VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PUBLIC HEARING & PLAN COMMISSION
RICHARD JUNG FIRE STATION – AUGUST 26, 2026, at 6:30 PM
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
President Gehrke called the Public Hearing and Plan Commission meeting to order at 6: 31p.m.
Roll Call
Present: Village President Gehrke; Trustee Baum; Commissioners Oelhafen, Eberle, Howard,
McCormack, and Lesser; Planner Sumwalt; Engineer Leisses; Attorney Larson; Administrator Green; and
Clerk Cappozzo.
Absent: None.
Public Hearing: A request by Mike Wichert/ Ausblick, Inc., for a Conditional Use Permit for Downhill
Skiing and Snowboarding – with lights for Ausblick Ski Hill in the PR Zoning District, on the property
located at W260N6395 Mary Hill Road, known as Tax Keys LSBT 0257.999.002 and LSBT 0224.999.005 .
President Gehrke reviewed the procedure for the public hearing, Clerk Cappozzo read the published
Notice of Public Hearing into the record, and President Gehrke opened the Hearing.
Planner Sumwalt presented a detailed overview of the proposal. He explained that the primary
impetus for the new Conditional Use Permit (CUP) application was Ausblick , Inc.'s acquisition of an
adjacent 1.97-acre parcel (Tax Key LSBT 0224.999.005) from a neighboring property owner to the north,
which the applicant intends to incorporate into its site plan and plan of operation. Planner Sumwalt
further explained that because all prior approvals for the ski hill had been issued by Waukesha County
under its former shoreland zoning jurisdiction, and that authority had transferred to the Village upon
incorporation, a new CUP issued by the Village was required rather than a si mple amendment to the
county's prior approval.
Planner Sumwalt noted that the 2010 Waukesha County CUP was included in the packet for reference.
He stated that the petitioner had submitted responses to all general conditional use standards under
Section 18.04(d) of the zoning ordinance, and that staff had reviewed those responses. He confirmed
that, consistent with the Commission's past practice on conditional uses, the body would be asked to
determine whether the petitioner had sufficiently responded to each standard.
Planner Sumwalt summarized the key elements of the proposed site plan and plan of operation:
● New Parking Lot: The principal reason for the application was the addition of 99 new parking
stalls on the 1.97 -acre acquired parcel to the north, intended to address longstanding traffic
PLAN COMMISSION
August 26, 2026
Page 2 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
congestion and overflow parking on Mary Hill Road. The existing facility has approximately 124
off-street parking spaces, bringing the proposed total to approximately 223 spaces. Planner
Sumwalt noted there are no specific parking standards in the zoning ordinance for ski hills, but
that an assembly use standard based on a lodge capacity of approximately 200 persons
would suggest a need for roughly 150 spaces. Ausblick had provided capacity information
indicating a hill capacity of approximately 300 people, an average daily use of 100 to 125
people, a lodge capacity of 200, and a staff count ranging from 12 to 20 persons.
● Phased Development: The applicant proposed a phased approach to development,
incorporating improvements previously approved by Waukesha County that had not yet been
completed. Planner Sumwalt identified the following phases and approximate timelines: new
parking lot construction (2027 –2028); snowmaking and lighting infrastructure (2028); fill and
grading completion (2031); a new quad chairlift (2032); and a proposed utility distribution
building (approximately 2031). Proposed Condition 11 of the site plan plan of operation would
require all approved phases to be completed by December 31, 2032, with any extension subject
to Plan Commission approval.
