Packet
Village of Cross Plains · Dane County · meeting of Oct 5, 2026 · Agenda packets
Open the original document More from Village of Cross Plains
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
10.05.26 Plan Commission Agenda
10.05.26- PLAN COMMISSION AGENDA.PDF
10.05.2026 Plan Commission Packet
10.05.26- PLAN COMMISSION PACKET V.2.PDF
1.
Documents:
2.
Documents:
1
Plan Commission
Regular Meeting Notice and Agenda
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
Monday, October 5, 2026
6:30 pm
The Village of Cross Plains will provide opportunities for the public to participate virtually or by calling in .
Please take note that the meeting will continue even if technical problems occur. The log in information is
as follows:
Zoom Meeting Link:
https://us02web.zoom.us/j/83459730362
Conference telephone line:
+1 312 626 6799
Meeting ID: 834 5973 0362
I. Call to Order
II. Roll Call
III. Pledge of Allegiance
IV. Public Comment – This is an opportunity for anyone to address the Plan Commission on any issue. Please observe
the time limit of 3 minutes. While the Plan Commission encourages input from residents, it may not discuss or act
on any issue that is not duly noticed on the agenda. Please see the Public Comment instructions at the end of this
agenda.
V. General Business – Regular Meeting
1. Approval of the Minutes from the September 8, 2026 Plan Commission Meeting.
2. Approval of the Minutes from the September 14, 2026 Special Plan Commission Meeting.
3. Zuern Building Products, 1918 and 1923 Market Street
a. Public Hearing Regarding a General Development Plan for the Proposed Redevelopment .
b. Discussion and Possible Action Regarding a General Development Plan for the Proposed
Redevelopment.
c. Discussion and Possible Action Regarding a Specific Implementation Plan for the Proposed
Redevelopment.
4. Discussion Regarding Village Administrator Transition Period.
2
VI. Adjournment
This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance
with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of
members of other governmental bodies of the municipality may be in attendance at the above stated meeting to
gather information. No action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals. For additional information or to request this service, contact the
Village Hall at (608) 798-3241 or bobbi@cross-plains.wi.us.
PUBLIC COMMENT INSTRUCTIONS
WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either on or
not on the agenda to be included in the meeting packet, by emailing bobbi@cross-plains.wi.us or in writing to Plan
Commission, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will be
distributed at the meeting.
IN-PERSON: Public comment forms are available at the Meeting Room entrance. Please fill out and hand to staff prior to
start of meeting. Comments are limited to three -minutes per person and must be delivered at the designated microphone
for recording purposes. Accommodations can be provided for those unable to access the microphone.
VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand” if on
video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those wishing to
provide oral comments remotely must have their full name displayed within the Zoom application and must state address of
residence.
*As permitted by the Wisconsin open meetings law and while not required, the Plan Commission has chosen to allow public
comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Village Board may
not engage in discussion or take action during this period but may consider deferring the subject to a later meet ing with
notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on certain specified matters
where the public can comment. The meeting chairperson will identify rules for providing comments. Other items on the
agenda which are not listed for public hearing do not require the Board to allow public comment, however the meeting
chairperson can at their own discretion allow limited public comments.
1
Plan Commission
Regular Meeting Notice and Agenda
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
Monday, October 5, 2026
6:30 pm
The Village of Cross Plains will provide opportunities for the public to participate virtually or by calling in .
Please take note that the meeting will continue even if technical problems occur. The log in information is
as follows:
Zoom Meeting Link:
https://us02web.zoom.us/j/83459730362
Conference telephone line:
+1 312 626 6799
Meeting ID: 834 5973 0362
I. Call to Order
II. Roll Call
III. Pledge of Allegiance
IV. Public Comment – This is an opportunity for anyone to address the Plan Commission on any issue. Please observe
the time limit of 3 minutes. While the Plan Commission encourages input from residents, it may not discuss or act
on any issue that is not duly noticed on the agenda. Please see the Public Comment instructions at the end of this
agenda.
