JOINT ARCHITECTURAL BOARD/PLAN COMMISSION AGENDA
MONDAY, SEPTEMBER 21, 2026 ∙ 6:30 PM
BOARD ROOM, MUNICIPAL BUILDING, 210 COTTONWOOD
Roll Call
Pledge of Allegiance
Public Comments: Please be advised the Joint Architectural Board/Plan Commission will
receive comments from the public related to any item(s) on the agenda for a three-minute
time period per person, with time extensions per the Chairman’s discretion.
1. Consideration of a motion to approve the Jt. Architectural Board/Plan Commission
minutes of August 17, 2026
2. Architectural Board review and consideration of an application for signage for 83 Hartland
Business, 805 Cardinal Lane
3. Plan Commission review and consideration of a conditional use permit for 83 Hartland
Business, 805 Cardinal Lane and scheduling a public hearing for October 19, 2026
4. Architectural Board review and consideration of an application for signage for T-Lon, 1110
Richards Road
5. Architectural Board review and consideration of an application for signage for Lake
Country Lutheran, 401 Campus Drive
6. Announcements: The following individuals will be given an opportunity to make
announcements at the meeting regarding (1) activities taken since the previous meeting on
behalf of the community, (2) future municipal activities, and (3) communications received from
citizens. It is not contemplated that these matters will be discussed or acted upon. The
following individuals may provide announcements: Village President or individual Village Board
members or Village Administrator or other Village Staff members.
7. Adjourn
Ryan Bailey, Village Manager
A complete packet of meeting materials is normally available by 5:00 pm on the Friday before the meeting on the Village website:
www.villageofhartland.wi.gov (Government/Agendas and Minutes). Notice: Please note that upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals through appropriate aids and services. For additional information or to request this service, contact
Sandee Policello, Village Clerk, at 262-367-2714. The Municipal Building is handicap accessible. To participate in the Village of Hartland “Zoom”
meeting with video: https://us02web.zoom.us/j/85649376649?pwd=KswAf72xU2NM7albaS3ROvfbk9c39V.1 The Meeting ID is 856 4937
6649, Passcode is 346824. To participate in the Village of Hartland “Zoom” meeting (audio only), please dial 1(646)931-3860.
JOINT ARCHITECTURAL BOARD/PLAN COMMISSION MINUTES
MONDAY AUGUST 17, 2026
6:30 PM, BOARD ROOM
MUNICIPAL BUILDING, 210 COTTONWOOD AVE.
Present: Jeff Pfannerstill, Ann Wallschlager, Jeff Bierman, Tim Hallquist, Chip Schneeberger,
David DeCourcy-Bower and Mike Demet.
Others Present: Ryan Bailey, Scott Hussinger, Ryan Amtmann, Kevin Bohlman, Deidre
Bushey, Attorney Hector de la Mora, Mandeep Dran (via Zoom), Karen Dodge, Dan Cowell
and Jack Bertram.
Roll Call
The Pledge of Allegiance.
Public Comments
No public comments were received from those present in the room or participating via
Zoom.
1. Consideration of a motion to approve the Jt. Architectural Board/Plan Commission
minutes of July 20, 2026 –
Motion (Wallschlager/Schneeberger) to approve the Joint Architectural Board and Plan
Commission minutes of July 20, 2026. Carried (6-0) with DeCourcy-Bower abstaining.
2. Architectural Board review and consideration for signage for Heraus, 541 S. Industrial
Drive -
Karen Dodge, appearing via Zoom as permit expediter on behalf of Heraeus, presented the
signage request. She described the project as a rebranding effort involving a change in font
and logo only, with no change to sign size or location. The existing signs are illuminated, and
the proposed signs would retain that feature. No concerns were raised by staff or
commissioners.
Motion (DeCourcy-Bower/Hallquist) to approve the signage for Heraus, 541 S. Industrial
Drive. Carried (7-0).
3. Architectural Board review and consideration of an application for signage for 83
Hartland Business, 805 Cardinal Lane
4. Plan Commission review and consideration of a conditional use permit for 83 Hartland
Business, 805 Cardinal Lane
a. Public hearing to hear comments on the proposed conditional use permit
Items 3 and 4 were addressed jointly, as both concerned the same property and the same
recurring deficiencies.
