Regular Meeting
City of Delafield · Waukesha County · meeting of Jul 8, 2026 · Agendas
Open the original document More from City of Delafield
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF DELAFIELD
MEETING AGENDA
LAKE WELFARE COMMITTEE
Chair: Mike Hausman
Members: Chris Arndt, Greg Domino, Jerry Dunnick, Jim Ellsworth, Gayle Gaborsky, Travis Manard,
Susan McVey, Ald. Paul Price, Sarah Reardon, Andrew Vrakas
Office: (262) 646-6220 - E-Mail: clerksoffice@cityofdelafieldwi.gov – cityofdelafieldwi.gov
July 8, 2026 6:00 PM City Hall, Council Chambers
500 Genesee St.
Regular Meeting
1. Call to Order
2. Pledge of Allegiance
3. Roll Call
4. Special Orders of Business
Discussion and action on the following items:
A. None
5. Approve the following meeting minutes:
A. June 10, 2026 Regular Meeting
6. Citizen Comments
7. Unfinished Business
Discussion and possible action on the following items:
A. “Welcome to the Lake” Program
B. Wakesurfing Recommendations, Notifications, Communicator Article
C. Erosion / Storm Runoff from East Side of Nagawicka Lake
D. Aerators
E. Nagawicka Lake Water Level and No-Wake Rules
8. New Business
Discussion and possible action on the following items:
A. DELC 0788.020, 1407 Milwaukee Street. Owner: Daniel Hurrle. Applicant: Kevin Enright, K2
Structures, LLC. Applicant requests approval to remodel an existing boathouse.
B. Aquatic Plant Management Post-Treatment Inspection Report
C. Annual Lake Awareness Meeting Date, Location, Agenda
9. Requested Future Agenda Items
10. Correspondence
11. Lake Welfare Committee Meeting Dates and Deadlines
A. Regular Meeting: August 12, 2026
B. Regular Meeting Submittal Deadline: August 1, 2026
12. Adjournment
All meetings of the Lake Welfare Committee are public meetings. The meeting of the Committee is a working session for the Committee itself,
and, outside of the Citizens Comments section, discussion by those in attendance is limited to Committee members, staff and others that may be
a party to the matter being discussed.
CITY OF DELAFIELD
MEETING AGENDA
LAKE WELFARE COMMITTEE
Chair: Mike Hausman
Members: Chris Arndt, Greg Domino, Jerry Dunnick, Jim Ellsworth, Gayle Gaborsky, Travis Manard,
Susan McVey, Ald. Paul Price, Sarah Reardon, Andrew Vrakas
Office: (262) 646-6220 - E-Mail: clerksoffice@cityofdelafieldwi.gov – cityofdelafieldwi.gov
AMERICANS WITH DISABILITIES ACT NOTICE: Upon reasonable notice (at least 72 hours in advance) the City will furnish appropriate auxiliary
aids and services when necessary to afford individuals with disabilities an equal opportunity to participate in and to enjoy the benefits of a service,
program or activity provided by the City.
NOTICE OF POSSIBLE QUORUM: It is possible that members of and possibly a quorum of members of other governmental bodies of the
municipality may be in attendance at the above-stated meeting to gather information: no action will be taken by any governmental body at the
above-stated meeting other than the governmental body specifically referred to above in this notice.
Clerk: CC Posted: 07/01/2026 X City Hall Bulleting Board X Website X Notified Media
1
ORDINANCE NO. 25-O1112
AN ORDINANCE TO CREATE SECTION 21.19 OF THE CITY OF OCONOMOWOC
MUNICIPAL CODE TO RESTRICT THE USE OF AERATORS ON INLAND WATERS
WHEREAS, in the interest of public health, safety, or welfare, the City of Oconomowoc
has the authority to enact ordinances related to the use and operation of “Aerators” on inland
waters;
WHEREAS, the frozen surface of the inland waters within the City of Oconomowoc is
frequently enjoyed by snowmobilers, UTV/ATV riders, cross-country skiers, snowshoers, and
other outdoor and recreational enthusiasts;
WHEREAS, the use of aerators on inland waters to dissipate or block ice from forming on
the water presents a public health, safety and welfare issue for people utilizing the frozen surfaces
of the water;
WHEREAS, it is the intent of these regulations to provide for the safe and healthful use of
the inland waters (lakes, ponds and rivers) located solely within the City of Oconomowoc pursuant
to the grant of authority under the police power of the City;
WHEREAS, the Common Council has determined that it is necessary to regulate the use
of Aerators upon inland waters within the City of Oconomowoc to protect the health and welfare
of the City of Oconomowoc, its citizens, and those who use and enjoy inland waters within the
City of Oconomowoc;
WHEREAS, the City of Oconomowoc hereby adopts the following restrictions on the use
or operation of Aerators on inland waters;
NOW, THEREFORE, the Common Council of the City of Oconomowoc, Waukesha
County, Wisconsin, does hereby ordain as follows:
SECTION 1. Section 21.19 of the City of Oconomowoc Municipal Code is hereby created
to read as follows:
