PROPOSED FUNDING PLAN
2024 Capital Budget
GENERAL FUNDING GOALS
• Maintain our current annual debt levy of approximately $2.5 million
• Maintaining a steady debt levy is a key component of our long-term financing
goals
• Utilize all net new construction and five year carryforward to support
the SAFER grant and fund additional street projects
• Fund stormwater management program by implementing a
Stormwater Utility fee
RECOMMENDED FUNDING SUMMARY
(for the proposed 2024 Capital Budget)
New GO
Debt Other
Impact
Fees
SAFER
Levy T otal
Public Works/Transportation/Parks
(10-year tax levy debt)
$2,550,000 $1,050,000 - $3,501,000 $7,101,000
Water Utility (20-year debt paid from user charges) 5,150,000 - 805,000 - 5,955,000
Sewer Utility (paid from user charges) - 1,145,000 215,000 - 1,360,000
Storm Utility (20-year debt paid from user charges) 660,000 - - - 660,000
Municipal Facilities (Fire Station #3) 3,252,000 - 748,000 - 4,000,000
Other (Centennial Plaza) 265,000 250,000 - - 515,000
T otal Proposed 2024 Capital Budget $11,877,000 $2,445,000 $1,768,000 $3,501,000 $19,591,000
b
a – Includes $550k future contribution from Waste Management
b – $650k American Rescue Plan funding; $400k WI DOT LRIP funds
c – Sewer cash on hand
d – $200k T ourism cash on hand; $50k WEDC Grant
c
d
a
2024 DEBT BORROWING
• 2024 Proposed Capital Budget
• $2,000,000 Capital Projects
• $5,150,000 Water Utility
• $3,252,000 Fire Impact Fees
• $660,000 Storm Utility
• $550,000 Future Waste Management
contribution for County Line Road
• $265,000 T ourism funding
• 2024 Additional Debt Borrowing
• $2,000,000 Municipal Facilities Fund 605
(borrow for capital outlay > $250k)
• The 2024 Budget provides for the following
capital outlay:
Public Works Tympco Street Sweeper 320,000
Public Works 5yd Dump - Plow/Wing/Sander 255,000
Public Works 5yd Dump - Plow/Wing/Sander 255,000
Public Works Caterpillar 3 yd Loader 249,000
Public Works Ford F550 92,000
Public Works 1 Ton Dump 74,000
Public Works Deck Tilt Trailer 52,000
Public Works Chevy 1500 45,000
Public Works Diamond Groomer 32,000
Fire Department Engine 1,000,000
Fire Department SCBA AFG Match 55,000
Clerk Services Remodel 100,000
Library Remodel 150,000
Engineering Remodel 180,000
Police Body Cameras Grant Match 16,000
2,875,000
2024 CAPITAL BUDGET AT A GLANCE 1/7/2024
VILLAGE PROJECTS
Approved Crucial Declaration
Project # DESCRIPTION Life COST EXPLANATION to Recommend of Intent by
Must Do Operations VB on file
In order to reduce potential hazards to pedestrians and to minimize the exposure of the Village to liability for personal injury, the
2024 Sidewalk Replacement Program 10+ $100,000Village has initiated an on-going program for inspection of existing sidewalks and for repair or replacement ofdefective sidewalk sections.X
This proposed project is part of the Village’s on-going program to replace defective curb and gutter and repair defective concrete
2024 Curb & Gutter Program 10+ $80,000 pavements in the Village. The Village initiated the curb and gutter replacement program several years ago in conjunction X
with the Sidewalk Replacement Program and has continued this annual program focusing on the most defective and deteriorated
curb and gutter sections each year on a rotating basis throughout the curb and gutter areas of the Village.
The Village also as part of this program replaces of defective concrete pavement on roadways that are maintained by the Village. The
Village maintains several miles of concrete pavement and sections of the pavement have deteriorated to a point that replacement is necessary.
