Public Works Committee Agenda
Tuesday, October 20, - 7:00 AM
Town ofVerona Hall, 7669 County Highway PD
1. Call to Order/Additions to Agenda/Approve Agenda
2. Public Comment
3. Approval of Minutes from September 15, 2026
4. Discussion and Possible Action: Natural Hazard Mitigation Planning (10 Minutes)
5. Discussion: Preliminary 2027 Capital Improvement Program (20 Minutes)
6. Information and Possible Action: Contract Snow plowing contracts (5 Minutes)
7. Information: Fitchrona Road and Nine Springs Valley Interceptor Replacement (Goose Lake to Fitchrona
Road) (5 Minutes)
8. Information: Hyper Road, Military Ridge Trail reconstruction and Dairy Ridge Road. (5 Minutes)
9. Development Updates: (15 minutes)
a. Riverside Vista
b. Sugar River Vista
c. Riverside Road Development
d. Sunset Drive Development
10. Equipment Condition Update (5 minutes)
11. Monthly Public Works Report (5 minutes)
12. Schedule November 2026 Committee Meeting and set agenda items.
13. Adjourn
To receive agendas and other announcements by email, use the "alert notifications" feature on the Town website at
hftp://www.tov/n.verona.wi.us/.
If anyone having a qualifying disability as defined by the American With Disabilities Act, needs an interpreter, materials in alternate
formats or other accommodations to access these meetings, please contact the Town ofVerona Clerk's office @ 608-845-7187 or
twithee@town,verona.v/i.us Please do so at least -48 hours prior to the meeting so that proper arrangements can be made.
Notice is also given of a quorum of the Plan Commission and /or the Town of Verona Board could occur at this meeting for the purpose
of gathering information only.
Posted 09/11/2026
Public Works Committee Minutes
September 15, 2026, - 7:00 AM
Town ofVerona Hall, 7669 County Highway PD
Present: Mike Duerst, John Senseman Russ Swiggum
Absent: Brett Lindell, Manfred Enburg
Also Present: Chris Bames, Public Works Director, Mark Judd
Public Present: Bob Blasdel, Linda Blasdel
1. Call to Order/Additions to Agenda/Approve Agenda - Duerst called the meeting to order at
7:00 AM, Duerst asked for additions and approval of the agenda. Senseman moved to accept
the agenda, seconded by Swiggum, motion carried.
2. Public Comment: Bob Blasdel stated he had concerns about recent activity next to his
property (Wedig Property) with tree cutting and trail building and noise issues with adjacent
properties. Blasdels questioned whether there was a "disturbing the peace" ordinance. Linda
Blasdel questioned whether the town kept track of messages and telephone calls to town hall.
Barnes responded that Public Works keeps a record of all requested actions.
3. Action: Review August 18, 2026, Minutes, -the committee reviewed the minutes. Senseman
moved to approve the August minutes as submitted, second by Duerst, motion carried.
4. Discussion: Potential driveway access 6473 Sunset Drive: Barnes stated the applicant had
withdrawn his application.
5. Discussion and Possible Action: Natural Hazard IVIitigation Planning: Barnes stated that
he had not received a reviewed draft back from Dane Cunty Emergency Response Department,
so he requested to delay discussion until next month.
6. Discussion: Preliminary 2027 Capital Improvement Program: Duerst asked Barnes to
explain the attached draft program. Barnes explained Fitchrona Road was the costliest project,
and no current estimate of the town share was available. Barnes stated Manhattan Drive was
approved for LRIP funds, and the scheduling could not be changed. Other proposed roads
include Riverside Road and Pine Row in 2027. Discussion followed. Barnes explained the
different techniques which may be applicable for Riverside Road including; overlay and chip
seal, pulverizing and repaying or cold in-place recycling. Barnes explained the next years out-
2028, 2029, 2030 and the ratio of paving to chip seal roads. Senseman questioned what the
plan would be for Shady Oak Road? Barnes stated that the plan calls for a 2-inch overlay.
Barnes explained that Implements of Husbandry (IOH) are basically exempt from road weight,
width, and length restrictions. Discussion followed. A revised draft will be available for the
October meeting
7. Information: Town Storm Water Basin Clean Out: Barnes stated that the work had been
completed by Edgerton Construction at the quoted cost of $45,000.
8. Information: Fitchrona Road and Nine Springs Valley Interceptor Replacement (Goose
Lake to Fitchrona Road) Barnes stated that the project had been bid, and the low bid was
received by Minger Construction. The total cost to be shared by the city and the Town for piping
and the metering station is $100,625.
9. Information: Hyper Road, Military Ridge Trail reconstruction and Dairy Ridge Road.
Barnes states that the new bridge was under construction and the Hyper Road construction will
continue as weather permits. Barnes also stated that he had received a request to lower the
speed limit on Dairy Ridge Road west of Hyper Drive.
10. Development Updates:
a. Riverside Vista : no new actions
b. Sugar River Vista; the project is substantially complete. Minor ditching and road striping
are the only remaining items. Staff has received 1 new driveway application.
c. Riverside Road Development; the project is under redesign based on Plan
Commission and Public Works Committee comments. Barnes explained the new
concept with a private road and condominium development on the west side. Discussion
followed. Blasdel questioned whether Sugar River Road was suitable for construction
traffic. Barnes replied that in his experience no road in the town, with few exceptions, is
built to a standard suitable for heavy traffic. Barnes explained that there are restrictions
on local agency ability to require improvements.
d. Sunset Drive Development; traffic counts and analysis is underway
11. Equipment Condition Update: Judd stated the winter snow damage to the 2014 Peterbiltwas
fully repaired. Judd also replaced a hose on the John Deere boom mower.