The property owner, Mandeep Dran, appeared via Zoom. The sign contractor responsible
for submitting the application was not present. President Pfannerstill noted that this matter
had now appeared on the agenda four consecutive times without the required parties
present to answer technical question.
Mandeep Dran acknowledged he had no knowledge of the signage specifications, as the
application had been submitted independently by the contractor, identified as Tim Stephan.
President Pfannerstill expressed significant frustration, noting that this was the first time in
nearly ten years of service that he had been so stern with an applicant. He emphasized that
the Commission had been accommodating in repeatedly postponing the matter, but that
the pattern of non-appearance was no longer acceptable. He stressed that, as the property
owner, the responsibility for compliance rests with Mandeep Dran regardless of which
contractor submitted the application.
The Building Inspector, Scott Hussinger, confirmed that the proposed pylon sign exceeded
the maximum allowable height under the Village code by one foot, and that a revised,
compliant rendering had been requested from the sign contractor as recently as one week
prior but had never been submitted. He further noted that signs had already been installed
on the building without approval. The current application materials still reflected the non-
compliant taller sign.
Wallschlager also raised concerns about separately observed code violations on the
property, including debris, discarded pallets, damaged fencing, stored appliances, and a
damaged mailbox framing constituting a public nuisance. Mandeep Dran The property
owner acknowledged these issues and indicated steps were being taken to address them.
Village Attorney Hector Delgado Mora addressed the property owner directly, advising that
as the property owner, he bears fundamental legal responsibility for all signage and code
compliance on the property, regardless of the actions of third-party contractors. He further
advised that the Village reserved the right to commence a per diem prosecution for each
day the non-compliant pylon sign remained in place. Such fines, if unpaid, could be reduced
to a judgment and become a cloud on the property's title.
The Commission was informed that the business is currently operating outside of
compliance with both its signage approvals and its conditional use permit, and that the
Village had been allowing operations to continue as a matter of good faith during the review
process. The property owner was advised to contact the Building Inspector the following
day and to take the matter with the utmost seriousness, as the Village retains the authority
to issue a stop-order.
DeCourcy-Bower sought clarification on whether a height waiver mechanism similar to that
used for another business on Highway 83 (Kwik Trip) was available. Staff confirmed it was
not, as Kwik Trip's approval came through a Planned Unit Development — no equivalent
mechanism exists for standard signage applications. Bailey also clarified that the prior
month's meeting had established the property owner's willingness to accept a same-size
sign, but the contractor was again absent to confirm whether that was feasible. deCourcy-
Bower said so what we have in the packet is a sign that exceeds in terms of the
measurements and in terms of the specifications, and it was stated that is correct.
Motion (Pfannerstill/Demet) to deny the signage application and increased height in the
sign. They will have to resubmit the request, the application, and they will have to pay for
publishing again with the reason being people not being here to answer questions 4 times.
Mandeep asked about the store conditional use permit. He said that he submitted the
application separate from the sign application. Bailey said they both have been denied so he
will need to reapply and submit for both the signs and the conditional use permit
application for 83 Hartland Business at 805 Cardinal Lane, and to require full resubmission
of both applications including payment of applicable fees and republication for a public
hearing. Carried (6-0).
Pfannerstill recapped the last 4 meetings. The 1
st meeting Mr. Dran was not present. He
said Mr. Dran was told it was absolutely imperative that he be at the 2nd meeting, but again
Mr. Dran was not there. He said at the 3rd meeting the person from the sign company was
not at the meeting, so it was postponed again. He said today’s meeting is the 4th meeting
and again the sign person is not there. Pfannerstill made clear that the items would be
denied and that a full resubmission — including a new application fee and republication for
the public hearing — would be required before the matter could be placed back on an
agenda.
5. Plan Commission review of petition to rezone tax key HAV 0729116 located at 221
Cottonwood Avenue, from Residential to B-3 Zoning and consideration to refer to Village
Board –
The applicant, Christopher Mullett of 935 Emerald Drive, was present. He explained that he
is the owner of Bubbles Car Wash and is seeking to rezone a residential parcel across the
street from his existing business to B-3 commercial zoning, with the intent of using the
existing house structure as office space for his expanding business headquarters. He stated
there are no immediate plans to redevelop the property, though he acknowledged that
additional development could be considered in five or more years as his business grows. He
expressed appreciation for the character of the existing building and a desire to maintain
the charm of the structure.
