Community Development Authority Agenda Packet - 5:00 PM
City of Oconomowoc · Waukesha County · meeting of Aug 25, 2026 · Agenda packets
Open the original document More from City of Oconomowoc
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Oconomowoc
Community Development Authority
Tuesday, August 25, 2026 - 5:00 PM
City Hall - Conference Room 3
174 E. Wisconsin Ave. Oconomowoc, WI 53066
Notice: If a person with a disability requires that the meeting be accessible or that materials at the
meeting be in accessible format, call the City Clerk at least 48 hours prior to the meeting to request
adequate accommodations. Tel: (262) 569-2186.
1. Comments from audience
2. Review CDA Mission
a. Establishing Oconomowoc as the best small city
b. The Community Development Authority (CDA) will:
1. Define short and long term strategies that respect the stakeholders of Oconomowoc
2. Implement an environmentally-friendly revitalization plan that fosters economic stability
c. The focus of the CDA shall be to:
1. Revitalize the strategic areas
2. Encourage diversity in commerce, employment and housing types
3. Identify and select immediate short term projects which serve as a foundation for long
term solutions
4. Foster trust and confidence within the Oconomowoc community
5. Seek fair and equitable public/private partnerships
3. Approval of Meeting Minutes -
a. Minutes of January 20, 2026
4. New Business:
a. Election of Chairperson
b. Consider/act on Oconomowoc Business Development Loan Application for Crafty Cow, LLC
c. Consider/Recommend: Facade Program Grant Change
d. Review/Discuss: E. Wisconsin Avenue Redevelopment Plan
1
5. Comments from CDA Members
6. Adjourn
Gina Kozlik, City Clerk
City of Oconomowoc
Notice is hereby given that a majority of the Common Council and Plan Commission may be present at the above-noticed meeting
to gather information about a subject over which they have decision-making responsibility. This constitutes a meeting of the
Common Council pursuant to State ex rel. Badke v. Greendale Village Board, 173Wis. 2d 553, 494 N.W. 2d 408 (1993) and must be
noticed as such, although the Common Council will not take any formal action at this meeting.
2
1
Community Development Authority - January 20, 2026
City of Oconomowoc
Community Development Authority Meeting
Minutes
January 20, 2026 - 5:00 PM
Aldermen Present: Dan Rogers, Mary Blaska, Trevor Stiles, Robert Magnus, Scott Carter and Nick Noggle
Absent: Kevin Ellis
Also Present: Mike Bertrand, Tina Wallace, Robert Duffy
Chairman Blaska called the Community Development Authority Meeting to order and appropriate meeting notice was
confirmed at 5:00 PM.
Approval of Meeting Minutes -
a. Minutes of December 16, 2024
Motion to approve the minutes of December 16, 2024 made by Carter and seconded by Stiles.
Motion carried 5-0-0.
New Business:
a. Consider/act on Oconomowoc Business Development Loan Pool Application for Newport
1875
Motion to approve the Oconomowoc Business Development Loan Pool Application for Newport
1875 made by Magnus and seconded by Rogers.
Motion carried 5-0-0.
Old Business:
a. E. WI Avenue Update
Duffy gave an update. He stated during budget time every year he brings this forward as a
reminder. He explained the overlay district to encourage redevelopment in this area. He has
reached out to property owners. Magnus asked Duffy to email the CDA members a copy of the UW
Report.
Comments from CDA Members
Mayor Magnus commented that there are two people, Nick Noggle and April Welch, running for Alderman in
District 1. He stated that the State of the City for the Chamber of Commerce is on Thursday, February 12 from
8-9:30 am at the Community Center and registration is now open.
Adjourn
Motion to adjourn made by Magnus and seconded by Rogers.
Motion carried 5-0-0.
The meeting adjourned at 5:17 PM.
Minutes taken by Tina Wallace, Admin. Assistant
3
174 E. Wisconsin Avenue Oconomowoc, Wisconsin 53066
www.oconomowocusa.com
August 18
, 2026
Oconomowoc Community Development Authority
174 E. Wisconsin Avenue
Oconomowoc, WI 53066
RE: Business Development Loan Approval
Dear Community Development Authority Members:
City Staff has reviewed the Business Development Loan application of David Eichler of Crafty Cow,
LLC at 153 E. Wisconsin Ave in Downtown Oconomowoc.