12. Monthly Public Works Report: There were no questions
13. Schedule Meeting set for October: The next meeting was set for October 20, 2026
Adjourn Motion by Senseman, second by Swiggum to adjourn at 8:27 AM.
Approved: October 20, 2026, Prepared By: W. Christopher Barnes
Town ofVerona Annex
Dane County Natural Hazard Mitigation Plan
Summer 2027
TOWN OF
VERONA'
Dane County Natural Hazard Mitigation Plan; Town of Verona Annex
Town of Verona Annex
This annex is part of the Dane County Natural Hazard Mitigation Plan (DCNHMP). The strategies
adopted in this annex are designed to guide local efforts to reduce risks from natural hazards.
These strategies are best completed in collaboration with neighboring communities and Dane
County government as part of a comprehensive countywide mitigation program.
Community Profile
The Town of Verona is located in the southeast quadrant of Dane County south of the State
Highway 14 corridor. The Town is nearly 30 square miles of agriculture and open lands with rural
residential. The City of Verona is located to the North and east and Fitchburg to the east.
According to the 2024 U.S. Census American Community Sun/ey, 2,578 residents live in the Town
of Verona.
Table 1: Town ofVerona Geographic Profile
Geographic Feature
Total land area
Major water bodies
Primary land uses
Description
29.4 square miles
Sugar River
Agriculture and open land, rural residential
Source: 2020 Dane County Land Use Inventory
Population Summary
The following table highlights populations that are vulnerable to the hazards identified in the
DCNHMP companion document and the priority hazards identified for the Town of Verona.
Table 2: Town of Verona, 2024 Population Profile
Category
2024 Total population
2024 Population Under 18 years old
Number of households
Average household size
Self-Reported Disabled Population
Persons experiencing poverty
High school graduate (includes equlvalency)
Bachelor's degree or higher
Population 5 years+ speaks English less than "very well"
Number
2,578
675
886
2.84
134
66
314
983
25
Percent of Total
100
26
5
0.3
12
38
1
Source: US Census, 2024 American Community Survey
Table 3: Town of Verona Population Projections, 2030-2040
Population
2020 (Census)
1,947
2030
2,009
2040
2.113
2050
2.218
2020-2050
271
Source: Demographic Services Center, Wisconsin Department of Administration, 2024
Prepared by Dane County Emergency Management-Summer 2027Page 2 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Asset Inventory
Assets include the people, property, and facilities within the Town ofVerona that could be exposed
to hazards in general. Property, essential infrastructure, and natural, cultural or historic resources
inventories help provide a comprehensive picture of the community and an assessment method
for exposure to hazards by establishing the improved and total values, capacities, and populations
for these assets. Inventories also form the basis for estimating potential losses, where possible.
General Property
The Town ofVeronas most dominant land uses are agriculture and rural residential. The total value
of these assets Is more than $578.6 million, with greatest value in the residential sector.
Table 4: Property Exposure Summary
Property Type
Total
Agriculture
Industrial
Residential
Transportation
Utility
Commercial
Other
Institutional/
Governmental
Parcels
1,701
393
47
1,178
2
8
37
23
13
Improved Parcels
1,678
393
47
1.178
2
0
31
18
9
Land Value ($)
385,760,000
74,278,000
10.898,200
289,498,600
100,000
0
10,324,700
201,500
459,000
Content Value ($)
192,880,000
37.139.000
5,449,100
144,749,300
50,000
0
5.162.350
100,750
229,500
Total Value ($}
578.640.000
111,417.000
16.347,300
434,247.900
150,000
0
15,487.050
302,250
688.500
Source: Dane County Planning and Development, December 2021
Critical Facilities
The Town of Verona identified critical facilities to protect from disaster impacts using GIS data
inventories from Dane County and information gathered from the Town.
Table 5: Critical Facility Summary/Essential Infrastructure
Facility
Badger Prairie Health Care Center (Dane County
Owned)
Badger Prairie Needs Netv/ork (Dane County Owned)
Madison Metro Sewerage District Pump Station #12
(MMSD Owned)
Bridge B-13-335 (Riverside Road)
Bridge B-13-617 (Shady Oak Lane)
Bridge B-13-886 (Valley Road)
Bridge B-13-363 (White Crossing)
Bridge B-13-434 (CTH PB) County Owned
Bridge 8-13-487 (CTH PD) County Owned
Bridge B-13-053 (WISDOT Owned)
Bridge B-13-383 (WISDOT Owned)
Type
Ef
El
El
El
El
El
El
El
El
El
El
No. of Facilities
1
1
1
1
1
1
1
1
1
1
1
Replacement Value ($)
N/A
N/A
N/A
1,500.000
1.500.000
1.500.000
1.500,000
1.500,000
1.500.000
1,500.000
1,500,CXX)
Prepared by Dane County Emergency Manogement-Summer 2027Page 3 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Bridge B-13-486 (CTH PD) County Owned
Bridge P-13-183 [WISDOT Owned)
Town Hall and Office
Town Public Works Garage building and Equipment
Wisconsin Power and Light Substati on
Mt. Vernon Tele. fTDS) Cellular Tov/er
Dane County Cellular Tower
Dane County Microwave Tower
U.S. Cellular Tower
Entercom Tower
Town of Verona Public Works Radio Tower
Verona Airport (Private Owned)
Sugar Ridge Airport (Private Owned)
345 XV ATC transmission Line (ATC Owned)
69/138 KV ATC Transmission Line (ATC Owned]
El
El
VF
El
El
El
El
El
El
El
El
VF
VF
El
El
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1.500.000
1,500.000
$5.000.000
$3 500.000
N/A
N/A
N/A
N/A
N/A
N/A
$15,000
$200.000
$1,000.000
N/A
N/A
*EI: Essential Infrastructure: VF: Vulnerable Facilities; HM: Hazardous Materials Facilities; NA: Natural
Asset
Source; Verona 2026
Other Assets
The Town ofVerona identified these other assets:
• Sugar River - natural recreational and agricultural asset
• Military Ridge Trail-Recreational asset
Vulnerability Assessment
A hazard identification and vulnerability analysis was completed for the Town of Verona using the
same methodology as the countywide assessment. The information in this Annex was reviewed
and updated through the town board process. Table 6 outlines the hazard identified for Verona.
