Packet
Village of Cross Plains · Dane County · meeting of Sep 28, 2026 · Agenda packets
Open the original document More from Village of Cross Plains
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
09.28.2026 Village Board Agenda
09.28.26 VB AGENDA.PDF
09.28.2026 Village Board Packet
09.28.26 VB PACKET.PDF
1.
Documents:
2.
Documents:
Page 1 of 3
Village of Cross Plains Board of Trustee Meeting
Regular Meeting Notice and Agenda
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
September 28, 2026
6:00 pm
The Village of Cross Plains will provide opportunities for the public to monitor the meeting virtually or by
calling in. Please take note that the meeting will continue even if technical problems occur. The log in
information is as follows:
Zoom Virtual Meeting Link:
https://us02web.zoom.us/j/88215999241
Conference telephone line:
+1 312 626 6799
Meeting ID:
882 1599 9241
I. Call to Order
II. Roll Call
III. Pledge of Allegiance
IV. Public Comment - This is an opportunity for anyone to address the Village Board on any issue.
Please observe the time limit of 3 minutes. While the Village Board encourages input from
residents, it may not discuss or act on any issue that is not duly noticed on the agenda. Please see
the Public Comment instructions at the end of this agenda.
V. Consent Agenda – Upon request of any Trustee, any item may be removed from the Consent
Agenda for separate consideration under General Business.
1. Approve Minutes of Regular Village Board Meeting Held on September 14, 2026.
2. Approve Total Disbursements from 9/726 through 9/23/26 in the amount of
$931,219.47 as follows:
• 110 – General Fund $97,208.49
• 120 – Capital Fund $817,083.11
• 130 – Library Fund $2,833.05
• 150 – Debt Service Fund $5,329.75
• 200 – Library Endowment Fund $741.03
• 310 – TID $0.00
Page 2 of 3
• 660 – Water Utility -$13,157.08
• 670 – Sewer Utility $21,181.12
3. Approve 2027 Dane County Library Tax Exemption Resolution.
4. Approve Sewer Adjustment Request – 1851 Cornerstone Dr.
VI. Report of Village Officers
1. Village President
2. Village Vice President
3. Other Trustee Reports
4. Village Administrator
5. Village Department Heads/Other Reports
VII. General Business
1. Guest Speakers – Dana Monogue and Jerrud Rossing, Middleton-Cross Plains Area School
District.
2. Discussion and Possible Action Regarding Approval of the 2027 Agreement Between the Village
of Cross Plains and the Wisconsin Professional Police Association.
3. Discussion and Possible Action Regarding Approval of the Johnson Block Engagement Letter for
the 2027 Test Year Water Utility Rate Case.
4. Discussion and Possible Action Regarding Wastewater Treatment Plant Facility Plan and
Sampling Requirement Required by DNR.
5. Discussion and Possible Action Regarding 2027 Wage and Benefits Budget and Supplemental
Requests.
6. Distribution of the 2027 Draft Operating Base Budget and Supplemental Requests.
VIII. Closed Session
1. The Village Board will meet in Closed Session pursuant to 19.85(1)(c) of Wisconsin Statutes,
“Considering employment, promotion, compensation or performance evaluation data of any
public employee over which the governmental body has jurisdiction or exercises
Page 3 of 3
responsibility,” to discuss the terms of employment for an Interim Village
Administrator/Economic Development Director.
A. Reconvene into Open Session pursuant to 19.85(2) of Wisconsin Statutes.
B. Discussion and Possible Action to Accept the Resignation of Village
Administrator/Economic Development Director Carly Persson.
C. Discussion and Possible Action Regarding the Appointment and Terms of
Employment of an Interim Village Administrator/Economic Development Director
and the Recruitment Process for a Permanent Village Administrator/Economic
Development Director.
IX. Future Agenda Items
X. Adjournment
This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance
with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of
members of other governmental bodies of the municipality may be in attendance at the above stated meeting to
gather information. No action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals. For additional information or to request this service, contact the
Village Hall at (608) 798-3241 or bobbi@cross-plains.wi.us.
PUBLIC COMMENT INSTRUCTIONS
WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either
on or not on the agenda to be included in the meeting packet, by emailing bobbi@cross-plains.wi.us or in writing to
Village Board, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will
be distributed at the meeting.
IN-PERSON: Public comment forms are available at the Board Room entrance. Please fill out and hand to staff prior
to start of meeting. Comments are limited to three- minutes per person and must be delivered at the designated
microphone for recording purposes. Accommodations can be provided for those unable to access the microphone.
VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand”
if on video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those
wishing to provide oral comments remo tely must have their full name displayed within the Zoom application and
must state address of residence.
*As permitted by the Wisconsin open meetings law and while not required, the Village Board has chosen to allow
public comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Village
Board may not engage in discussio n or take action during this period but may consider deferring the subject to a
later meeting with notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on
certain specified matters where the public can comment. The me eting chairperson will identify rules for providing
comments. Other items on the agenda which are not listed for public hearing do not require the Board to allow
public comment, however the meeting chairperson can at their own discretion allow limited publ ic comments.
Page 1 of 3
Village of Cross Plains Board of Trustee Meeting
Regular Meeting Notice and Agenda
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
September 28, 2026
6:00 pm
The Village of Cross Plains will provide opportunities for the public to monitor the meeting virtually or by
calling in. Please take note that the meeting will continue even if technical problems occur. The log in
information is as follows:
Zoom Virtual Meeting Link:
https://us02web.zoom.us/j/88215999241
Conference telephone line:
+1 312 626 6799
Meeting ID:
882 1599 9241
I. Call to Order
II. Roll Call
III. Pledge of Allegiance
IV. Public Comment - This is an opportunity for anyone to address the Village Board on any issue.
Please observe the time limit of 3 minutes. While the Village Board encourages input from
residents, it may not discuss or act on any issue that is not duly noticed on the agenda. Please see
the Public Comment instructions at the end of this agenda.
V. Consent Agenda – Upon request of any Trustee, any item may be removed from the Consent
Agenda for separate consideration under General Business.
1. Approve Minutes of Regular Village Board Meeting Held on September 14, 2026.
2. Approve Total Disbursements from 9/726 through 9/23/26 in the amount of
$931,219.47 as follows:
• 110 – General Fund $97,208.49
• 120 – Capital Fund $817,083.11
• 130 – Library Fund $2,833.05
• 150 – Debt Service Fund $5,329.75
• 200 – Library Endowment Fund $741.03
• 310 – TID $0.00
Page 2 of 3
• 660 – Water Utility -$13,157.08
• 670 – Sewer Utility $21,181.12
3. Approve 2027 Dane County Library Tax Exemption Resolution.
4. Approve Sewer Adjustment Request – 1851 Cornerstone Dr.
VI. Report of Village Officers
1. Village President
2. Village Vice President
3. Other Trustee Reports
4. Village Administrator
5. Village Department Heads/Other Reports
VII. General Business
1. Guest Speakers – Dana Monogue and Jerrud Rossing, Middleton-Cross Plains Area School
District.
2. Discussion and Possible Action Regarding Approval of the 2027 Agreement Between the Village
of Cross Plains and the Wisconsin Professional Police Association.
3. Discussion and Possible Action Regarding Approval of the Johnson Block Engagement Letter for
the 2027 Test Year Water Utility Rate Case.
4. Discussion and Possible Action Regarding Wastewater Treatment Plant Facility Plan and
Sampling Requirement Required by DNR.
5. Discussion and Possible Action Regarding 2027 Wage and Benefits Budget and Supplemental
Requests.
6. Distribution of the 2027 Draft Operating Base Budget and Supplemental Requests.
VIII. Closed Session
1. The Village Board will meet in Closed Session pursuant to 19.85(1)(c) of Wisconsin Statutes,
“Considering employment, promotion, compensation or performance evaluation data of any
public employee over which the governmental body has jurisdiction or exercises
Page 3 of 3
responsibility,” to discuss the terms of employment for an Interim Village
Administrator/Economic Development Director.
A. Reconvene into Open Session pursuant to 19.85(2) of Wisconsin Statutes.
B. Discussion and Possible Action to Accept the Resignation of Village
Administrator/Economic Development Director Carly Persson.
C. Discussion and Possible Action Regarding the Appointment and Terms of
Employment of an Interim Village Administrator/Economic Development Director
and the Recruitment Process for a Permanent Village Administrator/Economic
Development Director.
IX. Future Agenda Items
X. Adjournment
This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance
with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of
members of other governmental bodies of the municipality may be in attendance at the above stated meeting to
gather information. No action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals. For additional information or to request this service, contact the
Village Hall at (608) 798-3241 or bobbi@cross-plains.wi.us.
PUBLIC COMMENT INSTRUCTIONS
WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either
on or not on the agenda to be included in the meeting packet, by emailing bobbi@cross-plains.wi.us or in writing to
Village Board, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will
be distributed at the meeting.
IN-PERSON: Public comment forms are available at the Board Room entrance. Please fill out and hand to staff prior
to start of meeting. Comments are limited to three- minutes per person and must be delivered at the designated
microphone for recording purposes. Accommodations can be provided for those unable to access the microphone.
VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand”
if on video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those
wishing to provide oral comments remo tely must have their full name displayed within the Zoom application and
must state address of residence.
*As permitted by the Wisconsin open meetings law and while not required, the Village Board has chosen to allow
public comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Village
Board may not engage in discussio n or take action during this period but may consider deferring the subject to a
later meeting with notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on
certain specified matters where the public can comment. The me eting chairperson will identify rules for providing
comments. Other items on the agenda which are not listed for public hearing do not require the Board to allow
public comment, however the meeting chairperson can at their own discretion allow limited publ ic comments.
Page 1 of 4
Village of Cross Plains Board of Trustee Meeting
Regular Meeting Minutes
Village Hall
2417 Brewery Rd
Cross Plains, WI 53528
(608) 798-3241
Monday, September 14, 2026
6:00 pm
The video link to this meeting can be found at: https://www.youtube.com/watch?v=AmPsXSqZ2Po
I. Call to Order
President Lengfeld called the Village Board meeting to order at 6:00 PM.
II. Roll Call
Present: Trustees Jed Henry, Bill Brosius, Sarah Borchardt, Cameron Bjorklund, Michael Pomykalski,
Judy Ketelboeter and President Jay Lengfeld.
Absent: None.
Also Present: Village Administrator Carly Persson, Village Clerk Bobbi Zauner, Library Director
Elizabeth Clauss, Public Facilities Director Matt Couey, Parks and Recreation Director Kane
Browskowski, Chief of Police Tony Ruesga, EMS Chief Holly Ellickson, Brian Berquist of Town and
Country Engineering, Jeff Haen, and Kyle Haen.
Present via teleconference and/or web meeting: Joe Pertzborn and Kevin Murphy.
III. Pledge of Allegiance
IV. Public Comment – None.
V. Consent Agenda
1. Approve Minutes of Regular Village Board Meeting Held on August 24, 2026.
2. Approve Total Disbursements from 8/20/26 through 9/3/26 in the amount of $ 501,077.24 as
follows:
• 110 – General Fund: $35,906.82
• 120 – Capital Fund: $38,098.04
• 130 – Library Fund: $4,500.94
• 150 – Debt Service - $363,034.19
• 200 – Library Endowment Fund: $18.70
• 310 – TID Fund: $0.00
• 660 – Water Fund: $43,075.64
• 670 – Sewer Fund: $16,442.91
Page 2 of 4
3. Approve Sewer Adjustment Request – 1410 Ridgetrail Dr.
A motion was made by Brosius, seconded by Henry, and unanimously carried by the Village Board to
approve the Consent Agenda as presented.
VI. Report of Village Officers
1. Village President -None.
2. Village Vice President – None.
3. Other Trustee Reports
A. Brosius reminded everyone that the Board of Review will be held on Wednesday, September
16. He provided an overview of the expectations and responsibilities of trustees during the
Board of Review.
4. Village Administrator
A. Persson reported that the Oktoberfest event has been cancelled and that the recruitment for
a new Village attorney is ongoing.
5. Village Department Heads/Other Reports – None.
VII. General Business
1. Continued Discussion and Possible Action Regarding 2027 Capital Improvement Projects.
• Pool Vacuum
o A motion was made by Ketelboeter , seconded by Brosius, and unanimously carried
by the Village Board to approve the pool vacuum for the 2027 CIP, to be paid for with
Pool Improvement Funds.
• Pool/Recreation Point of Sale System & Workstations
o A motion was made by Brosius, seconded by Ketelboeter, and unanimously carried
by the Village Board a approve the pool/recreation point of sale system &
workstations for the 2027 CIP, at a cost not to exceed $6,000.
• Brewery Creekside Park Updates
o Following discussion, this project was removed from the 2027 CIP.
• Repair Concrete Floors
o EMS Chief Holly Ellickson confirmed that this project has already been done, so the
project can be removed from the 2027 CIP.
• Replace Two-Way Radios, 1998 Tender 2 Replacement, and Fire Station Caulking
o A motion was made by Bjorklund, seconded by Henry, and unanimously carried by
the Village Board to approve the replacement of two-way radios, replacement of the
1998 Tender 2, and Fire Station caulking for the 2027 CIP.
• DS300 Polling Place Scanner and Tabulator
o Clerk Zauner said that Dane County was proposing a cost share for this equipment, so
it can be removed from the CIP and paid for with the Election operating
budget/previously approved fund balance.
• Marchstone Water Infrastructure
o The cost and timing of this project is unknown at this time and will be discussed at a
later date.
Page 3 of 4
• Wastewater Treatment Facility Updates
o The cost and timing of these projects are unknown at this time and will be discussed
at a later date.
2. Discussion and Possible Action Regarding the 2028-2031 Capital Improvement Plan.
A motion was made by Brosius and seconded by Bjorklund to approve the 2028 -2031 Capital
Improvement Plan. Following discussion, a voice vote was called. Motion carried, 7-0.
3. Discussion and Possible Action Regarding a Request to Allow Earth -Disturbing Activities for
Marchstone Development Phase I Beyond September 15, 2026.
Following an overview by Persson , a motion was made by Brosius, seconded by Ketelboeter, and
unanimously carried by the Village Board to allow earth-disturbing activities for seeding until October
15 and to allow earth-disturbing activities in the right-of-way until November 15.
4. Discussion and Possible Action Regarding Payment Request #1 for Creekside Way Rehabilitation
and Maintenance.
Following an overview by Brian Berquist of Town & Country Engineering, a motion was made by Henry,
seconded by Borchardt, and unanimously carried by the Village Board to approve payment request
#1 to Payne & Dolan in the amount of $60,663.18.
5. Discussion and Possible Action Regarding Purchase of New Thinnes Street Water Main.
Following an overview by Berquist and discussion, a motion was made by Pomykalski and seconded
by Ketelboeter to approve the quote by James Peterson Sons with a Village net contribution not to
exceed $400,000. A roll call vote was requested. YES – Henry, Borchardt, Pomykalski, and Ketelboeter.
NO – Brosius, Bjorklund, and Lengfeld. Motion carried, 4-3.
6. Discussion and Possible Action Regarding Wastewater Treatment Plant Sampling Equipment
Required by the DNR.
Following discussion, a motion was made by Lengfeld and seconded by Bjorklund to postpone General
Business Item #6 to the September 28 Village Board meeting. Following further discussion, a roll call
was requested. YES – Pomykalski, Bjorklund, Ketelboeter, Borchardt, Brosius, and Lengfeld. NO –
Henry. Motion carried, 6-1.
7. Discussion and Possible Action Regarding Updates to Street Light Policy.
Following an overview by Pomykalski and discussion, a motion was made by Borchardt, seconded by
Henry, and unanimously carried by the Village Board to approve the changes to the Street Light Policy.
8. Discussion and Possible Action Regarding No Parking on North Hill Point Road, from Stone Valley
Road to County Highway P.
Following an overview by Bjorklund and discussion, a motion was made by Henry, seconded by
Bjorklund, and unanimously carried by the Village Board to approve No Parking on North Hill Point
Road from Stone Valley Road to County Highway P.
9. Discussion and Possible Action Regarding New Village Hall and Police Department
A. Construction Update
Persson provided a status update on the construction progress of the new building.
B. Financial Update
Zauner presented a summary of actual costs spent to date for new building.
Page 4 of 4
C. Payment Application #9
Following discussion, a motion was made by Borchardt, seconded by Ketelboeter, and
unanimously carried by the Village Board to approve pay application #9 in the amount of
$754,398.43 to Brickl Bros.
10. Discussion and Possible Action Regarding 2027 Draft EMS District Budget.
Following discussion, no action was taken.
11. Distribution of the Draft 2027 Wage and Benefits Budget.
The draft 2027 Wage and Benefits Budget was included in the packet and will be discussed at the next
meeting.
VIII. Future Agenda Items – None.
IX. Adjournment
A motion was made by Brosius, seconded by Henry, and unanimously carried by the Village Board to
adjourn. The meeting ended at 8:39 p.m.
Proper notice of this meeting was given to the public and posted on the public bulletin boards in accordance with the
Open Meeting Law.
Respectfully submitted,
____________________________
Bobbi Zauner
Finance Director/Clerk
Village of Cross Plains
Finance Department
Memorandum
To: Village of Cross Plains Trustees
From: Bobbi Zauner, Village of Cross Plains Finance Director
Date: September 23, 2026
Re: Check Disbursements, 9/4/26 – 9/23/26
To view the check disbursements for the period of September 4 – September 23, 2026, please click on the link
below:
https://cross-plains.wi.us/DocumentCenter/View/2766/Check-register-9426-92326
Resolution Requesting Exemption from Dane County Library Tax
WHEREAS the Dane County Board has established a county library and levies a county library tax as
authorized under Section 43.57 (3) of the Wisconsin Statutes, and
WHEREAS the Dane County Library Board has determined that the library serving the village of
Cross Plains meets the minimum standards of operation established by the County Board (RES
185, 2011-2012; RES 98, 2013-2014; RES 233, 2016-2017; RES 149 2023-2024) in
compliance with Section 43.11 (3) (d) of the Wisconsin Statutes, and
WHEREAS Section 43.64 (2) (b) of the Wisconsin Statutes provides that a village or city which levies
a tax for public library service and appropriates and expends for a library fund as defined by
s.43.52 (1) during the year for which the county tax levy is made a sum at least equal to the
county tax rate in the prior year multiplied by the equalized valuation of property in the city or
village for the current year, and
WHEREAS the village of Cross Plains will appropriate in 2026 and expend in 2027 an amount in
excess of that calculated above in support of its library,
NOW THEREFORE BE IT RESOLVED that the village of Cross Plains hereby requests of the Dane
County Board of Supervisors that the village of Cross Plains be exempted from the payment of
any tax for the support of the County Library Service as provided in Section 43.64 (2).
BE IT FURTHER RESOLVED that confirmed copies of this resolution will be forwarded by the
Village clerk to the following party:
Tracy Herold, Director
Dane County Library Service
herold@dcls.info
Date Passed:_________________
Vote:_______________________
__________________________________ _______________________________
Jay Lengfeld Village President
Exempt Total 86,057,702,700
County Total 109,786,344,600
2025 tax base $23,728,641,900
2026 DCLS app $6,896,986
2027 County library tax levy rate $0.0002906608
Per 2026 DOR DaneCo EqVal
EXEMPT LIBS 2026 Eq Val 2027 Min App 2026 App Diff
Villages Belleville 361,674,400 $105,125 $283,800 $178,675
Black Earth 228,308,100 $66,360 $174,832 $108,472
Cambridge 297,810,600 $86,562 $98,275 $11,713
Cross Plains 685,706,600 $199,308 $312,775 $113,467
Deerfield 419,144,000 $121,829 $185,283 $63,454
DeForest 2,213,555,600 $643,394 $850,850 $207,456
Marshall 419,644,900 $121,974 $198,600 $76,626
Mazomanie 308,457,900 $89,657 $110,065 $20,408
McFarland 1,751,791,100 $509,177 $845,250 $336,073
Mount Horeb 1,287,668,400 $374,275 $535,358 $161,083
Oregon 2,220,665,000 $645,460 $1,174,668 $529,208
Waunakee 3,782,162,800 $1,099,326 $1,278,257 $178,931
Cities Fitchburg 6,509,170,600 $1,891,961 $2,465,722 $573,761
Madison 49,866,568,400 $14,494,257 $23,034,898 $8,540,641
Middleton 5,810,447,900 $1,688,869 $1,726,842 $37,973
Monona 2,021,501,300 $587,571 $944,229 $356,658
Stoughton 2,040,229,800 $593,015 $726,931 $133,916
Sun Prairie 6,579,043,200 $1,912,270 $2,405,736 $493,466
Verona 4,571,340,300 $1,328,709 $1,424,453 $95,744
Agenda Memorandum
1
Staff/Department: Carly Persson, Village Administrator
Subject Matter: 2027 Cross Plains Professional Police Association Agreement
Meeting Date: September 28, 2026
Referral History: N/A
Executive Summary:
Project Background:
Code/Policy Review:
Fiscal Impact:
The Village and the Cross Plains Professional Police Association have reached an agreement on a one-
year successor contract in effect from January 1 through December 31, 2027. The Association has ratified
the agreement, and it is now being presented to the Village Board for approval.
The agreement includes a 2% wage increase effective January 1, 2027, followed by a 2.5% increase
effective July 1, 2027. It also removes the trial 11-hour shift schedule, incorporates the recruit academy
officer provisions into the contract, and increases the ballistic vest reimbursement.
Because the wage increases take effect in January and July, the estimated increase in 2027 wage
costs is approximately 3.3% compared with maintaining the current wage schedule for the full year.
Beginning July 1, 2027, wage rates will be approximately 4.55% higher than the current schedule.
Actual costs will depend on staffing, overtime, and related benefit expenses.
The agreement also increases the maximum ballistic vest and carrier reimbursement by $300 when a
replacement is due under the five-year replacement cycle.
The collective bargaining agreement is subject to approval by the Village Board.
The Village and Association met on July 29 and August 13, 2026, to negotiate a successor agreement. The
major changes include:
• A 2% wage increase effective January 1, 2027, and an additional 2.5% increase effective July 1,
2027.
• The part-time officer rate remains $30 per hour.
• The 11-hour shift memorandum is removed, with officers returning to the regular eight-hour, six-
days-on/three-days-off schedule.
• The recruit academy officer provisions are incorporated into the contract as a new Article 30.
• The ballistic vest replacement reimbursement increases from $600 to $900 and includes both the
vest and carrier.
• The deadline for requesting approval to purchase a uniform item exceeding the $525 annual
allowance changes from September 1 to October 1.
• The agreement has a one-year term ending December 31, 2027.
Agenda Memorandum
2
Recommendation:
Appendices:
Staff recommends that the Village Board approve the 2027 collective bargaining agreement with the Cross
Plains Professional Police Association and authorize the Village President and Village Clerk to execute the
agreement.
1. 2027 Cross Plains Professional Police Association Agreement - Redline
Agreement between the
VILLAGE OF CROSS PLAINS
and the
CROSS PLAINS POLICE DEPARTMENT
WISCONSIN PROFESSIONAL POLICE ASSOCIATION
LAW ENFORCEMENT EMPLOYEE RELATIONS DIVISION
20267
TABLE OF CONTENTS
ARTICLE PAGE
1 RECOGNITION………………….………………………………..........1
2 MANAGEMENT RIGHTS……………………………………………...1
3 GENDER…………………………………………………………..........3
4 ASSOCIATION ACTIVITIES; BULLETIN BOARD………………….3
5 GRIEVANCE PROCEDURE…………………………………………..3
6 PROBATIONARY PERIOD………………………………………..…..7
7 SENIORITY………………………………………………………..........7
8 LAYOFF AND RECALL…………………………………………..........8
9 NO STRIKE OR LOCKOUT……………………………………………8
10 DISCIPLINE AND DISCHARGE………………………………...........9
11 HOURS OF WORK……………………………………………………..9
12 VACATIONS……………………………………………………………12
13 HOLIDAYS……………………………………………………………..13
14 SICK LEAVE……………………………………………………………13
15 CIVIL LEAVE AND JURY DUTY………….……………………........15
16 BEREAVEMENTLEAVE…….………………………………………..15
17 LEAVES OF ABSENCE………………………………………………16
18 MILITARY LEAVE……………………………………………………..17
19 HEALTH AND DENTAL INSURANCE………………………….......18
20 LIFE INSURANCE…………………………………………………….19
21 INCOME CONTINUATION INSURANCE…………………………..19
22 RETIREMENT………………………………………….………………19
23 UNIFORM ALLOWANCE…………………………….………….……19
24 WAGES………………………………………………….……………...20
25 EDUCATIONAL INCENTIVE…………………………………………21
26 WORKER’S COMPENSATION....………………………………..….21
27 MISCELLANEOUS………………………………………………….…21
28 SCHOOL RESOURCE OFFICER……………………………………22
29 REGULAR PART-TIME EMPLOYEES……………………………...25
30 NONCERTIFIED AND RECRUIT ACADEMY OFFICERS………..25
301 SEPARABILITY AND SAVINGS….……………………………......257
312 DUES DEDUCTION …………….………………………………......268
323 SCOPE OF THE AGREEMENT……...………………..……….…..279
334 DURATION…………………………………………………. ……... 2830
SIGNATURE PAGE………………...……………………………...2830
APPENDIX A…………………………..…………………………... 2931
APPENDIX B…………………………..…………………..………... 313
MOU LATERAL TRANSFER OF CERTIFIED LE OFFICERS… 324
MOU POLICE RECRUIT ACADEMY………………………………. 33
MOU 11-HOUR SHIFT SCHEDULE……………………………….. 34
1
INTRODUCTION
THIS AGREEMENT is made and entered into by and between VILLAGE OF
CROSS PLAINS, hereinafter referred to as the “Village” or the “Employer”, AND
WISCONSIN PROFESSIONAL POLICE ASSOCIATION/LEER DIVISION, hereinafter
referred to as the “Association”, and shall continue in full force and effect as hereinafter
set forth.
ARTICLE 1: RECOGNITION
1.01 The Employer recognizes that the Association is the sole and exclusive
bargaining agent as certified by the Wisconsin Employment Relations Commission in
Case 1, No. 47626, ME-3240, Decision No. 27340-A, for all regular full-time and regular
part-time employees of the Village of Cross Plains who have the power of arrest,
excluding supervisory, managerial, confidential, craft and all other employees.
ARTICLE 2: MANAGEMENT RIGHTS
2.01 It is agreed that the management of the Employer’s operations and the
direction of its working forces is vested exclusively in the Employer and that this
includes but is not limited to the following:
a) To direct, supervise and evaluate the work of its Employees;
b) to hire, promote, transfer, classify, reclassify, or lay off employees;
c) to discipline, demote or discharge employees in accordance with Article
10;
d) to plan, direct and control operations
2
e) to set the standards of work and its performance;
f) to determine the amount and quality of the work and services needed, by
whom it shall be performed, and the location where such work and service
shall be performed;
g) to determine to what extent any process, service or activities of any nature
whatsoever shall be added, modified, eliminated or obtained by contract
with any other person or employer;
h) to introduce new or improved methods, tools, equipment or facilities, or to
change existing practices, methods tools, equipment and facilities;
i) to schedule the hours of work and to determine the assignment and
allocation of duties:
j) to select and to determine the number and qualifications of employees
required;
k) to make, modify and enforce reasonable rules and regulations not
inconsistent with the provisions of this Agreement.
2.02 The Employer shall have the right to employ part-time employees.
2.03 The Employer’s exercise of the foregoing functions shall be limited only by
the express provisions of this Agreement and the Employer has all the rights which it
had at common is law except those expressly bargained away in this Agreement. This
Article shall be liberally construed.
3
ARTICLE 3: GENDER
3.01 All references to he or his are assumed to apply with equal force to she or
her.
ARTICLE 4: ASSOCIATION ACTIVITIES; BULLETIN BOARD
4.01 Employees shall limit Association business to non- working time wherever
possible. In no event shall the performance of Association business interfere with the
operations of the Department. Prior to performing any Association business during
working time, the employee shall first obtain the permission of the Chief or the Chiefs
designee.
4.02 The Employer shall make bulletin board space available to the Association
for the posting of official Association business in a location reasonably accessible to
employees. Only items approved by the Association shall be posted. All items shall be
dated by the Association.
ARTICLE 5: GRIEVANCE PROCEDURE
5.01 A grievance is defined as a complaint by an employee or the Association
that an express provision of this Agreement was violated by the Employer. A grievance
shall be processed as follows (it is understood that an employee may discuss a
grievance with the employee’s immediate supervisor prior to the filing of a grievance,
but such discussion shall not be considered a formal step in the grievance procedure).
An employee may not maintain a grievance under Article 5 and a Grievance under
Village Ordinance 9.18, Grievance Procedure. Therefore, if an employee files a
grievance under Village Ordinance 9.18, Grievance Procedure, the employee and the
4
Association thereby waive any right to file a grievance under Article 5. For the purpose
of grievance processing, “days” shall mean calendar days, excluding Saturdays,
Sundays, and those holidays listed in Article 13.
Step 1: A grievance shall be filed by an employee, with or without the assistance
of a steward, or the Association within six (6) days of the alleged violation
or first knowledge thereof by submitting such grievance in writing to the
Chief or his/her designee. The grievance shall include a description of the
relevant facts, the express provision(s) alleged to be violated, and the
specific relief requested. The Chief or his/her designee will respond to the
grievance in writing within 10 days of receiving the written grievance.
Step 2 : If an employee’s timely grievance is not settled to the grievant’s
satisfaction at Step 1, then within ten (10) days from the date of receipt of
the Step 1 answer, the grievant may submit the grievance to the Village
Administrator/Clerk. If requested by the grievant at the time the grievance
is submitted, the Village Administrator/Clerk will give the grievant an
opportunity to meet with the Administrator/Clerk. The grievance will be
answered in writing within 45 days of receipt by the Administrator/Clerk.
Step 3: If the grievance involves a termination of Employment, and the grievant is
not satisfied with the Step 2 answer, the grievant shall have ten (10) days
from the date of the Step 2 answer to submit the grievance to the Village
Clerk or his/her designee. The Employer or its designee shall meet, upon
request, with the Association representative to discuss the grievance. The
Employer shall give a written answer to the Association within ten (10)
5
days of the meeting. If no meeting is requested, the Employer shall give a
written answer to the Association within twenty (20) days after receiving
the grievance under this step.
5.02 Failure of the Employer or its designee to respond or adjust a grievance
within the above time limits shall constitute a denial of the grievance. Grievances not
timely filed or appealed as provided above shall be barred even though the parties
continue to discuss said grievances. There may be no waiver of this provision unless it
is mutually agreed to in writing by the Association and the Employer.
5.03 The Village Board may, in its sole discretion, elect to hear and decide a
grievance at any step of the grievance procedure. The decision of the Village Board
shall be final except as provided in Section 5.04.
5.04 If the grievant and/or the Association is not satisfied with the final decision
after the exhaustion of the grievance steps identified previously, the grievant and/or the
Association may request that the grievance be determined by an impartial arbitrator.
Notification of the intent to arbitrate must be sent to the Village Clerk within ten (10)
days of receipt of the response of the Employer, or within ten (10) days of when the
response from the Employer was due. The parties agree to the following procedure in
selecting an arbitrator to resolve the dispute:
A. The parties will request the Wisconsin Employment Relations Commission
(WERC) to provide a panel of an odd number of potential arbitrators from
the WERC staff. The parties shall alternately strike a name from the panel
until only one remains. The party requesting arbitration shall be the first to
strike a name.