V. General Business – Regular Meeting
1. Approval of the Minutes from the September 8, 2026 Plan Commission Meeting.
2. Approval of the Minutes from the September 14, 2026 Special Plan Commission Meeting.
3. Zuern Building Products, 1918 and 1923 Market Street
a. Public Hearing Regarding a General Development Plan for the Proposed Redevelopment .
b. Discussion and Possible Action Regarding a General Development Plan for the Proposed
Redevelopment.
c. Discussion and Possible Action Regarding a Specific Implementation Plan for the Proposed
Redevelopment.
4. Discussion Regarding Village Administrator Transition Period.
2
VI. Adjournment
This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance
with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of
members of other governmental bodies of the municipality may be in attendance at the above stated meeting to
gather information. No action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals. For additional information or to request this service, contact the
Village Hall at (608) 798-3241 or bobbi@cross-plains.wi.us.
PUBLIC COMMENT INSTRUCTIONS
WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either on or
not on the agenda to be included in the meeting packet, by emailing bobbi@cross-plains.wi.us or in writing to Plan
Commission, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will be
distributed at the meeting.
IN-PERSON: Public comment forms are available at the Meeting Room entrance. Please fill out and hand to staff prior to
start of meeting. Comments are limited to three -minutes per person and must be delivered at the designated microphone
for recording purposes. Accommodations can be provided for those unable to access the microphone.
VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand” if on
video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those wishing to
provide oral comments remotely must have their full name displayed within the Zoom application and must state address of
residence.
*As permitted by the Wisconsin open meetings law and while not required, the Plan Commission has chosen to allow public
comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Village Board may
not engage in discussion or take action during this period but may consider deferring the subject to a later meet ing with
notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on certain specified matters
where the public can comment. The meeting chairperson will identify rules for providing comments. Other items on the
agenda which are not listed for public hearing do not require the Board to allow public comment, however the meeting
chairperson can at their own discretion allow limited public comments.
1
Plan Commission
Regular Meeting Minutes
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
Tuesday, September 8, 2026
6:30 pm
The video link to this meeting can be found at: https://www.youtube.com/watch?v=uyqDYCPSmQE
I. Call to Order
Village President Lengfeld called the meeting to order at 6:31 pm.
II. Roll Call
Present: Commissioner(s): Seth Johnson, Tim Hillebrand, Trustee Bill Brosius, Trustee Judy Ketelboeter, and
Village President Lengfeld.
Absent: Commissioners Kevin Thusius and Joanna Cree.
Also Present: Village Clerk Bobbi Zauner, Jeff Haen, Kyle Haen, and Michael Pomykalski.
Attending Virtually: Planner Sonja Kruesel of Vandewalle & Associates, Brian Berquist of Town & Country
Engineering, Dave Ripp, Bob Ripp, and Kevin Murphy.
III. Pledge of Allegiance
IV. Public Comment – None.
V. General Business – Regular Meeting
1. Approval of the Minutes from the July 6, 2026 Plan Commission Meeting.
A motion was made by Hillebrand, seconded by Brosius, and unanimously carried by the Plan
Commission to approve the minutes from the July 6, 2026 Plan Commission Meeting.
2. Discussion and Possible Action Regarding a Request to Allow Earth-Disturbing Activities for
Marchstone Development Phase I Beyond September 15, 2026.
A motion was made by Ketelboeter, seconded by Johnson, and unanimously carried by the Plan
Commission to move General Business Item #2 to the end of General Business.
3. Discussion Regarding the Ripp Family Development Proposal South of Highway KP and East of
Gil’s Way.
Following a presentation by Dave Ripp, the Plan Commission discussed the concept plan and provided
feedback.
2
4. Discussion and Possible Action Regarding Updates to Street Light Policy.
Following a presentation by Michael Pomykalski and discussion, a motion was made by Johnson and
seconded by Lengfeld to recommend approval of the updated streetlight policy. Following further
discussion, a roll call vote was requested. YES – Hillebrand, Johnson, Brosius, and Lengfeld. NO –
Ketelboeter. Motion carried, 4-1.
5. Discussion and Possible Action Regarding a Request to Allow Earth-Disturbing Activities for
Marchstone Development Phase I Beyond September 15, 2026.
