PLAN COMMISSION AGENDA
TAX INCREMENTAL DISTRICT NO. 8 CREATION
SEPTEMBER 28, 2026 at 6:00 PM
Roll Call
1. Public Hearing regarding the proposed creation of Tax Incremental Finance District No. 8,
the proposed boundaries of the District, and the proposed Project Plan for the District.
2. Consideration and possible action on a “Resolution Establishing the Boundaries of and
Approving the Project Plan for Tax Incremental Finance District No. 8.”
3. Adjourn
Ryan Bailey, Village Manager
A complete packet of meeting materials is normally available by 5:00pm on the Friday before the meeting on the
Village website: www.villageofhartland.wi.gov (Government/Agendas and Minutes).
Notice: Please note that upon reasonable notice, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services. For additional information or to request this service, contact
Sandee Policello, Village Clerk, at 262-367-2714. The Municipal Building is handicap accessible.
To participate via Zoom: https://us02web.zoom.us/j/89850624053?pwd=VwluaCmybfiJ1kwVkhOPQg68Mzi3ie.1
Meeting ID: 898 5062 4053 Passcode: 962014
September
28
, 2026
DRAFT
PROJECT PLAN
Village of Hartland,
Wisconsin
Tax Incremental Finance District No. 8
Prepared by:
Ehlers
N19W24400 Riverwood Drive,
Suite 100
Waukesha, WI 53188
BUILDING COMMUNITIES. IT’S WHAT WE DO.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 2
KEY DATES
Organizational Joint Review Board Meeting Held:
September 28, 2026
Public Hearing Held:
September 28, 2026
Consideration
by Plan Commission:
September 28, 2026
Consideration
by Village Board:
October 12, 2026
Consideration
by the Joint Review Board:
TBD
TABLE OF CONTENTS
Executive Summary
................................
................................
................................
................................
.....
3
Preliminary Map of Proposed District Boundary
................................
................................
............
6
Map Showing Existing Uses and Conditions
................................
................................
....................
8
Preliminary Parcel List and Analysis
................................
................................
................................
...
10
Equalized Value Test
................................
................................
................................
................................
..
11
Statement Listing the Kind, Number and Location of All Proposed Public Works or
Improvements Within the District
................................
................................
................................
.......
12
Map Showing Proposed Improvements and Uses
................................
................................
........
18
Detailed List of Estimated Project Costs
................................
................................
..........................
21
Economic Feasibility Study, Description of the Methods of Financing Estimated
Project Costs and the Time When Related Costs or Monetary Obligations are to be
Incurred
................................
................................
................................
................................
..........................
22
Annexed Property
................................
................................
................................
................................
.....
26
Estimate of Property to Be Devoted to Retail Business
................................
...........................
26
Proposed Changes of Zoning Ordinances, Master Plan, Map, Building Codes and
Village Ordinances
................................
................................
................................
................................
....
26
Statement of the Proposed Method for the Relocation of any Persons to be Displaced
................................
................................
................................
................................
................................
...........
27
How Creation of the Tax Incremental District Promotes the Orderly Development of
the Village
................................
................................
................................
................................
.....................
27
List of Estimated Non
-
Project Costs
................................
................................
................................
.
27
Legal Opinion Advising Whether the Plan is Complete and Complies with Wis. Stat. §
66.1105(4)(f)
................................
................................
................................
................................
.................
28
Calculation of the Share of Projected Tax Increments Estimated to be Paid by the
Owners of Property in the Overlying Taxing Jurisdictions
................................
......................
30
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 3
SECTION 1:
Executive Summary
DESCRIPTION OF DISTRICT
Tax Incremental District (“TID”) No.
8
(“District”) is a proposed In Need of
Rehabilitation or Conservation District comprising approximately
0.55
acres
located
at 101 E. Capitol Drive and
107 E. Capitol Drive
. The District will be
created to pay
a developer incentive for extraordinary costs
needed
to
facilitate construction of a
34,200
-
square
-
foot
m
ixed
-
use building
and ongoing
planning/administrative costs of the District
.