6
B. The arbitrator shall not add to, subtract from, or modify the language of
this agreement in arriving at a determination of the issue presented. The
arbitrator shall have no authority to change wage rates or salaries. The
arbitrator shall be expressly confined to the precise issue submitted for
arbitration and shall have no authority to determine any other issue not so
submitted. All expenses which may be involved in the proceedings shall
be borne equally by both parties, except that expenses related to the
calling of witnesses, or any other similar expenses, shall be borne by the
party calling those witnesses.
C. The arbitrator selected shall hold a hearing at a time and place convenient
to the parties at the earliest possible date following notification of
selection. The arbitrator shall take such evidence as his/her judgment
deems appropriate for disposition of the dispute.
D. The expenses for the arbitrator’s services shall be borne equally by the
parties. However, all other expenses incurred by the parties shall be the
responsibility of the party incurring said expenses. If either party desires a
transcript of the proceeding, both parties shall be obligated to pay one- half
(1/2) the cost of obtaining and producing the transcript and providing a
copy to the arbitrator.
7
ARTICLE 6: PROBATIONARY PERIOD
6.01 All employees hired shall serve an eighteen (18) month probationary
period. The initial probationary period may be extended by mutual written agreement
between the Employer and the Association.
6.02 During an employee’s probationary period, the Employer may discipline or
discharge the employee and said discipline or discharge shall not be subject to review
under this Agreement or under Village Ordinance 9.18, Grievance Procedure.
6.03 Probationary employees shall become eligible for paid sick leave upon
hire.
6.04 Probationary employees shall become eligible for paid holidays upon hire,
with the exception of the time spent in the recruit academy.
ARTICLE 7: SENIORITY
7.01 The principal of seniority shall be taken into account only to the extent
expressly provided in this Agreement.
7.02 Seniority shall be calculated as of the start of employee’s most recent
regular full-time employment.
7.03 An employee’s seniority and employment relationship shall be broken and
terminated for any of the following reasons:
a) If the employee quits.
b) If the employee is discharged.
c) If a non -probationary employee is on layoff for more than twelve
(12) consecutive months.
8
d) If the employee is on layoff and fails to notify the Employer of
his/her intention to return to work within five (5) calendar days after
issuance of the recall notice or fails to report to work within ten (10)
calendar days after issuance of the recall notice. The notice of
recall for any employee who has been laid off shall be mailed to the
last known address of the employee on the books of the Village.
e) If the employee is absent from employment for three (3)
consecutive working days without notice to the Employee, absent
proven inability to contact the Employer.
f) If the employee retires.
ARTICLE 8: LAYOFF AND RECALL
8.01 The principle of seniority shall be taken into account when the Employer
decides to layoff and recall employees. Seniority shall control, in case of layoff or recall,
provided the remaining employees are qualified to perform the available work. Regular
part-time employees shall be laid off prior to regular full-time employees.
8.02 The Employer agrees to notify the Association in writing of all layoff and
recall notices. This provision shall not be construed to require any advance notice of
such action(s).
ARTICLE 9: NO STRIKE OR LOCKOUT
9.01 The Employer agrees that there will be no lockout during the term of this
Agreement. The Association agrees that there will not be any complete or partial strikes,
9
sympathy strikes, picketing, refusals to cross picket lines, slowdowns, work stoppages,
secondary boycotts or other cessations of work, economic or otherwise, during the term
of this Agreement. Participation by any employee in any of the foregoing activities,
whether or not sanctioned by the Association, shall be grounds for discipline, including
immediate discharge.
ARTICLE 10: DISCIPLINE AND DISCHARGE
10.01 The Village reserves the right to discipline employees consistent with the
best interests of the Village and the efficient operation of the Department. Employees
who have completed their probationary period shall be accorded an opportunity to be
heard before discipline is imposed. Discipline shall only be imposed where the Village
determines that there is reasonable basis to conclude that such action is appropriate
under the circumstances. However, discipline resulting in an unpaid suspension, a
reduction in rank, an unpaid suspension and reduction in rank, and/or discharge shall
only be imposed where the Village determines that there is just cause for such action
under the circumstances according to Policy, Village Ordinance, and State Statutes.
Village is further defined within this article to include either the Police Chief or Police
Commission as is applicable.
ARTICLE 11: HOURS OF WORK
11.01 The Village shall determine the work schedule necessary to conduct the
operation of the Police Department. Changes in the work schedule initiated by the Chief
or his/her designee with less than forty -eight (48) hours notice shall be paid at the
10
overtime rate for all hours worked which were not previously scheduled. The overtime
provision shall not apply to changes initiated by the Chief or his/her designee with more
than forty-eight (48) hours notice or emergency situations. Emergency situations shall
be defined as natural disasters; major fires; riots; weather -related situations (tornados,
etc); or other situations requiring a call -out of the Department. The Chief or his/her
designee shall post the work schedule within ten (10) days of the next month.
11.02 Regular full-time employment is defined as a normal work schedule that is
equal to 1950 hours per year. The standard work week/schedule shall consist of 6 days
on duty to be followed by 3 days off duty: 6- 3, 6-3. The on-duty work day shall be a shift
of 8 hours per day, based on 1950 hours per year. The standard shift shall be defined
as a continuous eight (8) hour block of time. There shall be a minimum of ten (10)
hours off between scheduled shifts except in emergencies, as defined in Section 11.01,
or when an officer is subpoenaed for court or volunteers for an assignment or special
event. If the Chief or his/her designee schedules or initiates a change in a schedule
such that an employee is scheduled to work another shift with less than the minimum
time off, the first four (4) hours of that shift shall be at the overtime rate. This shall not
apply where the entire shift is overtime. Shift changes may occur in agreement with
Police Chief.
11.03 All hours worked in excess of eight (8) hours on a normal scheduled work
day shall be paid at the rate of one and one- half (1 ½) times the regular hourly rate.
Paid or unpaid leave (e.g., holiday, sick leave, vacation, funeral, medical leave) shall not
be included in the calculation of the eight (8) hours of work. This section is not
applicable to trades of days.
11
11.04 An Employee who is required to report for work outside his/her regular
schedule of hours shall be guaranteed a minimum of two (2) hours pay at the rate of
one and one- half (1 ½) times the regular hourly rate with < 24 hours notice before the
original shift. The minimum guarantee shall not apply where the hours are worked
immediately preceding or following the employee’s regular shift. At the discretion of the
Chief, the employee may be required to remain on duty for up to the two (2) hours
minimum.
11.05 Overtime may be taken as pay or banked as compensatory time off for
later use. Compensatory time may be banked up to a maximum of forty -eight (48) hours
at any time. Any compensatory time in an employee’s bank and not scheduled for future
use by December 1st will be paid out in the next payroll period or at the employees
designation, carried over into the next calendar year. The Chief of Police must approve
the taking of comp time, and may, at his/her discretion, deny comp time off if it creates
overtime.
11.06 Employees may switch or trade shifts with the approval of the Chief and at
least twelve (12) hours prior notice.
11.07 Nothing in this Article shall constitute a guarantee of work or pay in lieu of
work, nor otherwise limit the Village’s right to schedule the hours of work.
11.08 Each officer working between the hours of 6 PM and 6AM shall receive an
additional seventy cents ($.70) per hour for each hour worked. (Note: $.70 is straight
$.70 per hour regardless of O.T.)
11.09 An employee who works one hour less than his/her regular shift because
of the switch to daylight savings time, shall work an additional hour in order to be paid
12
for working his/her entire regular shift. In the event an employee is working a shift during
which the switch from daylight savings time to standard time occurs, and the employee
works one (1) hour more than his/her regular shift, the employee will be compensated at
the overtime rate for the additional hour worked.
ARTICLE 12: VACATIONS
12.01 Regular full-time employees are eligible for paid vacation as follows:
During First Year (< 1) 3.33 hours per month
Two through Five Years (2 – 5) 96 hours per year
Six through Eleven Years (6 – 11) 120 hours per year
Twelve through Seventeen Years (12 – 17) 160 hours per year
Eighteen through Twenty-Three Years (18 – 23) 200 hours per year
Twenty-Four through Twenty-Nine Years (24 – 29) 240 hours per year
Thirty years and over (> 30) (effective 01/01/2024) 256 hours per year
12.02 Vacation must be taken within 12 months of being earned. With the
approval of the Chief of Police or his/her designee, up to 40 hours may be carried
forward for an additional 180 days. Vacation not taken is considered forfeited, except
where a timely request for vacation cannot be approved.
12.03 Initial vacation leave will be selected, on a seniority basis, in increments of
a minimum of one week [six (6) scheduled work days]. Such requests must be delivered
to the Chief of Police or his/her designee by January 15
th of each year. The Employer
will take reasonable steps to notify employees of the status of those requests. All leave
13
shall be subject to the staffing requirements of the Village. Once approved, first choice
vacations may not be canceled by the Chief or his/her designee except for emergency
situations.
ARTICLE 13: HOLIDAYS
13.01 Regular full-time employees are eligible for the following paid holidays:
New Year’s Day Thanksgiving Day
Martin Luther King Day (MLK)
Labor Day Christmas Eve
Memorial Day Christmas Day
Independence Day New Year’s Eve
13.02 In addition to the above holidays, regular full -time employees shall receive
four (4) floating holidays each twelve (12) months.
13.03 Employees shall receive eight (8) hours of holiday time for each of the
paid holidays listed in 13.01. In addition, employees required to work on the listed
holidays shall be compensated at time and one- half for all hours worked. Employees
may elect to take holiday pay either in pay or as comp time.
ARTICLE 14: SICK LEAVE
14.01 Regular full-time employees shall earn paid sick leave at the rate of one
(1) day [(eight (8) hours)] per month, to a maximum accumulation of one- hundred eighty
(180) days [one thousand four hundred forty (1440) hours].
14
14.02 Sick leave may be used to cover absences which result from illness or
injury to the employee. Sick leave may also be used to tend to a member of the
employee’s immediate family. Immediate family is defined as spouse, parents, parents -
in-law, stepparents, children, stepchildren, brothers and sisters, grandchildren, brothers
and sisters-in-law, or grandparents.
14.03 The Village reserves the right to require an employee who is requesting
payment of sick leave or is otherwise absent from work due to illness or injury, to submit
satisfactory medical evidence of the need for sick leave and/or ability to return to work.
Except in cases of suspected abuse or recurrent absence, medical proof shall not
generally be required for absences of less than three (3) days.
14.04 Upon termination of employment for reasons of death, retirement or
permanent disability, the employee or if deceased, the employee’s surviving spouse
and/or eligible dependents shall receive compensation for one hundred percent (100%)
of the amount equivalent to the value of the accumulated unused sick leave, not to
exceed one hundred thirty (130) working days [one thousand forty (1040) hours. The
value of the employee’s accumulated sick leave shall be used to pay the full premium of
the continued participation in the Village’s group health and/or life insurance plan until
the amount of the sick leave is exhausted. Upon exhaustion of such funds, the
employee, surviving spouse and/or eligible dependents retain the right to continue in the
Village’s group health plan, as provided by law at their own expense.
15
ARTICLE 15: CIVIL LEAVE AND JURY DUTY
15.01 An employee shall be given time off without loss of pay when performing
jury duty, when subpoenaed to appear before a court, public body or commission in
connection with the Village business, or for the purpose of voting. In the case of jury
duty, the employee shall remit his jury fee to the Village. The employee may retain
payment to the employee for expenses at the prevailing rate. If the employee does not
remit the fee, they shall be considered to be on leave of absence without pay while
performing jury duty. Employees on jury or witness duty are required to report to work if
the jury or witness duty does not require the employee to miss the employee’s work
shift.
15.02 For justifiable reasons, a leave of absence without pay shall be granted an
employee, upon her/his request, to appear under subpoena or in her/his own behalf in
litigation involving personal or private matters.
ARTICLE 16: BEREAVEMENT LEAVE
16.01 Upon request, an employee shall be granted up to, but not to exceed,
three (3) consecutive working days with pay for the purpose of arranging for and/or
attending the funeral/celebration of life of an immediate family member. Immediate
family member shall include spouse, child, parent, sibling, spouse’s parents,
stepparents, stepchildren, and any member of the employee’s household.
16.02 Upon request, an employee shall be granted up to, but not to exceed, two
(2) consecutive working days with pay for the purpose of arranging for and/or attending
the funeral/celebration of life of an extended family member. Extended family member
16
shall include grandparents, grandchildren, children’s spouses, aunts, uncles, and
brother/sister-in-law.
16.03 Leave without pay may be granted to attend the funeral/celebration of life
of a family member (relative by blood or marriage) who does not satisfy the definition of
immediate or extended family member.
16.04 One-half (1/2) day with pay will be granted to attend the funeral/celebration
of life of an immediate fellow employee provided scheduling could be arranged with the
Supervisor.
ARTICLE 17: LEAVES OF ABSENCE
17.01 Medical Leave. An employee requiring a medical leave shall request such
leave in writing. All leaves shall be subject to the Employer’s approval and the
presentation of satisfactory medical evidence of the need for the leave. The request
shall specify the expected duration of the leave. Approved leaves shall generally not
exceed sixty (60) days. An employee requiring an extension of an approved leave shall
submit a request for extension, together with satisfactory medical evidence of the need
for the extension, prior to expiration of the previously approved leave. Any extension in
a previously approved leave shall be subject to the Employer’s approval. Such a leave
of absence shall run concurrently with any leaves available under the Americans with
Disabilities Act, the Wisconsin Fair Employment Act and/or the state and federal Family
and Medical Leave Acts and the substitution of paid leave shall be consistent with the
provisions of said Acts.
17
17.02 Personal Leave. An employee requesting a personal (non- medical) leave
of absence shall submit a written request. All personal leaves shall be unpaid and shall
generally not exceed thirty (30) days. As a condition of approving a personal leave, the
employee may be required to exhaust any accrued vacation or compensatory time. All
requests for a personal leave are subject to prior Employer approval.
17.03 While on an unpaid leave of absence, no benefits shall accrue and the
employee shall be responsible for any insurance premiums due should he/she elect to
continue coverage where permitted under applicable state or federal law. This provision
applies to leaves related to an employee’s disability(ies), unless such leave is protected
by the state/federal FMLA or the Wisconsin Worker’s Compensation Act. Furthermore,
during a leave of absence when the Village is responsible for a portion of the insurance
premiums, the employee must continue to pay his/her portion of the premiums. If the
employee fails to pay his/her portion of the premiums during such a leave of absence,
the Village may recoup any and all premiums paid on behalf of the employee during the
leave of absence.
17.04 An employee requesting a leave of absence related to the birth or
adoption of a child, or for the serious health condition of a parent, child or spouse shall
submit a written request to the Chief of Police for approval. Such family leaves shall be
provided in accordance with applicable state and federal FMLA provisions.
ARTICLE 18: MILITARY LEAVE
18.01 The Village will comply with all State and Federal laws regarding military
leave for restoration of employment. Any rights accrued will not be interrupted by
18
absence while on military leave. If re-employed, time spent in military service may be
counted in computing years of service for annual leave.
18.02: Employees who are members of the National Guard or United States
Military Reserve shall be granted temporary leaves of absence for required hours of
duty or training. The employer agrees to pay full-time employees the differential
between military pay for such required duty or training and the employee’s regular
straight time earnings for such period, but such differential pay shall be limited to a
maximum of two (2) weeks’ pay, less military pay, in any one (1) year.
ARTICLE 19: HEALTH AND DENTAL INSURANCE
19.01 The Village agrees to provide health insurance plan(s) and dental
insurance plan(s) for regular full-time employees, during the term of this Agreement.
19.02 Effective January 1, 2016, the Village will pay the premium for single or
family health insurance in the amount of eighty -eight percent (88%) of the gross
premium of the alternative or standard health insurance plan that is the least costly
qualified plan with the service area, but not more than the total amount of the premium
of the plan selected. The remaining twelve percent (12%) shall be paid by the
employee by payroll deduction.
19.03 During the term of this Agreement, the Village shall self insure with Delta
Dental for dental insurance for single or family coverage, as selected by the employee
with coverage remaining as has been customary.
19.04 Flexible Spending Account. The Village will establish a flex spending
account within the guidelines established under Section 125 of the Internal Revenue
19
Code. The program would be established and administered in total compliance with the
IRS rules and procedures.
ARTICLE 20: LIFE INSURANCE
20.01 The Village agrees to maintain the current or a substantially equivalent
term life insurance plan for regular full -time employees during the term of this
Agreement. The Village shall pay 100% of the premium.
ARTICLE 21: INCOME CONTINUATION INSURANCE
21.01 The Village agrees to maintain the current or substantially equivalent
income continuation insurance plan for the term of this Agreement. The Village shall pay
100% of the premium for the plan based upon a 180 day waiting period. Employees
selecting a shorter waiting period shall pay any additional premium, by payroll
deduction, in accordance with current practice.
ARTICLE 22: RETIREMENT
22.01 For the duration of the agreement, the employees will contribute the full
payment of the employee required contribution.
ARTICLE 23: UNIFORM ALLOWANCE
23.01 The Employer shall provide each regular full -time employee with an initial
uniform issue as set forth in Appendix A. After completion of the probationary period,
each regular full -time employee shall receive a uniform allowance of five hundred
twenty-five dollars ($525.00) per year. Any monies overspent shall be reimbursed by
the employee to the Village upon request. Employer shall provide a ballistic vest as
initial issue per State of Wisconsin bid price. Employer shall furnish $ 6900.00 for
20
replacement of ballistic vest only and carrier, pursuant to the manufacturer’s
specifications (5 years). Wearing of the vest issued by the Employer is mandatory when
on duty. There shall be no payout of uniform allowance balances. Employee may
request of the Chief by September October 1 of the current budget year to purchase an
approved Uniform item in excess of five hundred twenty-five dollars ($525.00).
23.02 Claims for damage to clothing and/or equipment, resulting from the
performance of duty, shall be directed to the Chief of Police for review. The Village
shall pay the total cost for repair or replacement of personal property items that are
prescription in nature (example: eyeglasses) and required to function as a police officer
as well as all items listed in Appendix A, provided, however, any damage, destruction or
loss was not caused by the negligence or intentional act of the employee, as
determined by the Village Administrator. All other items of personal property (watches,
jewelry, etc.) will be repaired or replaced at a value not to exceed one hundred fifty
dollars ($150.00) per officer per incident, again provided, however, any damage,
destruction or loss was not caused by the negligence or intentional act of the employee,
as determined by the Village Administrator. If the officer has an item repaired or
replaced pursuant to this section, and subsequently obtains a successful judgment
against the party causing the damage, the officer shall turn over to the Village any
amounts received in damages up to the actual amount of the Village’s expenditure.
ARTICLE 24: WAGES
24.01 See Appendix ‘B’ for the current wage scale.
24.02 Employees shall be paid on a bi -weekly basis in accordance with current
practice.
21
ARTICLE 25: EDUCATIONAL INCENTIVE
25.01 Regular full-time Employees who have been employed by the Village for
more than thirty six (36) months shall receive the following incentive for post -secondary
and/or graduate-level education:
60 degree credits 1% increase to the employee's yearly base
wage rate identified in Appendix B
120 degree credits 2% increase to the employee's yearly base
wage rate identified in Appendix B
ARTICLE 26: WORKER’S COMPENSATION
26.01 The Village agrees to comply with the applicable provisions of Chapter
102, Wis. Stats. (worker’s compensation).
ARTICLE 27: MISCELLANEOUS
27.01 When an employee uses his/her personal vehicle for Village business
because a Village vehicle is not available, as determined by the Chief or his/her
designee, the Village shall pay the current IRS rate per mile for all miles traveled on
behalf of the Village.
27.02 In the event that the Employer decides to dissolve the Police Department
and use other policing, all officers employed at that time shall be given a severance
package consisting of six (6) months of full pay and benefits, including insurance and
retirement, paid by the Employer. The Employer shall make every effort to notify the
affected officers as far in advance as possible. An employee who leaves the
22
Department prior to its dissolution shall not be eligible for the severance package. An
affected employee who finds employment elsewhere prior to the expiration of the six (6)
month severance package shall immediately notify the Village of Cross Plains, at which
time all benefits will cease from the Village. The Village shall then disburse the balance
of the wage package to the employee, fulfilling the Village’s obligation.
ARTICLE 28: SCHOOL RESOURCE OFFICER
28.01. The Village shall have the right to select the employee it deems most
qualified to fill the School Resource Officer position based upon the duties,
responsibilities and qualification standards. Any current Cross Plains police officers who
apply for the position and are deemed to meet the minimum qualification standards will
be given hiring preference over outside candidates. The Village shall not be bound in
any way by considerations of seniority in making its hiring decision.
28.02. An officer hired into the SRO position must agree to serve in the position
for a minimum of two (2) consecutive school years and to give notice by April 15 of the
second year of their intent to continue in or to vacate the position. This service
commitment may be terminated at an earlier date by mutual agreement of the officer
and the Village. The employee assigned to the position of SRO ("Officer") shall work a
(5-2) schedule during those periods in which school is in session, that period generally
being from the third full week of August through the first full week of June. The
employee will revert to a schedule assigned by the Chief of Police during the intervening
eleven (11) summer weeks when school is in recess. The additional hours worked
23
during the school year under the (5-2) schedule will result in the accumulation of a Kelly
Day every third week.
28.03. The normal work shift during the school year shall be eight (8) consecutive
hours per day assigned between the hours of 6:00 am and 5:00 pm at the discretion of
the Police Chief or a designee. Excluding the summer recess period, the Officer shall
report to the Police Chief for assignment on days that he/she works when school is not
in session. When the employee is working during the summer recess period, the normal
shift shall be eight (8) consecutive hours per day assigned at the discretion of the Police
Chief. The Village may, however, adjust the normal work shift hours for up to ten (10)
days per school year without being subject to the overtime provisions of the next
paragraph. The Village will attempt to identify the days on which the Officer is to work a
different schedule at the beginning of each school semester. A normal schedule of eight
(8) consecutive hours between the hours of 6:00 a.m. to 11 :00 p.m., will be determined
by the Chief, with input from the Officer. Changes to the normal schedule of hours will
require at least 48 hours' notice, unless otherwise agreed to between the Officer and the
Chief. The Chief reserves the right to assign hours outside the hours of 6:00 a.m. to
11:00 p.m., which hours shall be paid at the overtime rate or the call back rate,
whichever is applicable.
28.04. The Officer shall be paid at the appropriate step on the Police Officer
wage scale as provided in the collective bargaining agreement.
28.05. The use of sick leave will be consistent with Article 14 of the collective
bargaining agreement. The scheduling of vacation shall be done in accordance with the
seniority provisions of the collective bargaining agreement and the approval of the
24
Police Chief to take time off is not intended to reduce the normal number of vacation
slots available to patrol officers.
28.06. The Kelly Days referred to in Section 3028.02 must be used in the manner
described below: Seven (7) of the Kelly Days must be taken off when school is in
session, except that no more than one (I) consecutive Kelly Day may be utilized while
school is in session. The remaining Kelly Days must be taken off when school is not in
session, which would include days set aside for teacher training, breaks scheduled
around holiday periods, and spring break.
28.07 The Officer shall normally wear a police uniform unless authorized by the
Chief of Police to wear other Department approved attire.
28.08. The Village shall provide the Officer with an appropriately equipped car to
use while performing school resource duties.
28.09 The Officer shall not be eligible for night differential on days that school is
in session, except that the Officer would be eligible to receive night differential, if
applicable, for those ten (I0) shifts per year that the Village has reserved the right to
modify.
28.10 In the event that the SRO position is vacated or terminated for any reason,
the Officer who held the position shall have the right to bump back into a patrol shift
without loss of seniority.
28.11. The SRO may be temporarily removed from school duties to assist with
investigations or perform other duties as deemed necessary by the Police Chief.
25
ARTICLE 29: REGULAR PART-TIME EMPLOYEES
29.01 Definition: A regular part-time employee shall be a certified law
enforcement officer who works less than 1,200 hours per year.
29.02 Hours of Work: Regular part-time officers shall be assigned available hours
in the schedule on a monthly basis.
29.03 Probationary Period: Regular part-time employees shall be considered
probationary for all hours worked in such status and as such may be dropped from the
work schedule without recourse.
29.04 Seniority: Regular part-time employees shall have no seniority.
29.05 Benefits: Regular part-time employees shall have no benefits except the
following:
Uniform: The Village will supply an initial uniform (2 pair of pants, 2 short
sleeve shirts, 2 long sleeve shirts, a winter jacket as chosen by the department and
department patches.
Holiday Pay: If a regular part-time employee works on a named
holiday as listed in Article 13, they will receive time and one-half pay for all
hours worked on the named holiday.
ARTICLE 30: NONCERTIFIED AND RECRUIT ACADEMY OFFICERS
30.01 A newly hired police officer will be sworn in by the Village of Cross Plains
clerk/municipal judge prior to the start of the Police Recruit Academy per Wisconsin
Training and Standards Rules and Regulations. From the date of hire, the recruit officer
will be afforded the benefits extended by the CBA and the Village of Cross Plains,
including but not limited to, health insurance, paid holidays and WRS protective status,
26
except where specifically addressed otherwise in this agreement. A newly hired, non-
certified officer, assigned to field training prior to the start of the recruit academy will
receive pay at 75% of the start wage as listed in – Appendix “B” – Wages and be
assigned to a work schedule rotation per Article 11 – Section 11.02 until they are
assigned to the recruit academy. A newly hired police officer, sponsored by the Village
of Cross Plains to the Police Recruit Academy to become certified, will receive 75% of
the start wage as listed in Appendix “B” - Wages while in attendance at the academy.
Upon the first day following graduation, the recruit officer will move to the status of
certified police officer and will continue to progress through the wage scale as outlined
in Appendix “B”.
30.02 While attending the academy, the recruit officer will be paid 40 hours per
week for the academy daily schedule (Monday through Friday) including, but not limited
to, time attending academy classes and travel time, and will not be eligible for overtime.
If the academy requires attendance on Saturday or Sunday, the recruit officer will
receive overtime for those hours in attendance, if those hours exceed 40 hours in a 7-
day period. The recruit officer will not be eligible for shift premium pay.
30.03 During the academy, the recruit officer will be in probationary status, as
listed in Article 6 and serves at the pleasure of the Chief of Police and may be
terminated. The Chief of Police or their designee shall receive reports from the
Academy Director regarding attendance and performance. The recruit officer shall
adhere to the Village’s attendance policy as well as the academy attendance policy. The
recruit officer may not carry a concealed weapon until such time the recruit officer
successfully completes the academy and qualifies with their firearm unless the officer
27
has a valid Wisconsin CCW permit. If the recruit officer fails the academy they may be
terminated.
30.04 A recruit officer, while attending the academy, may be requested to report
to work (outside of academy hours) if the department has exigent circumstances that
would require additional staffing needs. These additional hours would be paid at time
and one-half (1 ½).
30.05 Attendance at the police academy shall result in the officer’s probationary
period (Article 6 – Section 6.01) being extended equal to the time spent in the academy.
ARTICLE 301: SEPARABILITY AND SAVINGS
301.01 If any Article or Section of this Agreement or any addendum thereto
should be held invalid by operation of law or by any tribunal of competent jurisdiction, or
if compliance with or enforcement of any Article or Section should be restrained by such
tribunal, pending a final determination as to its validity, the remainder of this Agreement
and any addendum thereto, or the application of such Article or Section to persons or
circumstances other than those as to which it has been held invalid or as to which
compliance with or enforcement of has been restrained, shall not be affected thereby.
3 01.
02 In the event that any Article or Section is held invalid or enforcement of or
compliance with which has been restrained, as set forth above, the parties affected
thereby shall enter into immediate collective bargaining negotiations, upon the request
of the Association, for the purpose of seeking a mutually satisfactory replacement for
such Article or Section during the period of invalidity or restraint.
28
ARTICLE 312: DUES DEDUCTION
3 12.01: The Employer agrees to deduct monthly dues in the amount certified by
the WPPA/LEER from the pay of employees who individually sign a dues deduction
authorization form supplied by the WPPA/LEER, including any Local Association dues
which the employee has authorized to be deducted in conjunction with the WPPA/LEER
dues (the “combined dues”).
312.0
2 It shall be WPPA/LEER’s responsibility to obtain dues authorization
forms from new employees and provide them to employer no less than 30 days prior to
the date in which dues deductions are to commence.
312.0
3 The employer shall notify the WPPA of all new hires of the
bargaining unit within 30 days of their start date.
312.0 4 The Employer shall deduct the combined dues amount each month
for each employee requesting such deduction, upon receipt of such form and shall remit
the total of such deductions, with a list of employees from whom such sums have been
deducted, to the WPPA/LEER or Local Association if applicable, in one lump sum not
later than the 15th of each month.
312.0
5 Authorization of dues deduction by a voluntary member may be
revoked upon notice in writing to the Employer, WPPA or to the Local Association.
312.0 6 The Association will represent all of the employees in the
bargaining unit, members and non- members, fairly and equally. No employee shall be
required to join the Association, but membership in the Association shall be made
available to all employees in the bargaining unit who apply consistent with either the
29
WPPA or local Association Constitution and By -Laws. No employee shall be denied
membership because of race, creed, color, sex or other legally protected class status.
312.07 It is expressly understood and agreed that WPPA/LEER will refund
to the employer or the employee involved any dues erroneously deducted by the
employer and paid to WPPA/LEER and/or the Local Association. WPPA/LEER shall
indemnify and hold the employer harmless against any and all claims, demands, suits,
orders, judgments or any other forms of liability against Employer which may arise out
of action taken or not taken by Employer for the purpose of complying with this Article.
ARTICLE 323: SCOPE OF THE AGREEMENT
323.01 This Agreement sets forth the entire understanding and agreement
of the parties and may not be modified in any respect except by writing subscribed to by
the parties. Nothing in this Agreement shall be construed as requiring either party to do
or refrain from doing anything not explicitly and expressly set forth in this Agreement;
nor shall either party be deemed to have agreed or promised to do or refrain from doing
anything unless this Agreement explicitly and expressly sets forth such agreement or
promise.
30
ARTICLE 334: DURATION
334.01 Except as expressly provided herein, this Agreement shall be in full
force and effect for the period from January 1, 20267 , until and including December 31,
20267, and shall continue, unless written notice of desire to terminate, modify, or re-
negotiate the Agreement is served by either party on the other at least one hundred
eighty (180) days prior to the date of expiration.
FOR THE VILLAGE FOR THE WISCONSIN PROFESSIONAL
CROSS PLAINS: POLICE ASSOCIATION/LEER DIVISION
___________________________ __________________________________
Village President WPPA/LEER Division Business Agent
___________________________ __________________________________
Village Administrator Cross Plains PD Association President
31
APPENDIX A
1. All regular full-time employees shall receive the following initial uniforms and equipment:
Long Sleeve Uniform Shirts (3)
Short Sleeve Uniform Shirts (3)
Uniform Pants (3)
Uniform Hat
Black Tie
Ballistic Vest (level IIIA / HG2)
All Weather Jacket
Rain Jacket
Individual nametags
Officer insignia
Shirt and coat badges
2. All regular full-time employees shall be given the option to be issued the following equipment
upon hire. A new officer may elect to use their own equipment as approved by the Chief of
Police.