A commissioner noted that the proposed rezoning is consistent with the Village's
comprehensive plan, making the request appropriate and well-aligned with planned land
use for the area.
Motion (DeCourcy-Bower/Schneeberger) to approve the rezoning of Tax Key HAV 0729116
located at 221 Cottonwood Avenue from Residential to B-3 Zoning and to refer the matter
to the Village Board. Carried (7-0).
The Village Administrator noted the applicant would appear before the Village Board the
following Monday, and that a public hearing on the rezoning would be scheduled for the
subsequent month.
6. Plan Commission review and consideration of proposed pool house and sport court at
1313 Shelly Lane -
Jack Bertram of Elevate Design, architect of record, presented the project on behalf of
property owner John Hendrix. The proposal consists of a pool house addition to serve an
existing pool, intended for use as an exercise space, bar area, and powder room. The
structure is not a dwelling.
The Building Inspector noted that all setback requirements are met. The one item requiring
Board consideration was the proposed roof height of 18 feet, which exceeds the standard
maximum of 15 feet for accessory structures. However, Village code provides the Board
authority to approve accessory building heights up to 18 feet when the structure is found to
be compatible with the principal structure.
The architect explained that the increased height was intentional and driven by aesthetics:
the existing home features a steep roof pitch of approximately 10 to 12, and reducing the
accessory structure's pitch to meet the 15-foot standard would result in a flat, visually
incompatible appearance. A contractor present confirmed that a 7-pitch roof is required to
reach the 18-foot height and that lowering it would be inconsistent with the character of
the home. The Board found the 18-foot height compatible with the principal structure.
A commissioner confirmed that HOA approval had been obtained from both the
association's president and all neighbors within the cul-de-sac, as required by the HOA's
governing documents.
Motion (DeCourcy-Boer/Schneeberger) to approve the proposed pool house and sport court
at 1313 Shelly Lane, including the 18-foot accessory structure height. Carried (7-0).
7. The Architectural Board and Plan Commission will conduct a second review and
consider referral to the Village Board, a proposed hotel for tax keys HAV0729095 and
HAV0729987 located at 101 E. Capitol Drive and 107/109 E. Capitol Drive
a. Certified survey map
b. Site plans for a 36-room boutique hotel with a rooftop lounge that will be open to the
public
c. Planned Unit Development Agreement
d. Proposed tax incremental financing district
Dan Call of Luther Group presented on behalf of the development and ownership team,
reporting that an updated, more detailed engineering submittal had been made in late July.
Village staff had reviewed and issued a comment letter, and the development team had
responded. A call between Village Engineer Ryan Bailey and the project's engineer, Ari
Smith, had taken place that morning to work through outstanding items collaboratively.
Engineering and Site Plan Comments
Village Engineer Ryan Bailey summarized five substantive items remaining from his
comment review:
Site Logistics: A site logistics drawing has been submitted showing how construction vehicles
and staging will be managed. The development team intends to work on two adjacent
properties and will be required to provide written agreements from those neighboring
property owners, to be incorporated into the developer agreement.
Shoreline/Stream Bank Stabilization: The stream bank between the Haight Drive Bridge and
the concrete seawall at Tabby's is in poor condition and must be stabilized using riprap or
natural shore stabilization methods. This secondary project is expected to take six to nine
months to permit and could be constructed in fall 2027. The obligation will be memorialized
in the developer agreement, and the Village Attorney confirmed that no occupancy permit
will be issued until this work is complete, nor will TIF funds be released.
Sidewalk and Curb and Gutter Replacement: Village staff anticipates that construction
activity along Cottonwood Avenue and Capitol Drive will damage existing sidewalk and curb
and gutter. The development team acknowledged this and agreed to replace all affected
sidewalk and curb and gutter along the front of the hotel. This will also be included in the
developer agreement, with some coordination expected with the Village's own upcoming
Cottonwood Avenue roadway redesign project.
Utility Design: Village Engineer Bailey will meet with the utility superintendent and the
development team to verify utility connections, which are expected to differ from what is
currently shown on the plans.
FDC Connection: The location of the fire department connection is still being worked out.