The intended use is a 36 room
boutique hotel, along with a rooftop lounge that will be open to the publ
ic
(“Project”) to be developed by
Luther Group
(“Developer”).
AUTHORITY
The Village is creating the District under the provisions of Wis. Stat. §
66.1105
.
ESTIMATED TOTAL PROJECT COST EXPENDITURES
The Village anticipates making total expenditures of approximately $
3,8
1
8,245
(“Project Costs”) to undertake the projects listed in this Project Plan (“Plan”).
INCREMENTAL VALUATION
The Village projects that new land and improvements value of approximately
$
17,500,000
will result from the Project. Creation of this additional value will
be made possible by the Project Costs made within the District. A table
detailing assumptions as to the development timing and associated values is
included in the Economic Feasibility S
tudy located within this Plan.
EXPECTED TERMINATION OF DISTRICT
Based on the Economic Feasibility Study located within Section 9 of this Plan,
the Village anticipates that the District will generate sufficient tax increment to
pay all Project Costs within
20
of its allowable 27 years.
SUMMARY OF FINDINGS
As required by Wis. Stat. § 66.1105, and as documented in this Plan and the
exhibits contained and referenced herein, the following findings are made:
1.
That “but for” the creation of this District, the development projected to
occur as detailed in this Plan: 1) would not occur; or 2) would not occur in
the manner, at the values, or within the timeframe desired by the Village. In
reaching this determinatio
n, the Village has considered:
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 4
The Developer’s representation that the Project is not economically viable
without public participation based on extraordinary costs associated with
demolition of structures and redevelopment of existing sites.
Redevelopment projects often involve extraordinary costs beyond those
typically associated with greenfield or otherwise unconstrained
development. These costs are tied to site
-
specific challenges, such as
environmental conditions
and
soil limitations needed to make the site
shovel
-
ready and support private investment. Extraordinary costs are
distinguished from broader TIF eligible expenses to focus on costs that
substantiate the “but
-
for” test and justify public assistance. Luther Grou
p
identified these costs, and Village staff reviewed and agreed that they are
appropriate for reimbursement through
the District
.
2.
The economic benefits of the District, as measured by increased
employment, business and personal income, and property value, are
sufficient to compensate for the cost of the improvements. In making this
determination, the Village has considered the follow
ing information:
The Project
represents a significant investment within the downtown core
of the Village and will complement existing business within the community
by increasing the
purchase
of
goods and services from local suppliers in
construction of the Project, and induced effects of employee households
spending locally for goods and services from retailers, restaurants and
service companies.
3.
The benefits of the proposal outweigh the anticipated tax increments to be
paid by the owners of property in the overlying taxing jurisdictions. As
required by Wis. Stat. § 66.1105(4)(i)4., a calculation of the share of
projected tax increments estimated t
o be paid by the owners of property in
the overlying taxing jurisdictions has been prepared and can be found in this
Plan. However, because the Project would not occur without the use of tax
incremental financing, these tax increments would not be paid but
for
creation of the District. Accordingly, the Village finds that the benefits
expected to be realized as set forth in this Plan outweigh the value of the
tax increments to be invested in the Project.
4.
Not less than 50% by area of the real property within the District is in need
of rehabilitation or conservation work as defined by Wis. Stat. §
66.1337(2m)(a).
5.
Based on the foregoing finding, the District is designated as a district in need
of rehabilitation or conservation.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 5
6.
The Project Costs relate directly to the rehabilitation or conservation of
property and improvements in the District, consistent with the purpose for
which the District is created.
Improvements to be made in the District are
likely to significantly enhance the value of substantially
all
the other real
property in the District.
7.
The equalized value of taxable property in the District, plus the incremental
value of all existing tax incremental districts within the Village does not
exceed 12% of the total equalized value of taxable property within the
Village.
8.
The Village estimates that
less than 35%
of the territory within the District
will be devoted to retail business at the end of the District’s maximum
expenditure period, pursuant to Wis. Stat. § 66.1105(5)(b).
9.
That there are no parcels to be included within the District that were
annexed by the Village within the preceding three
-
year period.
10.