Black duty belt
Duty belt keepers
OC carrier
Key chain keeper
Baton carrier
Baton
handcuff case
Handcuffs
Radio carrier
Latex glove carrier
Tourniquet carrier
Tourniquet
Magazine carrier
Taser Holster
All uniform and equipment items purchased for new employees by the Village or through an
employee’s uniform account must be returned if the employee terminates employment with the
village within three (3) years of the date of hire, regardless of the reason. The Department will
maintain a record of purchased items for the first 3 years. Exceptions to the return process are the
following items:
Long Sleeve Uniform Shirts (3)
Short Sleeve Uniform Shirts (3)
32
Uniform Pants (3)
Uniform Hat
3. Uniform Allowance can be used to purchase the following items:
Any uniform or equipment item listed in Appendix A1 and A2
Black turtleneck shirts
White or Black tee Shirts
Black belt for uniform pants
Approved Ballistic Vest Carrier
Black Boots / Shoes
Whistle and chain
Flashlight
Flashlight carrier
Folding knife
Gloves for Duty use
Holster for duty pistol
33
APPENDIX ‘B’
2026: 2% ATB - compress 15-year step to the 10-year step
If the 11-hour schedule MOU cannot be implemented by the first pay period in January 2026,
the ATB wage increase will be 3%. If the 11-hour schedule MOU can be implemented early
in 2026 the wage increase will be adjusted to 2% ATB.
If the 11-hour schedule MOU, due to staffing levels, reverts to the 6/3 schedule during 2026
wages will be adjusted to the 3% ATB wage schedule.
CURRENT 2026 @ 2% 2026 @ 3%
1/1/2025 1/1/2026 1/1/2026
Part-Time
Officer
$30.00
$30.00
$30.00
Academy
Officer
75% of start
rate
$22.16
$22.60
$22.82
Patrol Officer
Start $ 29.54 $30.13 $30.43
18 Months $ 30.11 $30.71 $31.01
3 Years $ 30.67 $31.28 $31.59
5 Years $ 31.71 $32.34 $32.66
10 Years $ 32.25 $33.88 $34.22
15 Years $ 33.22
Sergeant
5% above Top
Patrol
$ 34.88 $35.57 $35.93
34
CURRENT 2027 @ 2% 2027 @ 2.5%
1/1/2026 1/1/2027 7/1/2027
Part-Time Officer $30.00 $30.00 $30.00
Academy Officer —
75% of start rate
$22.82 $23.28 $23.86
Patrol Officer —
Start
$30.43 $31.04 $31.82
Patrol Officer — 18
Months
$31.01 $31.63 $32.42
Patrol Officer — 3
Years
$31.59 $32.22 $33.03
Patrol Officer — 5
Years
$32.66 $33.31 $34.14
Patrol Officer — 10
Years
$34.22 $34.90 $35.77
Sergeant — 5%
above Top Patrol
$35.93 $36.65 $37.57
An officer acting as a Field Training Officer (FTO) shall receive one (1) hour of overtime
for each shift worked in FTO status.
35
MEMORANDUM OF UNDERSTANDING
between
THE VILLAGE OF CROSS PLAINS (“Village”)
and the
CROSS PLAINS PROFESSIONAL POLICE ASSOCIATION AND
WISCONSIN PROFESSIONAL POLICE ASSOCIATION/ LEER (“Association”)
WHEREAS, the Village of Cross Plains (the Village) and the Cross Plains Professional
Police Association and Wisconsin Professional Police Association/LEER (the
Association) are parties to a Collective Bargaining Agreement (CBA) for the year 20267;
and
WHEREAS, The Village and the Association believe it is in their mutual best interest to
attract and retain certified police officers as lateral transfers to the Police Department.
NOW THEREFORE, to further that interest, the City and the Association hereby resolve
to amend the current CBA in the following manner.
1. Lateral Transfer of Certified Law Enforcement Officers
Appendix “B” – Wages.
Appendix “B” Wages. It is agreed by both parties that the Chief shall have the
discretion to start an experienced certified police officer, newly hired to the
Department, at any step on the wage scale from start through 510 years as shown in
Appendix “B”, commensurate with the officer’s prior experience.
Article 14: Sick Leave – Section 14.01: Lateral transfers of certified police officers
with less than five years’ experience will be credited 96 hours (1 year) of sick time
upon hire. Lateral transfers of certified police officers with five years or more
experience will be credited 192 hours (2 years) of sick time. This credited sick leave
will not be eligible for future conversion upon retirement.
All other terms and conditions of the parties’ 20267 Collective Bargaining Agreement
shall apply. If there are conflicts between the parties’ 20267 Collective Bargaining
Agreement and this Memorandum of Understanding, the terms of this Memorandum of
Understanding shall govern.
Dated this _____ day of _________, 20256.
FOR THE ASSOCIATION: FOR THE VILLAGE OF CROSS PLAINS:
_______________
__________
36
MEMORANDUM OF UNDERSTANDING
between the
VILLAGE OF CROSS PLAINS
and the
CROSS PLAINS PROFESSIONAL POLICE ASSOCIATION (CPPPA)
WISCONSIN PROFESSIONAL POLICE ASSOCIATION
LAW ENFORCEMENT EMPLOYEE RELATIONS DIVISION
NONCERTIFIED NEW HIRES AND THOSE ATTENDING THE POLICE RECRUIT
ACADEMY
It is agreed by and between the Village of Cross Plains and the Cross Plains
Professional Police Association (CPPPA) Wisconsin Professional Police Association
Law Enforcement Employee Relations Division (WPPA/LEER), that during the term of
this Memorandum of Understanding the parties agree to the following in relation to the
hiring of noncertified officers in regards to sponsorship at the Police Recruit Academy,
wages, benefits and the relationship to the 2026 Collective Bargaining between the
parties.
1. A newly hired police officer will be sworn in by the Village of Cross Plains
clerk/municipal judge prior to the start of the Police Recruit Academy per Wisconsin
Training and Standards Rules and Regulations.
From the date of hire, the recruit officer will be afforded the benefits extended by the
CBA and the Village of Cross Plains, including but not limited to, health insurance,
paid holidays and WRS protective status, except where specifically addressed
otherwise in this agreement.
A newly hired, non- certified officer, assigned to field training prior to the start of the
recruit academy will receive pay at 75% of the start wage as listed in the CBA –
Appendix “B” – Wages and be assigned to a work schedule rotation per Article 11 –
Section 11.02 until they are assigned to the recruit academy.
A newly hired police officer, sponsored by the Village of Cross Plains to the Police
Recruit Academy to become certified, will receive 75% of the start wage as listed in
Appendix “B” - Wages of the CBA, while in attendance at the academy. Upon the first
day following graduation, the recruit officer will move to the status of certified police
officer and will continue to progress through the wage scale as outlined in Appendix
“B” of the CBA.
The Village/Department will pay for academy costs (tuition and books).
2. While attending the academy, the recruit officer will be paid 40 hours per week for the
academy daily schedule (Monday through Friday) including, but not limited to, time
37
attending academy classes and travel time, and will not be eligible for overtime. If the
academy requires attendance on Saturday or Sunday, the recruit officer will receive
overtime for those hours in attendance, if those hours exceed 40 hours in a 7- day
period. The recruit officer will not be eligible for shift premium pay.
3. During the academy, the recruit officer will be in probationary status, as listed in the
CBA -Article 6 and serves at the pleasure of the Chief of Police and may be
terminated. The Chief of Police or their designee shall receive reports from the
Academy Director regarding attendance and performance. The recruit officer shall
adhere to the Village’s attendance policy as well as the academy attendance policy.
The recruit officer may not carry a concealed weapon until such time the recruit
officer successfully completes the academy and qualifies with their firearm unless the
officer has a valid Wisconsin CCW permit. If the recruit officer fails the academy they
may be terminated.
4. A recruit officer, while attending the academy, may be requested to report to work
(outside of academy hours) if the department has exigent circumstances that would
require additional staffing needs. These additional hours would be paid at time and
one-half (1 ½).
5. Attendance at the police academy shall result in the officer’s probationary period
(Article 6 – Section 6.01 of the CBA) being extended equal to the time spent in the
academy.
This agreement shall be effective upon execution by all parties.
IN WITNESS WHEREOF, the parties hereto have executed this agreement on this,
the __________ day of ____________ 2025.
FOR THE ASSOCIATION: FOR THE VILLAGE OF
CROSS PLAINS:
38
MEMORANDUM OF UNDERSTANDING
BETWEEN
VILLAGE OF CROSS PLAINS
AND
CROSS PLAINS PROFRESSIONAL POLICE ASSOCIATION/
WISCONSIN PROFESSIONAL POLICE ASSOCIATION
This is a Memorandum of Understanding (“MOU”) is between the Village of Cross
Plains (“Village”) and the Cross Plains Professional Police Association/Wisconsin
Professional Police Association (“Association”). The Village and the Association are
parties to a collective bargaining agreement (“CBA”) with a term of January 1, 2026, to
December 31, 2026. In negotiations for the CBA, the parties agreed to the
implementation of an 11- hour shift schedule for employees assigned to the Patrol
classification on a trial period basis. The parties agreed to memorialize the terms and
impact of this schedule in this MOU.
Therefore, in consideration of the mutual covenants found below, the parties hereby
agree to the following provisions:
1. Effective the first pay period in January 2026, the work schedule for sworn
employees assigned to the Patrol and Sargent classification will consist of an 11-
hour shift rotation of 2- on/2-off, 3-on/2-off, 2-on/3-off that is equal to 2,002 hours
worked in a year. This rotation is set forth in Exhibit A, which is incorporated by
reference. The Chief may make exceptions for training or special assignments.
The work schedule for the school resource officer will continue to be based on
1,950 hours per year.
An employee working a schedule under this MOU who is subpoenaed to appear
in a court case concerning matters arising in the course of their duties will receive
compensation as outlined in Article 11 – Section 11.04 of the CBA. If the
combination of shift work and court time results in the employee working sixteen
(16) hours or more of continuous on- duty time or results in the inability to have
eight (8) hours of rest between the end of the shift/court time and the employee’s
next scheduled shift, the Chief may permit the employee to take time off on the
next shift in order to create an eight hour rest period and utilize any accumulated
paid time for that purpose.
2. Assignments to shifts under this schedule will be assigned by the Chief of
Police.
An employee’s scheduled hours of work may not be changed without forty -eight
(48) hours’ notice prior to both the start of the previously scheduled shift and the
newly assigned shift, unless an emergency is declared by the Chief of Police or
mutually agreed upon by the Employee.
39
3. Employees working a schedule under this MOU will be paid eleven (11) -hours of
regular pay for each 11- hour shift worked. If an employee works more than
those hours, the employee will be entitled to overtime pay as set forth in Article
11 of the CBA, including the ability to designate overtime pay as compensatory
time. The language in Section 11.03, entitling an employee to overtime for
working “in excess of eight (8) hours on a normal scheduled work day” shall not
apply during the term of this MOU.
4. Each officer working between the hours of 6PM and 6AM shall receive an
additional seventy cents ($.70) per hour for each hour worked as stated in
Section 11.08 of the CBA.
5. Employees working an 11- hour schedule under this MOU shall receive their bi -
weekly pay calculated using 2,002 hours per year which will result in payment of
thirty-eight (38.5) hours per week or seventy -six (77) hours per bi -weekly pay
period.
School Resource Officer(s) working an 8- hour (5 -2) schedule under this MOU
shall receive their bi-weekly pay calculated using 1,950 hours per year which will
result in payment of thirty -seven and one half (37.5) hours per week or seventy -
five (75) hours per bi-weekly pay period.
6. Vacations will be handled as set forth in Article 12 of the CBA.
Sick leave will continue to be earned as outlined in Article 14 of the CBA. The
use of one working day of sick leave will equal eleven (11) hours.
Bereavement Leave under Article 16 will be considered one (1) shift (11 hours).
7. All officers shall receive nine (9) paid holidays listed in Article 13 (paid out or
saved as compensatory time as straight time, eight (8) hours). In addition,
officers who work on holidays shall be paid one and one- half (1 ½) times their
regular straight time rate of pay for all hours worked on the holiday.
As stated in Section 13.02 floating Holidays shall be earned at eight (8)
hours.
All other language in Article 13 shall apply.
8. Unless specifically modified by this MOU, all other provisions of the CBA will
continue to apply. This MOU does not impact or modify Article 2 -Management
Rights of the CBA.
9. The parties agree to meet monthly to monitor and review the progress of the
MOU and to make any mutually agreed upon modifications to the MOU, including
reverting back to the 6/3 – 8-hour schedule.
10. The parties agree to meet in August 2026 to review the MOU and determine
whether to extend it beyond December 31, 2026. At that time, either party may
elect to terminate this MOU effective December 31, 2026. If the MOU is not
40
terminated effective that date, this MOU will be effect until the parties mutually
agreed to terminate it or the shift schedule is modified by a successor CBA.
This agreement shall be effective upon execution by all parties.
IN WITNESS WHEREOF, the parties hereto have executed this agreement on this,
the __________ day of ____________ 2025.
FOR THE ASSOCIATION: FOR THE VILLAGE OF
CROSS PLAINS:
September 23, 2026
Village of Cross Plains Water Utility
Cross Plains, Wisconsin
You have requested that we perform a compilation enga gement of the financial forecast of the Village of
Cross Plains Water Utility, which comprise the financ ial schedules as of December 31, 2027, and for the
year then ending, and the related summaries of significant assumptions, in the form prescribed and required
by the Wisconsin Public Service Commission. We are pleased to confirm our acceptance and our
understanding of this engagement by means of this letter.
A financial forecast presents, to the best of management’s knowledge and belief, the Village of Cross Plains
Water Utility’s expected financial posit ion, results of operations for the forecast period. It is based on
management’s assumptions, reflecting conditions it expects to exist and the course of action it expects to
take during the forecast period.
Our Responsibilities
The objective of our engagement is to apply accounting and financial reporting expertise to assist you in
the presentation of a financial forecast without undert aking to obtain or provide any assurance that there
are no material modifications that should be made to the financial forecast in order for it to be in accordance
with guidelines for presentation of a forecast established by the American institute of Certified Public
Accountants (AICPA).
We will conduct our compilation engagement in accordance with Statements on Standards for Accounting
and Review Services (SSARSs) promulgated by th e Accounting and Review Services Committee of the
AICPA and comply with the AICPA’s Code of Professional Conduct, including the ethical principles of
integrity, objectivity, professional competence, and due care.
We are not required to, and will not, verify the accuracy or completeness of the information you will provide
to us for the engagement or otherwise gather ev idence for the purpose of expressing an opinion or a
conclusion. Accordingly, we will not express an opini on or a conclusion nor provide any assurance on the
financial forecast.
Our engagement cannot be relied upon to identify or di sclose any misstatements in the financial forecast,
including those caused by fraud or error, or to id entify or disclose any wrongdoing within the entity or
noncompliance with laws and regulations.
Village of Cross Plains Water Utility
Page 2
Your Responsibilities
The engagement to be performed is conducted on the basis that you acknowledge and understand that our
role is to assist you in the presentation of a financial forecast in accordance with guidelines for presentation
of a forecast established by the AICPA. You have the following overall responsibilities that are fundamental
to our undertaking the engagement in accordance with SSARSs:
a. The selection of accounting principles to be applied in the preparation of the financial forecast.
b. The preparation and fair presentation of the fina ncial forecast in accordance with guidelines for
presentation of a forecast established by the AICPA and the inclusion of all informative disclosures
that are appropriate for forecasts under those guidelines.
c. Development of assumptions that reflect your pl ans and expectations regarding events and
circumstances for the forecast period.
d. The design, implementation, and maintenance of inte rnal control relevant to the preparation and
presentation of the financial forecast that is free from material misstatement, whether due to fraud
or error.
e. The prevention and detection of fraud.
f. To ensure that the entity complies with the laws and regulations applicable to its activities.
g. The accuracy and completeness of the records, documents, explanations, and other information,
including significant judgments, you provide to us for the engagement.
h. To provide us with:
i. Access to all information of which you are awar e is relevant to the preparation and fair
presentation of the financial forecast, such as records, documentation, and other matters.
ii. Additional information that we may request from you for the purpose of the compilation
engagement.
iii. Unrestricted access to persons w ithin the entity of whom we determine it necessary to make
inquiries.
Our Report
As part of our engagement, we will issue a report that will state that we did not examine or review the
financial forecast and that, accordi ngly, we do not express an opini on, a conclusion, nor provide any
assurance on it. It will also state (1) that the forecasted results may not be achieved and (2) that we assume
no responsibility to update the report for events and circumstances occurring after the date of the report.
Circumstances may arise in which it is necessary fo r us to modify our repor t or withdraw from the
engagement.
You agree to include our accountant’s compilation repor t in any document containing financial forecast
that indicates that we have performed a compilation engagement on the financial forecast and, prior to
inclusion of the report, to ask our permission to do so.
Village of Cross Plains Water Utility
Page 3
Other Relevant Information
If, for any reason, we are unable to complete the compilation of your financial forecast, we will not issue a
report on such forecast as a result of this engagement.
Brett Hofmeister, CPA is the engagement partner for the services specified in th is letter. The engagement
partner’s responsibilities include supervising Johnson Block & Company, Inc.’s services performed as part
of this engagement and signing or authorizing another qualified firm representative to sign the accountant’s
report.
With regard to the electronic dissemination of financial statements, including financial statements published
electronically on your Internet website, you understa nd that electronic sites are a means to distribute
information and, therefore, we are not required to read the information contained in these sites or to consider
the consistency of other information in the electronic site with the original document.
Our fee for these services will be billed at our regular hourly rates and will be based upon the number of
hours required by the staff assigned to complete the enga gement. We estimate our fee to be a range of
$8,500 to $10,500. This fee range includes comp iling the information through submission of the
application. However, if we encounter unexpected circumstances that require us to devote more staff time
to the engagement than anticipated, we will discuss the matter with you.
Any time devoted to responding to data requests afte r the application has been submitted or attending the
hearing or representing the Utility before the Wisconsin Public Service Commission will also be billed at
our regular hourly rates and is outside of the fee provided above.
You agree to release, indemnify, defend, and hold us harmless from any liab ility or costs, including
attorney’s fees, resulting from man agement’s knowing misrepresentations to us or resulting from any
actions against us by third parties relying on the fi nancial forecast described herein except for our own
intentional wrongdoing.
We look forward to a continued rela tionship with your organization, a nd we are available to discuss the
contents of this letter or other professional services you may desire. If you request us to perform additional
services not contemplated or described in this enga gement letter, we will provide you with a separate
agreement describing those additional services and fees.
Village of Cross Plains Water Utility
Page 4
Please sign and return this letter to indicate yo ur acknowledgement of, and agreement with, the
arrangements to perform a compilation engagement with respect to the financial forecast, and our respective
responsibilities.
Respectfully,
Johnson Block & Company, Inc.
RESPONSE: This letter correctly sets forth our understanding of the Village of Cross Plains Water Utility.
Acknowledged and agreed on behalf of the Village of Cross Plains Water Utility by:
S i g n a t u r e :
T i t l e :
D a t e :
TOWN & COUNTRY ENGINEERING, INC.
Madison ⧫ Rhinelander ⧫ Kenosha ⧫ Platteville
6264 Nesbitt Road • Madison, WI 53719 • (608) 273-3350 • tce@tcengineers.net
MEMORANDUM
Date: Monday September 28, 2026
To: Village of Cross Plains Board of Trustees
From: Evan Chambers, P.E. – Project Engineer, Town & Country Engineering
Subject: WWTF Facility Plan
The Village of Cross Plains is undertaking a Facilities Planning effort to assess the condition of
its wastewater treatment facility (WWTF), establish a need for improvement, evaluate options to
address system needs, and to identify the cost -effective alternatives. The last major upgrade of
the WWTF occurred in 2005/2006 , however equipment and components at the WWTF exist
dating back to the 1960s.
In order to increase capacity and ratings of the existing WWTF, a facility plan is required by the
Wisconsin DNR to serve as a 20-year planning document.
Phase 1 – Capacity & Projections
• Village desire to maximize WWTF capacity with existing tanks and footprint
• Population of 4,200 today reaching 5,400 in 20-year planning period
• Organics capacity analysis of existing facility
o Population of 8,700 for annual average loadings
o Population of 6,000 for maximum month loadings
Phase 2 – Cost Estimates
• Develop capital cost estimates for system needs
• Worked with Village staff to prioritize needs using a phased approach opposed to a single
larger project
• Complete this phase with Present Worth Analysis to incorporate 20 years of operation and
maintenance expenses
Phase 3 – Funding Options & User Rate Analysis
• Utilize the agreed upon prioritization to develop a cashflow-based user rate analysis
• Incorporate funding options and all sewer utility revenues and expenses
• Evaluate and assess rate impacts and affordability of the identified needs
Next Steps
• Review User Rate Analysis at Village Board – October/November 2026
• Provide Village Board with Report draft – December 2026
• Hold a Public Hearing to review Facility Plan – December 2026/January 2027
• Incorporate comments and issue Final report to DNR – January 2027
Future Discussion Items
• Project design & bidding timeline
• Project construction
Cross Plains
Facilities Plan
Alternative Takeoff
PROJECT COST ESTIMATE
Cost Estimate Summary
STRName
5 60,000$ 80,020 $ 280,000 $ Entire Site paving
10 860,000$ 450,000 $ 300,000 $ New Generator
15 970,000$ 760,000 $ 340,000 $ New screen
20 60,000$ 320,000 $ - $
30 -$ 2,750,000 $ - $
33 -$ - $ 330,000 $
Tank cleaning, new mixers,
piping, valves, and gates
35 850,000$ - $ - $
40 70,000$ 20,000 $ 150,000 $
Architectural, plumbing, and
HVAC
45 1,680,000$ - $ - $
50 180,000$ - $ - $
55 180,000$ - $ - $
60 UV Structure 60,000$ 1,070,000 $ - $
WWTF Construction Subtotal 5,000,000$ 5,400,000 $ 1,400,000 $
Electrical and Integration35% 1,800,000$ 15% 810,000 $ 15% 210,000 $
Additional Contractor Costs20% 1,400,000$ 20% 1,240,000 $ 20% 320,000 $
Additional Design and Management Costs
Contingencies 10% 820,000$ 10% 750,000 $ 10% 193,000 $
Engineering, Admin, Legal13% 1,070,000$ 13% 970,000 $ 13% 250,000 $
Resident Observation 4% 330,000$ 4% 300,000$ 4% 80,000$
Total Project Cost 10,250,000 $ 9,500,000 $ 2,500,000 $
South Final Clarifier
North Final Clarifier
North Oxidation Ditch
Scum Pump Building
Headworks/Service Building
Blower Building
Digester
Selector Basins
South Oxidation Ditch
Doors, WAS pumps, Electrical,
HVAC
Tank Cleaning and Process
Equipment
9/25/2026
Landscaping, asphalt
removal
New Chemical Feed System
Low Priority
10+ Years
Architectural, plumbing,
and HVAC
Site Work
Control/Sludge Thickening Bldg
Entrance Paving and Retaining
Wall
Sludge thickening and
Electrical
Architectural, plumbing,
HVAC, and new blowers
Architecrual, plumbing,
and new pumps
0-5 Years
High Priority
5-10 Years
Medium Priority
Orthophosphate Analyzer
Mechanism Rehab and
Coating
Mechanism Rehab and
Coating
Tank Cleaning, Concrete
Rehab, and Process
Equipment
Electrical
New effluent pumping
station
New effluent sampler
Structure rehabilitation,
adding wall height
Agenda Memorandum
1
Staff/Department:
Subject Ma
tter:
Meeting Date:
Matt Couey, Director of Public Facilities
Wastewater Testing Equipment
9/28/2026 Village Board Meeting
9/14/2026 Village Board MeetingReferral History:
Executive Summary:
Project Backg
round:
Code/Policy Review:
The WIDNR has issued the Village of Cross Plains a new permit to discharge under the Wisconsin
Pollutant Discharge Elimination System (WPDES). Under this permit the Village of Cross Plains is
a
llowed to discharge from the Wastewater Plant to the Black Earth Creek Watershed in
accordance with the effluent limitations, monitoring requirements and other conditions set forth
in the permit.
In May 2026 the DNR presented this permit to us and gave the Village the opportunit y to
address any concerns we may have. In June the Village sent a letter of concern to the DNR
about Sampling Frequency and Compliance Schedule. The DNR talked with the Village a
bout
the concerns, but would not change the requirements. The two changes that will affe ct the
Village the most is the DO (Dissolved Oxygen) and pH ( Potential of Hydrogen) sampling
requirements from 3x per we
ek to 5x and the need to do continues Temperature Maximum.
The DO and pH sampling went into affect 9/1/2026 and they gave
us until Jan 1, 2027 to be in
compliance with the Continues Temperature monitoring. Adding new equipment to structure
60 (Effluent) and run wires through an existing conduit to the SCADA panel would bring us in
compliance with the
permit.
WPDES Permit No. WI-0020788-11-0
Agenda Memorandum
2
Fiscal Impact:
Recommendation:
We will need new monitoring equipment, an electrician to pull wires to the lab and LW Allen to
program our SCADA system. Asking for approval not to exceed $25,000.
Staff is recommending moving forward with the equipment upgrade. Upgrading the equipment
not only brings us in compliance with the permit, but also helps us on days that a regular
operator is not available to be there. Though traditional lab work is still needed for everyday
operations this equipment will help non wastewater operators get the numbers needed for
reporting. We are also working to make sure the equipment we get now is also compatible with
future system upgrades.
WPDES Permit No. WI-0020788-11-0
WPDES PERMIT
STATE OF WISCONSIN
DEPARTMENT OF NATURAL RESOURCES
PERMIT TO DISCHARGE UNDER THE WISCONSIN POLLUTANT DISCHARGE
ELIMINATION SYSTEM
VILLAGE OF CROSS PLAINS
is permitted, under the authority of Chapter 283, Wisconsin Statutes, to discharge from a facility
located at
1000 MAIN STREET (USH 14), CROSS PLAINS, WISCONSIN
to
BLACK EARTH CREEK WATERSHED, LW17 LOWER WISCONSIN RIVER
BASIN) IN DANE COUNTY
in accordance with the effluent limitations, monitoring requirements and other conditions set
forth in this permit.
The permittee shall not discharge after the date of expiration. If the permittee wishes to continue to discharge after
this expiration date an application shall be filed for reissuance of this permit, according to Chapter NR 200, Wis.
Adm. Code, at least 180 days prior to the expiration date given below.
State of Wisconsin Department of Natural Resources
For the Secretary
By _________________________
Lisa Creegan
Wastewater Field Supervisor
_________________________
Date Permit Signed/Issued
PERMIT TERM: EFFECTIVE DATE - August 01, 2026 EXPIRATION DATE - June 30, 2031
07/23/2026
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
TABLE OF CONTENTS
1 INFLUENT REQUIREMENTS 1
1.1 SAMPLING POINT(S) 1
1.2 MONITORING REQUIREMENTS 1
1.2.1 Sampling Point 701 - INFLUENT 1
2 SURFACE WATER REQUIREMENTS 2
2.1 SAMPLING POINT(S) 2
2.2 MONITORING REQUIREMENTS AND EFFLUENT LIMITATIONS 2
2.2.1 Sampling Point (Outfall) 001 - EFFLUENT 2
3 LAND APPLICATION REQUIREMENTS 11
3.1 SAMPLING POINT(S) 11
3.2 MONITORING REQUIREMENTS AND LIMITATIONS 11
3.2.1 Sampling Point (Outfall) 002 - HAULED SLUDGE 11
4 SCHEDULES 18
4.1 WATER QUALITY TRADING (WQT) ANNUAL REPORT 18
4.2 TEMPERATURE MONITORING 18
4.3 DISSIPATIVE COOLING EVALUATION 19
4.4 PFOS/PFOA MINIMIZATION PLAN DETERMINATION OF NEED 19
4.5 LAND APPLICATION MANAGEMENT PLAN 20
5 STANDARD REQUIREMENTS 21
5.1 REPORTING AND MONITORING REQUIREMENTS 21
5.1.1 Monitoring Results 21
5.1.2 Sampling and Testing Procedures 21
5.1.3 Sample Types 21
5.1.4 Recording of Results 22
5.1.5 Reporting of Monitoring Results 22
5.1.6 Compliance Maintenance Annual Reports 23
5.1.7 Records Retention 23
5.1.8 Other Information 23
5.1.9 Reporting Requirements – Alterations or Additions 23
5.2 SYSTEM OPERATING REQUIREMENTS 24
5.2.1 Noncompliance Reporting 24
5.2.2 Flow Meters 24
5.2.3 Raw Grit and Screenings 24
5.2.4 Sludge Management 24
5.2.5 Prohibited Wastes 24
5.2.6 Bypass 25
5.2.7 Scheduled Bypass 25
5.2.8 Controlled Diversions 25
5.2.9 Proper Operation and Maintenance 26
5.2.10 Operator Certification 26
5.3 SEWAGE COLLECTION SYSTEMS 26
5.3.1 Sanitary Sewage Overflows and Sewage Treatment Facility Overflows 26
5.3.2 Capacity, Management, Operation and Maintenance (CMOM) Program 28
5.3.3 Sewer Cleaning Debris and Materials 28
5.4 SURFACE WATER REQUIREMENTS 28
5.4.1 Permittee-Determined Limit of Quantitation Incorporated into this Permit 28
5.4.2 Appropriate Formulas for Effluent Calculations 28
5.4.3 Effluent Temperature Requirements 29
5.4.4 Visible Foam or Floating Solids 29
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
5.4.5 Surface Water Uses and Criteria 29
5.4.6 Percent Removal 30
5.4.7 E. coli 30
5.4.8 Seasonal Disinfection 30
5.4.9 Whole Effluent Toxicity (WET) Monitoring Requirements 30
5.4.10 Whole Effluent Toxicity (WET) Identification and Reduction 30
5.4.11 PFOS and PFOA Requirements 31
5.5 LAND APPLICATION REQUIREMENTS 31
5.5.1 Sludge Management Program Standards And Requirements Based Upon Federally Promulgated Regulations 31
5.5.2 General Sludge Management Information 31
5.5.3 Sludge Samples 31
5.5.4 Land Application Characteristic Report 31
5.5.5 Calculation of Water Extractable Phosphorus 32
5.5.6 Monitoring and Calculating PCB Concentrations in Sludge 32
5.5.7 Annual Land Application Report 32
5.5.8 Other Methods of Disposal or Distribution Report 32
5.5.9 Approval to Land Apply 32
5.5.10 Soil Analysis Requirements 33
5.5.11 Land Application Site Evaluation 33
5.5.12 Sludge Hauling 33
6 SUMMARY OF REPORTS DUE 34
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
1
1 Influent Requirements
1.1 Sampling Point(s)
Sampling Point Designation
Sampling
Point
Number
Sampling Point Location, Waste Type/Sample Contents and Treatment Description (as
applicable)
701 Influent: 24-hour flow proportional composite sampler located immediately prior to influent Parshall
flume at the influent wet well prior to mechanical screening.
1.2 Monitoring Requirements
The permittee shall comply with the following monitoring requirements.
1.2.1 Sampling Point 701 - INFLUENT
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Flow Rate MGD Daily Continuous
BOD5, Total mg/L 3/Week 24-Hr Flow
Prop Comp
Suspended Solids,
Total
mg/L 3/Week 24-Hr Flow
Prop Comp
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
2
2 Surface Water Requirements
2.1 Sampling Point(s)
Sampling Point Designation
Sampling
Point
Number
Sampling Point Location, Waste Type/Sample Contents and Treatment Description (as
applicable)
001 Effluent: 24-hour Flow Proportional Composite sampler located prior to UV disinfection, with grab
samples obtained after the cascade aerator prior to discharge to Black Earth Creek. Flow is measured by
ultrasonic meter and Parshall flume after UV disinfection prior to aeration and discharge.