21.19. Use of Aerators on Inland Waters.
(1) The purpose of this ordinance is to protect the public health, safety and welfare from the
potential adverse effects which may arise from the use of aerators on inland waters (lakes,
ponds, and rivers) in the City of Oconomowoc. The Common Council recognizes and
2
concludes that the proper and safe use of lakes, ponds, and rivers in the City of
Oconomowoc is desirable to maintain the physical, ecological, cultural and aesthetic
characteristics of such lakes, ponds and rivers, their shorelines and the rights of riparian
owners and users as well as the City as a whole, and to promote the public health, safety
and welfare of all persons making use of lakes, ponds and rivers within the City of
Oconomowoc. Accordingly, it is the intent and purpose of the Common Council to adopt
reasonable regulations for the removal of ice and the use of aerators in lakes, ponds, and
rivers in the City of Oconomowoc.
(2) Scope and Application. The terms and provisions of this section shall be interpreted and
applied as minimum standards and requirements for the promotion and protection of the
public health, safety, and welfare and for the public peace and preservation of natural
resources and public and private property within the City of Oconomowoc.
(3) Definitions. “Aerator” means any device or equipment used on City inland waters which
affects the water’s surface to prevent or inhibit the natural formation of ice on the water’s
surface.
(4) Aeration Safety Regulations. Aerators that prevent the natural formation of ice to occur
must be removed prior to the November 15th of any given year and may not be reinstalled
until April 15th or later of any given year.
(5) Penalties and Enforcement.
(a) General Penalty. Except as otherwise provided, any person who shall violate this
chapter shall upon conviction thereof forfeit not less than $100.00 nor more than
$250.00 together with the costs of prosecution.
(b) Continuing Violations. Each violation and each day a violation continues shall
constitute a separate offense and shall be punishable as such.
(c) Violation of this chapter shall be deemed a nuisance, irrespective of how that term is
defined elsewhere in this code. Nothing in this chapter shall preclude the City from
maintaining any appropriate action, including seeking injunctive relief from a court of
competent jurisdiction to prevent or remove a violation of any provision of this chapter.
Section 3. Severability . Should any portion of this Ordinance or the affected Code
Section(s) be declared unconstitutional or invalid by a court of competent jurisdiction, the
remainder shall not be affected.
3
Section 4. Effective Date. This ordinance shall be in full force and effect upon passage
and publication.
DATED: ______________ CITY OF OCONOMOWOC
By: ___________________________
Robert P. Magnus, Mayor
ATTEST:
__________________________________
Gina Kozlik, Clerk
Adopted: __________________________
Published: _________________________
Effective Date: ______________________
V:\Lakes & Groundwater\Aerator Prohibition\Council 12022025\Ordinance 25-O1112 to Create Section 21.19 Restricting the Use of
Aerators on Inland Waters 12022025 Final.docx
1
Mike Hausman
From: Tom Hafner <thafner@cityofdelafieldwi.gov>
Sent: Wednesday, May 20, 2026 5:27 PM
To: Paul Price; Mike Hausman
Cc: Tim Aicher; Sean Heinzel; Aaron Koch
Subject: [External] Slow-No-Wake
Mike and Paul,
We have good daily lake level data readily available going back to November of 2005. So, that’s nearly 20 years and
seven months of data. In that Ɵme, following is a record of when the 10” slow-no-wake would’ve been in place and
when a proposed 8” water level would’ve triggered the slow-no-wake order. The 10” level resulted in 3 slow-no-wake
events in the past 20+ years. The 8” level would’ve resulted in 5 slow-no-wake events in that same period. I color coded
the three events that would’ve triggered slow-no-wake requirements regardless of a 10” or 8” water level restricƟon. It’s
interesƟng to note that 3 of these 5 significant events have occurred in the past less than 4 years. Only two of the events
occurred in the first almost 17 years of the data. Note the increased length of the slow-no-wake orders if we went to the
8” level, especially the two events that hit the 8” level but didn’t get to the 10” level. My main concern is that boaters
would be complaining to open the dam more just for boaƟng purposes, during a Ɵme when opening the dam is causing
significant flooding impacts to our neighbors downstream. It would heighten the tension between people upstream
wanƟng the dam opened more and people downstream wanƟng the dam closed more. Let me know if you need any
addiƟonal data on this for the Lake Welfare CommiƩee.