This item required a ¾ vote of the Plan Commission. Because only 5 members of the Plan Commission
were in attendance, this item was not discussed.
VI. Adjournment
A motion was made by Johnson, seconded by Brosius, and unanimously carried by the Plan Commission to adjourn
at 7:52 pm.
Proper notice of this meeting was given to the public and posted on the public bulletin boards in accordance with
the Open Meeting Law.
Respectfully submitted,
___________________
Bobbi Zauner
Village Clerk
1
Plan Commission
Special Meeting Minutes
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
Monday, September 14, 2026
5:30 pm
The video link to this meeting can be found at: https://youtu.be/RPG5tvBz4bY?si=EpGU1lD7-OXnUBkH
I. Call to Order
Village President Lengfeld called the meeting to order at 5:30 pm.
II. Roll Call
Present: Commissioner(s): Seth Johnson, Tim Hillebrand, Joanna Cree, Trustee Bill Brosius, Trustee Judy
Ketelboeter, and Village President Lengfeld.
Absent: Commissioners Kevin Thusius.
Also Present: Jeff Haen and Kyle Haen, and Brian Berquist of Town & Country Engineering.
Attending Virtually: None.
III. Pledge of Allegiance
IV. Public Comment – None.
V. General Business – Regular Meeting
1. Discussion and Possible Action Regarding a Request to Allow Earth-Disturbing Activities for
Marchstone Development Phase I Beyond September 15, 2026.
Following presentations and discussion by Administrator Persson and Jeff Haen, a motion was made by
Hillebrand, seconded by Brosius, and unanimously carried by the Plan Commission to recommend approval
of the request to extend earth-disturbing activities for Marchstone Development Phase I to October 15, 2026
and work in the right of way to November 15, 2026.
VI. Adjournment
A motion was made by Brosius, seconded by Ketelboeter, and unanimously carried by the Plan Commission to
adjourn at 5:37 pm.
Proper notice of this meeting was given to the public and posted on the public bulletin boards in accordance with
the Open Meeting Law.
2
Respectfully submitted,
___________________
Carly Persson
Village Administrator
VILLAGE OF CROSS PLAINS
Plan Commission – Public Hearing Notice
Pursuant to Section 84.159(e) and 84.158(c) of the Village of Cross Plains Code of Ordinances, n otice is
hereby given that a public hearing will be held at Village Hall, located at 2417 Brewery Road, Cross Plains,
WI 53528 at 6:30 pm or earliest extent possible, on October 5, 2026 before the Plan Commission regarding
the following items:
1. A General Development Plan for the proposed redevelopment of the Zuern Building Products
properties located at 1918 and 1923 Market Street, Cross Plains, WI 53528.
All persons interested in reviewing the specific language or would like to ask further questions, may
contact Village Administrator, Carly Persson, at (608) 798-3241 ext. 105 or cpersson@cross-plains.wi.us.
All persons interested are invited to attend these public hearings and be heard. Interested parties are
encouraged to participate by Zoom. You may join the meeting by going to
https://us02web.zoom.us/j/83459730362 or by calling 1-312-626-6799 and entering the meeting ID;
834 5973 0362.
Dated this 17
th and 24th day of September, 2026.
Carly Persson
Village Administrator
Village of Cross Plains
Memorandum
To: Village of Cross Plains Plan Commissioners
From: Carly Persson, Village Administrator
Date: October 5, 2026
Re: Zuern Building Products, 1918 and 1923 Market Street
General Development Plan (GDP) and Specific Implementation Plan (SIP) Submittal
To view Zuern’s submittal, please click on the link below:
Link to submittal:
https://we.tl/t-NesK05FaCT8PqSB9
Page 1 of 7
To: Village of Cross Plains
From: Sonja Kruesel, AICP, Village Planner, Vandewalle & Associates
Date: October 5, 2026
Re: 1923 & 1918 Market St. Planned Development (GDP and SIP Review)
Site Details:
Summary: Zuern Building Products &
Design Center is requesting approval of a
General Development Plan (GDP) and Specific Implementation Plan (SIP) for improvements to its
two existing properties located on opposite sides of Market Street.