● Outdoor Lighting: Planner Sumwalt addressed two distinct aspects of the lighting plan. First, the
proposed new parking lot would be served by 30 -foot, full-cutoff pole lighting, consistent with
the Village's zoning code requirements. Second, the proposed new ski hill slope lighting
presented a more complex situation. The applicant proposed "raptor -style" floodlights
mounted at approximately a 70-degree angle to provide long-distance illumination of the ski
slope for skier safety. Planner Sumwalt acknowledged that ski hill operations typically require
specialized sports or flood lighting rather than strict full -cutoff fixtures, and proposed a
compromise condition requiring all outdoor lighting to be operated in a manner that minimizes
glare, sky glow, and light trespass, with ski slope lighting remaining illuminated only during
public operating hours and extinguished within one hour of closing. He further recommended
that the ski slope floodlights be equipped with visors or shields to minimize glare and light
trespass onto adjacent properties, and that a final lighting plan be subject to review and
approval by the Zoning Administrator.
● Outdoor Events and Amplified Music: Planner Sumwalt noted that the petitioner's narrative
described various club-sponsored events and community activities. He stated that under the
Village's PR zoning district, temporary uses are permitted subject to Village Board approval. He
proposed Condition 3 in the staff review to formalize that requirement. He also noted a
proposed condition prohibiting live music, concerts, and other outdoor amplified
performances, while acknowledging the existing practice of background music being piped to
the slope. He indicated he wished to hear from the petitioner on this point.
● Hours of Operation: Proposed hours of 7:00 AM to 12:00 AM were presented. Planner Sumwalt
clarified that the prior county CUP had listed 11:30 PM as the limit, but that this likely reflected
lights-out for ski operations rather than accounting for staff cl ose-out procedures, which the
proposed midnight closure time was intended to address.
PLAN COMMISSION
August 26, 2026
Page 3 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Mike Wichert, President of Ausblick , Inc., thanked the Commission for the opportunity to present. He
provided brief background on the ski hill, noting it originated through Marquette University around 1950
and that the current club has operated for approximately 55 years. He confirmed that the lighting visor
approach would be workable for the ski hill and affirmed that the additional 99 parking stalls were
intended to address past overflow parking issues on Mary Hill Road during special events.
Mr. Wichert expressed some concern regarding conditions related to outdoor events and amplified
music. He noted that the ski hill has historically had music piped out to the slope for the past 25 years
at a very low volume, and that events such as men's an d ladies' days, gala events, and occasional
weddings have occurred, with live music generally confined to the lodge interior. He sought
clarification on what level of board approval might be required for routine club activities and events.
Josh Pudelko of Trio Engineering, representing the applicant, added that Ausblick has operated under
an existing CUP and has been incrementally building out improvements that were previously
approved. He emphasized that the current application was primarily informative and additive in
nature, focused on the parking lot expansion, and w as not intended to introduce fundamentally new
elements to the ski hill operation. He noted that items such as the new chairlift and slope lighting had
already been included in prior county approvals and were simply being carried forward and
memorialized under the Village's jurisdiction.
Questions from Plan Commission and Village Board Members
Commissioner Lesser asked whether the site plan referenced in the 2010 county CUP —specifically a
plan dated April 22, 2010 —had been obtained. Planner Sumwalt confirmed that he had formally
requested the document from Waukesha County but received only the CUP itself, with no
accompanying plans. Clerk Cappozzo confirmed that no such plans were on file in the village's
records. Mr. Pudelko stated that the development team had replicated the content of the 2010 plan on
the current site plan, incorporating all previously approved improvements. Mr. Lesser stated that he
would like to see the original plan document and reiterated that understanding its contents was
important context for the Commission's deliberations.
Commissioner Lesser also referenced Condition 5 of the 2010 county CUP, which specified that only
one special event —a members-only racing event —was permitted. He noted that in practice, events
with attendance of up to 400 guests had reportedly occurred, with vehicles parked on both sides of
Mary Hill Road, in apparent violation of Conditions 5 and 6 of the existing CUP, which also prohibited
parking within the road right -of-way of Mary Hill Road. Mr. Lesser stated that these violations raised
concerns about the transition to a new CUP and the need for comprehensive conditions going forward.
