Arch Bd/Plan Commission 3-16-26 Packet
Village of Hartland · Waukesha County · meeting of Mar 16, 2026 · Agenda packets
Open the original document More from Village of Hartland
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Village of Hartland
210 Cottonwood Avenue
Hartland WI 53029
PH: 262-367-2714
FAX: 262-367-2430
www.villageofhartland.wi.gov
JOINT ARCHITECTURAL BOARD/PLAN COMMISSION AGENDA
MONDAY, MARCH 16, 2026 ∙ 6:30 PM
BOARD ROOM, MUNICIPAL BUILDING, 210 COTTONWOOD
Roll Call
Pledge of Allegiance
Public Comments: Please be advised the Joint Architectural Board/Plan Commission will receive
comments from the public related to any item(s) on the agenda for a three-minute time period per
person, with time extensions per the Chairman’s discretion.
1. Consideration of a motion to approve the Jt. Architectural Board/Plan Commission minutes of
February 16, 2026
2. Architectural Board review and consideration of an application for residential addition to 320
Prospect
3. Architectural Board review and consideration of an application for installation of exterior door
at 375 Cottonwood Avenue
4. Architectural Board review and consideration of sign application for 418 Merton Avenue,
Tropitana
5. Plan Commission review and consideration of fence installation at 313 Circle Drive, St. Charles
6. Announcements: The following individuals will be given an opportunity to make announcements at
the meeting regarding (1) activities taken since the previous meeting on behalf of the community, (2)
future municipal activities, and (3) communications received from citizens. It is not contemplated that
these matters will be discussed or acted upon. The following individuals may provide announcements:
Village President or individual Village Board members or Village Administrator or other Village Staff
members.
7. Adjourn
Ryan Bailey, Village Manager
A complete packet of meeting materials is normally available by 5:00 pm on the Friday before the meeting on the Village website:
www.villageofhartland.wi.gov (Government/Agendas and Minutes). Notice: Please note that upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals through appropriate aids and services. For additional information or to request this service,
contact Sandee Policello, Village Clerk, at 262 -367-2714. The Municipal Building is handicap accessible. To participate in the Village of Hartland
“Zoom” meeting with video: https://us02web.zoom.us/j/89246536894?pwd=JDPby9eNVxhDUs01kcYE4bEiIpSC9f.1
The Meeting ID is 892 4653 6894, Passcode is 244886. To participate in the Village of Hartland “Zoom” meeting (audio only), please dial
1(312)626-6799.
JOINT ARCHITECTURAL BOARD/PLAN COMMISSION MINUTES
MONDAY DECEMBER 15, 2025
6:30 PM, BOARD ROOM
MUNICIPAL BUILDING, 210 COTTONWOOD AVE.
Present: Jeff Pfannerstill, Ann Wallschlager, Tim Hallquist, Jeff Bierman, Chip Schneeberger, David
DeCourcy-Bower and Mike Demet.
Excused: Tim Hallquist,
Others Present: Ryan Bailey, Tonia Smith, Tom Jenson, Scott Hussinger, Ryan Amtmann and Robert
Talbot.
Public Comments:
No Public Comments.
1. Consideration of a motion to approve the Jt. Architectural Board/Plan Commission minutes of
December 15, 2025
Motion (DeCourcy-Bower/Schneeberger) to approve the minutes of the December 15, 2026,
meeting. Carried (6-0).
2. Architectural Board review and consideration of an application for addition of an attached
garage at 216 Merton Avenue
Robert Couden, property owner at 216 Merton Avenue, was present and explained the attached
garage addition. He explained that there is currently no garage and that the proposed structure will
include attic storage to compensate for the lack of storage in the existing small, old house.
Commissioner Wallschlager inquired about the unusual property configuration, noting that there are
two homes on the lot and questioning the driveway access to the back house. Couden clarified that
while the survey may not clearly show it, there is a gravel driveway that extends to a stone sidewalk
leading to the rear house, approximately 40 feet from the parking area. He mentioned plans to pave
the driveway with asphalt next year and install a concrete sidewalk to the back house.