The Plan for the District is feasible and is in conformity with the Master Plan
of the Village.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 6
SECTION 2:
Preliminary Map of Proposed District Boundary
Map
f
ound on
f
ollowing
p
age.
The TID boundary will be as of 1/1/2027. A
CSM is anticipated to combine the two parcels.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 7
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 8
SECTION 3:
Map Showing Existing Uses and Conditions
Ma
p
f
ound on
f
ollowing
p
age.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 9
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 10
SECTION 4:
Preliminary Parcel List and Analysis
Rehabilitation Conditions:
Condition 1
:
Carrying out plans for a program of voluntary or compulsory
repair and rehabilitation of buildings or other improvements.
Condition 2
:
Acquisition of real property and demolition, removal or
rehabilitation of buildings and improvements on the property where
necessary to eliminate unhealthful, unsanitary or unsafe conditions, lessen
density, reduce traffic hazards, eliminate obsolete or ot
her uses detrimental to
the public welfare, to otherwise remove or prevent the spread of blight or
deterioration, or to provide land for needed public facilities.
Condition 3
:
Installation, construction or reconstruction of streets, utilities,
parks, playgrounds, and other improvements necessary for carrying out the
objectives of the urban renewal project.
Condition 4
:
The disposition, for uses in accordance with the objectives of the
urban renewal project, of any property acquired in the area of the project. The
disposition shall be in the manner prescribed in this section for the disposition
of property in a redevelopm
ent project area. "Urban renewal project"
includes undertakings and activities for the elimination and for the prevention
of the development or spread of slums or blighted, deteriorated or
deteriorating areas and may involve any work or undertaking for th
is purpose
constituting a redevelopment project or any rehabilitation or conservation
work, or any combination of the undertaking or work
.
The parcels being added to the District meet the criteria of “Carrying out
plans for a program of voluntary or compulsory repair and rehabilitation of
buildings or other improvements”.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 11
SECTION 5:
Equalized Value Test
The following calculations demonstrate that the Village expects to be in
compliance with Wis. Stat. § 66.1105(4)(gm)4.c.,
which requires that the
equalized value of the taxable property in the proposed District, plus the value
increment of all existing tax incremental districts, does not exceed 12% of the
total equalized value of taxable property within the Village
.
The equalized value of the increment of existing tax incremental districts within
the Village, plus the base value of the proposed District, totals $
74,660,500
.
This value is less than the maximum of
$302,848,776
in equalized value that is
permitted for the Village.
The
projected
base value
of $1,205,000
for
the
District
includes improvement
value prior to expected demolition. It is anticipated
the
base value for the
District will reflect demolished structures
and removement of improvement
value.
Calculation of Village Equalized Value Limit
Village TID IN Equalized Value (Jan. 1, 2026)
2,523,739,800
$
TID Valuation Limit @ 12% of Above Value
302,848,776
$
Calculation of Value Subject to Limit
Estimated Base Value of Territory to be Included in District
1,205,600
$
Incremental Value of Existing Districts (Jan. 1, 2026)
73,454,900
$
Total Value Subject to 12% Valuation Limit
74,660,500
$
Total Percentage of TID IN Equalized Value
2.96%
Residual Value Capacity of TID IN Equalized Value
228,188,276
$
Valuation Test Compliance Calculation
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 12
SECTION 6:
Statement Listing the Kind, Number and Location of All
Proposed Public Works or Improvements Within the
District
Project Costs are any expenditure made, estimated to be made, or monetary
obligations incurred or estimated to be incurred as outlined in this Plan. Project
Costs will be diminished by any income, special assessments or other revenues,
including user fees
or charges, other than tax increments, received or
reasonably expected to be received in connection with the implementation of
the Plan. If Project Costs incurred benefit territory outside the District, a
proportionate share of the cost is not a Project Co
st. Costs identified in this
Plan are preliminary estimates made prior to design considerations and are
subject to change after planning, design and construction is completed.
