Special Village Board Packet 02/24/2026
Village of Mazomanie · Dane County · meeting of Feb 24, 2026 · Agenda packets
Open the original document More from Village of Mazomanie
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
SPECIAL VILLAGE BOARD
TUESDAY, FEBRUARY 24, 2026, 4:00PM
133 CRESCENT ST MAZOMANIE, WI 53560
Please take notice that there will be a public meeting of the above governmental body, on the date, time, and place indicated for
purposes considering the subject matter set forth in the following agenda.
T
he following agenda will be followed:
1. Call to Order
2. Roll Call
3. Additions/Corrections/Approval of the Agenda
4. Approve meeting minutes from February 10, 2026
5. Citizen Comment on any subject not on the agenda
6. OLD BUSINESS (The following items may have action taken)
a. Presentation from Mazomanie Fire Department regarding the purchase of fire apparatus .
7. N
EW BUSINESS (The following items may have action taken)
a. Approval of the dumpster and recycle placement at Walter Crossing Townhomes.
b. Approval of the site plan for Plastic Ingenuity Expansion.
c. Approval of site plan for new home construction at 509 Ridge Drive pursuant to §415-10.
8. ANNOUNCEMENTS
9. ADJOURNMENT
A
ny person who has a qualifying disability, as defined by the Americans with Disabilities Act, that requires the meeting or materials at
the meeting to be in an accessible location for format, must contact the Village Clerk at (608) 795-2100, at least 24-hours prior to the
commencement of the meeting so that any necessary/reasonable arrangements can be made to accommodate each request.
P
osted: 2/19/26 Angie Volkman
Board Minutes
February 10, 2026
Members Present: Natalie Beil, Village President; Rob Westerlund, Ray Schlamp, Karen Peterson, Jim Marx,
Justin Martinez, and Dawn Forseth.
Absent Member: None
Attendance: Curt Erickson (Administrator/CEO), Angie Volkman (Clerk/Treasurer), Tara Roessler (Deputy
Clerk/Treasurer), Nate Teuscher (Dane County Deputy), and Camden Parman (Village of Mazomanie Fire Dept –
Chief)
Meeting was called to order at 5:00pm by Natalie Beil, Village President.
Motion by Forseth, second by Marx to approve the agenda. Motion carried unanimously.
Motion by Martinez, second by Peterson to approve minutes from January 13, 2026. Motion carried
unanimously.
Appearances & Significant Correspondence (the Village reserves the right to require people to register). None
VILLAGE PRESIDENT’S REPORT. Natalie stated that the Administrator’s report in the packet covered all of
the topics.
VILLAGE STAFF REPORTS:
FIRE/EMS. Parman noted that EMS is scheduled to meet on Thursday, February 12, to address an unexpected
expense that was not included in the budget.
DANE COUNTY SHERIFF’s. Teuscher provided an update on the Black Earth and Mazomanie Police
Department activity for January 2026. During the month, there were a total of 217 calls for service, including 126 in
Mazomanie and 91 in Black Earth. Teuscher noted a few of the “noteworthy calls for service” to the Board.
VILLAGE ADMINISTRATOR’S REPORT. Erickson’s report was included in the packet but highlighted the
following from his report:
1. Plan Commission. Erickson noted to the Board that a Plan Commission meeting was held on Monday,
February 9, and a motion to table action on 509 Ridge Drive was recommended due to the lack of
necessary materials available. A stop work order was issued 1/21 due to a violation of Zoning
Ordinance 415-10(E) Preservation of Topography. The next Plan Commission meeting will be held
Monday, February 23, 2026 at 9:00am which will consider action for 509 Ridge Drive, Plastic
Ingenuity’s expansion, and the Looye Development dumpster placement.
2. Streets. Erickson reported that he is working with the Department of Transportation to discuss
lowering the speed limit further west near the Village’s cemetery due to the potential expansion of
Plastic Ingenuity and Cardinal Glass, the Village has expressed concerns about traffic safety in the
area. In coordination with our Deputy, Erickson was able to get the accident data showing eight
reported incidents since 2023, three of which involved vehicle–deer collisions.
Public Works Director Report. The Public Works report was included in the meeting packet.
Library Director Report. The Library Director report was included in the meeting packet.
Clerk/Treasurer Report. The report was included in the board packet. Volkman noted that the Spring Primary is
Tuesday, February 17, 2026, with voting 7am-8pm.
Deputy Clerk/Treasurer Report. The report was emailed to the Board. Roessler provided examples of tasks that
were noted in her report.
OLD BUSINESS (The following items will be discussed and may have action taken on them.) None
NEW BUSINESS (The following items will be discussed and may have action taken on them.)
a. Approve the recommendation to maintain angled parking on Crescent Street and to not include a
portion of State St from Crescent St. to E. Hudson St. during the 2026 Street Project. Motion by
Marx, second by Martinez to approve the recommendation. Motion carried unanimously.
b. Presentation by Mazomanie Fire Department regarding replacement fire apparatus options.
Parman was unable to prepare the presentation in time for this meeting
c. Approve an alarm system fee per year – Residential $25; Commercial $50 per ordinance 150-11
(permits for private alarm systems). Motion by Martinez, second by Peterson to approve an
alarm system fee per year. Motion carried unanimously.
COMMITTEES (The following items will be discussed and may have action taken on them)
a. PERSONNEL COMMITTEE – (Forseth). Dawn Forseth noted nothing at this time.
b. PUBLIC WORKS & PROPERTY (Marx). Marx noted nothing at this time.
c. PARKS & RECREATION COMMITTEE (Marx). Erickson reported that the
Comprehensive Outdoor Recreation Plan will begin in March. He also noted that a Lake
Marion/Bluff volunteer meeting is scheduled for February 18 at 4:30 p.m.
d. PUBLIC PROPTECTION & ORDINANCE COMMITTEE (Martinez). Erickson
reported that the Village is awaiting the Village Attorney’s review of seven (7)
ordinances.
e. FINANCE COMMITTEE (Beil). Beil noted that finance will need to meet next month.
Payment of Bills. Motion by Marx, second by Peterson to pay the bills.
Motion carried unanimously.
f. PLAN COMMISSION (Beil). Beil reported that a Plan Commission meeting is scheduled
for Monday, February 23.
g. PUBLIC UTILITIES COMMISSION (Marx). Marx noted nothing at this time.
h. HISTORIC PRESERV ATION COMMITTEE (Martinez). Martinez reported that a
meeting is scheduled for Wednesday, February 11 at 9am.
i. VISIONARY ALLIANCE (Peterson). Peterson reported that she would like to schedule a
joint meeting with the Public Works Department.
j. V ANGUARD COMMISSION (Marx/Schlamp). Schlamp provided an update that
Vanguard is purchasing a new truck.
k. DANE-IOWA WASTEWATER COMMISSION (Erickson). Erickson reported that
Superintendent Jeff Moyer will retire in May. Shawn will assume the role of
Superintendent, and Mitchell will move into Shawn’s current position, leaving that
position vacant.
l. DISTRICT ONE EMS (Forseth). Forseth reported that the meeting is scheduled for
Thursday, February 13, 2026.
Motion to move into closed session was made by Forseth, second by Martinez at 5:38pm pursuant to
Wisconsin State Statutes 19.85(1)(c) considering employment, promotion, compensation, performance,
evaluation data of any public employee over which the governmental body has jurisdiction or exercises
responsibility. (Fire Department). Roll Call Vote passes 7 to 0.
Motion to move into open session was made by Martinez, second by Marx. Motion carried unanimously.
ANNOUNCEMENTS. Beil announced the Lake Marion and Bluff Park volunteer meeting on Wednesday,
February 18th.
ADJOURNMENT. Motion by Peterson, second by Martinez to adjourn. Motion carried unanimously.
The meeting was adjourned at 6:45 p.m.
Angie Volkman, Clerk/Treasurer
Mazomanie Fire Department
133 Crescent Street
Mazomanie, Wisconsin 53560
www.fire-ems.net/firedept/view/MazomanieWI
October 10, 2009
T
o: Mazomanie Village Board
T
he Mazomanie Fire Department proposes to replace the existing truck known as Ladder One with a newer, used
vehicle currently available from Command Fire Apparatus.
B
ACKGROUND: Mazomanie’s original ladder truck had an 85 foot aluminum ladder, a large complement of
ground ladders, lots of other portable equipment, and a 1000 gallons per minute (GPM) pump. The 1968 truck was
purchased in 1991 from Lombard, IL for about $37,000. The first ladder truck was acquired after a mutual aid
ladder from Mount Horeb played an important role in two large downtown fires. With the aid of the ladder truck,
the fires were contained preventing damage to adjacent structures. The 1968 truck developed engine problems in
2001. No parts were available for the old gas-powered engine, which is the primary reason that it was replaced with
the existing 1971 vintage truck.
T
he present 1971 American LaFrance Ladder 1 was purchased in 2001at a cost of $6, 000 plus the trade-in of the
1968 Mack. The present truck has a 100 foot steel ladder but no pump or water tank. The vehicle, powered by a
6V71 Detroit diesel engine, has a five-speed manual transmission. This is a classic vehicle with 40 year old
technology. The standard transmission is difficult to drive, even for an experienced driver, and the aerial ladder has
loading limitations that limit or prohibit its operation at low angles.
P
ROPOSED REPLACEMENT: The truck that we are proposing to purchase is a 1997 E -1 “quint.” It has a 8V71
Detroit diesel engine with an automatic transmission, and a 75’ ladder with a pre-piped nozzle that can be operated
on the tip of either the bed section or the fly section of the aerial ladder. There is a 1,500 GPM pump, and a 500
gallon booster tank, as well as many compartments for equipment. It has a full complement of ground ladders and
an on-board generator. This truck does not have the load limitations that restrict our use of the existing ladder, and
the pump and tank are a major advantage and addition to the departments capabilities .
S
UMMARY: In the early 1990s, our long-range plans called for $75,000 to be spent in about 1999 to refurbish old
Engine 2, and another $75,000 to refurbish Ladder 1 about five years later. This money had to be spent in 1999 to
purchase the new Engine 2 when the old 1972 Mack pumper developed major un- repairable transmission problems.
The 1971 ladder truck has been an asset to us for eight years, but it has outlived its useful life as a piece of
firefighting equipment. We estimate that the quality construction and the aluminum body on the 1997 truck will
allow it to serve the village for another 20 – 25 years.
R
ECOMMENDATION: The Mazomanie Volunteer Fire Department recommends that the Mazomanie Village
Board provides approval to move forward with the purchase of the 1997 E -1 Quint Ladder truck described. The
Department is seeking approval for $208,000. This figure includes the initial truck cost plus expected costs to place
the truck in service in the Village of Mazomanie. The Department also requests approval from the Village Board to
liquidate the existing vehicle and apply any funds received to the cost of the ladder apparatus.
Village Board Meeting – February 24, 2026
Plan Commission – February 23, 2026
Re: Dumpster Enclosure Placement – Walter Crossing Townhomes
Background
The applicants, Scott & Kevin Looye, requested Plan Commission consideration of a
proposed dumpster enclosure location at the Walter Crossing Townhomes.
Previous locations presented to the Plan Commission at the November 17, 2025 meeting
included:
• Between the two principal buildings; and
• The southeast corner of the lot near the Walter–Emily Road intersection.
Based on feedback received from the Plan Commission and discussing with neighbors that
reside at 611 Ridge Drive, the applicants are now proposing placement at the northeast
corner of their 4-unit complex, near the north driveway and in proximity to the Village’s
stormwater retention easement.
Zoning and Code Review
Staff and the Plan Commission has reviewed the proposal for compliance with applicable
Village ordinances.
• Driveway Width: The proposed driveway opening serving the enclosure will not
exceed 30 feet in width at the roadway, consistent with the Village’s driveway
ordinance §201-2.
• Setback: The enclosure is proposed to be located approximately 23 feet from the
road right-of-way (20’ for R-4 District) §415-20(D).
• Height: The enclosure will not exceed a maximum height of six (6) feet §415-86(B).
• Stormwater Easement: The proposed location is near the Village’s stormwater
retention easement. Final placement of both the concrete pad and enclosure must
be verified to ensure they are located outside of the easement area.
Analysis
The proposed north-end placement provides convenient access from the existing driveway
while maintaining required setbacks and dimensional standards. Due to the proximity of
the Village’s stormwater retention easement, verification of the easement boundaries is
necessary prior to final approval to prevent encroachment. Should the pad or enclosure
encroach on the easement, the Looye’s will be responsible for Village utility work that may
damage or remove their structure.
The orientation of the enclosure opening will determine whether a gate is required for
screening purposes:
• If the enclosure opening faces south, a gate will not be required.
• If the enclosure opening faces east, a gate will be required.
Plan Commission Action
The Plan Commission moved to conditionally approve the placement of the dumpster
enclosure at the northeast end of the buildings, subject to the following conditions:
1. Verification that the concrete pad and enclosure are located outside of the Village’s
stormwater retention easement.
2. Compliance with gate requirements based on enclosure orientation, as outlined
above.
525 Junction Rd | Suite 7000 | Madison, Wisconsin 53717
Phone: 608-826-0532 | Fax: 608-826-0530 | vierbicher.com
February 16, 2026
Chair and Members of the Village Plan Commission
Village of Mazomanie
133 Crescent St., PO Box 26
Mazomanie, WI 53560
Re: Site Plan for Plastic Ingenuity, Village of Mazomanie
Dear Chairperson Beil and Plan Commission Members:
The above-referenced site plan application was received in our office for review on behalf of the
Village of Mazomanie. The Applicant/Owner is Plastic Ingenuity. This site portrays the intended future
expansion of their facility in the Village of Mazomanie.
Vierbicher staff reviewed the following four (4) application materials (received February 6, 2026 unless
otherwise noted):
• 2026.01.16 PI Mazo Warehouse Schedule
• 2025.10.06 Geo Tech Report
• 260204_Plastic Ingenuity - Plan Commission (this is Ideal Builders & Sketchworks Architectures’
renderings)
• Plan Set 2026-02-06 (the Site Plan)
Summary of Request
Plastic Ingenuity desires to expand their Mazomanie facility with a 280ft x 800ft building with loading
docks, plus access drives and parking. To facilitate this business expansion, the Applicant in late CY2025
pursued a Certified Survey Map (CSM No. 16966) to combine five (5) legal parcels into one (1) legal
parcel, as well as a rezoning for the four (4) smaller parcels along Hudson St. from A-1
Agricultural/Holding District to the I-1 Industrial District.