Regarding materials, Couden confirmed that the garage siding will match the existing home's siding.
The roof will use identical shingles to those installed in 2022, ensuring consistency with the existing
structure.
Building inspector Hussinger confirmed that the proposed garage meets all village setback
requirements. The question of permissibility for the walkway configuration was raised, with
confirmation that the village does not regulate sidewalks or driveways, making the current setup
acceptable given the unique nature of the property.
Motion: (DeCourcy-Bower/Schneeberger) moved to approve the addition of the attached garage at
216 Merton Avenue. Carried (6-0).
3. Architectural Board review and consideration of an application for signage for 122 E. Capitol
Drive -
Scott Baisie from Bower Sign and Lighting was present via zoom and explained the application on
behalf of Palmer Steakhouse. The project involves replacing the existing deteriorating blade sign
with a new, more durable version constructed of HDU (high-density urethane) panels that will be
painted to look like wood but offer superior weather resistance.
The new sign will feature top-down lighting and include a neon "open and immediate seating" sign
below, replacing a larger non-functioning sign currently in place. The design will maintain the
restaurant's branding while providing improved durability and functionality.
Motion: (DeCourcy-Bower/Schneeberger) moved the application for signage at 122 E. Capitol Dr.
Carried (6-0).
4. Plan Commission review and consideration of an Extraterritorial Certified Survey Map for the
Braden property at N30 W29315 Hillcrest Drive -
Village Manager Bailey explained that this property is within the village's extraterritorial boundary
but not in an area planned for future expansion. It was confirmed that the village is required to
approve certified survey maps in extraterritorial areas, even when no new construction is involved.
Motion: (DeCourcy-Bower/Schneeberger) to approve the Extraterritorial Certified Survey Map for
the Braden property at N30 W29315 Hillcrest Dr. Carried (6-0).
5. Discussion and consideration to erect a bulk water filling station at 570 Progress Drive, The
Village's Number 3 Wellhouse Site -
DPW Director Tom presented the proposal to install a prefabricated bulk water filling station to
replace the current honor-system arrangement using a fire hydrant. The existing system requires
customers to fill out forms indicating water usage, which creates accountability issues and potential
revenue loss.
Jenson explained that the new 4 x 6.5-foot prefabricated building will include a backflow preventer,
pressure relief system, and customer interface allowing payment via PIN pad or credit card, similar
to a gas station. The system will provide exact quantity measurements and immediate payment
processing, eliminating the need for year-end billing reconciliation.
The new location offers operational advantages, including easier access for large trucks and the
elimination of the need for vehicles to turn around in the dead-end area where the current hydrant
has been struck multiple times. Jenson noted that other municipalities using similar systems have
seen doubled water usage quantities, suggesting significant unreported usage under the current
system.
The facility will use the village's blue, white, and black color scheme and will be positioned on a
concrete slab with proper drainage. Fire department access will be maintained through PIN code
access. A question was asked about other potential revenue loss areas, which Jenson confirmed this
addresses the only bulk water sales location.
Motion: (Wallschlager/Schneeberger) to approve a bulk water filling station at 570 Progress Drive.
Carried (6-0).
6. Plan Commission review and consideration of Landscape Plans for Sandhill single-family
condominiums
Jim Siepman presented the landscape plan as a continuation of the existing Sandhill development
aesthetic. The proposal includes extending the black equestrian-style fencing along Winkelman Road
and creating a fence line to demarcate the boundary between the existing multifamily and new
single-family sections.
The plan features matching monument signs at the Terry Lane entrance, similar to those on
Homestead Road, though with different naming to distinguish the single-family section. A stone wall
using matching split-face fieldstone will separate the two phases along Sandhill Boulevard, with
appropriate signage for each section.
Landscaping will maintain consistency with the existing development, including a colonnade of trees
at the Terry Lane entrance and planting beds around monuments. Common areas will remain as
meadow grass or prairie restoration. The walking path will extend around the perimeter and into the
northern woods, with interior paved paths remaining private to residents.