Slow-No-Wake Order in effect at 10” above Max. PermiƩed Water Level
6/9/2008 – 6/14/2008 6 days
8/10/2025 – 8/17/2025 8 days
4/17/2026 – 4/23/2026 7 days
Slow-No-Wake Order in effect at 8” above Max. PermiƩed Water Level
6/9/2008 – 6/16/2008 8 days
4/13/2013 – 4/24/2013 12 days
9/12/2022 – 9/19/2022 8 days
8/10/2025 – 8/19/2025 10 days
4/16/2026 – 4/26/2026 11 days
Thanks ~ Tom
Thomas J. Hafner, P.E., ICMA-CM
City Administrator/Director of Public Works
500 Genesee Street • Delafield, WI 53018
Phone: (262) 303-4626
Fax: (262) 646-6223
thafner@cityofdelafieldwi.gov
cityofdelafieldwi.gov • LinkedIn
PLANNING & ZONING LLC 1
CITYOFDELAFIELDLAKEWELFARECOMMITTEE & PLAN
COMMISSIONZONINGREPORT
TO: Cityof DelafieldLakeWelfareCommittee & PlanCommission
FROM: AmyBarrows, CityPlanner
Planning & ZoningLLC
LWCMEETINGDATE: July8, 2026
PCMEETINGDATE: July29, 2026
RE: HurrleBoathouse
1407MilwaukeeStreet, DELC0788020
Thefollowingreport isprovidedfor cursoryreviewprior to action. Specificsrelatingto the submitted
documentsof this applicationmaybereferencedin the MeetingPacketdistributedby the Clerk.
PropertyOwner: DanielHurrle, HurrleTrust
Applicant: KevinEnright, K2Structures, LLC
ApplicationType: Boathouse
Location: 1407MilwaukeeStreet, DELC0788020
Zoning: RL-2, ResidentialLake
LandUsePlancategory: LakeResidential
Summary:
Thepropertyis15,149sq. ft. in sizeandlocatedon the southsideof NagawickaLakeon MilwaukeeStreet. The
propertyhasa single-familyresidence, detachedgarageandboathouse. Theexistingsingle-storyboathouse
needsrepair. Theboathouseis18.75ft widex 28.99ft. deep, approximately543.6 sq. ft. Theboathouseis
considereda nonconformingstructurebecauseit iscurrentlylocatedapproximatelytwo feet from the eastlot
line, whereasa six-foot setbackisrequired, andfour feet from the shoresetback, whereasfive feet isrequired.
Theapplicantisproposingto stabilizeandreconfigurethe foundationwall within the samefootprint. The
pouredconcretefoundationwill remain. TheexistingSmartsidelapsiding, cornertrim, gutter andfasciawill be
used, andadditionalmaterialwill beaddedto matchthe existingstructureandresidence. A roof deckand42”
tall cablerailingwith wood top will beinstalledon the roof of the boathousethat will alsomatchthe deckingof
the residence. Theoverheaddoorfacingthe lakewill bereplacedwith similar-type materialsto the existing
door. Thenewdoor will haveglassnot exceeding25% of the door arealocatedon the upperportion of the door
asillustratedon the buildingplan. A newsidedoor will be addedto the northwestsideof the boathouseto
matchthe materialsof the overheaddoor. Thewindowon the samesideof the buildingwill be replacedin-kind.
Hurrle Boathouse
PLANNING & ZONING LLC 2
In accordancewith Section52-201, nonconformingstructuresmayberepaired, maintained, renovatedor
remodeled. Theapplicantisproposingto makesignificantimprovementsto the boathouse. Theexisting
foundationandstructuralwallswill remain. Accordingto ScottHussinger, Cityof DelafieldBuildingInspector,
the existingboathouseroof framingisstructurallysubstandard. Therefore, the ceilingjoistswill needto be
replacedandmodifiedto supportthe structureandnewdecking. Accordingto the BuildingInspector,
conventionalroof framingstandardswill requirethe roof systemto beup to 6 inchestaller in certainareas. The
structuredoesnot otherwiseresultin a verticaladdition. Theroofingmodificationswill not resultin additional
wall height. Theoverallstructurewill continueto be lower than the boathouseon the adjacentpropertyto the
southeastthat islocatedapproximatelyfour feet from the sideof the subjectboathouse.
Theapplicantisalsoproposinga significantamountof landscapingwork that isunrelatedto the boathouse
improvements. Although, aspart of theseimprovementsthe applicantisproposingto directrooftop drainage
toward a drainfield locatedon the lakesideof the residencerather thaninstallinga rain garden. Section52-
25(b)(2) providesfor alternativestormwaterremediationmethods, providedthe CityEngineerreviewsthe
proposalandensuresthat it providesthe samelevelof environmentalbenefit asa rain garden.
