PROPOSED FUNDING PLAN 2024 Capital Budget GENERAL FUNDING GOALS • Maintain our current annual debt levy of approximately $2.5 million • Maintaining a steady debt levy is a key component of our long-term financing goals • Utilize all net new construction and five year carryforward to support the SAFER grant and fund additional street projects • Fund stormwater management program by implementing a Stormwater Utility fee RECOMMENDED FUNDING SUMMARY (for the proposed 2024 Capital Budget) New GO Debt Other Impact Fees SAFER Levy T otal Public Works/Transportation/Parks (10-year tax levy debt) $2,550,000 $1,050,000 - $3,501,000 $7,101,000 Water Utility (20-year debt paid from user charges) 5,150,000 - 805,000 - 5,955,000 Sewer Utility (paid from user charges) - 1,145,000 215,000 - 1,360,000 Storm Utility (20-year debt paid from user charges) 660,000 - - - 660,000 Municipal Facilities (Fire Station #3) 3,252,000 - 748,000 - 4,000,000 Other (Centennial Plaza) 265,000 250,000 - - 515,000 T otal Proposed 2024 Capital Budget $11,877,000 $2,445,000 $1,768,000 $3,501,000 $19,591,000 b a – Includes $550k future contribution from Waste Management b – $650k American Rescue Plan funding; $400k WI DOT LRIP funds c – Sewer cash on hand d – $200k T ourism cash on hand; $50k WEDC Grant c d a 2024 DEBT BORROWING • 2024 Proposed Capital Budget • $2,000,000 Capital Projects • $5,150,000 Water Utility • $3,252,000 Fire Impact Fees • $660,000 Storm Utility • $550,000 Future Waste Management contribution for County Line Road • $265,000 T ourism funding • 2024 Additional Debt Borrowing • $2,000,000 Municipal Facilities Fund 605 (borrow for capital outlay > $250k) • The 2024 Budget provides for the following capital outlay: Public Works Tympco Street Sweeper 320,000 Public Works 5yd Dump - Plow/Wing/Sander 255,000 Public Works 5yd Dump - Plow/Wing/Sander 255,000 Public Works Caterpillar 3 yd Loader 249,000 Public Works Ford F550 92,000 Public Works 1 Ton Dump 74,000 Public Works Deck Tilt Trailer 52,000 Public Works Chevy 1500 45,000 Public Works Diamond Groomer 32,000 Fire Department Engine 1,000,000 Fire Department SCBA AFG Match 55,000 Clerk Services Remodel 100,000 Library Remodel 150,000 Engineering Remodel 180,000 Police Body Cameras Grant Match 16,000 2,875,000 2024 CAPITAL BUDGET AT A GLANCE 1/7/2024 VILLAGE PROJECTS Approved Crucial Declaration Project # DESCRIPTION Life COST EXPLANATION to Recommend of Intent by Must Do Operations VB on file In order to reduce potential hazards to pedestrians and to minimize the exposure of the Village to liability for personal injury, the 2024 Sidewalk Replacement Program 10+ $100,000Village has initiated an on-going program for inspection of existing sidewalks and for repair or replacement ofdefective sidewalk sections.X This proposed project is part of the Village’s on-going program to replace defective curb and gutter and repair defective concrete 2024 Curb & Gutter Program 10+ $80,000 pavements in the Village. The Village initiated the curb and gutter replacement program several years ago in conjunction X with the Sidewalk Replacement Program and has continued this annual program focusing on the most defective and deteriorated curb and gutter sections each year on a rotating basis throughout the curb and gutter areas of the Village. The Village also as part of this program replaces of defective concrete pavement on roadways that are maintained by the Village. The Village maintains several miles of concrete pavement and sections of the pavement have deteriorated to a point that replacement is necessary. This proposed project is part of the Village’s on-going program to install storm sewer that addresses areas 2024 Storm Sewer Program 20+ $100,000 of existing roadways that do not drain properly, need storm sewer and to alleviate sump pump icing issues. X As part of the 2024 Asphalt Paving Program the Engineering Department typically uses two funding sources the Department of Public 2024 Asphalt Paving Program 10+ $2,646,000 Works Operating Budget and the Capital Budget. The first being a portion of the $800,000 that the Village Board has appropriated toX the Department of Public Works 2024 Operating Budget for replacement of deteriorated pavement and the second being the $600,000 that is being asked for as part of this Capital Budget. This year as part of the 2024 Operating Budget there was additional funding allocated as part of the SAFER Levy for the purpose of performing additional roadway repaving