This proposed project is part of the Village’s on-going program to install storm sewer that addresses areas
2024 Storm Sewer Program 20+ $100,000 of existing roadways that do not drain properly, need storm sewer and to alleviate sump pump icing issues. X
As part of the 2024 Asphalt Paving Program the Engineering Department typically uses two funding sources the Department of Public
2024 Asphalt Paving Program 10+ $2,646,000 Works Operating Budget and the Capital Budget. The first being a portion of the $800,000 that the Village Board has appropriated toX
the Department of Public Works 2024 Operating Budget for replacement of deteriorated pavement and the second being the $600,000
that is being asked for as part of this Capital Budget. This year as part of the 2024 Operating Budget there was additional
funding allocated as part of the SAFER Levy for the purpose of performing additional roadway repaving and maintenance.
The Asphalt Paving Program consists of the Repaving and Overlaying of existing asphalt pavement on Village streets that have
deteriorated to such a level that routine maintenance is no longer effective. In doing this work it will extend the serviceable life of the
roadway for a minimum of approximately 10 years. If this work is not done the asphalt pavement on Village streets will continue to deteriorate
to a level where the entire roadway will need to be replaced and this reconstruction will cost significantly more in the future. The Village
also performs roadway maintenance in the form of micro sealing and crackfilling using the Department of Public Works Operating Budget.
The Village of Menomonee Falls approved the Project Agreement between the Wisconsin Department of Transportation and the
41238 Menomonee Avenue Reconstruction 20+ $350,000 Village of Menomonee Falls for the reconstruction of Menomonee Avenue between Town Hall Road and Appleton Ave (STH 175) X
Appleton Ave to Townhall Road on July 20, 2020 and a Revised Project Agreement on August 1, 2022. These Project Agreements are for the design and construction
RIGHT-OF-WAY only for the Reconstruction of Menomonee Avenue from Town Hall Road to Appleton Avenue (STH 175) as part of the WDOT STP-
Urban project which provides an 80% Federal/20% Local split of project costs.
With the Design being 60% complete and the project timeline being that the project will be let in Nov of 2024 it is necessary to acquire
the needed rights and interests in the parcels of property for the reconstruction of Menomonee Avenue. The Village Board on November
6, 2023 approved the Resolution for the Relocation Order for the Reconstruction of Menomonee Avenue which identifies the interests in
the parcels of property identified on the Plat that are needed for the project. This is in accordance with the Wisconsin State Statutes.
With the revised project agreement being for design and construction only the acquisition of any needed rights and interests in property is to
be funded by the Village at 100%. There are 78 parcels with 2 small fee acquisitions, 3 permanent easements for storm sewer
and the remaining at temporary easements for driveways, grading and sloping.
This project would consist of the replacement of the Campell Drive Bridge over the Butler Ditch. Campbell Drive is a local road in an industrial
Campbell Drive Bridge 20+ $50,000 park in the SE Corner of the Village of Menomonee Falls and the Campbell Drive Bridge is just 1,500 feet downstream of the Overview Drive X
Culvert Replacement over Butler Ditch Bridge which is currently in design for replacement under the same program.
DESIGN
The Campbell Drive Bridge is over the Butler Ditch and consists of 3 large diameter corrugated metal pipes with Lannon stone headwalls
and wood beam guard for guard rails. Since the culverts are CMPs the flow line of all three of the culverts have corrosion with rust in all cells
at the flow line. The deterioration is not to the level of the Overview Drive Bridge but is not far behind when the flow line is rusted
through and backfill material has begun to create sinkholes behind the headwall. The Village DPW is planning on performing temporary
repairs to ensure the corrugated metal culverts do not deteriorate any further.
With the condition of the culverts, the undermining of the culvert and the amount of flow along the Butler Ditch these culverts need to be
replaced, the Village is proposing to use 3 - concrete culvert pipes or if more cost-effective poured in place box culvert. The existing structure
has a current sufficiency rating is 40.4. The Village entered into a State Municipal Agreement with the WDOT to reconstruct this bridge
on September 5, 2023.
Once approved the Village will begin soliciting for a design consultant so that the design will be underway in 2024 with Right-of-way in 2025
and construction scheduled for 2026.
This project consists of the design of the resurfacing or Appleton Avenue from 124th Street to St Francis Drive. The Village approved a Project
Appleton Avenue Resurfacing 20+ $400,000 Agreement with the WDOT on September 5, 2023. STH 175 (Appleton Avenue) is considered to be a Connecting Highway which meansX
124th St to St Francis Drive that the State owns the roadway and it functions as a State Highway but the Village Maintains and Permits the roadway as if it were
DESIGN a Village Roadway. The Village receives Connecting Highways funds from the State to offset the maintenance the Village performs such as
plowing, stripping, pavement replacement, ect.
