESILT BIO-LOGEROSION MATDITCH CHECKINLET SEDIMENT GUARD
®
®
NO SCALE14 CURLEX® SEDIMENT LOG® DETAIL (NO BLANKET)
®
STAKE DETAIL(BARE SOIL) (WITH TRENCH)NO SCALE44
®
®
NOTE: TRENCH OPTION IS MOST APPLICABLE IN LOOSE,UNCONSOLIDATED SOILS
®
ANCHOR DETAIL (PLAN VIEW)OPTIONAL OVERLAPPING JOINTNO SCALE74
NOTE:INSTALLED HEIGHT IS MEASURED FROM THE UPSLOPE GROUNDSURFACE TO THE TOP OF THE PRODUCT. DUE TO SETTLEMENTAND/OR DEFORMATION, THE INSTALLED HEIGHT MAY NOT BEEQUIVALENT TO THE NOMINAL DIAMETER OF THE PRODUCT
INSTALLEDHEIGHT2-INCH MIN.ENTRENCHMENT GROUNDSURFACE
EROSION CONTROLPLAN - SOUTH
C1.31
1" = 40'
MATCH LINESEE SHEET C1.30
Page 30 of 54
$ /
Project Name:
Client:
Issuance:
Scale:
Date:Project Number:Sheet Name:Sheet Number:
CCopyright 2024
25-0074.00
01-05-2026
Spring Creek ChurchParking ImprovementsN35 W22000 Capitol DrPewaukee, WI 53072
01-05-2026Plan Commission02-06-2026Plan Commission Resubmittal03-13-2026Staff Comments
Pipe DiameterTrash Rack WidthW (in.)Trash Rack LengthL (in.)Total # of BarsBBar SpacingS (in.) Section A-A
Plan View
End View
Isometric View
CONSTRUCTIONDETAILS
C5.00
Page 31 of 54
Office of the Planner & Community Development Director
W240 N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
Phone (262) 691-0770 Fax (262) 691-1798
fuchs@pewaukee.wi.us
Date: January 28, 2026 (Responses added 2/6/26 in RED)
To: Spring Creek Church
From: Nick Fuchs, Planner & Community Development Director
RE: Staff Comments - Site & Building Plan Review
Comments and Recommendations:
Below are comments and recommendations for the proposed development application for property located at
N35W22000 Capitol Drive (Tax Key No. PWC 0909999005).
1. Please provide lot coverage calculations in accordance with Section 340-2.10D(4) of the Zoning Code.
Impervious area lot calculations have been added to the site plan.
2. Please ensure that the proposed lighting is in compliance with Section 340-2.10D(6). Note that light
poles may not exceed 20-feet as measured from grade.
Poles are designed as 17’ high from grade to top of pole.
3. Are the proposed lights dimmable?
Not included in this design, however there are options for motion sensors on the fixtures/poles. The lot
would dim to 20 or 50% when no activity is detected.
4. How many seats are within the church?
There are pews used the church in lieu of fixed seating and the capacity is 1,650 occupants
5. Is the layout of the existing parking lot to the east of the proposed changing? It appears different on the
plans than how it is currently striped.
The existing parking lot striping to the east has been updated to match the current layout.
6. The parking lot shall be paved in accordance with the minimums set forth in Section 340-8.1C.(1) of the
Zoning Code.
So noted. Pavement sections match/exceed requirements.
7. Approval will be conditioned upon final Engineering Department approval of grading, erosion control,
utilities, and storm water management plans, which must be obtained prior to any land disturbance.
So noted. Updated plans and reports will be sent to Engineering department for their review.
Page 32 of 54
Office of the Planner & Community Development Director
W240 N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
Phone (262) 691-0770, Fax (262) 691-1798
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of March 19, 2026
Date: March 10, 2026
Project Name: Lake Pewaukee Sanitary District Site & Building Plan Review
Project Address/Tax Key No.: N25W27534 Oak Street / PWC 0935979001
Applicant: Lake Pewaukee Sanitary District (LPSD)
Property Owner: PEWAUKEE LAKE SANITARY DISTRICT AND TOWN OF PEWAUKEE
Current Zoning: I-1 Urban Institutional and F-1 Floodplain District
2050 Land Use Map Designation: Governmental/Institutional and Floodplains, Lowland, & Upland
Conservancy and Other Natural Areas
Use of Surrounding Properties: Single-family residential to the north, east, south, and west
Project Description
The applicant filed a Site & Building Plan Review Application for property located at N25W27534
Oak Street requesting approval of a building addition and lift station. The property is approximately
1.94 acres and is zoned I-1 Urban Institutional District and F-1 Floodplain District.
The I-1 District allows, as a permitted use, public utility offices as well as accessory storage. Lift
stations are also allowed as an essential service and are exempt from height and yard regulations per
sections 340-11.1D. and 340-11.25C., respectively.
The total area of the building addition is 6,922 square feet comprising of 2,448 square feet of new
office space and 4,474 square feet of new shop space. The lift station is 1,259 square feet. The project
also includes adding new paved areas and repaving existing drive and parking areas. Parking spaces
are being redesigned to conform to the city’s size requirement of a minimum of 180 square feet.
According to the applicant, the total impervious surface onsite, including all buildings and hard
surfaces, is 35,223 square feet, which is 57% of the site. The remaining 43% of greenspace is in
compliance with the city’s 40% minimum greenspace standard.
There is wetland and floodplain setback on the south side of the property as shown on the site plan. No
improvements encroach into these areas.
The building addition is brick with EIFS accents and includes six overhead doors on the east elevation.
The lift station is also primarily brick.
The Landscape Plan provided consists of two trees and twelve shrubs. The two trees are located on the
west end of the parking lot in front of the building. The shrubs are located along the front of the
building near the main entrance. There are existing trees along the perimeter of the site, however,
primarily on the neighboring properties.
Page 33 of 54
Planner & Community Development Director Nick Fuchs
The applicant is proposing to maintain the existing light poles but add new fixtures. New building
lighting will be placed on the building addition as well as on the lift station.
Signage is shown on the building and is subject to staff review and approval of a Sign Permit.
Recommendation
Staff recommends approval of the Site & Building Plan Review Application for the Lake Pewaukee
Sanitary District, subject to final Engineering Department approval of grading, erosion control,
stormwater management, and utility plans, prior to any land disturbance.
Page 34 of 54
ARCHITECTKueny Architects10505 Corporate Drive, Suite 100(262) 857-8101Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
01KUENY ARCHITECTS, LLC10505 CORPORATE DRIVE -SUITE 100 PLEASANT PRAIRIE, WI 53158
1. All concrete to test 4000 psi in 28 days.2. Verify all dimensions, access, utilities and working conditions in the field.3. Conform to all applicable codes, ordinances and safety standards.4. Obtain and pay for all required permits and fees.5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the Specifications.6. No concrete to be poured without Architect's prior review.7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.8. Leave site clean, neat and free of debris at all times.9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.10. Guard against interfering with Owner's operations.11. These Drawings contain no provisions or procedures for on-site safety. Each Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.