Siepman clarified the HOA structure, explaining there will be two individual HOAs plus one
overarching HOA for common elements like roads and fences. Snow removal and landscaping for
single-family units will be managed separately from the existing multifamily units, though street
maintenance will remain unified for efficiency.
Siepman was asked about winter path maintenance and he explained that paths are not currently
plowed due to cost considerations and variability of weather conditions.
M
otion: (Wallschlager/Schneeberger) to the landscape plans for Sandhill single-family
condominiums. Carried (6-0).
7. A
rchitectural Board review and consideration of architectural standards for Sandhill single-
family dwellings to allow developer review of individual plans -
Siepman said the proposal establishes architectural standards that mirror those used in Windrush,
with some modifications for the site's constraints. Key requirements include natural exterior
materials, matching shingle roofs consistent with the existing Sandhill development, and traditional
roof lines rather than low-pitch or prairie styles. Three-and-a-half car garages represent the
maximum allowed to preserve lot space utilization.
Village Administrator Bailey explained that this system allows staff to review individual home plans
rather than requiring each home to come before the planning commission, streamlining the
approval process while maintaining design standards. Scott will review each home's architectural
plans and grading plans individually, similar to the successful Windrush process.
de Coursey-Bower asked about setback requirements between homes in this condominium
development versus typical single-family standards. The minimum side setback was confirmed at 20
feet between homes, which provides adequate access for maintenance while avoiding the
challenges of tighter setbacks seen in some communities.
Bierman inquired about parking adequacy given the road width and parking restrictions. The
development will follow the existing Sandhill model with parking allowed on only one side of the
streets to maintain emergency vehicle access. Front setbacks of approximately 30 feet will provide
adequate driveway parking for multiple vehicles.
M
otion: (deCourcy-Bower/Schneeberger) to the architectural standards for Sandhill single-family
dwellings to allow developer review of individual plans. Carried (6-0).
8. A
rchitectural Board and Plan Commission review and consideration of resubmittal of approved
addition for T-Lon at 1110 Richards Road -
Daniel from Oliver Construction presented the revised proposal for T-lon products, explaining that
after receiving initial approval, the property owner decided to proceed with a smaller scope. The
revised addition reduces the footprint by 2,700 square feet while maintaining the same overall
height and main facade fenestration as previously approved.
Changes include eliminating overhead door access on the south side, which will now be a solid brick
wall, and reducing the scope on the east side to use split-face block instead of brick accents,
consistent with the existing building's rear facade. The interior program remains the same open
warehouse space, and all materials will match the existing building to maintain visual consistency.
Scott confirmed that the curb appeal and street view will remain effectively the same as the
previously approved proposal, ensuring the reduction in scope does not negatively impact the
building's appearance from public areas.
Motion: (deCourcy-Bower/Schneeberger) to approve the resubmittal of approved addition for T-Lon
at 1110 Richards Road. Carried (6-0).
9. Plan Commission review of conceptual plan for Haight Drive
Village Manager Bailey introduced this conceptual proposal that had been presented to the village
board the previous week. The project involves permanently closing the dangerous intersection at
Haight Drive to create a community space, with funding being sought through a Vibrant Spaces
Grant worth $50,000.
Village Engineer Amtmann presented two conceptual alternatives for transforming the roadway into
a shared space that could serve both businesses (Beer Snobs and the Inn) and provide public
amenities. The closure would eliminate the problematic two-way stop that has created safety
hazards, including nearby misses with vehicles almost driving into Beer Snobs.
The concept envisions tables, igloos, and other amenities that could create a vibrant downtown
space during warmer months. The area would feature different zones, potentially including private
seating for the restaurants and public areas such as a holiday tree location and general sitting areas
near the library.
Several design considerations were discussed, including the use of decorative concrete rather than
grass due to maintenance challenges, the installation of bollards to prevent vehicle access, and the
approximately six-foot elevation change across the site. The businesses would maintain the space
under a potential lease arrangement, removing the burden from taxpayers while providing them
with operational benefits.