Commissioner Lesser raised further questions regarding the three high-capacity wells on the property
used for snowmaking. He inquired about the depth, casing size, capacity, and frequency of operation
of the wells, and expressed concern that large withdrawals —potentially exc eeding 400 gallons per
minute per well—could create voids in the aquifer, adversely impacting neighboring private wells. He
PLAN COMMISSION
August 26, 2026
Page 4 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
stated he had spoken with the DNR and believed the wells to have 12 -inch casings at approximately
1,000 feet in depth.
Finally, Commissioner Lesser also raised questions about existing lighting, noting that a fixture near
the top of the ski lift appeared to be located approximately 20 to 30 feet above the tree canopy and
was creating glare visible from adjacent subdivisions, including Bracklin Drive. He questioned whether
the new lights, to be installed atop the raised grade, would be similarly positioned above the tree line
and suggested that directional, downward -facing fixtures should be required for both new and
existing lights.
Trustee Baum asked whether the new slope lighting would be substantially similar to the existing
lighting. Mr. Wichert confirmed that the same general type of lighting would be used, with a transition
from metal halide to LED technology already underway. J ohn Fink, Operations Director at Ausblick ,
clarified that the existing lighting system does not support remote dimming or percentage -based
control, and that the proposed new lighting was not planned to incorporate that feature either, with
operations managed via individual circuit control.
Commissioners asked about the operational feasibility of requiring Village Board approval for
temporary uses and club events, noting that only one board meeting occurs per month. Mr. Wichert
expressed concern that many routine member -benefit events—such as men's days a nd ladies' days
occurring throughout the ski season—had never required outside approval, and sought clarity on what
level of oversight was intended. Administrator Green suggested that Ausblick provide an annual list of
events for board approval at a single meeting, rather than seeking approval for each event
individually, to minimize administrative burden.
Commissioners asked about the square footage of the lodge and the approximate number of people
inside during peak events. Mr. Wichert stated that the usable public space in the lodge is
approximately 6,000 to 7,000 square feet, exclusive of office areas. He estimated t hat during large
events with 400 attendees, at least half of those individuals would be on the hill or on the deck at any
given time.
The board asked about the fire department's review of the lodge's occupancy capacity. Operations
Director Fink stated that the fire department conducts two annual inspections and has never raised
capacity concerns, though he acknowledged that no formal occupancy pos ting had been observed
in his tenure.
Commissioner Eberle asked whether the stormwater management plan for the new parking lot had
been approved by the county. Mr. Pudelko confirmed that a separate stormwater management plan
for the parking lot expansion had been submitted to Waukesha County for review and approval, but
that the permit had not yet been issued.
PLAN COMMISSION
August 26, 2026
Page 5 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Attorney Larson clarified, in response to Commissioner Lesser's earlier question, that the issuance of a
new Village CUP would supersede and terminate the existing Waukesha County CUP. Planner Sumwalt
explained that the process was intentionally structured as a new application so that the Village would
have its own approval document under current Village zoning standards, rather than attempting to
amend a county -issued permit. He noted that the applicant's submitted plans were intended to
incorporate all previously approved improvements and ongoing work through 2032.
Administrator Green and Planner Sumwalt confirmed that the question about the legal relationship
between the two permits and the need for the new CUP to be comprehensive was addressed in the
record, and that the applicant's submitted responses were part of the official record.
Commissioner Lesser raised a concern regarding Condition 25 of the existing county CUP, which
required a 30 -foot buffer along the west and south lot lines consistent with deed restrictions. He
questioned whether the recently added fill material—described as raising the hilltop approximately 20
feet—encroached upon or altered the character of that buffer zone, and whether new light fixtures to
be installed on top of the elevated grade would be above the existing tree canopy. Mr. Pudelko
displayed the site plan on -screen, showing the 30 -foot buffer maintained along the south and west
lot lines, and confirmed that the existing topography and the proposed final contours were closely
aligned in those areas. He confirmed that skiing and light ing are not proposed within the buffer.