LakeWelfareCommitteeprovidesa recommendationto PlanCommission. PlanCommissionis requiredto
considerthe location, architecturaldesign, color andmaterial to be usedandcompatibility with the principal
structure, rainwater remediation, buildingson adjacentproperties, the lakeshoresetting, andthe neighbors'
commentsandlakewelfare committee recommendations. Specificconsiderationshallbe givento the visual
impact of the boathousefrom the lakeandto anyobstruction by the boathouseto an adjacentproperty
owner'sview of the lake.
PossibleLakeWelfareCommitteeMotion: Recommendthat PlanCommissionapprovethe boathouse
improvementsaspresentedsubjectto the followingconditions:
1. Constructionof the boathouseimprovementsshallnot commenceuntil a Certificateof Complianceis
issuedby the CityPlanneranda BuildingPermitisissuedby the BuildingInspector. Theboathouseplans
preparedby CNChamblissArchitecture, LLC, andreviewedby the LakeWelfareCommitteeshallbe
compliedwith.
2. Theheightof the boathouseshallonlybemodifiedasdeemednecessaryby the Cityof DelafieldBuilding
Inspectorto complywith conventionalroof framingstandards.
3. In accordancewith Section52-25(b)(2), the CityEngineershallreviewthe stormwaterdrainfield and
ensurethat it providesthe samelevelof environmentalbenefit asa rain garden.
4. Anyconcreterepairand/or replacementbetweenthe boathouseandlakeshallbelocatedoutsideof the
floodplainunlessall necessaryfloodplainpermittingisobtained.
5. Nochangesshallbemadeto the existingtopographyof the sitewithout a gradingplanbeingreviewed
andapprovedby the CityEngineer.
0 7 8 8 0 1 8
67'
264'
87.50'
0 7 8 8 0 2 0
0 7 8 8 0 2 2
0 7 8 8 0 2 1
0 7 8 8 0 1 9
8
7
67'
130.66'
67'
254.
10'
84.15'
MILWAUKEEST
130.68'
1407 MILWAUKEE ST
1401 MILWAUKEE ST
1419 MILWAUKEE ST
1427 MILWAUKEE ST
Tax Parcel | DELC0788020
The information and depictions herein are for informational purposes and Waukesha County specifically disclaims accuracy
in this reproduction and specifically admonishes and advises that if specific and precise accuracy is required, the same
should be determined by procurement of certified maps, surveys, plats, Flood Insurance Studies, or other official means.
Waukesha County will not be responsible for any damages which result from third party use of the information and
depictions herein, or for use which ignores this warning.
Map Title
Legend
Site Address
Site Address Units
Tax Parcels
Assessor Plat Assessor
CSM CSM
Condominium Condomin
Subdivision Subdivisio
Focus Labels
Focused Pushpins
Focused Polygons
Focused Polygons ( Borders)
Override 1
Notes
7/1/2026 1:20PMPrintedDate:
SEWRPC, Waukesha County Land Information Office, Waukesha County LIS, Waukesha County Land Information Office ±
0 23 46 68 91
1inch equals 46 feet
BOATHOUSE RENOVATION
MILWAUKEE STREET
DELAFIELD, WI
CNC hambliss
Architecture, llc
T1
June 9, 2026
Review Set
Not for Construction
SCALE: 6" = 1'- 0"1 Boathouse Perspective
BOATHOUSE RENOVATION
MILWAUKEE STREET
DELAFIELD, WI
CNC hambliss
Architecture, llc
A1
June 9, 2026
Review Set
Not for Construction