Now, Plastic Ingenuity and its team have prepared a Site Plan to fulfill the requirements of §415-93 Site
Plan Approval & the Site Plan checklist per §215-11(5) Stormwater Management Plan Requirements. This
site plan requires review and recommendation by the Plan Commission, and subsequent review and
approval by the Village Board. “Action Items” in this letter represent actionable items the Village team
needs prior to a building permit being issued for construction; these action items are represented in the
possible motion language to conditionally approve.
Site Information
Location: One (1) parcel south of Hudson St.: 153/0806-172-0001-1
Adjacent Land Uses: N – residential (Town of Mazomanie)
E, S – Industrial
February 18, 2026
Page 2 of 6
W – Agricultural (Town of Mazomanie)
Zoning: I-1 Industrial District
Review Comments
Action items for the Village to consider, sorted by the four (4) materials provided for this review:
2026.01.16 PI Mazo Warehouse Schedule
1. The Schedule outlines component steps necessary for project completion. Line 33 notes a start
construction date of Mon April 13, 2026, while Line 55 notes a substantial completion date of
Thursday April 1, 2027.
Action Item 1: Plastic Ingenuity and its team shall share with the Village (staff; Christian Reid, PE;
Matt Miller, AICP, CNU-A) submitted as well as approved materials related to schedule line items:
12. State Plan Review;
16. County/ DNR Approvals;
17. DSPS Site Plumbing Approvals
Any/all necessary building permits; erosion control and/or stormwater management permits; or
other Village/Dane County/State of Wisconsin permits shall be obtained prior to construction
commencing.
2. Schedule Line 35 references Site Utilities.
Action Item 2: If the expansion necessitates updated/upsized utility services from the Village of
Mazomanie, Plastic Ingenuity and the Village of Mazomanie shall have a Developer Agreement
prepared, reviewed by respective legal counsels, signed, and recorded at the Dane County
Register of Deeds at Applicant expense prior to construction commencing.
2025.10.06 Geo Tech Report
3. The GeoTech report on page 1/37 states that:
“Based on the planned finished floor elevation in relation to existing site grades, fills on the order
of about 5.5 to 7.5± ft are typically anticipated to achieve finished site grades within the area of
the proposed building. However, fills on the order of about 16.5 ft are expected within the areas
of the existing stormwater basins.”
Action Item 3: Plastic Ingenuity team shall clarify the estimated total quantity of fill (in cubic
yards and corresponding truckloads) needed. This includes material moved within the site, as
well as material brought in from elsewhere.
4. The GeoTech report on page 3/37 for ‘1. Site Preparation’ states that:
“topsoil be stripped/removed at least 10 ft beyond the proposed construction areas, including
areas required for cuts and fills beyond the proposed building footprints and pavement areas.
The topsoil can be stockpiled on-site and re-used as fill in landscaped areas.
February 18, 2026
Page 3 of 6
Action Item 4: Plastic Ingenuity team shall clarify topsoil stockpiling locations on site to the
satisfaction of the Village Engineer.
5. The GeoTech report on page 4/37 for ‘1. Site Preparation’ states that CGC recommends that:
“fill placement to the design slab subgrade elevation occur early in the development.”
Question: Based upon schedule line 34 anticipating ‘site grading/building prep’ in April 2026,
what concerns, if any, does the Plastic Ingenuity team or Village have regarding
dust/vibration/noise impacts to adjacent property owners? What will construction hours be?
6. The GeoTech report on page 5/37 for ‘2. Foundation Design’ states that “interior footings have
no minimum requirement.”
Action Item 5: Plastic Ingenuity team shall clarify interior footings planned depth to the Village.
7. The GeoTech report on page 9/37 for ‘7. Stormwater Infiltration Potential’ states that CGC
recommends that:
“the soils at and several feet below the bottom of stormwater management system be checked
by a certified soil tester in conjunction with the basin designer to document that the soils are
appropriate for the design infiltration rate or recommend remedial measures, if necessary.”
Action Item 6: Plastic Ingenuity team shall have soils at/below the bottom of the stormwater
management system checked by a certified soil tester in conjunction with the basin designer.
This information shall be shared with the Village Engineer. Remedial measures and their
specifications, if necessary, shall be shared with the Village Engineer then enacted.
8. Action Item 7: CGC’s ‘Construction Considerations’ & ‘Recommended Construction Monitoring’
shall be followed to the maximum extent practicable.
260204_Plastic Ingenuity - Plan Commission (Ideal Builders & Sketchworks Architectures’ renderings)
This architectural planset portrays the intended warehouse addition. A couple fast facts:
• Estimated 222,472 GSF
• The warehouse building expansion is 280 ft wide by 800 ft long (excluding the connection to the
existing building).
• Fifteen (15) parking stalls – twelve (12) standard; two (2) van accessible; one (1) accessible
• Ten (10) loading bays on eastern elevation (façade), with one (1) 15’x15’ overhead door on
western elevation (façade).
• Dimensioned office/lounge/breakroom/restrooms are portrayed on sheet 2/5.
• There are twenty (20) ‘people doors’ across the four (4) elevations (facades).
Question: Based upon the anticipated finished grades / finished floor elevation as well as seeing
depictions of the twenty (20) ‘people doors,’ how would someone in a wheelchair enter this new
warehouse addition? Through the existing building/connection to the south? The parking lot
along the eastern elevation (near the seven loading bays, see depiction ‘East Elevation’)
provisions accessible parking, but does not have accessible entry into the building?
February 18, 2026
Page 4 of 6
Question: On Sheets 1 and 4/5, are small(er) trucks utilizing the three (3) loading bays numbered
8, 9, and 10? This plan (aerial) view does not appear to show sufficient pavement for a semi to
back into those stalls.
9. Action Item 8: The Architectural Planset shall be updated to concur with the Quam Engineering
plan set, as there are differences in parking lot location, parking stall quantity, and other features
(‘seven (7) loading bays’ to ‘ten (10) loading bays’).
Plan Set 2026-02-06 (the Site Plan)
This site plan was reviewed against the requirements of §415-93 Site Plan Approval & the Site Plan
checklist per §215-11(5) Stormwater Management Plan Requirements. Email correspondence regarding
these items occurred January 16, 2026. Comments below are arranged based upon the sheet within
the planset.
Sheet C-1 Existing Site Plan
Comment: This is an existing industrial site, with residences north of the property and open lands
to the west. Per DCI Map and FEMA NFHL, the site is neither regulatory floodway nor floodplain.
DCIMap does identify the site as an “internally drained area,” with stormwater comments
appearing below.
Comment: This sheet points out items which existing condition items are to be changed (such as
driveways) or removed, such as lighting or a 15” CMP culvert in road ROW.
10. Action Item 9: Work (repair or replacement) in Village Right-of-Way (ROW) shall be approved by
the Village.
Sheet C-2 Preliminary Proposed Site Plan
Comment: This planset shows ten (10) parking stalls along the eastern edge of the proposed
building. (See Action Item 8)
Question: How far is it anticipated that the ramp on the western elevation (façade) extends
from the building?
Comment: There was Village-Applicant correspondence in December 2025-January 2026
regarding access, specifically driveways. For reference:
Per §201-2(A), “a maximum of 30 feet at the property line […] and a maximum of 35 feet at the
roadway for […] all other properties.”
Per §201-2(C), “No more than two driveway entrances and approaches shall be constructed for
any lot or premises except where deemed necessary and feasible without the impairment of
safety, convenience and utility of the street by the Village Board.”
Plastic Ingenuity proposes three (3) total driveways: the existing driveway off Industrial Drive; the
existing driveway off Hudson St. in the center (with realignment); and one (1) new driveway in
the western extents of the property. Per a January 5, 2026 email with Aaron Falkovsky of Quam
Engineering:
February 18, 2026
Page 5 of 6
“The proposed [new western] driveway dimensions are 68ft at the property line and 151ft
at the roadway, which allow a semi to make the turn east onto Hudson without crossing
the centerline.”
11. Action Item 10: The Plastic Ingenuity team shall provide an exhibit documenting the total
impervious area of the site (existing; plus new building and pavement areas) to the Village
Engineer & Village Staff.
12. Action Item 11: Plan Commission recommends and Village Board approves that :
The Plastic Ingenuity request for three (3) total driveways, instead of two (2) per §201-
2(C), with
The third driveway closest to western lot line, possessing dimensions 68ft at the property
line and 151ft at the roadway, exceeding the standards per §201-2(A),
Are acceptable in the name of site accessibility and roadway safety.
13. Action Item 12: Per discussions between Village Engineer Christian Reid, PE and Village
Administrator Curt Erickson, increased truck traffic on Hudson Road affects the pavement. As a
result, Asphalt surface testing shall be performed by Plastic Ingenuity from Industrial Drive to the
proposed new western driveway. If pavement repair/replacement is necessary, it shall be
performed per Village standards at Plastic Ingenuity’s expense. Finally, Truck traffic shall not exit
the facility and head west onto Town roads. Truck traffic shall go to the east (right) onto Village
roads.
Sheet C-3 Preliminary Grading Plan
Comment: Please view Action Item 14 for Sheet C-6.
Sheet C-4 Preliminary Utility Plan
Comment: The proposed 280ft x 800 ft building has an estimated roof surface area of +-224,208
sq. ft [ 2 roof planes * (140.13ft edge x 800ft length). The western roof plane drains to the new
2026 Infiltration Basin, while the eastern roof plane drains to the relocated West Sediment Basin s.
New paved areas represent additional impervious area affecting stormwater volumes.
Question: What are the surface areas / volumes for the two (2) relocated west sediment basins,
the relocated west infiltration basin, and the 2026 Infiltration Basin? Is there a reason no new
sedimentation basin is (identified) on the western side of the proposed building?
Question: What size water and sanitary lines are necessary to service the new building? Will the
new building be sprinklered? Where services are to be expanded/provided, Action Item 2 shall
apply.
14. Action Item 13: The Plastic Ingenuity team shall clarify designs, specifications, and construction
for utilities as well as the stormwater management system to the satisfaction of the Village
Engineer and Village Public Works Director. The Stormwater Management system shall meet all
applicable Village of Mazomanie, Dane County, and Wisconsin DNR standards.
Sheet C-5 Building Addition Storm Sewer Plan
February 18, 2026
Page 6 of 6
Comment: Please see previous sheet for comments and action items.
Sheet C-6 Details
15. Action Item 14: The construction and maintenance of Erosion Control measures shall be in
accordance with Wisconsin DNR and Dane County requirements.
Sheet C-7 Preliminary Proposed Landscaping Plan
Comment: Autumn Brilliance Maple can have salt tolerance issues, so care should be taken with
how close they are planted to the property line (and thus Hudson Road) while not infringing on
contoured areas flowing to stormwater facilities.
16. Action Item 15: Landscaping shall not infringe upon safe sightlines for vehicles accessing the site
or Hudson Road. The Landscaping plan planting selections as proposed are acceptable and
shall be implemented as presented.
Recommendation
The Plan Commission may consider:
• Conditional approval of the site plan, plus
• Recommendation to the Village Board
I will attend the Monday February 23, 2026 Plan Commission and February 24, 2026 Village Board
meeting to answer any questions.
Sincerely,
Matthew G. Miller, AICP, CNU-A
Vierbicher
Enclosure: 2026-02-23 Plan Commission_Plastic Ingenuity Site Plan_Possible Motion Language
Cc: Village Board
Angie Volkman, Village Clerk
Curt Erickson, Village Administrator
Chris Statz, PW Director
William S. Cole, Village Attorney, Axley Brynelson LLP
Plastic Ingenuity, Attn: Troy Stoenner
Aaron Falkosky, PE, Quam Engineering
John Hentrich, Ideal Builders, Senior Project Manager
Tracy Johnson, Building Inspector
Christian Reid, PE, Town & Country Engineering Inc.
Andrew R. Kurtz, Planning and Community Development Manager, Vierbicher
M:\Mazomanie, Village of\250934 - 2025-2026 Development Reviews\001 - Plastic Ingenuity\Reviews\2026-02-16_Plastic Ingenuity
Site Plan Review Ltr.docx
6264 Nesbitt Road ∙ Madison, Wisconsin 53719 ∙ (608) 273-3350 ∙ www.tcengineers.net
Madison Rhinelander Kenosha Platteville
February 23, 2026
Mr. Curt Erickson, Village Administrator
Village of Mazomanie
133 Crescent Street, P.O. Box 26
Mazomanie, WI 53560
Subject: Plastic Ingenuity 2026 Expansion – Site Pl an Review
Dear Curt:
We have received the site plan for a proposed warehouse expansion for Plastic Ingenuity located
at 20 Industrial Drive dated February 6, 2026, and completed our review relative to the
infrastructure and engineering aspects of the proje ct. We understand a parallel review is being
completed by Matt Miller, Village Planner, covering zoning aspects of the site. We have
consolidated our comments with Village staff, and recommend approval of the plans conditioned
upon the following items:
Sheet C-1
The new expansion will require removal of the commu nity gardens facility that is located on the
Plastic Ingenuity property. That site is currently served by a 1-inch water lateral that will need to
be abandoned at the corporation stop of the water main. The existing meter pit will also need to
be abandoned and the meter returned to the Village.
Sheet C-2
It is not clear how/if the new expansion will receive sewer and water service. The fire chief should
be consulted about requirements related to fire hydrant proximity to the new expansion.
A number of existing private stormwater management features will need to be relocated for this
project. All changes to existing features and the s izing of new features will need to comply with
the Village, Dane County, and DNR requirements. Full approvals from those agencies should be
provided before commencing work.
It is also not clear how the connections to Hudson Street will be accomplished. Detailed elevations
of the driveway and road connection should be included in all successive submittals.
Page 2
Sheet C-3
A new fire hydrant and connection is shown near the existing main driveway to Hudson Street but
not labelled. If this is proposed, an isolation va lve will be needed near the main connection and
a minimum 10-foot long/full-width pavement patch pr ovided. The connection will need to be
further evaluated once the roadway connection details are provided.
General
An updated stormwater management maintenance affidavit will be needed to cover the relocated
and new stormwater features.
I plan on attending the upcoming plan commission me eting to address any questions that may
arise, but please also feel free to call regarding these comments.
Very truly yours,
TOWN & COUNTRY ENGINEERING, INC.
Christian J. Reid, P.E.
cc: Mr. Chris Statz, Public Works Director, Village of Mazomanie (via email)
Mr. William Cole, Village Attorney, Axley Brynelson (via email)
Mr. Matt Miller, Village Planner, Vierbicher (via email)
Mr. John Hentrich, Senior Project Manager, Ideal Builders (via email
Mr. Aaron Falkosky, Quam Engineering (via email)
J:\JOB#S\Mazomanie\MZ-146-M6 2026 Plastic Ingenuity Expansion Review\1. Admin and PM\2026 Expansion Re view Letter 1.docx
Residential and Commercial Site Design Consultants
Residential and Commercial Site Design Consultants
Residential and Commercial Site Design Consultants
Residential and Commercial Site Design Consultants
Residential and Commercial Site Design Consultants
Residential and Commercial Site Design Consultants
····
1.6.7.2.5.4. 8.3.