With all Project Costs, the costs of engineering, design, survey, inspection,
materials, construction, restoring property to its original condition, apparatus
necessary for public works, legal and other consultant fees, testing,
environmental studies, perm
its, updating Village ordinances and plans,
judgments or claims for damages and other expenses are included as Project
Costs.
The following is a list of public works and other tax incremental financing
eligible Project Costs that the Village expects to make, or may need to make,
in conjunction with the implementation of the District’s Plan. The map found in
Section 7 of this Plan
along with the Detailed List of Project Costs found in
Section 8 provide additional information as to the kind, number and location of
potential Project Costs.
Property, Right
-
of
-
Way and Easement Acquisition
Property Acquisition for Development
To promote and facilitate development the Village may acquire property within
the District. The cost of property acquired, and any costs associated with the
transaction, are eligible Project Costs. Following acquisition, other Project
Costs within the cate
gories detailed in this Section may be incurred to make
the property suitable for development. Any revenue received by the Village
from the sale of property acquired pursuant to the execution of this Plan will
be used to reduce the total project costs of t
he District. If total Project Costs
incurred by the Village to acquire property and make it suitable for
development exceed the revenues or other consideration received from the
sale or lease of that property, the net amount shall be considered “real prope
rty
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 13
assembly costs” as defined in Wis. Stat. § 66.1105(2)(f)1.c., and subject to
recovery as an eligible Project Cost.
Property Acquisition for Conservancy
To promote the objectives of this Plan, the Village may acquire property within
the District that it will designate for conservancy. These conservancy objectives
include: preserving historic resources or sensitive natural features; protection
of scenic and
historic views; maintaining habitat for wildlife; maintaining
adequate open space; reduction of erosion and sedimentation by preserving
existing vegetation; and providing adequate areas for management of
stormwater. The cost of property acquired for conse
rvancy, and any costs
associated with the transaction, are eligible Project Costs.
Acquisition of Rights
-
of
-
Way
The Village may need to acquire property to allow for installation of streets,
driveways, sidewalks, utilities, stormwater management practices and other
public infrastructure. Costs incurred by the Village to identify, negotiate and
acquire rights
-
of
-
way
are eligible Project Costs.
Acquisition of Easements
The Village may need to acquire temporary or permanent easements to allow
for installation and maintenance of streets, driveways, sidewalks, utilities,
stormwater management practices and other public infrastructure. Costs
incurred by the Village to identi
fy, negotiate and acquire easement rights are
eligible Project Costs.
Relocation Costs
If relocation expenses are incurred in conjunction with the acquisition of
property, those expenses are eligible Project Costs. These costs may include,
but are not limited to: preparation of a relocation plan; allocations of staff time;
legal fees; public
ation of notices; obtaining appraisals; and payment of
relocation benefits as required by
Wis. Stat. Chapter 32 and Wis. Admin. Code
ADM 92.
Site Preparation Activities
Environmental Audits and Remediation
If it becomes necessary to evaluate any land or improvement within the District,
any cost incurred by the Village related to environmental audits, testing, and
remediation are eligible Project Costs .
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 14
Demolition
To make sites suitable for development, the Village may incur costs related to
demolition and removal of structures or other land improvements, to include
abandonment of wells or other existing utility services.
Site Grading
Land within the District may require grading to make it suitable for
development, to provide access, and to control stormwater runoff. The Village
may need to remove and dispose of excess material, or bring in fill material to
provide for proper site eleva
tions. Expenses incurred by the Village for site
grading are eligible Project Costs.
Utilities
Sanitary Sewer System Improvements
To allow development to occur, the Village may need to construct, alter, rebuild
or expand sanitary sewer infrastructure within the District. Eligible Project
Costs include, but are not limited to, construction, alteration, rebuilding or
expansion of: coll
ection mains; manholes and cleanouts; service laterals; force
mains; interceptor sewers; pumping stations; lift stations; wastewater treatment
facilities; and all related appurtenances. To the extent sanitary sewer projects
undertaken within the District p
rovide direct benefit to land outside of the
District, the Village will make an allocation of costs based on such benefit.