3 4 5 6 7 8 9 10 11 12
12 RISERS ( 6 7/8")
EQ
UA
L
EQ
UA
L
6'-0" 3'-8"
1
A5
1
A3
1
A4
2
A3
EXISTING POURED CONCRETE FOUNDATION
13'
0
W
X
8
6
H
O
VERHEA
D
D
OO
R
JUSTIFIED TO EXTERIOR OF THE
EXISTING / RECONFIGURED
CONCRETEFOUNDATIONWALL: 2x6
WOOD STUDS AT 16" OC, w/ 1/2"
WATERPROOF INTERIOR BOARD, 1/ 2"
EXTERIORSHEATHING & LAPSIDING
TO MATCH EXISTING RESIDENCE
EXISTING BOATHOUSE
DN 2R
65" W x 48" H FIXED WINDOW 36" W x 80" H DOOR
SCALE: 1/ 4" = 1'- 0"1 Floor Plan
NORTH
BOATHOUSE RENOVATION
MILWAUKEE STREET
DELAFIELD, WI
CNC hambliss
Architecture, llc
A2
June 9, 2026
Review Set
Not for Construction
1
A5
1
A3
1
A4
2
A3
UP
13R
CONFIRM
w/ SITE)
DECK - MATCHEXISTINGATRESIDENCE
CABLERAILINGw/ WOOD TOPRAIL
FACEOF SHEATHINGBELOWSHOWNDASHED
GUTTER
SCALE: 1/ 4" = 1'- 0"1 Roof Plan
NORTH
BOATHOUSE RENOVATION
MILWAUKEE STREET
DELAFIELD, WI
CNC hambliss
Architecture, llc
A3
June 9, 2026
Review Set
Not for Construction
3"
6"
9'-
81/
2
1'-
4
EXISTING LAKESIDE GRADE
TOP OF BOATHOUSE SLAB
TOP OF ORIGINAL
WALL
TOP OF DECK
PROPOSED LAKESIDE GRADE
42"H CABLERAILw/ WOOD TOP
RAIL, TO MATCH EXISTING
GUTTER
DECK, TO MATCH EXISTING
FACSIA
CORNER TRIM, TO MATCH
EXISTING
LAP SIDING, TO MATCH
EXISTING
EXISTING /
RECONFIGUREDPOURED
CONCRETE FOUNDATION
TREADS & CLOSED RISERS,
TO MATCHDECK
MATERIAL
SCALE: 1/ 4" = 1'- 0"1 North / Lake Elevation
SCALE: 1/ 4" = 1'- 0"2 South Elevation
BOATHOUSE RENOVATION
MILWAUKEE STREET
DELAFIELD, WI
CNC hambliss
Architecture, llc
A4
June 9, 2026
Review Set
Not for Construction
RAISE EXISTING
HOSEBIB
42" H CABLE RAIL w/ WOOD
TOPRAIL, TO MATCHEXISTING
GUTTER
DECK, TO MATCHEXISTING
FACSIA
CORNERTRIM, TO MATCH
EXISTING
LAP SIDING, TO MATCH
EXISTING
CASING, TO MATCH
EXISTING
SILL & APRON, TO MATCH
EXISTING
WOOD
HANDRAIL
NEIGHBOR'S EXISTING
BOATHOUSE & RAILING
EXISTING /
RECONFIGUREDPOURED
CONCRETE FOUNDATION
EXISTING LAKESIDE GRADE
TOP OF BOATHOUSESLAB
TOP OF ORIGINAL WALL
TOP OF DECK
PROPOSED LAKESIDE GRADE
SCALE: 1/ 4" = 1'- 0"1 East Elevation
BOATHOUSE RENOVATION
MILWAUKEE STREET
DELAFIELD, WI
CNC hambliss
Architecture, llc
A5
June 9, 2026
Review Set
Not for Construction
37
42"H CABLERAILw/ WOOD
TOPRAIL, TO MATCH
EXISTING
GUTTER
DECK, TO MATCH EXISTING
FACSIA
CORNER TRIM, TO MATCH
EXISTING
LAPSIDING, TO MATCH
EXISTING
EXISTING /
RECONFIGUREDPOURED
CONCRETE FOUNDATION
TREADS & CLOSEDRISERS,
TO MATCHDECK
MATERIAL
SCALE: 1/ 4" = 1'- 0"1 West Elevation
299.
64'
0 7 8 8 0 1 4
68'
0 7 8 8 9 8 7
0 7 8 8 0 1 5
0 7 8 8 9 8 8
0 7 8 8 9 8 9
0 7 8 8 0 1 8
0 7 8 8 0 1 6
0 7 8 8 0 1 7
0 7 8 8 9 9 0
0 7 8 8 0 1 4
4
5
290.
40'
280.
57' 274.
71'<
87.50'
343.
20'
106.78'
42.66'
264'
263.
4'
34.04'
66'
63.03'
67'
27.72'
90.57'
66'
87.50'
49.17'
66'
228.
27'
382.
80' 33.96'
247.
5'
63.03'
66'
202.
7'
65.96'
MILWAUKEEST
0 7 9 7 9 4 2
0 7 9 7 9 4 3
07 9 7 9 4 2 0 0 1
0 7 9 7 9 9 2
0 7 9 7 9 9 1
1
250.
72'
479.
10'
68.27'
134.19'
420.
5'420.
50'
202.
89'
112.87' 90.57'
372.
64'
77.71'
78.45'
375.
75'
L a k e N a g a w i c k a
0 7 8 8 0 2 1
0 7 8 8 0 2 2
0 7 8 8 0 2 0
0 7 8 8 0 1 9
8
6
7
84.15'
254.