············
Residential and Commercial Site Design Consultants
LEVEL INFORMATION
A. 222,472 GSF
B. PARKING STALLS: 15 TOTAL
a. STANDARD: 12
b. VAN ACCESSIBLE: 2
c. ACCESSIBLE: 1
C. 7 LOADING DOCK BAYS
D. BUILDING MECHANICALS
0'
0' 30' 60'
1/2" 1"
SCALE: 1" = 60' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
DESIGN PARTNERS DEVELOPMENT PARTNERSPLASTIC INGENUITY WAREHOUSE ADDITION
SITE PLAN
1 OF 5 DATE: 02/04/2026
PLAN
NORTH
TRUE NORTH ROTATION
DN
LEVEL INFORMATION
A. 222,472 GSF
B. PARKING STALLS: 15 TOTAL
a. STANDARD: 12
b. VAN ACCESSIBLE: 2
c. ACCESSIBLE: 1
C. 7 LOADING DOCK BAYS
D. BUILDING MECHANICALS
1
A
B
4
C
2
2 OF 5
2
6'-2" 120'-0" 98'-0" 55'-10"
280'-0"
72'-0" 800'-0"
44'-0" 95'-0" 95'-0" 6'-0"
100'-0" 120'-0" 120'-0" 120'-0" 120'-0" 104'-0" 28'-6" 20'-8" 66'-10"
43'-5" 64'-11" 16'-8" 16'-8" 20'-11" 67'-9" 11'-4" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 11'-8" 116'-0" 120'-0" 120'-0" 90'-8"
240'-0"
4 OF 5
1
4 OF 5
2
4 OF 5
3
5 OF 5
1
5 OF 5
2
5 OF 5
3
EXISTING ROOF
25'-0" 25'-0" 25'-0" 25'-0" 16'-8" 16'-8" 16'-8" 25'-0" 25'-0" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 16'-8" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 24'-0" 24'-0" 24'-0"
3 5 6 8 9 10 11 12 14 15 16 18 19 20 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
25'-3" 25'-6" 25'-6" 25'-6" 25'-6" 25'-6" 25'-6" 25'-6" 25'-6" 25'-6" 25'-3"
D
E
F
G
J
K
L
M
N
Q
S
50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 72'-0"
38 39 40 41 42 43 44
872'-0"
70'-0" 70'-0" 70'-0" 70'-0"
H
1'-4"
1'-4"
P
A
B
6' -3" x 9' -2"
DRIVER'S BATHROOM
9' -2" x 12' -4"
DRIVER LOUNGE
5' -7" x 19' -3"
CORRIDOR
11' -9" x 19' -3"
OPEN OFFICE 12' -11" x 19' -3"
BREAKROOM
9' -5" x 11' -7"
MANAGER OFFICE
6' -5" x 10' -10"
WOMENS
9' -5" x 11' -7"
MANAGER OFFICE
6' -4" x 10' -7"
MENS
7'-2 1/4" 13'-1 1/2"
9'-10" 6'-0" 12'-2" 12'-0" 13'-4" 8'-1"
9 10 11 12
4'-0"
4'-0"
4'-0"
10'-1 5/8" 10'-2 1/8"
7'-8" 4'-7 1/4" 8'-0 1/2"
9'-11 5/8" 10'-4 1/8"
1'-8"
EIGHTEEN (18)
12"x12" LOCKERS
0' 1/4"
0' 8' 16' 32'
1/2" 1"
SCALE: 1/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
DESIGN PARTNERS DEVELOPMENT PARTNERSPLASTIC INGENUITY WAREHOUSE ADDITION
FLOOR PLAN
2 OF 5 DATE: 02/04/2026
FIRST FLOOR PLAN
PLAN
NORTH
TRUE NORTH ROTATION
FIRST FLOOR - ENLARGED OFFICE PLAN
0' 1/4"
0' 1' 2' 4'
1/2" 1"
8'
2"
SCALE: 1/4" = 1' -0"
DN
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0" 1/2" / 1'-0"
EXISTING ROOF
0' 1/4"
0' 2' 4' 8'
1/2" 1"
SCALE: 1/8" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
DESIGN PARTNERS DEVELOPMENT PARTNERSPLASTIC INGENUITY WAREHOUSE ADDITION
ROOF PLAN
3 OF 5 DATE: 02/04/2026
ROOF PLAN - PRESENTATION
PLAN
NORTH
TRUE NORTH ROTATION
FIRST FLOOR
100' -0"
EAVE
145' -0"
GRADE
96' -0"
WALL PACK LIGHT
METAL GUTTER SYSTEM
METAL ROOF
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
4'-0" 45'-0" 6'-2 1/2"
55'-2 1/2"
METAL PANEL SIDING
FIRST FLOOR
100' -0"
EAVE
145' -0"
GRADE
96' -0"
/
MATCHLINE
3 4 OF 5
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
METAL PANEL SIDING
METAL GUTTER SYSTEM
METAL ROOF
FIRST FLOOR
100' -0"
EAVE
145' -0"
GRADE
96' -0"
/
MATCHLINE
2 4 OF 5
METAL PANEL SIDING
METAL GUTTER SYSTEM
METAL ROOF
LOADING BAY
OVERHEAD DOOR
EXTERIOR STAIR
EXTERIOR DOOR LOADING BAY LEVELER
W/ BUMPER PAD
LOADING BAY
OVERHEAD DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
CANOPY
112' -0"
PRE -MADE CANOPY BY CANOPY SUPPLIER PRE -MADE CANOPY BY CANOPY SUPPLIER
METAL GUTTER SYSTEM
EXTERIOR STAIR
EXTERIOR DOOR
METAL GUTTER SYSTEM
STOREFRONT WINDOW
LOADING BAY
DOOR SEAL
LOADING BAY LEVELER
W/ BUMPER PAD
LOADING BAY
DOOR SEAL
WALL PACK LIGHT
0' 1/4"
0' 4' 8' 16'
1/2" 1"
SCALE: 1/16" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
DESIGN PARTNERS DEVELOPMENT PARTNERSPLASTIC INGENUITY WAREHOUSE ADDITION
EXTERIOR ELEVATIONS
4 OF 5 DATE: 02/04/2026
1/16" = 1'-0" 1 NORTH ELEVATION
1/16" = 1'-0" 2 EAST ELEVATION 1
1/16" = 1'-0" 3 EAST ELEVATION 2
FIRST FLOOR
100' -0"
EAVE
145' -0"
GRADE
96' -0"
METAL PANEL SIDING
METAL GUTTER SYSTEM
METAL ROOF
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
WALL PACK LIGHT
FIRST FLOOR
100' -0"
STOREFRONT
140' -0"
EAVE
145' -0"
GRADE
96' -0"
/
MATCHLINE
3 5 OF 5
METAL PANEL SIDING
METAL GUTTER SYSTEM
METAL ROOF
EXTERIOR DOOR
EXTERIOR STAIR
STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
FIRST FLOOR
100' -0"
STOREFRONT
140' -0"
EAVE
145' -0"
GRADE
96' -0"
EXISTING LOW EAVE
125' -5 1/4"
/
MATCHLINE
2 5 OF 5
METAL PANEL SIDING
METAL GUTTER SYSTEM
METAL ROOF
EXTERIOR STAIR
EXTERIOR DOOR
15'X15'
OVERHEAD DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
EXTERIOR STAIR
EXTERIOR DOOR
STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW STOREFRONT WINDOW
0' 1/4"
0' 2' 4' 8'
1/2" 1"
SCALE: 1/8" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
DESIGN PARTNERS DEVELOPMENT PARTNERSPLASTIC INGENUITY WAREHOUSE ADDITION
EXTERIOR ELEVATIONS
5 OF 5 DATE: 02/04/2026
1/16" = 1'-0" 1 SOUTH ELEVATION
1/16" = 1'-0" 2 WEST ELEVATION 1
1/16" = 1'-0" 3 WEST ELEVATION 2
ID Task Name Duration Start Finish
1 PI Mazo Warehouse 433 days Fri 7/18/25 Thu 4/1/27
2 Pre-Construction 182 days Fri 7/18/25 Mon 4/6/26
3 Concept Designing 2 wks Mon 6/30/25 Mon 7/14/25
4 PI Release Final Design 0 days Mon 12/29/25 Mon 12/29/25
5 Village of Mazomanie Plan
Commission Meeting
0 days Mon 1/26/26 Mon 1/26/26
6 Village of Mazomanie Plan
Commission Meeting
0 days Mon 2/16/26 Mon 2/16/26
7 Village of Mazomanie Village
Board Meeting
0 days Tue 2/10/26 Tue 2/10/26
8 Village of Mazomanie Village
Board Meeting
0 days Tue 3/10/26 Tue 3/10/26
9 Architectural & Structural Design 6 wks Tue 1/6/26 Mon 2/16/26
10 Preliminary Reaction and
Anchor Bolt Plan
0 days Fri 1/30/26 Fri 1/30/26
11 Pre-Engineered Metal Building
Shop Drawings
6 wks Tue 1/20/26 Mon 3/2/26
12 State Plan Review 6 wks Tue 2/17/26 Mon 3/30/26
13 Local Building Permit Review
and Approval
1 wk Tue 3/31/26 Mon 4/6/26
14 Building Permit is Available 0 days Mon 4/6/26 Mon 4/6/26
15 Final Civil Design 6 wks Mon 12/29/25 Mon 2/9/26
16 County/DNR Approvals 4 wks Tue 2/10/26 Mon 3/9/26
17 DSPS Site Plumbing Approvals 4 wks Tue 2/10/26 Mon 3/9/26
18 Final Project Pricing 2 wks Tue 2/3/26 Mon 2/16/26
19 Contract Execution Between
Ideal and PI
1 wk Tue 2/17/26 Mon 2/23/26
20 Award Suppliers/Subcontractors 1 wk Tue 2/24/26 Mon 3/2/26
21 Long Lead Procurement 85 days Mon 2/23/26 Tue 6/23/26
22 Release Long Lead Time Items 0 days Mon 2/23/26 Mon 2/23/26
23 Pre-Engineered Metal Building
Fabrication
16 wks Tue 3/3/26 Tue 6/23/26
24 Doors/Frames Review 10 days Tue 2/24/26 Mon 3/9/26
25 Doors/Frames Delivery 8 wks Tue 3/10/26 Mon 5/4/26
26 Overhead Door Drawings Review 10 days Tue 2/24/26 Mon 3/9/26
27 Overhead Door Delivery 6 wks Tue 3/10/26 Mon 4/20/26
28 Windows Review 10 days Tue 2/24/26 Mon 3/9/26
29 Windows Delivery 8 wks Tue 3/10/26 Mon 5/4/26
30 Loading Dock Equipment Delivery 4 wks Tue 2/24/26 Mon 3/23/26
31 Construction 358 days Mon 11/3/25 Thu 4/1/27
32 Site Work 26 days Mon 4/13/26 Tue 5/19/26
33 Start Construction 0 days Mon 4/13/26 Mon 4/13/26
34 Site Grading/Building Prep 10 days Tue 4/14/26 Mon 4/27/26
35 Site Utilities 10 days Tue 4/28/26 Mon 5/11/26
36 Site Grading/Loading Dock Prep 3 days Tue 5/12/26 Thu 5/14/26
37 Base Coarse 3 days Fri 5/15/26 Tue 5/19/26
38 Building Shell 230 days Tue 4/28/26 Wed 3/24/27
39 Building Foundations 16 wks Tue 4/28/26 Wed 8/19/26
40 Metal Building Erection and
Insulation
26 wks Thu 7/30/26 Wed 2/3/27
41 Site Concrete 10 days Thu 2/4/27 Wed 2/17/27
42 Asphalt 10 days Thu 2/4/27 Wed 2/17/27
43 Landscaping 25 days Thu 2/18/27 Wed 3/24/27
44 Floor Slabs 10 wks Tue 12/15/26 Wed 2/24/27
45 Interior Buildout 46 days Thu 1/28/27 Thu 4/1/27
46 Steels Stud/Drywall 10 days Thu 1/28/27 Wed 2/10/27
47 Overhead Doors/Loading
Dock Equipment
5 days Thu 2/11/27 Wed 2/17/27
48 Aluminum Windows 5 days Thu 2/18/27 Wed 2/24/27
49 Doors/Frames/Hardware 2 days Thu 2/25/27 Fri 2/26/27
50 Painting 5 days Mon 3/1/27 Fri 3/5/27
51 Flooring 5 days Mon 3/8/27 Fri 3/12/27
52 Casework 2 days Mon 3/15/27 Tue 3/16/27
53 Finishes 10 days Mon 3/15/27 Fri 3/26/27
54 Testing & Inspections, Final
Cleaning, Punchlist
3 days Mon 3/29/27 Wed 3/31/27
55 Substantial Completion 1 day Thu 4/1/27 Thu 4/1/27
PI Release Final Design
Village of Mazomanie Plan Commission Meeting
Village of Mazomanie Plan Commission Meeting
Village of Mazomanie Village Board Meeting
Village of Mazomanie Village Board Meeting
Architectural & Structural Design
Preliminary Reaction and Anchor Bolt Plan
Pre-Engineered Metal Building Shop Drawings
State Plan Review
Local Building Permit Review and Approval
Building Permit is Available
Final Civil Design
County/DNR Approvals
DSPS Site Plumbing Approvals
Final Project Pricing
Contract Execution Between Ideal and PI
Award Suppliers/Subcontractors
Long Lead Procurement
Release Long Lead Time Items
Pre-Engineered Metal Building Fabrication
Doors/Frames Review
Doors/Frames Delivery
Overhead Door Drawings Review
Overhead Door Delivery
Windows Review
Windows Delivery
Loading Dock Equipment Delivery
Site Work
Start Construction
Site Grading/Building Prep
Site Utilities
Site Grading/Loading Dock Prep
Base Coarse
Building Shell
Building Foundations
Metal Building Erection and Insulation
Site Concrete
Asphalt
Landscaping
Floor Slabs
Steels Stud/Drywall
Overhead Doors/Loading Dock Equipment
Aluminum Windows
Doors/Frames/Hardware
Painting
Flooring
Casework
Finishes
Testing & Inspections, Final Cleaning, Punchlist
Substantial Completion
6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 1 6 11 16 21 26 31 5 10 15 20 25 30 5 10 15 20 25 30 4 9 14 19 24 29 4 9 14 19 24 29 3 8 13 18 23 28 2 7 12 17 22 27 2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 1 6 11 16 21 26 31 5 10 15 20 25 30 5
December 2025 January 2026 February 2026 March 2026 April 2026 May 2026 June 2026 July 2026 August 2026 September 2026 October 2026 November 2026 December 2026 January 2027 February 2027 March 2027 April 2027 May 2027
PI Mazo Warehouse Addition
20 Industrial Dr.
Mazomanie, WI 53560
Date: Fri 1/16/26
October 6, 2025
C25410
Mr. John Hentrich
Ideal Builders, Inc.