The committee is recommending loan approval for costs to accommodate HVAC upgrades based
on the following factors:
• A well-established business and to accommodate demand and growth ;
• The applicant’s commitment to Downtown Oconomowoc;
• Investment into a downtown building which will improve customer experience.
Currently, there is an existing balance on an existing Oconomowoc Business Loan, however all
parties are accepting of a new loan for the difference to the program maximum.
The recommended loan amount for Crafty Cow, LLC is $8,000 and terms are 1% interest with a 10-
year payoff.
It is also our belief that this is the type of loan that the Business Development Loan Pool was
intended as it assists in enhancing downtown building stock and uses the funds for reinvestment
into a downtown building.
The Committee would request the Oconomowoc Community Development Authority’s approval for
this loan application contingent upon City Building Inspector review .
If you would like additional information, or would like to further discuss, please feel free to contact
me at 262-569-2185.
Sincerely,
CITY OF OCONOMOWOC
Robert K. Duffy
Economic Development Director
4
5
6
7
8
To: Mayor Rosek
Common Council
CDA
From: Bob Duffy, Economic Development
Date: August 4, 2026
Re: Façade Project Resolution to Increase Grant Dollars
In 2008, the City Council approved resolutions creating a Façade Grant Program. Since that
time, City Staff has worked with owners of the designated downtown properties to enhance
these structures back to their former grandeur. The City has assisted over 50 building owners
since its inception.
In 2017, the City also created a major façade program that could assist up to $50,000 for major
investment into significant downtown structures. That was the mechanism used to assist with
the Mann Opera Hall building (now North 48) at 102 – 108 N. Main Street, and Cornerstone Pub
building.
The current program created allowed a maximum loan and grant amount of $5,000. In working
with the owners, costs are increasing to make substantive improvements. In an effort to
continue to assist building owners, it may be appropriate to increase the grant amount to
$10,000.
To make more of these projects a reality, thought an increase in funding available would provide
additional incentive. Currently, the City’s Façade fund has approximately $280,000 available to
assist with both types of façade projects.
Memorandum
PROJECT UPDATES FOR COUNCIL
9
RESOLUTION #26-R3389
RESOLUTION APPROVING CHANGES TO THE CITY OF OCONOMOWOC
FAÇADE IMPROVEMENT GRANT PROGRAM
Whereas, the City of Oconomowoc has established a priority to eliminate
undesirable conditions, and to undertake urban renewal and community development
programs; and
Whereas, the City of Oconomowoc has authorized the Community Development
Authority to transact business and exercise any and all powers, duties and functions set
out in §66.1201 and §66.1333 Wis. Stats.; and
Whereas, the Community Development Authority has recommended a change to
the Facade Grant Program to serve as an assistance tool to provide grants for front & rear
façade improvements, and costs of improving existing commercial structures and
businesses located in Downtown Oconomowoc, and commercial property along E.
Wisconsin and Summit Avenue; and
Whereas, the Façade Improvement Grant Program will serve to stimulate
investment in Oconomowoc.
Now Therefore Be It Resolved, that this Public/Private partnership is necessary to
continue the implementation of the recommendations of the Downtown Revitalization and
Waterfront Plans.
Be It Further Resolved, that the Oconomowoc Façade Improvement Grant
Program be established as attached hereto as Exhibit A and incorporated herein.
Be It Further Resolved, the City of Oconomowoc Community Development
Authority be made aware of recommended.
Be It Further Resolved, that Economic Development Staff in consultation with the
City Administrator is authorized to approve the $10,000 grant for the implementation of the
Façade Improvement Grant Program.
Be It Further Resolved, that authority is hereby granted to the Oconomowoc City
Administrator and Community Development Authority Executive Director to take the
necessary steps to promote the program and seek applicants.