GENERAL NOTES
CONSULTANTS
SHEET INDEX
SITE MAP
PROJECT INFO ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com VOLUME #2 - LPSD - Lake Facility - Site 1N25 W27534 Oak StreetPewaukee, WI 53072February 10, 2026Lake Pewaukee Sanitary DistrictLPSD -Lake Facility Facility -Site 1
TITLE SHEET01 Title Sheet - Site 1ARCHITECTURAL1A101 Site Layout Plan1A103 Site Grading, Utility and Erosion Plan1A104 Site Details and Standards1A105 Landscape Plan1A201 Floor Plan1A205 Exterior Elevations1A401 Wall Sections1A405 Wall SectionsELECTRICAL1E202 Lighting Plan & General Site PlanGrand total: 10
Page 35 of 54
C FNCC FNCC FNCC FNCC FNCC FNCC FNC
11A301
1A2051
1A2054868.00 LOWER F.F872.00 MAIN F.F
867.82 LOWER F.F
872.00 MAIN F.F(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(03 30 00.36) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A" -WITH ADA DETECTABLEWARNING PLATE4'-0"21'-4 1/8"8'-0 7/8"
4'-0"(03 30 00.04) 8" CONCRETE SLABOVER 8" CRUSHED STONE; SLABTYPE "C"19'-0"
SEE R/M DRAWINGS FOR WORK RELATED TO THE LIFT STATION
46'-6 1/8"R 11'-7 5/32"11'-7 5/8"
NEW OFFICE ADDITION -2,448 SQ/FTNEW SHOP ADDITION -4,474 SQ/FT
NEW OFFICE ADDITION -2,448 SQ/FTNEW SHOP ADDITION - 4,474 SQ/FT
EXISTING -4,156 SQ/FT
TOTAL ADDED AREA - 6,922 SQ/FTMAIN FACILITY AREAS
EXISTING PARKING LOT TO REMAIN AS IS --NEW ASPHALT ONLY -NO CHANGE IN LIMITSTHIS AREA IS ALTERNATE #1EXISTING LIGHT POLE BASE TO REMAIN. INSTALL NEW LIGHT POLE WITH LED LIGHT FIXTURENEW RETAINING WALL BLOCK SYSTEM
FLOOD PLAIN 75 FOOT SETBACKWETLAND 25 FOOT SETBACK71'-0"27'-5 1/4"
44'-0 1/4"
50'-7"68'-0 1/4"
114'-9 1/4"20'-0"25'-0" SET BACK25'-0"
42'-8 1/8"
58'-3 1/8"
7'-5 1/4"35'-7 1/2"20 FOOT SETBACK
20 FOOT SETBACK
25 FOOT SETBACK
25 FOOT SETBACK
(9,224 SQ/FT)
BUILDING 1 AREA -- 264 SQ/FT BUILDING 2 AREA -- 995 SQ/FT
LOT COVERAGETOTAL ADDED MAIN BUILDING AREA - 6,922 SQ/FTEXISTING MAIN BUILDING AREA - 4,156 SQ/FTTOTAL ADDED LIFT STATION AREA - 1,259 SQ/FTTOTAL SITE AREA - 62,352 SQ/FTNORTH ASPHALT AREA - 9,224 SQ/FTEAST ASPHALT AREA - 10,292 SQ/FTMISC. CONCRETE PAD AREA - 3,370 SQ/FTIMPERVIOUS SURFACE TOTAL - 35,223 SQ/FT35,223 / 62,352 SQ/FT x 100 = 57% IMPERVIOUS / 43% GREEN SPACE
5'-6 1/2"
6"2'-7 5/8"9'-0"5'-0"11'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"
20'-0"20'-0"22'-6 5/8"3'-11 1/2"9'-4 7/8"GENERAL PAVING NOTES:MINIMUM PAVEMENT STRUCTURE -SEE SITE GEOTECHNICAL REPORT (NOTE: IF NO GEOTECHNICAL REPORT IS AVAILABLE, USE THESE THICKNESS SPECIFIED BELOW):ASPHALTIC CONCRETE PAVEMENTBASE THICKNESS -10"BASE MATERIAL -DENSE GRADED BASE MEETING WISDOT SPECIFICATION SECTION 305, 1-1/4”DENSE GRADED BASE. PROVIDE AGGREGATE CONFORMING TO 301.2 FOR CRUSHED STONE, CRUSHED GRAVEL, CRUSHED CONCRETE, RECLAIMED ASPHALT, REPROCESSED MATERIAL, OR BLENDED MATERIAL. CONTRACTOR MAY USE PULVERIZED AND SALVAGE MATERIAL FROM DEMO ACTIVITIES AS LONG AS IT MEETINGS WISDOT SPECIFICATION. THIS MATERIAL WILL BE ALLOWED TO BE USED IN THE BOTTOM HALF OF THE BASE COURSE STRUCTURE.ASPHALT PAVEMENT LAYER THICKNESSES:BINDER LAYER: 2.25" HMA PAVEMENT 3 MT 58-28 S SURFACE LAYER: 1.75”HMA PAVEMENT 4 MT 58-28H
26'-6 1/8"
10'-0"
10'-0"EXISTING EDGE OF PARKING LOT TO REMAINNEW ASPHALT ONLY EXISTING PARKING LOT ACCESS TO REMAINALTERNATE #1
EXISTING19'-5 1/2"(32 12 00) RE-PAVE EXISTING PARKING LOT. SEE GENERAL PAVING NOTES FOR ASPHALT REQUIREMENTS
(32 12 00) NEW ASPHALT TO BE MIN. 10 FT AWAY FROM PROPERTY LINE
PROPERTY LINE
EXISTING EDGE OF PARKING LOT TO REMAINEXISTING EDGE ASPHALT TO REMAIN
NEW EDGE OF ASPHALT (32 12 00) NEW PAVED PARKING LOT. SEE GENERAL PAVING NOTES FOR ASPHALT REQUIREMENTSBASE BID
4'-0"4'-0"5'-1"
(32 12 00) NEW PAVED PARKING LOT. SEE GENERAL PAVING NOTES FOR ASPHALT REQUIREMENTS
EXISTING LIGHT POLE BASE TO REMAIN. INSTALL NEW LIGHT POLE WITH LED LIGHT FIXTURE NEW CONCRETE LIGHT POLE BASE NEW LIGHT POLE WITH LED LIGHT FIXTURETOP OF BASE @ 24" AFFLIGHT POLE MAX. HEIGHT = 18 FT AFFTOTAL POLE MAX HEIGHT = 20 FT AFF
NEW CONCRETE LIGHT POLE BASE NEW LIGHT POLE WITH LED LIGHT FIXTURETOP OF BASE @ 24" AFFLIGHT POLE MAX. HEIGHT = 18 FT AFFTOTAL POLE MAX HEIGHT = 20 FT AFF
4'-0"CUT EXISTING CURB - NEW ADA ACCESS8'-0"1A1012 (03 30 00.37) ALL NEW CONCRETESIDEWALK ON THE NORTH SIDE.4" CONCRETE SLAB OVER 4"COMPACTED STONE
13'-5"
14'-8"
11A402MAX SLOPE 1:201'-5 7/8"4'-0"5'-0"SLOPE 1:207'-4 1/8"SLOPED SIDEWALK16'-4 1/8"LEVEL (-) 0'-0 1/4"OFFICE LEVEL
LEVEL -0'-6"LEVEL -0'-6"OFFICE LEVEL
1'-5 7/8"LEVEL (-) 0' -5 1/8"LEVEL (-) 0'-5 1/8"LEVEL (-) 0' -5 1/8"CUT EXISTING CURB - NEW ADA ACCESS8'-0"sloped curb2'-0 1/4"LEVEL -0'-0"LEVEL (-) 0'-1/4"LEVEL (-) 0'-0 1/4"LEVEL (-) 0'-0 1/4"(03 30 00.36) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A" -WITH ADA DETECTABLEWARNING PLATE(03 30 00.37) ALL NEW CONCRETESIDEWALK ON THE NORTH SIDE.4" CONCRETE SLAB OVER 4"COMPACTED STONE(03 30 00.37) ALL NEW CONCRETE SIDEWALK ONTHE NORTH SIDE. 4" CONCRETE SLAB OVER 4"COMPACTED STONE
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
PLAN NORTHSHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
KEYNOTE LEGENDN25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:24 PM
SCALE: As indicated
1A101