1406 Emil Street
Madison, WI 53713
Re: Geotechnical Exploration Report
Plastic Ingenuity – North Expansion
20 Industrial Drive, Mazomanie, Wisconsin
Dear Mr. Hentrich:
Construction • Geotechnical Consultants, Inc. (CGC) has completed the subsurface exploration
program for the above-referenced project. The purpose of this program was to evaluate the subsurface
conditions within the proposed construction area s and to provide geotechnical recommendations
regarding site preparation, foundation, floor slab, loading dock wall and pavement design/construction.
Seismic site class and stormwater infiltration potential will also be discussed. An electronic copy of
this report is provided for your use.
PROJECT DESCRIPTION / SITE CONDITIONS
We understand that Plastic Ingenuity is planning to construct a new structure just north of the existing
plant in Mazomanie, Wisconsin. The structure is anticipated to consist of the construction of single-
story (high bay), slab-on-grade building, with a footprint covering about 140,000 sq. ft. A potential
70,000 sq. ft., future expansion along the north end of the proposed new building may be considered
in the future. Paved access drives, parking and loading docks are planned along the east and west sides
of the new building . The finished floor elevation of the building is understood to be planned at EL
773.5. Stormwater management basins are generally planned beyond the proposed access drives to the
east and west of the new building. Refer to the Boring & Test Pit Location Exhibit provided in
Appendix B for a depiction of the proposed site layout.
The topography of the subject site is relatively flat, with e xisting site grades within the proposed
development area ranging between about EL 770 and 766. However, two (2) existing stormwater
basins, with apparent bottom elevations around EL 757 to 758, are present near the southeast corner of
the planned new building. The majority of the planned development area is comprised of grass, beyond
the existing asphalt access drive and loading dock/parking area, along the north side of the existing
plant. A fenced-in community garden exists within the northwest portion of the site.
Based on the planned finished floor elevation in relation to existing site grades, fills on the order of
about 5.5 to 7.5 ± ft are typically anticipated to achieve finished site grades within the area of the
proposed building. However, fills on the order of about 1 6.5 ft are expected within the area s of the
existing stormwater basins.
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 2
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
SUBSURFACE CONDITIONS
Subsurface conditions were explored by drilling 8 Standard Penetration Test (SPT) soil borings and
excavating three (3) test pits at locations selected by the project design team. More specifically, the
borings were performed within the new building area to a depth of 15 ft below grade. As an exception,
Boring 8 was completed in the area of a proposed stormwater management system. The test pits were
performed to the planned depth of 12 ft.
The boring and test pit locations were staked in the field by CGC utilizing conventional taping
procedures referenced to existing site features . The ground surface elevations at each location were
estimated by CGC from the provided topographic site plan prepared by Quam Engineering . The
borings were drilled by America’s Drilling Company ( under subcontract to CGC) on September 24,
2025 using a Geoprobe rotary drill rig equipped with hollow -stem augers and an automatic SPT
hammer. The specific procedures used for drilling and sampling are described in Appendix A. The test
pits were excavated by Hellenbrand Bros. Excavating (under subcontract to CGC) and logged by CGC
on September 17, 2025. The approximate boring and test pit locations are shown in plan on the Boring
& Test Pit Location Exhibit attached in Appendix B.
The subsurface profile at the boring and test pit locations were similar and can generally be described
by the following strata (in descending order):
• Approximately 3 to 18± in. of sandy topsoil/topsoil fill; underlain by
• Very l oose to medium dense , native sand with varying silt and gravel contents,
extending to the maximum depths explored.
It is important to note the near surface sand soils immediately below the surficial black sandy topsoil
were typically dark brown in color and contained appreciable silt contents, but minimal organic matter.
Distinguishing between topsoil and underlying inorganic dark sand soils during topsoil stripping will
therefore likely be difficult. Additionally, dark brown sand fill was encountered to depths of about 3
and 1.5± ft at Borings 1 and 2.
Representative samples of the relatively dark, native sand strata encountered below the surficial topsoil
and/or fill at Borings 2, 4 and 5 were tested for their natural moisture and organic contents in our
laboratory. Moisture contents were determined to range between about 9.3 and 11.9%, with associated
organic contents varying between about 1.9 and 2.3% . For reference, soil containing less than 4%
organic matter are typically considered inorganic or slightly organic.
Two (2) samples from the test pits were subjected to sieve analysis (gradation) testing to aid in their
USDA classification. The results of the gradations are presented in the Particle Size Distribution
Reports enclosed in Appendix E.
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 3
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
Groundwater was not encountered in the borings or test pits during or immediately after completion.
As an exception, apparent groundwater was noted in Boring 2 below a depth of about 14 ft (EL 749±)
during drilling. Groundwater levels are expected to fluctuate with seasonal variations in precipitation,
infiltration, evapotranspiration and other factors . A more detailed description of the site soil and
groundwater conditions is presented in Appendix B on the Soil Boring Logs and in Appendix E on the
Wisconsin Department of Safety & Professional Services Soil and Site Evaluation – Storm forms for
the test pits and designated stormwater boring (B-8).
DISCUSSION AND RECOMMENDATIONS
Subject to the limitations discussed below and based on the subsurface exploration, it is our opinion
that the site is suitable for the proposed construction and that the proposed structure can be supported
by conventional spread footing foundations bearing on natural sand soils and/or properly placed and
compacted granular structural fill . However, moisture conditioning, recompaction and/or
undercutting/replacement of very loose to loose sand , where present, will likely be required prior to
structural fill placement and/or below foundations . Furthermore, in view of the amount of fill
anticipated to raise site grades in some areas, it is imperative that structural fill soils are properly
placed and compacted early in the development of the site, as outlined in the following Site Preparation
section. Our recommendations for site preparation, foundation, floor slab, loading dock wall and
pavement design/construction are presented in the following subsections. Seismic site class and
stormwater infiltration potential are also discussed. Additional information regarding the conclusions
and recommendations presented in this report is discussed in Appendix C.
1. Site Preparation
We recommend that the topsoil be stripped/removed at least 10 ft beyond the proposed construction
areas, including areas required for cuts and fills beyond the proposed building footprints and pavement
areas. The topsoil can be stockpiled on-site and re-used as fill in landscaped areas. As noted previously,
topsoil thicknesses of about 3 to 18± in. were encountered in the borings and test pits , but variable
topsoil thicknesses should be expected between and beyond boring/test pit locations. As stated earlier,
the relatively dark sand underlying the surficial topsoil appears to be inorganic and does not need to
be stripped prior to fill placement. However, differentiating between the surficial organic topsoil and
the underlying inorganic, dark sand will require a trained eye during site stripping. Trees and tree
roots should be removed in conjunction with topsoil stripping. Care should also be exercised when
removing organic soils, engineered soils, or accumulated silt/fines from within the existing stormwater
facilities in the southeast.
Following clearing, grubbing and topsoil removal, the exposed subgrades are generally expected to
consist of natural sand soils with varying silt and gravel contents. In general, the silt content of the
sand soils typically decreased with depth on this site. Exposed sand soils in areas to receive fill should
be thoroughly compacted with a smooth drum vibratory roller . Where loose / yielding areas are
identified which cannot be adequately densified through compaction, the areas should be undercut and
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 4
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
replaced with granular backfill compacted to at least 95% compaction based on modified Proctor
methods (ASTM D1557) in accordance with our Recommended Compacted Fill Specifications
presented in Appendix D. Alternatively, 3 -in. dense graded base (DGB) that is placed in loose 10-in.
lifts and compacted until deflection ceases can also be used to restore grades in undercut areas. Note
that discing or scarifying of relatively wet siltier sand soils, if encountered, should be considered to
promote drying of the materials and potentially reduce (but not necessarily eliminate) the amount of
undercutting.
Fill placement to establish site grades can proceed following the development of a firm, stable
subgrade. Given the amount of fill required to achieve site grades, we recommend that fill placement
to the design slab subgrade elevation occur early in the development. To the extent possible, we
recommend using granular soils (i.e., sands/gravels) as structural fill, because these soils are relatively
easy to properly place and compact in most weather conditions compared to clay/silt soils. Note that
the on-site sand soils (SM , SP-SM and SP on the logs) are considered adequate for use as structural
fill/backfill, provided moisture contents are near the optimum moisture contents in order to facilitate
adequate compaction during placement. The addition of water to the cleaner sand soils (denoted as SP
and SP-SM on the boring logs) will likely be required to aid in achieving adequate compaction levels.
We recommend that structural fill be compacted to at least 95% compaction based on modified Proctor
methods (ASTM D1557) following Appendix D guidelines. Periodic field density tests should be taken
by CGC staff within the fill to document the adequacy of compactive effort.
Excavation work should proceed in accordance with OSHA slope guidelines. The cleaner sand soils
(SP to SP-SM on the borings logs) encountered on the site are generally classified as OSHA “Type C”
soils, and excavation slopes of 1.5H:1V are expected to be temporarily stable. Appropriate excavation
slopes should be determined by a competent person completing the earthwork.
2. Foundation Design
In our opinion, the proposed structures can be supported on reinforced concrete spread footing
foundations bearing on the native sand soils and/or structural fill used to achieve site grades . The
recommended allowable bearing pressure is controlled by the very loose to loose conditions
encountered in several of the borings below foundation elevations. Isolated undercutting/replacement
may be required where very loose sand soils remain following recompaction. Provided the
recommendations regarding foundation subgrade preparation and evaluation outlined below are
followed, the following parameters should be used for foundation design:
• Maximum allowable bearing pressure: 2,000 psf
• Minimum foundation widths:
-- Continuous wall footings: 18 in.
-- Column pad footings: 30 in.
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 5
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
• Minimum footing depths:
-- Exterior/perimeter footings: 4 ft
-- Interior footings: no minimum requirement
We recommend using a smooth-edged backhoe bucket for footing excavation. Given the prevalent very
loose to loose conditions encountered in several of the borings, footing subgrades must be rigorously
compacted with an excavator-mounted vibratory compactor (i.e., hoe-pak) or large vibratory smooth
drum roller to densify the subg rade soils. The addition of water to the subgrades (prior to applying
compactive effort) may be required to aid in compaction of the cleaner sands (i.e., SP and SP-SM soils
shown on the logs). Recompacted subgrades should be carefully evaluated by CGC. Subgrades that
are not adequately densified should be removed to a depth of 2 ft below design footing grade, the base
of the undercut moistened and thoroughly compacted until no deflection is noted, and then the undercut
backfilled with the previously removed sand soils. The sand backfill should be placed in 8 to 12 in. lifts
and compacted with a large vibratory plate compactor or hoe -pak (backhoe mounted compactor) to a
minimum of 95% of the maximum dry density as determined by ASTM D 1557. The base of undercut
excavations should be widened beyond the footing edges at least 0.5 ft in each direction for each foot
of undercut depth for stress distribution purposes. As an alternative to reusing sand soils, 3-in. dense
grade base (DGB) could be placed and compacted to restore footing grade in undercut areas. CGC staff
should be present during footing excavations to check that adequate bearing conditions exist and during
backfilling to check compaction levels.
Provided the foundation design/construction recommendations discussed above are followed, we
estimate that total and differential settlements should not exceed 1.0 and 0.5 in., respectively.
3. Floor Slabs
In our opinion, the floor slab can be supported on the native sand or newly placed/compacted fill used
to achieve design grades, where necessary . Prior to slab construction, slab subgrades should be
compacted or recompacted, as described in the Site Preparation section of this report, and stabilized as
needed with 3-in. DGB or replaced with compacted granular fill.
To act as a bedding layer below the slab, we recommend including a minimum 6 -in. thick layer of
dense graded base (DGB), such as 1¼-in. DGB, immediately below the slab. To reduce the potential
for moisture migration through the slab, a vapor barrier can also be utilized. Fill and base layer material
below the floor slab should be placed as described in the Site Preparation section of this report. Slabs
constructed on a minimum 6 -in. thick DGB layer may be designed utilizing a subgrade modulus of
150 pci. The design subgrade modulus is based on a firm or adequately stabilized, recompacted
subgrade such that non-yielding conditions are developed. loor slabs should be structurally separated
from footings with a compressible filler and have construction joi nts and reinforcement for crack
control.
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 6
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
4. Seismic Site Class
In our opinion, the average soil/rock properties in the upper 100 ft of the site (based on predominantly
loose to medium dense sands encountered in the borings and estimated SPT blow counts generally
increasing with depth) may be characterized as a stiff soil profile. This characterization would place
the site in Site Class D for seismic design according to the International Building Code and ASCE 7.
5. Loading Dock and Site Retaining Walls
We anticipate that the exterior building wall in loading dock area s will be laterally restrained from
rotating by the floor slab. Therefore, at-rest lateral earth pressures resulting from the wall backfill
(below the floor slab) should be used during design of these walls. Walls that are not restrained from
rotating (such as exterior site retaining walls, including retaining walls along the sides of exterior
loading dock ramps) can be designed for active earth pressures behind the walls and passive pressures
in front of the walls. To reduce the buildup of such pressures, high -quality backfill should be placed
within 4 to 6 ft of the walls, consisting of well -graded sand or gravel having no more than 12% by
weight passing the No. 200 U.S. standard sieve (i.e., USCS designations SP, SP-SM, GP or GP-GM).
Soils containing cobbles/boulders should not be used in direct contact with loading dock or other site
retaining walls.
Weepholes should be placed near the base of exterior site retaining walls (if planned) on 10-ft centers
to provide drainage of the wall backfill. The weepholes should be hydraulically connected with the
backfill and should be protected with a non-woven geotextile fabric to minimize soil loss through the
weepholes. The wall designer may have other and/or additional drainage requirements.