When the roadway is in need of more work than just maintenance the WDOT assumes responsibility for the project and works with the
Village to improve the roadway. The WDOT oversees the project and for the Design the cost Share is 75% State/25% Local and for the
Construction the cost share is 100% State with the Village paying for any Village requested work such as Sanitary Manhole Rebuilds, storm
sewer upgrades, parking, ect. The Right of Way acquisition is handled by the Local municipality but 100% reimbursed from the WDOT.
The asphalt along this section of STH 175 (Appleton Ave) is showing its age and has some deterioration beginning along the entire length
that maintenance will not be able to fix. The WDOT would like to begin the design process for the resurfacing of this section of STH 175
(Appleton Ave) which will take several years to complete. The Schedule is to begin design next year and complete in 2026 with acquisitions
being in late 2026 to 2027 with Construction in 2029 to 2030. This is a 4.33 mile section of roadway which for most of its length is 4 lanes
with a large amount of traffic, businesses and accesses. This is a complicated project that affects a lot of properties and travelers
which necessitates the need for the long timeframe from initial design to construction.
This project consists of the design and construction of Wheeler Drive from Rozanne Drive to Menomonee River Parkway. The reconstruction
Wheeler Dr - Rozanne to Men River Pkwy20+ $1,990,000 will include a relay of the existing water main with appurtenances, reconstructing of the sanitary sewer manholes, relaying of sanitary X
Wm Relay, San Lat, Storm Sewer & Street Reconst laterals, removal and replacement of the curb & gutter and driveway approaches and removal and replacement of the base course
DESIGN & CONSTRUCTION and asphalt pavement. With this project the Storm Sewer that currently runs behind the homes on the east side of Wheeler will be moved
into Wheeler and properly sized. The existing storm sewer is undersized and located close to homes, under sheds and electrical poles
making it virtually un-maintainable.
This project will also be constructing a water quality pond along Menomonee River Parkwy adjacent to the Menomonee River to begin treating
the storm water runoff in accordance with the Village’s MS-4 Permit. This was presented as part of the creation of the Village’s Storm Utility.
County Line Road (CTH Q) is an arterial roadway in the north east part of the Village of Menomonee Falls on the boarder with the Village
County Line Road Reconstuction 20+ $2,055,000 of Germantown. The current ADT was taken in May of 2018 with a count of 5,000 cars a day with about 5 percent trucks. This roadway is X
STH 145 to Boundary Road located between several Waste Management properties that consist of an active landfill, closed landfill, compositing operation and a newly
CONSTRUCTION constructed garbage truck depot. The new garbage truck depot dispatches trucks to surrounding communities in Southeastern Wisconsin.
Lastly, Waste Management has relocated their main driveway to the landfill that haulers and residents use from Boundary Road to
County Line Road due the approved landfill expansion along Boundary Road. This has added a significant increase in traffic, turning
movements and trucks using this section of County Line Road.
This project consists of the reconstruction of County Line Road from STH 145 to Boundary Road. The pavement in this section deteriorated
to such a level that the rutting and potholes are not being able to be maintained. The reconstruction will consist of pulverizing the existing
pavement and the addition of new ¾ inch Crushed Limestone to bring the base up to 16 inches thick and then 6 inches of heavy-duty
asphalt will be installed for the entire length. Lastly at the entrances to the Waste Management facilities on the north and south side of
County Line Road curb & gutter medians will be installed to create safe turning lanes for the traffic using the families.
The Village applied for and received a reimbursable grant from the WDOT from the Local Road Improvement Program in the amount
of $400,000. The Village has also received a commitment from Waste Management for $550,000 which is the estimate to construct the new
turn lanes into the Waste Management Facilities.
This project consists of the construction of a new 8 inch water main to replace the existing 6” water main and appurtenances in Dardis
Dardis Ave - Jacobson Dr to Ann Ave 20+ $1,125,000 Drive from Jacobson Drive to Ann Avenue. The existing 6” water main will be replaced with an 8” water main due to the age and material X
Water Main & San Lateral Relay of the water main. The existing water main is sandcast and has reached the end of the useful service life.