2.2 Monitoring Requirements and Effluent Limitations
The permittee shall comply with the following monitoring requirements and limitations.
2.2.1 Sampling Point (Outfall) 001 - EFFLUENT
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Flow Rate MGD Daily Continuous
BOD5, Total Weekly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
BOD5, Total Weekly Avg 34 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
BOD5, Total Monthly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
BOD5, Total Monthly Avg 30 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
BOD5, Total Weekly Avg 112.5 lbs/day 3/Week Calculated May through October
BOD5, Total Weekly Avg 168.9 lbs/day 3/Week Calculated November through April
Suspended Solids,
Total
Weekly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
Suspended Solids,
Total
Weekly Avg 34 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
Suspended Solids,
Total
Monthly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
Suspended Solids,
Total
Monthly Avg 30 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
Suspended Solids,
Total
Weekly Avg 112.5 lbs/day 3/Week Calculated May through October
Suspended Solids,
Total
Weekly Avg 168.9 lbs/day 3/Week Calculated November through April
pH Field Daily Max 9.0 su 5/Week Grab
pH Field Daily Min 6.0 su 5/Week Grab
Dissolved Oxygen Daily Min 7.0 mg/L 5/Week Grab
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
3
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Nitrogen, Ammonia
(NH3-N) Total
Daily Max 16 mg/L 3/Week 24-Hr Flow
Prop Comp
Nitrogen, Ammonia
(NH3-N) Total
Weekly Avg 16 mg/L 3/Week 24-Hr Flow
Prop Comp
May through September
Nitrogen, Ammonia
(NH3-N) Total
Weekly Avg 14 mg/L 3/Week 24-Hr Flow
Prop Comp
October through April
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 6.5 mg/L 3/Week 24-Hr Flow
Prop Comp
October through April
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 11 mg/L 3/Week 24-Hr Flow
Prop Comp
May
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 10 mg/L 3/Week 24-Hr Flow
Prop Comp
June
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 8.9 mg/L 3/Week 24-Hr Flow
Prop Comp
July
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 9.5 mg/L 3/Week 24-Hr Flow
Prop Comp
August
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 12 mg/L 3/Week 24-Hr Flow
Prop Comp
September
E. coli Geometric
Mean -
Monthly
126 #/100 ml Weekly Grab Limit Effective May
through September
annually.
E. coli % Exceedance 10 Percent Monthly Calculated Limit Effective May
through September
annually. See the E. coli
Percent Limit section. Enter
the result in the DMR on
the last day of the month.
Chloride mg/L Monthly 24-Hr Flow
Prop Comp
January through December
2030
PFOS ng/L 1/ 2 Months Grab Monitoring only. See
PFOS/PFOA Minimization
Plan Determination of Need
schedule.
PFOA ng/L 1/ 2 Months Grab Monitoring only. See
PFOS/PFOA Minimization
Plan Determination of Need
schedule.
Temperature
Maximum
deg F Daily Continuous Monitoring effective
January 1, 2027 as per
Temperature Monitoring
schedule.
Phosphorus, Total Monthly Avg 1.0 mg/L 3/Week 24-Hr Flow
Prop Comp
Limit effective throughout
the permit term.
Phosphorus, Total lbs/day 3/Week Calculated Report daily mass
discharged using Equation
1a. in the Water Quality
Trading (WQT) section.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
4
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
WQT Credits Used
(TP)
lbs/month Monthly Calculated Report WQT TP Credits
used per month using
Equation 2c. in the Water
Quality Trading (WQT)
section. Available TP
Credits are specified in
Table 2 and in the approved
Water Quality Trading
Plan.
WQT Computed
Compliance (TP)
Monthly Avg 0.33 mg/L Monthly Calculated Report the WQT TP
Computed Compliance
value using Equation 3a. in
the Water Quality Trading
(WQT) section. Value
entered on the last day of
the month.
WQT Computed
Compliance (TP)
Monthly Avg 1.6 lbs/day Monthly Calculated Report the WQT TP
Computed Compliance
value using Equation 3b. in
the Water Quality Trading
(WQT) section. Value
entered on the last day of
the month.
WQT Credits Used
(TP)
Annual Total 122.8 lbs/yr Annual Calculated The sum of total monthly
credits used may not exceed
Table 2 values listed.
Nitrogen, Total
Kjeldahl
mg/L See Listed
Qtr(s)
24-Hr Flow
Prop Comp
Annual in rotating quarters.
See Nitrogen Series
Monitoring section.
Nitrogen, Nitrite +
Nitrate Total
mg/L See Listed
Qtr(s)
24-Hr Flow
Prop Comp
Annual in rotating quarters.
See Nitrogen Series
Monitoring section.
Nitrogen, Total mg/L See Listed
Qtr(s)
Calculated Annual in rotating quarters.
See Nitrogen Series
Monitoring section below.
Total Nitrogen shall be
calculated as the sum of
reported values for Total
Kjeldahl Nitrogen and
Total Nitrite + Nitrate
Nitrogen.
Acute WET TUa See Listed
Qtr(s)
24-Hr Flow
Prop Comp
See Whole Effluent
Toxicity (WET) sections
for monitoring dates and
WET requirements.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
5
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Chronic WET Monthly Avg 2.3 TUc See Listed
Qtr(s)
24-Hr Flow
Prop Comp
See Whole Effluent
Toxicity (WET) sections
for monitoring dates and
WET requirements.
2.2.1.1 Annual Average Design Flow
The annual average design flow of the permittee’s wastewater treatment facility is 0.593 MGD.
2.2.1.2 pH – Grab Sample Analyses
When pH Field limit(s) or monitoring are included in a permit, the permittee shall comply with the following
conditions:
• The permittee shall perform pH testing required in this permit using an approved method from ch. NR 219,
Wis. Adm. Code, Table B,
• The permittee shall utilize a pH probe/meter that incorporates and uses automatic temperature compensation,
• The permittee shall analyze pH samples as soon as possible after collection not to exceed 15 minutes (this
may mean transporting samples to an offsite laboratory is not an option), and
• The permittee shall calibrate the pH probe/meter daily, using unexpired 4, 7, and 10 buffers prior to use.
2.2.1.3 Dissolved Oxygen (DO) – Grab Sample Analyses
When dissolved oxygen (DO) grab limit(s) or monitoring are included in a permit, the permittee shall comply with the
following conditions:
• The permittee shall perform DO testing required in this permit using an approved method from ch. NR 219,
Wis. Adm. Code, Table B,
• The permittee shall utilize a DO probe/meter that incorporates and uses automatic temperature compensation,
• The permittee shall set the barometric pressure on the DO meter to local elevation and not sea level,
• The permittee shall analyze DO samples as soon as possible after collection not to exceed 15 minutes (this
may mean transporting samples to an offsite laboratory is not an option), and
• The permittee shall calibrate the DO probe/meter daily prior to use.
2.2.1.4 E. coli Percent Limit
No more than 10 percent of E. coli bacteria samples collected in any calendar month may exceed 410 #/100 ml.
Bacteria samples may be collected more frequently than required. All samples shall be reported on the monthly
discharge monitoring reports (DMRs). The following calculation should be used to calculate percent exceedances.
2.2.1.5 PFOS/PFOA Sampling and Reporting Requirements
For grab samples, as defined per s. NR 218.04(10), Wis. Adm. Code, a single sample at a location as defined by the
sample point description shall be taken during the time of the day most representative to capture all potential
discharges. If extra equipment besides the sample bottle is used to collect the sample, it is recommended that a one-
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
6
time equipment blank is collected with the first sample. An equipment blank would be collected by passing
laboratory-verified PFAS-free water over or through field sampling equipment before the collection of a grab sample
to evaluate potential contamination from the equipment used during sample.
If any equipment blanks are performed, these results shall be reported in the comments section of the eDMR and shall
also be documented in the reports submitted as part of the PFOS/PFOA Minimization Plan Determination of Need
schedule of the permit.
2.2.1.6 PFOS/PFOA Minimization Plan Determination of Need
The permittee shall monitor PFOS and PFOA as specified in the table above and report on the effluent concentrations
including trends in monthly and annual average PFOS and PFOA concentrations as specified in the PFOS/PFOA
Minimization Plan Determination of Need Schedule.
If, after reviewing the data, the Department determines that a minimization plan for PFOS and PFOA is necessary
based on the procedures in s. NR 106.98(4), Wis. Adm. Code, the Department will notify the permittee in writing that
a PFOS and PFOA minimization plan that satisfies the requirements in s. NR 106.99, Wis. Adm. Code, is required.
The permittee shall submit an initial plan for Department approval no later than 90 days after written notification was
sent from the Department in accordance with s. NR 106.985(2)(a), Wis. Adm. Code. Pursuant to s. NR 106.985(2)(b),
Wis. Adm. Code, as soon as possible after Department approval of the PFOS and PFOA minimization plan, the
Department will modify or revoke and reissue the permit in accordance with public notice procedures under ch. 283,
Wis. Stats., and ch. NR 203, Wis. Adm. Code, to include the PFOS and PFOA minimization plan and other related
terms and condition.
If, however, the Department determines that a PFOS and PFOA minimization plan is unnecessary based on the
procedures in s. NR 106.98(4), Wis. Adm. Code, the Department shall notify the permittee that no further action is
required. Per s. NR 106.98(3)(a), Wis. Adm. Code, the Department may reduce monitoring frequency to once every 3
months (quarterly) on a case-by-case basis, but only after at least 12 representative results have been generated. If the
permittee requests a reduction in monitoring and the Department agrees a reduction would be appropriate, the permit
may be modified in accordance with public notice procedures under ch. 283, Wis. Stats., and ch. NR 203, Wis. Adm.
Code, to incorporate this change.
2.2.1.7 Effluent Temperature Monitoring
For monitoring temperature continuously, collect measurements in accordance with s. NR 218.04(13), Wis. Code.
This means that discrete measurements shall be recorded at intervals of not more than 15 minutes during the 24-hour
period. Report the maximum temperature measured during the day on the DMR.
2.2.1.8 Phosphorus Water Quality Trading (WQT)
The permittee may use water quality trading to demonstrate compliance with WQBELs for total phosphorus (TP) of
0.33 mg/L and 1.6 lbs/day as a monthly average. Pollutant reduction credits for total phosphorus are available as
specified in Water Quality Trading Plan WQT-2025-0015 or approved amendments thereof.
Table 2. Available Phosphorus Credits per WQT-2025-0015
Year
Available Phosphorus
Credits (lbs/yr) –
Total
2026 122.8
2027 122.8
2028 122.8
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
7
2029 122.8
2030 122.8
2031* 122.8
*In the event that this permit expires and is administratively continued beyond the year(s) specified in the above table, 122.8
lbs/yr of credit will be available in subsequent years until the permit is reissued, modified, or revoked.
Only those pollutant reduction credits established by a water quality trading plan approved by the Department may be
used by the permittee to demonstrate compliance with the WQBELs identified in this subsection. If the permittee
wishes to use pollutant reduction credits not identified in an approved water quality trading plan, the permittee must
amend the plan or develop a new plan and obtain Department approval of the amended or new plan prior to use of the
new pollutant reduction credits. Prior to Department approval, the amended or new water quality trading plan will be
subject to notice and opportunity for public comment. Any change in the number of available credits requires a permit
modification.
In the event pollutant reduction credits as defined in the approved water quality trading plan are no longer generated,
the permittee shall comply with the WQBELs for total phosphorus contained in this subsection. The quantity of
credits specified in Table 2 may be used to demonstrate compliance for a given year.
2.2.1.9 Demonstrating Compliance with TP WQBELs Using Water Quality Trading
Use the following methods to demonstrate compliance with the TP WQBELs contained in the Water Quality Trading
subsection above.
TOTAL POLLUTANT DISCHARGED (TP)
Use the following equations to calculate the amount of pollutant discharged for Monthly Avg TP [lbs/day].
TP Discharged [lbs/day] = TP Discharged [mg/L] × Daily Flow [MGD] × 8.34 (Eq. 1a.)
Monthly or Weekly Avg = Ʃ daily results ÷ # of results (Eq. 1b.)
WQT CREDITS USED (TOTAL PHOSPHORUS)
Use the following method to calculate the credits to be used expressed as a mass in lbs/month:
WQT TP Credits Needed [lbs/day] = (Monthly Avg TP [mg/L] – 0.33 [mg/L]) × Monthly Avg Flow [MGD] × 8.34
(Eq. 2a.)
WQT TP Credits Needed [lbs/day] = Monthly Avg TP [lbs/day] – 1.6 lbs/day (Eq. 2b.)
When the “Monthly Avg TP” discharged is greater than both 0.33 mg/L and 1.6 lbs/day, select the greater of the two
values from Equation 2a or 2b to be used in Equation 2c below.
Note: When the TP discharge is less than 0.33 mg/L AND 1.6 lbs/day as a monthly avg, report 0 (zero) as the “WQT
Credits Used (TP)”.
WQT TP Credits Used [lbs/month] = WQT TP Credits Needed [lbs/day] × # of days of discharge/month (Eq. 2c.)
WQT COMPUTED COMPLIANCE (TOTAL PHOSPHORUS)
Use the following method to demonstrate compliance with TP WQBELs expressed as a concentration in mg/L:
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
8
WQT TP Computed Compliance [mg/L] = Monthly Avg TP [mg/L] – [WQT TP Credits Needed [lbs/day]* ÷ (Monthly Avg
Flow [MGD] × 8.34)] (Eq. 3a.)
*Greater of either Equation 2a or 2b, the value used for Equation 2c.
Use the following method to demonstrate compliance with TP WQBELs expressed as a mass in lbs/day:
WQT TP Computed Compliance [lbs/day] = Monthly Avg TP [lbs/day] – WQT TP Credits Needed [lbs/day]**
(Eq. 3b.)
**Greater of either Equation 2a or 2b, the value used for Equation 2c.
Negative computed compliance values should be entered as zero - “0”.
2.2.1.10 Additional Water Quality Trading Requirements
When using water quality trading to demonstrate compliance with WQBELs for TP, the permittee shall comply with
the following:
• Failure to implement any of the terms or conditions of the approved water quality trading plan is a violation of this
permit.
• Each month the permittee shall certify that the nonpoint source management practices installed to generate pollutant
reduction credits are operated and maintained in a manner consistent with that specified in the approved water quality
trading plan. Such a certification may be made by including the following statement as a comment on the monthly
discharge monitoring report:
I certify that management practices identified in the approved water quality trading plan as the source of
pollutant reduction credits are installed, established and properly maintained.
• At least once a year the permittee or the permittee’s agent shall inspect each nonpoint source management practice
that generates pollutant reduction credits to confirm the implementation of the management practice and their
appropriate operation and adequate maintenance.
• The permittee shall notify WDNR by telephone within 24 hours or next business day of becoming aware that
pollutant reduction credits used or intended for use by the permittee are not being implemented or generated as
defined in the approved trading plan. A written notification shall be submitted to the Department within 5 days
regarding the status of the permittee’s pollutant reduction credits.
• The permittee shall provide WDNR written notice within 7 days of the trade agreement upon which the approved
water quality trading plan is based being amended, modified, or revoked. This notification shall include the details of
any amendment or modification in addition to the justification for the changes.
• The permittee shall not use pollutant reduction credits for the demonstration of compliance when pollutant reduction
credits are not being generated.
2.2.1.11 Water Quality Trading Reopener Clause
Under any of the following conditions as provided by s. 283.53(2), Wis. Stats. and ss. NR 203.135 and 203.136, Wis.
Code, the Department may modify or revoke and reissue this permit to modify or eliminate permit terms and
conditions related to water quality trading:
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
9
• The permittee fails to implement the water quality trading plan as approved;
• The permittee fails to comply with permit terms and conditions related to water quality trading;
• New information becomes available that would change the number of credits available for the water quality trade or
would change the Department’s determinations that water quality trading is an acceptable option.
2.2.1.12 Submittal of Permit Application for Next Reissuance and Pollutant Trading Plan
The permittee shall submit the permit application for the next reissuance at least 6 months prior to expiration of this
permit.
The permittee has submitted a Water Quality Trading Plan that was approved by WDNR on July 15, 2025. If the
permittee intends to pursue pollutant trading to achieve compliance in a future permit term, an updated water quality
trading plan is due with the application for the next reissuance. If system upgrades will be used in combination with
pollutant trading the permittee shall submit plans for any system upgrade.
2.2.1.13 Nitrogen Series Monitoring
Monitoring for Total Kjeldahl Nitrogen (TKN), Nitrite + Nitrate Nitrogen, and Total Nitrogen shall be conducted
once each year in rotating quarters in order to collect seasonal information about the discharge. Tests are required
during the following quarters.
• July – September 2027; October – December 2028; January – March 2029; April – June 2030; January
– March 2031
Nitrogen Series monitoring shall continue after the permit expiration date (until the permit is reissued) in accordance
with the monitoring requirements specified in the last full calendar year of this permit. For example, the next test
would be required in April – June 2032.
Testing: Monitoring shall be performed during normal operating conditions. Permittees are not allowed to turn off or
otherwise modify treatment systems, production processes, or change other operating or treatment conditions during
testing.
2.2.1.14 Whole Effluent Toxicity (WET) Testing
Primary Control Water for Acute Tests: Synthetic (standard) laboratory water
Primary Control Water for Chronic Tests: The receiving water (Black Earth Creek) is to be used as the dilution
water and primary control for chronic WET tests, unless the use of different dilution water is approved by the
Department prior to use. The dilution water used in WET tests conducted on Outfall 001 shall be a grab sample
collected from the receiving water location, upstream and out of the influence of the mixing zone and any other
known discharge.
Primary Control Water for Chronic Tests: Black Earth Creek
Instream Waste Concentration (IWC): 43%
Dilution Series: At least five effluent concentrations and dual controls must be included in each test.
• Acute: 100, 50, 25, 12.5, 6.25% and any additional selected by the permittee.
• Chronic: 100, 75, 50, 25, 12.5% and any additional selected by the permittee.
WET Testing Frequency:
Acute tests are required during the following quarters:
• Acute: October – December 2028; April – June 2030
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
10
Acute WET testing shall continue after the permit expiration date (until the permit is reissued) in accordance
with the WET requirements specified for the last full calendar year of this permit. For example, the next test
would be required April – June 2032.
Chronic tests are required during the following quarters:
• Chronic: July – September 2027; October – December 2028; January – March 2029; April – June
2030; January – March 2031
Chronic WET testing shall continue after the permit expiration date (until the permit is reissued) in accordance
with the WET requirements specified for the last full calendar year of this permit. For example, the next test
would be required April 1 – June 30, 2032.
Testing: WET testing shall be performed during normal operating conditions. Permittees are not allowed to turn off
or otherwise modify treatment systems, production processes, or change other operating or treatment conditions
during WET tests.
Reporting: The permittee shall report test results on the Discharge Monitoring Report form, and also complete the
"Whole Effluent Toxicity Test Report Form" (Section 6, "State of Wisconsin Aquatic Life Toxicity Testing Methods
Manual, 2nd Edition"), for each test. The original, complete, signed version of the Whole Effluent Toxicity Test
Report Form shall be sent to the Biomonitoring Coordinator, Bureau of Water Quality, 101 S. Webster St., P.O. Box
7921, Madison, WI 53707-7921, within 45 days of test completion. The Discharge Monitoring Report (DMR) form
shall be submitted electronically by the required deadline.
Determination of Positive Results: An acute toxicity test shall be considered positive if the Toxic Unit - Acute (TUa)
is greater than 1.0 for either species (fathead minnow (Pimephales promelas) and waterflea (Ceriodaphnia dubia)).
The TUa shall be calculated as follows: TUa = 100 ÷ LC50. A chronic toxicity test shall be considered positive if the
Toxic Unit - Chronic (TUc) is greater than 2.3 for either species. The TUc shall be calculated as follows: TUc = 100 ÷
IC25.
Additional Testing Requirements: Within 90 days of a test which showed positive results, the permittee shall
submit the results of at least 2 retests to the Biomonitoring Coordinator on "Whole Effluent Toxicity Test Report
Forms". The 90-day reporting period shall begin the day after the test which showed a positive result. The retests shall
be completed using the same species and test methods specified for the original test (see the Standard Requirements
section herein).
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
11
3 Land Application Requirements
3.1 Sampling Point(s)
The discharge(s) shall be limited to land application of the waste type(s) designated for the listed sampling point(s) on
Department approved land spreading sites or by hauling to another facility.
Sampling Point Designation
Sampling
Point
Number
Sampling Point Location, Waste Type/Sample Contents and Treatment Description (as
applicable)
002 Aerobically digested, Dewatered, Cake, Class B, Representative sludge samples shall be collected from
the discharge of the gravity belt thickener.
3.2 Monitoring Requirements and Limitations
The permittee shall comply with the following monitoring requirements and limitations.
3.2.1 Sampling Point (Outfall) 002 - HAULED SLUDGE
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Solids, Total Percent Annual Composite
Arsenic Dry Wt Ceiling 75 mg/kg Annual Composite
Arsenic Dry Wt High Quality 41 mg/kg Annual Composite
Cadmium Dry Wt Ceiling 85 mg/kg Annual Composite
Cadmium Dry Wt High Quality 39 mg/kg Annual Composite
Copper Dry Wt Ceiling 4,300 mg/kg Annual Composite
Copper Dry Wt High Quality 1,500 mg/kg Annual Composite
Lead Dry Wt Ceiling 840 mg/kg Annual Composite
Lead Dry Wt High Quality 300 mg/kg Annual Composite
Mercury Dry Wt Ceiling 57 mg/kg Annual Composite
Mercury Dry Wt High Quality 17 mg/kg Annual Composite
Molybdenum Dry Wt Ceiling 75 mg/kg Annual Composite
Nickel Dry Wt Ceiling 420 mg/kg Annual Composite
Nickel Dry Wt High Quality 420 mg/kg Annual Composite
Selenium Dry Wt Ceiling 100 mg/kg Annual Composite
Selenium Dry Wt High Quality 100 mg/kg Annual Composite
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
12
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Zinc Dry Wt Ceiling 7,500 mg/kg Annual Composite
Zinc Dry Wt High Quality 2,800 mg/kg Annual Composite
Nitrogen, Total
Kjeldahl
Percent Annual Composite Monitoring only required if
land application occurs.
Nitrogen, Ammonium
(NH4-N) Total
Percent Annual Composite Monitoring only required if
land application occurs.
Phosphorus, Total Percent Annual Composite Monitoring only required if
land application occurs.
Phosphorus, Water
Extractable
% of Tot P Annual Composite Monitoring only required if
land application occurs.
Potassium, Total
Recoverable
Percent Annual Composite Monitoring only required if
land application occurs.
PCB Total Dry Wt Ceiling 50 mg/kg Once Composite Once in 2028
PCB Total Dry Wt High Quality 10 mg/kg Once Composite Once in 2028
PFOA + PFOS g/kg Annual Calculated Report the sum of PFOA
and PFOS. See PFAS
permit sections for more
information.
PFAS Dry Wt Annual Grab Perfluoroalkyl and
Polyfluoroalkyl Substances
based on updated DNR
PFAS List. See PFAS
Permit Sections for more
information.
Other Sludge Requirements
Sludge Requirements Sample Frequency
List 3 Requirements – Pathogen Control: The requirements in List
3 shall be met prior to land application of sludge.
Annual
List 4 Requirements – Vector Attraction Reduction: The vector
attraction reduction shall be satisfied prior to, or at the time of land
application as specified in List 4.
Annual
3.2.1.1 List 2 Analysis
If the monitoring frequency for List 2 parameters is more frequent than "Annual" then the sludge may be analyzed for
the List 2 parameters just prior to each land application season rather than at the more frequent interval specified.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
13
3.2.1.2 Changes in Feed Sludge Characteristics
If a change in feed sludge characteristics, treatment process, or operational procedures occurs which may result in a
significant shift in sludge characteristics, the permittee shall reanalyze the sludge for List 1, 2, 3 and 4 parameters
each time such change occurs.
3.2.1.3 Multiple Sludge Sample Points (Outfalls)
If there are multiple sludge sample points (outfalls), but the sludges are not subject to different sludge treatment
processes, then a separate List 2 analysis shall be conducted for each sludge type which is land applied, just prior to
land application, and the application rate shall be calculated for each sludge type. In this case, List 1, 3, and 4 and
PCBs need only be analyzed on a single sludge type, at the specified frequency. If there are multiple sludge sample
points (outfalls), due to multiple treatment processes, List 1, 2, 3 and 4 and PCBs shall be analyzed for each sludge
type at the specified frequency.
3.2.1.4 Sludge Which Exceeds the High Quality Limit
Cumulative pollutant loading records shall be kept for all bulk land application of sludge which does not meet the
high quality limit for any parameter. This requirement applies for the entire calendar year in which any exceedance of
Table 3 of s. NR 204.07(5)(c), Wis. Adm. Code, is experienced. Such loading records shall be kept for all List 1
parameters for each site land applied in that calendar year. The formula to be used for calculating cumulative loading
is as follows:
[(Pollutant concentration (mg/kg) x dry tons applied/ac) ÷ 500] + previous loading (lbs/acre) = cumulative lbs
pollutant per acre
When a site reaches 90% of the allowable cumulative loading for any metal established in Table 2 of s. NR
204.07(5)(b), Wis. Adm. Code, the Department shall be so notified through letter or in the comment section of the
annual land application report (3400-55).
3.2.1.5 Sludge Analysis for PCBs
The permittee shall analyze the sludge for Total PCBs one time during 2028. The results shall be reported as "PCB
Total Dry Wt". Either congener-specific analysis or Aroclor analysis shall be used to determine the PCB
concentration. The permittee may determine whether Aroclor or congener specific analysis is performed. Analyses
shall be performed in accordance with Table EM in s. NR 219.04, Wis. Adm. Code and the conditions specified in
Standard Requirements of this permit. PCB results shall be submitted by January 31, following the specified year of
analysis.
3.2.1.6 Lists 1, 2, 3, and 4
List 1
TOTAL SOLIDS AND METALS
See the Monitoring Requirements and Limitations table above for monitoring frequency and limitations for the
List 1 parameters
Solids, Total (percent)
Arsenic, mg/kg (dry weight)
Cadmium, mg/kg (dry weight)
Copper, mg/kg (dry weight)
Lead, mg/kg (dry weight)
Mercury, mg/kg (dry weight)
Molybdenum, mg/kg (dry weight)
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
14
List 1
TOTAL SOLIDS AND METALS
See the Monitoring Requirements and Limitations table above for monitoring frequency and limitations for the
List 1 parameters
Nickel, mg/kg (dry weight)
Selenium, mg/kg (dry weight)
Zinc, mg/kg (dry weight)
List 2
NUTRIENTS
See the Monitoring Requirements and Limitations table above for monitoring frequency for the List 2 parameters
Solids, Total (percent)
Nitrogen Total Kjeldahl (percent)
Nitrogen Ammonium (NH4-N) Total (percent)
Phosphorus Total as P (percent)
Phosphorus, Water Extractable (as percent of Total P)
Potassium Total Recoverable (percent)
List 3
PATHOGEN CONTROL FOR CLASS B SLUDGE
The permittee shall implement pathogen control as listed in List 3. The Department shall be notified of the pathogen
control utilized and shall be notified when the permittee decides to utilize alternative pathogen control.
The following requirements shall be met prior to land application of sludge.
Parameter Unit Limit
Fecal Coliform*
MPN/gTS or
CFU/gTS 2,000,000
OR, ONE OF THE FOLLOWING PROCESS OPTIONS
Aerobic Digestion Air Drying
Anaerobic Digestion Composting
Alkaline Stabilization PSRP Equivalent Process
* The Fecal Coliform limit shall be reported as the geometric mean of 7 discrete samples on a dry weight basis.
List 4
VECTOR ATTRACTION REDUCTION
The permittee shall implement any one of the vector attraction reduction options specified in List 4. The Department
shall be notified of the option utilized and shall be notified when the permittee decides to utilize an alternative option.
One of the following shall be satisfied prior to, or at the time of land application as specified in List 4.
Option Limit Where/When it Shall be Met
Volatile Solids Reduction 38% Across the process
Specific Oxygen Uptake Rate 1.5 mg O2/hr/g TS On aerobic stabilized sludge
Anaerobic bench-scale test <17 % VS reduction On anaerobic digested sludge
Aerobic bench-scale test <15 % VS reduction On aerobic digested sludge
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
15
List 4
VECTOR ATTRACTION REDUCTION
The permittee shall implement any one of the vector attraction reduction options specified in List 4. The Department
shall be notified of the option utilized and shall be notified when the permittee decides to utilize an alternative option.
One of the following shall be satisfied prior to, or at the time of land application as specified in List 4.
Option Limit Where/When it Shall be Met
Aerobic Process >14 days, Temp >40C and
Avg. Temp > 45C
On composted sludge
pH adjustment >12 S.U. (for 2 hours)
and >11.5
(for an additional 22 hours)
During the process
Drying without primary solids >75 % TS When applied or bagged
Drying with primary solids >90 % TS When applied or bagged
Equivalent
Process
Approved by the Department Varies with process
Injection - When applied
Incorporation - Within 6 hours of application
3.2.1.7 Daily Land Application Log
Daily Land Application Log
Discharge Monitoring Requirements and Limitations
The permittee shall maintain a daily land application log for biosolids land applied each day when land application
occurs. The following minimum records must be kept, in addition to all analytical results for the biosolids land
applied. The log book records shall form the basis for the annual land application report requirements.
Parameters Units Sample
Frequency
DNR Site Number(s) Number Daily as used
Outfall number applied Number Daily as used
Acres applied Acres Daily as used
Amount applied As appropriate * /day Daily as used
Application rate per acre unit */acre Daily as used
Nitrogen applied per acre lb/acre Daily as used
Method of Application Injection, Incorporation, or surface
applied
Daily as used
*gallons, cubic yards, dry US Tons or dry Metric Tons
3.2.1.8 Sludge Monitoring for PFAS
Sampling shall occur for perfluoroalkyl and polyfluoroalkyl compounds (PFAS) listed in the table below and as
indicated in sampling point sections above. Monitoring shall occur at each sample point when sludge is generated
regardless of the end use (i.e. land applied, hauled to another facility, landfilled).