Schneeberger raised concerns about pedestrian circulation, suggesting that a central walkway might
better serve foot traffic than requiring people to navigate around restaurant seating areas. This led
to broader discussion about improving connectivity between this space and other village amenities
like the park to the east.
DeCourcy-Bower emphasized the need to consider the broader pedestrian network, noting that
removing stop signs on Cottonwood would affect crossing patterns and that the space should
connect well with surrounding areas. He suggested examining the entire intersection redesign and
considering improvements to pedestrian access along Haight Drive, including the bridge crossing
where sidewalks currently disappear.
The conversation expanded to consider the relationship with potential future development,
particularly regarding the former gas station property and planned Cottonwood Avenue
improvements. Bailey noted that major Cottonwood reconstruction, including buried power lines, is
planned but delayed pending area redevelopment to avoid road damage from construction traffic.
Practical concerns were addressed, including parking impacts (removal of nine spaces), the need for
agreements with property owners regarding liquor license boundaries, and winter maintenance
considerations. The engineering timeline includes initial meetings with adjacent property owners
before returning to the commission with refined concepts.
Bailey emphasized that multiple iterations would return to the board and encouraged ongoing
communication with staff.
It was suggested public input opportunities, such as displaying concepts at the library to gauge
community interest and gather feedback on this significant change to the village center.
The project timeline is driven by grant requirements, with applications already submitted for 2026
funding and potential 2027 alternatives available. Work could be completed in 2027 even with 2026
grant approval. Total project cost is estimated at $250,000, budgeted from cash reserves without
borrowing.
M
otion: (Schneeberger/Demet) to approve the conceptual plan for Haight Drive. Carried (6-0).
1
0. Announcements -
• Pfannerstill announced the upcoming election primary for Swallow School District, with
voting available at Village Hall for Village of Hartland residents.
• The recent "Sleep Out for Veterans" fundraising event was highlighted as a tremendous
community success. It was stated there was stated there was exceptional attendance with
favorable weather conditions, with activities both inside and outside the venue. It was noted
record-breaking donations with 131 baskets available for auction, demonstrating
strong community support for homeless veterans. The event traditionally occurs around
Valentine's Day weekend.
11. Adjourn -
Motion: (deCourcy-Bower/Schneeberger) to adjourn. Carried (6-0).
Meeting adjourned at 8:51 pm.
Respectfully submitted by
Recording Secretary,
Deidre Bushéy, Deputy Clerk
SURVEYING MEMBER
2554 N . 100th STREET
W AUW A TOSA, WISCONSIN 53226
ACSM
WSLS
WIDE
--PROSPECT AVE.--
ASSOCIA TES, I N C .
FREDERICK W . SHIBILSKI RLS
(414) 257-2212
SCALE 1 ° = 2 0 '
W C P S 0 0 2 5 5 2 9
N . 2 0 6 1 2 0 0 . . 79.21. 1 . 0 1 1
9 0 - 0 0 - 0 6 -
134.50'
61.2
103.2
132.0'
1 0 2 . 8
conc
٥٥٥٢ .
N e x i s t . OwELLING
PARK 3 . R - o - y
PLAT OF SURVEY
- o f -
LOT 26, PAWLING'S SECOND SUBDIVISION OF BLOCK FIVE, being a part of the
West 1 / 2 o f the Northeast 1/4 of
Section 3 , T o w n 7 North, Range 1 8
E a s t , in the Village of Hartland,
Waukesha County, Wisconsin.
Survey location: 320 Prospect Ave.
Buyer: B i l l y Neumann
11,9
EXIST.
GARAGES
2.w
Surveyed for: I D L MORTGAGE CORP.
"I hereby certify that I have surveyed the above described
property a n d that the above m a p i n a true representation thereof
and showe the size and location o f the property, its exterior
boundaries, the location o f all vinible structures a n d dimensions o f
all principal buildings thereon, boundary fences, apparent e a s e -
ments, roadways a n d encroachments, i f a n y .
I S C O N S I N R E G I S T E R E D L A N D S U R V E Y O R
79.2'
chn, in k .