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Site Layout Plan
A3 Addendum #3 03/02/2026
1/4" = 1'-0"2Site -Enlarged Sidewalk Detail
Page 36 of 54
T
E
CP CP
Concentric Cylindrical StructureRIM 864.48SURFACE = ???839.261 24" NE839.411 24" NW
Null StructureRIM 840.73SURFACE = ???838.564 24" SW0.71%
E
No N Md UP-6.65%-6.73%
861862863864866867868 866867868869871872873874876877878879881882883884
861862863864
868869
866867868 865
870
875
880
865
864861862863864866
862863865860
865866.00
862.90862.50
866.00865.98866.00866.45866.00
B-3
B-2B-1 16'-0"14'-0"14'-0"
11A301
1A2051
1A2054868.00 LOWER F.F872.00 MAIN F.F872.00 MAIN F.F870.00872.00870.00871.00(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(03 30 00.36) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A" -WITH ADA DETECTABLEWARNING PLATE(03 30 00.36) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A" -WITH ADA DETECTABLEWARNING PLATE4'-0"21'-4 1/8"
4'-0"
114'-9 1/4"
SEE R/M DRAWINGS FOR WORK RELATED TO THE LIFT STATION
NEW OFFICE ADDITION -2,448 SQ/FTNEW SHOP ADDITION -4,474 SQ/FT
NEW OFFICE ADDITION -2,448 SQ/FTNEW SHOP ADDITION - 4,474 SQ/FT
EXISTING -4,156 SQ/FT
TOTAL ADDED AREA - 6,922 SQ/FTMAIN FACILITY AREASEXISTING PARKING LOT TO REMAIN AS IS --NEW ASPHALT ONLY -NO CHANGE IN LIMITS ALTERNATE #1 EXISTING LIGHT TO REMAINEXISTING LIGHT TO REMAIN870.00NEW RETAINING WALL BLOCK SYSTEM868.00869.00870.00871.00872.00873.00874.00
NEW GRADESCONTOURS870.00EXISTING GRADES870.00
FLOOD PLAIN 75 FOOT SETBACKWETLAND 25 FOOT SETBACK71'-0"27'-5 1/4"
44'-0 1/4"
50'-7"68'-0 1/4"
114'-9 1/4"
S/F - SILT FENCE PER DETAIL
S/F - SILT FENCE PER DETAILS/F - SILT FENCE PER DETAILDEMO EXISTING868.00 LOWER F.F
868.00
868.00867.00
867.00
866.00866.00866.00865.00864.00+ 865.35+ 865.70+ 865.95866.00867.00868.00
+ 867.95+ 867.50
TEMPORARY 40'x8' STORAGE BOXES PROVIDED BY GC FOR OWNER USE4" WATER LINE, L-103'(22 11 00) NEW 4" WATER MAIN LINE. CONNECT TO CITY OFPEWAUKEE WATER MAIN. EXISTING 6" WATER MAIN. FIELD VERIFY LOCATION -LIVE TAPE REQUIRED(22 11 00) CONTRACTOR TO TRENCH & REPAIR SITE. RESEED AS NEEDED
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
PLAN NORTHSHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
KEYNOTE LEGENDN25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:25 PM
SCALE: 1" = 10'-0"
1A103
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Site Grading, Utility andErosion Plan
A3 Addendum #3 03/02/2026A1 Addendum #1 02/23/2026
Page 37 of 54
SLTSLTSLTSLTSLTSLT (10 75 00) STEEL GALVANIZED FOUNDATION SLEEVE(10 75 00) ALUMINUM FLASH COLLAR(10 75 00) CAST ALUMINUM CLEATS W/ CLEAT COVER LOCKABLE BOX(10 75 00) TAPERED ALUMINUM FLAG POLE(10 75 00) FLAG POLE MOUNTED LIGHTING SYSTEM; SEE SPECIFICATIONS -SEE ELECTRICAL FOR POWER REQUIREMENTS(10 75 00) SWIVEL SNAPS WITH COVERS
(10 75 00) FILL PER FLAG POLE MANUFACTURER DESIGN(10 75 00) STEEL BASE PLATE (10 75 00) LIGHTNING GROUND SPIKE
(10 75 00) SPUN ALUMINUM BALL(10 75 00) CAST ALUMINUM REVOLVING TRUCK
(10 75 00) CONCRETE FOUNDATION BY FLAG POLE CONATRCTOR(03 30 00) #4 REBAR & TIESSEE ELECTRICAL PLANS FOR REQUIRED POWER FEED REQUIREMENTSLEVEL 01(03 30 00) 12"Ø CONCRETE BASE FOR FLAG POLE LIGHT FIXTURE. TOP & 6" AFF. (BY ELECTRICAL CONTRACTOR)*(2) light typical per flag pole. See plan for light locations2'-6"4"
4'-0"ORANGE CONSTRUCTIONFENCEFENCE LOCATIONDRIPLINE (VARIES)RADIUS = 1' PER INCH OF TRUNK DIAM.(LIMITS OF CRITICAL ROOT ZONE)(20'-0" FOR 20"DIAMETER TREE)CRZ RADIUSCRITICAL ROOT ZONE (CRZ)TREE PROTECTION FENCE @ CRZDRIPLINE
20'50' MINIMUMHARD SURFACE PUBLIC ROAD12" MINUMUM3"-6" WASHED STONEGEOTEXTILE UNDERLINERMIRAFI 700xEXCESSFABRICGEOTEXTILEFABRIC2FLOW DIRECTIONANCHOR STAKEMIN. 18" LONGTIEBACK BETWEEN FENCEPOST AND ANCHORSILTFENCEFLOW DIRECTIONGEOTEXTILEFABRIC ONLYBACKFILL & COMPACTTRENCH WITHEXCAVATED SOILFLOW DIRECTION
MAY BE REQUIRED IN UNSTABLE SOILS
2'-0"3'-0" MAX.3'-0" MAX.3'-0" MAX.3'-0" MAX.2FLOWFOLD3" MAX.GEOTEXTILEFABRIC3SUPPORT CORDNOTE:* ****
NOTE: ADDITIONAL POST DEPTH OR TIE BACKSGENERAL NOTES:SILT FENCETRENCH DETAILSILT FENCE TIE BACKTWIST METHODHOOK METHODFLOW DIRECTIONFLOW DIRECTION52'-0" MIN.1'-0" MIN.WOOD POSTWOOD POSTGEOTEXTILEFABRICGEOTEXTILEFABRICJOINING TWO LENGTHS OF SILT FENCEGEOTEXTILEFABRICGEOTEXTILEFABRICWOOD POSTWOOD POST
(WHEN ADDITIONAL SUPPORT REQUIRED)
WOOD POSTSLENGTH 3'-4'20" DEPTHIN GROUNDATTACH THE FABRIC TO THEPOSTS WITH WIRE STAPLES ORWOODEN LATH AND NAILS
8'-0" POST SPACING ALLOWED IF A WOVEN GEOTEXTILE FABRIC IS USED.1. HORIZONTAL BRACE REQUIRED WITH 2" X 4" WOODEN FRAME OR EQUIVALENT AT TOP OF POSTS.2. TRENCH SHALL BE A MINIMUM OF 4" WIDE & 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC. FOLD MATERIAL TO FIT TRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL.4. SILT FENCE TO EXTEND ACROSS THE TOP OF THE PIPE.5. CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTING LENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY USE ONE OF THE FOLLOWING TWO METHODS; A) OVERLAP THE END POSTS AND TWIST, OR ROTATE, AT LEAST 180 DEGREES, B) HOOK THE END OF EACH SILT FENCE LENGTH.3. WOOD POSTS SHALL BE A MINIMUM SIZE OF 1" X 1" OF OAK OR HICKORY.