10'
130.66'
67'
80'
93.24'
62'
67'
0 7 9 7 9 9 3
0 7 9 7 9 9 4
0 7 8 8 0 2 4
0 7 8 8 0 2 3
0 7 9 7 9 9 6
91' 191'
229.
16'
246.
18'
286.
03'
80'
10'
54'
91.53'
82.40'
217.
6'130'
217.
6'130.68'
207.
6'
217'
192'
MILWAUKEEST
La k e N a g a w i c k a
La k e N a g a w i ck a
0 7 9 7 0 0 1
0 7 9 7 0 0 3
1
2
4
189.
5'
50'
190'
65'
50'
54'
25'
18.5'
NOTE:PARCELS797-026 THROUGH
0797-029 ANDPARCEL
0797-031
HAVEANINTERESTIN
LOT1
MAPOFDOUGLASPARK,
A ROADRIGHT-OF-WAY.
893
931
944
94
3
942
933
941
932
897
898
939
938
937
936934
894
891
929
928
926
92
7
92
4
922
923
921
919
917
918
914
912
907
896
913 908
902
911
91
6
899
906
909 903
904
901
892
930
940
935
895
925
920
890
910
915
90
0
905
1327 MAIN ST
1331 MILWAUKEE ST
1407 MILWAUKEE ST
1307 MILWAUKEE ST
1312 MILWAUKEE ST
1322 MILWAUKEE ST
1335 MILWAUKEE ST
1341 MILWAUKEE ST
1342 MILWAUKEE ST
1347 MILWAUKEE ST
1400 MILWAUKEE ST
1401 MILWAUKEE ST
1404 MILWAUKEE ST
1419 MILWAUKEE ST
1420 MILWAUKEE ST
1427 MILWAUKEE ST
1430 MILWAUKEE ST
1433 MILWAUKEE ST
1445 MILWAUKEE ST
1447 MILWAUKEE ST
1459 MILWAUKEE ST
0 60 120 180 240
ft
The information and depictions herein are for informational purposes and Waukesha County specifically disclaims accuracy in this reproduction and specifically admonishes and advises
that if specific and precise accuracy is required, the same should be determined by procurement of certified maps, surveys, plats, Flood Insurance Studies, or other official means. Waukesha
County will not be responsible for any damages which result from third party use of the information and depictions herein, or for use which ignores this warning.
Map Title Lake
Nagawicka
MILWAUKEESTAmericanLegionPark
Legend
Site Address
Site Address Units
Tax Parcels
Assessor Plat Assessor Plat
CSM CSM
Condominium Condominium
Subdivision Subdivision
Points of Interest
Index Contour Index Contour
Index Depression Index
Intermediate Contour Interme
Intermediate Depression Interme
RGB
Red: Band_ 1
Green: Band_ 2
Blue: Band_ 3
Focus Labels
Focused Pushpins
Notes
3/ 18/ 2026 1:39PMPrintedDate:
SEWRPC, WaukeshaCounty Land Information Office ±
I- 1
A N A\
ARDSCAP- AN
EXIST'
DR V_
5T
GARAG_
X
A
G
AY
G
EXISTI
LA\5CARI
3 BIG DADDY HOSTA
EX15TI
RE5 D.