and maintenance. The Asphalt Paving Program consists of the Repaving and Overlaying of existing asphalt pavement on Village streets that have deteriorated to such a level that routine maintenance is no longer effective. In doing this work it will extend the serviceable life of the roadway for a minimum of approximately 10 years. If this work is not done the asphalt pavement on Village streets will continue to deteriorate to a level where the entire roadway will need to be replaced and this reconstruction will cost significantly more in the future. The Village also performs roadway maintenance in the form of micro sealing and crackfilling using the Department of Public Works Operating Budget. The Village of Menomonee Falls approved the Project Agreement between the Wisconsin Department of Transportation and the 41238 Menomonee Avenue Reconstruction 20+ $350,000 Village of Menomonee Falls for the reconstruction of Menomonee Avenue between Town Hall Road and Appleton Ave (STH 175) X Appleton Ave to Townhall Road on July 20, 2020 and a Revised Project Agreement on August 1, 2022. These Project Agreements are for the design and construction RIGHT-OF-WAY only for the Reconstruction of Menomonee Avenue from Town Hall Road to Appleton Avenue (STH 175) as part of the WDOT STP- Urban project which provides an 80% Federal/20% Local split of project costs. With the Design being 60% complete and the project timeline being that the project will be let in Nov of 2024 it is necessary to acquire the needed rights and interests in the parcels of property for the reconstruction of Menomonee Avenue. The Village Board on November 6, 2023 approved the Resolution for the Relocation Order for the Reconstruction of Menomonee Avenue which identifies the interests in the parcels of property identified on the Plat that are needed for the project. This is in accordance with the Wisconsin State Statutes. With the revised project agreement being for design and construction only the acquisition of any needed rights and interests in property is to be funded by the Village at 100%. There are 78 parcels with 2 small fee acquisitions, 3 permanent easements for storm sewer and the remaining at temporary easements for driveways, grading and sloping. This project would consist of the replacement of the Campell Drive Bridge over the Butler Ditch. Campbell Drive is a local road in an industrial Campbell Drive Bridge 20+ $50,000 park in the SE Corner of the Village of Menomonee Falls and the Campbell Drive Bridge is just 1,500 feet downstream of the Overview Drive X Culvert Replacement over Butler Ditch Bridge which is currently in design for replacement under the same program. DESIGN The Campbell Drive Bridge is over the Butler Ditch and consists of 3 large diameter corrugated metal pipes with Lannon stone headwalls and wood beam guard for guard rails. Since the culverts are CMPs the flow line of all three of the culverts have corrosion with rust in all cells at the flow line. The deterioration is not to the level of the Overview Drive Bridge but is not far behind when the flow line is rusted through and backfill material has begun to create sinkholes behind the headwall. The Village DPW is planning on performing temporary repairs to ensure the corrugated metal culverts do not deteriorate any further. With the condition of the culverts, the undermining of the culvert and the amount of flow along the Butler Ditch these culverts need to be replaced, the Village is proposing to use 3 - concrete culvert pipes or if more cost-effective poured in place box culvert. The existing structure has a current sufficiency rating is 40.4. The Village entered into a State Municipal Agreement with the WDOT to reconstruct this bridge on September 5, 2023. Once approved the Village will begin soliciting for a design consultant so that the design will be underway in 2024 with Right-of-way in 2025 and construction scheduled for 2026. This project consists of the design of the resurfacing or Appleton Avenue from 124th Street to St Francis Drive. The Village approved a Project Appleton Avenue Resurfacing 20+ $400,000 Agreement with the WDOT on September 5, 2023. STH 175 (Appleton Avenue) is considered to be a Connecting Highway which meansX 124th St to St Francis Drive that the State owns the roadway and it functions as a State Highway but the Village Maintains and Permits the roadway as if it were DESIGN a Village Roadway. The Village receives Connecting Highways funds from the