Both properties are current zoned LI (Light Industrial) and have historically operated together as
part of Zuern’s building materials sales and storage operation. The Planned Development would
establish a coordinated development plan for the two properties and provide flexibility from certain
underlying LI zoning standards necessary to accommodate redevelopment and reinvestment in the
two sites. Both sites have relatively significant constraints associated with mapped Floodway and
100-Year Floodplain district. Both sites are located directly south of the Wisconsin and Southern
Railroad corridor.
According to the applicant, the proposed redevelopment would occur in three phases as follows:
• Phase 1, West Parcel (1923 Market Street): Construction of a two-story addition to the
existing showroom/office building. The first-floor addition would expand showroom space,
West East
Acres 2.1 1.5
Parcel No. 0707-041-
6074-1
0707-032-
4574-1
Address 1923 Market St 1918 Market St
Zoning Light Industrial Light Industrial
Proposed
Use
Office,
Showroom,
and Storage
Structures
Warehouse
West Parcel:
1923 Market St.
East Parcel:
1918 Market St.
Page 2 of 7
and the second floor would provide additional office space. Improvements also include new
customer and employee parking areas and landscaping. Timing: start October 2026.
• Phase 2, East Parcel (1918 Market Street): Demolition of three existing buildings and
construction of a new ~20,500 sf warehouse. The warehouse would increase indoor lumber
and material storage. Improvements also include parking, loading docks, site circulation, and
landscaping.
• Phase 3, West Parcel (1923 Market Street): Replace an existing building near the
northwest corner of the property with two open-sided storage structures of ~7,385 and
~9,167 sf. The structures would provide covered storage or materials currently stored
outdoors.
Comprehensive Plan: The Village’s Future Land Use map identifies the west parcel for Light
Industrial and identifies the east parcel as Downtown Mixed Use. The proposed project would allow
for the continued longstanding industrial/building materials use of both properties, along with
continued base zoning of Light Industrial. No conflicts with the Comprehensive Plan are identified.
Planned Development Zoning Approach: The applicant is requesting Planned Development (PD)
zoning primarily to accommodate several site-specific departures from the underlying zoning
standards. These primarily include a reduced building setback and pavement setback on the north
side of the east parcel, increased accessory building heights on the west parcel, reduced landscape
surface ratios on both parcels, and procedural flexibility to allow the General Development Plan
(GDP) and Specific Implementation Plan (SIP) to be considered concurrently.
The PD process includes four primary steps which progress from an initial concept through detailed
site-specific approval:
1. Pre-application review with staff (completed)
2. Concept review by the Plan Commission (completed)
3. GDP review and public hearing (October 8, 2026)
4. SIP review and action (October 8, 2026)
The Plan Commission’s actions are recommendations to the Village Board which has final approval
authority.
The Plan Commission should consider the requested modifications in the context of the overall
redevelopment of the properties rather than simply as individual dimensional exceptions. The
project represents substantial reinvestment in the existing industrial business. The improvements
would replace or renovate several existing structures, consolidate portions of the outdoor storage
operation into new enclosed or covered buildings, improve parking and access, clarify the record
regarding existing nonconforming conditions, and introduce additional landscaping along the public-
facing portions of both sites. The overall impervious space is also reduced in the proposed condition
and the architectural appearance of all buildings is improved.
While several of the requests are fairly substantial departures from the code requirements (such as
the 12’ north side setback and reductions compared to the 30% required landscape surface ratio)
Page 3 of 7
these flexibilities are proposed as part of a comprehensive reinvestment of two already highly
constrained and already developed sites.
Requested PD Flexibilities:
Site or
Zoning Issue
West Parcel
(1923 Market
St.)
East Parcel (1918
Market St.)