Compaction of the backfill within 3 to 5 ft of the walls should be performed with lightweight
equipment to avoid the development of excessive lateral earth pressures. The backfill should generally
be compacted to a minimum of 93% modified Proctor followin g Appendix C guidelines, but a
minimum 95% compaction is recommended where footings, floor slabs or pavement will bear on the
wall backfill. Loading dock walls restrained from rotating and constructed in accordance with the
previous recommendations may be designed for an equivalent fluid pressure of 55 psf per ft of depth
(drained, at-rest conditions). Walls not restrained from rotating constructed in accordance with the
above recommendations may be designed for an active equivalent fluid pressure of 35 psf per ft of
depth behind the walls, and passive pressures on the order of 200 psf per ft of depth in front of the
walls, also assuming drained conditions. The passive pressure value includes a safety factor of 2 to
prevent excessive wall deflection. Add itionally, the wall design should also account for surcharge
effects that could be applied during or after construction.
We recommend using an ultimate concrete-to-soil friction factor of 0.4 for retaining wall footings
bearing on compacted sand. Retaining wall footing subgrades should be evaluated and prepared as
discussed in the Building Foundations section.
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 7
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
6. Pavement Design
Subgrade soils within planned parking and drive areas are generally expected to consist of native sand
soils and compacted granular fill used to achieve site grades . Pavement subgrades should be re -
compacted (and moistened where subgrades are comprised of relatively dry, clean sands), as described
in the Site Preparation section of this report, and stabilized as needed with compacted coarse stone or
replaced with compacted granular fill.
We expect that the new 15-stall asphalt parking lot planned along the east side of the new building will
be exposed to automobile traffic, with less than one 18-kip equivalent single axle load (ESAL) assumed
per day. In view of this, we have assumed Traffic Class I following Wisconsin Asphalt Pavement
Association (WAPA) recommendations for the small parking area. However, for the main access
drives and loading dock areas where tractor-trailer traffic will be experienced, we have assumed Traffic
Class III according to WAPA. The pavement sections summarized in Table 1 below were selected
assuming a Soil Support Value “SSV” of about 4.0 for a firm or adequately stabilized sand subgrade
and a design life of 20 years.
TABLE 1
Recommended Pavement Sections
Material
Thicknesses (in.)
WisDOT Specification (1) Traffic Class I
(Light Duty)
Traffic Class
III
(Heavy Duty)
Bituminous Upper Layer (2,3) 1.75 2.0 Section 460, Table 460-1
Bituminous Lower Layer (2,3) 1.75 2.5 Section 460. Table 460-1
Dense Graded Base Course (2,3) 8.0 12.0 Sections 301 and 305,
3 in. and 1¼ in.
Total Thickness 11.5 16.5
Notes:
1) Wisconsin DOT Standard Specifications for Highway and Structure
Construction, latest edition, including supplemental specifications, and
Wisconsin Asphalt Pavement Association 2021 Asphalt Pavement Design Guide.
2) Compaction requirements:
- Bituminous concrete: Refer to Section 460-3.
- Base course: Refer to Section 301.3.4.2, Standard Compaction
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 8
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
3) Mixture Type LT bituminous; refer to Section 460, Table 460 -2 of the Standard
Specifications. Note that a 5LT mix should not be utilized, as settlement and/or
shoving of the pavement surface may occur under turning and/or parked vehicles,
especially during summer months.
4) The upper 4 in. should consist of 1¼ -in. DGB; the bottom part of the layer can
consist of 3-in. DGB.
The recommended pavement sections assume regular maintenance (crack sealing, etc.) will occur, as
needed. Note that if traffic volumes are greater than those assumed, CGC should be allowed to review
the recommended pavement sections and adjust them accordingly. Alternative pavement designs may
prove acceptable and should be reviewed by CGC.
Where concrete pavement may be used, such as in pavement areas subjected to concentrated wheel
loads (e.g., dumpster pads, etc.), we recommend that the concrete pavement be at least 6 -in. thick, be
underlain by at least 6 in. of DGB and contain reinforcement for crack control. Concrete slabs underlain
by a minimum 6-in. thick dense graded base layer over a firm or stabilized subgrade can be designed
utilizing a subgrade modulus of 150 pci. Note that a thicker pavement section (more than 6 in. of
concrete) may be required at dolly pads or truck aprons, depending on anticipated pavement loads,
which should be evaluated by a structural engineer.
7. Stormwater Infiltration Potential
Test Pits 1 through 3 and Boring 8 were requested and performed in the area of proposed stormwater
management systems. The subsurface profiles encountered below the surficial topsoil in the test pits
(and boring) were generally similar, and they consisted of granular soils comprised of sandy loam,
gravelly sandy loam, gravelly loamy sand, fine sand, sand, and/or gravelly sand, extending to the test
pit termination depths. As an exception, a relatively thin stratum of silt loam was noted below the
surficial topsoil in TP-1. Groundwater was not noted within the test pits (or stormwater boring) above
the depths explored . In our opinion, the subsurface conditions encountered in the test pits (and
associated borings) generally appear well suited for infiltrating stormwater.
Infiltration Potential: The following is a summary of the estimated infiltration rates
for the soils encountered in the test pits and Boring 8 , per Table 2 of the WDNR
Conservation Practice Standard 1002, Site Evaluation for Storm Water Infiltration .
The estimated infiltration rates are as follows:
• Silt loam (SIL) 0.13 in./hr
• Sandy loam (SL) 0.50 in./hr
• Gravelly sandy loam (GRSL) 0.50 in./hr
• Fine sand (FS) 0.50 in./hr
• Gravelly loamy sand (GRLS) 1.63 in./hr
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 9
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
• Sand (S) 3.60 in./hr
• Gravelly sand (GRS) 3.60 in./hr
Note that the infiltration rates should be considered very approximate since they are
merely based on soil texture and do not account for in -place soil density and other
factors, which will affect the infiltration rate. We recommend that the soils at and
several feet below the bottom of stormwater management system be checked by a
certified soil tester in conjunction with the basin designer to document that the soils are
appropriate for the design infiltration rate or recommend remedial measures, if
necessary. Variability in the soil conditions should be expected across the site, which
could result in a wide range of undercut depths to reach soil suitable for the design
infiltration rate. The Wisconsin Department of Safety & Professional Services Soil
and Site Evaluation – Storm forms for the test pits (and designated stormwater boring)
are contained in Appendix E.
Groundwater: Groundwater was not encountered in the stormwater test pits or boring
above the depths explored . However, seasonal fluctuations in the groundwater level
should be expected on this site.
Bedrock: Bedrock was not encountered in the test pits or borings above the depths
explored.
During construction, appropriate erosion control should be provided to prevent eroded soil from
contaminating the stormwater management areas. Where appropriate, the stormwater system design
should include pretreatment to remove fine -grained soils (silt/c lay) and clogging materials
(oils/greases) from stormwater prior to entering the infiltration areas. Additionally, a regular
maintenance plan should be developed to remove silt/clay soils and clogging materials that may
accumulate in the bottom of the stormwater management areas over time. Failure to adequately control
fine-grained soils and clogging materials from entering the infiltration areas or failure to regularly
remove fine -grained soils and clogging materials that accumulate at the base of the st ormwater
infiltration systems will likely cause the stormwater management systems to fail. Additionally, it is
important that the soils in the bottom of the infiltration systems do not become compacted during
construction or measures are taken to mitigate soils that are compacted during construction. Refer to
WDNR Conservation Practice Standards 1002, 1003 and 1004, as well as NR151 for additional
information.
CONSTRUCTION CONSIDERATIONS
Due to variations in weather, construction methods and other factors, specific construction problems
are difficult to predict. Soil related difficulties which could be encountered on the site are discussed
below:
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 10
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
• We recommend that final site grading activities be completed during dry weather, if
possible. Construction traffic should be avoided on prepared subgrades to m inimize
potential disturbance.
• Earthwork construction during the early spring or late fall could be complicated as a
result of wet weather and freezing temperatures. During cold weather, exposed
subgrades should be protected from freezing before and after footing construction. Fill
should never be placed while frozen or on frozen ground.
• Excavations extending greater than 4 ft in depth below the existing ground surface
should be sloped or braced in accordance with current OSHA standards.
RECOMMENDED CONSTRUCTION MONITORING
The quality of the foundation , floor slab and pavement subgrades will be largely determined by the
level of care exercised during site development. To check that earthwork and foundation construction
proceeds in accordance with our recommendations, the following operations should be monitored by
CGC:
• Topsoil stripping/subgrade proof-rolling within the construction areas;
• Fill/backfill placement and compaction;
• Foundation excavation/subgrade preparation; and
• Concrete placement.
* * * * *
Geotechnical Exploration Report
C25410 Plastic Ingenuity – North Expansion
Mazomanie, Wisconsin
October 6, 2025
Page 11
S:\DOC\October 2025\25410.geo.rjp_ajb.docx
It has been a pleasure to serve you on this project. If you have any questions or need additional
consultation, please contact us.
Sincerely,
CGC, Inc.
Ryan J. Portman, P.E., CST
Senior Consulting Professional
Alex J. Bina, P.E., CST
Consulting Engineer
Encl: Appendix A - Field Exploration
Appendix B - Boring & Test Pit Location Exhibit
Logs of Test Borings (8)
Log of Test Boring-General Notes
Unified Soil Classification System
Appendix C - Document Qualifications
Appendix D - Recommended Compacted Fill Specifications
Appendix E - WDSPS Soil and Site Evaluation – Storm Forms
Particle Size Distribution Reports
APPENDIX A
FIELD EXPLORATION
APPENDIX A
FIELD EXPLORATION
Subsurface conditions were explored by drilling 8 Standard Penetration Test (SPT) soil borings at
locations selected by the project design team. In each boring, soil samples were obtained at 2.5-foot
intervals to a depth of 10 ft and at 5-ft intervals thereafter. As an exception, Boring 8 was sampled at
2.5-ft intervals to the termination depth of 16 ft. The soil samples were obtained in general accordance
with specifications for standard penetration testing, ASTM D 1586. The specific procedures used for
drilling and sampling are described below.
1. Boring Procedures between Samples
The boring is extended downward, between samples, by a hollow-stem auger.
2. Standard Penetration Test and Split-Barrel Sampling of Soils
(ASTM Designation: D 1586)
This method consists of driving a 2 -inch outside diameter split -barrel sampler using a 140 -
pound weight falling freely through a distance of 30 inches. The sampler is first seated 6 inches
into the material to be sampled and then driven 12 inches. The nu mber of blows required to
drive the sampler the final 12 inches is recorded on the log of borings and is known as the
Standard Penetration Resistance.
During the field exploration, the driller visually classified the soil and prepared a field log. Field
screening of the soil samples for possible environmental contaminants was not conducted by the
drillers as these services were not part of CGC’s work scope. Water level observations were made in
each boring during and after drilling and are shown at the bottom of each boring log. Upon completion
of drilling, the borings were backfilled with bentonite (where required) to satisfy WDNR regulations
and the soil samples were delivered to our laboratory for visual classification. The soils were visually
classified by a geotechnical engineer using the Unified Soil Classification System.
In addition to the soil borings, three (3) test pits were excavated within the planned/possible stormwater
management areas. The excavations were logged (using the USDA classification system) in the field
by CGC and subsequently backfilled with excavation spoils placed in lifts and tamped with t he
excavator bucket.
The final boring logs, including laboratory test results, along with a Boring & Test Pit Location Exhibit
and a description of the Unified Soil Classification System are presented in Appendix B. The WDSPS
Soil and Site Evaluation – Storm forms for the stormwater test pits and boring are attached in
Appendix E.
APPENDIX B
BORING & TEST PIT LOCATION EXHIBIT
LOGS OF TEST BORINGS (8)
LOG OF TEST BORING-GENERAL NOTES
UNIFIED SOIL CLASSIFICATION SYSTEM
Date:
10/2025 BORING & TEST PIT LOCATION EXHIBIT
Plastic Ingenuity – North Expansion
Mazomanie, WisconsinJob No.
C25410
Notes
1. Soil borings performed by ADC on September 24, 2025. Test pits excavated by HBE on
September 17, 2025.
2. Boring and test pit locations shown are approximate.
3. Base map was provided by Quam Engineering.
TP-1
TP-2
TP-3
B-4
B-1
B-2
B-3
B-5
B-6
B-7
B-8
Soil Boring Location Test Pit Location
84912
16
661410
12
3± in. TOPSOIL Fill7± in. Base Course FillFILL: Dark Brown Fine to Medium Sand, SomeSilt, Little GravelVery Loose, Dark Reddish-Brown Fine to MediumSAND, Some Silt, Little Gravel (SM)Loose to Medium Dense, Tan Fine to CoarseSAND, Little to Trace Gravel, Trace Silt (SP)
End of Boring at 15 ftBorehole Backfilled with Bentonite Chips
1234
5
MMMM
M
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 11.5'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-1
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
765.5±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
15121112
11
1.916141314
15
4± in. TOPSOILFILL: Dark Brown Fine to Medium Sand, SomeSilt, Little GravelMedium Dense, Very Dark Brown Silty SAND,Trace Organics (SM)Medium Dense, Tan Fine to Medium SAND, TraceSilt and Gravel (SP)Medium Dense, Tan Fine to Coarse SAND, Littleto Trace Gravel, Trace Silt (SP)
End of Boring at 15 ftBorehole Backfilled with Bentonite Chips
1234
5
MMMM
M/W
9.3
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
2014.0' 11'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-2
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
763±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
16231611
13
13141615
13
7± in. TOPSOILMedium Dense, Dark Reddish-Brown Fine toMedium SAND, Some Silt, Little Gravel (SM)Medium Dense, Tan Fine to Coarse SAND, Littleto Trace Gravel, Trace Silt (SP)Medium Dense, Tan Fine SAND, Trace Silt (SP)Medium Dense, Tan Fine to Medium SAND, TraceSilt and Gravel (SP)
Medium Dense, Tan Fine to Coarse SAND, SomeGravel, Trace Silt (SP)End of Boring at 15 ftBorehole Backfilled with Bentonite Chips
1234
5
MMMM
M
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 12.5'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-3
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
768±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
4488
6
2.310111313
14
6± in. TOPSOILVery Loose, Dark Reddish-Brown Fine to MediumSAND, Some Silt, Little Gravel, Trace Organics(SM)Very Loose, Brown Fine SAND, Little Silt(SP-SM)Loose, Tan Fine to Medium SAND, Trace Silt andGravel (SP)
End of Boring at 15 ftBorehole Backfilled with Bentonite Chips
1234
5
MMMM
M
11.9
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 12.5'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-4
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
766.5±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
3866
11
9.810151415
16
5± in. TOPSOIL FillVery Loose, Dark Reddish-Brown Fine to MediumSAND, Some Silt, Little Gravel, Trace Organcis(SM)Loose, Brown to Tan Fine SAND, Trace Silt (SP)
Loose to Medium Dense, Tan Fine to MediumSAND, Trace Silt and Gravel (SP)
End of Boring at 15 ftBorehole Backfilled with Bentonite Chips
1234
5
MMMM
M
1.9
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 12'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-5
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
767±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
491611
15
12131513
15
4± in. TOPSOILVery Loose, Dark Reddish-Brown Fine to MediumSAND, Some Silt, Little Gravel (SM)Very Loose, Brown to Reddish-Brown Fine SAND,Some Gravel, Little Silt (SP-SM)Loose to Medium Dense, Tan Fine to MediumSAND, Trace Silt and Gravel (SP)
Medium Dense, Tan Fine to Coarse SAND, Littleto Trace Gravel, Trace Silt (SP)End of Boring at 15 ftBorehole Backfilled with Bentonite ChipsNote: Boring was Offset 40± ft East of PlannedLocation Due to Presence of Garden and Fencing.
