Pabst Farms Joint Stormwater District Agenda Packet - 5:00 PM
City of Oconomowoc · Waukesha County · meeting of Jun 24, 2026 · Agenda packets
Open the original document More from City of Oconomowoc
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PABST FARMS JOINT STORMWATER DISTRICT
C/O 174 East Wisconsin Avenue, Oconomowoc, Wisconsin 53066
(262) 569-2175 (262) 569-3238 Fax
REGULAR COMMISSION MEETING
June 24, 2026 @ 5:00 p.m. At Oconomowoc City Hall
174 East Wisconsin Avenue
NOTICE: If a person with a disability requires that the meeting be accessible or that materials at
the meeting be in an accessible format, call the City Clerk’s office, (262) 569-2175, at least 48 hours
in advance to request adequate accommodations.
Agenda:
1. Call to order, confirmation of meeting notification and roll call
2. Minutes of May 20, 2026 regular meeting
3. Comments from Audience
4. Reports of Staff
5. Discussion on possible easements for extension of pathway for Village Crossings
6. Discussion and action on Lake Country Village and Interlaken Village stormwater
basins 1-4 and 10 transfer
7. Comments from Commissioners
8. Set date for next meeting
9. Adjourn
Gina Kozlik, City Clerk
City of Oconomowoc
“Members of other City or Village governmental bodies (boards, commissions, committees, council, etc) may
attend the above noticed meeting of the Pabst Farms Joint Stormwater District in order to gather
information. The only action to be taken at the above noticed meeting will be action by the Pabst Farms Joint
Stormwater District.”
Pabst Farms Joint Stormwater District Meeting Minutes
May 20, 2026
President Nash called the meeting to order at 5:00 pm.
Members present: Vice President Herzog, President Nash, Commissioner Phillips, Commissioner Wagner,
Commissioner Brozovich
Others present: Terry Tavera (Ruekert - Mielke) and Tina Wallace (City of Oconomowoc)
2. Approve Minutes of September 10, 2025 Meeting: Motion by Phillips to approve the minutes from the 9/10/25 meeting;
second by Herzog. Motion carried 5-0.
3. Comments from Audience: None.
4. Comments from Staff: None.
5. Discussion and action on approval of Wis-Pak parking lot expansion storm water management: Herzog stated
Wis-Pak is requesting a small expansion to their parking lot. Motion by Phillps to approve the Wis-Pak parking lot expansion
storm water management; second by Herzog. Motion carried 5-0.
6. Discussion and action on approval of easement for Valley Road sidewalk: Herzog explained there is an empty lot
right along Valley on the south side of the road. There are two property owners that have requested the sidewalk be moved
onto their property because of the topography and the drainage. This would keep the sidewalk from going into the ditch. The
Pabst Farms District owns a piece. Motion by Phillips to approve the easement for Valley Rd Sidewalk; second by Brozovich.
Motion carried 5-0.
7. Discussion and action on possible easements for extension of pathway for Village Crossings: Herzog stated this
goes back years. The existing walking path around the pond is gravel. Now the Condo Association has asked the city to
remove the path. He stated the developer never completed the path as originally planned. Brozovich stated Brian Bell is
putting the remainder of the path in with upcoming developments. The association will be responsible for maintenance.
Commissioners discussed concerns on moving the path, the removal of trees and defer this to the city and set limits.
Commissioners agree to let the city get feedback and bring this back for approval. No action taken.
8. Discussion and action on fence between SUMT0636992006 and Summit Cemetery: Nash explained this is the
property to the north of the cemetery where there is a large wet pond. There is an existing split rail fence that goes along the
north property line. It is seriously degrading and falling down and the Village has had staff remove a bunch of sections. The
cemetery is hesitant on spending $20K to replace the entire stretch. Nash stated the Village doesn’t have the staff to complete
with work. She stated the Summit Cemetery Board has requested feedback from the district on removing the fencing
completely or should it be replaced and would the district be willing to help fund the replacement. Commissioners discussed
having the cemetery put up signage, funding, removing the fence and putting up trees. Nash will go back to the Cemetery
Board and report that they should remove the fence and if there are problems we will revisit it and no help with funding at this
time. No action taken.
9. Election of Officers:
Motion by Herzog to nominate Nash as President; second by Phillips. Motion carried 5-0.
Motion by Nash to nominate Herzog as Vice President; second by Phillips. Motion carried 5-0.
Motion by Herzog to nominate Phillips as Secretary; second by Wagner. Motion carried 5-0.
