09.14.2026 Plan Commission Agenda
9.14.26- PLAN COMMISSION AGENDA.PDF
09.14.2026 Plan Commission Packet
9.14.26- PLAN COMMISSION PACKET.PDF
1.
Documents:
2.
Documents:
1
Plan Commission
Special Meeting Notice and Agenda
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
Monday, September 14, 2026
5:30 pm
The Village of Cross Plains will provide opportunities for the public to participate virtually or by calling in.
Please take note that the meeting will continue even if technical problems occur. The log in information is
as follows:
Zoom Meeting Link:
https://us02web.zoom.us/j/83459730362
Conference telephone line:
+1 312 626 6799
Meeting ID: 834 5973 0362
I. Call to Order
II. Roll Call
III. Pledge of Allegiance
IV. Public Comment – This is an opportunity for anyone to address the Plan Commission on any issue. Please observe
the time limit of 3 minutes. While the Plan Commission encourages input from residents, it may not discuss or act
on any issue that is not duly noticed on the agenda. Please see the Public Comment instructions at the end of this
agenda.
V. General Business – Regular Meeting
1. Discussion and Possible Action Regarding a Request to Allow Earth-Disturbing Activities for Marchstone
Development Phase I Beyond September 15, 2026.
VI. Adjournment
This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance
with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of
members of other governmental bodies of the municipality may be in attendance at the above stated meeting to
gather information. No action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals. For additional information or to request this service, contact the
Village Hall at (608) 798-3241 or bobbi@cross-plains.wi.us.
PUBLIC COMMENT INSTRUCTIONS
WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either on or
not on the agenda to be included in the meeting packet, by emailing bobbi@cross-plains.wi.us or in writing to Plan
2
Commission, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will be
distributed at the meeting.
IN-PERSON: Public comment forms are available at the Meeting Room entrance. Please fill out and hand to staff prior to
start of meeting. Comments are limited to three- minutes per person and must be delivered at the designated microphone
for recording purposes. Accommodations can be provided for those unable to access the microphone.
VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand” if on
video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those wishing to
provide oral comments remotely must have their full name displayed within the Zoom application and must state address of
residence.
*As permitted by the Wisconsin open meetings law and while not required, the Plan Commission has chosen to allow public
comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Village Board may
not engage in discussion or take action during this period but may consider deferring the subject to a later meet ing with
notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on certain specified matters
where the public can comment. The meeting chairperson will identify rules for providing comments. Other items on the
agenda which are not listed for public hearing do not require the Board to allow public comment, however the meeting
chairperson can at their own discretion allow limited public comments.
1
Plan Commission
Special Meeting Notice and Agenda
Village Hall
2417 Brewery Road
Cross Plains, WI 53528
(608) 798-3241
Monday, September 14, 2026
5:30 pm
The Village of Cross Plains will provide opportunities for the public to participate virtually or by calling in.
Please take note that the meeting will continue even if technical problems occur. The log in information is
as follows:
Zoom Meeting Link:
https://us02web.zoom.us/j/83459730362
Conference telephone line:
+1 312 626 6799
Meeting ID: 834 5973 0362
I. Call to Order
II. Roll Call
III. Pledge of Allegiance
IV. Public Comment – This is an opportunity for anyone to address the Plan Commission on any issue. Please observe
the time limit of 3 minutes. While the Plan Commission encourages input from residents, it may not discuss or act
on any issue that is not duly noticed on the agenda. Please see the Public Comment instructions at the end of this
agenda.
V. General Business – Regular Meeting
1. Discussion and Possible Action Regarding a Request to Allow Earth-Disturbing Activities for Marchstone
Development Phase I Beyond September 15, 2026.
VI. Adjournment
This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance
with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of
members of other governmental bodies of the municipality may be in attendance at the above stated meeting to
gather information. No action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to
accommodate the needs of disabled individuals. For additional information or to request this service, contact the
Village Hall at (608) 798-3241 or bobbi@cross-plains.wi.us.
PUBLIC COMMENT INSTRUCTIONS
WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either on or
not on the agenda to be included in the meeting packet, by emailing bobbi@cross-plains.wi.us or in writing to Plan
2
Commission, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will be
distributed at the meeting.
IN-PERSON: Public comment forms are available at the Meeting Room entrance. Please fill out and hand to staff prior to
start of meeting. Comments are limited to three- minutes per person and must be delivered at the designated microphone
for recording purposes. Accommodations can be provided for those unable to access the microphone.
VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand” if on
video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those wishing to
provide oral comments remotely must have their full name displayed within the Zoom application and must state address of
residence.