Local Hazard Priorities
The current highest hazard properties and events are high windstorm events (straight line winds,
tornados) which result In tree damage and damage to existing overhead utilities and road closures.
Recent history has seen a decline in heavy snow events, but the conditions and possibilities exist
for serous winter storm events resulting in road closures and emergency snow removal. Localized
flooding occurs on Fltchrona Road during rain events typically above a 2 year event (2.84 inches)
over a 24 hour event.
Recent Local Hazard Events
Recent hazard events that impacted the community beyond the impacts and events recorded in
the Dane County Hazard Mitigation Plan.
Table 6. Town of Verona Recent Hazard Events
Natural
HazardDateImpacted StructureComprehensive Harm to
Jurisdiction
Other Losses
(Fiscal, programs, etc.)
Prepared by Done County Emergency Manogement-Summer 2027Page 4 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Flooding
High
Winds
High
Winds
Food Ing
Flooding
September 10,
2022
May 23,2024
May 20,2023
August 9,2025
August 10,2025
Fitchrona Road
Flint Lane, Cross
Country Circle
Fritz Road, Spring
Rose Road
Fttchrona Road
Fttchrona Road
Road Closed due to Flooding
Road Closed due to tree damage
Road Closed due to tree damage
Road Closed due to Flooding
Road Closed due to Flooding
Source: Town of Verona, 2026
Flooding
Structures and Properties in the Floodplain
The planning team estimated the number of structures located in the 100-and 500-yearfloodplain
for each Dane County community to assess the potential risk to people and property. Potential
individuals at risk were estimated by multiplying residential structures by the average household
size in Dane County (2.37 people as of 2021). Estimated loss potentials for all structures in the
floodway along with a full description of the methodology used can be found in the main plan,
Table 7. Primary Structures in the Floodplatn
Number of Residential Structures
Number of Non-Resldential Structures
Total Number of Structures
Total Improved Structure Values ($)
Potential Number of People at Risk
100-Year Floodplaln
7
1
8
$1.046,104
17
500-Year Roodplaln
8
3
11
$609,107
19
Source: Dane County Land Information Office, 2021
Repetitive Loss Properties and Flood Insurance Policies
FEMA collects data on flood insurance claims made for all properties In the United States. Using
this data, the agency identifies repetitive loss and severe repetitive loss properties. Repetitive loss
properties have incurred more than $1,000 in flood-related damage on at least two occasions in
any 10-year period since 1978. No repetitive or severe repetitive loss properties were reported in
Verona. Verona has 0 active flood insurance policies.
Tornadoes
While it is difficult to predict tornado-related losses due to the random nature of the event, the
planningteamdevelopedestimatesof the percent area of each Jurisdiction that could be impacted
based on the average sized tornado (F2) in Dane County. The loss ratio (the ratio of the damaged
building value to total exposed building value) is a measure of the impact to the jurisdiction.
Communities with loss ratios of 10% or more may have difficulty recovering from a disaster. High
value exposure is based on total- 100%, medium- 50%, and low- 25% loss to the property
potentially impacted. Refer to the tornado profile methodology in the companion plan for details.
Prepared by Dane County Emergency Management-Summer 2027Page 5 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Table 8. Tornado Loss Estimate
% Area
Impact
3,51
Improved
Parcel
Count
1,678
Affected
Structure
Estimate
58
Total Exposed
Value ($)
578.640.000
Estimated Loss $
High Damage
Range
20,339.141
Moderate
Damage
Range
10,169,570
Low
Damage
Range
5,084,785
Loss Ratio for
Moderate
Damage Range
2%
Source: Dane County Land Information Office, 2021
Problems or Additional Vulnerability Issues
The Town of Verona faces the following additional vulnerabilities:
Badger Prairie Health Care Center- is a skilled nursing facility located in the Town of Verona. The
facility series approximately 150 people whose needs cannot be met in other care settings by
providing long-term care, end-of-life care, and short-term rehabilitation, These residents are
particularly vulnerable to natural hazards due to transportation and logical needs.
Capability Assessment
Each community has a unique set of capabilities, including authorities, policies, programs, staff,
funding, and other resources available to accomplish mitigation and reduce long-term vulnerability.
By documenting the existing capabilities in each community, we can identify capabilities that
currently reduce disaster losses or could be used to reduce disaster losses in the future.
Mitigation Capabilities Summary
The following table summarizes the capabilities of the Town and where some may be lacking.
Prepared by Dane County Emergency Management-Summer 2027Page 6 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Table 10. Town of Verona Planning & Regulatory Capabilities
Regulatory Tools (ordinances, codes, plans)
Comprehensive or Master Plan
Capital Improvements Plan
Economic Development Plan
Local Emergency Operations Plan
Continuity of Operations Plan (COOP)
Other plans
Zoning ordinance
Subdivision ordinance
Building code
Site plan review requirements
Growth management ordinance
Shoreland / wetland zoning ordinance
Ftoodplaln zoning ordinance
Special purpose ordinance
FEMA / NFIP Community Rating System
Flood Insurance study or other engineering study for streams
Elevation certificates (for fioodplatn development)
Erosion or sediment control program
Stormwater management program
Fire department ISO rating
Climate change Impact program
Climate Action Plan
Yes/No
Yes
Yes
No
Yes
No
No
Yes
Yes
Yes
Yes
No
Yes
Yes
No
No
No
Yes
Yes
Yes
Yes
No
No
Comments
Currently under review
Managed by Dane County
Managed by the Town
Managed by the Town
Managed by the Town
Managed by Dane County
Managed by Dane County
Managed by Dane County
Managed by Dane Count/
City of Verona Fire Dept.