CONSTRUCTION
The Sanitary Laterals will be replaced as part of the MMSD’s Private Property Infiltration and Inflow Reduction Program. The work will
consist of canvasing 30 residents on Dardis Drive to participate in the sanitary sewer lateral replacement program. Replacement will consist of
open cut trenching with a full pipe replacement up to the home if the homeowner determines they would like to participate in the program.
Otherwise, the laterals will be replaced from the main line to the lot line. This will reduce the infiltration into the Village’s sanitary sewer
system from leaky sanitary laterals.
This project consists of the Construction of a water to replace the existing 16” water main and appurtenances in Menomonee Avenue
Menomonee Ave - Appleton to Town Hall 20+ $4,360,000 from Appleton Avenue to Town Hall Road. This water main replacement project is being complted in advance of the reconstruction X
Wm Relay of Menomonee Ave that the Village & WDOT will be undertaking in 2025.
CONSTRUCTION
The water main was originally installed in 1959 and is made of old sandcast ductile iron. With the roadway being replaced in this section,
the water main nearing the end of its useful life and that this 16” water main is an important east-west link in the Village’s water system, it is in
need of replacement.
There are several Sanitary Laterals will be replaced as part of the MMSD’s Private Property Infiltration and Inflow Reduction Program. The
work will consist of canvasing 30 residents along Menomonee Ave to participate in the sanitary sewer lateral replacement program.
Replacement will consist of open cut trenching with a full pipe replacement up to the home if the homeowner determines they would like to
participate in the program. Otherwise, the laterals will be replaced from the main line to the lot line. This will reduce the infiltration into the
Village’s sanitary sewer system from leaky sanitary laterals.
In the fall of 2023 the Village updated the Sanitary and Water Studies for the west side of the Village which were done in 2009 and 2014
Well #11 - Deep Well - Silver Spring 20+ $140,000 respectively. The West Side Sewer and Water Study analyzes the existing sanitary and water systems and evaluates several alternatives X
DESIGN for providing water and sewer service to undeveloped lands throughout the western portion of the Village of Menomonee Falls. Future
sewer flows and water demands for the study area were forecasted for 5 years, 10 years, 20 years into the future, as well as for full
build-out of the lands that are currently undeveloped.
As the western portion of the Village of Menomonee Falls continues to develop, additional water supply (wells) will be required before
build-out. The rate of growth of the area will directly relate to the time the facilities will be required. The analysis of historical pumping data
yielded the average day and maximum day pumpages in the southwest service area were 420,000 GPD and 1,260,000 GPD, respectively.
Currently wells #8 capacity is 1.01 MGPD & #9 is 2.02 MGPD but they have to be used together for blending due to radium in Well #9
which is a deep sandstone well so the capacity of both is 1.01 MGPD. The only other well on the west side is well #10 whose capacity is 0.72
MGPD. So with all three wells running and existing storage the Village can meet maximum day but if well #8 or #10 would go down the Village
may experience a shortfall.
The study recommends several options which includes searching for additional wells but also constructing a deep sandstone well adjacent
to Well #10 to provide additional capacity. This project is for the design of a new deep well and the necessary approvals from the WDNR
and PSC (Public Service Commission).
This project is eligible for 75% water impact fees as detailed in the Village of Menomonee Falls Public Facilities Needs Assessment
and Impact Fee Study Update approved on July of 2023.
The project consists of the design and installation of Fiber Optic network communication facilities between the Village of Menomonee
Menomonee Ave Fiber Extension 10+ $300,000 Falls Municipal Building and Well/Reservoir #5 located along the west side of Town Hall Road south of Menomonee Avenue. Under this X
Village Hall to Well No 5 project, installation of these fiber optic facilities would be completed within Menomonee Avenue in advance of the future reconstruction of
DESIGN & CONSTRUCTION Menomonee Avenue between Appleton Avenue and Town Hall Road scheduled for the Summer of 2025.
This fiber-optic installation will provide improved communication between the SCADA (Supervisory Control and Data Acquisition) system
and remote utility facilities located along this route, including 2 Sanitary Sewer Lift Stations and Well/Reservoir #5. SCADA system
components are deployed in the field to gather real-time data and to enhance system automation and control. This fiber connection will
improve communication allowing Utilities Staff to reliably monitor and communicate remotely with the pumps and other telemetry, as well as
monitor for any malfunctions at these remote locations through the SCADA system located at the Utilities Building on Margaret Road.