Dated: _____________________ CITY OF OCONOMOWOC
By: ______________________
ATTEST: Matt Rosek, Mayor
___________________________
Gina Kozlik, Clerk
10
EXHIBIT A
FAÇADE IMPROVEMENT GRANT PROGRAM
City of Oconomowoc Façade Improvement Grant Program thanks you for investing in the City of
Oconomowoc! The Façade Improvement Grant Program provides financial assistance for
exterior building and site improvements of eligible properties to enhance form, function and
design within the City of Oconomowoc. Specifically, the intent is to reimburse applicants for
eligible expenses that contribute to the physical, economic, social and aesthetic well-being of the
City.
1. Eligible Properties: Properties must either: a) be located within the Downtown
Business District or b) be located within the E. Wisconsin Avenue or Summit Avenue
corridor and have commercial zoning. Buildings must be at least 30 years old.
Preference is given to properties occupied by a first-floor retail business. Properties
that contain a non-conforming use are not eligible to apply for funding.
2. Applicants: Applicants must either own or lease an eligible property.
3. Grant Amount: Only projects with a total construction value (City grant + applicant’s
share) of $20,000 or greater will be considered. Applicants may be eligible for a grant
award of up to 50% of the total improvement cost, up to a maximum of $50,000.
4. Eligible Expenses: Improvements that qualify for reimbursement include Façade
Improvement, Signage, and Other Site Improvements provided that they focus on the
street-facing façade and/or areas visible from the public right-of-way.
Façade Improvement
a. Façade Renovation – painting, re-facing the street-facing façade with a new
material or changing the appearance of the building through a change in roofline
or other means
b. Entrance Feature – adding or renovating a prominent entry feature
c. Windows & Doors – replacing, installing or restoring windows (including
display, ornamental, upper-story and storm windows) and exterior doors
d. Architectural Elements – installing, restoring or replacing cornices, parapets,
awnings, canopies and/or exterior woodwork (including window trim)
Signage – replacing or installing wall and/or monument signs
Other Site Improvements
a. Site Lighting – installing or replacing decorative site lighting (wall or ground
mounted) and/or accent lighting to highlight architectural features or elements
b. Fencing – installing or replacing decorative fencing around parking areas,
between properties and/or to define pedestrian space
c. Refuse Screening – installing or replacing an exterior enclosure for refuse
d. Access Improvements – modifying site access to consolidate driveways, provide
cross access with an adjacent property and/or improve pedestrian movement by
providing a sidewalk from the right-of-way to the front entrance or within the site;
improving the accessibility of the site to meet ADA requirements.
11
Interior life safety and ADA accessibility improvements are only eligible in conjunction
with a façade improvement. Only the portion of costs for demolition that are required to
construct the eligible improvements will be considered. Fees related to architectural/
engineering drawings, permits and construction management may also be considered for
reimbursement.
5. Ineligible Expenses: New construction, routine maintenance (such as tuck-
pointing, parking lot repair – sealcoating, re-striping, mill and overlay, etc.), general
interior remodeling costs, property acquisition, working capital, production
equipment, or day-to-day operational expenses (inventory, utilities, taxes,
advertising, etc.).
6. Fees: There is no application fee associated with the program. However, if an
applicant owes money to the City all accounts must be brought current before entering
into a grant agreement. Additionally, the tenant must have current business and, as
applicable, liquor licenses.
7. Evaluation: The Economic Development & Planning staff will review all applications
on an as- needed basis. Proposals shall be evaluated on their visual impact (curb
appeal, pedestrian experience and magnitude of improvements), financial impact and
property use.