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
SHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
N25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:27 PM
SCALE: As indicated
1A104
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Site Details andStandards1/2" = 1'-0"2Flag Pole Detail1 1/2" = 1'-0"3Flag Pole - Light Detail
1/4" = 1'-0"5Tree Protection Detail
3/16" = 1'-0"1Stone Tracking Pad3/4" = 1'-0"4Silt Fence Details
Page 38 of 54
PPT
E
CP CP
Concentric Cylindrical StructureRIM 864.48SURFACE = ???839.261 24" NE839.411 24" NW
Null StructureRIM 840.73SURFACE = ???838.564 24" SW98.7'24"0.71%
E
No N Md UP
861862863864866867868 866867868869871872873874876877878879881882883884
861862863864
868869
866867868 865 865
870
875
880
865
864861862863864866
862863865860
865866.00
862.90862.50
866.00865.98866.00866.45866.00
B-3
B-2B-1 16'-0"14'-0"14'-0"
11A301867.816 LOWER F.F
870.00872.00870.00871.00
SEE R/M DRAWINGS FOR WORK RELATED TO THE LIFT STATION
R 11'-7 5/32"11'-7 5/8"EXISTING PARKING LOT TO REMAIN AS IS --NEW ASPHALT ONLY -NO CHANGE IN LIMITS
870.00NEW RETAINING WALL BLOCK SYSTEM868.00869.00870.00871.00872.00873.00874.00
FLOOD PLAIN 75 FOOT SETBACKWETLAND 25 FOOT SETBACK71'-0"27'-5 1/4"
44'-0 1/4"
50'-7"68'-0 1/4"
114'-9 1/4"
RE-SEED ALL DISTURBED AREASRE-SEED ALL DISTURBED AREASSG ( 3 )SO ( 3 )SG ( 3 )SO ( 3 )SG ( 3 )SG ( 3 )SO ( 3 )SG ( 3 )SO ( 3 )SG ( 3 )DECORATIVE WASHED STONE
DECORATIVE WASHED STONEDECORATIVE WASHED STONERE-SEED ALL DISTURBED AREASRE-SEED ALL DISTURBED AREAS
CM ( 1 )CM ( 1 )
868.00
868.00867.00
867.00
866.00866.00866.00865.00864.00+ 865.35+ 865.70+ 865.95866.00867.00868.00
+ 867.95+ 867.50
4'-0"3'-6"RIP-RAP @ ROOF DRAIN DISCHARGE LOCATIONS
RIP-RAP @ ROOF DRAIN DISCHARGE LOCATIONS4'-0"2'-2"
4'-0"4'-0"RIP-RAP @ ROOF DRAIN DISCHARGE LOCATIONS
4'-0"4'-0"RIP-RAP @ ROOF DRAIN DISCHARGE LOCATIONS
41A400SimLANDSCAPE GENERAL NOTES: 1. RE-GRAD AND RE-SEED ALL DISTUREBED AREAS2. MULCHED AREAS: 6 FT DIAM. AREA W/ MULCH (4" DEEP) OVER LANDSCAPE PAPER AND PLASTIC LANDSCAPE EDGE AROUND ALL TREES AND BUSHES AS NOTED ON PLANS.3. RIVEROCK AREAS: AREA W/ 1-1/2" RIVER WASH STONE OVER LANDSCAPE PAPER (4" DEEP)
GRASS SEED- ALL DISTURBED AREAS SHALL BE RESEEDED. 1- GENERAL: ALL SEED SHALL BEA. FREE FROM NOXIOUS WEED SEEDS AND RECLEANEDB. GRAGE A RECENT CROP SEEDC. TREATED WITH APPROPRIATE FUNGICIDE AT TIME OF MIXING. D. DELIVERED TO THE SITE IN SEALED CONTAINERS WITH DEALER'S GUARANTEED ANALYSIS AND SEASON CERTIFICATION OF WEIGHT, PURITY, AND GERMINATION2- PROPORTIONS BY WEIGHTA. BARON BLUEGRASS 20%B. MAJESTIC BLUEGRASS 20%C. TOUCHDOWN BLUEGRASS 20%D. PENNLAWN FESCUE 20%E. FIESTA RYE GRASS 20%(OR APPROVED EQUAL)
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
PLAN NORTHSHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
N25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:29 PM
SCALE: As indicated
1A105
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Landscape Plan
1" = 10'-0"1Site - Option 1A Landscape Plan
Page 39 of 54
CLCL
734 SFconf / meeting room102reception105waiting101entry100
mens115womens113break room104shared office108manager office111 existing garage119existing utility room117conference/office112
garage addition - 1120
file room109 data116
scada/office106
file 2110
garage addition - 2118
10'-4 1/4"26'-8 1/4"40'-0"31'-0"
68'-0 1/4"
48'-0 1/4"
01020304 0605 07A BB
DD
EE
E1E2E3 E4E5
E6
11A300 11A300
21A300 21A30031A300 31A300
11A301
11A301
21A301
21A301
31A301
31A30126'-8"8'-10"29'-3"44'-6"7'-4"35'-6"81'-1"116'-7"8'-8" EXaEXa EXbEXb
EXcEXc70'-9 3/4"4'-2 7/8"31'-0"38'-5 3/4"1'-4"
28'-9 3/8"13'-3 3/4"
05.8
C.8C.8D.4D.4
18'-9"
D.5D.5
19'-3"
B.8B.8
03.3
D.2D.2
1A2051
1A2052
1A2053
1A2054
11A302
11A302
11A400
21A302 21A302
21A40031A40011A40131A400Sim21A40131A40141A401
11A40221A40231A40241A40251A402
61A402
51A401
61A401
71A401
81A401
65'-0 1/4"
41'-6 1/4"
31A302
31A302
janitor114corridor107corridor103closet102.1EX109a111a
102b104a102a106a105a
OH120BOH120C
OH119AOH119B108a107a102c113a114a115a116a
closet112.1
3'-4"2'-1"120a
C.6C.6 103a1A2042shower113.1shower115.1
11A40321A403
41A40331A403
11A404
21A40431A40441A40411A40521A405
31A405
flat fileshanging fileplan rackTVTVTV
TVTVTV
4'-0"
19'-3"18'-9"18'-3"14'-11 7/8"CC
110a
101a100a
1A70115
112a112b
1A70116
1A2047unisex121
1A7012106 61 00.01
1A20441A2021Sim
39'-7 3/8"6'-10 7/8"65'-3"
3'-2 3/4"50'-10 3/8"
12'-4"4'-0"3'-1 1/2"9'-2 1/2"3'-4"3 1/8"4 7/8"18'-7"
3'-2"21'-4"1'-11"2"
11"2'-5"3 7/8"
OH118A102d4 7/8"1'-6"
71A402
120b
31S500Sim31S500Sim31S500Sim
31S500Sim31S500Sim31S500Sim
OH102A
10'-0"1'-9 3/4"2'-0"10'-8"1'-6"8" 41A404Sim31S500Sim31S500Sim31S500Sim3'-3"1'-10 1/8"6'-7 7/8"4'-1 3/8"4'-1 3/8"
02.2
41A405
8"1'-0"
41A4002'-1"12'-0"1'-9 7/8"16'-0"2'-8"16'-0"2'-6"16'-0"6'-10"16'-0"2'-8"16'-0"2'-2 1/4"
OH120A1'-4"1'-9"21A2011AD4-01
S1-MAIN FLOOR LEVEL0'-0"S1-LOWER FLOOR-4'-0"
4"6"6"6"1S50010Sim6"1'-6"EXISTING CONCRETE LANDING
FIELD VERIFY4'-0"1S50010SimNEW 6" POURED IN PLACE CONCRETE WALL & SLABDOWEL BARS @ 12" O.C.DOWEL BARS @ 12" O.C.1'-1"1'-1"GUARD RAIL HEIGHT3'-6"(05 50 00) 1-1/2" DIAMETERRAIL(05 50 00) 7" X 4" X 1/4" CONTINUOUS STEEL PLATE(05 50 00) 6"X8"X1/4" POST PLATEWITH (4) 3/8"X5-1/2" CONCRETEANCHORS INTO CONCRETE EXISTING CONCRETE SLABNEW 6" POURED IN PLACE CONCRETE WALL & SLAB2'-0"
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
PLAN NORTHSHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
KEYNOTE LEGENDN25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:32 PM
SCALE: As indicated
1A201
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Floor Plan
3/16" = 1'-0"1First Floor Planrestroom
06 61 00.01 SOLID SURFACE COUNTER TOP
A3 Addendum #3 03/02/2026A1A1 Addendum #4 03/05/2026
3/4" = 1'-0"2Landing Section Detail
Page 40 of 54
S1-MAIN FLOOR LEVEL0'-0"S1-TO EX WALL11'-4 7/8"0102030406 0507 E1E2E3E4E5 11A30121A30131A30105.8 03.3S1-LOWER FL NEWT.O.WALL16'-0"11A302S1-MAIN FL NEW T.O.WALL13'-4"11A40221A40251A40231A30221A4031'-4 5/8"3'-0"3'-0"3'-0"2'-4"3'-0"4'-0"3'-0"10'-8"12'-0"10'-8"6'-2 1/2"EQEQEQEQEQEQ EXTERIOR BRICK1" INSULATED BRONZE GLASSARCHITECTURAL SHEET METAL -BRONZE