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
16
PERFLUOROALKYLCARBOXILIC Acids (PFCAs)
PFBA Perfluorobutanoic acid
PFPeA Perfluroropentanoic acid
PFHxA Perfluorohexanoic acid
PFHpA Perfluoroheptanoic acid
PFOA Perfluorooctanoic acid
PFNA Perfluorononanoic acid
PFDA Perfluorodecanoic acid
PFUnA Perfluroroundecanoic acid
PFDoA Perfluorododecanoic acid
PFTrDA Perfluorotridecanoic acid
PFTeDA Perfluorotetradecanoic acid
PERFLUOROALKYLSULFONIC Acids (PFSAs)
PFBS Perfluorobutane sulfonic acid
PFPeS Perfluroropentane sulfonic acid
PFHxS Perfluorohexane sulfonic acid
PFHpS Perfluoroheptane sulfonic acid
PFOS Perfluorooctane sulfonic acid
PFNS Perfluorononane sulfonic acid
PFDS Perfluorodecane sulfonic acid
PFDoS Perfluorododecane sulfonic acid
TELOMER SULFONIC Acids
4:2FTSA 1H,1H,2H,2H-Perfluorohexane sulfonic acid
6:2FTSA 1H,1H,2H,2H-Perfluorooctane sulfonic acid
8:2FTSA 1H,1H,2H,2H-Perfluorodecane sulfonic acid
PERFLUOROOCTANCESULFONAMIDES (FOSAs)
PFOSA Perfluroroctane sulfonamide
NMeFOSA N-Methyl perfluoroocatane sulfonamide
NEtFOSA N-Ethyl perfluorooctane sulfonamide
PERFLUOROOCTANCESULFONAMIDOACETIC Acids
NMeFOSAA N-Methyl perfluoroocatane sulfonamidoacetic acid
NEtFOSAA N-Ethyl perfluorooctane sulfonamidoacetic acid
NATIVE PERFLUOROOCTANCESULFONAMIDOETHANOLS (FOSEs)
NMeFOSE N-Methyl perfluorooctane sulfonamideoethanol
NEtFOSE N-Ethyl perfluorooctane sulfonamidoethanol
PERFLUOROALKYLETHERCARBOXYLIC Acids (PFECAs)
HFPO-DA Hexafluoropropylene oxide dimer acid
ADONA 4,8-dioxa-3H-perfluorononanoic acid
PFMPA Perfluoro-3-methoxypropanoic acid
PFMBA Perfluoro-4-methoxybutanoic acid
NFDHA Nonafluoro-3,6-dioxaheptaoic acid
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
17
CHLORO-PERFLUOROALKYLSULFONATE
9Cl-PF3ONS 9-chloroehexadecafluoro-3-oxanone-1-sulfonic acid
11Cl-PF3OUdS 11-chloroelcosafluoro-3-oxaundecane-1-sulfonic acid
PFEESA Perfluroro(2-ethoxyethane)sulfonic acid
TELOMER SULFONIC Acids
3:3FTCA 3-Perfluoropropyl propanoic acid
5:3FTCA 2H,2H,3H,3H-Perfluorooctanoic acid
7:3FTCA 3-Perfluoroheptyl propanoic acid
Note: If WDNR Lab Certification removes a particular compound from the reporting list above and upon receiving
written communication from the department, reporting for that compound is no longer required.
3.2.1.9 Sampling and Reporting Sludge Samples for PFAS
Representative sludge samples shall be collected at each sample point as listed. At minimum, liquid sludge
storage/digesters should be thoroughly mixed prior to sampling. Cake sludge samples should consist of seven equal
size discrete samples and be collected from different areas and depths then composited into one sample for laboratory
analysis.
Note: If additional equipment is used for collecting sludge samples (i.e., shovels, compositing buckets, bottles, etc.),
then a one-time equipment blank is recommended to be collected with the first sample. An equipment blank sample is
collected by passing laboratory verified PFAS-free water over or through field sampling equipment before the
collection of a representative sludge sample. The equipment blank result shall be reported on the annual Sludge
Characteristics Form (3400-049) in the comment section when reporting PFAS concentrations in the sludge.
The permittee shall report each of the PFAS sludge monitoring results on the annual Sludge Characteristics and
Monitoring Form (3400-049) as provided by the department. The permittee shall also report the summation of PFOS
and PFOA on this same form. All results shall be reported in dry weight. The annual Sludge Characteristics and
Monitoring Form (3400-049) are due January 31, of the year following the collection of the sludge samples.
The laboratory performing the analysis on any samples shall be certified for the applicable PFAS compounds in the
solids matrix by the Wisconsin Laboratory Certification Program established under s. 299.11, Wis. Stats., and in
accordance with s. NR 149.41, Wis. Adm. Code. The department may reject any sample results if results are produced
by a laboratory that is not in compliance with certification requirements under ch. NR 149, Wis. Adm. Code.
3.2.1.10 PFAS Land Application Requirements
The department recommends the landspreading and/or land application of sludge be done in a manner consistent with
the most recent version of the “Interim Strategy for Land Application of Biosolids and Industrial Sludges containing
PFAS”.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
18
4 Schedules
4.1 Water Quality Trading (WQT) Annual Report
Required Action Due Date
Annual WQT Report: Submit an annual WQT report that shall cover the previous year. The WQT
Report shall include:
The number of pollutant reduction credits (lbs/month) used each month of the previous year to
demonstrate compliance;
The source of each month’s pollutant reduction credits by identifying the approved water quality
trading plan that details the source;
A summary of the annual inspection of each nonpoint source management practice that generated any
of the pollutant reduction credits used during the previous year; and
Identification of noncompliance or failure to implement any terms or conditions of this permit with
respect to water quality trading that have not been reported in discharge monitoring reports.
01/31/2027
Annual WQT Report #2: Submit an annual WQT report that shall cover the previous year. 01/31/2028
Annual WQT Report #3: Submit an annual WQT report that shall cover the previous year. 01/31/2029
Annual WQT Report #4: Submit an annual WQT report that shall cover the previous year. 01/31/2030
Annual WQT Report #5: Submit the 5th annual WQT report. If the permittee wishes to continue to
comply with phosphorus limits through WQT in subsequent permit terms, the permittee shall submit
a revised WQT plan including a demonstration of credit need, compliance record of the existing
WQT, and any additional practices needed to maintain compliance over time.
01/31/2031
Annual WQT Report Required After Permit Expiration: In the event that this permit is not
reissued by the expiration date, the permittee shall continue to submit annual WQT reports by
January 31 each year covering the total number of pollutant credits used, the source of the pollution
reduction credits, a summary of annual inspection reports performed, and identification of
noncompliance or failure to implement any terms or conditions of the approved water quality trading
plan for the previous calendar year.
4.2 Temperature Monitoring
Required Action Due Date
Complete Installation: Complete installation of a temperature monitoring and data logging device at
the outfall 001 sample point capable of monitoring effluent temperature continuously as defined in
Table B in ss. NR 219 and s. NR 218.04(13), Wis. Adm. Code.
12/31/2026
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
19
Achieve Compliance: Begin monitoring effluent temperature continuously at the outfall 001 sample
point.
01/01/2027
4.3 Dissipative Cooling Evaluation
This schedule requires the permittee to conduct a dissipative cooling evaluation by the specified due date.
Required Action Due Date
Report on Effluent Discharges: Submit a dissipative cooling evaluation on effluent temperature
with conclusions regarding compliance. Dissipative cooling study must be conducted in the month of
October during the second year of the permit term and submitted to the Department by the listed due
date. Informational Note: Refer to the Surface Water subsections regarding 'Determination of Need
for Effluent Limits' and 'Dissipative Cooling Demonstration - Weekly Average Limits' concerning
requests for a Department determination on the need for limits and follow-up procedures for
demonstration of dissipative cooling per NR 106.59, as well as re-evaluation of the limits pursuant to
NR 106 Subchapters V & VI or NR 102.26, Wis. Adm. Code.
12/31/2028
4.4 PFOS/PFOA Minimization Plan Determination of Need
Required Action Due Date
Report on Effluent Discharge: Submit a report on effluent PFOS and PFOA concentrations and
include an analysis of trends in monthly and annual average PFOS and PFOA concentrations. This
analysis should also include a comparison to the applicable narrative standard in s. NR 102.04(8)(d),
Wis. Adm. Code.
This report shall include all additional PFOS and PFOA data that may be collected including any
influent, intake, in-plant, collection system sampling, and blank sample results.
07/01/2027
Report on Effluent Discharge and Evaluation of Need: Submit a final report on effluent PFOS and
PFOA concentrations and include an analysis of trends in monthly and annual average PFOS and
PFOA concentrations of data collected over the last 24 months. The report shall also provide a
comparison on the likelihood of the facility needing to develop a PFOS/PFOA minimization plan.
This report shall include all additional PFOS and PFOA data that may be collected including any
influent, intake, in-plant, collection system sampling, and blank sample results.
The permittee shall also submit a request to the department to evaluate the need for a PFOS/PFOA
minimization plan.
If the Department determines a PFOS/PFOA minimization plan is needed based on a reasonable
potential evaluation, the permittee will be required to develop a minimization plan for Department
approval no later than 90 days after written notification was sent from the Department. The
Department will modify or revoke and reissue the permit to include PFOS/PFOA minimization plan
reporting requirements along with a schedule of compliance to meet WQBELs. Effluent monitoring
of PFOS and PFOA shall continue as specified in the permit until the modified permit is issued.
If, however, the Department determines there is no reasonable potential for the facility to discharge
PFOS or PFOA above the narrative standard in s. NR 102.04(8)(d), Wis. Adm. Code, no further
action is required and effluent monitoring of PFOS and PFOA shall continue as specified in the
permit.
07/01/2028
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
20
4.5 Land Application Management Plan
A management plan is required for the land application system if sludge is land applied by permittee instead of hauled
to another facility.
Required Action Due Date
Land Application Management Plan Submittal: Submit a management plan to optimize the land
application system performance and demonstrate compliance with ch. NR 204, Wis. Adm. Code. This
management plan shall 1) specify information on pretreatment processes (if any); 2) identify land
application sites; 3) describe site limitations; 4) address vegetative cover management and removal;
5) specify availability of storage; 6) describe the type of transporting and spreading vehicle(s); 7)
specify monitoring procedures; 8) track site loading; 9) address contingency plans for adverse
weather and odor/nuisance abatement; and 10) include any other pertinent information. Once
approved, all landspreading activities shall be conducted in accordance with the plan. Any changes
to the plan must be approved by the Department prior to implementing the changes. Plan shall be
submitted 60 days prior to land application.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
21
5 Standard Requirements
Chapter NR 205, Wisconsin Administrative Code: The conditions in ss. NR 205.07(1) and NR 205.07(2), Wis.
Adm. Code, are included by reference in this permit. The permittee shall comply with all of these requirements. Some
of these requirements are outlined in the Standard Requirements section of this permit. Requirements not specifically
outlined in the Standard Requirement section of this permit can be found in ss. NR 205.07(1) and NR 205.07(2), Wis.
Adm. Code.
5.1 Reporting and Monitoring Requirements
5.1.1 Monitoring Results
Monitoring results obtained during the previous month shall be summarized and reported on a Department
Wastewater Discharge Monitoring Report. The report may require reporting of any or all of the information specified
below under ‘Recording of Results’. This report is to be returned to the Department no later than the date indicated on
the form. A copy of the Wastewater Discharge Monitoring Report Form or an electronic file of the report shall be
retained by the permittee.
Monitoring results shall be reported on an electronic discharge monitoring report (eDMR). The eDMR shall be
certified electronically by a responsible executive or municipal officer, manager, partner or proprietor as specified in
s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner or proprietor that has
been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The ‘eReport Certify’ page
certifies that the electronic report form is true, accurate and complete.
If the permittee monitors any pollutant more frequently than required by this permit, the results of such monitoring
shall be included on the Wastewater Discharge Monitoring Report pursuant s. NR 205.07(1)(r)2., Wis. Adm. Code.
For the purpose of meeting sampling frequency requirements, a week is defined as a calendar week, which begins on
Sunday and ends on Saturday. The calendar week shall be used as the basis for reporting monitoring data on discharge
monitoring reports.
The permittee shall comply with all limits for each parameter regardless of monitoring frequency. For example,
monthly, weekly, and/or daily limits shall be met even with monthly monitoring. The permittee may monitor more
frequently than required for any parameter.
5.1.2 Sampling and Testing Procedures
Sampling and laboratory testing procedures shall be performed in accordance with Chapters NR 218 and NR 219,
Wis. Adm. Code, and completed by a laboratory certified or registered in accordance with the requirements of ch. NR
149, Wis. Adm. Code. Groundwater sampling shall be performed in accordance with procedures contained in s. NR
140.16, Wis. Adm. Code, and the WDNR publications, Groundwater Sampling Desk Reference (PUBL-DG-037-96)
and Groundwater Sampling Field Manual (PUBL-DG-038-96). The analytical methodologies used shall enable the
laboratory to quantitate all substances for which monitoring is required at levels below the effluent limitation and/or
groundwater standard. If the required level cannot be met by any of the methods available in ch. NR 219, Wis. Adm.
Code, then the method with the lowest limit of detection shall be selected. Additional test procedures may be specified
in this permit.
5.1.3 Sample Types
The permittee shall use the following definitions from s. NR 218.04, Wis. Adm. Code as prescribed in the WPDES
permit for the appropriate method and manner of obtaining samples:
24-hour Composite Sample: A combination of individual samples taken at intervals of not more than one hour such
that the volumes of each of the individual samples and of the combination are proportional to the volumes of flow
during each interval and during the 24-hour period respectively.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
22
• 24-hour Flow Proportional Composite Sample: A combination of individual grab samples taken over a 24-
hr period, where the individual grab samples are of equal volume and taken at intervals after a specified
volume of discharge has occurred.
• 24-hour Time Proportional Composite Sample: A combination of individual grab samples taken over a 24-
hr period, where the individual grab samples are of equal volume and taken at consistent intervals not
exceeding 15 minutes.
Composite Sample: A combination of individual samples of equal volume taken at approximately equal intervals not
exceeding one hour over a specified period of time.
• 3-hr Composite Sample: A combination of three (3) individual grab samples of equal volume taken at one-
hour intervals.
Continuous Sample: A composite of successive individual samples of equal volume taken automatically at equal
intervals not exceeding 15 minutes. Where the term is used in connection with monitoring temperature or pH it means
continuous in-line recording or monitoring at intervals of not more than 15 minutes.
Continuous sample is synonymous with in-line measurements and may apply to flow, temperature, pH, and dissolved
oxygen measurements only. The in-line instrument takes automatic readings at intervals of not more than 15 minutes
during a 24-hour period.
Grab Sample: A single sample taken at one moment of time or a combination of several smaller samples of equal
volume taken in less than a 2-minute period. Where the term is used in connection with monitoring temperature or pH
it means a single measurement.
5.1.4 Recording of Results
The permittee shall maintain records which provide the following information for each effluent measurement or
sample taken:
• The date, exact place, method and time of sampling or measurements;
• The individual who performed the sampling or measurements;
• The date the analysis was performed;
• The individual who performed the analysis;
• The analytical techniques or methods used; and
• The results of the analysis.
5.1.5 Reporting of Monitoring Results
The permittee shall use the following conventions when reporting effluent monitoring results:
• Pollutant concentrations less than the limit of detection shall be reported as < (less than) the value of the limit
of detection. For example, if a substance is not detected at a detection limit of 0.1 mg/L, report the pollutant
concentration as < 0.1 mg/L.
• Pollutant concentrations equal to or greater than the limit of detection, but less than the limit of quantitation,
shall be reported and the limit of quantitation shall be specified.
• For purposes of calculating fees under ch. NR 101, Wis. Adm. Code, a reporting limit of 2.0 mg/L for BOD5
and 2.5 mg/L Total Suspended Solids shall be considered to be limits of quantitation.
• For the purposes of reporting a calculated result, average or a mass discharge value, the permittee may
substitute a “0” (zero) for any pollutant concentration that is less than the limit of detection. However, if the
effluent limitation is less than the limit of detection, the department may substitute a value other than zero for
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
23
results less than the limit of detection, after considering the number of monitoring results that are greater than
the limit of detection and if warranted when applying appropriate statistical techniques.
• If no discharge occurs through an outfall, flow related parameters (e.g. flow rate, hydraulic application rate,
volume, etc.) should be reported as “0” (zero) at the required sample frequency specified for the outfall. For
example: if the sample frequency is daily, “0” would be reported for any day during the month that no
discharge occurred.
5.1.6 Compliance Maintenance Annual Reports
Compliance Maintenance Annual Reports (CMAR) shall be completed using information obtained over each calendar
year regarding the wastewater conveyance and treatment system. The CMAR shall be submitted and certified by the
permittee in accordance with ch. NR 208, Wis. Adm. Code, by June 30, each year on an electronic report form
provided by the Department.
In the case of a publicly owned treatment works, a resolution shall be passed by the governing body and submitted as
part of the CMAR, verifying its review of the report and providing responses as required. Private owners of
wastewater treatment works are not required to pass a resolution; but they must provide an Owner Statement and
responses as required, as part of the CMAR submittal.
The CMAR shall be certified electronically by a responsible executive or municipal officer, manager, partner or
proprietor as specified in s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner
or proprietor that has been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The
certification verifies that the electronic report is true, accurate and complete.
5.1.7 Records Retention
The permittee shall retain records of all monitoring information, including all calibration and maintenance records and
all original strip chart recordings or electronic data records for continuous monitoring instrumentation, copies of all
reports required by the permit, and records of all data used to complete the application for the permit for a period of at
least 3 years from the date of the sample, measurement, report or application. All pertinent sludge information,
including permit application information and other documents specified in this permit or s. NR 204.06(9), Wis. Adm.
Code shall be retained for a minimum of 5 years.
5.1.8 Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in a permit application or submitted
incorrect information in a permit application or in any report to the Department, it shall promptly submit such facts or
correct information to the Department.
5.1.9 Reporting Requirements – Alterations or Additions
The permittee shall give notice to the Department as soon as possible of any planned physical alterations or additions
to the permitted facility. Notice is only required when:
• The alteration or addition to the permitted facility may meet one of the criteria for determining whether a
facility is a new source.
• The alteration or addition could significantly change the nature or increase the quantity of pollutants
discharged. This notification requirement applies to pollutants which are not subject to effluent limitations in
the existing permit.
• The alteration or addition results in a significant change in the permittee’s sludge use or disposal practices,
and such alteration, addition, or change may justify the application of permit conditions that are different from
or absent in the existing permit, including notification of additional use of disposal sites not reported during
the permit application process nor reported pursuant to an approved land application plan. Additional sites
may not be used for the land application of sludge until department approval is received.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
24
5.2 System Operating Requirements
5.2.1 Noncompliance Reporting
Sanitary sewer overflows and sewage treatment facility overflows shall be reported according to the ‘Sanitary Sewer
Overflows and Sewage Treatment Facility Overflows’ section of this permit.
The permittee shall report the following types of noncompliance by a telephone call to the Department's regional
office within 24 hours after becoming aware of the noncompliance:
• Any noncompliance which may endanger health or the environment;
• Any violation of an effluent limitation resulting from a bypass;
• Any violation of an effluent limitation resulting from an upset; and
• Any violation of a maximum discharge limitation for any of the pollutants listed by the Department in the
permit, either for effluent or sludge.
A written report describing the noncompliance shall also be submitted to the Department's regional office within 5
days after the permittee becomes aware of the noncompliance. On a case-by-case basis, the Department may waive
the requirement for submittal of a written report within 5 days and instruct the permittee to submit the written report
with the next regularly scheduled monitoring report. In either case, the written report shall contain a description of the
noncompliance and its cause; the period of noncompliance, including exact dates and times; the steps taken or planned
to reduce, eliminate and prevent reoccurrence of the noncompliance; and if the noncompliance has not been corrected,
the length of time it is expected to continue.
A scheduled bypass approved by the Department under the ‘Scheduled Bypass’ section of this permit shall not be
subject to the reporting required under this section.
NOTE: Section 292.11(2)(a), Wisconsin Statutes, requires any person who possesses or controls a hazardous
substance or who causes the discharge of a hazardous substance to notify the Department of Natural Resources
immediately of any discharge not authorized by the permit. The discharge of a hazardous substance that is not
authorized by this permit or that violates this permit may be a hazardous substance spill. To report a
hazardous substance spill, call DNR's 24-hour HOTLINE at 1-800-943-0003.
5.2.2 Flow Meters
Flow meters shall be calibrated annually, as per s. NR 218.06, Wis. Adm. Code.
5.2.3 Raw Grit and Screenings
All raw grit and screenings shall be disposed of at a properly licensed solid waste facility or picked up by a licensed
waste hauler. If the facility or hauler are located in Wisconsin, then they shall be licensed under chs. NR 500-555,
Wis. Adm. Code.
5.2.4 Sludge Management
All sludge management activities shall be conducted in compliance with ch. NR 204 "Domestic Sewage Sludge
Management", Wis. Adm. Code.
5.2.5 Prohibited Wastes
Under no circumstances may the introduction of wastes prohibited by s. NR 211.10, Wis. Adm. Code, be allowed into
the waste treatment system. Prohibited wastes include those:
• Which create a fire or explosion hazard in the treatment work;
• Which will cause corrosive structural damage to the treatment work;
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
25
• Solid or viscous substances in amounts which cause obstructions to the flow in sewers or interference with the
proper operation of the treatment work;
• Wastewaters at a flow rate or pollutant loading which are excessive over relatively short time periods so as to
cause a loss of treatment efficiency; and
• Changes in discharge volume or composition from contributing industries which overload the treatment
works or cause a loss of treatment efficiency.
5.2.6 Bypass
This condition applies only to bypassing at a sewage treatment facility that is not a scheduled bypass, approved
blending as a specific condition of this permit, a sewage treatment facility overflow or a controlled diversion as
provided in the sections titled ‘Scheduled Bypass’, ‘Blending’ (if approved), ‘SSO’s and Sewage Treatment Facility
Overflows’ and ‘Controlled Diversions’ of this permit. Any other bypass at the sewage treatment facility is prohibited
and the Department may take enforcement action against a permittee for such occurrences under s. 283.89, Wis. Stats.
The Department may approve a bypass if the permittee demonstrates all the following conditions apply:
• The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;
• There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities or adequate
back-up equipment, retention of untreated wastes, reduction of inflow and infiltration, or maintenance during
normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should
have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred
during normal periods of equipment downtime or preventative maintenance. When evaluating feasibility of
alternatives, the department may consider factors such as technical achievability, costs and affordability of
implementation and risks to public health, the environment and, where the permittee is a municipality, the
welfare of the community served; and
• The bypass was reported in accordance with the Noncompliance Reporting section of this permit.
5.2.7 Scheduled Bypass
Whenever the permittee anticipates the need to bypass for purposes of efficient operations and maintenance and the
permittee may not meet the conditions for controlled diversions in the ‘Controlled Diversions’ section of this permit,
the permittee shall obtain prior written approval from the Department for the scheduled bypass. A permittee’s written
request for Department approval of a scheduled bypass shall demonstrate that the conditions for bypassing specified
in the above section titled ‘Bypass’ are met and include the proposed date and reason for the bypass, estimated
volume and duration of the bypass, alternatives to bypassing and measures to mitigate environmental harm caused by
the bypass. The department may require the permittee to provide public notification for a scheduled bypass if it is
determined there is significant public interest in the proposed action and may recommend mitigation measures to
minimize the impact of such bypass.
5.2.8 Controlled Diversions
Controlled diversions are allowed only when necessary for essential maintenance to assure efficient operation.
Sewage treatment facilities that have multiple treatment units to treat variable or seasonal loading conditions may shut
down redundant treatment units when necessary for efficient operation. The following requirements shall be met
during controlled diversions:
• Effluent from the sewage treatment facility shall meet the effluent limitations established in the permit.
Wastewater that is diverted around a treatment unit or treatment process during a controlled diversion shall be
recombined with wastewater that is not diverted prior to the effluent sampling location and prior to effluent
discharge;
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
26
• A controlled diversion does not include blending as defined in s. NR 210.03(2e), Wis. Adm. Code, and as
may only be approved under s. NR 210.12. A controlled diversion may not occur during periods of excessive
flow or other abnormal wastewater characteristics;
• A controlled diversion may not result in a wastewater treatment facility overflow; and
• All instances of controlled diversions shall be documented in sewage treatment facility records and such
records shall be available to the department on request.
5.2.9 Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control which
are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and
maintenance includes effective performance, adequate funding, adequate operator staffing and training as required in
ch. NR 114, Wis. Adm. Code, and adequate laboratory and process controls, including appropriate quality assurance
procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems only when
necessary to achieve compliance with the conditions of the permit.
5.2.10 Operator Certification
The wastewater treatment facility shall be under the direct supervision of a state certified operator. In accordance
with s. NR 114.53, Wis. Adm. Code, every WPDES permitted treatment plant shall have a designated operator-in-
charge holding a current and valid certificate. The designated operator-in-charge shall be certified at the level and in
all subclasses of the treatment plant, except laboratory. Treatment plant owners shall notify the department of any
changes in the operator-in-charge within 30 days. Note that s. NR 114.52(22), Wis. Adm. Code, lists types of facilities
that are excluded from operator certification requirements (i.e. private sewage systems, pretreatment facilities
discharging to public sewers, industrial wastewater treatment that consists solely of land disposal, agricultural
digesters and concentrated aquatic production facilities with no biological treatment).
5.3 Sewage Collection Systems
5.3.1 Sanitary Sewage Overflows and Sewage Treatment Facility Overflows
5.3.1.1 Overflows Prohibited
Any overflow or discharge of wastewater from the sewage collection system or at the sewage treatment facility, other
than from permitted outfalls, is prohibited. The permittee shall provide information on whether any of the following
conditions existed when an overflow occurred:
• The sanitary sewer overflow or sewage treatment facility overflow was unavoidable to prevent loss of life,
personal injury or severe property damage;
• There were no feasible alternatives to the sanitary sewer overflow or sewage treatment facility overflow such
as the use of auxiliary treatment facilities or adequate back-up equipment, retention of untreated wastes,
reduction of inflow and infiltration, or preventive maintenance activities;
• The sanitary sewer overflow or the sewage treatment facility overflow was caused by unusual or severe
weather-related conditions such as large or successive precipitation events, snowmelt, saturated soil
conditions, or severe weather occurring in the area served by the sewage collection system or sewage
treatment facility; and
• The sanitary sewer overflow or the sewage treatment facility overflow was unintentional, temporary, and
caused by an accident or other factors beyond the reasonable control of the permittee.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
27
5.3.1.2 Permittee Response to Overflows
Whenever a sanitary sewer overflow or sewage treatment facility overflow occurs, the permittee shall take all feasible
steps to control or limit the volume of untreated or partially treated wastewater discharged, and terminate the
discharge as soon as practicable. Remedial actions, including those in s. NR 210.21 (3), Wis. Adm. Code, shall be
implemented consistent with an emergency response plan developed under the CMOM program.
5.3.1.3 Permittee Reporting
Permittees shall report all sanitary sewer overflows and sewage treatment overflows as follows:
• The permittee shall notify the department by telephone, fax or email as soon as practicable, but no later than
24 hours from the time the permittee becomes aware of the overflow;
• The permittee shall, no later than five days from the time the permittee becomes aware of the overflow,
provide to the department the information identified in this paragraph using department form number 3400-
184. If an overflow lasts for more than five days, an initial report shall be submitted within 5 days as required
in this paragraph and an updated report submitted following cessation of the overflow. At a minimum, the
following information shall be included in the report:
a) The date and location of the overflow;
b) The surface water to which the discharge occurred, if any;
c) The duration of the overflow and an estimate of the volume of the overflow;
d) A description of the sewer system or treatment facility component from which the discharge occurred
such as manhole, lift station, constructed overflow pipe, or crack or other opening in a pipe;
e) The estimated date and time when the overflow began and stopped or will be stopped;
f) The cause or suspected cause of the overflow including, if appropriate, precipitation, runoff
conditions, areas of flooding, soil moisture and other relevant information;
g) Steps taken or planned to reduce, eliminate and prevent reoccurrence of the overflow and a schedule
of major milestones for those steps;
h) A description of the actual or potential for human exposure and contact with the wastewater from the
overflow;
i) Steps taken or planned to mitigate the impacts of the overflow and a schedule of major milestones for
those steps;
j) To the extent known at the time of reporting, the number and location of building backups caused by
excessive flow or other hydraulic constraints in the sewage collection system that occurred
concurrently with the sanitary sewer overflow and that were within the same area of the sewage
collection system as the sanitary sewer overflow; and
k) The reason the overflow occurred or explanation of other contributing circumstances that resulted in
the overflow event. This includes any information available including whether the overflow was
unavoidable to prevent loss of life, personal injury, or severe property damage and whether there were
feasible alternatives to the overflow.
NOTE: A copy of form 3400-184 for reporting sanitary sewer overflows and sewage treatment
facility overflows may be obtained from the department or accessed on the department’s web site at
http://dnr.wi.gov/topic/wastewater/SSOreport.html. As indicated on the form, additional information
may be submitted to supplement the information required by the form.
• The permittee shall identify each specific location and each day on which a sanitary sewer overflow or
sewage treatment facility overflow occurs as a discrete sanitary sewer overflow or sewage treatment facility
overflow occurrence. An occurrence may be more than one day if the circumstances causing the sanitary
sewer overflow or sewage treatment facility overflow results in a discharge duration of greater than 24 hours.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
28
If there is a stop and restart of the overflow at the same location within 24 hours and the overflow is caused
by the same circumstance, it may be reported as one occurrence. Sanitary sewer overflow occurrences at a
specific location that are separated by more than 24 hours shall be reported as separate occurrences; and
• A permittee that is required to submit wastewater discharge monitoring reports under s. NR 205.07 (1) (r),
Wis. Adm. Code, shall also report all sanitary sewer overflows and sewage treatment facility overflows on
that report.
5.3.1.4 Public Notification
The permittee shall notify the public of any sanitary sewer and sewage treatment facility overflows consistent with its
emergency response plan required under the CMOM (Capacity, Management, Operation and Maintenance) section of
this permit and s. NR 210.23 (4) (f), Wis. Adm. Code. Such public notification shall occur promptly following any
overflow event using the most effective and efficient communications available in the community. At minimum, a
daily newspaper of general circulation in the county(s) and municipality whose waters may be affected by the
overflow shall be notified by written or electronic communication.
5.3.2 Capacity, Management, Operation and Maintenance (CMOM) Program
• The permittee shall have written documentation of the Capacity, Management, Operation and Maintenance
(CMOM) program components in accordance with s. NR 210.23(4), Wis. Adm. Code. Such documentation
shall be available for Department review upon request. The Department may request that the permittee
provide this documentation or prepare a summary of the permittee’s CMOM program at the time of
application for reissuance of the WPDES permit.
• The permittee shall implement a CMOM program in accordance with s. NR 210.23, Wis. Adm. Code.
• The permittee shall at least annually conduct a self-audit of activities conducted under the permittee’s CMOM
program to ensure CMOM components are being implemented as necessary to meet the general standards of
s. NR 210.23(3), Wis. Adm. Code.
5.3.3 Sewer Cleaning Debris and Materials
All debris and material removed from cleaning sanitary sewers shall be managed to prevent nuisances, run-off, ground
infiltration or prohibited discharges.
• Debris and solid waste shall be dewatered, dried and then disposed of at a licensed solid waste facility.
• Liquid waste from the cleaning and dewatering operations shall be collected and disposed of at a permitted
wastewater treatment facility.
• Combination waste including liquid waste along with debris and solid waste may be disposed of at a licensed
solid waste facility or wastewater treatment facility willing to accept the waste.
5.4 Surface Water Requirements
5.4.1 Permittee-Determined Limit of Quantitation Incorporated into this Permit
For pollutants with water quality-based effluent limits below the Limit of Quantitation (LOQ) in this permit, the LOQ
calculated by the permittee and reported on the Discharge Monitoring Reports (DMRs) is incorporated by reference
into this permit. The LOQ shall be reported on the DMRs, shall be the lowest quantifiable level practicable, and shall
be no greater than the minimum level (ML) specified in or approved under 40 CFR Part 136 for the pollutant at the
time this permit was issued, unless this permit specifies a higher LOQ.
5.4.2 Appropriate Formulas for Effluent Calculations
The permittee shall use the following formulas for calculating effluent results to determine compliance with average
concentration limits and mass limits and total load limits:
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
29
Weekly/Monthly/Six-Month/Annual Average Concentration = the sum of all daily results for that week/month/six-
month/year, divided by the number of results during that time period. [Note: When a six-month average effluent limit
is specified for Total Phosphorus the applicable periods are May through October and November through April,
except in cases of Water Quality Trading, wherein the applicable periods are January through June and July through
December.]