*As permitted by the Wisconsin open meetings law and while not required, the Plan Commission has chosen to allow public
comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Village Board may
not engage in discussion or take action during this period but may consider deferring the subject to a later meet ing with
notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on certain specified matters
where the public can comment. The meeting chairperson will identify rules for providing comments. Other items on the
agenda which are not listed for public hearing do not require the Board to allow public comment, however the meeting
chairperson can at their own discretion allow limited public comments.
Agenda Memorandum
1
Staff/Department: Carly Persson, Village Administrator
Subject Matter: Marchstone Development: Phase I Earth Disturbing Activities
Meeting Date: Plan Commission – September 14, 2026
Village Board – September 14, 2026
Referral History: Plan Commission – March 2, 2026, Village Board – March 23, 2026
Executive Summary:
Project Background:
Code/Policy Review:
Staff Analysis:
On August 6, 2026, the Marchstone developers requested permission to continue earth-disturbing activities for
Phase I beyond September 15, 2026. Section 83.104 of the Village Municipal Code states: “All earth disturbing
activities for land divisions greater than one acre in size shall occur between May 1 and September 15 each
year.” This request follows the variance approved by the Plan Commission and Village Board in March 2026,
which allowed Phase I earth-disturbing work to begin on March 23, 2026.
The developer provided revised tentative schedules for the remaining Phase I improvements. One schedule
covers the portion of Phase I south of Evergreen Parkway, and the second covers the remaining work north of
Evergreen Parkway. The schedules identify the work anticipated to continue after September 15, 2026.
Variances and waivers from the requirements of Chapter 83 require approval by the Plan Commission and
Village Board. A three-fourths affirmative vote of the entire membership of the Plan Commission is required to
recommend approval or conditional approval. A three-fourths affirmative vote of the entire membership of the
Village Board is then required to grant the variance or waiver.
Section 83.104 of The Village Municipal Code of Ordinances
Section 83.120 Variances and Waivers
Village Engineer Brian Berquist of Town & Country Engineering anticipates that topsoil placement and seeding
will be completed within approximately one week after September 15. Acceptance of the improvements will be
conditioned upon the required stabilization through seed and mulch. The stormwater ponds have been
constructed and are available to collect sediment and runoff during the remaining work and future home
construction.
Some additional earth disturbance will also be necessary for utility work, including trenching and conduit
installation. Brian anticipates that the remaining work will be completed by the first week of October. Based on
the limited duration of the remaining work, the erosion control measures in place, and the stabilization
requirements tied to acceptance of the improvements, Brian recommends allowing earth-disturbing activities to
continue beyond September 15.
Agenda Memorandum
2
Fiscal Impact:
Recommendation:
Staff recommend the Plan Commission and Village Board recommend approval of the request to continue earth-
disturbing activities for Marchstone Phase I beyond September 15, 2026, as outlined in the revised project
schedules.
N/A
1
Carly Persson
From: Kyle Haen <Kyle@haenrealestate.com>
Sent: Thursday, August 6, 2026 9:04 AM
To: Carly Persson; Jeff Haen
Cc: Adam Watkins; Dombrowski, Paul; Robert C. Procter
Subject: RE: Upcoming Village Board Meeting / Marchstone
Attachments: MarchstonePhase1.pdf; MarchstonePhase2.pdf
Follow Up Flag: Follow up
Flag Status: Completed
Good morning,
Regarding item one below and requesƟng an extension beyond the 9/15 date, we would like to include the
following:
We are wriƟng to formally request permission to conƟnue construcƟon on the first phase of the Marchstone
development beyond the September 15th deadline. AƩached is a revised tentaƟve project schedule
highlighƟng remaining milestones and anƟcipated Ɵmelines for the improvements. The first aƩachment
(Phase 1) refers to the southern porƟon of the first phase of the development South of Evergreen Pkwy. The
second aƩachment highlights the remaining porƟon of the lands North of Evergreen Pkwy.
Thank you and please let us know if you have any quesƟons
Jeff and Kyle
From: Carly Persson <cpersson@cross-plains.wi.us>
Sent: Wednesday, August 5, 2026 4:15 PM
To: Jeff Haen <Jeff@haenrealestate.com>; Kyle Haen <Kyle@haenrealestate.com>
Cc: Adam Watkins <adam.watkins@wyserengineering.com>; Dombrowski, Paul
<paul.dombrowski@huschblackwell.com>; Robert C. Procter <rprocter@axley.com>
Subject: RE: Upcoming Village Board Meeting / Marchstone
Hi Jeff and Kyle,
We met today and discussed each of these items:
1. Earth disturbance extension past 9/15
a. Received exhibit from Adam, would also require an email request like Kyle sent last Ɵme. ¾ affirmaƟve
vote at Plan Commission and Village Board is required. I have you penciled in for Plan Commission on
9/8 (just double checking because of Labor Day week), and Village Board on 9/14.