2'-0"6'-4"
8'-4"8'-0"
8'-4"71A402
10'-8"04 20 00.02
08 41 13.A608 41 13.A603 30 00.1007 60 00.14
08 41 13.A608 41 13.A1203 30 00.2731S500Sim02 10 00.1002 10 00.1010'-8"3'-9 3/4"10'-0"07 24 00.0102.28'-11 3/4"
2'-0"6'-4"22 13 16.A1122 13 16.A129"8'-6"11"1'-10 5/8"11'-0"
11'-0"
14'-0"EQEQ14'-0"EQEQ26 56 00.A126 56 00.A126 56 00.A126 56 00.A127 00 00.A1027 00 00.A941A400
1'-6"08 41 13.A1308 41 13.A13
S1-MAIN FLOOR LEVEL0'-0"S1-TO EX WALL11'-4 7/8"S1-LOWER FLOOR-4'-0"
AB D E E611A30021A30031A300
S1-LOWER FLOOR T.O.F-9'-0"
EXaEXbEXcC.8D.4D.5B.8D.2 S1-LOWER FL NEWT.O.WALL16'-0"S1-MAIN FL NEW T.O.WALL13'-4"11A400 21A30221A40031A40031A402C.641A40331A403 21A40531A405C3'-0"5'-4"3'-0"5'-4"3'-0"6'-0"6'-0"9'-4"WD-01WD-01WD-028'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"2'-6 1/4"1'-6"WD-03WD-03WD-03WD-03WD-03102d07 24 00.0104 20 00.0207 60 00.03
08 41 13.A604 20 00.2403 30 00.2708 41 13.A508 41 13.A604 20 00.2404 20 00.24
04 20 00.0207 60 00.0308 41 13.A6
13'-4"41A4054'-3" 08 41 13.A608 41 13.A6EQEQ12'-0"26 56 00.A1EQEQ14'-0"26 56 00.A107 60 00.0326 56 00.A107 60 00.0304 20 00.024'-8 3/4"5'-8"1'-6"
1'-6"1'-6"04 20 00.2604 20 00.2604 20 00.2604 20 00.2604 20 00.26
11'-0"26 56 00.A1
11'-0"08 41 13.A13201S50021A2011AD4-01
S1-MAIN FLOOR LEVEL0'-0"S1-TO EX WALL11'-4 7/8"S1-LOWER FLOOR-4'-0"
01020304 0605 07E1E2E3 E4E511A30121A30131A30105.803.3 S1-LOWER FL NEWT.O.WALL16'-0"11A302S1-MAIN FL NEW T.O.WALL13'-4"11A40121A40131A40141A40131A30241A40411A405
4'-0"12'-0"1'-6"6'-6 1/4"4'-0"8'-0"4'-0"8'-0"4'-0"8'-0"3'-8 1/8"3 7/8"8'-0"4'-0"8'-0"20'-0"1S50011Sim03 30 00.2705 50 00.0104 20 00.0208 41 13.A608 11 00.A4
5'-0"3'-0"9'-4"02 10 00.0207 60 00.0307 60 00.03
5'-4"3'-0"6'-0"4'-4 1/8"9'-4"5'-0"04 20 00.0208 41 13.A608 41 13.A604 20 00.0208 41 13.A607 24 00.0104 20 00.0208 41 13.A602.2 26 52 00.02
18'-0"EQEQ26 56 00.A126 56 00.A1
12'-0"26 56 00.A1EQEQ 27 00 00.A926 56 00.A127 00 00.A1004 20 00.26
04 20 00.26
04 20 00.26
04 20 00.26
1'-6"1'-6" 04 20 00.26
1'-6"
S1-MAIN FLOOR LEVEL0'-0"S1-TO EX WALL11'-4 7/8"S1-LOWER FLOOR-4'-0"
ABDEE6 11A30021A30031A300EXaEXbEXcC.8D.4D.5 B.8D.2 S1-LOWER FL NEWT.O.WALL16'-0"S1-MAIN FL NEW T.O.WALL13'-4"21A302C.641A40331A40311A40421A40431A404ARCHITECTURAL SHEET METAL -BRONZEC
083601S50011Sim1S50011Sim1S50011SimOH120BOH120C OH119AOH119B120aOH120AOH118A08 30 00.A3
04 20 00.0204 20 00.02
0836008 30 00.A308 11 00.A405 50 00.0105 50 00.0105 50 00.0103 30 00.27
07 60 00.0326 56 00.A107 60 00.0326 56 00.A107 60 00.0326 56 00.A107 60 00.0326 52 00.02
18'-0"07 60 00.0327 00 00.A1027 00 00.A1027 00 00.A9
04 20 00.2604 20 00.26
15'-0"15'-0"
14'-0"
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
SHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
KEYNOTE LEGENDN25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:24:50 PM
SCALE: 3/16" = 1'-0"
1A205
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Exterior Elevations
3/16" = 1'-0"1North Elevation
3/16" = 1'-0"2West Elevation
3/16" = 1'-0"3South Elevation
3/16" = 1'-0"4East Elevation
02 10 00.02 EXISTING WALLS TO REMAIN02 10 00.10 EXISTING EXTERIOR LIGHT POLES TO REMAIN03 30 00.10 CAST-IN-PLACE CONCRETE WALL; REFER TO PLANS FOR THICKNESS03 30 00.27 CONCRETE FROST STOOP. TYP @ ALL EXTERIOR DOORS04 20 00.02 FACE BRICK; PROVIDE ALL TIES, WEEPS, AND FLASHING; SEESPECIFICATIONS04 20 00.24 STONE WINDOW SILL04 20 00.26 MASONRY CONTROL JOINT (TYP.)05 50 00.01 6" STEEL BOLLARD - GALVANIZED AND GROUTED SOLID; PLASTIC SLEEVECOVER - COLOR SELECTED BY ARCHITECT07 24 00.01 EXTERIOR EIFS PANEL PER SPECS07 60 00.03 SHEET METAL WALL CAP; PROVIDE STIFFENING BEAD AT HEIGHTS OVER 12"07 60 00.14 PRE-FINISHED SHEET METAL SCUPPER W/ WITH DRIP EDGE08 11 00.A4 DOOR AND HARDWARE PER DOOR SCHEDULES08 30 00.A3 OVERHEAD DOOR FULL VISION PANEL; REFER TO EXTERIOR ELEVATIONS08 41 13.A5 ALUMINUM STOREFRONT DOOR; SEE SPECIFICATIONS08 41 13.A6 ALUMINUM STOREFRONT WINDOW SYSTEM; SEE SPECIFICATIONS08 41 13.A12 ALUMINUM SLIDING DOOR PER SPECS AND SCHEDULES08 41 13.A13 OPERABLE CASEMENT WINDOW KAWNEER OptiQ® AA®4325 SERIES OREQUAL22 13 16.A11 SMITH 1770 DOWNSPOUT NOZZLE FOR ROOF DRAIN BY PLUMBINGCONTRACTOR. SIZE TO MATCH PIPE22 13 16.A12 SMITH 1770 DOWNSPOUT NOZZLE FOR ROOF OVERFLOW DRAIN BYPLUMBING CONTRACTOR. SIZE TO MATCH PIPE26 52 00.02 EXTERIOR REMOTE HEADS PER ELECTRIC PLANS26 56 00.A1 SURFACE MOUNT WALL PACK LIGHTING; REFER TO MEP27 00 00.A9 CARD READER PER SPECS27 00 00.A10 CCTV CAMERA PER SPECS08360
A3A3 Addendum #6 03/06/2026A1 Addendum #1 02/23/2026
Page 41 of 54
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"
S1-LOWER FLOOR-4'-0"
DD.2S1-MAIN FL NEW T.O.WALL13'-4"21A400
(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(07 21 00.08) 3" RIGID INSULATION; (2) LAYERS OF1-1/2" LAYERS STAGGERED(03 30 00.13) 12" CONCRETE WALL; SEE DETAILSFOR REINFORCING(03 30 00.05) CONCRETE FOOTING; SEESTRUCTURAL FOR FOOTING SCHEDULES ANDREINFORCING
1A5002Sim1A5001Sim(03 30 00.01) #15 FELT PAPER BONDBREAKER.TYPICAL @ ALL WALLS; FOAM BONDBREAKER AT EXTERIOR LOCATIONS(04 20 00.02) FACE BRICK; PROVIDE ALL TIES,WEEPS, AND FLASHING; SEE SPECIFICATIONS(05 41 00.01) 6" MTL. STUD FRAMING @ 16" O.C. W/(07 21 00) BATT INSULATION. MIN R-19 AT EXTERIORWALLS.5'-6"3'-0"5'-8"2'-8"13'-4"(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURALFRAMING PLANS(05 12 00.01) STEEL BEAM; REFER TO STRUCTURAL(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGIDROOF INSULATION; LAYERS STAGGERED (MIN.R-38)(06 10 00.01) WOOD BLOCKING AS REQUIRED(07 53 00.A1) SINGLE PLY E.P.D.M. MEMBRANEROOFING SYSTEM -FULLY ADHERED1A5009(06 10 00.01) WOOD BLOCKING AS REQUIRED(06 61 00.02) SOLID SURFACE WINDOW SILL(08 41 13.A6) ALUMINUM STOREFRONT WINDOWSYSTEM; SEE SPECIFICATIONS(08 80 00.01) 1" LOW-E INSULATED GLAZING UNIT(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM;24" X 24" (ACT-1)(07 24 00.01) EXTERIOR EIFS PANEL PER SPECS(05 30 00.01) METAL ROOF DECKING; SEESTRUCTURAL PLANS -FASTENERS PERSTRUCTURAL DETAILS1A50010
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"
S1-LOWER FLOOR-4'-0"