Weekly Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x 8.34,
then average the daily mass values for the week.
Monthly Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x 8.34,
then average the daily mass values for the month.
Six-Month Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x
8.34, then average the daily mass values for the six-month period. [Note: When a six-month average effluent limit is
specified for Total Phosphorus the applicable periods are May through October and November through April.]
Annual Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x 8.34,
then average the daily mass values for the entire year.
Total Monthly Discharge: = monthly average concentration (mg/L) x total flow for the month (MG/month) x 8.34.
Total Annual Discharge: = sum of total monthly discharges for the calendar year.
12-Month Rolling Sum of Total Monthly Discharge: = the sum of the most recent 12 consecutive months of Total
Monthly Discharges.
5.4.3 Effluent Temperature Requirements
Weekly Average Temperature – If temperature limits are included in this permit, Weekly Average Temperature
shall be calculated as the sum of all daily maximum results for that week divided by the number of daily maximum
results during that time period.
Cold Shock Standard – Water temperatures of the discharge shall be controlled in a manner as to protect fish and
aquatic life uses from the deleterious effects of cold shock pursuant to Wis. Adm. Code, s. NR 102.28. ‘Cold Shock’
means exposure of aquatic organisms to a rapid decrease in temperature and a sustained exposure to low temperature
that induces abnormal behavior or physiological performance and may lead to death.
Rate of Temperature Change Standard – Temperature of a water of the state or discharge to a water of the state
may not be artificially raised or lowered at such a rate that it causes detrimental health or reproductive effects to fish
or aquatic life of the water of the state pursuant to Wis. Adm. Code, s. NR 102.29.
5.4.4 Visible Foam or Floating Solids
There shall be no discharge of floating solids or visible foam in other than trace amounts.
5.4.5 Surface Water Uses and Criteria
In accordance with NR 102.04, Wis. Adm. Code, surface water uses and criteria are established to govern water
management decisions. Practices attributable to municipal, industrial, commercial, domestic, agricultural, land
development or other activities shall be controlled so that all surface waters including the mixing zone meet the
following conditions at all times and under all flow and water level conditions:
• Substances that will cause objectionable deposits on the shore or in the bed of a body of water, shall not be
present in such amounts as to interfere with public rights in waters of the state.
• Floating or submerged debris, oil, scum or other material shall not be present in such amounts as to interfere
with public rights in waters of the state.
• Materials producing color, odor, taste or unsightliness shall not be present in such amounts as to interfere with
public rights in waters of the state.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
30
• Substances in concentrations or in combinations which are toxic or harmful to humans shall not be present in
amounts found to be of public health significance, nor shall substances be present in amounts which are
acutely harmful to animal, plant or aquatic life.
5.4.6 Percent Removal
During any 30 consecutive days, the average effluent concentrations of BOD5 and of total suspended solids shall not
exceed 15% of the average influent concentrations, respectively. This requirement does not apply to removal of total
suspended solids if the permittee operates a lagoon system and has received a variance for suspended solids granted
under NR 210.07(2), Wis. Adm. Code.
5.4.7 E. coli
The monthly limit for E. coli shall be expressed as a geometric mean. In calculating the geometric mean, a value of 1
is used for any result of 0.
5.4.8 Seasonal Disinfection
Disinfection shall be provided from May 1 through September 30 of each year. Monitoring requirements and the
limitations for Fecal Coliform (interim) and E. coli apply only during the period in which disinfection is required.
Whenever chlorine is used for disinfection or other uses, the limitations and monitoring requirements for residual
chlorine shall apply. A dechlorination process shall be in operation whenever chlorine is used.
5.4.9 Whole Effluent Toxicity (WET) Monitoring Requirements
In order to determine the potential impact of the discharge on aquatic organisms, static-renewal toxicity tests shall be
performed on the effluent in accordance with the procedures specified in the "State of Wisconsin Aquatic Life Toxicity
Testing Methods Manual, 2nd Edition" (PUB-WT-797, November 2004) as required by NR 219.04, Table A, Wis.
Adm. Code). All of the WET tests required in this permit, including any required retests, shall be conducted on the
Ceriodaphnia dubia and fathead minnow species. Receiving water samples shall not be collected from any point in
contact with the permittee's mixing zone and every attempt shall be made to avoid contact with any other discharge's
mixing zone.
5.4.10 Whole Effluent Toxicity (WET) Identification and Reduction
Within 60 days of a retest which showed positive results, the permittee shall submit a written report to the
Biomonitoring Coordinator, Bureau of Water Quality, 101 S. Webster St., PO Box 7921, Madison, WI 53707-7921,
which details the following:
• A description of actions the permittee has taken or will take to remove toxicity and to prevent the recurrence
of toxicity;
• A description of toxicity reduction evaluation (TRE) investigations that have been or will be done to identify
potential sources of toxicity, including the following actions:
a) Evaluate the performance of the treatment system to identify deficiencies contributing to effluent
toxicity (e.g., operational problems, chemical additives, incomplete treatment)
b) Identify the compound(s) causing toxicity. Conduct toxicity screening tests on the effluent at a
minimum of once per month for six months to determine if toxicity recurs. Screening tests are WET
tests using fewer effluent concentrations conducted on the most sensitive species. If any of the
screening tests contain toxicity, conduct a toxicity identification evaluation (TIE) to determine the
cause. TIE methods are available from USEPA “Methods for Aquatic Toxicity Identification
Evaluations: Phase I Toxicity Characterization Procedures (EPA/600/6-91/003) and “Toxicity
Identification Evaluation: Characterization of Chronically Toxic Effluents, Phase I” (EPA/600/6-
91/005F).
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
31
c) Trace the compound(s) causing toxicity to their sources (e.g., industrial, commercial, domestic)
d) Evaluate, select, and implement methods or technologies to control effluent toxicity (e.g., in-plant or
pretreatment controls, source reduction or removal)
• Where corrective actions including a TRE have not been completed, an expeditious schedule under which
corrective actions will be implemented;
• If no actions have been taken, the reason for not taking action.
The permittee may also request approval from the Department to postpone additional retests in order to investigate the
source(s) of toxicity. Postponed retests must be completed after toxicity is believed to have been removed.
5.4.11 PFOS and PFOA Requirements
The laboratory performing the analysis on any samples shall be certified for the applicable PFAS compounds in the
aqueous matrix by the Wisconsin Laboratory Certification Program established under s. 299.11, Wis. Stats., in
accordance with s. NR 149.41, Wis. Adm. Code. All laboratories are required to utilize EPA Method 1633A for
sampling PFAS in sludge.
The Department may reject any sample results if results are produced by a laboratory that is not in compliance with
certification requirements under ch. NR 149, Wis. Adm. Code.
5.5 Land Application Requirements
5.5.1 Sludge Management Program Standards And Requirements Based Upon
Federally Promulgated Regulations
In the event that new federal sewage sludge standards or regulations are promulgated, the permittee shall comply with
the new sewage sludge requirements by the dates established in the regulations, if required by federal law, even if the
permit has not yet been modified to incorporate the new federal regulations.
5.5.2 General Sludge Management Information
The General Sludge Management Form 3400-48 shall be completed and submitted prior to any significant sludge
management changes.
5.5.3 Sludge Samples
All sludge samples shall be collected at a point and in a manner which will yield sample results which are
representative of the sludge being tested, and collected at the time which is appropriate for the specific test.
5.5.4 Land Application Characteristic Report
Each report shall consist of a Characteristic Form 3400-49 and Lab Report. The Characteristic Report Form 3400-49
shall be submitted electronically by January 31 following each year whether or not samples are analyzed. In years in
which monitoring does not occur, the report shall be completed by checking on the form that monitoring/land
application did not occur.
Following submittal of the electronic Characteristic Report Form 3400-49, this form shall be certified electronically
via the ‘eReport Certify’ page by a responsible executive or municipal officer, manager, partner or proprietor as
specified in s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner or proprietor
that has been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The ‘eReport Certify’
page certifies that the electronic report is true, accurate and complete. The Lab Report must be sent directly to the
facility’s DNR sludge representative or basin engineer unless approval for not submitting the lab reports has been
given.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
32
The permittee shall use the following convention when reporting sludge monitoring results: Pollutant concentrations
less than the limit of detection shall be reported as < (less than) the value of the limit of detection. For example, if a
substance is not detected at a detection limit of 1.0 mg/kg, report the pollutant concentration as < 1.0 mg/kg .
All results shall be reported on a dry weight basis.
5.5.5 Calculation of Water Extractable Phosphorus
When sludge analysis for Water Extractable Phosphorus is required by this permit, the permittee shall use the
following formula to calculate and report Water Extractable Phosphorus:
Water Extractable Phosphorus (% of Total P) =
[Water Extractable Phosphorus (mg/kg, dry wt) ÷ Total Phosphorus (mg/kg, dry wt)] x 100
5.5.6 Monitoring and Calculating PCB Concentrations in Sludge
When sludge analysis for “PCB, Total Dry Wt” is required by this permit, the PCB concentration in the sludge shall
be determined using either congener-specific analysis or Aroclor analysis. The permittee may decide which of these
analyses is performed. Analyses shall be performed in accordance with the following provisions and Table EM in s.
NR 219.04, Wis. Adm. Code:
• If congener-specific analysis is employed: All PCB congeners shall be delineated. Non-detects shall be treated
as zero. The values that are between the limit of detection (LOD) and the limit of quantitation shall be used
when calculating the total value of all congeners. All results shall be added together and the total PCB
concentration by dry weight reported.
• If Aroclor analysis is employed, reporting protocols, consistent with s. NR 106.07(6)(e), should be as follows:
If all Aroclors are less than the LOD, then the Total PCB Dry Wt result should be reported as less than the
highest LOD. If a single Aroclor is detected, then that is what should be reported for the Total PCB result. If
multiple Aroclors are detected, they should be summed and reported as Total PCBs. If the LOD cannot be
achieved after using the appropriate clean up techniques, a reporting limit that is achievable for the Aroclors
or each congener for the sample shall be determined. This reporting limit shall be reported and qualified
indicating the presence of an interference.
5.5.7 Annual Land Application Report
Land Application Report Form 3400-55 shall be submitted electronically by January 31, each year whether or not
non-exceptional quality sludge is land applied. Non-exceptional quality sludge is defined in s. NR 204.07(4), Wis.
Adm. Code. Following submittal of the electronic Annual Land Application Report Form 3400-55, this form shall be
certified electronically via the ‘eReport Certify’ page by a responsible executive or municipal officer, manager,
partner or proprietor as specified in s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer,
manager, partner or proprietor that has been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm.
Code. The ‘eReport Certify’ page certifies that the electronic report form is true, accurate and complete.
5.5.8 Other Methods of Disposal or Distribution Report
The permittee shall submit electronically the Other Methods of Disposal or Distribution Report Form 3400-52 by
January 31, each year whether or not sludge is hauled, landfilled, incinerated, or exceptional quality sludge is
distributed or land applied. Following submittal of the electronic Report Form 3400-52, this form shall be certified
electronically via the ‘eReport Certify’ page by a responsible executive or municipal officer, manager, partner or
proprietor as specified in s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner
or proprietor that has been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The
‘eReport Certify’ page certifies that the electronic report form is true, accurate and complete.
5.5.9 Approval to Land Apply
Bulk non-exceptional quality sludge as defined in s. NR 204.07(4), Wis. Adm. Code, may not be applied to land
without a written approval letter or Form 3400-122 from the Department unless the Permittee has obtained permission
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
33
from the Department to self-approve sites in accordance with s. NR 204.06(6), Wis. Adm. Code. Analysis of sludge
characteristics is required prior to land application. Application on frozen or snow-covered ground is restricted to the
extent specified in s. NR 204.07(3)(l), Wis. Adm. Code.
5.5.10 Soil Analysis Requirements
Each site requested for approval for land application must have the soil tested prior to use. Each approved site used
for land application must subsequently be soil tested such that there is at least one valid soil test in the four years prior
to land application. All soil sampling and submittal of information to the testing laboratory shall be done in
accordance with UW Extension Bulletin A-2100. The testing shall be done by the UW Soils Lab in Madison or
Marshfield, WI or at a lab approved by UW. The test results including the crop recommendations shall be submitted
to the DNR contact listed for this permit, as they are available. Application rates shall be determined based on the
crop nitrogen recommendations and with consideration for other sources of nitrogen applied to the site.
5.5.11 Land Application Site Evaluation
For non-exceptional quality sludge, as defined in s. NR 204.07(4), Wis. Adm. Code, a Land Application Site Request
Form 3400-053 shall be submitted to the Department for the proposed land application site. The Department will
evaluate the proposed site for acceptability and will either approve or deny use of the proposed site. The permittee
may obtain permission to approve their own sites in accordance with s. NR 204.06(6), Wis. Adm. Code.
5.5.12 Sludge Hauling
The permittee is required to submit Form 3400-52 to the Department. If sludge is hauled to another facility,
information shall include the quantity of sludge hauled, the name, address, phone number, contact person, and permit
number of the receiving facility. Form 3400-52 shall be submitted annually by January 31 each year whether or not
sludge is hauled.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
34
6 Summary of Reports Due
FOR INFORMATIONAL PURPOSES ONLY
Description Date Page
Water Quality Trading (WQT) Annual Report -Annual WQT Report January 31, 2027 18
Water Quality Trading (WQT) Annual Report -Annual WQT Report #2 January 31, 2028 18
Water Quality Trading (WQT) Annual Report -Annual WQT Report #3 January 31, 2029 18
Water Quality Trading (WQT) Annual Report -Annual WQT Report #4 January 31, 2030 18
Water Quality Trading (WQT) Annual Report -Annual WQT Report #5 January 31, 2031 18
Water Quality Trading (WQT) Annual Report -Annual WQT Report
Required After Permit Expiration
See Permit 18
Temperature Monitoring -Complete Installation December 31, 2026 18
Temperature Monitoring -Achieve Compliance January 1, 2027 19
Dissipative Cooling Evaluation -Report on Effluent Discharges December 31, 2028 19
PFOS/PFOA Minimization Plan Determination of Need -Report on Effluent
Discharge
July 1, 2027 19
PFOS/PFOA Minimization Plan Determination of Need -Report on Effluent
Discharge and Evaluation of Need
July 1, 2028 19
Land Application Management Plan -Land Application Management Plan
Submittal
See Permit 20
Compliance Maintenance Annual Reports (CMAR) by June 30, each year 23
General Sludge Management Form 3400-48 prior to any
significant sludge
management changes
31
Characteristic Form 3400-49 and Lab Report by January 31
following each year
whether or not
samples are analyzed
31
Land Application Report Form 3400-55 by January 31, each
year whether or not
non-exceptional
quality sludge is land
applied
32
Other Methods of Disposal or Distribution Report Form 3400-52 by January 31, each
year whether or not
sludge is hauled,
landfilled,
incinerated, or
exceptional quality
sludge is distributed
or land applied
32
Wastewater Discharge Monitoring Report no later than the date
indicated on the form
21
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
35
Report forms shall be submitted electronically in accordance with the reporting requirements herein. Any facility
plans or plans and specifications for municipal, industrial, industrial pretreatment and non industrial wastewater
systems shall be submitted to the Bureau of Water Quality, P.O. Box 7921, Madison, WI 53707-7921. All other
submittals required by this permit shall be submitted to: Central Office, 101 S Webster St, P.O. Box 7921, Madison,
WI 53707-7921.
WPDES Permit No. WI-0020788-11-0
WPDES PERMIT
STATE OF WISCONSIN
DEPARTMENT OF NATURAL RESOURCES
PERMIT TO DISCHARGE UNDER THE WISCONSIN POLLUTANT DISCHARGE
ELIMINATION SYSTEM
VILLAGE OF CROSS PLAINS
is permitted, under the authority of Chapter 283, Wisconsin Statutes, to discharge from a facility
located at
1000 MAIN STREET (USH 14), CROSS PLAINS, WISCONSIN
to
BLACK EARTH CREEK WATERSHED, LW17 LOWER WISCONSIN RIVER
BASIN) IN DANE COUNTY
in accordance with the effluent limitations, monitoring requirements and other conditions set
forth in this permit.
The permittee shall not discharge after the date of expiration. If the permittee wishes to continue to discharge after
this expiration date an application shall be filed for reissuance of this permit, according to Chapter NR 200, Wis.
Adm. Code, at least 180 days prior to the expiration date given below.
State of Wisconsin Department of Natural Resources
For the Secretary
By _________________________
Lisa Creegan
Wastewater Field Supervisor
_________________________
Date Permit Signed/Issued
PERMIT TERM: EFFECTIVE DATE - August 01, 2026 EXPIRATION DATE - June 30, 2031
07/23/2026
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
TABLE OF CONTENTS
1 INFLUENT REQUIREMENTS 1
1.1 SAMPLING POINT(S) 1
1.2 MONITORING REQUIREMENTS 1
1.2.1 Sampling Point 701 - INFLUENT 1
2 SURFACE WATER REQUIREMENTS 2
2.1 SAMPLING POINT(S) 2
2.2 MONITORING REQUIREMENTS AND EFFLUENT LIMITATIONS 2
2.2.1 Sampling Point (Outfall) 001 - EFFLUENT 2
3 LAND APPLICATION REQUIREMENTS 11
3.1 SAMPLING POINT(S) 11
3.2 MONITORING REQUIREMENTS AND LIMITATIONS 11
3.2.1 Sampling Point (Outfall) 002 - HAULED SLUDGE 11
4 SCHEDULES 18
4.1 WATER QUALITY TRADING (WQT) ANNUAL REPORT 18
4.2 TEMPERATURE MONITORING 18
4.3 DISSIPATIVE COOLING EVALUATION 19
4.4 PFOS/PFOA MINIMIZATION PLAN DETERMINATION OF NEED 19
4.5 LAND APPLICATION MANAGEMENT PLAN 20
5 STANDARD REQUIREMENTS 21
5.1 REPORTING AND MONITORING REQUIREMENTS 21
5.1.1 Monitoring Results 21
5.1.2 Sampling and Testing Procedures 21
5.1.3 Sample Types 21
5.1.4 Recording of Results 22
5.1.5 Reporting of Monitoring Results 22
5.1.6 Compliance Maintenance Annual Reports 23
5.1.7 Records Retention 23
5.1.8 Other Information 23
5.1.9 Reporting Requirements – Alterations or Additions 23
5.2 SYSTEM OPERATING REQUIREMENTS 24
5.2.1 Noncompliance Reporting 24
5.2.2 Flow Meters 24
5.2.3 Raw Grit and Screenings 24
5.2.4 Sludge Management 24
5.2.5 Prohibited Wastes 24
5.2.6 Bypass 25
5.2.7 Scheduled Bypass 25
5.2.8 Controlled Diversions 25
5.2.9 Proper Operation and Maintenance 26
5.2.10 Operator Certification 26
5.3 SEWAGE COLLECTION SYSTEMS 26
5.3.1 Sanitary Sewage Overflows and Sewage Treatment Facility Overflows 26
5.3.2 Capacity, Management, Operation and Maintenance (CMOM) Program 28
5.3.3 Sewer Cleaning Debris and Materials 28
5.4 SURFACE WATER REQUIREMENTS 28
5.4.1 Permittee-Determined Limit of Quantitation Incorporated into this Permit 28
5.4.2 Appropriate Formulas for Effluent Calculations 28
5.4.3 Effluent Temperature Requirements 29
5.4.4 Visible Foam or Floating Solids 29
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
5.4.5 Surface Water Uses and Criteria 29
5.4.6 Percent Removal 30
5.4.7 E. coli 30
5.4.8 Seasonal Disinfection 30
5.4.9 Whole Effluent Toxicity (WET) Monitoring Requirements 30
5.4.10 Whole Effluent Toxicity (WET) Identification and Reduction 30
5.4.11 PFOS and PFOA Requirements 31
5.5 LAND APPLICATION REQUIREMENTS 31
5.5.1 Sludge Management Program Standards And Requirements Based Upon Federally Promulgated Regulations 31
5.5.2 General Sludge Management Information 31
5.5.3 Sludge Samples 31
5.5.4 Land Application Characteristic Report 31
5.5.5 Calculation of Water Extractable Phosphorus 32
5.5.6 Monitoring and Calculating PCB Concentrations in Sludge 32
5.5.7 Annual Land Application Report 32
5.5.8 Other Methods of Disposal or Distribution Report 32
5.5.9 Approval to Land Apply 32
5.5.10 Soil Analysis Requirements 33
5.5.11 Land Application Site Evaluation 33
5.5.12 Sludge Hauling 33
6 SUMMARY OF REPORTS DUE 34
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
1
1 Influent Requirements
1.1 Sampling Point(s)
Sampling Point Designation
Sampling
Point
Number
Sampling Point Location, Waste Type/Sample Contents and Treatment Description (as
applicable)
701 Influent: 24-hour flow proportional composite sampler located immediately prior to influent Parshall
flume at the influent wet well prior to mechanical screening.
1.2 Monitoring Requirements
The permittee shall comply with the following monitoring requirements.
1.2.1 Sampling Point 701 - INFLUENT
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Flow Rate MGD Daily Continuous
BOD5, Total mg/L 3/Week 24-Hr Flow
Prop Comp
Suspended Solids,
Total
mg/L 3/Week 24-Hr Flow
Prop Comp
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
2
2 Surface Water Requirements
2.1 Sampling Point(s)
Sampling Point Designation
Sampling
Point
Number
Sampling Point Location, Waste Type/Sample Contents and Treatment Description (as
applicable)
001 Effluent: 24-hour Flow Proportional Composite sampler located prior to UV disinfection, with grab
samples obtained after the cascade aerator prior to discharge to Black Earth Creek. Flow is measured by
ultrasonic meter and Parshall flume after UV disinfection prior to aeration and discharge.
2.2 Monitoring Requirements and Effluent Limitations
The permittee shall comply with the following monitoring requirements and limitations.
2.2.1 Sampling Point (Outfall) 001 - EFFLUENT
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Flow Rate MGD Daily Continuous
BOD5, Total Weekly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
BOD5, Total Weekly Avg 34 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
BOD5, Total Monthly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
BOD5, Total Monthly Avg 30 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
BOD5, Total Weekly Avg 112.5 lbs/day 3/Week Calculated May through October
BOD5, Total Weekly Avg 168.9 lbs/day 3/Week Calculated November through April
Suspended Solids,
Total
Weekly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
Suspended Solids,
Total
Weekly Avg 34 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
Suspended Solids,
Total
Monthly Avg 23 mg/L 3/Week 24-Hr Flow
Prop Comp
May through October
Suspended Solids,
Total
Monthly Avg 30 mg/L 3/Week 24-Hr Flow
Prop Comp
November through April
Suspended Solids,
Total
Weekly Avg 112.5 lbs/day 3/Week Calculated May through October
Suspended Solids,
Total
Weekly Avg 168.9 lbs/day 3/Week Calculated November through April
pH Field Daily Max 9.0 su 5/Week Grab
pH Field Daily Min 6.0 su 5/Week Grab
Dissolved Oxygen Daily Min 7.0 mg/L 5/Week Grab
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
3
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Nitrogen, Ammonia
(NH3-N) Total
Daily Max 16 mg/L 3/Week 24-Hr Flow
Prop Comp
Nitrogen, Ammonia
(NH3-N) Total
Weekly Avg 16 mg/L 3/Week 24-Hr Flow
Prop Comp
May through September
Nitrogen, Ammonia
(NH3-N) Total
Weekly Avg 14 mg/L 3/Week 24-Hr Flow
Prop Comp
October through April
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 6.5 mg/L 3/Week 24-Hr Flow
Prop Comp
October through April
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 11 mg/L 3/Week 24-Hr Flow
Prop Comp
May
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 10 mg/L 3/Week 24-Hr Flow
Prop Comp
June
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 8.9 mg/L 3/Week 24-Hr Flow
Prop Comp
July
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 9.5 mg/L 3/Week 24-Hr Flow
Prop Comp
August
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 12 mg/L 3/Week 24-Hr Flow
Prop Comp
September
E. coli Geometric
Mean -
Monthly
126 #/100 ml Weekly Grab Limit Effective May
through September
annually.
E. coli % Exceedance 10 Percent Monthly Calculated Limit Effective May
through September
annually. See the E. coli
Percent Limit section. Enter
the result in the DMR on
the last day of the month.
Chloride mg/L Monthly 24-Hr Flow
Prop Comp
January through December
2030
PFOS ng/L 1/ 2 Months Grab Monitoring only. See
PFOS/PFOA Minimization
Plan Determination of Need
schedule.
PFOA ng/L 1/ 2 Months Grab Monitoring only. See
PFOS/PFOA Minimization
Plan Determination of Need
schedule.
Temperature
Maximum
deg F Daily Continuous Monitoring effective
January 1, 2027 as per
Temperature Monitoring
schedule.
Phosphorus, Total Monthly Avg 1.0 mg/L 3/Week 24-Hr Flow
Prop Comp
Limit effective throughout
the permit term.
Phosphorus, Total lbs/day 3/Week Calculated Report daily mass
discharged using Equation
1a. in the Water Quality
Trading (WQT) section.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
4
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
WQT Credits Used
(TP)
lbs/month Monthly Calculated Report WQT TP Credits
used per month using
Equation 2c. in the Water
Quality Trading (WQT)
section. Available TP
Credits are specified in
Table 2 and in the approved
Water Quality Trading
Plan.
WQT Computed
Compliance (TP)
Monthly Avg 0.33 mg/L Monthly Calculated Report the WQT TP
Computed Compliance
value using Equation 3a. in
the Water Quality Trading
(WQT) section. Value
entered on the last day of
the month.
WQT Computed
Compliance (TP)
Monthly Avg 1.6 lbs/day Monthly Calculated Report the WQT TP
Computed Compliance
value using Equation 3b. in
the Water Quality Trading
(WQT) section. Value
entered on the last day of
the month.
WQT Credits Used
(TP)
Annual Total 122.8 lbs/yr Annual Calculated The sum of total monthly
credits used may not exceed
Table 2 values listed.
Nitrogen, Total
Kjeldahl
mg/L See Listed
Qtr(s)
24-Hr Flow
Prop Comp
Annual in rotating quarters.
See Nitrogen Series
Monitoring section.
Nitrogen, Nitrite +
Nitrate Total
mg/L See Listed
Qtr(s)
24-Hr Flow
Prop Comp
Annual in rotating quarters.
See Nitrogen Series
Monitoring section.
Nitrogen, Total mg/L See Listed
Qtr(s)
Calculated Annual in rotating quarters.
See Nitrogen Series
Monitoring section below.
Total Nitrogen shall be
calculated as the sum of
reported values for Total
Kjeldahl Nitrogen and
Total Nitrite + Nitrate
Nitrogen.
Acute WET TUa See Listed
Qtr(s)
24-Hr Flow
Prop Comp
See Whole Effluent
Toxicity (WET) sections
for monitoring dates and
WET requirements.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
5
Monitoring Requirements and Effluent Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Chronic WET Monthly Avg 2.3 TUc See Listed
Qtr(s)
24-Hr Flow
Prop Comp
See Whole Effluent
Toxicity (WET) sections
for monitoring dates and
WET requirements.
2.2.1.1 Annual Average Design Flow
The annual average design flow of the permittee’s wastewater treatment facility is 0.593 MGD.
2.2.1.2 pH – Grab Sample Analyses
When pH Field limit(s) or monitoring are included in a permit, the permittee shall comply with the following
conditions:
• The permittee shall perform pH testing required in this permit using an approved method from ch. NR 219,
Wis. Adm. Code, Table B,
• The permittee shall utilize a pH probe/meter that incorporates and uses automatic temperature compensation,
• The permittee shall analyze pH samples as soon as possible after collection not to exceed 15 minutes (this
may mean transporting samples to an offsite laboratory is not an option), and
• The permittee shall calibrate the pH probe/meter daily, using unexpired 4, 7, and 10 buffers prior to use.
2.2.1.3 Dissolved Oxygen (DO) – Grab Sample Analyses
When dissolved oxygen (DO) grab limit(s) or monitoring are included in a permit, the permittee shall comply with the
following conditions:
• The permittee shall perform DO testing required in this permit using an approved method from ch. NR 219,
Wis. Adm. Code, Table B,
• The permittee shall utilize a DO probe/meter that incorporates and uses automatic temperature compensation,
• The permittee shall set the barometric pressure on the DO meter to local elevation and not sea level,
• The permittee shall analyze DO samples as soon as possible after collection not to exceed 15 minutes (this
may mean transporting samples to an offsite laboratory is not an option), and
• The permittee shall calibrate the DO probe/meter daily prior to use.
2.2.1.4 E. coli Percent Limit
No more than 10 percent of E. coli bacteria samples collected in any calendar month may exceed 410 #/100 ml.
Bacteria samples may be collected more frequently than required. All samples shall be reported on the monthly
discharge monitoring reports (DMRs). The following calculation should be used to calculate percent exceedances.
2.2.1.5 PFOS/PFOA Sampling and Reporting Requirements
For grab samples, as defined per s. NR 218.04(10), Wis. Adm. Code, a single sample at a location as defined by the
sample point description shall be taken during the time of the day most representative to capture all potential
discharges. If extra equipment besides the sample bottle is used to collect the sample, it is recommended that a one-
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
6
time equipment blank is collected with the first sample. An equipment blank would be collected by passing
laboratory-verified PFAS-free water over or through field sampling equipment before the collection of a grab sample
to evaluate potential contamination from the equipment used during sample.
If any equipment blanks are performed, these results shall be reported in the comments section of the eDMR and shall
also be documented in the reports submitted as part of the PFOS/PFOA Minimization Plan Determination of Need
schedule of the permit.
2.2.1.6 PFOS/PFOA Minimization Plan Determination of Need
The permittee shall monitor PFOS and PFOA as specified in the table above and report on the effluent concentrations
including trends in monthly and annual average PFOS and PFOA concentrations as specified in the PFOS/PFOA
Minimization Plan Determination of Need Schedule.
If, after reviewing the data, the Department determines that a minimization plan for PFOS and PFOA is necessary
based on the procedures in s. NR 106.98(4), Wis. Adm. Code, the Department will notify the permittee in writing that
a PFOS and PFOA minimization plan that satisfies the requirements in s. NR 106.99, Wis. Adm. Code, is required.
The permittee shall submit an initial plan for Department approval no later than 90 days after written notification was
sent from the Department in accordance with s. NR 106.985(2)(a), Wis. Adm. Code. Pursuant to s. NR 106.985(2)(b),
Wis. Adm. Code, as soon as possible after Department approval of the PFOS and PFOA minimization plan, the
Department will modify or revoke and reissue the permit in accordance with public notice procedures under ch. 283,
Wis. Stats., and ch. NR 203, Wis. Adm. Code, to include the PFOS and PFOA minimization plan and other related
terms and condition.
If, however, the Department determines that a PFOS and PFOA minimization plan is unnecessary based on the
procedures in s. NR 106.98(4), Wis. Adm. Code, the Department shall notify the permittee that no further action is
required. Per s. NR 106.98(3)(a), Wis. Adm. Code, the Department may reduce monitoring frequency to once every 3
months (quarterly) on a case-by-case basis, but only after at least 12 representative results have been generated. If the
permittee requests a reduction in monitoring and the Department agrees a reduction would be appropriate, the permit
may be modified in accordance with public notice procedures under ch. 283, Wis. Stats., and ch. NR 203, Wis. Adm.
Code, to incorporate this change.
2.2.1.7 Effluent Temperature Monitoring
For monitoring temperature continuously, collect measurements in accordance with s. NR 218.04(13), Wis. Code.