8. Procedural Requirements:
a. Interested property and business owners should schedule a pre- application
meeting with staff to determine the scope of the project and initial compliance
with the program policy. No work can commence until a grant agreement is fully
executed.
b. Applicants shall submit a completed application form including proof of
ownership/lease and property owner’s approval. Applications are available in
the Economic Development Department and must include:
i. Plat of survey with legal description of property
ii. Photos of the existing building and proposed project area/site
iii. Schematic drawings illustrating proposed work, or pictures with
project description attached
iv. Project schedule
v. Cost estimates from contractors
c. City staff will review all applications and make a recommendation to the
Architectural Commission if approvals are necessary.
d. The City Council or designated Committee will approve or deny all applications.
e. If an application is approved:
i. The subject property shall pass a life safety inspection.
ii. The City and applicant shall enter into a grant agreement.
iii. Upon execution of the grant agreement, the applicant shall be
required to submit for building permits within 45 days. Permits must be
secured and paid for within 90 days after grant agreement approval.
iv. Work must begin within 30 days of permit issuance and have
passed all required final inspections within 365 days of grant
agreement approval.
v. Upon completion of the Façade Improvements and all required final
inspections, the applicant shall submit to the City a properly executed and
12
notarized contractor statement showing the full cost of the work as well as
each separate component amount due to the contractor and each and
every subcontractor involved in furnishing labor, materials, or equipment in
the work. In addition, the applicant shall submit to the City proof of payment
of the contract cost pursuant to the contractor's and the architect's
statements and waivers or releases of liens from each contractor and
subcontractor.
f. Grant disbursements may be made in one installment or, upon request, up to three
incremental installments paid upon the City’s determination that a proportionate
amount of all of the required construction work for the improvements has been
completed and the proper waivers or releases of liens therefor from each contractor
and subcontractor have been submitted to the City.
9. Maintenance: The applicant, its successors, and/or assigns shall be responsible for
properly maintaining the improvements in their finished form and without change or
alteration thereto, except as may be approved by the City, for a period of three (3) years
from completion.
13
CITY OF OCONOMOWOC FAÇADE IMPROVEMENT GRANT APPLICATION
Applicant:
Street Address:
Mailing Address (if different):
Contact Person Title:
Daytime Phone:
Cell:
Fax:
Email:
Applicant is: Building Owner Building & Business Owner Business Owner
If applicant is not the building owner, please provide the following:
Building Owner Name:
Mailing Address:
City: State Zip:
Daytime Phone Cell:
Email:
Important: If applicant is not the building owner, please include a letter from the building owner
providing endorsement and permission for the proposed renovations.
How long has the present building owner owned the property?
Are the upper floor(s) of the building currently occupied? YES N/A NO
Has any improvement costing more than $2,500.00 been made to the building in the past 3 years?
YES NO
If yes, please give a brief description and approximate cost:
Brief Description Amount Spent
14
Brief Description of Proposed Work: (Detailed Scope of Work is to be attached to application)
Cost of Project: $ (Include quote from licensed contractor)
Estimated date that project will begin if grant is awarded:
Estimated completion date for project:
Is the building currently occupied?
YES NO
If YES, Name of Tenant Business:
Name of Business Owner:
Type of Business:
Remaining years on lease
(Include copy of executed lease with application)
If NO, Name of Proposed Tenant:
Name of Owner:
Type of Business (be specific):
If new business, include a copy of complete business plan with application.
Length of lease:
(Include copy of executed lease with application)
CERTIFICATION
Under penalties of perjury, I certify to the City of Oconomowoc that all of the information
contained in this application is true and correct to the best of my knowledge.
Date: __________________
Applicant’s Signature
15
1
MEMORANDUM
ECONOMIC DEVELOPMENT DEPARTMENT
Date: July 28, 2026
To: CDA Members
From: Bob Duffy, Economic Development
Re: E. Wisconsin Avenue Gateway Redevelopment Master Plan
RELATES TO THE STRATEGIC PLAN
Strategic Goal- III. Focus on Community Growth
A. Research & Plan for City Development
1 Create Vision for Development Options & plan for E. Wisconsin Ave
Corridor
BACKGROUND
The City adopted design guidelines for the E. Wisconsin Avenue corridor in order to encourage
development and redevelopment opportunities. The City has also established a City Strategic Plan goal
to Develop Options and Plan for E. Wisconsin Avenue corridor.
At the request of the City, the University of Wisconsin Milwaukee Community Design Solutions group has
come up with a redevelopment concept for the E. Wisconsin Avenue corridor.