22 CATLIN'S GIANT AJUGA
4 SUN KING ARALIA
I HILLSIDE BLACK
BEAUTY SNAKEROOT
2 LITTLE LIME PUNCH
HYDRANGEA
4 KAREN RHODODENDRON
EX15TI
DEC
I QUAKING ASPEN
CARADONNA SALVIA
2 FLOWERING QUINCE
3 CHOCOLATE JOE PYE WEED
8 BEVAN'S GERANIUM
10
GATEWAYJOYPYE
CHOKEBERRY
DD
ALVIA
18PURPLE2DRNGAONNAGONLAMIUM
CE
3 BOWL OF BEAUTY PEONY
7 KAREN RHODODENDRON
3 PALACE PURPLE CORAL BELLS //
17 SUNDROPS PRIMROSE
I (
j
14 JUNE FEVER HOSTA
0 PRAIRIE DROPSEED
4 ANNABELLE HYDRANGEA
L
EXISTING PIER
LAKE
EX15T1v
GARAG
EXI5T1\
DRIV_^ AY
a
EXISITNG FENCE
LOCATION DUE
TO TREE
ISTI\G
LA\SCA°I\G
RELOCATED FENCE
EXISTING FENCE LOCATION
EXI51 I\
RESID=
EXIST
DECK
STORMWATER DRAIN FIELD
804'0" - TOP OF DRAIN FIELD
801'0" - BOTTOM OF DRAIN FIELD
4" OVERFLOW EMITTER
3'X12'X2.5' DEPTH DIMENSIONS
3 STONE WRAPPED IN GEOTEX.
7-g30
PERCENT POROUSITY ASSUMED
APROXIMATEY 27 CF CAPACITY
0
DIRECTION OF SURFACE WATER FLOW
OUTCROPPING ACCENT
X 807&-
SiG7'4" -
5'8""_,,
X 80'
i
DRY LAID PAVER PATTERN ' A
DRY LAID SOLDIER COURSE
WALL MAX HEIGHT 2'3" //
DRY LAID FLAGSTONE ,/
3 STONE STEPS 7" HEIGHT X 12" DEPTH X SEE WIDTH
DRY LAID FLAGSTONESTEPPER TYP.
3 STEPS 7' HEIGHT X 4' WDITH X' 12" DFFTH
OUTCRO3PSTEPS7`LHEIAHT XI4' WDTI- I2" D pTHOUTCROPPINGWALL MAX I -EIGHTI'
804'3"
STEPS TO ROOF DECK -
REFER TO ARCHITECTURAL PLANS
4" SCH 35 PVC BDS TO DRAIN FIELD
OUTCROPPING WALLS MAX HEIGHT I'0"
3 STEPS 7" HEIGHT X 3'5" WDITH X 12" DEPTH
3 STEPS7''INHEIHALLS38'XWIH
HEIGHT
12" DEPTH
TREE Al -IS BEEN REMOVED
BRING FENCE INLNE - ADJUSTMENT APPROXIMATELY v.
MATCH EXISTING FENCE STYLE:
3cf POST HEIGHT
36" PICKET HEIGHT
3 1/4" PICKET WIDTH
2" OPENING
i
35' SETBACK
MEANDER LINE
CONCRETE PAD TO BE REMOVED
STEPS INTO THE LAKE - 4' WIDTH
EXISTING ROCK SHORELINE
EXISTING CONCRETE
EXISTING PIER
REPLACE EXISTING CRACKED CONCRETE
X 800'0" WATER LEVEL
FLOODPLAIN - 800'0" NAVD88 per FEMA
800'5"
BOATHOUSE RENOVATION BY OTHERS -
REFER TO ARCHITECTURAL PLANS
LAKE
0T-5
ill plan values ame appmx'nna ve and are
or Ce purpose o- suggennedolacement.
Inor a tma ions o^ the plan nnay be
CL,ured dump cols nc ion to obna'n
Cal CPal cnaracmer, as o
nnaxinn'ze - ne ' a fa led
nundscope, and c en
cold:joins obse
All elegnea s o
exac eggneer'
0 q ual'2'ed cer
o a.asalla
All pan
appmoved
All mod co
led
uuell as
egr*y of ne ins
void any incelemr
wed,
ne pan - la_
np snould be co
Ied person p-'
sees a nd ypes gnus
n cl'e
CaF
n p -'or one
0 var'ety a mUs
Ding Persons°
Sl opop can no be
and cormec-less of
ne above plan, TPia als \ Csmy Ps go-
ne controc ing company used 20
ns allat'on, or i= ala's \- seey is
con nrac red ^ o- pmojec n supem'son,
r2'rope- gnus be a a'neo by
con - ac
ors_and subcon racCP,
COP'R S \ C Co n s uuorn is
copyr gn ed as pmscr'wd by lows
ne C\ed code, y\le 7, — nis
was publisnedon no PC/2C
n's plan is owned by -Iola's CCery T
Gceden Snop no and sna l only be
mans - erred upon = ull poynne
and uur ten no ice,
15 0
be clo- , o con
Piola's \ urseyy T Pa
no d Poole Fm puali y
J
u - e
mp e ed by
or o
be
ns allan
ad size
non
piala
SINCE1978
C
Nursery
Garden Shop, inc.
Planting • Design
Construction
n
No.
REVISIONS
Date Description
V
CAP P A
RR_
9E\
414 cea1-2700
407 " ilwoukee St
D lcA-Fi ld, wl NNO1
J
SCALE
DRAWN BY
Bk TO
CHECKED BY
P ED C
DATE
DATE OF PRINT -/
6/2
J
PROJECT NO.
SHEET NO.
J
PLAT OF SURVEY
BEING THE SOUTHEASTERLY 1/2 OF LOT 6, GRAHAM PARK, LOCATED IN THE SOUTHEAST
1/4 OF SECTION 17, TOWNSHIP 7 NORTH, RANGE 18 EAST, CITY OF DELAFIELD,
WAUKESHA COUNTY, WISCONSIN.