Those costs corresponding to the benefit allocated to land within the District,
and necessitated by the implementation of the Project
Plan, are eligible Project
Costs. Implementation of the Project Plan may also require that the Village
construct, alter, rebuild or expand sanitary sewer infrastructure located outside
of the District. That portion of the costs of sanitary sewer system pr
ojects
undertaken outside the District which are necessitated by the implementation
of the Project Plan are eligible Project Costs.
Water System Improvements
To allow development to occur, the Village may need to construct, alter, rebuild
or expand water system infrastructure within the District. Eligible Project Costs
include, but are not limited to, construction, alteration, rebuilding or expansion
of: distri
bution mains; manholes and valves; hydrants; service laterals; pumping
stations; wells; water treatment facilities; storage tanks and reservoirs; and all
related appurtenances. To the extent water system projects undertaken within
the District provide dire
ct benefit to land outside of the District, the Village will
make an allocation of costs based on such benefit. Those costs corresponding
to the benefit allocated to land within the District, and necessitated by the
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 15
implementation of the Project Plan, are eligible Project Costs. Implementation
of the Project Plan may also require that the Village construct, alter, rebuild or
expand water system infrastructure located outside of the District. That portion
of the costs
of water system projects undertaken outside the District which are
necessitated by the implementation of the Project Plan are eligible Project
Costs.
Stormwater Management System Improvements
Development within the District will cause stormwater runoff. To manage this
stormwater runoff, the Village may need to construct, alter, rebuild or expand
stormwater management infrastructure within the District. Eligible Project
Costs include, but are no
t limited to, construction, alteration, rebuilding or
expansion of: stormwater collection mains; inlets, manholes and valves; service
laterals; ditches; culvert pipes; box culverts; bridges; stabilization of stream and
river banks; and infiltration, filtra
tion and detention Best Management Practices
(BMP’s). To the extent stormwater management system projects undertaken
within the District provide direct benefit to land outside of the District, the
Village will make an allocation of costs based on such bene
fit. Those costs
corresponding to the benefit allocated to land within the District, and
necessitated by the implementation of the Project Plan, are eligible Project
Costs. Implementation of the Project Plan may also require that the Village
construct, alt
er, rebuild or expand stormwater management infrastructure
located outside of the District. That portion of the costs of stormwater
management system projects undertaken outside the District which are
necessitated by the implementation of the Project Plan
are eligible Project
Costs.
Electric Service
To create sites suitable for development, the Village may incur costs to provide,
relocate or upgrade electric services. Relocation may require abandonment and
removal of existing poles or towers, installation of new poles or towers, or
burying of overhead
electric lines. Costs incurred by the Village to undertake
this work are eligible Project Costs.
Gas Service
To create sites suitable for development, the Village may incur costs to provide,
relocate or upgrade gas mains and services. Costs incurred by the Village to
undertake this work are eligible Project Costs.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 16
Communications Infrastructure
To create sites suitable for development, the Village may incur costs to provide,
relocate or upgrade infrastructure required for voice and data communications,
including, but not limited to: telephone lines, cable lines and fiber optic cable.
Costs incurr
ed by the Village to undertake this work are eligible Project Costs.
Streets and Streetscape
Street Improvements
To allow development to occur, the Village may need to construct or
reconstruct streets, highways, alleys, access drives and parking areas. Eligible
Project Costs include, but are not limited to: excavation; removal or placement
of fill; construction of ro
ad base; asphalt or concrete paving or repaving;
installation of curb and gutter; installation of sidewalks and bicycle lanes;
installation of culverts, box culverts and bridges; rail crossings and signals;
utility relocation, to include burying overhead u
tility lines; street lighting;
installation of traffic control signage and traffic signals; pavement marking;
right
-
of
-
way restoration; installation of retaining walls; and installation of
fences, berms, and landscaping.
Streetscaping and Landscaping
To attract development consistent with the objectives of this Plan, the Village
may install amenities to enhance development sites, rights
-
of
-
way and other
public spaces. These amenities include, but are not limited to: landscaping;
lighting of streets, si
dewalks, parking areas and public areas; installation of
planters, benches, clocks, tree rings, trash receptacles and similar items; and
installation of brick or other decorative walks, terraces and street crossings.