State to offset the maintenance the Village performs such as plowing, stripping, pavement replacement, ect. When the roadway is in need of more work than just maintenance the WDOT assumes responsibility for the project and works with the Village to improve the roadway. The WDOT oversees the project and for the Design the cost Share is 75% State/25% Local and for the Construction the cost share is 100% State with the Village paying for any Village requested work such as Sanitary Manhole Rebuilds, storm sewer upgrades, parking, ect. The Right of Way acquisition is handled by the Local municipality but 100% reimbursed from the WDOT. The asphalt along this section of STH 175 (Appleton Ave) is showing its age and has some deterioration beginning along the entire length that maintenance will not be able to fix. The WDOT would like to begin the design process for the resurfacing of this section of STH 175 (Appleton Ave) which will take several years to complete. The Schedule is to begin design next year and complete in 2026 with acquisitions being in late 2026 to 2027 with Construction in 2029 to 2030. This is a 4.33 mile section of roadway which for most of its length is 4 lanes with a large amount of traffic, businesses and accesses. This is a complicated project that affects a lot of properties and travelers which necessitates the need for the long timeframe from initial design to construction. This project consists of the design and construction of Wheeler Drive from Rozanne Drive to Menomonee River Parkway. The reconstruction Wheeler Dr - Rozanne to Men River Pkwy20+ $1,990,000 will include a relay of the existing water main with appurtenances, reconstructing of the sanitary sewer manholes, relaying of sanitary X Wm Relay, San Lat, Storm Sewer & Street Reconst laterals, removal and replacement of the curb & gutter and driveway approaches and removal and replacement of the base course DESIGN & CONSTRUCTION and asphalt pavement. With this project the Storm Sewer that currently runs behind the homes on the east side of Wheeler will be moved into Wheeler and properly sized. The existing storm sewer is undersized and located close to homes, under sheds and electrical poles making it virtually un-maintainable. This project will also be constructing a water quality pond along Menomonee River Parkwy adjacent to the Menomonee River to begin treating the storm water runoff in accordance with the Village’s MS-4 Permit. This was presented as part of the creation of the Village’s Storm Utility. County Line Road (CTH Q) is an arterial roadway in the north east part of the Village of Menomonee Falls on the boarder with the Village County Line Road Reconstuction 20+ $2,055,000 of Germantown. The current ADT was taken in May of 2018 with a count of 5,000 cars a day with about 5 percent trucks. This roadway is X STH 145 to Boundary Road located between several Waste Management properties that consist of an active landfill, closed landfill, compositing operation and a newly CONSTRUCTION constructed garbage truck depot. The new garbage truck depot dispatches trucks to surrounding communities in Southeastern Wisconsin. Lastly, Waste Management has relocated their main driveway to the landfill that haulers and residents use from Boundary Road to County Line Road due the approved landfill expansion along Boundary Road. This has added a significant increase in traffic, turning movements and trucks using this section of County Line Road. This project consists of the reconstruction of County Line Road from STH 145 to Boundary Road. The pavement in this section deteriorated to such a level that the rutting and potholes are not being able to be maintained. The reconstruction will consist of pulverizing the existing pavement and the addition of new ¾ inch Crushed Limestone to bring the base up to 16 inches thick and then 6 inches of heavy-duty asphalt will be installed for the entire length. Lastly at the entrances to the Waste Management facilities on the north and south side of County Line Road curb & gutter medians will be installed to create safe turning lanes for the traffic using the families. The Village applied for and received a reimbursable grant from the WDOT from the Local Road Improvement Program in the amount of $400,000. The Village has also received a commitment from Waste Management for $550,000 which is the estimate to construct the new turn lanes into the Waste Management Facilities. This project consists of the construction of a