2. ResubmiƩal of deed restricƟons
a. Thank you for the clean and redline versions. I have this on the 8/24 Village Board MeeƟng agenda.
3. Tree clearing to take place aŌer 9/15
a. The Village would need a proposal for the areas to be removed and shows that the proposed removals
comply with the updated ordinance. We have a forester on staff now to review the proposal for
compliance. No formal meeƟng (Plan Commission or Village Board) is required.
Please let me know if you have any quesƟons.
GAS
GASESAN
SANSTM XX XXX
GASGAS
GASGAS
GAS
E E
X
WAT
WAT
STMSTMSTMSTMSTMSTMSTMSTM STMSTMSTMSTM
OHE STMSTMSTMSTMSTM
STM
STM
STM
STM
STM SANSANSANSANSANSANSANSAN
SAN
SANSAN
SANSANSANSAN
WAT
WATWAT
VLT
WATWATWAT
WATWATWATWATWATWATWATWATWATWATWATWATWAT
WATWATWAT
WATWATGASGAS
GASGAS
GASGASGASGAS
GAS
GAS
GASGASGAS
GAS
GAS
GAS
GASGAS
GAS
GASGASGAS
GASGAS
E E E E
E E
E
E E E
E E
E E E E E
STM
OHEEE SANSAN
OHESTMSTMSTM
XXXXXX
XXXXX
SAN
SAN
STM
STM
STM
STM
STMSAN
SAN
SAN
SAN
6,404 SQ. FT.0.15 ACRES39
6,318 SQ. FT.0.15 ACRES22
6,508 SQ. FT.0.15 ACRES35
6,456 SQ. FT.0.15 ACRES37
6,538 SQ. FT.0.15 ACRES32
6,351 SQ. FT.0.15 ACRES41
45,209 SQ FT1.04 ACRESOUTLOT 2
6,050 SQ. FT.0.14 ACRES24
6,050 SQ. FT.0.14 ACRES26
6,050 SQ. FT.0.14 ACRES28
6,050 SQ. FT.0.14 ACRES30
53,158 SQ FT1.22 ACRESOUTLOT 36,600 SQ. FT.0.15 ACRES186,600 SQ. FT.0.15 ACRES166,600 SQ. FT.0.15 ACRES14 12,074 SQ. FT.0.28 ACRES13
11,047 SQ. FT.0.25 ACRES7157,582 SQ FT1.32 ACRESOUTLOT 610,892 SQ. FT.0.25 ACRES7910,957 SQ. FT.0.25 ACRES75
11,124 SQ. FT.0.26 ACRES73
10,941 SQ. FT.0.25 ACRES76
11,086 SQ. FT.0.25 ACRES72
10,924 SQ. FT.0.25 ACRES77
10,932 SQ. FT.0.25 ACRES68
10,908 SQ. FT.0.25 ACRES78
11,009 SQ. FT.0.25 ACRES7010,971 SQ. FT.0.25 ACRES69
10,859 SQ. FT.0.25 ACRES8110,875 SQ. FT.0.25 ACRES80
11,914 SQ. FT.0.27 ACRES6610,894 SQ. FT.0.25 ACRES67
12,025 SQ. FT.0.28 ACRES8210,974 SQ. FT.0.25 ACRES74
24,109 SQ. FT.0.55 ACRES116
17,707 SQ. FT.0.41 ACRES126
22,251 SQ. FT.0.51 ACRES114
11,468 SQ. FT.0.26 ACRES119
29,170 SQ. FT.0.67 ACRES117
15,029 SQ. FT.0.35 ACRES11818,154 SQ. FT.0.42 ACRES121
63,098 SQ FT1.45 ACRESOUTLOT 113,200 SQ. FT.0.30 ACRES1113,200 SQ. FT.0.30 ACRES1013,848 SQ. FT.0.32 ACRES12 10,200 SQ. FT.0.23 ACRES711,299 SQ. FT.0.26 ACRES9 10,200 SQ. FT.0.23 ACRES6
20,250 SQ. FT.0.46 ACRES64
20,316 SQ. FT.0.47 ACRES63
20,197 SQ. FT.0.46 ACRES65
8,270 SQ. FT.0.19 ACRES48
8,436 SQ. FT.0.19 ACRES428,100 SQ. FT.0.19 ACRES44
6,600 SQ. FT.0.15 ACRES5331,303 SQ FT0.72 ACRESOUTLOT 56,600 SQ. FT.0.15 ACRES51 6,600 SQ. FT.0.15 ACRES596,600 SQ. FT.0.15 ACRES556,600 SQ. FT.0.15 ACRES576,600 SQ. FT.0.15 ACRES61
6,174 SQ. FT.0.14 ACRES47
15,233 SQ. FT.0.35 ACRES20
13,012 SQ. FT.0.30 ACRES21