Justification
Side Yard
Setback
-- 12 feet vs.
required 25-foot
min
Allow the warehouse to shift north, away from the
regulatory floodplain
Pavement
Setback
(North)
-- 0 feet vs. required
5-foot min
Accommodate circulation on the north side of the
warehouse, including fire safety access, and truck
movements to the loading docks at the rear of the
building
Accessory
Building
Height
26 feet and 31
feet vs.
required 20-
foot max
-- Necessary to accommodate covered material
storage and forklift access
Landscape
Surface Ratio
~11%
proposed vs.
required 30%
min
~17% proposed
vs. required 30%
min
Applicants indicate both contain more landscaped
areas than exists today despite not meeting the
minimum of 30% LSR. The west parcel is almost
100% impervious today (88% proposed) and the
east parcel is about 80% impervious today (82%
proposed).
Parking 28 spaces
proposed vs.
32 required
-- Share parking between the two sites. While the west
side is deficient by 4 spaces, the east side provides
a surplus of 13 spaces that can be shared across
the two properties.
Building
Separation
Proposed 19
feet vs.
required 50
The reduced building separation is between
accessory storage buildings which are not intended
to be occupied or fully enclosed.
Floodplain
Variances
Relief sought for
dryland
contiguous
access
Must be approved by the ZBA. PD approval is
conditioned upon ZBA approval.
Fire Lane
Variances
12-foot fire lane
width proposed
rather than typical
20 feet
Must be approved by the Fire Chief. Reference is
included in this staff report.
Site Access, Circulation, and Parking: The proposal would modify and formalize access to both
properties. On the west parcel, the number of existing driveway openings would be reduced from
three to two. The east parcel would retain two access points, but the overall frontage in driveway
Page 4 of 7
opening would be reduced in size. The applicant does not anticipate a significant change in daily
traffic volumes associated with the redevelopment.
Parking is proposed to function collectively between the two properties with the PD zoning serving
as formal documentation of shared parking arrangements. The expanded showroom/office use on
the west parcel requires 32 spaces per the zoning code. Instead of 32 spaces, the applicant is
proposing 28 spaces, resulting in a deficiency of 4 spaces. The warehouse on the east parcel requires
4 parking spaces (one stall per employee on the maximum shift), and the applicant is proposing 19
parking spaces (the site plan shows 19 while the narrative states 20 – I am using the more restrictive 19),
resulting in a surplus of 13 spaces. If the land uses were to change in the future, or if ownership of
one of the parcels changed in the future, in a way that would modify the parking availability,
amendment to the Planned Development may be necessary.
Floodway and Floodplain Overlay Zoning: Floodplain considerations are an important component
of the project and were one of the principal issues identified during concept review. Portions of the
properties are located within the mapped FEMA Zone AE floodplain and regulatory floodway.
Floodways are generally more restricted as that is the area where floodwaters flow during
inundation. If fill is placed in the floodway, a hydraulic study is required to show no increase in the
flood elevation. The applicants stated that while improvements are planned such as modifications to
driveway entrances, pavement, and parking areas, grading will remain at the existing elevation, and
no new fill will be placed. Fencing within the floodway is proposed to be designed as breakaway
fencing.
Development is allowed in the floodplain if buildings are constructed to flood protection
regulations. The finished floor of buildings must be located 2 feet above the base flood elevation. In
addition, the floodplain ordinance requires that a 15-foot dryland area be provided around the
entirety of the structure which would provide land access for safety response during a flood. The
applicant is requesting approval to not provide a continuous halo of dryland access around the
Page 5 of 7
building. They state that dryland access can be accommodate on the north, but on the south side of
the sites, the elevated building generally abuts mapped floodway rather than dryland access. The
applicant’s justification is that building entrances (which would be used during safety response) are
not located on the south side of the building and would be accessible via appropriate dryland in their
proposed locations.
Floodplain compliance, while important to review during PD/Site Plan review at the Plan
Commission level, is separate from the zoning flexibility authorized with a PD approval. To receive
relief from the floodplain ordinance, the Zoning Board of Appeals must consider a variance. Any
required floodplain permits, certifications, ZBA variance, or other building permits shall be obtained
separately from the PD approval. A related condition of approval is included.
Fire Lane Access: The proposed warehouse on the east parcel is located approximately 12 feet from
the north property line. This area is also intended to provide fire access along the north side of the
building. Typical fire access lane requires approximately 20 feet of unobstructed width, therefore the
configuration proposed does not meet the typical requirements.