Once installed, a fiber optic connection is the most reliable and secure communications system currently developed; more reliable
than a cellular or radio frequency connection. Intermittent disruptions can occur with radio and cellular connections because of weather, tree
foliage, or destructive incidents that may occur above ground to these other communication facilities.
The project consists of the design and installation of Fiber Optic network communication facilities between the existing Fiber Optic cable in
TownLine Road Fiber Extension 10+ $210,000 Augusta Pkwy. and Utility facilities along Bella Vista Drive. This fiber optic extension will connect a new Sanitary Sewer Flow Meter and a new X
Augusta Prkwy to Bella Vista Dr Water Booster Station for the Bella Vista Development to our Utility SCADA (Supervisory Control and Data Acquisition) system.
DESIGN & CONSTRUCTION
Reliable communication between the Utility SCADA system and the Bella Vista sanitary sewer flow meter and water booster station
located along this route is critical to proper control and operation of these remote Utility facilities. SCADA system components are deployed
in the field to gather real-time data and to enhance system automation and control. This fiber connection will provide reliable communication
allowing Utilities Staff to monitor, control and communicate remotely with the pumps, meters and other telemetry, as well as monitor for any
malfunctions at the remote locations through the SCADA system located at the Utilities Building on Margaret Road.
This project consists of the design of Phase II of Aero Park Community Park located in the Northeast Corner of the intersection of Lisbon
Aero Park - Community Park - PHASE II 20+ $80,000 Road and Lannon Road. Phase I consisted of the mass grading of the site along with grass, wetland and prairie restoration, asphalt path along X
DESIGN with sections of mowed trails and a boardwalk section, stoning the proposed parking lot and installing trees around the park.
Phase II currently would consist of constructing the park road with water main and storm sewer from Lannon Road which would connect
to the Tamarind Subdivision to the south. The parking lot that was stoned in phase I would be paved and installation of a new play structure.
This project was included in the Village of Menomonee Falls Public Facilities Needs Assessment and Impact Fee Study Update approved on
July of 2023.
The project consists of the design and installation of security cameras and recording equipment to capture video in order to deter
Village Park - Security Camara System 10+ $140,000 vandalism, tagging and other undesirable or illegal activities within Village Park. X
DESIGN & CONSTRUCTION
On-site video recording systems would not have the ability for real-time, live monitoring of security camera feeds. This project also includes
investigation of various options, costs and possible installation of fiber optic cable connecting these Village Park security cameras with
Village Hall. This fiber optic connection would allow the Police Department to monitor the security camera feeds coming from Village Park in
real-time. This live monitoring could be of significant value should an emergency situation develop at Village Park.
Cost sharing for this fiber optic cable with the Water Utility may also be available if the existing water booster station at Garfield Drive
and Appleton Avenue is also connected to the Village Hall fiber run as part of this project.
This project consists of the reimagining of Centennial Plaza which is a three-decade old space as a community destination in the heart
Centential Plaza Renovation 20+ $515,000 of Menomonee Falls. The project will add shade structures, landscaping, lighting, and site amenities that will make the space more welcoming, X
DESIGN & CONSTRUCTION and provide improved access, vendor space, a performance platform, and electricity to support a wide variety of events.
The goal is to support the ongoing revitalization of our downtown by making Centennial Plaza a place that people want to be. As a more
inviting and programmable space, the plaza will ultimately attract and retain visitors, residents, and employees in our community.
The project includes the installation of a 1,650 square foot concrete vendor area, a small platform performance stage and shelter,
a custom curved shade structure, a new landscape area, picnic table seating, redesigned lighting, a perimeter bollard system, electric service
upgrades, curved block seating, and public art installations.
This project consists of the design and construction for the relaying of 2 existing water mains and 1 sanitary sewer line between Rozanne
Main Street - Rozanne to Fond du Lac 20+ $705,000 Dr and Fond du Lac Avenue. The new 12 inch water main will replace 2 existing 8 inch water mains installed in the 1950’s and the sanitary X
Sanitary & Water main Relay relay will abandon a section of ex 8 inch sanitary sewer installed in 1959. This project is being proposed as part of the redevelopment
DESIGN & CONSTRUCTION of several properties long Main Street and will provide adequate flow and fire flows to the new development as well as move the
water main and sanitary sewer into the Main Street ROW so the Village’s existing easements can be vacated.