1234
5
MMMM
M
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 12'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-6
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
768±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
5202013
8
14111516
13
12± in. TOPSOIL (OL)Loose, Brown to Reddish-Brown Fine SAND,Some Gravel, Little Silt (SP-SM)Medium Dense, Tan Fine to Coarse SAND, SomeGravel, Trace Silt (SP)Medium Dense, Tan Fine SAND, Trace Silt (SP)
Loose, Tan Fine to Medium SAND, Trace Silt andGravel (SP)End of Boring at 15 ftBorehole Backfilled with Bentonite Chips
1234
5
MMMM
M
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 11'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-7
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
769±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
51397878
12131413141310
12± in. TOPSOILLoose, Dark Reddish-Brown Fine to MediumSAND, Some Silt, Little Gravel (SM)USDA: 7.5YR 2.5/2 Sandy LoamLoose to Medium Dense, Tan Fine SAND, TraceSilt (SP)USDA: 7.5YR 7/2 Fine Sand
Loose, Tan Fine to Coarse SAND, Some Gravel,Trace Silt (SP)USDA: 10YR 7/3 Sand/Gravelly SandEnd of Boring at 16 ftBorehole Backfilled with Bentonite Chips
1234567
MMMMMMM
7822DT
SOIL PROPERTIES
2.25" HSA; Autohammer
(qa)SAMPLE
soil types and the transition may be gradual.Chief
Boring No.LOG OF TEST BORING
(in.)
9/24/25
5
10
15
20NW 13'
P (608) 288-4100, FAX (608) 288-7887NDepthNo. qu
Start
T
WATER LEVEL OBSERVATIONSRJPDepth to Cave in
Plastic Ingenuity North ExpansionC25410
E
Drill Method
PL
The stratification lines represent theSKLoggerNW
Mazomanie, WIB-8
(tsf)Moist
20 Industrial Drive
Editor9/24/25Depth to WaterGENERAL NOTESTime After Drilling15 Mins.Rig
and RemarksSheet of
approximate boundary between
ProjectSurface Elevation (ft)1 1
CJ
(ft)
Driller
Rec W
768±
EndADC
Y LL
Location
While DrillingUpon Completion of Drilling
2921 Perry Street, Madison, WI 53713VISUAL CLASSIFICATIONJob No.
LOI
LOG OF TEST BORING
General Notes
SYMBOLS
Drilling and Sampling
CS – Continuous Sampling
RC – Rock Coring: Size AW, BW, NW, 2”W
RQD – Rock Quality Designation
RB – Rock Bit/Roller Bit
FT – Fish Tail
DC – Drove Casing
C – Casing: Size 2 ½”, NW, 4”, HW
CW – Clear Water
DM – Drilling Mud
HSA – Hollow Stem Auger
FA – Flight Auger
HA – Hand Auger
COA – Clean-Out Auger
SS - 2” Dia. Split-Barrel Sample
2ST – 2” Dia. Thin-Walled Tube Sample
3ST – 3” Dia. Thin-Walled Tube Sample
PT – 3” Dia. Piston Tube Sample
AS – Auger Sample
WS – Wash Sample
PTS – Peat Sample
PS – Pitcher Sample
NR – No Recovery
S – Sounding
PMT – Borehole Pressuremeter Test
VS – Vane Shear Test
WPT – Water Pressure Test
Laboratory Tests
qa – Penetrometer Reading, tons/sq ft
qa – Unconfined Strength, tons/sq ft
W – Moisture Content, %
LL – Liquid Limit, %
PL – Plastic Limit, %
SL – Shrinkage Limit, %
LI – Loss on Ignition
D – Dry Unit Weight, lbs/cu ft
pH – Measure of Soil Alkalinity or Acidity
FS – Free Swell, %
Water Level Measurement
- Water Level at Time Shown
NW – No Water Encountered
WD – While Drilling
BCR – Before Casing Removal
ACR – After Casing Removal
CW – Cave and Wet
CM – Caved and Moist
Note: Water level measurements shown on
the boring logs represent conditions at the
time indicated and may not reflect static
levels, especially in cohesive soils.
DESCRIPTIVE SOIL CLASSIFICATION
Grain Size Terminology
Soil Fraction Particle Size U.S. Standard Sieve Size
Boulders ............................... Larger than 12” ..................... Larger than 12”
Cobbles ................................ 3” to 12” ............................... 3” to 12”
Gravel: Coarse..................... ¾” to 3” ............................... ¾” to 3”
Fine ......................... 4.76 mm to ¾” ....................... #4 to ¾”
Sand: Coarse ....................... 2.00 mm to 4.76 mm.............. #10 to #4
Medium ................... 0.42 to mm to 2.00 mm ......... #40 to #10
Fine ......................... 0.074 mm to 0.42 mm ............ #200 to #40
Silt ................................ ......... 0.005 mm to 0.074 mm .......... Smaller than #200
Clay ................................ ....... Smaller than 0.005 mm ......... Smaller than #200
Plasticity characteristics differentiate between silt and clay.
General Terminology Relative Density
Physical Characteristics Term “N” Value
Color, moisture, grain shape, fineness, etc. Very Loose…….… . 0 - 4
Major Constituents Loose……………… 4 - 10
Clay, silt, sand, gravel Medium Dense…...10 - 30
Structure Dense……………...30 - 50
Laminated, varved, fibrous, stratified, Very Dense……….Over 50
cemented, fissured, etc.
Geologic Origin
Glacial, alluvial, eolian, residual, etc.
Relative Proportions
Of Cohesionless Soils Consistency
Proportional Defining Range by Term qu-tons/sq. ft
Term Percentage of Weight Very Soft……….. 0.0 to 0.25
Soft…………..…. 0.25 to 0.50
Trace.................................0% - 5% Medium………..…0.50 to 1.0
Little .............................. 5% - 12% Stiff…………….…. 1.0 to 2.0
Some ........................... 12% - 35% Very Stiff………..... 2.0 to 4.0
And ............................. 35% - 50% Hard……….………...Over 4.0
Organic Content by
Combustion Method Plasticity
Soil Description Loss on Ignition Term Plastic Index
Non Organic…………………Less than 4% None to Slight……......0 - 4
Organic Silt/Clay……………4 – 12% Slight………………......5 - 7
Sedimentary Peat………….12% - 50% Medium……………......8 - 22
Fibrous and Woody Peat… More than 50% High to Very High .. Over 22
The penetration resistance, N, is the summation of the number of blows
required to effect two successiv e 6” penetrations of the 2” split -barrel
sampler. The sampler is driven with a 140 lb. weight falling 30” and is seated
to a depth of 6” before commencing the standard penetration test.
Clean Gravels (Less than 5% fines)
Gravels with fines (More than 12% fines)
Clean Sands (Less than 5% fines)
Sands with fines (More than 12% fines)
Madison - Milwaukee
PT Peat and other highly organic soils
MH
Inorganic silts, micaceous or
diatomaceous fine sandy or silty soils,
elastic silts
OH Organic clays of medium to high plasticity,
organic silts
ML
Inorganic silts and very fine sands, rock
flour, silty or clayey fine sands or clayey
silts with slight plasticity
OL Organic silts and organic silty clays of low
plasticity
Atterberg limits below "A"
line or P.I. less than 4
Atterberg limits above "A"
line with P.I. greater than 7
Well-graded gravels, gravel-sand
mixtures, little or no fines
Well-graded sands, gravelly sands, little or
no fines
Poorly graded sands, gravelly sands, little
or no fines
Silty gravels, gravel-sand-silt mixtures
Poorly-graded gravels, gravel-sand
mixtures, little or no fines
Clayey sands, sand-clay mixtures
Atterberg limts above "A"
line or P.I. greater than 7
SW
SP Not meeting all gradation requirements for GW
Classification System
Unified Soil
SILTS AND
CLAYS
Liquid limit 50% or
greater
CH Inorganic clays of high plasticity, fat clays
FINE-GRAINED SOILS
(50% or more of material is smaller than No. 200 sieve size.)
SILTS AND
CLAYS
Liquid limit less
than 50%
CL
LABORATORY CLASSIFICATION CRITERIA
HIGHLY
ORGANIC SOILS
COARSE-GRAINED SOILS
(more than 50% of material is larger than No. 200 sieve size)
Inorganic clays of low to medium plasticity,
gravelly clays, sandy clays, silty clays,
lean clays
SM Silty sands, sand-silt mixtures
SW
SP
GM
GP
UNIFIED SOIL CLASSIFICATION AND SYMBOL CHART
Clayey gravels, gravel-sand-clay mixtures
Determine percentages of sand and gravel from grain-size curve. Depending
on percentage of fines (fraction smaller than No. 200 sieve size), coarse-
grained soils are classified as follows:
Less than 5 percent …………………………………………... GW, GP, SW, SP
More than 12 percent …….………………..….………………. GM, GC, SM, SC
5 to 12 percent ………………..….... Borderline cases requiring dual symbols
GP Not meeting all gradation requirements for GW
GW
GM Atterberg limts below "A"
line or P.I. less than 4
GC
Above "A" line with P.I. between 4
and 7 are borderline cases requiring
use of dual symbols
Limits plotting in shaded zone with
P.I. between 4 and 7 are borderline
cases requiring use of dual symbols
SM
SC
GW
50% or more of
coarse fraction
smaller than No. 4
sieve size
SANDS
More than 50% of
coarse fraction
larger than No. 4
sieve size
GRAVELS
GC
SC
Cu = D60
D10
greater than 4; CC = D30
D10 × D60
between 1 and 3
Cu = D60
D10
greater than 4; CC = D30
D10 × D60
between 1 and 3
APPENDIX C
DOCUMENT QUALIFICATIONS
CGC, Inc. 07/01/2016
APPENDIX C
DOCUMENT QUALIFICATIONS
I. GENERAL RECOMMENDATIONS/LIMITATIONS
CGC, Inc. should be provided the opportunity for a general review of
the final design and specifications to confirm that earthwork and
foundation requirements have been properly interpreted in the design
and specifications. CGC should be retained to provide soil
engineering services during excavation and subgrade preparation.
This will allow us to observe that construction proceeds in
compliance with the design concepts, specifications and
recommendations, and also will allow design changes to be made in
the event that subsurface conditions differ from those anticipated
prior to the start of construction. CGC does not assume responsibility
for compliance with the recommendations in this report unless we are
retained to provide construction testing and observation services.
This report has been prepared in accordance with generally accepted
soil and foundation engineering practices and no other warranties are
expressed or implied. The opinions and recommendations submitted
in this report are based on interpretation of the subsurface
information revealed by the test borings indicated on the location
plan. The report does not reflect potential variations in subsurface
conditions between or beyond these borings. Therefore, variations in
soil conditions can be expected between the boring locations and
fluctuations of groundwater levels may occur with time. The nature
and extent of the variations may not become evident until
construction.
II. IMPORTANT INFORMATION
ABOUT YOUR
GEOTECHNICAL ENGINEERING REPORT
Subsurface problems are a principal cause of construction delays,
cost overruns, claims, and disputes. While you cannot eliminate all
such risks, you can manage them. The following information is
provided to help.
Geotechnical engineers structure their services to meet the specific
needs of their clients. A geotechnical engineering study conducted
for a civil engineer may not fulfill the needs of a construction
contractor or even another civil engineer. Because each geotechnical
engineering study is unique, each geotechnical engineering report is
unique, prepared solely for the client. No one except you should rely
on your geotechnical engineering report without first conferring with
the geotechnical engineer who prepared it. And no one - not even you
- should apply the report for any purpose or project except the one
originally contemplated.
READ THE FULL REPORT
Serious problems have occurred because those relying on a
geotechnical engineering report did not read it all. Do not rely on an
executive summary. Do not read selected elements only.
A GEOTECHNICAL ENGINEERING REPORT IS BASED ON
A UNIQUE SET OF PROJECT-SPECIFIC FACTORS
Geotechnical engineers consider a number of unique, project-specific
factors when establishing the scope of a study. Typical factors
include: the client’s goals, objectives, and risk management
preferences; the general nature of the structure involved, its size, and
configuration; the location of the structure on the site; and other
planned or existing site improvements, such as access roads, parking
lots, and underground utilities. Unless the geotechnical engineer who
conducted the study specifically indicates otherwise, do not rely on a
geotechnical engineering report that was:
• not prepared for you,
• not prepared for your project,
• not prepared for the specific site explored, or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing
geotechnical report include those that affect:
• the function of the proposed structure, as when it’s changed
from a parking garage to an office building, or from a light
industrial plant to a refrigerated warehouse,
• elevation, configuration, location, orientation, or weight of the
proposed structure,
• composition of the design team, or project ownership.
As a general rule, always inform your geotechnical engineer of
project changes - even minor ones - and request an assessment of
their impact. CGC cannot accept responsibility or liability for
problems that occur because our reports do not consider
developments of which we were not informed.
SUBSURFACE CONDITIONS CAN CHANGE
A geotechnical engineering report is based on conditions that existed
at the time the geotechnical engineer performed the study. Do not
rely on a geotechnical engineering report whose adequacy may have
been affected by: the passage of time; by man-made events, such as
construction on or adjacent to the site; or by natural events, such as
floods, earthquakes, or groundwater fluctuations. Always contact the
geotechnical engineer before applying the report to determine if it is
still reliable. A minor amount of additional testing or analysis could
prevent major problems.
MOST GEOTECHNICAL FINDINGS ARE PROFESSIONAL
OPINION
Site exploration identifies subsurface conditions only at those points
where subsurface tests are conducted or samples are taken.
Geotechnical engineers review field and laboratory data and then
apply their professional judgement to render an opinion about
subsurface conditions throughout the site. Actual subsurface
conditions may differ - sometimes significantly - from those
indicated in your report. Retaining the geotechnical engineer who
developed your report to provide construction observation is the most
CGC, Inc. 07/01/2016
effective method of managing the risks associated with unanticipated
conditions.