The redevelopment concepts include a mix of housing types, as well as mixed use buildings with first
floor commercial and upper floor residential. Based on prior feedback, they included visual preference
images for general architecture. The specifics will be determined by the Architectural Commission when
projects move forward as it relates to building size, intensity, and massing. They would then have a
contextual basis for details based on what is proposed.
In addition, there have been E. Wisconsin Avenue cross-sections to be considered and analyzed as
changes occur in the corridor.
The purpose of the Gateway Corridor area planning is to determine the land’s highest and best use
potential in order for the City to realize it’s vision for downtown revitalization and strategic plan goal for
the E. Wisconsin Avenue corridor.
16
17
Oconomowoc Gateway Masterplan
February 2023
18
3
4
5
7
15
16
17
23
24
25
31
Project Summary ...........................................................................................................................................
Location Map .................................................................................................................................................
Existing Conditions .......................................................................................................................................
Precedent Research .....................................................................................................................................
Existing Land Use Plan ................................................................................................................................
Base Map .......................................................................................................................................................
Master Plans ..................................................................................................................................................
Proposed Parking Options ...........................................................................................................................
Development Massing .................................................................................................................................
Renderings .....................................................................................................................................................
Street Sections ..............................................................................................................................................
TABLE OF CONTENTS
2 | Oconomowoc Gateway | Community Design Solutions
19
Oconomowoc
Bob Duffy, Jason Gallo and Kristi Weber
Carolyn Esswein
Roe Draus, Tess Richard
Client
Client Representative
CDS Director
CDS Project Assistants
PARTICIPANTS
PROJECT SUMMARY
The City of Oconomowoc wants to build on the success of their downtown core. The project site,
situated east of the core, serves as a gateway into the downtown. The project goal was to determine
site constraints and housing development strategies for vacant and underutilized properties. Site
access, parking, programming, and floodplain constraints were identified. Community Design
Solutions (CDS) developed three master plans that include mixed-use apartment buildings,
townhomes, and single family homes. The options vary based on density and housing types.
Plan features include: improved pedestrian realm, increased density, individual housing nodes, and
an activated the streetscape with public spaces and active ground floors along Wisconsin Avenue.
3 | Oconomowoc Gateway | Community Design Solutions
20
Location Map
4 | Oconomowoc Gateway | Community Design Solutions
DOWNTOWN CORE
N
PROJECT SITE
21
Existing Conditions
Steep topography shifts that separates parcels
Existing storefronts and surface parking lots along Wisconsin Avenue Current parking options, view of woodlands to the north
Street conditions and current setback on Wisconsin Avenue
5 | Oconomowoc Gateway | Community Design Solutions
22
Existing Conditions
North area of site with heavy woodlands and floodplain
Current street conditions with two traffic lanes and a central turn lane Approach from the existing downtown area looking west
Approach from the east looking west along Wisconsin Avenue
6 | Oconomowoc Gateway | Community Design Solutions
23
Apartment Building PRECEDENTS
Link: https://www.greshamsmith.com/project/martin-corner-mixed-use-development/
Link: https://www.treehugger.com/seattle-apartment-could-help-solve-housing-and-energy-crises-4857106