new 8 inch water main to replace the existing 6” water main and appurtenances in Dardis Dardis Ave - Jacobson Dr to Ann Ave 20+ $1,125,000 Drive from Jacobson Drive to Ann Avenue. The existing 6” water main will be replaced with an 8” water main due to the age and material X Water Main & San Lateral Relay of the water main. The existing water main is sandcast and has reached the end of the useful service life. CONSTRUCTION The Sanitary Laterals will be replaced as part of the MMSD’s Private Property Infiltration and Inflow Reduction Program. The work will consist of canvasing 30 residents on Dardis Drive to participate in the sanitary sewer lateral replacement program. Replacement will consist of open cut trenching with a full pipe replacement up to the home if the homeowner determines they would like to participate in the program. Otherwise, the laterals will be replaced from the main line to the lot line. This will reduce the infiltration into the Village’s sanitary sewer system from leaky sanitary laterals. This project consists of the Construction of a water to replace the existing 16” water main and appurtenances in Menomonee Avenue Menomonee Ave - Appleton to Town Hall 20+ $4,360,000 from Appleton Avenue to Town Hall Road. This water main replacement project is being complted in advance of the reconstruction X Wm Relay of Menomonee Ave that the Village & WDOT will be undertaking in 2025. CONSTRUCTION The water main was originally installed in 1959 and is made of old sandcast ductile iron. With the roadway being replaced in this section, the water main nearing the end of its useful life and that this 16” water main is an important east-west link in the Village’s water system, it is in need of replacement. There are several Sanitary Laterals will be replaced as part of the MMSD’s Private Property Infiltration and Inflow Reduction Program. The work will consist of canvasing 30 residents along Menomonee Ave to participate in the sanitary sewer lateral replacement program. Replacement will consist of open cut trenching with a full pipe replacement up to the home if the homeowner determines they would like to participate in the program. Otherwise, the laterals will be replaced from the main line to the lot line. This will reduce the infiltration into the Village’s sanitary sewer system from leaky sanitary laterals. In the fall of 2023 the Village updated the Sanitary and Water Studies for the west side of the Village which were done in 2009 and 2014 Well #11 - Deep Well - Silver Spring 20+ $140,000 respectively. The West Side Sewer and Water Study analyzes the existing sanitary and water systems and evaluates several alternatives X DESIGN for providing water and sewer service to undeveloped lands throughout the western portion of the Village of Menomonee Falls. Future sewer flows and water demands for the study area were forecasted for 5 years, 10 years, 20 years into the future, as well as for full build-out of the lands that are currently undeveloped. As the western portion of the Village of Menomonee Falls continues to develop, additional water supply (wells) will be required before build-out. The rate of growth of the area will directly relate to the time the facilities will be required. The analysis of historical pumping data yielded the average day and maximum day pumpages in the southwest service area were 420,000 GPD and 1,260,000 GPD, respectively. Currently wells #8 capacity is 1.01 MGPD & #9 is 2.02 MGPD but they have to be used together for blending due to radium in Well #9 which is a deep sandstone well so the capacity of both is 1.01 MGPD. The only other well on the west side is well #10 whose capacity is 0.72 MGPD. So with all three wells running and existing storage the Village can meet maximum day but if well #8 or #10 would go down the Village may experience a shortfall. The study recommends several options which includes searching for additional wells but also constructing a deep sandstone well adjacent to Well #10 to provide additional capacity. This project is for the design of a new deep well and the necessary approvals from the WDNR and PSC (Public Service Commission). This project is eligible for 75% water impact fees as detailed in the Village of Menomonee Falls Public Facilities Needs Assessment and Impact Fee Study Update approved on July of 2023. The project consists of the design and installation of Fiber Optic network communication facilities between the Village of Menomonee Menomonee Ave