1 n c .
o n prop. I n . - MISCONST FREDERICK W . SHIBILSKI 5 - 1 1 5 4
M I L W A U K E E ,
W I S .
"This survey i s made f o r the use o f the present owners o f t h e
p r o p e r t y , a n d a l a o those w h o p u r c h a s e , m o r i g a g e , o r guarantee the title thereto w i t h i n o n e y e a r from date hereof."
MONUMENTATION BY WRITTEN AGREEMENT WITH THE
ABOVE NAMED CLIENT (HAS MET B E E N WAIVED IN ACCORDANCE WITH A - E 8.01 ( 1 ) ( b ) OF THE WISCONSIN
ADMINISTRATIVE CODE
LAND
AND SURVEIN S U R V E Y a R
"THIS 1 8 NOT A N ORIGINAL
SURVEY UNLESS THIS BEAL
IS RED."
JULY22,1986
DATE
٥// ١
FIELD WORK BY
KIK / DIK DRAWN BY
1 3 1 1 5 JOB NUMBEA
LAUREN STRASSER
339 PROSPECT AVE
HARTLAND, WI 53029-2022
FEISTHAMMEL FAMILY TRUST
PO BOX 242
HARTLAND, WI 53029-0242
DAVID & JEAN CATANIA
328 PROSPECT AVE
HARTLAND, WI 53029-2023
VAGA PROPERTIES LLC
2960 HUNTINGTON CIR
BROOKFIELD, WI 53005-1927
MICHELE H ANDRAE
256 W CAPITOL DR
HARTLAND, WI 53029
PARK IT REAL ESTATE INVESTING LLC
N78W29196 FLYNN RD
HARTLAND, WI 53029-9551
CHRISTOPHER VIESSELMANN &
ERIN FLANAGAN
247 W PARK AVE
HARTLAND, WI 53029-2020
MICHAEL J HORVATH
205 W PARK AVE
HARTLAND, WI 53029
HARTLAND MEADOWS RETIREMENT
APARTMENTS LLC
W320N1161 BUTTERNUT RIDGE CT
DELAFIELD, WI 53018-2257
EDWIN & ANNETTE MILLER TRUST
354 PROSPECT AVE
HARTLAND, WI 53029
DAVID & SUSAN JAMBRETZ
338 PROSPECT AVE
HARTLAND, WI 53029
MAC HOLDINGS LLC
PO BOX 102
DOUSMAN, WI 53118-0102
CYNTHIA M BROWN
243 W CAPITOL DR
HARTLAND, WI 53029
DANIEL & SALLY ANDERSON
315 W CAPITOL DR
HARTLAND, WI 53029
FREDERICK F AND MARY J OTT 2011
LIVING TRUST
229 W PARK AVE
HARTLAND, WI 53029-2020
PAMELA FILO
344 PROSPECT AVE
HARTLAND, WI 53029
NICHOLAS & KATELYN GOMEZ
221 W PARK AVE
HARTLAND, WI 53029-2020
MAC HOLDINGS LLC
PO BOX 102
DOUSMAN, WI 53118-0102
THOMAS H BEAUMONT
310 ZION ST
HARTLAND, WI 53029
492 PARTNERS LLC
492 RIVERSIDE DR
PRINCETON, NJ 08540-5421
DAVID P& ERICA PEERS
345 PROSPECT AVE
HARTLAND, WI 53029-2022
MARGARET M CONDON
248 W CAPITOL DR
HARTLAND, WI 53029
ROBERT J & SUSAN L KOSANKE
2007 LIVING TRUST
237 W PARK AVE
HARTLAND, WI 53029
HARMANN RENTALS LLC
W320N9189 HIGHWAY 83
HARTLAND, WI 53029-9737
STEPHEN SECOSH
213 W PARK AVE
HARTLAND, WI 53029
SHAWN M HOPPE
320 PROSPECT AVE
HARTLAND, WI 53029-2023
TIMOTHY E MUELLER
330 PROSPECT AVE
HARTLAND, WI 53029-2023
Fence
Source: Village of Hartland website. First collected Oct 7, 2026.