This means that discrete measurements shall be recorded at intervals of not more than 15 minutes during the 24-hour
period. Report the maximum temperature measured during the day on the DMR.
2.2.1.8 Phosphorus Water Quality Trading (WQT)
The permittee may use water quality trading to demonstrate compliance with WQBELs for total phosphorus (TP) of
0.33 mg/L and 1.6 lbs/day as a monthly average. Pollutant reduction credits for total phosphorus are available as
specified in Water Quality Trading Plan WQT-2025-0015 or approved amendments thereof.
Table 2. Available Phosphorus Credits per WQT-2025-0015
Year
Available Phosphorus
Credits (lbs/yr) –
Total
2026 122.8
2027 122.8
2028 122.8
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
7
2029 122.8
2030 122.8
2031* 122.8
*In the event that this permit expires and is administratively continued beyond the year(s) specified in the above table, 122.8
lbs/yr of credit will be available in subsequent years until the permit is reissued, modified, or revoked.
Only those pollutant reduction credits established by a water quality trading plan approved by the Department may be
used by the permittee to demonstrate compliance with the WQBELs identified in this subsection. If the permittee
wishes to use pollutant reduction credits not identified in an approved water quality trading plan, the permittee must
amend the plan or develop a new plan and obtain Department approval of the amended or new plan prior to use of the
new pollutant reduction credits. Prior to Department approval, the amended or new water quality trading plan will be
subject to notice and opportunity for public comment. Any change in the number of available credits requires a permit
modification.
In the event pollutant reduction credits as defined in the approved water quality trading plan are no longer generated,
the permittee shall comply with the WQBELs for total phosphorus contained in this subsection. The quantity of
credits specified in Table 2 may be used to demonstrate compliance for a given year.
2.2.1.9 Demonstrating Compliance with TP WQBELs Using Water Quality Trading
Use the following methods to demonstrate compliance with the TP WQBELs contained in the Water Quality Trading
subsection above.
TOTAL POLLUTANT DISCHARGED (TP)
Use the following equations to calculate the amount of pollutant discharged for Monthly Avg TP [lbs/day].
TP Discharged [lbs/day] = TP Discharged [mg/L] × Daily Flow [MGD] × 8.34 (Eq. 1a.)
Monthly or Weekly Avg = Ʃ daily results ÷ # of results (Eq. 1b.)
WQT CREDITS USED (TOTAL PHOSPHORUS)
Use the following method to calculate the credits to be used expressed as a mass in lbs/month:
WQT TP Credits Needed [lbs/day] = (Monthly Avg TP [mg/L] – 0.33 [mg/L]) × Monthly Avg Flow [MGD] × 8.34
(Eq. 2a.)
WQT TP Credits Needed [lbs/day] = Monthly Avg TP [lbs/day] – 1.6 lbs/day (Eq. 2b.)
When the “Monthly Avg TP” discharged is greater than both 0.33 mg/L and 1.6 lbs/day, select the greater of the two
values from Equation 2a or 2b to be used in Equation 2c below.
Note: When the TP discharge is less than 0.33 mg/L AND 1.6 lbs/day as a monthly avg, report 0 (zero) as the “WQT
Credits Used (TP)”.
WQT TP Credits Used [lbs/month] = WQT TP Credits Needed [lbs/day] × # of days of discharge/month (Eq. 2c.)
WQT COMPUTED COMPLIANCE (TOTAL PHOSPHORUS)
Use the following method to demonstrate compliance with TP WQBELs expressed as a concentration in mg/L:
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
8
WQT TP Computed Compliance [mg/L] = Monthly Avg TP [mg/L] – [WQT TP Credits Needed [lbs/day]* ÷ (Monthly Avg
Flow [MGD] × 8.34)] (Eq. 3a.)
*Greater of either Equation 2a or 2b, the value used for Equation 2c.
Use the following method to demonstrate compliance with TP WQBELs expressed as a mass in lbs/day:
WQT TP Computed Compliance [lbs/day] = Monthly Avg TP [lbs/day] – WQT TP Credits Needed [lbs/day]**
(Eq. 3b.)
**Greater of either Equation 2a or 2b, the value used for Equation 2c.
Negative computed compliance values should be entered as zero - “0”.
2.2.1.10 Additional Water Quality Trading Requirements
When using water quality trading to demonstrate compliance with WQBELs for TP, the permittee shall comply with
the following:
• Failure to implement any of the terms or conditions of the approved water quality trading plan is a violation of this
permit.
• Each month the permittee shall certify that the nonpoint source management practices installed to generate pollutant
reduction credits are operated and maintained in a manner consistent with that specified in the approved water quality
trading plan. Such a certification may be made by including the following statement as a comment on the monthly
discharge monitoring report:
I certify that management practices identified in the approved water quality trading plan as the source of
pollutant reduction credits are installed, established and properly maintained.
• At least once a year the permittee or the permittee’s agent shall inspect each nonpoint source management practice
that generates pollutant reduction credits to confirm the implementation of the management practice and their
appropriate operation and adequate maintenance.
• The permittee shall notify WDNR by telephone within 24 hours or next business day of becoming aware that
pollutant reduction credits used or intended for use by the permittee are not being implemented or generated as
defined in the approved trading plan. A written notification shall be submitted to the Department within 5 days
regarding the status of the permittee’s pollutant reduction credits.
• The permittee shall provide WDNR written notice within 7 days of the trade agreement upon which the approved
water quality trading plan is based being amended, modified, or revoked. This notification shall include the details of
any amendment or modification in addition to the justification for the changes.
• The permittee shall not use pollutant reduction credits for the demonstration of compliance when pollutant reduction
credits are not being generated.
2.2.1.11 Water Quality Trading Reopener Clause
Under any of the following conditions as provided by s. 283.53(2), Wis. Stats. and ss. NR 203.135 and 203.136, Wis.
Code, the Department may modify or revoke and reissue this permit to modify or eliminate permit terms and
conditions related to water quality trading:
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
9
• The permittee fails to implement the water quality trading plan as approved;
• The permittee fails to comply with permit terms and conditions related to water quality trading;
• New information becomes available that would change the number of credits available for the water quality trade or
would change the Department’s determinations that water quality trading is an acceptable option.
2.2.1.12 Submittal of Permit Application for Next Reissuance and Pollutant Trading Plan
The permittee shall submit the permit application for the next reissuance at least 6 months prior to expiration of this
permit.
The permittee has submitted a Water Quality Trading Plan that was approved by WDNR on July 15, 2025. If the
permittee intends to pursue pollutant trading to achieve compliance in a future permit term, an updated water quality
trading plan is due with the application for the next reissuance. If system upgrades will be used in combination with
pollutant trading the permittee shall submit plans for any system upgrade.
2.2.1.13 Nitrogen Series Monitoring
Monitoring for Total Kjeldahl Nitrogen (TKN), Nitrite + Nitrate Nitrogen, and Total Nitrogen shall be conducted
once each year in rotating quarters in order to collect seasonal information about the discharge. Tests are required
during the following quarters.
• July – September 2027; October – December 2028; January – March 2029; April – June 2030; January
– March 2031
Nitrogen Series monitoring shall continue after the permit expiration date (until the permit is reissued) in accordance
with the monitoring requirements specified in the last full calendar year of this permit. For example, the next test
would be required in April – June 2032.
Testing: Monitoring shall be performed during normal operating conditions. Permittees are not allowed to turn off or
otherwise modify treatment systems, production processes, or change other operating or treatment conditions during
testing.
2.2.1.14 Whole Effluent Toxicity (WET) Testing
Primary Control Water for Acute Tests: Synthetic (standard) laboratory water
Primary Control Water for Chronic Tests: The receiving water (Black Earth Creek) is to be used as the dilution
water and primary control for chronic WET tests, unless the use of different dilution water is approved by the
Department prior to use. The dilution water used in WET tests conducted on Outfall 001 shall be a grab sample
collected from the receiving water location, upstream and out of the influence of the mixing zone and any other
known discharge.
Primary Control Water for Chronic Tests: Black Earth Creek
Instream Waste Concentration (IWC): 43%
Dilution Series: At least five effluent concentrations and dual controls must be included in each test.
• Acute: 100, 50, 25, 12.5, 6.25% and any additional selected by the permittee.
• Chronic: 100, 75, 50, 25, 12.5% and any additional selected by the permittee.
WET Testing Frequency:
Acute tests are required during the following quarters:
• Acute: October – December 2028; April – June 2030
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
10
Acute WET testing shall continue after the permit expiration date (until the permit is reissued) in accordance
with the WET requirements specified for the last full calendar year of this permit. For example, the next test
would be required April – June 2032.
Chronic tests are required during the following quarters:
• Chronic: July – September 2027; October – December 2028; January – March 2029; April – June
2030; January – March 2031
Chronic WET testing shall continue after the permit expiration date (until the permit is reissued) in accordance
with the WET requirements specified for the last full calendar year of this permit. For example, the next test
would be required April 1 – June 30, 2032.
Testing: WET testing shall be performed during normal operating conditions. Permittees are not allowed to turn off
or otherwise modify treatment systems, production processes, or change other operating or treatment conditions
during WET tests.
Reporting: The permittee shall report test results on the Discharge Monitoring Report form, and also complete the
"Whole Effluent Toxicity Test Report Form" (Section 6, "State of Wisconsin Aquatic Life Toxicity Testing Methods
Manual, 2nd Edition"), for each test. The original, complete, signed version of the Whole Effluent Toxicity Test
Report Form shall be sent to the Biomonitoring Coordinator, Bureau of Water Quality, 101 S. Webster St., P.O. Box
7921, Madison, WI 53707-7921, within 45 days of test completion. The Discharge Monitoring Report (DMR) form
shall be submitted electronically by the required deadline.
Determination of Positive Results: An acute toxicity test shall be considered positive if the Toxic Unit - Acute (TUa)
is greater than 1.0 for either species (fathead minnow (Pimephales promelas) and waterflea (Ceriodaphnia dubia)).
The TUa shall be calculated as follows: TUa = 100 ÷ LC50. A chronic toxicity test shall be considered positive if the
Toxic Unit - Chronic (TUc) is greater than 2.3 for either species. The TUc shall be calculated as follows: TUc = 100 ÷
IC25.
Additional Testing Requirements: Within 90 days of a test which showed positive results, the permittee shall
submit the results of at least 2 retests to the Biomonitoring Coordinator on "Whole Effluent Toxicity Test Report
Forms". The 90-day reporting period shall begin the day after the test which showed a positive result. The retests shall
be completed using the same species and test methods specified for the original test (see the Standard Requirements
section herein).
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
11
3 Land Application Requirements
3.1 Sampling Point(s)
The discharge(s) shall be limited to land application of the waste type(s) designated for the listed sampling point(s) on
Department approved land spreading sites or by hauling to another facility.
Sampling Point Designation
Sampling
Point
Number
Sampling Point Location, Waste Type/Sample Contents and Treatment Description (as
applicable)
002 Aerobically digested, Dewatered, Cake, Class B, Representative sludge samples shall be collected from
the discharge of the gravity belt thickener.
3.2 Monitoring Requirements and Limitations
The permittee shall comply with the following monitoring requirements and limitations.
3.2.1 Sampling Point (Outfall) 002 - HAULED SLUDGE
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Solids, Total Percent Annual Composite
Arsenic Dry Wt Ceiling 75 mg/kg Annual Composite
Arsenic Dry Wt High Quality 41 mg/kg Annual Composite
Cadmium Dry Wt Ceiling 85 mg/kg Annual Composite
Cadmium Dry Wt High Quality 39 mg/kg Annual Composite
Copper Dry Wt Ceiling 4,300 mg/kg Annual Composite
Copper Dry Wt High Quality 1,500 mg/kg Annual Composite
Lead Dry Wt Ceiling 840 mg/kg Annual Composite
Lead Dry Wt High Quality 300 mg/kg Annual Composite
Mercury Dry Wt Ceiling 57 mg/kg Annual Composite
Mercury Dry Wt High Quality 17 mg/kg Annual Composite
Molybdenum Dry Wt Ceiling 75 mg/kg Annual Composite
Nickel Dry Wt Ceiling 420 mg/kg Annual Composite
Nickel Dry Wt High Quality 420 mg/kg Annual Composite
Selenium Dry Wt Ceiling 100 mg/kg Annual Composite
Selenium Dry Wt High Quality 100 mg/kg Annual Composite
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
12
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Zinc Dry Wt Ceiling 7,500 mg/kg Annual Composite
Zinc Dry Wt High Quality 2,800 mg/kg Annual Composite
Nitrogen, Total
Kjeldahl
Percent Annual Composite Monitoring only required if
land application occurs.
Nitrogen, Ammonium
(NH4-N) Total
Percent Annual Composite Monitoring only required if
land application occurs.
Phosphorus, Total Percent Annual Composite Monitoring only required if
land application occurs.
Phosphorus, Water
Extractable
% of Tot P Annual Composite Monitoring only required if
land application occurs.
Potassium, Total
Recoverable
Percent Annual Composite Monitoring only required if
land application occurs.
PCB Total Dry Wt Ceiling 50 mg/kg Once Composite Once in 2028
PCB Total Dry Wt High Quality 10 mg/kg Once Composite Once in 2028
PFOA + PFOS g/kg Annual Calculated Report the sum of PFOA
and PFOS. See PFAS
permit sections for more
information.
PFAS Dry Wt Annual Grab Perfluoroalkyl and
Polyfluoroalkyl Substances
based on updated DNR
PFAS List. See PFAS
Permit Sections for more
information.
Other Sludge Requirements
Sludge Requirements Sample Frequency
List 3 Requirements – Pathogen Control: The requirements in List
3 shall be met prior to land application of sludge.
Annual
List 4 Requirements – Vector Attraction Reduction: The vector
attraction reduction shall be satisfied prior to, or at the time of land
application as specified in List 4.
Annual
3.2.1.1 List 2 Analysis
If the monitoring frequency for List 2 parameters is more frequent than "Annual" then the sludge may be analyzed for
the List 2 parameters just prior to each land application season rather than at the more frequent interval specified.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
13
3.2.1.2 Changes in Feed Sludge Characteristics
If a change in feed sludge characteristics, treatment process, or operational procedures occurs which may result in a
significant shift in sludge characteristics, the permittee shall reanalyze the sludge for List 1, 2, 3 and 4 parameters
each time such change occurs.
3.2.1.3 Multiple Sludge Sample Points (Outfalls)
If there are multiple sludge sample points (outfalls), but the sludges are not subject to different sludge treatment
processes, then a separate List 2 analysis shall be conducted for each sludge type which is land applied, just prior to
land application, and the application rate shall be calculated for each sludge type. In this case, List 1, 3, and 4 and
PCBs need only be analyzed on a single sludge type, at the specified frequency. If there are multiple sludge sample
points (outfalls), due to multiple treatment processes, List 1, 2, 3 and 4 and PCBs shall be analyzed for each sludge
type at the specified frequency.
3.2.1.4 Sludge Which Exceeds the High Quality Limit
Cumulative pollutant loading records shall be kept for all bulk land application of sludge which does not meet the
high quality limit for any parameter. This requirement applies for the entire calendar year in which any exceedance of
Table 3 of s. NR 204.07(5)(c), Wis. Adm. Code, is experienced. Such loading records shall be kept for all List 1
parameters for each site land applied in that calendar year. The formula to be used for calculating cumulative loading
is as follows:
[(Pollutant concentration (mg/kg) x dry tons applied/ac) ÷ 500] + previous loading (lbs/acre) = cumulative lbs
pollutant per acre
When a site reaches 90% of the allowable cumulative loading for any metal established in Table 2 of s. NR
204.07(5)(b), Wis. Adm. Code, the Department shall be so notified through letter or in the comment section of the
annual land application report (3400-55).
3.2.1.5 Sludge Analysis for PCBs
The permittee shall analyze the sludge for Total PCBs one time during 2028. The results shall be reported as "PCB
Total Dry Wt". Either congener-specific analysis or Aroclor analysis shall be used to determine the PCB
concentration. The permittee may determine whether Aroclor or congener specific analysis is performed. Analyses
shall be performed in accordance with Table EM in s. NR 219.04, Wis. Adm. Code and the conditions specified in
Standard Requirements of this permit. PCB results shall be submitted by January 31, following the specified year of
analysis.
3.2.1.6 Lists 1, 2, 3, and 4
List 1
TOTAL SOLIDS AND METALS
See the Monitoring Requirements and Limitations table above for monitoring frequency and limitations for the
List 1 parameters
Solids, Total (percent)
Arsenic, mg/kg (dry weight)
Cadmium, mg/kg (dry weight)
Copper, mg/kg (dry weight)
Lead, mg/kg (dry weight)
Mercury, mg/kg (dry weight)
Molybdenum, mg/kg (dry weight)
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
14
List 1
TOTAL SOLIDS AND METALS
See the Monitoring Requirements and Limitations table above for monitoring frequency and limitations for the
List 1 parameters
Nickel, mg/kg (dry weight)
Selenium, mg/kg (dry weight)
Zinc, mg/kg (dry weight)
List 2
NUTRIENTS
See the Monitoring Requirements and Limitations table above for monitoring frequency for the List 2 parameters
Solids, Total (percent)
Nitrogen Total Kjeldahl (percent)
Nitrogen Ammonium (NH4-N) Total (percent)
Phosphorus Total as P (percent)
Phosphorus, Water Extractable (as percent of Total P)
Potassium Total Recoverable (percent)
List 3
PATHOGEN CONTROL FOR CLASS B SLUDGE
The permittee shall implement pathogen control as listed in List 3. The Department shall be notified of the pathogen
control utilized and shall be notified when the permittee decides to utilize alternative pathogen control.
The following requirements shall be met prior to land application of sludge.
Parameter Unit Limit
Fecal Coliform*
MPN/gTS or
CFU/gTS 2,000,000
OR, ONE OF THE FOLLOWING PROCESS OPTIONS
Aerobic Digestion Air Drying
Anaerobic Digestion Composting
Alkaline Stabilization PSRP Equivalent Process
* The Fecal Coliform limit shall be reported as the geometric mean of 7 discrete samples on a dry weight basis.
List 4
VECTOR ATTRACTION REDUCTION
The permittee shall implement any one of the vector attraction reduction options specified in List 4. The Department
shall be notified of the option utilized and shall be notified when the permittee decides to utilize an alternative option.
One of the following shall be satisfied prior to, or at the time of land application as specified in List 4.
Option Limit Where/When it Shall be Met
Volatile Solids Reduction 38% Across the process
Specific Oxygen Uptake Rate 1.5 mg O2/hr/g TS On aerobic stabilized sludge
Anaerobic bench-scale test <17 % VS reduction On anaerobic digested sludge
Aerobic bench-scale test <15 % VS reduction On aerobic digested sludge
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
15
List 4
VECTOR ATTRACTION REDUCTION
The permittee shall implement any one of the vector attraction reduction options specified in List 4. The Department
shall be notified of the option utilized and shall be notified when the permittee decides to utilize an alternative option.
One of the following shall be satisfied prior to, or at the time of land application as specified in List 4.
Option Limit Where/When it Shall be Met
Aerobic Process >14 days, Temp >40C and
Avg. Temp > 45C
On composted sludge
pH adjustment >12 S.U. (for 2 hours)
and >11.5
(for an additional 22 hours)
During the process
Drying without primary solids >75 % TS When applied or bagged
Drying with primary solids >90 % TS When applied or bagged
Equivalent
Process
Approved by the Department Varies with process
Injection - When applied
Incorporation - Within 6 hours of application
3.2.1.7 Daily Land Application Log
Daily Land Application Log
Discharge Monitoring Requirements and Limitations
The permittee shall maintain a daily land application log for biosolids land applied each day when land application
occurs. The following minimum records must be kept, in addition to all analytical results for the biosolids land
applied. The log book records shall form the basis for the annual land application report requirements.
Parameters Units Sample
Frequency
DNR Site Number(s) Number Daily as used
Outfall number applied Number Daily as used
Acres applied Acres Daily as used
Amount applied As appropriate * /day Daily as used
Application rate per acre unit */acre Daily as used
Nitrogen applied per acre lb/acre Daily as used
Method of Application Injection, Incorporation, or surface
applied
Daily as used
*gallons, cubic yards, dry US Tons or dry Metric Tons
3.2.1.8 Sludge Monitoring for PFAS
Sampling shall occur for perfluoroalkyl and polyfluoroalkyl compounds (PFAS) listed in the table below and as
indicated in sampling point sections above. Monitoring shall occur at each sample point when sludge is generated
regardless of the end use (i.e. land applied, hauled to another facility, landfilled).
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
16
PERFLUOROALKYLCARBOXILIC Acids (PFCAs)
PFBA Perfluorobutanoic acid
PFPeA Perfluroropentanoic acid
PFHxA Perfluorohexanoic acid
PFHpA Perfluoroheptanoic acid
PFOA Perfluorooctanoic acid
PFNA Perfluorononanoic acid
PFDA Perfluorodecanoic acid
PFUnA Perfluroroundecanoic acid
PFDoA Perfluorododecanoic acid
PFTrDA Perfluorotridecanoic acid
PFTeDA Perfluorotetradecanoic acid
PERFLUOROALKYLSULFONIC Acids (PFSAs)
PFBS Perfluorobutane sulfonic acid
PFPeS Perfluroropentane sulfonic acid
PFHxS Perfluorohexane sulfonic acid
PFHpS Perfluoroheptane sulfonic acid
PFOS Perfluorooctane sulfonic acid
PFNS Perfluorononane sulfonic acid
PFDS Perfluorodecane sulfonic acid
PFDoS Perfluorododecane sulfonic acid
TELOMER SULFONIC Acids
4:2FTSA 1H,1H,2H,2H-Perfluorohexane sulfonic acid
6:2FTSA 1H,1H,2H,2H-Perfluorooctane sulfonic acid
8:2FTSA 1H,1H,2H,2H-Perfluorodecane sulfonic acid
PERFLUOROOCTANCESULFONAMIDES (FOSAs)
PFOSA Perfluroroctane sulfonamide
NMeFOSA N-Methyl perfluoroocatane sulfonamide
NEtFOSA N-Ethyl perfluorooctane sulfonamide
PERFLUOROOCTANCESULFONAMIDOACETIC Acids
NMeFOSAA N-Methyl perfluoroocatane sulfonamidoacetic acid
NEtFOSAA N-Ethyl perfluorooctane sulfonamidoacetic acid
NATIVE PERFLUOROOCTANCESULFONAMIDOETHANOLS (FOSEs)
NMeFOSE N-Methyl perfluorooctane sulfonamideoethanol
NEtFOSE N-Ethyl perfluorooctane sulfonamidoethanol
PERFLUOROALKYLETHERCARBOXYLIC Acids (PFECAs)
HFPO-DA Hexafluoropropylene oxide dimer acid
ADONA 4,8-dioxa-3H-perfluorononanoic acid
PFMPA Perfluoro-3-methoxypropanoic acid
PFMBA Perfluoro-4-methoxybutanoic acid
NFDHA Nonafluoro-3,6-dioxaheptaoic acid
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
17
CHLORO-PERFLUOROALKYLSULFONATE
9Cl-PF3ONS 9-chloroehexadecafluoro-3-oxanone-1-sulfonic acid
11Cl-PF3OUdS 11-chloroelcosafluoro-3-oxaundecane-1-sulfonic acid
PFEESA Perfluroro(2-ethoxyethane)sulfonic acid
TELOMER SULFONIC Acids
3:3FTCA 3-Perfluoropropyl propanoic acid
5:3FTCA 2H,2H,3H,3H-Perfluorooctanoic acid
7:3FTCA 3-Perfluoroheptyl propanoic acid
Note: If WDNR Lab Certification removes a particular compound from the reporting list above and upon receiving
written communication from the department, reporting for that compound is no longer required.
3.2.1.9 Sampling and Reporting Sludge Samples for PFAS
Representative sludge samples shall be collected at each sample point as listed. At minimum, liquid sludge
storage/digesters should be thoroughly mixed prior to sampling. Cake sludge samples should consist of seven equal
size discrete samples and be collected from different areas and depths then composited into one sample for laboratory
analysis.
Note: If additional equipment is used for collecting sludge samples (i.e., shovels, compositing buckets, bottles, etc.),
then a one-time equipment blank is recommended to be collected with the first sample. An equipment blank sample is
collected by passing laboratory verified PFAS-free water over or through field sampling equipment before the
collection of a representative sludge sample. The equipment blank result shall be reported on the annual Sludge
Characteristics Form (3400-049) in the comment section when reporting PFAS concentrations in the sludge.
The permittee shall report each of the PFAS sludge monitoring results on the annual Sludge Characteristics and
Monitoring Form (3400-049) as provided by the department. The permittee shall also report the summation of PFOS
and PFOA on this same form. All results shall be reported in dry weight. The annual Sludge Characteristics and
Monitoring Form (3400-049) are due January 31, of the year following the collection of the sludge samples.
The laboratory performing the analysis on any samples shall be certified for the applicable PFAS compounds in the
solids matrix by the Wisconsin Laboratory Certification Program established under s. 299.11, Wis. Stats., and in
accordance with s. NR 149.41, Wis. Adm. Code. The department may reject any sample results if results are produced
by a laboratory that is not in compliance with certification requirements under ch. NR 149, Wis. Adm. Code.
3.2.1.10 PFAS Land Application Requirements
The department recommends the landspreading and/or land application of sludge be done in a manner consistent with
the most recent version of the “Interim Strategy for Land Application of Biosolids and Industrial Sludges containing
PFAS”.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
18
4 Schedules
4.1 Water Quality Trading (WQT) Annual Report
Required Action Due Date
Annual WQT Report: Submit an annual WQT report that shall cover the previous year. The WQT
Report shall include:
The number of pollutant reduction credits (lbs/month) used each month of the previous year to
demonstrate compliance;
The source of each month’s pollutant reduction credits by identifying the approved water quality
trading plan that details the source;
A summary of the annual inspection of each nonpoint source management practice that generated any
of the pollutant reduction credits used during the previous year; and
Identification of noncompliance or failure to implement any terms or conditions of this permit with
respect to water quality trading that have not been reported in discharge monitoring reports.
01/31/2027
Annual WQT Report #2: Submit an annual WQT report that shall cover the previous year. 01/31/2028
Annual WQT Report #3: Submit an annual WQT report that shall cover the previous year. 01/31/2029
Annual WQT Report #4: Submit an annual WQT report that shall cover the previous year. 01/31/2030
Annual WQT Report #5: Submit the 5th annual WQT report. If the permittee wishes to continue to
comply with phosphorus limits through WQT in subsequent permit terms, the permittee shall submit
a revised WQT plan including a demonstration of credit need, compliance record of the existing
WQT, and any additional practices needed to maintain compliance over time.
01/31/2031
Annual WQT Report Required After Permit Expiration: In the event that this permit is not
reissued by the expiration date, the permittee shall continue to submit annual WQT reports by
January 31 each year covering the total number of pollutant credits used, the source of the pollution
reduction credits, a summary of annual inspection reports performed, and identification of
noncompliance or failure to implement any terms or conditions of the approved water quality trading
plan for the previous calendar year.
4.2 Temperature Monitoring
Required Action Due Date
Complete Installation: Complete installation of a temperature monitoring and data logging device at
the outfall 001 sample point capable of monitoring effluent temperature continuously as defined in
Table B in ss. NR 219 and s. NR 218.04(13), Wis. Adm. Code.
12/31/2026
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
19
Achieve Compliance: Begin monitoring effluent temperature continuously at the outfall 001 sample
point.
01/01/2027
4.3 Dissipative Cooling Evaluation
This schedule requires the permittee to conduct a dissipative cooling evaluation by the specified due date.
Required Action Due Date
Report on Effluent Discharges: Submit a dissipative cooling evaluation on effluent temperature
with conclusions regarding compliance. Dissipative cooling study must be conducted in the month of
October during the second year of the permit term and submitted to the Department by the listed due
date. Informational Note: Refer to the Surface Water subsections regarding 'Determination of Need
for Effluent Limits' and 'Dissipative Cooling Demonstration - Weekly Average Limits' concerning
requests for a Department determination on the need for limits and follow-up procedures for
demonstration of dissipative cooling per NR 106.59, as well as re-evaluation of the limits pursuant to
NR 106 Subchapters V & VI or NR 102.26, Wis. Adm. Code.
12/31/2028
4.4 PFOS/PFOA Minimization Plan Determination of Need
Required Action Due Date
Report on Effluent Discharge: Submit a report on effluent PFOS and PFOA concentrations and
include an analysis of trends in monthly and annual average PFOS and PFOA concentrations. This
analysis should also include a comparison to the applicable narrative standard in s. NR 102.04(8)(d),
Wis. Adm. Code.
This report shall include all additional PFOS and PFOA data that may be collected including any
influent, intake, in-plant, collection system sampling, and blank sample results.
07/01/2027
Report on Effluent Discharge and Evaluation of Need: Submit a final report on effluent PFOS and
PFOA concentrations and include an analysis of trends in monthly and annual average PFOS and
PFOA concentrations of data collected over the last 24 months. The report shall also provide a
comparison on the likelihood of the facility needing to develop a PFOS/PFOA minimization plan.
This report shall include all additional PFOS and PFOA data that may be collected including any
influent, intake, in-plant, collection system sampling, and blank sample results.
The permittee shall also submit a request to the department to evaluate the need for a PFOS/PFOA
minimization plan.
If the Department determines a PFOS/PFOA minimization plan is needed based on a reasonable
potential evaluation, the permittee will be required to develop a minimization plan for Department
approval no later than 90 days after written notification was sent from the Department. The
Department will modify or revoke and reissue the permit to include PFOS/PFOA minimization plan
reporting requirements along with a schedule of compliance to meet WQBELs. Effluent monitoring
of PFOS and PFOA shall continue as specified in the permit until the modified permit is issued.
If, however, the Department determines there is no reasonable potential for the facility to discharge
PFOS or PFOA above the narrative standard in s. NR 102.04(8)(d), Wis. Adm. Code, no further
action is required and effluent monitoring of PFOS and PFOA shall continue as specified in the
permit.
07/01/2028
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
20
4.5 Land Application Management Plan
A management plan is required for the land application system if sludge is land applied by permittee instead of hauled
to another facility.
Required Action Due Date
Land Application Management Plan Submittal: Submit a management plan to optimize the land
application system performance and demonstrate compliance with ch. NR 204, Wis. Adm. Code. This
management plan shall 1) specify information on pretreatment processes (if any); 2) identify land
application sites; 3) describe site limitations; 4) address vegetative cover management and removal;
5) specify availability of storage; 6) describe the type of transporting and spreading vehicle(s); 7)
specify monitoring procedures; 8) track site loading; 9) address contingency plans for adverse
weather and odor/nuisance abatement; and 10) include any other pertinent information. Once
approved, all landspreading activities shall be conducted in accordance with the plan. Any changes
to the plan must be approved by the Department prior to implementing the changes. Plan shall be
submitted 60 days prior to land application.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
21
5 Standard Requirements
Chapter NR 205, Wisconsin Administrative Code: The conditions in ss. NR 205.07(1) and NR 205.07(2), Wis.
Adm. Code, are included by reference in this permit. The permittee shall comply with all of these requirements. Some
of these requirements are outlined in the Standard Requirements section of this permit. Requirements not specifically
outlined in the Standard Requirement section of this permit can be found in ss. NR 205.07(1) and NR 205.07(2), Wis.
Adm. Code.