ED.5S1-MAIN FL NEW T.O.WALL13'-4"1A5004Sim1A5003Sim1A5002Sim1A5001Sim(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(03 30 00.13) 12" CONCRETE WALL; SEE DETAILSFOR REINFORCING(03 30 00.13) 12" CONCRETE WALL; SEE DETAILSFOR REINFORCING(03 30 00.05) CONCRETE FOOTING; SEESTRUCTURAL FOR FOOTING SCHEDULES ANDREINFORCING
manager office111(03 30 00.01) #15 FELT PAPER BONDBREAKER.TYPICAL @ ALL WALLS; FOAM BONDBREAKER AT EXTERIOR LOCATIONS
1'-0"4'-4"8" 4'-8"8'-8"5'-0"3'-0"(05 41 00.01) 6" MTL. STUD FRAMING @ 16" O.C. W/(07 21 00) BATT INSULATION. MIN R-19 AT EXTERIORWALLS.(06 61 00.02) SOLID SURFACE WINDOW SILL(08 41 13.A6) ALUMINUM STOREFRONT WINDOWSYSTEM; SEE SPECIFICATIONS(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM;24" X 24" (ACT-1)(05 12 00.01) STEEL BEAM; REFER TO STRUCTURAL(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGIDROOF INSULATION; LAYERS STAGGERED (MIN.R-38)(06 10 00.01) WOOD BLOCKING AS REQUIRED(05 30 00.01) METAL ROOF DECKING; SEESTRUCTURAL PLANS -FASTENERS PERSTRUCTURAL DETAILS(07 53 00.A1) SINGLE PLY E.P.D.M. MEMBRANEROOFING SYSTEM -FULLY ADHERED
(08 80 00.01) 1" LOW-E INSULATED GLAZING UNIT(04 20 00.02) FACE BRICK; PROVIDE ALL TIES,WEEPS, AND FLASHING; SEE SPECIFICATIONS
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"
S1-LOWER FLOOR-4'-0"
ED.5S1-MAIN FL NEW T.O.WALL13'-4"
(03 30 00.13) 12" CONCRETE WALL; SEE DETAILSFOR REINFORCING(07 21 00.08) 3" RIGID INSULATION; (2) LAYERS OF1-1/2" LAYERS STAGGERED(03 30 00.05) CONCRETE FOOTING; SEESTRUCTURAL FOR FOOTING SCHEDULES ANDREINFORCING
(04 20 00.02) FACE BRICK; PROVIDE ALL TIES,WEEPS, AND FLASHING; SEE SPECIFICATIONS
1A5004Sim
1A5001Sim1'-0"5'-0"4'-8"8'-8"13'-4"(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(03 30 00.01) #15 FELT PAPER BONDBREAKER.TYPICAL @ ALL WALLS; FOAM BONDBREAKER AT EXTERIOR LOCATIONS(06 10 00.02) 5/8" DENSGLASS SHEATHING; SEESPECIFICATIONS(07 21 00.06) 1" RIGID INSULATION(07 21 00.05) INSULATION BATT; TYPICAL ALL MTL.STUD EXTERIOR WALLS (MIN. R-19)(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM;24" X 24" (ACT-1)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURALFRAMING PLANS(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGIDROOF INSULATION; LAYERS STAGGERED (MIN.R-38)(05 12 00.01) STEEL BEAM; REFER TO STRUCTURAL(06 10 00.01) WOOD BLOCKING AS REQUIRED(07 53 00.A1) SINGLE PLY E.P.D.M. MEMBRANEROOFING SYSTEM -FULLY ADHERED(05 30 00.01) METAL ROOF DECKING; SEESTRUCTURAL PLANS -FASTENERS PERSTRUCTURAL DETAILS
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"
S1-LOWER FLOOR-4'-0"
31A300EXcS1-MAIN FL NEW T.O.WALL13'-4"(08 41 13.A6) ALUMINUMSTOREFRONT WINDOW SYSTEM;SEE SPECIFICATIONS
81A401
(06 61 00.02) SOLID SURFACEWINDOW SILL(09 68 00.A1) WALL BASE PERROOM FINISH SCHEDULES(09 91 00.05) PAINT WALLS PERROOM FINISH SCHEDULE(09 51 00.A1) ACOUSTICALCEILING TILE SYSTEM; 24" X 24"(ACT-1)(07 60 00.03) SHEET METAL WALLCAP; PROVIDE STIFFENING BEADAT HEIGHTS OVER 12"(06 10 00.01) WOOD BLOCKING ASREQUIRED(08 80 00.01) 1" LOW-E INSULATEDGLAZING UNIT(07 24 00.01) EXTERIOR EIFSPANEL PER SPECS
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"04E203.3S1-MAIN FL NEW T.O.WALL13'-4"(06 10 00.05) PRESSURE TREATED WOOD BLOCKING W/ STAINLESS STEEL FASTENERS(07 60 00.03) SHEET METAL WALL CAP; PROVIDE STIFFENING BEAD AT HEIGHTS OVER 12"(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGID ROOF INSULATION; LAYERS STAGGERED (MIN. R-38)(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM; 24" X 24" (ACT-1))(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURAL FRAMING PLANS
(03 30 00.02) 4" CONCRETE SLABOVER 4" CRUSHED STONE; SLABTYPE "A"A3S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"DD.2S1-MAIN FL NEW T.O.WALL13'-4"(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGID ROOF INSULATION; LAYERS STAGGERED (MIN. R-38)(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM; 24" X 24" (ACT-1)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURAL FRAMING PLANS(09 29 00.A1) 5/8" TYPE "X" GYPSUM WALLBOARD; 6MIL VAPOR BARRIER AT ALL EXTERIOR WALLS(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(05 12 00.01) STEEL BEAM; REFER TO STRUCTURAL
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"03E103.3S1-MAIN FL NEW T.O.WALL13'-4"41A402W14X435'-4"4"7'-8"(03 30 00.02) 4" CONCRETE SLAB OVER 4" CRUSHEDSTONE; SLAB TYPE "A"(09 29 00.A1) 5/8" TYPE "X" GYPSUM WALLBOARD; 6MIL VAPOR BARRIER AT ALL EXTERIOR WALLS(08 41 13.A12) ALUMINUM SLIDING DOOR PERSPECS AND SCHEDULES(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM;24" X 24" (ACT-1)(09 68 00.A1) WALL BASE PER ROOM FINISHSCHEDULES
(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM;24" X 24" (ACT-1)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURALFRAMING PLANS(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGIDROOF INSULATION; LAYERS STAGGERED (MIN.R-38)(05 30 00.01) METAL ROOF DECKING; SEESTRUCTURAL PLANS -FASTENERS PERSTRUCTURAL DETAILS(07 53 00.A1) SINGLE PLY E.P.D.M. MEMBRANEROOFING SYSTEM -FULLY ADHERED
S1-MAIN FLOOR LEVEL0'-0"
S1-TO EX WALL11'-4 7/8"0304E1E203.3S1-MAIN FL NEW T.O.WALL13'-4"
closet112.1manager office111exterior112b
(09 51 00.A1) ACOUSTICALCEILING TILE SYSTEM; 24" X 24"(ACT-1)(08 11 00.A4) DOOR ANDHARDWARE PER DOORSCHEDULES(09 68 00.A1) WALL BASE PERROOM FINISH SCHEDULES(09 91 00.05) PAINT WALLS PERROOM FINISH SCHEDULE(02 10 00.02) EXISTING WALLS TOREMAIN(02 10 00.02) EXISTING WALLS TOREMAIN(05 21 00.01) STEEL BAR JOIST;SEE STRUCTURAL FRAMINGPLANS(07 21 00.07) (2) LAYERS OF 3.3"POLY ISO RIGID ROOFINSULATION; LAYERSSTAGGERED (MIN. R-38)(07 53 00.A1) SINGLE PLY E.P.D.M.MEMBRANE ROOFING SYSTEM -FULLY ADHERED
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
SHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
N25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:39 PM
SCALE: 1/2" = 1'-0"
1A401
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Wall Sections1/2" = 1'-0"1Wall Section1/2" = 1'-0"2Wall Section1/2" = 1'-0"3Wall Section1/2" = 1'-0"4Wall Section
1/2" = 1'-0"5Wall Section1/2" = 1'-0"6Wall Section1/2" = 1'-0"7Wall Section1/2" = 1'-0"8Wall Section A3 Addendum #3 03/02/2026