These and any other similar amenities i
nstalled by the Village are eligible Project
Costs.
Community Development
Cash Grants (Development Incentives)
The Village may enter into agreements with property owners, lessees, or
developers of land located within the District for sharing costs to encourage
the desired kind of improvements and assure tax base is generated sufficient
to recover Project Costs. No
cash grants will be provided until the Village
executes a developer agreement with the recipient of the cash grant. Any
payments of cash grants made by the Village are eligible Project Costs.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 17
Miscellaneous
Projects Outside the Tax Increment District
Pursuant to Wis. Stat. § 66.1105(2)(f)1.n, the Village may undertake projects
within territory located within one
-
half mile of the boundary of the District
provided that: 1) the project area is located within the Village’s corporate
boundaries; and 2) the
projects are approved by the Joint Review Board. The
cost of projects completed outside the District pursuant to this section are
eligible project costs, and may include any project cost that would otherwise
be eligible if undertaken within the District. T
he Village
does not
intend to make
project cost expenditures outside the District
.
Professional Service and Organizational Costs
The costs of professional services rendered, and other costs incurred, in relation
to the creation, administration and termination of the District, and the
undertaking of the projects contained within this Plan, are eligible Project Costs.
Professional ser
vices include but are not limited to: architectural;
environmental; planning; engineering; legal; audit; financial; and the costs of
informing the public with respect to the creation of the District and the
implementation of the Plan.
Administrative Costs
The Village may charge to the District as eligible Project Costs reasonable
allocations of administrative costs, including, but not limited to, employee
salaries. Costs allocated will bear a direct connection to the time spent by
Village employees relating
to the implementation of the Plan.
Financing Costs
Interest expense, debt issuance expenses, redemption premiums, and any other
fees and costs incurred in conjunction with obtaining financing for projects
undertaken under this Plan are eligible Project Costs.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 18
SECTION 7:
Map Showing Proposed Improvements and Uses
Map
f
ound on
f
ollowing
p
age
with a rendering of the proposed development.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 19
S
ECTION 8:
Detailed List of Estimated Project Costs
The following list identifies the Project Costs that the Village currently expects
to incur in implementing the District’s Plan. All projects identified and related
costs reflect the best estimates available as of the date of preparation of this
Plan. All
costs are preliminary estimates and may increase or decrease. Certain
Project Costs listed may become unnecessary, and other Project Costs not
currently identified may need to be made. (Section 6 details the general
categories of eligible Project Costs). C
hanges in Project Cost totals or the types
of Project Costs to be incurred will not require that this Plan be amended. T
his
Plan is not meant to be a budget nor an appropriation of funds for specific
Project Costs, but a framework within which to manage Project Costs.
Any developer incentive provided will require a development agreement
approved by the Village Board. Subject to approval of a developer agreement
the payment term for the developer incentive is capped at
$3,658,245 payable
through 2048. If the full amount of the incentive is not repaid by 2048, the
Village will have no obligation to pay any outstanding balance.
Less:
Project Name/Type Cost Non-Project Costs Net Totals
Developer Incentive Extraordinary Costs ($2.1 million principal) 0
Utility relocations 200,000 200,000
Sidewalks Curb & Gutter 22,350 22,350
Earth Retention System 277,500 277,500
Underground Stormwater System 175,000 175,000
Structural Fill Corrections 150,000 150,000
Environmental Studies & Engineering 123,000 123,000
Asbestos & Lead Abatement 75,000 75,000
Contaminated Soil 227,150 227,150
Vapor Mitigation 125,000 125,000
Demolition & Clearance of Site Conditions 75,000 75,000
Urban Construction Premium and Site constraints 650,000 650,000
Interest on Developer incentive (5% present value) for 20 years 1,558,245 1,558,245
Ongoing Planning & Administrative Costs 160,000 160,000
TOTALS 3,818,245 0 3,818,245
Detailed List of Estimated Project Costs
Estimated
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 22
SECTION 9:
Economic Feasibility Study, Description of the Methods
of Financing Estimated Project Costs and the Time When
Related Costs or Monetary Obligations are to be Incurred
This Section includes a forecast of the valuation increases expected within the
District, the associated tax increment collections, a summary of how Project
Costs would be financed, and a projected cash flow demonstrating that the
District is economically
feasible.