Applicants acknowledged that the raised grade would bring the hilltop to approximately the level of
the existing tree line, but stated that plans included a tree farm on the property for replanting as older
trees are removed, and that additional pines were planned along the west and south property lines.
Commissioner Eberle requested a formal landscape plan showing buffer plantings along the south
and west lot lines. Mr. Wichert affirmed the applicant's willingness to provide this.
Public Testimony
President Gehrke reiterated the rules of testimony —including the three -minute time limit, the
requirement to direct comments to the Commission, and the prohibition on yielding time to other
speakers—and invited members of the public to come forward.
Joan Plato, Lake Drive, asked for confirmation that the new parking lot access would be limited to Mary
Hill Road and would not include an outlet to Lake Drive. She expressed concern that the proposed
increase in parking capacity, combined with the new qua d chairlift potentially doubling the ski hill's
throughput capacity, could result in significantly more vehicles using Lake Drive as a shortcut to the
ski hill via Google Maps routing. She estimated that up to 110 additional vehicles per day could travel
through Lake Drive at 25 percent of expanded capacity. Ms. Plato also raised concerns about
increased light pollution from the expanded ski hill lighting and stated, in direct rebuttal to the
applicant's characterization, that the piped music from the hill is clearly audible in Beacon Hills on
weekends and evenings. She further expressed concern that expansion of the ski hill's snowmaking
and stormwater systems would increase impacts on surrounding wetlands.
PLAN COMMISSION
August 26, 2026
Page 6 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Randy Plato, Lake Drive, questioned the credibility of the applicant's stated 400 -person maximum
capacity, suggesting that the magnitude of planned expansions —additional parking, a new chairlift,
and additional snowmaking capacity —indicated an intent to in crease attendance well beyond that
figure. He stated that the noise from the ski hill is clearly audible inside his home. He expressed concern
about parking continuing to expand beyond the 99 stalls proposed, and reiterated the question about
whether the new parking lot would have any outlet to Lake Drive. Mr. Plato also raised concerns about
retention pond overflow contributing to standing water in his roadside ditch, and noted that his well
water had recently appeared disc olored, which he suspected may be related to the ski hill's
snowmaking water withdrawals.
Jill (last name not provided), Ridge Drive in Ironwood East , expressed concern that snowmaking
operations during overnight hours produce excessive snow drift onto Mary Hill Road, making it
treacherous for drivers during winter. She requested that this issue be addressed within the conditional
use permit through improved coordination between Ausblick and the Village's public works
department. She also asked that the Commission consider requiring shielding of existing ski hill lights
that cause glare for drivers approaching Celtic Ridge on Bracklin Drive in winter. She raised the issue
of increased litter along Mary Hill Road attributable to ski hill traffic and requested that the applicant
be required to conduct additional trash pickups along that stretch, perhaps twice annually.
Vincent Damato, Saint Patrick's Court , stated that he owns a lot adjacent to the ski hill and that his
primary concern was light pollution from the ski hill's floodlights. He expressed that requiring visors or
shields on the lights was a logical step and raised no objection to the lighting pol e height, noting that
elevation could actually assist in directing the light more effectively. He also noted that with
construction planned for his lot, he was hopeful that the conditions of the CUP would be clearly
established so that expectations were known in advance.
Steve Garman, Bracklin Drive , stated that his property line directly abuts the ski hill to the south. He
confirmed that the light at or near the top of the ski lift shines directly into his bedroom and his
children's bedrooms each night. He requested that any lighting conditions appli ed to the new
installation also address the existing lights causing this issue. Mr. Garman also testified directly to the
aquifer impact concern, stating that since moving to the property in 2023, his family has experienced
multiple multi-day periods without well water that corresponded directly with snowmaking operations
at Ausblick, and that water service was restored when the snow machines were shut off. He requested
that the CUP include conditions establishing a maximum daily or weekly pumping volume to protect
neighboring wells.