Page 42 of 54
S1-LOWER FLOOR-4'-0"
E6
S1-LOWER FLOOR T.O.F-9'-0"
S1-LOWER FL NEWT.O.WALL16'-0"(06 10 00.05) PRESSURE TREATED WOOD BLOCKING W/ STAINLESS STEEL FASTENERS(07 60 00.03) SHEET METAL WALL CAP; PROVIDE STIFFENING BEAD AT HEIGHTS OVER 12"(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGID ROOF INSULATION; LAYERS STAGGERED (MIN. R-38)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURAL FRAMING PLANS(08 41 13.A6) ALUMINUM STOREFRONT WINDOW SYSTEM; SEE SPECIFICATIONS)(04 20 00) 12" INSULATED CONCRETE BLOCK(04 20 00.02) FACE BRICK; PROVIDE ALL TIES, WEEPS, AND FLASHING; SEE SPECIFICATIONS(07 21 00.06) 1" RIGID INSULATION
1A50012Sim1A5012Sim1A5011Sim
1A50011Sim(03 30 00.03) 6" CONCRETE SLAB OVER 6" CRUSHEDSTONE; SLAB TYPE "B"171S500Sim(03 30 00.01) #15 FELT PAPER BONDBREAKER.TYPICAL @ ALL WALLS; FOAM BONDBREAKER AT EXTERIOR LOCATIONS
(09 91 00.14) PAINT ALL EXPOSEDSTEEL PER ROOM FINISHSCHEDULE
exteriorgarage addition - 1120
(04 20 00.14) MASONRY LINTEL. SEE STRUCTURALPLANS AND DETAILS4'-0"12'-0"(03 30 00.06) CONCRETEFOUNDATION WALL; SEESTRUCTURAL FOR REINFORCING(07 21 00.08) 3" RIGID INSULATION;(2) LAYERS OF 1-1/2" LAYERSSTAGGERED(07 13 00) FOUNDATION WATERPROOFING SYSTEM -COMPLETE WALL AND FOOTING(22 00 00) DRAIN TILE PER PLANS.(31 20 00) GEOTEXTILE FABRICAROUND AGGREGATE FILL(03 30 00.05) CONCRETE FOOTING; SEESTRUCTURAL FOR FOOTING SCHEDULES ANDREINFORCING
W/ GRADE8" VARIESS1-LOWER FLOOR-4'-0"
05
S1-LOWER FLOOR T.O.F-9'-0"
S1-LOWER FL NEWT.O.WALL16'-0"(06 10 00.05) PRESSURE TREATED WOOD BLOCKING W/ STAINLESS STEEL FASTENERS(07 60 00.03) SHEET METAL WALL CAP; PROVIDE STIFFENING BEAD AT HEIGHTS OVER 12"(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGID ROOF INSULATION; LAYERS STAGGERED (MIN. R-38)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURAL FRAMING PLANS(08 41 13.A6) ALUMINUM STOREFRONT WINDOW SYSTEM; SEE SPECIFICATIONS)(04 20 00) 12" INSULATED CONCRETE BLOCK(04 20 00.02) FACE BRICK; PROVIDE ALL TIES, WEEPS, AND FLASHING; SEE SPECIFICATIONS(07 21 00.06) 1" RIGID INSULATION
1A50012Sim1A5012Sim1A5011Sim
1A50011Sim(03 30 00.03) 6" CONCRETE SLAB OVER 6" CRUSHEDSTONE; SLAB TYPE "B"171S500Sim4'-0"4'-0"10'-0"2'-0"5'-0"
garage addition - 1120exterior(03 30 00.01) #15 FELT PAPER BONDBREAKER.TYPICAL @ ALL WALLS; FOAM BONDBREAKER AT EXTERIOR LOCATIONS(09 91 00.05) PAINT WALLS PERROOM FINISH SCHEDULE(05 21 00.01) STEEL BAR JOIST;SEE STRUCTURAL FRAMINGPLANS(09 91 00.14) PAINT ALL EXPOSEDSTEEL PER ROOM FINISHSCHEDULE
(03 30 00.06) CONCRETEFOUNDATION WALL; SEESTRUCTURAL FOR REINFORCING(07 21 00.08) 3" RIGID INSULATION;(2) LAYERS OF 1-1/2" LAYERSSTAGGERED(07 13 00) FOUNDATION WATERPROOFING SYSTEM -COMPLETE WALL AND FOOTING(22 00 00) DRAIN TILE PER PLANS.(31 20 00) GEOTEXTILE FABRICAROUND AGGREGATE FILL(03 30 00.05) CONCRETE FOOTING; SEESTRUCTURAL FOR FOOTING SCHEDULES ANDREINFORCING
(04 20 00.14) MASONRY LINTEL. SEE STRUCTURALPLANS AND DETAILSW/ GRADE2'-0" VARIESS1-MAIN FLOOR LEVEL0'-0"S1-LOWER FLOOR-4'-0"
05
S1-LOWER FLOOR T.O.F-9'-0"
S1-LOWER FL NEWT.O.WALL16'-0"D.41(06 10 00.05) PRESSURE TREATED WOOD BLOCKING W/ STAINLESS STEEL FASTENERS(07 60 00.03) SHEET METAL WALL CAP; PROVIDE STIFFENING BEAD AT HEIGHTS OVER 12"(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGID ROOF INSULATION; LAYERS STAGGERED (MIN. R-38)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURAL FRAMING PLANS(04 20 00) 12" INSULATED CONCRETE BLOCK(04 20 00.02) FACE BRICK; PROVIDE ALL TIES, WEEPS, AND FLASHING; SEE SPECIFICATIONS(07 21 00.06) 1" RIGID INSULATION
1A50012Sim
1A50011Sim(03 30 00.03) 6" CONCRETE SLAB OVER 6" CRUSHEDSTONE; SLAB TYPE "B"
8'-8"W/ GRADE3'-4" VARIES(03 30 00.01) #15 FELT PAPER BONDBREAKER.TYPICAL @ ALL WALLS; FOAM BONDBREAKER AT EXTERIOR LOCATIONS
171S500Simgarage addition - 1120exterior
(07 21 00) TAPERED RIGID INSULATIONPER ROOF PLAN
(07 21 00.08) 3" RIGID INSULATION;(2) LAYERS OF 1-1/2" LAYERSSTAGGERED(07 13 00) FOUNDATION WATERPROOFING SYSTEM -COMPLETE WALL AND FOOTING(22 00 00) DRAIN TILE PER PLANS.(31 20 00) GEOTEXTILE FABRICAROUND AGGREGATE FILL
(08 41 13.A6) ALUMINUM STOREFRONT WINDOWSYSTEM; SEE SPECIFICATIONS(04 20 00.14) MASONRY LINTEL. SEE STRUCTURALPLANS AND DETAILS1A5011Sim4'-0"4'-0"12'-0"
1A5012Sim
S1-MAIN FLOOR LEVEL0'-0"S1-LOWER FLOOR-4'-0"
E3
S1-LOWER FLOOR T.O.F-9'-0"
S1-LOWER FL NEWT.O.WALL16'-0"(07 60 00.01) ARCHITECTURAL METAL PANELWALL SYSTEM; SEE SPECIFICATIONS
(07 13 00) FOUNDATION WATERPROOFING SYSTEM -COMPLETE WALL AND FOOTING(22 00 00) DRAIN TILE PER PLANS.(31 20 00) GEOTEXTILE FABRICAROUND AGGREGATE FILL
(09 51 00.A1) ACOUSTICAL CEILING TILE SYSTEM;24" X 24" (ACT-1)(05 21 00.01) STEEL BAR JOIST; SEE STRUCTURALFRAMING PLANS
(03 30 00.13) 12" CONCRETE WALL; SEE DETAILSFOR REINFORCING(04 20 00.10) 12"X8"X16" CMU WALL; PROVIDE ALLREINFORCING AS REQUIRED
(07 21 00.07) (2) LAYERS OF 3.3" POLY ISO RIGIDROOF INSULATION; LAYERS STAGGERED (MIN.R-38)MIN8"(06 10 00.05) PRESSURE TREATED WOOD BLOCKING W/ STAINLESS STEEL FASTENERS(07 60 00.03) SHEET METAL WALL CAP; PROVIDE STIFFENING BEAD AT HEIGHTS OVER 12"(07 21 00) TAPERED RIGID INSULATIONPER ROOF PLAN(07 21 00.09) 2" RIGID INSULATION(07 21 00.07) (2) LAYERS OF 3.3"POLY ISO RIGID ROOFINSULATION; LAYERSSTAGGERED (MIN. R-38)(05 30 00.01) METAL ROOF DECKING; SEESTRUCTURAL PLANS -FASTENERS PERSTRUCTURAL DETAILS(07 53 00) EPDM ROOFING MEMBRANE.WRAP OVER TOP OF WALL1A50012Sim
171S500Sim8'-8"
1A5017Sim
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
SHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
N25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:22:41 PM
SCALE: 1/2" = 1'-0"
1A405
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Wall Sections1/2" = 1'-0"1Wall Section - Garage Addition-1 - South 021/2" = 1'-0"2Wall Section - Garage Addition-1 West1/2" = 1'-0"3Wall Section - Garage Addition-1 - West 21/2" = 1'-0"4Wall Section - Garage Addition -2 - East1
Page 43 of 54
2
2
2
CRCRCR
8'-8"8'-0"8'-8"8'-0"8'-0"8'-0"8'-0"8'-6"8'-0"8'-8"8'-0"8'-0"
8'-8"8'-8"8'-0"
8'-8"
8'-0"
D-7/9/11RTU
unisex121
garage addition - 2118conf / meeting room102reception105waiting101