Key Assumptions
The Project is estimated to generate approximately $1
7
.5 million in incremental
value. This is a preliminary estimate. There are not many comparable projects
in the immediate area.
Estimated valuations and timing for construction of the
Project are included in
Table 1.
Assuming an Interim tax rate of $9.91 per
thousand of equalized value, and 1.25% appreciation, the District would
generate approximately $5.4 million in incremental tax revenue over
the 27
-
year term of the District as shown in
Table 2
.
Based on the Project Cost expenditures included within the cash flow exhibit
(Table 3)
, the District is projected to remain open for 20 years due to incentive
payments ending in 2048.
The projected closure is based on the various assumptions noted in this Plan
and will vary dependent on actual Project Costs incurred and the actual amount
of tax increments collected.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 23
Table 1
–
Development Assumptions
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 24
Table 2
–
Tax Increment Projection Worksheet
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 25
Table 3
–
Cash Flow
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 26
SECTION 10:
Annexed Property
A tax incremental district cannot include annexed territory unless at least three
years have elapsed since the annexation, or certain other requirements are met.
None of the property within the proposed District boundary was
annexed
during the past three years.
SECTION 11:
Estimate of Property to Be Devoted to Retail Business
Pursuant to Wis. Stat. § 66.1105(5)(b), the Village estimates that
less than 35%
of the territory within the District will be devoted to retail business at the end
of the District’s maximum expenditure period.
SECTION 12:
Proposed Changes of Zoning Ordinances, Master Plan,
Map, Building Codes and Village Ordinances
Zoning Ordinances
The proposed Plan is in general conformance with the Village’s current zoning
ordinances. Individual properties may require rezoning at the time of
development.
Master (Comprehensive) Plan and Map
The proposed Plan is in general conformance with the Village’s Comprehensive
Plan identifying the area as appropriate for
redevelopment as a commercia use
.
Building Codes and Ordinances
Development within the District will be required to conform to State Building
Codes and will be subject to the Village's permitting and inspection procedures.
The proposed Plan conforms to all relevant State and local ordinances, plans,
and codes. No chang
es to the existing regulations are proposed or needed.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 27
SECTION 13:
Statement of the Proposed Method for the Relocation of
any Persons to be Displaced
Should implementation of this Plan require relocation of individuals or business
operations,
relocations will be handled in compliance with Wis. Stat. Chapter
32 and Wis. Admin. Code ADM 92.
SECTION 14:
How Creation of the Tax Incremental District Promotes
the Orderly Development of the Village
Creation of the District and the implementation of the projects in its Plan will
promote the orderly development of the
Village
because the
Project
represents
a significant investment within the downtown core of the Village and will
complement existing business within the community.
Through use of tax
increment financing, the
Village
can attract new investment that results in
increased tax base. Development will occur in an orderly fashion in accordance
with approved plans so that the Projects will be compatible with adjacent land
uses.
SECTION 15:
List of Estimated Non
-
Project Costs
Non
-
project costs are public works projects which only partly benefit the
District. Costs incurred that do not benefit the District may not be paid with tax
increments. Examples of non
-
project costs are:
•
A public improvement made within the District that also benefits
property outside the District. That portion of the total Project Costs
allocable to properties outside of the District would be a non
-
project
cost.
•
A public improvement made outside the District that only partially
benefits property within the District. That portion of the total Project
Costs allocable to properties outside of the District would be a non
-
project cost.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 28
•
Projects undertaken within the District as part of the implementation of
this Project Plan, the costs of which are paid fully or in part by impact
fees, grants, special assessments, or revenues other than tax increments.
No improvements to be made within the District will benefit property outside
the District. Furthermore, there will be no improvements made outside the
District that will only partially benefit the District.
SECTION 16:
Legal Opinion Advising Whether the Plan is Complete
and Complies with Wis. Stat. § 66.1105(4)(f)
Legal Opinion Found on Following Page.