Fiber Extension 10+ $300,000 Falls Municipal Building and Well/Reservoir #5 located along the west side of Town Hall Road south of Menomonee Avenue. Under this X Village Hall to Well No 5 project, installation of these fiber optic facilities would be completed within Menomonee Avenue in advance of the future reconstruction of DESIGN & CONSTRUCTION Menomonee Avenue between Appleton Avenue and Town Hall Road scheduled for the Summer of 2025. This fiber-optic installation will provide improved communication between the SCADA (Supervisory Control and Data Acquisition) system and remote utility facilities located along this route, including 2 Sanitary Sewer Lift Stations and Well/Reservoir #5. SCADA system components are deployed in the field to gather real-time data and to enhance system automation and control. This fiber connection will improve communication allowing Utilities Staff to reliably monitor and communicate remotely with the pumps and other telemetry, as well as monitor for any malfunctions at these remote locations through the SCADA system located at the Utilities Building on Margaret Road. Once installed, a fiber optic connection is the most reliable and secure communications system currently developed; more reliable than a cellular or radio frequency connection. Intermittent disruptions can occur with radio and cellular connections because of weather, tree foliage, or destructive incidents that may occur above ground to these other communication facilities. The project consists of the design and installation of Fiber Optic network communication facilities between the existing Fiber Optic cable in TownLine Road Fiber Extension 10+ $210,000 Augusta Pkwy. and Utility facilities along Bella Vista Drive. This fiber optic extension will connect a new Sanitary Sewer Flow Meter and a new X Augusta Prkwy to Bella Vista Dr Water Booster Station for the Bella Vista Development to our Utility SCADA (Supervisory Control and Data Acquisition) system. DESIGN & CONSTRUCTION Reliable communication between the Utility SCADA system and the Bella Vista sanitary sewer flow meter and water booster station located along this route is critical to proper control and operation of these remote Utility facilities. SCADA system components are deployed in the field to gather real-time data and to enhance system automation and control. This fiber connection will provide reliable communication allowing Utilities Staff to monitor, control and communicate remotely with the pumps, meters and other telemetry, as well as monitor for any malfunctions at the remote locations through the SCADA system located at the Utilities Building on Margaret Road. This project consists of the design of Phase II of Aero Park Community Park located in the Northeast Corner of the intersection of Lisbon Aero Park - Community Park - PHASE II 20+ $80,000 Road and Lannon Road. Phase I consisted of the mass grading of the site along with grass, wetland and prairie restoration, asphalt path along X DESIGN with sections of mowed trails and a boardwalk section, stoning the proposed parking lot and installing trees around the park. Phase II currently would consist of constructing the park road with water main and storm sewer from Lannon Road which would connect to the Tamarind Subdivision to the south. The parking lot that was stoned in phase I would be paved and installation of a new play structure. This project was included in the Village of Menomonee Falls Public Facilities Needs Assessment and Impact Fee Study Update approved on July of 2023. The project consists of the design and installation of security cameras and recording equipment to capture video in order to deter Village Park - Security Camara System 10+ $140,000 vandalism, tagging and other undesirable or illegal activities within Village Park. X DESIGN & CONSTRUCTION On-site video recording systems would not have the ability for real-time, live monitoring of security camera feeds. This project also includes investigation of various options, costs and possible installation of fiber optic cable connecting these Village Park security cameras with Village Hall. This fiber optic connection would allow the Police Department to monitor the security camera feeds coming from Village Park in real-time. This live monitoring could be of significant value should an emergency situation develop at Village Park. Cost sharing for this fiber optic cable with the Water Utility may also be available if the existing water