Source: Town of Verona, 2026
Table 11. Town of Verona Personnel & Technical Capabilities
Personnel Resources
Staff trained on hazards and mitigation
County Emergency Management Liaison /
Designated Emergency Manager
Public Works
FIoodplaln Manager
Building Inspector
Planner/englneerwlthkno\vledgeof[and
development/land management practices
Professional In construction practices
related to buildings and/or infrastructure
Floodplaln Manager
Grant Writing
GlS/Mapplng
Warning systems/services
Maintenance Programs to Reduce Risk
Mutual Aid Agreements
Yes/No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
No
Department/PosJtion
Public Works
Public Works
Public Works Director
Public Works Director
Comments
Dane County
Dane County
Dane County
Outside Contract
Utility Based
Source: Town of Verona, 2026
Prepared by Dane County Emergency Management-Summer 2027Page 7 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Table 12. Town ofVerona Financial Capabilities
Financial Resources
Community Development Block Grants
Capital Improvements project funding
Authority to levy taxes for specific purposes
Dedicated funding for land, easement or conservation easement acquisition
Fees for water, sewer, gas, or electric utility services
Impact fees for new development
Incur debt through general obligation bonds
Incur debt through special tax bonds
Incur debt through private activities
Withhold spending in hazard prone areas
Accessible/EligtUe to Use
Yes
Yes
Yes
No
Yes (Sanitary Sewer only)
No
No
No
No
No
Source: Town ofVerona, 2026
Additional Capabilities
Past or ongoing public education or information programs:
• Stormwater Management ordinance is conjunction with Dane County
• Local drainage culvert inventory , inspection and replacement program
Improving Capabilities]
Town of Verona capabilities can be expanded and improved in the following ways:
1. Planning and Regulatory
a. ?
b. ?
2. Personnel & Technical
a, ?
b. ?
3. Financial
a. Increase Utility account fund balance for increased ?
b. Review General Fund balance to account for emergency response expenses and
increase if necessary
National Flood Insurance Program Participation
The Town ofVerona participates in the National Flood Insurance Program under Dane County.
Commented [VB1]; Please compfete this newly added
section. Sotry.
Prepared by Done County Emergency Monagement-Summer 2027Page 8 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Mitigation Strategies
Mitigatwn is defined as a sustained action to reduce or eliminate risk to people and property from
hazards and their effects. A mittsatton strategy is a measure, project, plan, or activity proposed to
reduce current and future vulnerabilities to hazards. Mitigation actions may include local plans and
regulations, structure and infrastructure projects, natural systems protection, and education
programs. Common mitigation activities include relocating or demolishing flood prone structures,
constructing storm shelters, bur/ing utilities, and conducting public awareness campaigns.
The Town completed ?, ?, ?, ? strategies established by the 2022 plan and continues several others.
Strategies relevant to the next five years arej
Strategy 1 Flooding Prevention
Goals
Prevention
Property Protection
Public Education & Awareness
Natural Resource Protection
Critical Facilities Protection
Structural Project
Minimize the impact of localized and regional flooding due to high rainfall events. The goal is
to keep all town roads open to vehicular traffic, especially y emergency response vehicles
during and after storm events. The desired outcome is continued mobility and sage travel
through the town before, during and after storm events.
Implementation
1. Ident properties subject to historical Flooding damage Step 1
a. Responsible party: Town staff
b, Funding source: Municipal budget
c. Comp/etion date; outgoing as flood events increase in intensity, duration, and frequency
2. Determine if voluntary purchase of impacted properties is desired by the property owner
a. Responsible party; Town Staff
b. Funding source; Municipal budget/ potential grant programs
a. Comp/etion date: 12-2029
3. Grant Writing for Pre-Disaster Mitigation Grant Program to fund property purchase
a. Responsible party: Town Staff
b. Funding source; Municipal Budget
a. Compfetfon date: Complete within the first 12 months of project initiation
4. Implementation process after awarded grant is received
a. Responsible Party: Independent appraiser/acquts'ition contractor
b. Funding Source: FEMA, municipal budget
c. .Comp/etfon date: 2-3 /ears foHowmg project inftiati'on
Commented (VBZJ; Please make note of the strategies that
were completed in the last plan.