Martin Corner Mixed-Use Development
Key Features to Consider:
- Ground Floor Retail
- Balconies
- Material Mix (Brick fits well contextually)
Pax Futura - NK architects
Key Features to Consider:
- Ground Floor Amenities
- No Balcony
- Sliding Window Slats
- Medal Cladding, Modern Style
7 | Oconomowoc Gateway | Community Design Solutions
24
Apartment Building PRECEDENTS
Link: http://aka-architects.net/project/fenton-cornerstone-building/
Link: https://www.bdcnetwork.com/ktgy-unveils-designs-downtown-superiors-main-street-mixed-use-portion
Fenton Cornerstone Building
Key Features to Consider:
- Ground Floor Retail (Storefront Glazing)
- Recessed Balcony
- Traditional Style
Downtown Superior, CO Main Street, KTGY
Architects
Key Features to Consider:
- Ground Floor Retail (Storefront Glazing)
- Material Mix
-Depth, Recessed Areas
- Vertical Window Bands/ Holes
8 | Oconomowoc Gateway | Community Design Solutions
25
Apartment Building PRECEDENTS
Link: https://wjwarchitects.com/work/hope-manor-ii/
Link: https://clarkbarnes.com/admiral-station-planned-site-west-seattle/
Home Manor II
Key Features to Consider:
- Ground Floor Retail
- No Balconies
- Traditional Materials (Brick fits well contextually)
Admiral Station
Key Features to Consider:
- Ground Floor Retail (Storefront Glazing)
- Large, Open Balconies
- Material Mix
-Depth, Recessed Areas
- Large Windows into Semi-public Apartment
9 | Oconomowoc Gateway | Community Design Solutions
26
Apartment Building PRECEDENTS
Link: https://www.fitzgeraldassociates.net/2014/01/23/midtown-square-awarded-best-block-charter-award
Link: http://sanderspace.com/project/southeastern-glass/
Midtown Square
Key Features to Consider:
- Ground Floor Retail
- 4 Stories
- Primarily Recessed Balconies
- Traditional Materials
- Brick fits well contextually
The Southeastern Glass Building
Key Features to Consider:
- Ground Floor Retail
- 4 Stories
- Primarily Recessed Balconies
- Material Mix
- Brick fits well contextually
10 | Oconomowoc Gateway | Community Design Solutions
27
Townhome PRECEDENTS
Link: https://lifeatwestport.com/town-homes/
Link: https://www.drhorton.com/new-jersey/new-jersey/burlington/capital-crossing
The Townhomes at Westport
Key Features to Consider:
- Front door
- Large Gable Roof Broken Up
- Multiple Textures
- Craftsman Style
- Single Family Home Character
Capital Crossing
Key Features to Consider:
- Back
- Multiple Materials
- Traditional Style
11 | Oconomowoc Gateway | Community Design Solutions
28
Townhome PRECEDENTS
Link: https://www.davidweekleyhomes.com/new-homes/nc/charlotte/charlotte/waverlytownhomecollection
Waverly Townhome Collection
Key Features to Consider:
- Front door
- Multiple Materials (Traditional)
- Modern Feel
Milwaukee Townhomes
Key Features to Consider:
- Front door
- Three Story
- Wood Accents
12 | Oconomowoc Gateway | Community Design Solutions
29
Townhome PRECEDENTS
Link: https://www.hendersonproperties.com/2012/11/advantages-of-home-owners-assocation/
Link: https://www.31southtownhomes.com/
Henderson Properties
Key Features to Consider:
- Front (Garage & Second Story Front Door)
- Three Story
- Traditional Style
- Residential Feel
31 South Townhomes
Key Features to Consider:
- Garage in back with entrance
- Modern Materials
- Multiple Roof Slopes
13 | Oconomowoc Gateway | Community Design Solutions
30
Townhome PRECEDENTS
Link: https://www.caliberhomesportland.com/about-us
Link: https://news.wjct.org/first-coast/2021-08-26/jacksonville-city-council-approves-proposal-for-town-houses
Caliber Homes
Key Features to Consider:
- Recessed Balcony
- Warm Wood Accent
- Appear as individual units
Johnson Commons
Key Features to Consider:
- Front door
- Modern, Smooth Panel System
- Gable Roof/ per Unit
14 | Oconomowoc Gateway | Community Design Solutions
31
Land Use Plan
Current land use shows the area is primarily mixed-use/commercial.
15 | Oconomowoc Gateway | Community Design Solutions
32
Base Map EXISTING SITE
The basemap shows site contraints including topography, floodplain, and buildings to keep.
16 | Oconomowoc Gateway | Community Design Solutions
33
Master Plan Option A: High Density
Option A focuses on high density housing options. Multi-story, mixed-used apartment buildings along with shared public greenspaces.
17 | Oconomowoc Gateway | Community Design Solutions
34
Master Plan Option B: Medium Density
Option B focuses on medium density housing options. Mult-story, mixed-used apartment buildings along Wisconsin Avenue to activate the streetscape.
Northern parcels and east gateway include townhomes with central shared public greenspaces.