6,600 SQ. FT.0.15 ACRES506,600 SQ. FT.0.15 ACRES526,600 SQ. FT.0.15 ACRES546,600 SQ. FT.0.15 ACRES566,600 SQ. FT.0.15 ACRES586,600 SQ. FT.0.15 ACRES6012,003 SQ. FT.0.28 ACRES6211,225 SQ. FT.0.26 ACRES49
6,002 SQ. FT.0.14 ACRES316,561 SQ. FT.0.15 ACRES336,535 SQ. FT.0.15 ACRES346,050 SQ. FT.0.14 ACRES29
6,482 SQ. FT.0.15 ACRES366,050 SQ. FT.0.14 ACRES27
6,430 SQ. FT.0.15 ACRES386,050 SQ. FT.0.14 ACRES25
6,051 SQ. FT.0.14 ACRES236,377 SQ. FT.0.15 ACRES40
6,600 SQ. FT.0.15 ACRES196,600 SQ. FT.0.15 ACRES176,600 SQ. FT.0.15 ACRES15
7,440 SQ. FT.0.17 ACRES458,237 SQ. FT.0.19 ACRES43
19,607 SQ. FT.0.45 ACRES115
6,064 SQ. FT.0.14 ACRES46
16,000 SQ. FT.0.37 ACRES125
16,000 SQ. FT.0.37 ACRES12216,000 SQ. FT.0.37 ACRES123
16,000 SQ. FT.0.37 ACRES124
11,468 SQ. FT.0.26 ACRES120
10,200 SQ. FT.0.23 ACRES8
12,365 SQ. FT.0.28 ACRES11112,534 SQ. FT.0.29 ACRES110 18,900 SQ. FT.0.43 ACRES518,900 SQ. FT.0.43 ACRES318,900 SQ. FT.0.43 ACRES418,081 SQ. FT.0.42 ACRES219,964 SQ. FT.0.46 ACRES1
10,110 SQ. FT.0.23 ACRES92
8,800 SQ. FT.0.20 ACRES85
9,020 SQ. FT.0.21 ACRES105
8,800 SQ. FT.0.20 ACRES84
9,020 SQ. FT.0.21 ACRES104
8,800 SQ. FT.0.20 ACRES83
9,933 SQ. FT.0.23 ACRES103 11,492 SQ. FT.0.26 ACRES91
195,740 SQ FT4.49 ACRESOUTLOT 7
11,458 SQ. FT.0.26 ACRES90
9,753 SQ. FT.0.22 ACRES109
11,458 SQ. FT.0.26 ACRES89
9,020 SQ. FT.0.21 ACRES108
9,020 SQ. FT.0.21 ACRES107
8,800 SQ. FT.0.20 ACRES86
9,020 SQ. FT.0.21 ACRES106
8,800 SQ. FT.0.20 ACRES888,800 SQ. FT.0.20 ACRES87
4,859,379 SQ FT111.56 ACRESOUTLOT 11
102,536 SQ FT2.35 ACRESOUTLOT 9
90.85'
148.94'
60.46'
117.15'114.34'71.08'
56.32'164.81'56.32'56.32'70.73'
101.82'
72.20'23.02'102.17'71.29'17.13'102.20'
128.33'
BLOCK = S 89°54'40" E 615.89'140.03'
10,750 SQ. FT.0.25 ACRES11310,750 SQ. FT.0.25 ACRES112
22,156 SQ. FT.0.51 ACRES99
11,119 SQ. FT.0.26 ACRES94
10,710 SQ. FT.0.25 ACRES93
10,969 SQ. FT.0.25 ACRES9610,929 SQ. FT.0.25 ACRES9510,931 SQ. FT.0.25 ACRES9713,378 SQ. FT.0.31 ACRES98
15,301 SQ. FT.0.35 ACRES100
11,213 SQ. FT.0.26 ACRES101
10,263 SQ. FT.0.24 ACRES102
BLOCK = S 89°54'40" E 605.41'
100.00'
66.00'66.00'
89.33'
94.31'SECTION 35SECTION 2
71.08'
921920
923
918919
918
919
920
918917
919918
924923
923922921 919 919918917920925922
927
919920
915
916
911912913914915
918919920921922923924925926927928928929930931932933934935940945945
940940935
940945
940935930925920
917916
927925920915912911911
920925930935940935931928
927926925920915911 911915920
939939
936935
930
925925926930930925926920925930934935936937
940935930925923922921924
920
924923922921920919918
936935930925
955956950944945935930925
920921922923
922922923919920921915916911
925920915925929920917
930
935
940
913914 916
915915924920916915924920919920921
913913 914915916
915
918
930925920920918920918918920920919921
928
924