Edward Ek, Ridge Drive, identified himself as a sustainability engineer specializing in nozzle applications
with direct knowledge of snowmaking systems. He stated that a single snowmaker with 30 nozzles
operating at 400 PSI can consume approximately 200,000 gallons of water per day, meaning that
operating 15 machines simultaneously could result in water usage equivalent to that of a data center—
PLAN COMMISSION
August 26, 2026
Page 7 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
approximately 3,000,000 gallons per snowmaker cycle. He expressed concern that while neighboring
residents use low-flow fixtures and conservation measures, the ski hill's snowmaking operation draws
an amount of water equivalent to ten swimming pools per ma chine per day. He requested firm
regulatory limits on snowmaking water usage and called for reduction in the total snow production
area permitted under the CUP.
Randy Felker, Bracklin Drive in Celtic Ridge, thanked the Commission for the rigor of its questioning and
requested that any conditions adopted in the new CUP be written with sufficient specificity to be
enforceable, noting that several conditions in the 2010 county CUP had not been adhered to in
practice. He asked that conditions addressing music volume, lighting levels, and water usage include
measurable data points capable of serving as an enforcement standard. He expressed concern that
as the ski hill expands, these issues will intensify without clearly defined and enforceable limits.
Bryan Lindgren of Newman Developments appeared as a representative of the property owner to the
north and northeast of the ski hill, from whom Ausblick is acquiring the 1.97 -acre parcel. He testified
that his company conducted significant due diligence before purchasing the Meissner property,
including review of Ausblick's operations, hours, and history, and that those uses were fully disclosed
in deed a nd title documents. He stated that Ausblick predates Celtic Ridge and the adjacent
neighborhoods, and that homes in proximity to the ski hill have proven to be among the most desirable
his company has built. He expressed support for the CUP application, characterizing the proceeding
as an opportuni ty to memorialize longstanding uses and address any deficiencies in the prior
approval paperwork.
No members of the public appeared on Zoom to provide testimony.
Responses to Public Comment
On the question of parking lot access to Lake Drive, Planner Sumwalt confirmed that a condition
adopted at the time of the Certified Survey Map approval for the Alpine Hills subdivision —which
created the 1.97-acre outlot—required that upon conveyance to Au sblick, access to Lake Drive would
be extinguished and all access to the parcel would be through Ausblick's property to Mary Hill Road.
The site plan as proposed reflects this, with a second access point on Mary Hill Road only.
On the question of the quad chairlift's speed, Mr. Wichert confirmed that the replacement chairlift
would be a fixed -grip, single-speed quad, not a high -speed detachable chairlift. He explained that
the purpose of the replacement is to address the mechanic al obsolescence of the existing triple
chairlift, which dates to 1971 and for which replacement parts are no longer available. He noted that a
four-person chair accommodates more riders aloft simultaneously, thereby reducing crowding on the
ground and in the lift queue without increasing the rate of uphill movement.
On the question of snowmaking water usage, Operations Director Fink clarified that the ski hill operates
a 5,000,000-gallon retention pond and draws from its two high -capacity wells only when the pond
PLAN COMMISSION
August 26, 2026
Page 8 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
requires replenishment. He stated that at maximum draw, the two wells together pump approximately
750 gallons per minute. He confirmed that all snow machines operating simultaneously draw
approximately 2,500 gallons per minute from the retention pond, and that a full cycle of all machines
operating over three to four consecutive days would consume approximately 3,000,000 gallons. He
noted that snowmaking operations are weather -dependent and not subject to a fixed annual
schedule, and that the ski hill prefe rs to rely on natural snowfall to the greatest extent possible, given
the cost of artificial snowmaking. He further confirmed that the applicant plans to add six snowmaking
machines to the existing thirty, and that no additional high -capacity wells are planned. The third well
on the property is non-functional and there are no plans to restore it.
On the question of plowing of Mary Hill Road, President Gehrke acknowledged that the Department of
Public Works already coordinates with Ausblick and bills for snow removal attributable to ski hill
operations, but suggested that communication protocols be improved to ensure timely response
during snowmaking operations.