A REPORT’S RECOMMENDATIONS ARE NOT FINAL
Do not over -rely on the confirmation-dependent recommendations
included in your report. Those confirmation-dependent
recommendations are not final , because geotechnical engineers
develop them principally from judgement and opinion . Geotechnical
engineers can finalize their recommendations only by observing
actual subsurface conditions revealed during construction. CGC
cannot assume responsibility or liability for the report’s
confirmation-dependent recommendations if we do not perform the
geotechnical-construction observation required to confirm the
recommendations’ applicability.
A GEOTECHNICAL ENGINEERING REPORT IS SUBJECT
TO MISINTERPRETATION
Other design team members’ misinterpretation of geotechnical
engineering reports has resulted in costly problems. Confront that
risk by having your geotechnical engineer confer with appropriate
members of the design team after submitting the report. Also retain
your geotechnical engineer to review pertinent elements of the design
team’s plans and specifications. Constructors can also misinterpret a
geotechnical engineering report. Confront that risk by having CGC
participate in prebid and preconstruction conferences, and by
providing geotechnical construction observation.
DO NOT REDRAW THE ENGINEER’S LOGS
Geotechnical engi neers prepare final boring and testing logs based
upon their interpretation of field logs and laboratory data. To prevent
errors or omissions, the logs included in a geotechnical engineering
report should never be redrawn for inclusion in architectural or other
design drawings. Only photographic or electronic reproduction is
acceptable, but recognize that separating logs from the report can
elevate risk.
GIVE CONSTRUCTORS A COMPLETE REPORT AND
GUIDANCE
Some owners and design professionals mistakenly believe they can
make constructors liable for unanticipated subsurface conditions by
limiting what they provide for bid preparation. To help prevent
costly problems, give constructors the complete geotechnical
engineering report, but preface it with a clearly written letter of
transmittal. In that letter, advise constructors that the report was not
prepared for purposes of bid development and that the report’s
accuracy is limited; encourage them to confer with th e geotechnical
engineer who prepared the report (a modest fee may be required)
and/or to conduct additional study to obtain the specific types of
information they need or prefer. A prebid conference can also be
valuable. Be sure constructors have suffici ent time to perform
additional study. Only then might you be in a position to give
constructors the best information available to you, while requiring
them to at least share some of the financial responsibilities stemming
from unanticipated conditions.
READ RESPONSIBILITY PROVISIONS CLOSELY
Some clients, design professionals, and constructors do not recognize
that geotechnical engineering is far less exact than other engineering
disciplines. This lack of understanding has created unrealistic
expectations that have led to disappointments, claims, and disputes.
To help reduce the risk of such outcomes , geotechnical engineers
commonly include a variety of explanatory provisions in their
reports. Sometimes labeled “limitations,” many of these provisions
indicate where geotechnical engineer’s responsibilities begin and end,
to help others recognize their own responsibilities and risks. Read
these provisions closely. Ask questions. Your geotechnical engineer
should respond fully and frankly.
ENVIRONMENTAL CONCERNS ARE NOT COVERED
The equipment, techniques, and personnel used to perform a n
environmental study differ significantly from those used to perform a
geotechnical study. For that reason, a geotechnical engineering
report does not usually relate any environmental findings,
conclusions, or recommendations; e.g., about the likelihood of
encountering underground storage tanks or regulated contaminants.
Unanticipated environmental problems have led to numerous project
failures. If you have not yet obta ined your own environmental
information, ask your geotechnical consultant for risk management
guidance. Do not rely on an environmental report prepared for
someone else.
OBTAIN PROFESSIONAL ASSISTANCE TO DEAL WITH
MOLD
Diverse strategies can be applied during building design,
construction, operation, and maintenance to prevent significant
amounts of mold from growing on indoor surfaces. To be effective,
all such strategies should be devised for the express purpose of mold
prevention, integrated into a comprehensive plan, and executed with
diligent oversight by a professional mold prevention consultant.
Because just a small amount of water or moisture can lead to the
development of severe mold infestations, many mold prevention
strategies focus on keeping building surfaces dry. While
groundwater, water infiltration, and similar issues may have been
addressed as part of the geotechnical engineering study whose
findings are conveyed in this report, the geotechnical engineer in
charge of this project is not a mold prevention consultant; none of the
services performed in connection with the geotechnical engineer’s
study were designed or conducted for the purpose of mold
prevention. Proper implementation of the recommendations
conveyed in this report will not of itself be sufficient to prevent mold
from growing in or on the structure involved.
RELY ON YOUR GEOTECHNICAL ENGINEER FOR
ADDITIONAL ASSISTANCE
Membership in the Geotechnical Business Council (GBC) of
Geoprofessional Business Association exposes geotechnical
engineers to a wide array of risk confrontation techniques that can be
of genuine benefit for everyone involved with a construction project.
Confer with CGC, a member of GBC, for more information.
Modified and reprinted with permission from:
Geotechnical Business Council
of the Geoprofessional Business Association
8811 Colesville Road, Suite G 106
Silver Spring, MD 20910
APPENDIX D
RECOMMENDED COMPACTED FILL SPECIFICATIONS
APPENDIX D
CGC, INC.
RECOMMENDED COMPACTED FILL SPECIFICATIONS
General Fill Materials
Proposed fill shall contain no vegetation, roots, topsoil, peat, ash, wood or any other non -soil material which by
decomposition might cause settlement. Also, fill shall never be placed while frozen or on frozen surfaces. Rock,
stone or broken concrete g reater than 6 in. in the largest dimension shall not be placed within 10 ft of the building
area. Fill used greater than 10 ft beyond the building limits shall not contain rock, boulders or concrete pieces
greater than a 2 sq ft area and shall not be plac ed within the final 2 ft of finish subgrade or in designated utility
construction areas. Fill containing rock, boulders or concrete pieces should include sufficient finer material to fill
voids among the larger fragments.
Special Fill Materials
In certain cases, special fill materials may be required for specific purposes, such as stabilizing subgrades, backfilling
undercut excavations or filling behind retaining walls. For reference, WisDOT gradation specifications for various
types of granular fill are attached in Table 1.
Placement Method
The approved fill shall be placed, spread and leveled in layers generally not exceeding 10 in. in thickness before
compaction. The fill shall be placed at moisture content capable of achieving the desired compaction level. For
clay soils or granular soils containing an appreciable amount of cohesive fines, moisture conditioning will likely be
required.
It is the Contractor's responsibility to provide all necessary compaction equipment and other grading equipment that
may be required to attain the specified compaction. Hand -guided vibratory or tamping compactors will be required
whenever fill is placed adjacent to walls, footings, columns or in confined areas.
Compaction Specifications
Maximum dry density and optimum moisture content of the fill soil shall be determined in accordance with modified
Proctor methods (ASTM D1557). The recommended field compaction as a percentage of the maximum dry density
is shown in Table 2. Note that these compaction guidelines would generally not apply to coarse gravel/stone fill.
Instead, a method specification would apply (e.g., compact in thin lifts with a vibratory compactor until no further
consolidation is evident).
Testing Procedures
Representative samples of proposed fill shall be submitted to CGC, Inc. for optimum moisture -maximum density
determination (ASTM D1557) prior to the start of fill placement. The sample size should be approximately 50 lb.
CGC, Inc. shall be retained to perform field density tests to determine the level of compaction being achieved in the
fill. The tests shall generally be conducted on each lift at the beginning of fill placement and at a frequency mutually
agreed upon by the project team for the remainder of the project.
WisDOT
Section 311
WisDOT
Section 312
WisDOT
Section 210
Breaker Run
Select
Crushed
Material
3-in. Dense
Graded Base
1 1/4-in. Dense
Graded Base
3/4-in. Dense
Graded Base
Grade 1
Granular
Backfill
Grade 2
Granular
Backfill
Structure
Backfill
Sieve Size
6 in. 100
5 in. 90-100
3 in. 90-100 100
1 1/2 in. 20-50 60-85
1 1/4 in. 95-100
1 in. 100
3/4 in. 40-65 70-93 95-100
3/8 in. 42-80 50-90
No. 4 15-40 25-63 35-70 100 (2) 100 (2) 25-100
No. 10 0-10 10-30 16-48 15-55
No. 40 5-20 8-28 10-35 75 (2)
No. 100 15 (2) 30 (2)
No. 200 2-12 2-12 5-15 8 (2) 15 (2) 15 (2)
Notes:
1. Reference: Wisconsin Department of Transportation Standard Specifications for Highway and Structure Construction.
2. Percentage applies to the material passing the No. 4 sieve, not the entire sample.
3. Per WisDOT specifications, both breaker run and select crushed material can include concrete
that is 'substantially free of steel, building materials and other deleterious material'.
Area Clay/Silt
Within 10 ft of building lines
Footing bearing soils 93 - 95
Under floors, steps and walks
- Lightly loaded floor slab 90
- Heavily loaded floor slab and thicker fill zones 92
Beyond 10 ft of building lines
Under walks and pavements
- Less than 2 ft below subgrade 92
- Greater than 2 ft below subgrade 90
Landscaping 85
Notes:
1. Based on Modified Proctor Dry Density (ASTM D 1557)
Percent Passing by Weight
Table 1
Gradation of Special Fill Materials
Table 2
Compaction Guidelines
Material
WisDOT Section 305 WisDOT Section 209
90
95
90
95
90
Percent Compaction (1)
Sand/Gravel
95
CGC, Inc. 6/2/2017
APPENDIX E
WDSPS SOIL AND SITE EVALUATION – STORM FORMS
PARTICLE SIZE DISTRIBUTION REPORTS
1002-CPS-23
Page of
County
Parcel I.D.
Property Owner Property Location
Govt. Lot ¼ ¼ S T 8 N R 6 E
Property Owner's Mail Address Lot # Block# Subd. Name or CSM #
City X Village Town Nearest Road
Soil Moisture
Drainage area sq ft acres Date of soil borings:
USDA-NRCS WETS Value:
Test site suitable for (check all that apply): Site not suitable; X Morphological Evaluation Dry = 1;
Bioretention; Subsurface Disperal System; Double Ring Infiltrometer Normal = 2;
Reuse; Irrigation; Other Other: (specify) Wet = 3.
#OBS. X Pit Boring Ground surface elevation ft. Elevation of limiting factor ft.
#OBS. X Pit Boring Ground surface elevation ft. Elevation of limiting factor ft.
Name (Please Print) Signature Credential Number
Address Date Evaluation Conducted Telephone Number
0sg ml gw < 5
201 N. Mallard Dr., Sun Prairie, WI 53590 9/17/2025 608-288-4100
0.5
3.640-60 10YR 6/3; 6/4 None GRS 0sg ml gw 15-25
18-40 10YR 3/6 None GRLS
60-66 10YR 6/4 None FS
66-144 10YR 6/4 None S 3.6
Comments: Test pit terminated at 12± ft. No apparent groundwater encountered to depth explored.
Ryan J. Portman 011200001 - SP (1201636)
TP1 766± < 754±
CROSS PLAINS WI 53528
0sg ml
gw < 5
< 5
1fsbk mfr gw 15-25
96-144 10YR 6/4 None
153/0806-172-8320-1
City State Zip Code Phone Number
Hydraulic Application Test Method
9/17/2025
MAZOMANIE W. Hudson St
Division of Industry Services
Attachment 2:
P.O. Box 2658
Madison, Wisconsin 53701
SOIL AND SITE EVALUATION - STORM
1017 PARK ST 1 CSM # 15064
Please print all information Reviewed by:
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m)] Date:
DET LLC
NE NW 17
In accordance with SPS 382.365, 385, Wis. Adm. Code, and WDNR Standard 1002 1 1
Attach a complete site plan on paper not less than 8 ½ x 11 inches in size. Plan must include, but not limited
to: vertical and horizontal reference point (BM), direction and percent of slope, scale or dimensions, north
arrow, and BM referenced to nearest road
Dane
0.13
Consistence Boundary % Rock
Frags.
% Fines Hydraulic App
Rate
Inches/Hr
0-15
Horizon Depth in. Dominant Color
Munsell
Redox Description Qu.
Sz. Cont. Color
Texture Structure Gr.
Sz. Sh.
10YR 3/2 None SIL 1fsbk mfr gw < 5
0.5
0.13
34-52 10YR 3/6 None GRSL
15-34 10YR 3/4 None SIL 1fsbk mfr gw < 5
FS
52-96 10YR 5/6 None S
0sg ml < 5 0.5
mfr gw < 5 1.1* 3.61fsbk
0.13
Consistence Boundary % Rock
Frags.
% Fines Hydraulic App
Rate
Inches/Hr
0-18
Comments: Test pit terminated at 12± ft. No apparent groundwater encountered to depth explored. *Based on gradation results on sample obtained at a depth of
about 5± ft.
TP2 766.5± < 754.5±
Horizon Depth in. Dominant Color
Munsell
Redox Description Qu.
Sz. Cont. Color
Texture Structure Gr.
Sz. Sh.
10YR 3/3 None SIL 1fsbk mfr
mfr gw 15-25 1.631fsbk
SBD-10793 (R 7/17)
WDNR - September 2017
1002-CPS-23
Page of
County
Parcel I.D.
Property Owner Property Location
Govt. Lot ¼ ¼ S T 8 N R 6 E
Property Owner's Mail Address Lot # Block# Subd. Name or CSM #
City X Village Town Nearest Road
Soil Moisture
Drainage area sq ft acres Date of soil borings:
USDA-NRCS WETS Value:
Test site suitable for (check all that apply): Site not suitable; X Morphological Evaluation Dry = 1;
Bioretention; Subsurface Disperal System; Double Ring Infiltrometer Normal = 2;
Reuse; Irrigation; Other Other: (specify) Wet = 3.
#OBS. X Pit Boring Ground surface elevation ft. Elevation of limiting factor ft.
Name (Please Print) Signature Credential Number
Address Date Evaluation Conducted Telephone Number
In accordance with SPS 382.365, 385, Wis. Adm. Code, and WDNR Standard 1002 1 1
Attach a complete site plan on paper not less than 8 ½ x 11 inches in size. Plan must include, but not limited
to: vertical and horizontal reference point (BM), direction and percent of slope, scale or dimensions, north
arrow, and BM referenced to nearest road
Dane
153/0806-172-8100-1
Division of Industry Services
Attachment 2:
P.O. Box 2658
Madison, Wisconsin 53701
SOIL AND SITE EVALUATION - STORM
1017 PARK ST 1 CSM # 12359
City State Zip Code Phone Number
Please print all information Reviewed by:
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m)] Date:
DET LLC
NE NW 17
Hydraulic Application Test Method
9/17/2025
TP3 764± < 752±
CROSS PLAINS WI 53528 MAZOMANIE W. Hudson St
0-9 10YR 3/4 None SIL
Horizon Depth in. Dominant Color
Munsell
Redox Description Qu.