Prepared by Done County Emergency Monagement-Summer 2027Page 9 of 11
Dane County Natural Hazard Mitigation Plan: Town of Verona Annex
Prepared by Dane County Emergency Management-Summer 2027 Page 10 of 11
K
(M
p1^
cd
Road Project Schedule
Revised to Meet Budget Conslralnta
Year Road From To Miles
Length
Classification Feet
PASER
Yoor
2025 Last
Mnlntcnanco 3
Chip Seat
14.40
Road Malntonanco Type (Cost per Footl
50% Wedgo/CNp
S 22.00
100%Wodgo/Chlp
S 3S.OO
Mill and
Resurface
S 52,00 5
Reconstruct
360.00
Total Cost
Fltehrona
Manhattan
Riverside
Pl no Row
Nosbltt
WI-G9
Spring Roso
Wl-69
Tonto
End
SuqarRlvor
End
0.28
0.34
2.75
0.25
Major
Local
Ma I or
Local
1478
1795
7851
1320
3
_5_
4/3
3
2019
S 29,040
$ 298,338
$ 93.350
S 2S5.000
s
Town Shore with tho
CjtjLQLEKchhurci
LRIP
23,040 5 298,338 S 93.350 $ 255,000 $
Shady Oak
Rivers! da
Fltchrona
Forest
Midtown
Sugar Rlvor
Tonto
Frtta
Nor Del Hill
Wl-69
North ofWhalen
End
052
2.75
0.9G
0.24
M3|-
Ma|
Ma|
or
or
or
Local
Z770_
6GS5
5069
12G7
.5
4/3
4
3 S 85,894
S 105,260
S 253.422
$ 111.514
s
470,196 S
Domarco
Tonto Trail
Hula
Pheasant
Goose Lake Dr
Sugar River
Frite
Tonto Trail
Fitch rona
Cross Country
Fitch rona
Fitch rona
Valloy Road
Riverside
End
End
End
End
End
Marr.hvtow
South Limit
0,2
0.29
0.2
0,23
0,24
0.84
1.08
Loc;
LOU
Loci
Loc;
Loo
Mn|
Ma|
I
1056
1531
1056
1214
1287
4444
5702
s
5
7
8
8
3
5
2021
-2019_
2019
S 15.206
S 17.487
S 18,248
S 40.128
$ 58,186
_S_168.872
S 216.691
Assumes No State ARIP Funds
40,128 $
Woods
Mid Town
Marshvlew
Jaggl DrivB
Allegheny
An dos
Cortlna
Everest
Sugar River
CTHPD
Tim be rLn
Sudar River
Frttz
Nosbltt
Evorest
Nesbttt
Cortlna
RIvoraldo
North Limit
Shndy Oak
CTHG
End
End
End
End
Atloqhony
South End
0.21
1.49
0.44
0.31
0.13
0.04
0.08
0.16
0.44
Major
Major
Major
Local
Locj[
Local
Local
Local
Local
1103
40 S6
2306
1637
686
211
422
345
2300
9
7
5
5
7
7
7
7
4
2019
2020
-30.19
2019
2017
2017
2017
2017
2019
S 1S,9G7
$ 23,570
S 15.101
S 3,041
$ 6,083
S 18,555
^_87,628
$ 87,400
¥ 21G.912
Assumes No Stoto ARtP Fur
s
ds
82,347 175.028 5 210,912 468,287
Timber Lano CTHPD Non h_L I in it 1.5 Major 7920 7 2020 ¥ 411.840
411,840
cross country
Sug.irRlyor
CrOKs Country
CroBS Country
Cross Count Clrc
Wast
Rlvsraldo
Madison Limit
Middle
cmss CQLintry
Nine Mound Rd
Volley Road
Vorona Limit
Llmit_
North End
0.51
0.98
031
0.45
0.73
Moi.
Ma].
Mnl.
Mnj.
or
or
ir
ir
Local
2693
5197
J637-.
_2376
3854
5
4
7
9
7
2014
2019
2021
2021
2021
S 102,326
S 197.466
S G2.198
S 90.288
£ 146,467
Assume!; No Stale ARIP Funds
S9B,7GG
Locust
RolUng Oaks
Mid Town
Pa u Iso n
WI-G9
CTHPB
Shady Oak
Wo'.t Llmtt
Verona Urn It
End
East. Limit
Tlmbor Ln
1 07
0.16
1.49
046
Loml
LOCQ]
Maior
Local
5G50
950
_3811
JM29-
7
4
7
7
2020
2032
2020
2020
S 13,686
_S_124.291
J_- 144,818
^_92,294
375,039
Range Trail
Bench
BnrtloH
Borchort
DnlW RldSO
North Town Limit
Sunsot
Purcell
Purcoll
Spring R 050
So.uth_Llmrt
End_
E"d-
North Limit
Sovnn Sprincf.
1.75
013
0.12
029
1 12
Ualor
Local
Local
Locnl
Local
9240
-686-
634
1531
2600
s
3
3
4
G
2023/24
2023
2023
2023
2023
¥ 9,124
S 203,230
_£_15J01,
? 58,186
? 98,800 ffiouldchangB due to EPIC1
36,495 S 218,381 5 15G.966 $ 411,8S2
M apis Grove
Sunsot
ShndyOnk
Sunset
Joffy Trail
North Town Limit
WI-G9
Oak Hill
CTHPB
South limit
Soulh Limit
Ranqe Troll
Shady Hill
Borchort
Mlcftown
O.G3
0.88
-009
1.53
0.11
Mn|
Ma|
wn|
Ma|
or
or
or
or
Local
4000
4645
471
8078
581
3
7
10
3
3
2023
2024
2025
2022
2023
S 66,908
? 6.7S?
S 8,364
S 152.000
S 306,979
Roads likely to be vacentedftransTerrad and not Included
Seven Springs
Imarty
Fltchrona
Dairy Ridtjo
Raymond
Nosbltt
End
MM Town
Lacy
0.48
0.28
0.28
Local
Mai.