CSM and Access to Adjacent Property (Tabby's)
A commissioner raised a question regarding emergency access to Tabby's, the adjacent
property to the east, whose rear yard currently relies on what had been a shared informal
access through the existing parking lot — access that will be eliminated by the hotel
construction. The development team confirmed that a private path of compacted crushed
granite, approximately five to six feet wide, is planned along the east side of the hotel
building from the rear of Tabby's out to Haight Drive. This path is intended strictly as a
private emergency egress and is not intended to serve as a public walkway. The
development team noted that the lower-level hotel floor on that side is level with the
parking structure and hotel windows are an additional 12 to 14 feet above grade, mitigating
concerns about public passage alongside the building.
Village Attorney Delgado Mora advised that the property owners should address the access
arrangement privately, as imposing a formal public easement could create operational
disruptions for the hotel. The development team indicated they had spoken with the
owners of Tabby's, who were satisfied with the proposed arrangement, and committed to
formalizing that understanding in writing. Village staff noted they would need clarity on
whether the path is characterized as a public, private, or exclusive-use access before
finalizing the developer agreement.
Environmental/Site Plan
A commissioner with environmental expertise inquired about the contaminated soil and
vapor issues identified in the Phase 1 Environmental Site Assessment. The development
team's representative confirmed that the site had previously been remediated and closed
by the DNR as a capped site. In order to construct, the cap must be formally reopened
through a post-closure modification process, which their environmental engineer Sigma was
submitting to the DNR that week. Vapor testing has been conducted, and results are
pending; the team is currently assuming a vapor mitigation system under the lower level
slab will likely be required. The commissioner expressed satisfaction that the proper
regulatory process was being followed.
Public Access to Rooftop Lounge
A commissioner inquired how members of the public would access the rooftop conservatory
without moving through guest areas of the hotel. The development team explained that
public visitors would enter through the hotel lobby to a dedicated public elevator serving
only the upper floor. Hotel guests would access the hotel portion of the upper floor through
a separate, key-secured entrance.
Planned Unit Development Agreement
Village Attorney Delgado Mora reported that the PUD agreement is well advanced, using the
previously approved Quarry development agreement as a template. Irrelevant provisions
have been removed, and the remaining items to be finalized include the secondary projects
(embankment stabilization and sidewalk/curb and gutter replacement) and the TIF
language, which was received late in the prior week. The core condition is clear: no TIF
funds will be released until an occupancy permit is issued, and no occupancy permit will be
issued until the shoreline embankment work is complete.
Proposed Tax Incremental Financing District
Greg Johnson of Ehlers, the Village's financial consultant, presented the proposed TIF
structure. He noted that the applicable district type would be a rehabilitation TIF, as this is a
redevelopment project within the downtown corridor meeting the required statutory
criteria.
The TIF assistance was structured around extraordinary costs specific to this redevelopment
project — costs that would not be incurred on a standard greenfield site. These include
utility relocations, earth retention systems, underground stormwater improvements, fill
corrections, environmental remediation (contaminated soil and vapor mitigation),
demolition, and an urban construction premium reflecting the constraints of building
adjacent to an existing structure, on a corner, and next to a river. The total of these
extraordinary costs was determined to be approximately $2,100,000.
The assistance would be structured on a pay-as-you-go basis, meaning the Village assumes
no upfront financial risk. The developer must complete the project per the terms of the
development agreement before any reimbursement begins. Annually, the Village would
retain $5,000 of the tax increment collected for administrative costs, with the remainder
paid to the developer. The assistance is capped at $2,100,000 in present value terms, with a
5% discount rate applied, resulting in a future value cap of approximately $3,658,245 over a
maximum 20-year term. Should tax increment generated over that period fall short of the
cap, the Village bears no obligation to make up the difference.
Keith Dahl, also of Ehlers attending via Zoom, clarified that the TIF base value would be
established as of January 1, 2027, at which point demolition will have occurred and only
land value will remain. All taxing jurisdictions — including the county, school district, and
technical college — continue to collect their share of taxes on that base land value. Only the
incremental value above that base, generated by the new hotel, flows into the TIF district to
reimburse the extraordinary costs. Once the assistance is paid in full or the 20-year period
concludes, the TIF closes, and all increased value returns to the full tax rolls benefiting all
jurisdictions.
A commissioner questioned whether the extraordinary cost figures had been subject to
independent review. Ehlers confirmed that the developer's initial TIF request had been
approximately $5,600,000, and that Ehlers had scaled it back significantly by focusing strictly
on costs demonstrably tied to the extraordinary site challenges, excluding standard
development costs such as land acquisition. The cap structure further protects the Village,
as any cost overruns are borne entirely by the developer.