Sz. Cont. Color
Texture
1fsbk mfr gw < 5 0.13
Consistence Boundary % Rock
Frags.
% Fines Hydraulic App
Rate
Inches/Hr
Structure Gr.
Sz. Sh.
29-39 10YR 4/6 None LFS
9-29 10YR 3/3 None SL
1fsbk mfr gw < 5 0.5
mfr gw < 5 0.51fsbk
78-144 10YR 7/3 None FS
39-78 10YR 6/4 None FS
0sg ml < 5 0.5
ml gw < 5 0.9* 0.50sg
Comments: Test pit terminated at 12± ft. No apparent groundwater encountered to depth explored. *Based on gradation results on sample obtained at a depth of
about 5± ft.
Ryan J. Portman 011200001 - SP (1201636)
201 N. Mallard Dr., Sun Prairie, WI 53590 9/17/2025 608-288-4100
SBD-10793 (R 7/17)
WDNR - September 2017
1002-CPS-23
Page of
County
Parcel I.D.
Property Owner Property Location
Govt. Lot ¼ ¼ S T 8 N R 6 E
Property Owner's Mail Address Lot # Block# Subd. Name or CSM #
City X Village Town Nearest Road
Soil Moisture
Drainage area sq ft acres Date of soil borings:
USDA-NRCS WETS Value:
Test site suitable for (check all that apply): Site not suitable; X Morphological Evaluation Dry = 1;
Bioretention; Subsurface Disperal System; Double Ring Infiltrometer Normal = 2;
Reuse; Irrigation; Other Other: (specify) Wet = 3.
#OBS. Pit X Boring Ground surface elevation ft. Elevation of limiting factor ft.
Name (Please Print) Signature Credential Number
Address Date Evaluation Conducted Telephone Number
In accordance with SPS 382.365, 385, Wis. Adm. Code, and WDNR Standard 1002 1 1
Attach a complete site plan on paper not less than 8 ½ x 11 inches in size. Plan must include, but not limited
to: vertical and horizontal reference point (BM), direction and percent of slope, scale or dimensions, north
arrow, and BM referenced to nearest road
Dane
153/0806-172-8190-1
Division of Industry Services
Attachment 2:
P.O. Box 2658
Madison, Wisconsin 53701
SOIL AND SITE EVALUATION - STORM
1017 PARK ST 4 CSM # 12359
City State Zip Code Phone Number
Please print all information Reviewed by:
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m)] Date:
DET LLC
NE NW 17
Hydraulic Application Test Method
9/17/2025
B-8 768± < 752±
CROSS PLAINS WI 53528 MAZOMANIE W. Hudson St
Topsoil (No Sample Obtained)
Consistence Boundary % Rock
Frags.
% Fines Hydraulic App
Rate
Inches/Hr
0-12
Horizon Depth in. Dominant Color
Munsell
Redox Description Qu.
Sz. Cont. Color
Texture Structure Gr.
Sz. Sh.
36-156 7.5YR 7/2 None FS
12-36 7.5YR 2.5/2 None SL
0sg ml gw < 5 0.5
mfr gw < 5 0.51fsbk
156-192 10YR 7/3 None S-GRS ml 10-20 3.60sg
Comments: Boring terminated at 16± ft. No apparent groundwater encountered to depth explored.
Ryan J. Portman 011200001 - SP (1201636)
201 N. Mallard Dr., Sun Prairie, WI 53590 9/24/2025 608-288-4100
SBD-10793 (R 7/17)
WDNR - September 2017
Tested By: JFS
Checked By: KJS
9/23/25(no specification provided)
PL=LL=PI=D90=D85=D60=D50=D30=D15=D10=Cu=Cc=USCS=AASHTO=*
Brown Fine to M edium Sand, Trace Silt and Gravel3/41/23/8#4#8#10#16#30#40#50#80#100#200100.099.299.298.798.498.498.397.275.034.910.15.81.1 0.51210.47580.37280.34360.28390.21480.17912.081.21SPNatural M oisture = 4.1%Ideal Builders, Inc.Plastic Inginuity - North ExpansionC25410
Material Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample Number: TP-1Depth: 5' Date:Client:Project:Project No: Figure
SIEVEPERCENTSPEC.*PASS?SIZEFINERPERCENT(X=NO)
PERCENT FINER
0102030405060708090100
GRAIN SIZE -mm 0.0010.010.1110100
% +3"
Coarse
% Gravel
Fine
Coarse
Medium
% Sand
Fine
Silt
% Fines
Clay
0.0
0.0
1.3
0.3
23.4
73.9
1.1
6 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200
Particle Size Distribution Report
Tested By: JFS
Checked By: KJS
9/23/25(no specification provided)
PL=LL=PI=D90=D85=D60=D50=D30=D15=D10=Cu=Cc=USCS=AASHTO=*
Light Brown Fine Sand, Trace Silt#16#30#40#50#80#100#200100.099.395.472.47.73.40.9 0.37150.34330.27260.25450.22210.19670.18611.470.97SPNatural M oisture = 3.6%Ideal Builders, Inc.Plastic Inginuity - North ExpansionC25410
Material Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample Number: TP-3Depth: 5' Date:Client:Project:Project No: Figure
SIEVEPERCENTSPEC.*PASS?SIZEFINERPERCENT(X=NO)
PERCENT FINER
0102030405060708090100
GRAIN SIZE -mm 0.0010.010.1110100
% +3"
Coarse
% Gravel
Fine
Coarse
Medium
% Sand
Fine
Silt
% Fines
Clay
0.0
0.0
0.0
0.0
4.6
94.5
0.9
6 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200
Particle Size Distribution Report
VILLAGE OF MAZOMANIE
VILLAGE BOARD REPORT
Meeting Date: February 24, 2026
Agenda Item: Site Plan Review – 509 Ridge Drive (§415-10 Preservation of Topography)
Applicant: Mark & Sue Barry, Kippley Construction, Grothman & Associates
BACKGROUND
The applicants, Mark and Sue Barry, received Architectural Control Committee approval in
accordance with the Pheasant Ridge Covenants and were issued a building permit in
October 2025 for construction of a single-family residence at 509 Ridge Drive.
On January 20, 2026, it was discovered that site excavation activities:
• Encroached onto adjacent Lot 13 and Lot 15
• Removed the Village-owned five-foot access parcel providing access to parkland
south of the property
On January 21, 2026, the Village issued a Stop Work Order pursuant to Village Ordinance
§415-10 (Preservation of Topography), which requires Plan Commission and Village Board
approval of a site plan when significant alteration of topography occurs.
PLAN COMMISSION 2/9/26
The Plan Commission reviewed and discussed the following matters:
1. Village-Owned Park Access Parcel
• The five-foot access to parkland was disturbed during excavation.
• Discussion included potential relocation of the access easement further east if Lot
15 is acquired by property owners.
• Concerns were expressed by neighboring residents regarding preservation of
intended park access for Pheasant Ridge Subdivision residents.
2. Adjacent Property Impacts
• Excavation encroached onto Lot 13 and Lot 15.
• The Commission discussed the need for:
o Temporary easement agreements – Lot 13 and Lot 14 have a recorded
temporary access easement for a period of 6-months.
o The Utility easement between Lot 14 and Lot 15 could be abandoned if no
utilities exist in this location. The abandoned easement shall be properly
recorded. The utilities will need to approve the abandonment of these
easements.
o Restoration of adjacent properties to pre-construction condition
3. Lot 15 Acquisition
• The applicants have submitted an Offer to Purchase Lot 15 with no contingencies,
and it has been verbally agreed to on February 23, 2026.
• Lot 15 will remain a buildable under Village Code (minimum lot width of 66 feet) if
reconfigured.
4. Erosion Control and Slope Stability
• Approximately 35-foot elevation changes from front to rear of lot.
• South, east, and west slopes require erosion control measures.
• Engineering staff requested:
o Confirmation of Dane County erosion control permit
▪ Per Tomas Toro, February 9, 2026 – An erosion control permit was not
filed, nor will be filed within the County. It is our understanding that
the permitting agency in this case is the Village of Mazomanie, as an
incorporated municipality. We do plan to satisfy all Village
requirements regarding this matter.
o Clarification of slope stabilization plan
▪ See additional materials included in the packet distributed 02/20/26.
o Identification of slope materials
▪ A geotechnical engineer has been retained to determine slope
materials. Results are included as an attachment.
o Details regarding long-term maintenance
▪ The property will need to comply with Village Ordinance §312-1
“Noxious Weeds & Grasses”
• Applicants’ representatives indicated approximately two feet of loose soil over
bedrock, with exposed bedrock anticipated on the south slope.
o Per Tomas Toro, February 9, 2026 – The excavated slopes appear stable at
this time due to the rigidity of the exposed bedrock, further evaluation by a
Geotechnical Engineer is recommended. Any plan for stabilizing or
protecting the southern and eastern slopes, if required, has not yet been
determined. The builder has contacted a Geotechnical Engineering firm to
coordinate an inspection and assess whether additional long-term
stabilization or protective measures are necessary.
▪ Plans should indicate which engineering firm will be conducting the
erosion control.
▪ Village staff inspected the five-foot access parcel on February 16,
2026, and discovered discoloration of soils indicating potential
erosion from the topsoil above the excavated surfaces.
5. Safety and Compliance
• Consideration of park user safety.
o A wrought-iron fence will be installed along the steepest parts of the slopes
which complies with Village Ordinances.
• Compliance with Village Property Maintenance and Noxious Weed ordinances will
be required.
PLAN COMMISSION DECISION 02/23/26:
Motion: To conditionally approve the site plan, contingent upon the following conditions:
1. Retaining walls (including Envirolok) shall be stamped by a professional engineer,
and shall be installed prior to the final certificate of occupancy. A temporary
certificate of occupancy may be issued, based upon item #2.
2. In writing, residents affirm that they know the risks regarding erosion, especially if
wall structures are not yet completed.
3. Utilities shall sign off on easement releases in separate document; along with an
updated CSM.
4. Western retaining wall on Lot 13 shall still allow for 10’ utility easement.
5. That Lot 15 sale to the Barry’s is completed.
6. Certificate of Occupancy shall be withheld until retaining walls are completed or
residents affirm risks.
7. The fence and berm shall be completed.
The Stop Work can be rescinded administratively and will be rescinded on 2/24/26. The
house has approximately 6-weeks of work left before completion.
S66°46'05"E87.50'-
S66°46'05"E87.50'-
N23°13'55"E140.64'N66°46'05"W87.50'-
S23°13'55"W140.64'
S23°13'55"W140.64'N23°13'55"E140.64'N66°46'05"W87.50'-72.02'15.48'
BENCHMARK:BURY TAG BOLTELEV = 818.90
HOUSE FLOORELEV = 825.03
BENCHMARK:TOP OF 3/4" REBARELEV = 817.03
GARAGE FLOORELEV = 818.30GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
TOLL FREE: 800-242-8511
NORTH
C1.0EXISTING CONDITIONS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:01 PM, ttoro
S66°46'05"E87.50'-
S66°46'05"E87.50'-
N23°13'55"E140.64'N66°46'05"W87.50'-
S23°13'55"W140.64'
S23°13'55"W140.64'N23°13'55"E140.64'N66°46'05"W87.50'-72.02'15.48'
BENCHMARK:BURY TAG BOLTELEV = 818.90
HOUSE FLOORELEV = 825.03
BENCHMARK:TOP OF 3/4" REBARELEV = 817.03S23°13'55"W110.64'
66.00'
109.00'72.02' 5.00'N23°13'55"E110.15'
GARAGE FLOORELEV = 818.30
30.60'5.10'N34°34'47"E31.10'
102.88'
N34°34'47"E
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
TOLL FREE: 800-242-8511
NORTH
C2.0PROPOSED SITE LAYOUT
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:02 PM, ttoro
BENCHMARK:BURY TAG BOLTELEV = 818.90
HOUSE FLOORELEV = 825.03
BENCHMARK:TOP OF 3/4" REBARELEV = 817.03
GARAGE FLOORELEV = 818.30GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
TOLL FREE: 800-242-8511
NORTH
C3.0PROPOSED GRADING PLAN
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
NOTES:1.CONTRACTOR SHALL COORDINATE TEMPORARYLIMITED EASEMENT (TLE) FOR ANY GRADING WORK INPRIVATE PROPERTY OWNED BY OTHERS.2.REMOVE ALL TREES 6" IN DIAMETER OR LARGER UP TO30' WEST OF THE WEST PROPERTY LINE OF LOT 14,PER TLE WITH LOT 13 OWNER(S).3.CONTRACTOR SHALL REMOVE ALL TREES 6" INDIAMETER OR LARGER WITHIN 5 FEET OF THE TOP OFANY SLOPE.
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:03 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
TOLL FREE: 800-242-8511
C3.1PROFILE
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:04 PM, ttoro
BENCHMARK:BURY TAG BOLTELEV = 818.90
HOUSE FLOORELEV = 825.03
BENCHMARK:TOP OF 3/4" REBARELEV = 817.03
GARAGE FLOORELEV = 818.30GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
TOLL FREE: 800-242-8511
NORTH
C4.0PROPOSED EROSION CONTROLPLAN
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:05 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
C5.0CONSTRUCTION DETAILS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:06 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
C5.1CONSTRUCTION DETAILS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:07 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
C5.2CONSTRUCTION DETAILS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:08 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
C5.3CONSTRUCTION DETAILS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:09 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
C5.4CONSTRUCTION DETAILS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
G:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:10 PM, ttoro
GROTHMAN& ASSOCIATES, S.C.PROFESSIONAL SERVICES
C5.5CONSTRUCTION DETAILS
KIPPLEY CONSTRUCTION828 INDUSTRY ROADSAUK CITY, WI 53583
PHEASANT RIDGE RUN GRADINGBEING LOTS 14 AND 15 AND PARK - 2,PHEASANT RIDGE RUN, LOCATED IN THENE1/4 OF THE SE1/4 SECTION 17, T. 8 N.,R. 6E., VILLAGE OF MAZOMANIE, DANECOUNTY, WISCONSIN.PARCELS: 153/0806-174-0144-1153/0806-174-0155-1153/0806-174-0900-1PRELIMINARY
EROSION CONTROL NOTES
GRADING AND SEEDING NOTESG:\2025\2510\1025-597\04 ENGINEERING\01 DWG\1025-597 BASE.dwg, 2/19/2026 6:39:11 PM, ttoro
Source: Village of Mazomanie website. First collected Oct 19, 2026.