Maj-
or
or
2534
1478
1478
3
7
4
2015
2026
Beyond 2035 Horizon
541,033
Grandulow
Schmld
Priaro Vlsto
Dragonfly Ct
Twin Rock Road
Whnlen
Sunset
Red Stone
Flint Lano
Horso Shoe Bond
Nor-dsl Mill
polling Meadow
Oak Hill
Shady Hill
Shaqbark
Hlckor/Rldgo
Prairie Glr
Pmlrie Clr
Fltchrona
CTHG
Spring Roso
Pralro Vista
Pralro Vista
Frtchrona
Rango Trail
CTHPB
North Limit
CTHPB
Shndy Oak
Shady Oak
Shady Oali;
Shady Oak
Hlckory
Raymond
South end
Phase 1 Una
CTHPB
End
End
End
Prairo Vista
WBit Town Limit
CTHPB
Enst End
south Limit
CTHPB
End
End
End
End
End
End
Phase 1 Uno
CTHPD
1.48
0.13
0.28
0.11
0.4G
0.94
0.6
0.17
0.25
0.43
0.16
0.27
0,16
0.06
0.05
0-23
0.17
0.19
Ma|or
Local
Local
Local
LOCQ]
Majot
Major
_Loca1
Locnl
-Loc.nl
Local
Local
Local
Local
Local
Local
Local
Local
7814
S8G
1470
490
2545
49G3
3168
898
1320
2270
845
1426
845
317
264
1214
900
978
3
2
9
3
9
7
7
5
6
8
10
10
10
10
10
10
5/10
5/10
2022
2022
2023
2023
2023
2033
2024
B023
2024
2024
2025
2025
2025
2025
2025
2025
2021
S 9,3B4
S 21,168
S 7.056
S 38,648
? 12,925
¥ 19,008
I 12,165
S 20,529
S 12.1G5
S 4,562
$ 3.802
5 17,4B7
S 12,980
$ 120,334
.? 8G, 275
$ 37,164
S 406,349
Nssbltt
Hidden River
Pine Row
Brandances
Valley
Raymond
WtillnoalWay
Block Cherry
Stordust
Wlndswepl Way
Davls HHIs
Shady Bend
Spring Rose
Marshvlew
.PUTCOIL
CmsACy.uritry
Spring Rose
Spring Rose
Bo beat
Boulder Hill
Stony Ridge
Rock Rid go
Sandy Ridge
Woinsr
Whlts Crossing
Wost Umtt
Rlvoraldo
Wl-69
CTHG
Sugar Rivor
CTHU
Town Uno
Simaot
Cross Countr/
CTHPD
CTMM
CTHM
US 18/151
Sugar River
CTHPB
Middle
US1B/151
South Urn It
Dairy Rid go
Slonv Rldgo
CTHM
Stony Ridge
Stony Rldgo
CTHPB
South of Gust
Fttchrona
North End
End
End
Wl-69
En-.1 Limit
Raymond
End
South End
End
South End
CTHM
North of US 18/151
North End
Borchort
Limit
Aroa of Pro Ire Vista
South of Riverside
End
End
CTHM
End
End
End
CTHPD
0.63
0.42
0.12
0.22
0.50
0.4
-0.14.
0,28
0.2
0.1
0.19
0.59
0,2
0.28
_0.75
_045_
0.33
0,6
046
OOG
028
0.16
0.04
01
0.78
Local
Local
Local
Local
Major
Loenl
Locnl
Local
Local
Local
Local
Local
Major
Lout
Locnl
l\ta|
Ma|
Ma|
>r
ar
ar
_L<iCal_
Local
_Local
Local
Local
Local
Ma)or
332G
221G
G34
11G2
262S
2112
761
1478
1056
528
1003
3115
1056
1503
3960
2376
1742
3168
2429
317
1478
845
220
528
4118
7
3
3
2
5
9
_8_
8
7
7
7
8
5
s
_6_
_6_
5
5
5/4
6
6
6
6
5
4
2019
2022
2022
2021
2021
2021
2024
2024
2019
2019
2023
.2020
2019
_2015_
-2.015_
2015
2018
-2P-2B-
2019
$ 47,900
$ 30.413
$ 10.9S8
S 14,446
S 44,859
_?. 14,211,293
S 37,896,782
S 9,8GS,954
_¥ 23,685,489
5 13,939
S 32,525
S 23,232
-?_-. 87,120
.£__
.£__
S 84,269
S 44,141
S 99,750
S 20.064
S 40.128
S 57,114
J_90.25S.s
£
I 156,499
$
$
$
$
s
s
j_-_$
s
s
$
s
$
338,936 S 382,630 $ GG4.435 S 664,435 $
Town of Verona 2027 Cost Deviation
Using 2026 estimates, bids and As built costs
spring Rose Road CSouth)
Original Estimate
As Bid
As Constructed
Spring Rose Road CMiddle)
Orifiinal Estimate
As Bid
AsConstrucTed
Bobcat Lane
Original Estimate
As Bid
As Constructed
Stoney Ridge Circle
Original Estimate
As Bid
As Constructed
Boulder Hill Court
Original Estimate
As Bid
As Constructed
Rock Ridge Court
Original Estimate
As Bid
As Constructed
Sandy Ridge Court
Original Estimate
As Bid
As Constructed
Wesner Road
Original Estimate
As Bid
As Constructed
White Crossing Road
Original Estimate
As Bid
As Constructed
White Crossing Road Extended to CTH PD
Origins I Estimate
As Bid
As Constructed
Length
3,170
1,742
2.186
1.370
435
925
242
570
2132
1980
$75,141
$61,856
$62,140
$47,240
$40,534
$33,468
$54,122
$44.989
$41.127
$19,112
$26.899
$32.280
$4,059
$3,432
$3,422
$12,165
$6.665
$6.665
$7.476
$1.984
$1.984
$3,478
$2,883
$3,246
$61.340
$52,936
$55,559
$50,000
$51,466
$54,879
Per foot Cost
$23.70
$19.51
$19.60
$27.12
$23.27
$19.21
$24.76
$14.19
$12.97
$13.95
$19.63
$23.56
$9.33
$7.89
$7.87
$13.15
$7.21
$7.21
$30.89
$8.20
$8.20
$6.10
$5.06
$5.69
$28.77
$24.83
$26.06
$25.25
$25.99
$27.72
Notes
18 foot width
Cul-de-sac
ncludessome
curbing
Cul-de-sac
Cul-de-sac
1 -3/4" overlap
1 -3/4" overlap
contingencies Engineering Inflation Total Estimated
(5%) (8%) Factor 7% 2027 Est.