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 29
Tax Incremental Finance District No. 8 Project Plan Village of Hartland
Prepared by Ehlers Page | 30
SECTION 17:
Calculation of the Share of Projected Tax Increments
Estimated to be Paid by the Owners of Property in the
Overlying Taxing Jurisdictions
The following projection is provided to meet the requirements of Wis. Stat. §
66.1105(4)(i)4.
Village of Hartland, Wisconsin Tax Incremental Finance District No. 8 Plan Commission Resolution
RESOLUTION NO. 09/28/2026
RESOLUTION ESTABLISHING THE BOUNDARIES OF AND APPROVING THE PROJECT PLAN FOR
TAX INCREMENTAL FINANCE DISTRICT NO. 8
WHEREAS, the Village of Hartland (the “Village”) has determined that use of Tax Incremental
Financing is required to promote development and redevelopment within the Village; and
WHEREAS, Tax Incremental Finance District No. 8 (the “District”) is proposed to be created by the
Village in accordance with the provisions of Wisconsin Statutes Section 66.1105 (the "Tax Increment
Law"); and
WHEREAS, a Project Plan for the District has been prepared that includes:
a. A statement listing of the kind, number and location of all proposed public works or
improvements within the District, or to the extent provided in Wisconsin Statutes Sections
66.1105(2)(f)1.k. and 66.1105(2)(f)1.n., outside of the District;
b. An economic feasibility study;
c. A detailed list of estimated project costs;
d. A description of the methods of financing all estimated project costs and the time when the
related costs or monetary obligations are to be incurred;
e. A map showing existing uses and conditions of real property in the District;
f. A map showing proposed improvements and uses in the District;
g. Proposed changes of zoning ordinances, master plan, map, building codes and Village
ordinances;
h. A list of estimated non-project costs;
i. A statement of the proposed plan for relocation of any persons to be displaced;
j. A statement indicating how the District promotes the orderly development of the Village;
k. An opinion of the Village Attorney or of an attorney retained by the Village advising that the
plan is complete and complies with Wisconsin Statutes Section 66.1105(4)(f); and
WHEREAS, prior to its publication, a copy of the notice of public hearing was sent to the chief
executive officers of Waukesha County, the Hartland-Lakeside Joint No 3 School District, and Arrowhead
Union High School and the Waukesha County Area Technical College District, and any other entities having
the power to levy taxes on property located within the District, in accordance with the procedures
specified in the Tax Increment Law; and
WHEREAS, prior to its publication, a copy of the notice of public hearing was also sent to the
owners of all property in the proposed District; and
WHEREAS, in accordance with the procedures specified in the Tax Increment Law, the Plan
Commission, on September 28, 2026 held a public hearing concerning the proposed creation of the
District, its proposed boundaries and its proposed Project Plan, providing interested parties a reasonable
opportunity to express their views thereon.
Village of Hartland, Wisconsin Tax Incremental Finance District No. 8 Plan Commission Resolution
NOW, THEREFORE, BE IT RESOLVED by the Plan Commission of the Village of Hartland that:
1. It recommends to the Village Board that Tax Incremental Finance District No. 8 be created
with boundaries as designated in Exhibit A of this Resolution.
2. It approves and adopts the Project Plan for the District, attached as Exhibit B, and
recommends its approval to the Village Board.
3. Creation of the District promotes orderly development in the Village.
Adopted this _____ day of _______________, 2026.
Plan Commission Chair
Village Clerk
Village of Hartland, Wisconsin Tax Incremental Finance District No. 8 Plan Commission Resolution
EXHIBIT A -
TAX INCREMENTAL FINANCE DISTRICT NO. 8
BOUNDARY MAP
[INCLUDED IN PROJECT PLAN]
Village of Hartland, Wisconsin Tax Incremental Finance District No. 8 Plan Commission Resolution
EXHIBIT B -
PROJECT PLAN
[DISTRIBUTED SEPARATELY]
Source: Village of Hartland website. First collected Oct 7, 2026.