This project is eligible for 100% water and sanitary sewer impact fees in accordance with the Village of Menomonee Falls Public
Facilities Needs Assessment and Impact Fee Study Update approved on July of 2023.
This project consists of the Design of a new culvert/bridge to replace the existing corrugated metal arch culvert with lannon stone headwalls
Menomonee Ave Culvert Replacement 20+ $145,000 and metal guard rails over the Fox River on Menomonee Avenue just east of Main Street and the bugline trail. The existing corrugated culvert X
200 feet East of Main Street by Bugline Trial is in poor condition and the guard rail on the north side of the structure has been hit by a car causing the guard rail to break free and the
DESIGN lannon stone head wall to begin to tip and fail. As part of the design the Village will analyze several different structures for cost,
constructability, current flows on the Fox River as well as meet current design standards.
This project consists of the design of a water quality pond on the property owned by the Village adjacent to Arthur Avenue along the
Arthur Avenue MS-4 Pond 20+ $100,000 Menomonee River. There are 102 acres of residential and commercial properties whose storm water runoff drains through the storm sewer X
Arthur Ave & Men River system that enters the Menomonee River in this location. The Village’s MS-4 permits requires that the Village reduce the pollutants
DESIGN (sediment & Phosphorus) from the storm runoff prior to entering the rivers and streams in the Village. This was presented as part of the
creation of the Village’s Storm Utility.
On March 6, 2023, the Village Board adopted a Resolution Accepting a Staffing for Adequate Fire and Emergency Response (SAFER)
Fire Station #3 Addition & Renovation 20+ $4,000,000 Grant from the Federal Emergency Management Agency. The SAFER Grant is being used by the Village to hire fourteen (14) additional X
CONSTRUCTION full-time firefighters to enhance the safety of the public. In order to accommodate these additional firefighters, an addition and renovation of
Fire Station No. 3 is necessary. The project consists of an addition off of the back of Fire Station No. 3 for seven (7) firefighter bunk rooms
along with the renovation of existing interior space for bathrooms and showers including two (2) relocated Officer's Suites. The project
also includes renovation of the basement level to accommodate a relocated fitness room, relocated gear storage and relocated EMS storage.
19,591,000
VILLAGE OF MENOMONEE FALLS
PROPOSED FIVE YEAR CAPITAL PLAN
2024-2028 1/9/2024
Proposed Proposed Proposed Proposed Proposed 5 Year
Description 2024 2025 2026 2027 2028 Total
VILLAGE PROJECTS
Asphalt Paving Program $2,646,000 $1,681,000 $1,696,000 $1,736,000 $1,955,000 $9,714,000
Curb & Gutter Program $80,000 $100,000 $100,000 $100,000 $100,000 $480,000
Sidewalk Replacement Program $100,000 $150,000 $150,000 $150,000 $150,000 $700,000
Storm Sewer Program $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Aero Park - Community Park $80,000 $915,000 $80,000 $270,000 $1,345,000
Ann Ave - Shady Ln to Sheridan Dr - WM Relay, San Lats, Storm Sw & Street Recon $1,196,000 $1,196,000
Ann Avenue - Jacobson to Hiawatha - WM Relay, San Lats, Storm Sw & Street Recon $1,355,000 $1,355,000
Appleton Avenue Resurfacing (124th St to St Francis Drive) $400,000 $400,000
Arthur Avenue MS-4 Pond - Arthur Ave & Men River $100,000 $580,000 $680,000
Campbell Drive - Culvert Replacement over Butler Ditch $50,000 $270,000 $425,000 $745,000