5.1 Reporting and Monitoring Requirements
5.1.1 Monitoring Results
Monitoring results obtained during the previous month shall be summarized and reported on a Department
Wastewater Discharge Monitoring Report. The report may require reporting of any or all of the information specified
below under ‘Recording of Results’. This report is to be returned to the Department no later than the date indicated on
the form. A copy of the Wastewater Discharge Monitoring Report Form or an electronic file of the report shall be
retained by the permittee.
Monitoring results shall be reported on an electronic discharge monitoring report (eDMR). The eDMR shall be
certified electronically by a responsible executive or municipal officer, manager, partner or proprietor as specified in
s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner or proprietor that has
been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The ‘eReport Certify’ page
certifies that the electronic report form is true, accurate and complete.
If the permittee monitors any pollutant more frequently than required by this permit, the results of such monitoring
shall be included on the Wastewater Discharge Monitoring Report pursuant s. NR 205.07(1)(r)2., Wis. Adm. Code.
For the purpose of meeting sampling frequency requirements, a week is defined as a calendar week, which begins on
Sunday and ends on Saturday. The calendar week shall be used as the basis for reporting monitoring data on discharge
monitoring reports.
The permittee shall comply with all limits for each parameter regardless of monitoring frequency. For example,
monthly, weekly, and/or daily limits shall be met even with monthly monitoring. The permittee may monitor more
frequently than required for any parameter.
5.1.2 Sampling and Testing Procedures
Sampling and laboratory testing procedures shall be performed in accordance with Chapters NR 218 and NR 219,
Wis. Adm. Code, and completed by a laboratory certified or registered in accordance with the requirements of ch. NR
149, Wis. Adm. Code. Groundwater sampling shall be performed in accordance with procedures contained in s. NR
140.16, Wis. Adm. Code, and the WDNR publications, Groundwater Sampling Desk Reference (PUBL-DG-037-96)
and Groundwater Sampling Field Manual (PUBL-DG-038-96). The analytical methodologies used shall enable the
laboratory to quantitate all substances for which monitoring is required at levels below the effluent limitation and/or
groundwater standard. If the required level cannot be met by any of the methods available in ch. NR 219, Wis. Adm.
Code, then the method with the lowest limit of detection shall be selected. Additional test procedures may be specified
in this permit.
5.1.3 Sample Types
The permittee shall use the following definitions from s. NR 218.04, Wis. Adm. Code as prescribed in the WPDES
permit for the appropriate method and manner of obtaining samples:
24-hour Composite Sample: A combination of individual samples taken at intervals of not more than one hour such
that the volumes of each of the individual samples and of the combination are proportional to the volumes of flow
during each interval and during the 24-hour period respectively.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
22
• 24-hour Flow Proportional Composite Sample: A combination of individual grab samples taken over a 24-
hr period, where the individual grab samples are of equal volume and taken at intervals after a specified
volume of discharge has occurred.
• 24-hour Time Proportional Composite Sample: A combination of individual grab samples taken over a 24-
hr period, where the individual grab samples are of equal volume and taken at consistent intervals not
exceeding 15 minutes.
Composite Sample: A combination of individual samples of equal volume taken at approximately equal intervals not
exceeding one hour over a specified period of time.
• 3-hr Composite Sample: A combination of three (3) individual grab samples of equal volume taken at one-
hour intervals.
Continuous Sample: A composite of successive individual samples of equal volume taken automatically at equal
intervals not exceeding 15 minutes. Where the term is used in connection with monitoring temperature or pH it means
continuous in-line recording or monitoring at intervals of not more than 15 minutes.
Continuous sample is synonymous with in-line measurements and may apply to flow, temperature, pH, and dissolved
oxygen measurements only. The in-line instrument takes automatic readings at intervals of not more than 15 minutes
during a 24-hour period.
Grab Sample: A single sample taken at one moment of time or a combination of several smaller samples of equal
volume taken in less than a 2-minute period. Where the term is used in connection with monitoring temperature or pH
it means a single measurement.
5.1.4 Recording of Results
The permittee shall maintain records which provide the following information for each effluent measurement or
sample taken:
• The date, exact place, method and time of sampling or measurements;
• The individual who performed the sampling or measurements;
• The date the analysis was performed;
• The individual who performed the analysis;
• The analytical techniques or methods used; and
• The results of the analysis.
5.1.5 Reporting of Monitoring Results
The permittee shall use the following conventions when reporting effluent monitoring results:
• Pollutant concentrations less than the limit of detection shall be reported as < (less than) the value of the limit
of detection. For example, if a substance is not detected at a detection limit of 0.1 mg/L, report the pollutant
concentration as < 0.1 mg/L.
• Pollutant concentrations equal to or greater than the limit of detection, but less than the limit of quantitation,
shall be reported and the limit of quantitation shall be specified.
• For purposes of calculating fees under ch. NR 101, Wis. Adm. Code, a reporting limit of 2.0 mg/L for BOD5
and 2.5 mg/L Total Suspended Solids shall be considered to be limits of quantitation.
• For the purposes of reporting a calculated result, average or a mass discharge value, the permittee may
substitute a “0” (zero) for any pollutant concentration that is less than the limit of detection. However, if the
effluent limitation is less than the limit of detection, the department may substitute a value other than zero for
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
23
results less than the limit of detection, after considering the number of monitoring results that are greater than
the limit of detection and if warranted when applying appropriate statistical techniques.
• If no discharge occurs through an outfall, flow related parameters (e.g. flow rate, hydraulic application rate,
volume, etc.) should be reported as “0” (zero) at the required sample frequency specified for the outfall. For
example: if the sample frequency is daily, “0” would be reported for any day during the month that no
discharge occurred.
5.1.6 Compliance Maintenance Annual Reports
Compliance Maintenance Annual Reports (CMAR) shall be completed using information obtained over each calendar
year regarding the wastewater conveyance and treatment system. The CMAR shall be submitted and certified by the
permittee in accordance with ch. NR 208, Wis. Adm. Code, by June 30, each year on an electronic report form
provided by the Department.
In the case of a publicly owned treatment works, a resolution shall be passed by the governing body and submitted as
part of the CMAR, verifying its review of the report and providing responses as required. Private owners of
wastewater treatment works are not required to pass a resolution; but they must provide an Owner Statement and
responses as required, as part of the CMAR submittal.
The CMAR shall be certified electronically by a responsible executive or municipal officer, manager, partner or
proprietor as specified in s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner
or proprietor that has been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The
certification verifies that the electronic report is true, accurate and complete.
5.1.7 Records Retention
The permittee shall retain records of all monitoring information, including all calibration and maintenance records and
all original strip chart recordings or electronic data records for continuous monitoring instrumentation, copies of all
reports required by the permit, and records of all data used to complete the application for the permit for a period of at
least 3 years from the date of the sample, measurement, report or application. All pertinent sludge information,
including permit application information and other documents specified in this permit or s. NR 204.06(9), Wis. Adm.
Code shall be retained for a minimum of 5 years.
5.1.8 Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in a permit application or submitted
incorrect information in a permit application or in any report to the Department, it shall promptly submit such facts or
correct information to the Department.
5.1.9 Reporting Requirements – Alterations or Additions
The permittee shall give notice to the Department as soon as possible of any planned physical alterations or additions
to the permitted facility. Notice is only required when:
• The alteration or addition to the permitted facility may meet one of the criteria for determining whether a
facility is a new source.
• The alteration or addition could significantly change the nature or increase the quantity of pollutants
discharged. This notification requirement applies to pollutants which are not subject to effluent limitations in
the existing permit.
• The alteration or addition results in a significant change in the permittee’s sludge use or disposal practices,
and such alteration, addition, or change may justify the application of permit conditions that are different from
or absent in the existing permit, including notification of additional use of disposal sites not reported during
the permit application process nor reported pursuant to an approved land application plan. Additional sites
may not be used for the land application of sludge until department approval is received.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
24
5.2 System Operating Requirements
5.2.1 Noncompliance Reporting
Sanitary sewer overflows and sewage treatment facility overflows shall be reported according to the ‘Sanitary Sewer
Overflows and Sewage Treatment Facility Overflows’ section of this permit.
The permittee shall report the following types of noncompliance by a telephone call to the Department's regional
office within 24 hours after becoming aware of the noncompliance:
• Any noncompliance which may endanger health or the environment;
• Any violation of an effluent limitation resulting from a bypass;
• Any violation of an effluent limitation resulting from an upset; and
• Any violation of a maximum discharge limitation for any of the pollutants listed by the Department in the
permit, either for effluent or sludge.
A written report describing the noncompliance shall also be submitted to the Department's regional office within 5
days after the permittee becomes aware of the noncompliance. On a case-by-case basis, the Department may waive
the requirement for submittal of a written report within 5 days and instruct the permittee to submit the written report
with the next regularly scheduled monitoring report. In either case, the written report shall contain a description of the
noncompliance and its cause; the period of noncompliance, including exact dates and times; the steps taken or planned
to reduce, eliminate and prevent reoccurrence of the noncompliance; and if the noncompliance has not been corrected,
the length of time it is expected to continue.
A scheduled bypass approved by the Department under the ‘Scheduled Bypass’ section of this permit shall not be
subject to the reporting required under this section.
NOTE: Section 292.11(2)(a), Wisconsin Statutes, requires any person who possesses or controls a hazardous
substance or who causes the discharge of a hazardous substance to notify the Department of Natural Resources
immediately of any discharge not authorized by the permit. The discharge of a hazardous substance that is not
authorized by this permit or that violates this permit may be a hazardous substance spill. To report a
hazardous substance spill, call DNR's 24-hour HOTLINE at 1-800-943-0003.
5.2.2 Flow Meters
Flow meters shall be calibrated annually, as per s. NR 218.06, Wis. Adm. Code.
5.2.3 Raw Grit and Screenings
All raw grit and screenings shall be disposed of at a properly licensed solid waste facility or picked up by a licensed
waste hauler. If the facility or hauler are located in Wisconsin, then they shall be licensed under chs. NR 500-555,
Wis. Adm. Code.
5.2.4 Sludge Management
All sludge management activities shall be conducted in compliance with ch. NR 204 "Domestic Sewage Sludge
Management", Wis. Adm. Code.
5.2.5 Prohibited Wastes
Under no circumstances may the introduction of wastes prohibited by s. NR 211.10, Wis. Adm. Code, be allowed into
the waste treatment system. Prohibited wastes include those:
• Which create a fire or explosion hazard in the treatment work;
• Which will cause corrosive structural damage to the treatment work;
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
25
• Solid or viscous substances in amounts which cause obstructions to the flow in sewers or interference with the
proper operation of the treatment work;
• Wastewaters at a flow rate or pollutant loading which are excessive over relatively short time periods so as to
cause a loss of treatment efficiency; and
• Changes in discharge volume or composition from contributing industries which overload the treatment
works or cause a loss of treatment efficiency.
5.2.6 Bypass
This condition applies only to bypassing at a sewage treatment facility that is not a scheduled bypass, approved
blending as a specific condition of this permit, a sewage treatment facility overflow or a controlled diversion as
provided in the sections titled ‘Scheduled Bypass’, ‘Blending’ (if approved), ‘SSO’s and Sewage Treatment Facility
Overflows’ and ‘Controlled Diversions’ of this permit. Any other bypass at the sewage treatment facility is prohibited
and the Department may take enforcement action against a permittee for such occurrences under s. 283.89, Wis. Stats.
The Department may approve a bypass if the permittee demonstrates all the following conditions apply:
• The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;
• There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities or adequate
back-up equipment, retention of untreated wastes, reduction of inflow and infiltration, or maintenance during
normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should
have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred
during normal periods of equipment downtime or preventative maintenance. When evaluating feasibility of
alternatives, the department may consider factors such as technical achievability, costs and affordability of
implementation and risks to public health, the environment and, where the permittee is a municipality, the
welfare of the community served; and
• The bypass was reported in accordance with the Noncompliance Reporting section of this permit.
5.2.7 Scheduled Bypass
Whenever the permittee anticipates the need to bypass for purposes of efficient operations and maintenance and the
permittee may not meet the conditions for controlled diversions in the ‘Controlled Diversions’ section of this permit,
the permittee shall obtain prior written approval from the Department for the scheduled bypass. A permittee’s written
request for Department approval of a scheduled bypass shall demonstrate that the conditions for bypassing specified
in the above section titled ‘Bypass’ are met and include the proposed date and reason for the bypass, estimated
volume and duration of the bypass, alternatives to bypassing and measures to mitigate environmental harm caused by
the bypass. The department may require the permittee to provide public notification for a scheduled bypass if it is
determined there is significant public interest in the proposed action and may recommend mitigation measures to
minimize the impact of such bypass.
5.2.8 Controlled Diversions
Controlled diversions are allowed only when necessary for essential maintenance to assure efficient operation.
Sewage treatment facilities that have multiple treatment units to treat variable or seasonal loading conditions may shut
down redundant treatment units when necessary for efficient operation. The following requirements shall be met
during controlled diversions:
• Effluent from the sewage treatment facility shall meet the effluent limitations established in the permit.
Wastewater that is diverted around a treatment unit or treatment process during a controlled diversion shall be
recombined with wastewater that is not diverted prior to the effluent sampling location and prior to effluent
discharge;
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
26
• A controlled diversion does not include blending as defined in s. NR 210.03(2e), Wis. Adm. Code, and as
may only be approved under s. NR 210.12. A controlled diversion may not occur during periods of excessive
flow or other abnormal wastewater characteristics;
• A controlled diversion may not result in a wastewater treatment facility overflow; and
• All instances of controlled diversions shall be documented in sewage treatment facility records and such
records shall be available to the department on request.
5.2.9 Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control which
are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and
maintenance includes effective performance, adequate funding, adequate operator staffing and training as required in
ch. NR 114, Wis. Adm. Code, and adequate laboratory and process controls, including appropriate quality assurance
procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems only when
necessary to achieve compliance with the conditions of the permit.
5.2.10 Operator Certification
The wastewater treatment facility shall be under the direct supervision of a state certified operator. In accordance
with s. NR 114.53, Wis. Adm. Code, every WPDES permitted treatment plant shall have a designated operator-in-
charge holding a current and valid certificate. The designated operator-in-charge shall be certified at the level and in
all subclasses of the treatment plant, except laboratory. Treatment plant owners shall notify the department of any
changes in the operator-in-charge within 30 days. Note that s. NR 114.52(22), Wis. Adm. Code, lists types of facilities
that are excluded from operator certification requirements (i.e. private sewage systems, pretreatment facilities
discharging to public sewers, industrial wastewater treatment that consists solely of land disposal, agricultural
digesters and concentrated aquatic production facilities with no biological treatment).
5.3 Sewage Collection Systems
5.3.1 Sanitary Sewage Overflows and Sewage Treatment Facility Overflows
5.3.1.1 Overflows Prohibited
Any overflow or discharge of wastewater from the sewage collection system or at the sewage treatment facility, other
than from permitted outfalls, is prohibited. The permittee shall provide information on whether any of the following
conditions existed when an overflow occurred:
• The sanitary sewer overflow or sewage treatment facility overflow was unavoidable to prevent loss of life,
personal injury or severe property damage;
• There were no feasible alternatives to the sanitary sewer overflow or sewage treatment facility overflow such
as the use of auxiliary treatment facilities or adequate back-up equipment, retention of untreated wastes,
reduction of inflow and infiltration, or preventive maintenance activities;
• The sanitary sewer overflow or the sewage treatment facility overflow was caused by unusual or severe
weather-related conditions such as large or successive precipitation events, snowmelt, saturated soil
conditions, or severe weather occurring in the area served by the sewage collection system or sewage
treatment facility; and
• The sanitary sewer overflow or the sewage treatment facility overflow was unintentional, temporary, and
caused by an accident or other factors beyond the reasonable control of the permittee.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
27
5.3.1.2 Permittee Response to Overflows
Whenever a sanitary sewer overflow or sewage treatment facility overflow occurs, the permittee shall take all feasible
steps to control or limit the volume of untreated or partially treated wastewater discharged, and terminate the
discharge as soon as practicable. Remedial actions, including those in s. NR 210.21 (3), Wis. Adm. Code, shall be
implemented consistent with an emergency response plan developed under the CMOM program.
5.3.1.3 Permittee Reporting
Permittees shall report all sanitary sewer overflows and sewage treatment overflows as follows:
• The permittee shall notify the department by telephone, fax or email as soon as practicable, but no later than
24 hours from the time the permittee becomes aware of the overflow;
• The permittee shall, no later than five days from the time the permittee becomes aware of the overflow,
provide to the department the information identified in this paragraph using department form number 3400-
184. If an overflow lasts for more than five days, an initial report shall be submitted within 5 days as required
in this paragraph and an updated report submitted following cessation of the overflow. At a minimum, the
following information shall be included in the report:
a) The date and location of the overflow;
b) The surface water to which the discharge occurred, if any;
c) The duration of the overflow and an estimate of the volume of the overflow;
d) A description of the sewer system or treatment facility component from which the discharge occurred
such as manhole, lift station, constructed overflow pipe, or crack or other opening in a pipe;
e) The estimated date and time when the overflow began and stopped or will be stopped;
f) The cause or suspected cause of the overflow including, if appropriate, precipitation, runoff
conditions, areas of flooding, soil moisture and other relevant information;
g) Steps taken or planned to reduce, eliminate and prevent reoccurrence of the overflow and a schedule
of major milestones for those steps;
h) A description of the actual or potential for human exposure and contact with the wastewater from the
overflow;
i) Steps taken or planned to mitigate the impacts of the overflow and a schedule of major milestones for
those steps;
j) To the extent known at the time of reporting, the number and location of building backups caused by
excessive flow or other hydraulic constraints in the sewage collection system that occurred
concurrently with the sanitary sewer overflow and that were within the same area of the sewage
collection system as the sanitary sewer overflow; and
k) The reason the overflow occurred or explanation of other contributing circumstances that resulted in
the overflow event. This includes any information available including whether the overflow was
unavoidable to prevent loss of life, personal injury, or severe property damage and whether there were
feasible alternatives to the overflow.
NOTE: A copy of form 3400-184 for reporting sanitary sewer overflows and sewage treatment
facility overflows may be obtained from the department or accessed on the department’s web site at
http://dnr.wi.gov/topic/wastewater/SSOreport.html. As indicated on the form, additional information
may be submitted to supplement the information required by the form.
• The permittee shall identify each specific location and each day on which a sanitary sewer overflow or
sewage treatment facility overflow occurs as a discrete sanitary sewer overflow or sewage treatment facility
overflow occurrence. An occurrence may be more than one day if the circumstances causing the sanitary
sewer overflow or sewage treatment facility overflow results in a discharge duration of greater than 24 hours.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
28
If there is a stop and restart of the overflow at the same location within 24 hours and the overflow is caused
by the same circumstance, it may be reported as one occurrence. Sanitary sewer overflow occurrences at a
specific location that are separated by more than 24 hours shall be reported as separate occurrences; and
• A permittee that is required to submit wastewater discharge monitoring reports under s. NR 205.07 (1) (r),
Wis. Adm. Code, shall also report all sanitary sewer overflows and sewage treatment facility overflows on
that report.
5.3.1.4 Public Notification
The permittee shall notify the public of any sanitary sewer and sewage treatment facility overflows consistent with its
emergency response plan required under the CMOM (Capacity, Management, Operation and Maintenance) section of
this permit and s. NR 210.23 (4) (f), Wis. Adm. Code. Such public notification shall occur promptly following any
overflow event using the most effective and efficient communications available in the community. At minimum, a
daily newspaper of general circulation in the county(s) and municipality whose waters may be affected by the
overflow shall be notified by written or electronic communication.
5.3.2 Capacity, Management, Operation and Maintenance (CMOM) Program
• The permittee shall have written documentation of the Capacity, Management, Operation and Maintenance
(CMOM) program components in accordance with s. NR 210.23(4), Wis. Adm. Code. Such documentation
shall be available for Department review upon request. The Department may request that the permittee
provide this documentation or prepare a summary of the permittee’s CMOM program at the time of
application for reissuance of the WPDES permit.
• The permittee shall implement a CMOM program in accordance with s. NR 210.23, Wis. Adm. Code.
• The permittee shall at least annually conduct a self-audit of activities conducted under the permittee’s CMOM
program to ensure CMOM components are being implemented as necessary to meet the general standards of
s. NR 210.23(3), Wis. Adm. Code.
5.3.3 Sewer Cleaning Debris and Materials
All debris and material removed from cleaning sanitary sewers shall be managed to prevent nuisances, run-off, ground
infiltration or prohibited discharges.
• Debris and solid waste shall be dewatered, dried and then disposed of at a licensed solid waste facility.
• Liquid waste from the cleaning and dewatering operations shall be collected and disposed of at a permitted
wastewater treatment facility.
• Combination waste including liquid waste along with debris and solid waste may be disposed of at a licensed
solid waste facility or wastewater treatment facility willing to accept the waste.
5.4 Surface Water Requirements
5.4.1 Permittee-Determined Limit of Quantitation Incorporated into this Permit
For pollutants with water quality-based effluent limits below the Limit of Quantitation (LOQ) in this permit, the LOQ
calculated by the permittee and reported on the Discharge Monitoring Reports (DMRs) is incorporated by reference
into this permit. The LOQ shall be reported on the DMRs, shall be the lowest quantifiable level practicable, and shall
be no greater than the minimum level (ML) specified in or approved under 40 CFR Part 136 for the pollutant at the
time this permit was issued, unless this permit specifies a higher LOQ.
5.4.2 Appropriate Formulas for Effluent Calculations
The permittee shall use the following formulas for calculating effluent results to determine compliance with average
concentration limits and mass limits and total load limits:
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
29
Weekly/Monthly/Six-Month/Annual Average Concentration = the sum of all daily results for that week/month/six-
month/year, divided by the number of results during that time period. [Note: When a six-month average effluent limit
is specified for Total Phosphorus the applicable periods are May through October and November through April,
except in cases of Water Quality Trading, wherein the applicable periods are January through June and July through
December.]
Weekly Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x 8.34,
then average the daily mass values for the week.
Monthly Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x 8.34,
then average the daily mass values for the month.
Six-Month Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x
8.34, then average the daily mass values for the six-month period. [Note: When a six-month average effluent limit is
specified for Total Phosphorus the applicable periods are May through October and November through April.]
Annual Average Mass Discharge (lbs/day): Daily mass = daily concentration (mg/L) x daily flow (MGD) x 8.34,
then average the daily mass values for the entire year.
Total Monthly Discharge: = monthly average concentration (mg/L) x total flow for the month (MG/month) x 8.34.
Total Annual Discharge: = sum of total monthly discharges for the calendar year.
12-Month Rolling Sum of Total Monthly Discharge: = the sum of the most recent 12 consecutive months of Total
Monthly Discharges.
5.4.3 Effluent Temperature Requirements
Weekly Average Temperature – If temperature limits are included in this permit, Weekly Average Temperature
shall be calculated as the sum of all daily maximum results for that week divided by the number of daily maximum
results during that time period.
Cold Shock Standard – Water temperatures of the discharge shall be controlled in a manner as to protect fish and
aquatic life uses from the deleterious effects of cold shock pursuant to Wis. Adm. Code, s. NR 102.28. ‘Cold Shock’
means exposure of aquatic organisms to a rapid decrease in temperature and a sustained exposure to low temperature
that induces abnormal behavior or physiological performance and may lead to death.
Rate of Temperature Change Standard – Temperature of a water of the state or discharge to a water of the state
may not be artificially raised or lowered at such a rate that it causes detrimental health or reproductive effects to fish
or aquatic life of the water of the state pursuant to Wis. Adm. Code, s. NR 102.29.
5.4.4 Visible Foam or Floating Solids
There shall be no discharge of floating solids or visible foam in other than trace amounts.
5.4.5 Surface Water Uses and Criteria
In accordance with NR 102.04, Wis. Adm. Code, surface water uses and criteria are established to govern water
management decisions. Practices attributable to municipal, industrial, commercial, domestic, agricultural, land
development or other activities shall be controlled so that all surface waters including the mixing zone meet the
following conditions at all times and under all flow and water level conditions:
• Substances that will cause objectionable deposits on the shore or in the bed of a body of water, shall not be
present in such amounts as to interfere with public rights in waters of the state.
• Floating or submerged debris, oil, scum or other material shall not be present in such amounts as to interfere
with public rights in waters of the state.
• Materials producing color, odor, taste or unsightliness shall not be present in such amounts as to interfere with
public rights in waters of the state.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
30
• Substances in concentrations or in combinations which are toxic or harmful to humans shall not be present in
amounts found to be of public health significance, nor shall substances be present in amounts which are
acutely harmful to animal, plant or aquatic life.
5.4.6 Percent Removal
During any 30 consecutive days, the average effluent concentrations of BOD5 and of total suspended solids shall not
exceed 15% of the average influent concentrations, respectively. This requirement does not apply to removal of total
suspended solids if the permittee operates a lagoon system and has received a variance for suspended solids granted
under NR 210.07(2), Wis. Adm. Code.
5.4.7 E. coli
The monthly limit for E. coli shall be expressed as a geometric mean. In calculating the geometric mean, a value of 1
is used for any result of 0.
5.4.8 Seasonal Disinfection
Disinfection shall be provided from May 1 through September 30 of each year. Monitoring requirements and the
limitations for Fecal Coliform (interim) and E. coli apply only during the period in which disinfection is required.
Whenever chlorine is used for disinfection or other uses, the limitations and monitoring requirements for residual
chlorine shall apply. A dechlorination process shall be in operation whenever chlorine is used.
5.4.9 Whole Effluent Toxicity (WET) Monitoring Requirements
In order to determine the potential impact of the discharge on aquatic organisms, static-renewal toxicity tests shall be
performed on the effluent in accordance with the procedures specified in the "State of Wisconsin Aquatic Life Toxicity
Testing Methods Manual, 2nd Edition" (PUB-WT-797, November 2004) as required by NR 219.04, Table A, Wis.
Adm. Code). All of the WET tests required in this permit, including any required retests, shall be conducted on the
Ceriodaphnia dubia and fathead minnow species. Receiving water samples shall not be collected from any point in
contact with the permittee's mixing zone and every attempt shall be made to avoid contact with any other discharge's
mixing zone.
5.4.10 Whole Effluent Toxicity (WET) Identification and Reduction
Within 60 days of a retest which showed positive results, the permittee shall submit a written report to the
Biomonitoring Coordinator, Bureau of Water Quality, 101 S. Webster St., PO Box 7921, Madison, WI 53707-7921,
which details the following:
• A description of actions the permittee has taken or will take to remove toxicity and to prevent the recurrence
of toxicity;
• A description of toxicity reduction evaluation (TRE) investigations that have been or will be done to identify
potential sources of toxicity, including the following actions:
a) Evaluate the performance of the treatment system to identify deficiencies contributing to effluent
toxicity (e.g., operational problems, chemical additives, incomplete treatment)
b) Identify the compound(s) causing toxicity. Conduct toxicity screening tests on the effluent at a
minimum of once per month for six months to determine if toxicity recurs. Screening tests are WET
tests using fewer effluent concentrations conducted on the most sensitive species. If any of the
screening tests contain toxicity, conduct a toxicity identification evaluation (TIE) to determine the
cause. TIE methods are available from USEPA “Methods for Aquatic Toxicity Identification
Evaluations: Phase I Toxicity Characterization Procedures (EPA/600/6-91/003) and “Toxicity
Identification Evaluation: Characterization of Chronically Toxic Effluents, Phase I” (EPA/600/6-
91/005F).
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
31
c) Trace the compound(s) causing toxicity to their sources (e.g., industrial, commercial, domestic)
d) Evaluate, select, and implement methods or technologies to control effluent toxicity (e.g., in-plant or
pretreatment controls, source reduction or removal)
• Where corrective actions including a TRE have not been completed, an expeditious schedule under which
corrective actions will be implemented;
• If no actions have been taken, the reason for not taking action.
The permittee may also request approval from the Department to postpone additional retests in order to investigate the
source(s) of toxicity. Postponed retests must be completed after toxicity is believed to have been removed.
5.4.11 PFOS and PFOA Requirements
The laboratory performing the analysis on any samples shall be certified for the applicable PFAS compounds in the
aqueous matrix by the Wisconsin Laboratory Certification Program established under s. 299.11, Wis. Stats., in
accordance with s. NR 149.41, Wis. Adm. Code. All laboratories are required to utilize EPA Method 1633A for
sampling PFAS in sludge.
The Department may reject any sample results if results are produced by a laboratory that is not in compliance with
certification requirements under ch. NR 149, Wis. Adm. Code.
5.5 Land Application Requirements
5.5.1 Sludge Management Program Standards And Requirements Based Upon
Federally Promulgated Regulations
In the event that new federal sewage sludge standards or regulations are promulgated, the permittee shall comply with
the new sewage sludge requirements by the dates established in the regulations, if required by federal law, even if the
permit has not yet been modified to incorporate the new federal regulations.
5.5.2 General Sludge Management Information
The General Sludge Management Form 3400-48 shall be completed and submitted prior to any significant sludge
management changes.
5.5.3 Sludge Samples
All sludge samples shall be collected at a point and in a manner which will yield sample results which are
representative of the sludge being tested, and collected at the time which is appropriate for the specific test.
5.5.4 Land Application Characteristic Report
Each report shall consist of a Characteristic Form 3400-49 and Lab Report. The Characteristic Report Form 3400-49
shall be submitted electronically by January 31 following each year whether or not samples are analyzed. In years in
which monitoring does not occur, the report shall be completed by checking on the form that monitoring/land
application did not occur.
Following submittal of the electronic Characteristic Report Form 3400-49, this form shall be certified electronically
via the ‘eReport Certify’ page by a responsible executive or municipal officer, manager, partner or proprietor as
specified in s. 283.37(3), Wis. Stats., or a duly authorized representative of the officer, manager, partner or proprietor
that has been delegated signature authority pursuant to s. NR 205.07(1)(g)2, Wis. Adm. Code. The ‘eReport Certify’
page certifies that the electronic report is true, accurate and complete. The Lab Report must be sent directly to the
facility’s DNR sludge representative or basin engineer unless approval for not submitting the lab reports has been
given.
WPDES Permit No. WI-0020788-11-0
VILLAGE OF CROSS PLAINS
32
The permittee shall use the following convention when reporting sludge monitoring results: Pollutant concentrations
less than the limit of detection shall be reported as < (less than) the value of the limit of detection. For example, if a
substance is not detected at a detection limit of 1.0 mg/kg, report the pollutant concentration as < 1.0 mg/kg .
All results shall be reported on a dry weight basis.
5.5.5 Calculation of Water Extractable Phosphorus
When sludge analysis for Water Extractable Phosphorus is required by this permit, the permittee shall use the
following formula to calculate and report Water Extractable Phosphorus:
Water Extractable Phosphorus (% of Total P) =
[Water Extractable Phosphorus (mg/kg, dry wt) ÷ Total Phosphorus (mg/kg, dry wt)] x 100
5.5.6 Monitoring and Calculating PCB Concentrations in Sludge
When sludge analysis for “PCB, Total Dry Wt” is required by this permit, the PCB concentration in the sludge shall
be determined using either congener-specific analysis or Aroclor analysis. The permittee may decide which of these
analyses is performed. Analyses shall be performed in accordance with the following provisions and Table EM in s.
NR 219.04, Wis. Adm. Code:
• If congener-specific analysis is employed: All PCB congeners shall be delineated. Non-detects shall be treated
as zero. The values that are between the limit of detection (LOD) and the limit of quantitation shall be used
when calculating the total value
Text truncated. Open the original for the full document.
Source: Village of Cross Plains website. First collected Oct 19, 2026.