booster station at Garfield Drive and Appleton Avenue is also connected to the Village Hall fiber run as part of this project. This project consists of the reimagining of Centennial Plaza which is a three-decade old space as a community destination in the heart Centential Plaza Renovation 20+ $515,000 of Menomonee Falls. The project will add shade structures, landscaping, lighting, and site amenities that will make the space more welcoming, X DESIGN & CONSTRUCTION and provide improved access, vendor space, a performance platform, and electricity to support a wide variety of events. The goal is to support the ongoing revitalization of our downtown by making Centennial Plaza a place that people want to be. As a more inviting and programmable space, the plaza will ultimately attract and retain visitors, residents, and employees in our community. The project includes the installation of a 1,650 square foot concrete vendor area, a small platform performance stage and shelter, a custom curved shade structure, a new landscape area, picnic table seating, redesigned lighting, a perimeter bollard system, electric service upgrades, curved block seating, and public art installations. This project consists of the design and construction for the relaying of 2 existing water mains and 1 sanitary sewer line between Rozanne Main Street - Rozanne to Fond du Lac 20+ $705,000 Dr and Fond du Lac Avenue. The new 12 inch water main will replace 2 existing 8 inch water mains installed in the 1950’s and the sanitary X Sanitary & Water main Relay relay will abandon a section of ex 8 inch sanitary sewer installed in 1959. This project is being proposed as part of the redevelopment DESIGN & CONSTRUCTION of several properties long Main Street and will provide adequate flow and fire flows to the new development as well as move the water main and sanitary sewer into the Main Street ROW so the Village’s existing easements can be vacated. This project is eligible for 100% water and sanitary sewer impact fees in accordance with the Village of Menomonee Falls Public Facilities Needs Assessment and Impact Fee Study Update approved on July of 2023. This project consists of the Design of a new culvert/bridge to replace the existing corrugated metal arch culvert with lannon stone headwalls Menomonee Ave Culvert Replacement 20+ $145,000 and metal guard rails over the Fox River on Menomonee Avenue just east of Main Street and the bugline trail. The existing corrugated culvert X 200 feet East of Main Street by Bugline Trial is in poor condition and the guard rail on the north side of the structure has been hit by a car causing the guard rail to break free and the DESIGN lannon stone head wall to begin to tip and fail. As part of the design the Village will analyze several different structures for cost, constructability, current flows on the Fox River as well as meet current design standards. This project consists of the design of a water quality pond on the property owned by the Village adjacent to Arthur Avenue along the Arthur Avenue MS-4 Pond 20+ $100,000 Menomonee River. There are 102 acres of residential and commercial properties whose storm water runoff drains through the storm sewer X Arthur Ave & Men River system that enters the Menomonee River in this location. The Village’s MS-4 permits requires that the Village reduce the pollutants DESIGN (sediment & Phosphorus) from the storm runoff prior to entering the rivers and streams in the Village. This was presented as part of the creation of the Village’s Storm Utility. On March 6, 2023, the Village Board adopted a Resolution Accepting a Staffing for Adequate Fire and Emergency Response (SAFER) Fire Station #3 Addition & Renovation 20+ $4,000,000 Grant from the Federal Emergency Management Agency. The SAFER Grant is being used by the Village to hire fourteen (14) additional X CONSTRUCTION full-time firefighters to enhance the safety of the public. In order to accommodate these additional firefighters, an addition and renovation of Fire Station No. 3 is necessary. The project consists of an addition off of the back of Fire Station No. 3 for seven (7) firefighter bunk rooms along with the renovation of existing interior space for bathrooms and showers including two (2) relocated Officer's Suites. The project also includes renovation of the basement level to accommodate a relocated fitness room, relocated gear storage and relocated EMS storage. 