There being no further comments, President Gehrke closed the Public Hearing at 8:19p.m.
*********************************
Citizen Comments
None.
Approval of Meeting Minutes – 7/22/2026 Plan Commission
Motion by Baum, second by Lesser, to approve the minutes as presented. Motion carried unanimously.
Correspondence
Administrator Green advised that a notice had been received under Wisconsin Act 12 regarding a
temporary extension of operating hours for Amrize, the former LaFarge/Holcim quarry. Clerk Cappozzo
confirmed the notices were included in the meeting packet. No action was required on this item, and
no further discussion was necessary.
New Business
A. Ausblick, Inc. CUP for Downhill Skiing and Snowboarding with lights at W260N6395 Mary Hill Rd
President Gehrke opened discussion on the CUP application. Attorney Larson recommended that
the Commission proceed by addressing the standards set forth in the zoning ordinance as the
evidentiary framework for a quasi -judicial determination under Act 67, a nd then address
conditions following that review.
Commissioner Eberle asked that the applicant be made aware that approval of a new Village CUP
would supersede and terminate the existing county CUP, including all conditions and referenced
plans. Attorney Larson confirmed this. Mr. Pudelko acknowledged the applicant's understanding
PLAN COMMISSION
August 26, 2026
Page 9 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
and reiterated that the current site plan was intended to incorporate all elements from the 2010
county approval. Attorney Larson stated that to the extent previously approved work has been
completed or is ongoing, the new CUP would pick up where the count y approval left off, and that
the phased development schedule extending through 2032 was intended to address remaining
work.
Commissioner Oelhafen expressed concern that without the original 2010 plan document, the
Commission could not fully verify what had been approved and what remained outstanding.
Attorney Larson acknowledged the concern but noted that the document is unloca table at both
the county and village level, rendering it effectively unenforceable, and that the most practical
course was to ensure the new CUP comprehensively addresses the current site plan as presented.
Planner Sumwalt noted he had asked the applicant to confirm that all elements of the 2010
approval were reflected in the submitted site plan, which the applicant's representative affirmed.
The Commission proceeded to review each of the conditional use standards under Section
18.04(d):
Standard A – Compliance with Zoning District Regulations: The Commission found this standard to
be met. The property is zoned PR, and all active ski operations are confined to that district.
Standard B – Public Health, Safety, and General Welfare: The Commission identified several areas
of concern under this standard:
- Parking and traffic on Mary Hill Road: Administrator Green indicated that the Department of
Public Works would be directed to study the feasibility of posting permanent no -parking signs
along Mary Hill Road in the vicinity of the ski hill property, with th e matter to be referred to the
Public Works Committee. Commissioners discussed the option of allowing temporary overflow
parking on the grassy area north of the maintenance building during the one major annual
race event, subject to Village Board approval as part of the temporary use process, with the
expectation that the new paved parking lot would be completed within the 2027 –2028
timeframe. Operations Director Fink confirmed that a flat area north of the maintenance
building could accommodate approximate ly 70 vehicles on a temporary basis when the
ground is frozen.
- Coordination with the Department of Public Works during snowmaking operations: Staff was
directed to improve communication protocols between Ausblick and the DPW so that
snowplowing can be deployed more effectively when snowmaking is active and drift
accumulation on Mary Hill Road is anticipated.
- Aquifer and well impacts from snowmaking water withdrawals: The Commission discussed the
extent of the Village's regulatory authority over high -capacity well withdrawals, which are
primarily regulated by the Wisconsin DNR. Planner Sumwalt noted he had prep ared a draft
condition addressing coordination, monitoring, and response to impacts on neighboring wells,
without overstepping DNR authority. Attorney Larson noted that some municipalities have
PLAN COMMISSION
August 26, 2026
Page 10 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
required well protection agreements under which the operator is obligated to provide
alternative water supplies to affected neighbors if wells run dry during withdrawal periods.