The Fire Chief has reviewed and approved the proposed reduced width. This access is particularly
important because the south side of the building is adjacent to the floodway and may not provide
reliable emergency access during a flood event. As a condition of approval, the 12-foot-wide area
between the north side of the warehouse and the north property line shall remain permanently clear
and unobstructed for fire and emergency access.
Lighting:
Photometric plans have been submitted for both properties. Proposed lighting includes building-
mounted fixtures and pole-mounted site lighting. The Lighting code requires no more than 0.50 foot
candles as measured at the property line. The maximum fixture height for the LI district is 16 feet. A
note on Sheet ES00 and ES01 states that fixtures will be mounted on a 20’ tall pole. The plans shall
either be revised to a maximum pole height of 16 feet or the exceedance shall be discussed and
potentially authorized by the Plan Commission as a Planned Development flexibility.
Location of 12’ Fire
Lane Proposed
Page 6 of 7
Landscaping: The landscaping plans concentrate planting primarily along Market Street and in the
proposed parking areas. Tables on Sheet C600 and C601 demonstrates that proposed planting
complies with the required number of landscaping points on both sites.
Building Architecture: Overall, the proposed materials generally coordinated a white, gray, and black
color palette provide a cohesive architectural character across the redevelopment while allowing the
showroom/office building has a more customer-oriented appearance.
• The showroom and office addition (west parcel) uses LP SmartSide siding in a combination
of white and dark gray colors. Roofing materials and black and clear-anodized aluminum
storefront/windows are proposed. The mix of siding orientations and materials, windows,
roof forms, and entrance features provide articulation and visual interest.
• The new warehouse (east parcel) uses an industrial material palette consisting primarily of
vertical metal wall panels in white and gray, with horizontal metal panels in dark gray.
• The materials for the proposed storage structures are also more industrial in nature.
Fencing and Outdoor Storage: Outdoor material storage would remain an important component of
the Zuern operation following redevelopment, although the new warehouse and covered storage
structures would allow additional materials to be stored indoors or under cover. The site plans
identify designated outdoor storage areas and proposed perimeter fencing on both properties.
Portions of the proposed fencing and gates located within the regulatory floodway are specifically
identified as breakaway fencing.
Recommendation: Staff recommends that the Plan Commission make the following motion.
Motion to recommend approval to the Village Board of the General Development Plan
(GDP) and Specific Implementation Plan (SIP) for Zuern Building Products at 1918 and
1923 Market Street, subject to the following Findings of Fact and Conditions of Approval:
Findings of Fact
1. Three phases of construction are approved as part of the Planned Development as noted in
this review memo and the submitted application.
2. Zoning flexibility is approved as listed below:
a. Reduced side yard building and pavement setback (1918 Market St.)
b. Increase accessory building height (1923 Market St.)
c. Reduced Landscape Surface Ratio (1918 and 1923 Market St.)
d. Reduced parking spaces at 1923 Market St. and shared parking arrangements
between 1918 and 1923 Market St.
e. Reduced accessory building separation (1923 Market St.)
f. Increase in light pole fixture height (1918 and 1923 Market St.)
Lighting was not identified as a flexibility in the materials submitted. The Plan
Commission shall either include as a flexibility of the PD or require compliance with the
16’ maximum.
Page 7 of 7
3. Fire Access as proposed, including a reduced 12-foot width at 1918 Market St. is approved
by the Fire Chief.
Conditions of Approval
1. All outstanding Village fees shall be paid prior to issuance of building permits.
2. The 12-foot-wide area between the north side of the warehouse and the north property line
shall remain permanently clear and unobstructed for fire and emergency access. No outdoor
material storage, vehicle parking, equipment storage, or other obstructions shall be permitted
within this area at any time.
3. Shared parking is approved as part of the GDP/SIP. If either property is subsequently sold
or otherwise separated from common ownership or operation, continued compliance with
applicable parking approvals is required.
4. Any required floodplain permits, certifications, ZBA variance, or other building permits shall
be obtained separately from the PD approval.
Source: Village of Cross Plains website. First collected Oct 19, 2026.