$20.491
$20.581
$24.431
$20.171
$14.901
$13.621
$20.621
$24.741
$8.28|
$8.26|
$7.57|
$7.571
$8.61
$8.61
$5.31
$5.98]
$26.071
$27.361
$27.291
$29.10|
$22.13
$22.23
$26.3S
$21 -7S
$16.05
$14.71
$22.27
$26.72
$8.9£
$8.9;
$8.T;
$8.1';
$9.3C
$9.3C
$5.7^
$6.4(
$28.1 (
$29.5;
$29.4E
$31.4;
$25.36
$23.68
$23.79
$29.02
$28.23
$23.31
$26.49
$17.22
$15.74
$14.93
$23.82
$28.53
$9.9£
$9.5';
$9.5£
$14.0';
$8.7'1
$8.7-1
$33.0E
$9.9£
$9.9£
$6.5:
$6.1':
$6.91
$30.7£
$30.1:
$31.6:
$27.0;
$31.5^
$33.6:
$24.27
$26.85
$19.82
$22.45
$9.70
$10.52
$17.65
$6.53
$79.09
$30.84
$30.73
Average Per Foot Cost 1-1/2 Inch overlay and Chip Seal
Average Cost Per foot 2 inch overlay with milling
Average Coar Chip Seal
$23.65
$47.56
$11.10
TOWN OF VERONA
TO: Town Board of Supervisors DATE: October 2, 2026
FROIVI: W. Christopher Barnes, Public Works Director
SUBJECT: 2026-27 Contract Snow and Ice Removal Contracts
Beginning in 2018, the town Public Works Department began plowing certain private
development roads under contract. The snow and ice removal of condominium subdivision
roads was approved by the town Board on 1/2/2018 (attached). The specific condominium
subdivisions/roads include Woods at Watch Hill, Deer Haven, and Fox Hills private
Homeowners Associations (HOAs). For the 2025/26 winter season, the 3 private HOA's were
billed and paid the town $15,675 for the service. To date, town staff have not experienced any
difficulties or problems in plowing the private roads.
Snow and ice removal consists of plowing accumulated snow greater than 2" as part of the
standard snowplow routes. Sand and salt materials are applied as needed in accordance with
standard practice and "Salt Wise" guidelines. The cost for snowplowing is based upon the
annual equipment rental rates established by the Wisconsin Department of Transportation,
standard Town labor rates, and annual salt contract cost per ton. For 2026/27 the hourly rate is
$300.00 with a 1-hour minimum charge. Each of the three HOA's has communicated their
agreement with the hourly rate and has requested the town continue to provide the service.
It is recommended the Board approve the 2026/27 hourly rate with the existing HOA's for
2025/26.
Attachment
TOWN_OF /
VERONA^
ATTACHMENT "A"
Town ofVerona 2026-27
Snowplow Maintenance Rates
WISDOT Annual Rental Rates 1/1/2024ClassRate
Truck Rental Rate (hr) 118
Spreader rate (hr) 424
Retractable wing plow (hr) 635
Snowplow-truck mounted (hr) 633
Truck/ Leader Storage Overhead
Total Equipment RateQncluding fuel) per hr
Material Current Salt and sand material cost per ton
$103.62
$14.46
$18.46
$18.86
$23.31
$178.71
Salt/Sand250 Ibs/trip @$101.06
Labor
Salt cost per ton
(2026-27)$12.63
Labor Rate( Patrolman) per hour
Total Hourly Rate
$85.00
$299.65
Average time to plow private roads
2" snowfall
Mainline streets
Clear cul de sacs
Clear entrance intersection
4-6" snowfall may take a vehicle call back
Mainline streets
Clear cul de sacs
Clear entrance intersection
Minimum Charge for Town forces to perform snowplowing
Estimated
Hours
0.5
0.25
0.25
1.0
1
0.5
0.5
2.0
hour
hours
$299.65 per event
USE $300.00 per event
west to allow for an alternate exit. Laura Dreger explained that she liked the improved plan, but she felt
the Town was growing too fast.
• Enburg moved to approve the rezoning of Parcel no. 062/0608-361-8810-0, Parcel no. 062/0608-361"
9090-0 and Parcel no. 062/0608-361-8501-0 from RH1 to R4 conditional upon the review by the Town
Attorney and signing by the Town Chair of the Developer Agreement. Second by Maxwell. Maxwell:
aye, Enburg: aye, Duerst: aye, Dreger: no, Geller: aye. Motion earned.
• Maxwell moved to approve the draft of the condominium plat with a maximum of 16 single-family
residential units with no unit being smaller than 1.5 acres, A common areas (private road, shared
driveway, and two out lots), v/ith an easement to be recorded for the Ice Age National Scenic Trail as
show on the condominium plat, and with an easement for a road to connection to the property on the
West. For the road easement to be implemented to the West the Town Board would have to approve
this road. Second by Duerst. There was a lengthy discussion about the road easement. Robert Proctor
noted that the developer could have established the easement after approvals without notifying te
Town. He also noted that many municipalities require such easements. Maxwell: aye, Enburg: aye,
Duerst; aye, Dreger no, Geller: aye. Motion carried.
• Maxwell moved to approve the deed restriction limiting the plat to a maximum of 16 single-family units
with no unit being smaller than 1.5 acres, 4 common areas (private road, shared driveway, and two out
lots), with an easement to be recorded for the Ice Age National Scenic Trail as shown on the
condominium plat map, and with a road easement to connect to the property on the West. Second by
Duerst. John Wright clarified that nothing can be built on the out lots. Robert Proctor noted that small
structures like a kiosk or mailbox could be built, but not a residence. Maxwell: aye, Enburg: aye, Duerst:
aye, Dreger no, Geller: aye. Motion carried.
iv. Land Use application 2017- 9 - for property located at 11451 Mid Town Road submitted by Justin Temple for
OAJ Development. The purpose of the application is the rezoning from A3 to R4 to allow for condominium
development made up of 29 single family units on 62.9 acres. - Doug Maxwell recused himself from the
conversation and left the table. Amanda Arnold took over the coordination of the presentation.