19,591,000 VILLAGE OF MENOMONEE FALLS PROPOSED FIVE YEAR CAPITAL PLAN 2024-2028 1/9/2024 Proposed Proposed Proposed Proposed Proposed 5 Year Description 2024 2025 2026 2027 2028 Total VILLAGE PROJECTS Asphalt Paving Program $2,646,000 $1,681,000 $1,696,000 $1,736,000 $1,955,000 $9,714,000 Curb & Gutter Program $80,000 $100,000 $100,000 $100,000 $100,000 $480,000 Sidewalk Replacement Program $100,000 $150,000 $150,000 $150,000 $150,000 $700,000 Storm Sewer Program $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Aero Park - Community Park $80,000 $915,000 $80,000 $270,000 $1,345,000 Ann Ave - Shady Ln to Sheridan Dr - WM Relay, San Lats, Storm Sw & Street Recon $1,196,000 $1,196,000 Ann Avenue - Jacobson to Hiawatha - WM Relay, San Lats, Storm Sw & Street Recon $1,355,000 $1,355,000 Appleton Avenue Resurfacing (124th St to St Francis Drive) $400,000 $400,000 Arthur Avenue MS-4 Pond - Arthur Ave & Men River $100,000 $580,000 $680,000 Campbell Drive - Culvert Replacement over Butler Ditch $50,000 $270,000 $425,000 $745,000 Centential Plaza Renovation $515,000 $515,000 County Line Road Reconstuction - STH 145 to Boundary Road $2,055,000 $2,055,000 Dardis Ave - Ann Ave to Men Ave - WM Relay & San Laterals $590,000 $590,000 Dardis Ave - Jacobson Dr to Ann Ave - WM Relay, San Lats, Storm Sw & Street Recon$1,125,000 $790,000 $1,915,000 Duke Street - Melanie to Queensway - WM Relay, San Lats, Storm Sw & Street Recon $1,530,000 $1,530,000 Elmwood Drive - Shady Ln to Hoyt Dr. - Water main Relay $425,000 $425,000 Fire Station #3 Addition & Renovation $4,000,000 $4,000,000 Grand Avenue - Bugline to Woodlawn -WM Relay, San Lats, Storm Sw & Street Recon $2,900,000 $2,900,000 Graysland Drive - Storm Sewer and Drainge $355,000 $355,000 Hiawatha Dr - Mary Ct to Men Ave -WM Relay, San Lats, Storm Sw & Street Recon $1,665,000 $1,665,000 Hillcrest Dr - Shady to Sheridan - WM Relay, San Lats, Storm Sw & Street Recon $845,000 $845,000 Hoyt Drive - Roosevelt Dr to Main St - Water main Relay $250,000 $250,000 Jacobon Dr - Ann Ave to Men Ave - WM Relay, San Lats, Storm Sw & Street Recon $755,000 $770,000 $1,525,000 Kings Highway - Pilgrim Rd to Rozanne Dr - WM Relay $1,090,000 $1,090,000 Lavergne Ave - Men Ave to Ann Ave - WM Relay & San Laterals $466,000 $466,000 Lepper Dam Repair Project $435,000 $435,000 MacArthur Dr - Park Building to Schlafer Dr. - Water main Relay $830,000 $830,000 MacArthur Dr - MS-4 Pond & Storm Sewer - Men Ave to Rotary Park $62,000 $1,030,000 $1,092,000 Main Street - Rozanne to Fond du Lac - Sanitary & Water main Relay $705,000 $705,000 Menomonee Ave - Appleton to Town Hall - Wm Relay & San Laterals $4,360,000 $4,360,000 Menomonee Ave Culvert Replacement - 200 feet East of Main Street by Bugline Trial$145,000 $455,000 $600,000 Menomonee Ave Fiber Extension - Village Hall to Well No 5 $300,000 $300,000 Menomonee Avenue Reconstruction (Appleton Ave to Townhall Road) $350,000 $2,330,000 $2,680,000 Norman Drive - MS-4 Pond & Storm Sewer - MacArthur to Men Ave $132,000 $132,000 Overview Drive - Culvert Replacement over Butler Ditch $265,000 $265,000 Richfield Subdivision Pond Dredging $275,000 $275,000 Shady Lane - Apple Tree Ct to Devonwood Rd - Storm Sewer & Street Recon $150,000 $150,000 Shady Lane - Lee Place to Menomonee Ave - WM Relay $840,000 $840,000 Shady Ln MS-4 Pond & Storm Sewer - Grand Ave to Erika Rd $95,000 $1,316,000 $1,411,000 Sheridan Dr - Hillcrest to Main St -WM Relay, San Lats, Storm Sw & Street Recon $1,455,000 $1,455,000 St. Thomas Dr & King David Ct. - Roosevelt to Martin - Water main Relay $680,000 $680,000 Sussex Wastewater Treatment Plant - Upgrade & Maintenance $1,250,000 $1,250,000 Theodore Dr - Ann Ave to Men Ave - WM Relay, San Lats, Stm Swr & Street Reconst $1,065,000 $1,065,000 Theodore Dr - Jacobson to Ann Ave - WM Relay, San Lats, Storm Sw & Street Recon $860,000 $660,000 $1,520,000 TownLine Road Fiber Extension - Augusta Prkwy to Bella Vista Dr $210,000 $210,000 Village Park - Security Camara System $140,000 $140,000 Village Park - Specialty Park - Optimist Way & Parking Lot $780,000 $780,000 Well #11 - Deep Well - Silver Spring $140,000 $1,100,000 $1,240,000 Well #12, Well #13 & Reservoir Building - Aero Park $200,000 $3,900,000 $4,100,000 Well #14 - Aero Park $1,900,000 $1,900,000 Wheeler Dr -Rozanne-Men River Pkwy-Wm Relay, San Lat, Storm Swr & Street Recon$1,990,000 $1,990,000 GRAND TOTAL PROJECT COSTS $19,591,000 $17,431,000 $13,802,000 $7,903,000 $8,919,000 $67,646,000

Source: Village of Menomonee Falls website. First collected Oct 7, 2026.