The Village Administrator noted that if this timeline holds, a special Plan Commission
meeting would be scheduled for September 28, 2026, with Village Board action targeted for
October 12, 2026. Demolition could begin in November 2026, with projected project
completion in May 2028.
Motion (Pfannerstill/Wallschlager) to refer to the Village Board the proposed hotel for tax
keys HAV0729095 and HAV0729987 located at 101 East Capitol Drive and 107/109 East
Capitol Drive — including the certified survey map, site plans for the 36-room boutique
hotel with rooftop lounge, the Planned Unit Development Agreement, and the proposed Tax
Incremental Financing District — contingent upon future approvals from Village staff, the
Village Attorney, the Village Engineer, the Village Building Inspector, and the Ehlers TIF
team. Carried (7-0).
8. Architectural Board and Plan Commission review of proposed murals at 150 E. Capitol
Drive, 112 W. Capitol Drive and the Nixon Park warming shed, with possible consideration
to refer to the Village Board
This item was withdrawn prior to the meeting. Village staff reported that the application
was denied by the BID and the applicant subsequently withdrew. No action was taken.
9. Announcements -
A commissioner announced the upcoming Hartland Street Dance, inviting the public to
attend and support the Chamber of Commerce. Another commissioner noted they would be
volunteering at the event.
10. Adjourn -
Motion (Schneeberger/Demet) to adjourn. Carried (7-0)
The meeting was adjourned at 7:58 pm.
98.04 64.02
THIS RENDERING IS FOR REFERENCE AND PERMITTING PURPOSES ONLY
ANY SEPARATE OR OPTIONAL COMPONENTS MUST BE ORDERED SEPARATELY
ALL ELECTRICAL SIGNS WILL COMPLY WITH UL 48 – UL FILE #E46729
MID SIGN
- INSTALL NEW 5 X 5 APPROX. - CITGO ID CABINET
- INSTALL NEW 5 X 5 APPROX. - 3 PRODUCT LED PRICER
( 12" DAK 5000 DIGITS )
- INSTALL NEW 2 X 5 APPROX. - 1 PRODUCT LED PRICER
( 8" DAK 5000 DIGITS )
CITGO 15863180 HARTLAND , WISCONSIN
CUSTOMER STORE ID SITE ADDRESS
08/17/2026 _(FD/SP)
15863180-RENDERING_B
RENDERING #
NIGHT VIEW
SCALE : 1:24
PLASTIC
ALUMINUM
MATERIALS:
FORMED FLAT
PMS 158 - POPPY RED•0VNB000651
PMS 185 - CARDINAL RED•0VNB3M0053
PMS 187 - BURGUNDY•0VNB000136
COLOR:
WHITE
PMS 286 - BLUE•0VNB3M0157
GREEN - L8-7758 GREEN PMS 356 CVC
PMS 877 - CABINET GREY•OPNTSW0017
D
E
F
G
62"
140"
61 1/4"
19"
EXISTING TO REMAIN
EXISTING TO REMAIN
REGULAR
UNLEADED
MID GRADE
UNLEADED
SUPER
PREMIUM
DIESEL
67 3/8" TRIM
60 7/8"
TRIM
67 3/8" TRIM
18 5/8"
2 1/4"
2 1/4"
EXISTING TO REMAIN
EXISTING TO REMAIN
61 1/4"
19"
67 3/4"67 3/4"
37.76 37.76
37.74
60.28
61 5/8" 8"
61 3/8"
61 3/8"
61 5/8"
From: Building Inspector
To: Sandee Policello
Cc: Building Inspector
Subject: 805 Cardinal
Date: Thursday, August 13, 2026 11:21:04 AM
Sandee,
Final consideration for Conditional Use Permit at 805 Cardinal Lane is on the August
PC agenda.
I observed debris and discarded equipment stored outdoors including pallets,
discarded fencing, shelving, and appliances stored outdoors.
The mailbox framing has been damaged and has “splintered” and is a public
nuisance.
I hope the Planning Commission discusses these site items prior to their final
consideration of CUP.
Kevin Bohlman
Village of Hartland building inspector
210 Cottonwood Ave. Hartland WI
(920) 988-9795
Sent from my iPhone