entry100
mens115womens113break room104shared office108manager office111
existing garage119existing utility room117conference/office112
garage addition - 1120
file room109
scada/office106data116file 2110janitor114corridor107corridor103closet102.1
closet112.1shower113.1shower115.1
A-1AA-1AnOSSnOSSA-1DA-3DE
A-1DA-1DA-1DA-1DA-1DA-1DA-1D A-1DA-1AA-1AemA-3AA-3AA-3AA-3DA-3DA-3DA-3DA-3DA-3DA-3DA-3DA-1AA-1AA-3AA-3AA-3AemA-3E
A-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2DA-2EA-2EA-4AA-4AA-4AA-4AemA-4AA-4AA-4AA-4AA-4AemA-4A
A-6AA-6AA-6AA-6AemA-6AA-6AA-6AA-6AA-6AemA-6A8'-0"8'-0"A-5AA-5AA-5AA-5AA-5AemA-5AA-5AA-5AA-5AA-5AemA-5AA-5AA-5EA-5E A-5AA-7AA-7AemA-7AA-7AA-7AA-7AA-7AA-7AA-7AemA-7AA-7AA-7AA-7AA-8AA-8AA-8AA-8AemA-8AA-8AA-8AA-8AA-8AA-10AA-10AA-10AA-10AemA-10AA-10A
A-7EA-10EA-9AemA-9AA-9AA-9AA-11AemA-11AA-11AA-11AA-11AA-11AA-11DA-11EA-9EA-9VLA-11VLA-9AA-11DA-11D
A-13G1A-13G1A-13G1A-13G2A-13VL
A-14HA-14HemA-14HA-14HA-14H A-14HA-14HA-14HemA-14HA-14HA-14HA-16HA-16HA-16HA-16HA-16HA-16HA-16HemA-16HA-16HA-16HA-16Hem
A-16H
A-17W1 A-17W1A-15W2A-15W2A-15W2A-15W2A-15W2A-15W2A-15W2
A-15W2A-15W2
A-2ELA-2ELA-1ERH
RHA-16E
A-16ERH
A-9EL
A-17W2A-17W2A-17W2
A-17W2A-17W2A-17W2
A-17W1
A-17W1
FOSFOSFOSFOSFOSFOSFOSFOSFOS
FOSFOSFOS
FOSFOS
FOSFOSFOSFOSFOS
FOSFOS
FOSFOS
nOSSnOSSnOSSnOSS
nOSS
nOSSnOSSnOSSnOSSnOSSnOSS
nOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSSnOSS
A-13ELNPDM
nOSSnOSSNPDMNPDMNPDMNPDMNPDMNPDMNPDMNPDMEMAEMAA-5E
RH
A-13EL
2'-11 1/2"23'-0"2'-11 1/2"EQEQEQEQA-17DA-17DA-17DA-17DA-17DNPDM$ND2$ND$T$ND$ND
NPA$NNPA$N$ND$NDNPA$N$N$T$VSNPA$NNPA$N$NNPA$N$VS$VS$VS$DN$DNNPA$VS$N
CEILING MOUNT ELECTRIC REEL DROP 2'-2 5/32"
CEILING MOUNT ELECTRIC REEL DROP21'-0"
CEILING MOUNT ELECTRIC REEL DROP21'-0"
(1)-2" CONDUIT FROM IT HANDHOLE TO DATA 116IT HANDHOLE (1)-2" CONDUIT FOR POWER FROM UTILITY 117 TO ENTRANCE GATE W/ (2) #6 WIRES
data116existing utility room117
12'-0"CR(27 00 00.A8) CARD READER POST(03 30 00.02) 4" CONCRETE SLAB OVER 4"CRUSHED STONE; SLAB TYPE "A"1-1/2" CONDUITPOWER FOR VERTICAL PIVOT GATEPOWER FOR VERTICAL PIVOT GATEELECTRIC BOX A-18A-18
A-15LP1A-15LP1A-17LP1A-17LP1
OWNER: PROJECT: PROJECT PROJECT ISSUE DATE: ©2023 Kueny Architects L.L.C. -All Rights Reserved 10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV. / DESCRIPTION DATE REVISIONS
KEY PLAN
PLAN NORTHSHEET SHEET TITLE:
ARCHITECTKueny ArchitectsPhone: (262) 857-8101Address: 10505 Corporate Drive, Suite 100Pleasant Prairie, Wisconsin 53158Architect of Record -Jon P. Wallenkamp
N25W27534 Oak StreetPewaukee, WI 53072Volume #2 -LPSD -Lake Facility Site 1
3/9/2026 12:42:00 PM
SCALE: As indicated
1E202
February 10, 2026Lake Pewaukee Sanitary District
BID SET
Lighting Plan & GeneralSite Plan3/16" = 1'-0"1Lighting Plan
3/64" = 1'-0"2Site 1 - Electrical Site Plan
A3 Addendum #3 03/02/2026A2 Addendum #2 02/24/2026A1A1 Addendum #4 03/05/2026A1 Addendum #1 02/23/2026
1/2" = 1'-0"3Light Pole Detail
Page 44 of 54
Page 45 of 54
Page 46 of 54
Page 47 of 54
Page 48 of 54
Page 49 of 54
Page 50 of 54
Page 51 of 54
Page 52 of 54
March 9, 2026
Lake Pewaukee Sanitary District
Project Address: N25W27534 Oak Street (Tax Key No. PWC 0935979001
Facility Information: LPSD Site & Building Plan Review
Re: Response to Staff Review Comments
The following is Kueny Architects, LLC letter in response to the staff review comments from the letter issued
on January 29, 2026. The italics text are your comments with Kueny’s response following in regular bold
fonts.
KEY ITEM(S):
1. Please make sure that setbacks are consistent throughout all plans, including the
setback lines and labeling. It appears setback lines may have been revised, but not the
labeling. Note that the front and rear yard setback is 25 -feet.
a. See revised sheet 1A101.
2. Please ensure that parking spaces conform to the size requirements of Section
340-8.1A of the Zoning Code.
a. Site Plan 1A101 was modified to show 9x20 parking stalls as
required to comply with the min required 180 sf.
3. Please ensure that paving meets the minimum paving requirements of Section
340-8.1C.(1)
a. See Sheet 1A101 with the paving requirement.
4. Staff recommends that all parking and paved areas be a minimum of ten feet
from property lines in accordance with Section 340 -8.1C.(3).
a. The existing parking lot will be repaved for maintenance purposes.
The new asphalt on the east side will comply with the 10 ft.
5. Is there outdoor storage of vehicles or equipment? If so, please label those areas
on the site plan.
A . There are no vehicles or equipment being stored outside of the
facility.
Page 53 of 54
6. Note Section 340 -8.2 requires all vehicle maneuverability to occur onsite and
outside of public rights -of-way.
a. All vehicles turning radius were confirmed and work inside the
paved area of the facility, and will not affect the public rights-of-way.
7. Is any new lighting proposed or just the replacement of existing fixtures only? It is
difficult to identify light locations on the Landscape and Lighting Plan. Please clearly show
all building and site lighting and label existing or proposed.
a. There are 2 existing poles on the north side and 2 new poles on the
east side as noted on 1A101 and the new sheet 1E202
8. Please ensure that the proposed lighting is in compliance with Section 340 -
2.10D(6). Note that light poles may not exceed 20 -feet as measured from grade.
a. The max height of the light poles is 20 ft as indicated on revised
sheet 1A101 and 1E201.
9. Please also provide a photometric plan showing light levels up to the property
lines.
a. Photometric Plan will be forthcoming.
10. Are lights dimmable?
a. Yes. The exterior lights can be dimmed down to 30% at night
11. Please indicate the planting quantities provided for each plant type in the
landscape table.
a. See revised sheet 1A105.
12. Approval will be conditioned upon final Engineering Department approval of
grading, erosion control, utilities, and storm water management plans, which must be
obtained prior to any land disturbance.
a. Acknowledged
Sincerely.
Kueny Architects, LLC
Jon P. Wallenkamp
Principal
Page 54 of 54