Centential Plaza Renovation $515,000 $515,000
County Line Road Reconstuction - STH 145 to Boundary Road $2,055,000 $2,055,000
Dardis Ave - Ann Ave to Men Ave - WM Relay & San Laterals $590,000 $590,000
Dardis Ave - Jacobson Dr to Ann Ave - WM Relay, San Lats, Storm Sw & Street Recon$1,125,000 $790,000 $1,915,000
Duke Street - Melanie to Queensway - WM Relay, San Lats, Storm Sw & Street Recon $1,530,000 $1,530,000
Elmwood Drive - Shady Ln to Hoyt Dr. - Water main Relay $425,000 $425,000
Fire Station #3 Addition & Renovation $4,000,000 $4,000,000
Grand Avenue - Bugline to Woodlawn -WM Relay, San Lats, Storm Sw & Street Recon $2,900,000 $2,900,000
Graysland Drive - Storm Sewer and Drainge $355,000 $355,000
Hiawatha Dr - Mary Ct to Men Ave -WM Relay, San Lats, Storm Sw & Street Recon $1,665,000 $1,665,000
Hillcrest Dr - Shady to Sheridan - WM Relay, San Lats, Storm Sw & Street Recon $845,000 $845,000
Hoyt Drive - Roosevelt Dr to Main St - Water main Relay $250,000 $250,000
Jacobon Dr - Ann Ave to Men Ave - WM Relay, San Lats, Storm Sw & Street Recon $755,000 $770,000 $1,525,000
Kings Highway - Pilgrim Rd to Rozanne Dr - WM Relay $1,090,000 $1,090,000
Lavergne Ave - Men Ave to Ann Ave - WM Relay & San Laterals $466,000 $466,000
Lepper Dam Repair Project $435,000 $435,000
MacArthur Dr - Park Building to Schlafer Dr. - Water main Relay $830,000 $830,000
MacArthur Dr - MS-4 Pond & Storm Sewer - Men Ave to Rotary Park $62,000 $1,030,000 $1,092,000
Main Street - Rozanne to Fond du Lac - Sanitary & Water main Relay $705,000 $705,000
Menomonee Ave - Appleton to Town Hall - Wm Relay & San Laterals $4,360,000 $4,360,000
Menomonee Ave Culvert Replacement - 200 feet East of Main Street by Bugline Trial$145,000 $455,000 $600,000
Menomonee Ave Fiber Extension - Village Hall to Well No 5 $300,000 $300,000
Menomonee Avenue Reconstruction (Appleton Ave to Townhall Road) $350,000 $2,330,000 $2,680,000
Norman Drive - MS-4 Pond & Storm Sewer - MacArthur to Men Ave $132,000 $132,000
Overview Drive - Culvert Replacement over Butler Ditch $265,000 $265,000
Richfield Subdivision Pond Dredging $275,000 $275,000
Shady Lane - Apple Tree Ct to Devonwood Rd - Storm Sewer & Street Recon $150,000 $150,000
Shady Lane - Lee Place to Menomonee Ave - WM Relay $840,000 $840,000
Shady Ln MS-4 Pond & Storm Sewer - Grand Ave to Erika Rd $95,000 $1,316,000 $1,411,000
Sheridan Dr - Hillcrest to Main St -WM Relay, San Lats, Storm Sw & Street Recon $1,455,000 $1,455,000
St. Thomas Dr & King David Ct. - Roosevelt to Martin - Water main Relay $680,000 $680,000
Sussex Wastewater Treatment Plant - Upgrade & Maintenance $1,250,000 $1,250,000
Theodore Dr - Ann Ave to Men Ave - WM Relay, San Lats, Stm Swr & Street Reconst $1,065,000 $1,065,000
Theodore Dr - Jacobson to Ann Ave - WM Relay, San Lats, Storm Sw & Street Recon $860,000 $660,000 $1,520,000
TownLine Road Fiber Extension - Augusta Prkwy to Bella Vista Dr $210,000 $210,000
Village Park - Security Camara System $140,000 $140,000
Village Park - Specialty Park - Optimist Way & Parking Lot $780,000 $780,000
Well #11 - Deep Well - Silver Spring $140,000 $1,100,000 $1,240,000
Well #12, Well #13 & Reservoir Building - Aero Park $200,000 $3,900,000 $4,100,000
Well #14 - Aero Park $1,900,000 $1,900,000
Wheeler Dr -Rozanne-Men River Pkwy-Wm Relay, San Lat, Storm Swr & Street Recon$1,990,000 $1,990,000
GRAND TOTAL PROJECT COSTS $19,591,000 $17,431,000 $13,802,000 $7,903,000 $8,919,000 $67,646,000