9. Reports of Staff: Nash gave an update on the Lake Country Village and Interlaken Village pond improvements. Two
ponds were inspected and are ready to be transferred to the district. Also, she has been getting a lot of emails and phone calls
on the conditions of the ponds in terms of overgrowth and vegetation. These items will be on a future agenda.
S:\Committees - Commissions\Pabst Farms Joint Stormwater District\Minutes\2026\PFJSD 05-20-26 Minutes.doc
10. Comments from Commissioners: None.
11. Set meeting date for next meeting: The next meeting to be determined.
Motion by Phillips to adjourn at 5:28 pm; second by Brozovich. Motion carried 5-0.
________________________________
Tina Wallace
City of Oconomowoc Deputy Clerk
From: Brian Pehl
To: Kamron Nash
Cc: Ryan Fritsch
Subject: Village of Summit - Lake Country Village Storm Water Basin Verification and Recommendation Memo
Date: Wednesday, May 20, 2026 3:47:36 PM
Attachments: LCV Basin Verification Memo - 05-20-2026.pdf
Good afternoon Kamron,
As we discussed, please find attached our memo based on yesterday’s site visit (5-19-2026), to
verify the items that were noted during our previous site visit were addressed properly. I confirmed
that the items were addressed for Basins 1, 2, 3, 4 & 10 and that there is still some work that needs
to be done for Basin 9 prior to recommending acceptance. The memo attached outlines this
recommendation. Please coordinate with PFJSD to get this on the next agenda for formal action.
Please feel free to contact me with any questions or concerns.
Thanks,
Brian
Brian Pehl, PE (WI)
Senior Professional Engineer II
Short Elliott Hendrickson Inc.
414.507.8840 Cell (preferred)
414.949.8950 Office
Building a Better World for All of Us®
Engineers | Architects | Planners | Scientists
Short Elliott Hendrickson Inc., 10 North Bridge Street, Chippewa Falls, WI 54729-2550
715.720.6200 | 800.472.5881 | 888.908.8166 fax | sehinc.com
SEH is 100% employee-owned | Affirmative Action–Equal Opportunity Employer
MEMORANDUM
TO: Kamron Nash, Village of Summit Publics Work Director
FROM: Brian Pehl, PE (Lic.WI)
DATE: May 20, 2026
RE: Lake Country & Interlaken Village SW Basin Acceptance and On-Going Maintenance
SEH No. 176551 Task 3
On May 19, 2026 a site visit was conducted with Ryan Fritsch (Neumann Development) and Jenny
Grimes (Heartland Ecological Group) to verify the storm water basin maintenance work that was identified
as required during a previous site visit with you, myself, and Ryan Fritsch (Neumann Development) was
completed prior to recommending approval and acceptance of the identified basins. That previous visit
was completed on August 26, 2025. I offer the following recommendations for the basins observed and
being considered. Photos of each basin were taken during the visit and available if needed or requested.
Basin 1
All identified work was completed. Acceptance of this basin is recommended.
Basin 2
All identified work was completed. Acceptance of this basin is recommended.
Basin 3
All identified work was completed. Acceptance of this basin is recommended.
Basin 4
All identified work was completed. Acceptance of this basin is recommended.
Basin 9
Wet Cell - North
The items identified with the previous visit have been addressed.
Wet Cell – South
Work was done to address the erosion observed during the previous site visit. The same type of erosion,
namely undermining of the erosion control matting installed along the flowline of the swales in the corner
of the basin (both the northeast and southeast corners of the basin) continue to be an issue. The erosion
in the southeast corner was more severe but both locations need to be repaired and re-stabilized prior to
recommending acceptance of this basin.
Infiltration Cell
The items identified with the previous visit have been addressed.
SW Basin Acceptance Verification and Maintenance Memorandum
5/20/2026
Page 2
Basin 10
All identified work was completed. Acceptance of this basin is recommended.
We recommend the acceptance of the noted BMPs referred to as Basins 1, 2, 3, 4, and 10 within the
Lake Country Village Subdivision Development be accepted by the Pabst Farms Joint Storm Water
District and that a meeting be coordinated as soon as convenient to formally act upon the
recommendation. Unless there are any objections to this recommendation, the developer does not intend
to continue maintaining the noted storm water basins and the maintenance of them will be transferred
upon formal acceptance.
x:\pt\s\summv\176551\task 3 - lake country village and interlaken\sw basin acceptance information\storm water basin acceptance and on-going maintenance memo for lcv and
iv - 05-20-2026.docx
Source: City of Oconomowoc website. First collected Oct 7, 2026.