SURVEY FORSURVEYOR
TED R. INDERMUEHLE, PIS, S-3119
501 MAPLE AVE.
DELAFIELD, WI 53018
414-949-8919
TINDERMUEHLE@SEHINC.COM
DAN AND BETH HURRLE
1407 MILWAUKEE ST.
DEI.AFIET D, WI 53018
TOTAL LAND AREA TO WATERS
EDGE = 15,149 SQ. FT.
NOTE: THE FIELD WORK WAS
DONE ON MARCH 10, 2017.
SCALE : 1"=30'
TIMBER WALL
RUNS ALONG
THE LOT LINE
BLOCK
RET. WALL
0h,
ti
LEGEND
1" DIA. IRON PIPE FOUND,
UNLESS STATED OTHERWISE.
O — 5/8" DIA. REBAR SET, 1.04
LB/Fr., 18" LONG
SURVEYOR'S CERTIFICATE:
I HEREBY CERTIFY THAT I HAVE SURVEYED THE ABOVE DESCRIBED PROPERTY AND THAT THE
ABOVE MAP IS A TRUE REPRESENTATION THEREOF AND SHOWS THE SIZE AND LOCATION OF THE
PROPERTY, ITS EXTERIOR BOUNDARIES, THE LOCATION OF ALL VISIBLE STRUCTURES AND
DIMENSIONS OF ALL PRINCIPAL BUILDINGS THEREON, BOUNDARY FENCES, APPARENT EASEMENTS,
ROADWAYS, AND VISIBLE ENCROACHMENTS, IF ANY.
Zlard" t 3, z-0 1 7
NACAWickALAKE
ROCK SHORELINE
cb'
BUILDING
1.9•
CHISELED CROSS
FOUND
CONC. LIES 1.4'
SOUTHERLY OF
THE LOT LINE
O
G) O
4v<v
4. 140y
n
Ar^• ,,,,,,,,,,,
E]
THIS SURVEY IS MADE FOR THE USE OF THE PRESENT OWNERS OF THE PROPERTY, AND ALSO THOSE
WHO PURCHASE, MORTGAGE, OR GUARANTEE THE TITLE THERETO WITHIN ONE ( 1) YEAR FROM DATE HEREOF. PROJECT NO. 141139
1
Mike Hausman
Subject: FW: [External] Nagawicka Treatment
From: Lakeland Bio, Kyle Schmit <kyle@lakelandbiologists.com>
Sent: Wednesday, June 17, 2026 9:04 AM
To: Tom Hafner <thafner@cityofdelafieldwi.gov>
Subject: Nagawicka Treatment
Hi Tom,
Lake Nagawicka Post-Treatment Inspection Report
A post-treatment inspection was conducted to evaluate the effectiveness of the 2026 aquatic plant
management program targeting Curly-Leaf Pondweed (CLP) and Eurasian Watermilfoil (EWM).
Overall, all treatment areas were highly successful. Both Curly-Leaf Pondweed and Eurasian
Watermilfoil have been effectively controlled throughout the treated portions of the lake. Below are
some key takaways.
Bark River Inlet
The Bark River inlet is now dominated by native Elodea, which has become the primary aquatic plant
species present. Targeted invasive species control was successful, and the remaining vegetation
provides beneficial fish and wildlife habitat while maintaining water quality.
Gazebo Bay
Historically, Gazebo Bay has supported dense growths of both Eurasian Watermilfoil and Curly-Leaf
Pondweed. During this inspection, no Eurasian Watermilfoil was observed, which is an excellent
indication that the management program continues to suppress this invasive species. The Curly-Leaf
Pondweed that was present earlier in the season is now dead and has largely broken down, leaving the
bay in significantly improved condition.
Hammerhead Bay
Hammerhead Bay has been restored to a navigable waterway following treatment. While some native
Sago Pondweed remains present, both Curly-Leaf Pondweed and Eurasian Watermilfoil have been
successfully controlled. The remaining native vegetation is beneficial and does not currently impede
navigation.
Summary
The 2026 treatment program has provided excellent control of both Curly-Leaf Pondweed and
Eurasian Watermilfoil. Native plant communities are becoming more prevalent in several areas,
particularly within the Bark River inlet, while historically problematic areas such as Gazebo Bay and
Hammerhead Bay have shown substantial improvement. Continued monitoring will ensure invasive
species remain at manageable levels and that native plant communities continue to recover.
Thank you,
2
Kyle Schmit
Lead Biologist
Lakeland Biologists, LLC
262-522-2822 Office
262-527-6010 cell
www.lakelandbiologists.com
Follow Us
Source: City of Delafield website. First collected Oct 7, 2026.