913
923
922921920919918
919920 925
925921921
925
930930935
940
941
930929928927
926927
930930929928927
920918917 929 925 927925
930
925924920 919
918917916
915
914914915916917918919
921
921922923924
907910911912913914915917
907910911912913914915915914913912911
911
913
914 915
915914913912911
914
917
919920925930929929926925
928925 920920915915914913912911911912913914915 915915
915916
919918917916915915916917920
921
922
920921922922921920920921922922921920
922
921
922923924925
923
920915915916917918919920921 925 930935931
937936938922923924 916916915914913912
915915912912911910905 905910911917916915914913912
916916912
915912
935930
928927926925924925926
917
918917
920919918920919918916915
915
916
919920921
921920919
919923928
920918
910
909915917915
920919918918
917917
915914
917917916916916
917
918919920921
921
921920919918922923924
925
926
927
927
926
925
925926927
939940
939
924924925926
925924 924925926927 926925921921922
920
919
918
917917
917
916
918919
920
921
920919
918
920919918917917918 919920925930934935936937
935930925920909
911913913
920
920918
922
927926
917920921
925926927
924
923922921
928930933927
925
922917917
922
910910
Hearing Impaired TDD (800) 542-2289O-4
NOTE: APPROXIMATELY 60,000 CY OF FILLREQUIRED FOR THE PHASE I IMPROVEMENTSHOWN. MATERIAL TO BE PROVIDED FROM GOLFCOURSE AREA AND FUTURE PHASES TO THE SOUTH.CONTRACTOR TO COORDINATE WITH DEVELOPER,ENGINEER, AND GOLF COURSE ARCHITECT FORFINAL LOCATION OF ON-SITE BORROW. NO TREECUTTING ALLOWED. NO FILL PLANNED TO BEIMPORTED FROM OFFSITE.
BIORETENTIONBASIN #4
MARCHSTONEVILLAGE OF CROSS PLAINS, DANE COUNTY, WI
JUNEBARK DRIVE
HILLCROFT LANE
MARCHSTONE BOULEVARD
LINDALE DRIVEBIORETENTIONBASIN #1
BIORETENTIONBASIN #3
BIORETENTIONBASIN #2
BIORETENTIONBASIN #3
EVERGREEN PARKWAY
SHADYSTREETTWIN PINE STREET
SHADYCIRCLE
THINNES STREET
BOLLENBECKSTREET
MARVIN COURT
ACKER STREET
WET POND #5.2
INFILTRATIONBASIN #5.1
BIORETENTIONBASIN #8
BIORETENTIONBASIN #7
DRY BASIN #6
INFILTRATIONBASIN #9.1WET BASIN#9.2
DRY BASIN#10
SEE SHEET O-4.1SEE SHEET O-4.2
SEE SHEET O-4.3
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO
940940
940
945
1050
1045
10401035
1030
102510201015101010051000
990985980
975
970
965
960 955 950
9981000 1000
100510101015
1020
10251030
1035
10401045
1050
1026
10121013
1002
978975972
937
BORROW PIT AREA AT FUTUREGOLF COURSE DRIVING RANGE.ANTICIPATED 60,000 CY OFMATERIAL GENERATED ASSHOWN. HAUL ROAD ANDDRIVING RANGE TO HAVE MIN. 6"TOPSOIL PLACED ANDRE-SEEDING COMPLETEDFOLLOWING COMPLETION OFMASS GRADING.
MARCHSTONEVILLAGE OF CROSS PLAINS, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289O-4.4
10.0%
HAUL ROAD EXTENSION FROM MARCHSTONEBOULEVARD
CONSTRUCTTEMPORARYSEDIMENTBASIN IN THISAREA
8.0%