18 | Oconomowoc Gateway | Community Design Solutions
35
Master Plan Option C: Mixed Density
Option C proposes a hybrid plan based on community input including mixed-used apartment buildings, townhomes, and single-family homes.
19 | Oconomowoc Gateway | Community Design Solutions
36
Master Plan Development Data
20 | Oconomowoc Gateway | Community Design Solutions
37
Development Areas
The west and central area of the redevelopment plan proposes mixed-
use apartment buildings along Wisconsin Avenue with townhomes in the
north. The townhomes feature a central shared public greeenspace with
bioswales.
21 | Oconomowoc Gateway | Community Design Solutions
38
Development Areas
The east area of the development plan proposes two, multi-story
mixed-used apartment buildings with a large public space. The
apartment buildings incorporate underground parking with rear
parking.
22 | Oconomowoc Gateway | Community Design Solutions
39
Proposed Parking
In order to satisfy a 1:1 parking requirement for the proposed housing options,
underground parking, rear parking, and parallel parking along Wisconsin Avenue
are proposed.
23 | Oconomowoc Gateway | Community Design Solutions
40
Development Massing Axonometric View
The axonometric view places the proposed housing options into context to show scale and fit into the focus area. The letters reference the rendering locations
on the following pages.
A
B
C
D
24 | Oconomowoc Gateway | Community Design Solutions
41
Rendering A TOWNHOMES
The townhomes face a central shared greenspace. The exterior finishes of the townhomes incorporate both traditional siding and stone.
25 | Oconomowoc Gateway | Community Design Solutions
42
Rendering B EXISTING BUILDING AND PROPOSED APARTMENT BUILDING ALONG WISCONSIN AVENUE
The view shows the redesigned street with parallel parking and bike lanes. The apartment building features a traditional style through the brick facade
integrated with a modern form.
26 | Oconomowoc Gateway | Community Design Solutions
43
Rendering C APARTMENT BUILDING AND TOWNHOMES (EXTERIOR FINISH C1)
In order to reflect the style of the existing downtown area, the building form is more traditional through the usage of angled roof forms, brick and siding
finishes. The building features balconies and recessed windows to create variety in the facade. On the ground floor, storefronts and plazas line Wisconsin Ave.
27 | Oconomowoc Gateway | Community Design Solutions
44
Rendering C APARTMENT BUILDING AND TOWNHOMES (EXTERIOR FINISH C2)
The building form is modern through the roof form but the exterior finish is a warm brick and stone.
28 | Oconomowoc Gateway | Community Design Solutions
45
Rendering D LAPHAM AND WISCONSIN INTERSECTION (EXTERIOR FINISH D1)
The buildings balance modern and traditional roof forms. The exterior finishes incorporate traditional brick and wood, along with neutral and cool color tones.
The public plaza acts as a pedestrian gateway into the redeveloped area. Bioswales and native plantings are incorporated along both Lapham and Wisconsin.
29 | Oconomowoc Gateway | Community Design Solutions
46
Rendering D LAPHAM AND WISCONSIN INTERSECTION (EXTERIOR FINISH D2)
The second option reflects a modern style through the building massing, roof forms, and materials.
30 | Oconomowoc Gateway | Community Design Solutions
47
Existing Street Section DOWNTOWN CORE AREA
The existing street of the downtown area informs the redesigned street for the redevelopment area. Downtown streets are approximately 46’ wide and includes
parallel parking on both sides.
31 | Oconomowoc Gateway | Community Design Solutions
48
Existing Street Section REDEVELOPMENT STUDY AREA
The existing street along the redevelopment area includes two driving lanes and a central turn lane. The existing street is approximately 45’ wide, which
demonstrates the potential for parallel parking and bike lanes similiar to the downtown core.
32 | Oconomowoc Gateway | Community Design Solutions
49
Proposed Street Section REDEVELOPMENT CONCEPT
The proposed street design for the redevelopment area includes parallel parking and bike lanes on both sides. The intent is to maximize parking options and to
slow traffic in the entire downtown area.
33 | Oconomowoc Gateway | Community Design Solutions
50
Source: City of Oconomowoc website. First collected Oct 7, 2026.