• Presentation - Justin Temple gave an overview of the project. He was asked to include road easements
to adjacent properties to the north and south on the two out lots as the previous project had and he
agreed to.
• Public comment - None. Amanda pointed out a late arriving letter from a neighbor that she had printed
and provided for the Board.
• Motion by Duerst to approve the rezoning of lot of Parcel no. 062/0608-961-8295-0 (Lot 2 of CSM
U442), from A3 to R4 conditional upon the review by the Town Attorney and signing by the Town Chair
of the Developer Agreement. Second by Enburg. Maxwell: abstained, Enburg: aye, Duerst: aye, Dreger
aye, Geller: aye. Motion carried.
• Motion by Duerst to approve the draft of the condominium plat with a maximum 29 single-family
residential units with no unit being smaller than 1.5 acres, 3 common areas (private road, and two out
lots), and with an easement for a road to connect to the property on the North and South. For the road
easement to be implemented, the Condo Declaration would have to have the Town Board approval to
allow for this road. Second by Enburg. Maxwell: abstained, Enburg: aye, Duerst; aye, Dreger: aye,
Geller: aye. Motion carried.
• Enburg moved to approve the deed restriction limiting the plat to a maximum of 29 single-family units
with no unit being smaller than 1.5 acres, 3 common areas (private road and two out lots) and with an
easement for a road to connect to the property on the North and South. Second by Duerst. Maxwell:
abstained, Enburg: aye, Duerst: aye, Dreger aye, Geller: aye. Motion carried.
b. Public Works
i. Discussion and possible action re: plowing for contract in condominium subdivisions - Amanda explained that
she had gathered a few more prices from private contractors and discussed the concept with the Public Works
Committee, but they had some concerns. Manfred Enburg explained that he feels the Town has enough to do
without taking on this extra responsibility. Mark Gellersaid he's fine with doing it if the Town doesn't compete
with local contractors. He suggested charging double the going rate, Maxwell made a motion to approve the
plowing of private roads at no cost (because they are already paying taxes). There was no second so the motion
failed. Tom Mathies reminded the Board that governments are not supposed to make a profit off of providing
sen/ices. Mike Duerst made a motion to plow private roads in condominiums and charge 1 ,5 times the average
of three quotes from private contractors. Second by Maxwell. Amanda explained that she would have to work
with the town attorney on a contract. Maxwell: aye, Enburg: no, Duerst: aye, Dreger: aye, Geller: aye. Motion
carried.
ii. Manfred Enburg reported on his concept of breaking the public works road budget up into three categories: one
fund for large capital project, another for chip sealing and small repairs, and a third for repairs that Mark Judd
would make.
iii. Mike Duerst asked for more direction on the purchase of a generator. The Board discussed whether or not the
town hall would ever be used as a shelter or an emergency headquarters, and decided that was unlikely. Mark
Geller reported that he had talked to the architect of the building and he said it would take a long time for the
building to get cold enough for pipes to break. Amanda Arnold added that she had talked to the power company
and they said most power outages are in the summer and less than a day. The Board thus decided that a
Town Board Minutes Page 2
TOWN OF VERONA
TO: Town Board of Supervisors
Public Works Committee
DATE: October 1,2026
FROM: W. Christopher Barnes, Public Works Director
SUBJECT: September 2026 Report
The monthly Public Works Department Activity report is submitted for the information and review
of the Board and the Committee. September was a very active month with continued callouts
for downed trees and completion of town and related construction projects. Seasonal mowing
and brush cutting continued along with pothole and asphalt wedging repairs. Numerous citizen
and resident concerns and action requests were received and addressed on a daily basis. If you
should have any questions, please let me know.
Road Maintenance Activities
• Continued third round of roadside mowing.
• Managed downed trees on Bobcat Lane, Spring Rose Road and Paulsen Road.
• Continued brush and slope mowing with the boom mower.
• Installed/reinsfalled 4 signs (likely 2 were stolen)
Equipment and Facility Activities
• Set up for various community room events.
• Continued operation of the olarwith system startup. Approx20kWof daily production.
• Completed the stormwater basin clean out with Edgerton Construction.
Stonnwater Basin cut to grade
1
Sanitary Sewer Utility Activities
Continued working with MMSD on the interceptor sewer replacement from Goose Lake
to the Fitchrona Road Pump Station #12. Bids received September 24, 2026. The low
bid was submitted by Minger Construction in the amount of $12,849,043. The total
Town/City share is $100,625 to be splint proportionally.
Enflineerina Activities
• Continued working with Fitchburg city staff and utility companies on the Fitchrona Road
Reconstruction project. Two property owners are contesting the city's right to acquire
right of way near the proposed Lacy Road roundabout Without the right of way
acquisition. Utility relocations are currently underway. A separate tree and grubbing
contract is complete. Additionally, the City of Fitchburg is working to gain approval from
the DNR for a non-motorized trail under the Military Ridge State Trail bridge.
Subsequently, the project bid opening has been postponed until late fall and construction
to begin in early 2027.
• Substantial completed the public infrastuce construction on the Sugar River Vista
subdivision. Paving is complete through binder and gravel shoulder is installed. Utilities
have been installed and all restoration in the right of way is complete.
• Began preparation of the 2027 capital improvement and operating budgets.
• Began the bi-annual road rating and certification program required by WISDOT. All
roads must be updated and submitted by December 2026.
• Assisted residents in understanding town road speed limits (Dairy Ridge Road)
ec: Sarah Gaskell, Town Planner/Administrator