Commissioner Oelhafen raised concerns about the burden of proof required to es tablish
causation, which Attorney Larson acknowledged was complex and potentially costly.
Commissioner Eberle requested that staff reach out to a knowledgeable DNR contact in the
private well supply division to obtain guidance on how to proceed, before the next meeting.
The Commission directed staff to pursue that inquiry and return with a proposed condition
addressing the secondary impacts of snowmaking withdrawals consistent with what the
Village's authority allows.
Standard C – Compatibility with Neighborhood Character:
- Landscaping and screening: Commissioner Eberle requested a detailed landscape plan
addressing buffer plantings —specifically evergreen trees —along the west and south lot lines,
to provide year-round screening for adjacent residents in Ironwood East, Celtic Ridge, and Saint
Patrick's Court. Planner Sumwalt noted that the staff review already includes a condition
(Condition 5) requesting a revised landscape plan, and stated that it could be amended to
explicitly address buffer plantings along those property lines. Mr. Wichert affirmed the
applicant's intent to plant evergreens along the west side and around the south portion of the
property.
- Outdoor lighting: The Commission discussed both existing and proposed lighting in detail.
Commissioner Eberle reiterated the concern that existing fixtures near the top of the ski lift are
positioned above the tree canopy and create glare into neighboring residences on Bracklin
Drive. Mr. Garman had testified that these lights shine directly into his bedroom. Operations
Director Fink stated that the existing lighting plan shows a lux value of zero at the property lines
and that all lighting is directed east, northeast, and north toward the ski runs. Planner Sumwalt
acknowledged that while foot -candle measurements at the lot line may comply with the
Village standard of 0.4 foot -candles, glare and visibility of the light source are not directly
captured by that measurement. The Commission directed staff to include a condition requiring
that the specific fixture identified as causing glare issues be shielded and directed to eliminate
spill toward adjacent residences, and that all new lights on the expanded hill be directional,
downward-facing fixtures with visors, aimed exclusively at the ski slope.
Standard D – Ingress, Egress, and Traffic Hazards: The Commission acknowledged the proposal to
add a second access point on Mary Hill Road and generally found this to be a significant safety
improvement. Commissioners raised the question of whether acceleration and deceleration lanes
should be required at both access points on Mary Hill Road, as has been done at other nearby
subdivisions. Following discussion, the majority of the Commission did not find sufficient evid ence
to require a Traffic Impact Analysis, given that the number of vehicles using the facility was not
projected to increase beyond current levels and a second access point was being added. Staff
was directed to review the access design details for both entry points and ensure they are clearly
and properly depicted on the site plan.
PLAN COMMISSION
August 26, 2026
Page 11 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Standard E – Adequate Off-Street Parking: The Commission discussed the proposed 223 -space
total parking provision. Commissioners generally found the number sufficient given the applicant's
stated maximum attendance of approximately 400 persons arriving pre dominantly in family
vehicles and the historical maximum overflow of 40 to 70 vehicles on the road during the annual
race event. The Commission noted that the Village Board approval process for temporary uses,
including the major race event, could incorpor ate conditions for temporary grass parking in the
overflow area and parking direction by volunteers, as has been the applicant's historical practice.
Permanent no -parking signs on Mary Hill Road were identified as a necessary complementary
measure. Commiss ioners also noted that if the parking proved insufficient in practice,
enforcement through the temporary use approval process could address the situation on a case-
by-case basis.
Standard F – Noxious or Offensive Uses: Discussion focused primarily on amplified music.
Commissioners noted that several neighboring residents had testified that background music
piped to the slope is clearly audible from their properties, while other Com missioners noted no
noise complaints had been received by village staff. Planner Sumwalt clarified that proposed
Condition 5 of the CUP, as drafted, would prohibit live music, concerts, and other outdoor amplified
performances, but would not affect the existing background radio music played on the slope,
which does not constitute a live performance. The Commission discussed whether the prohibition
on outdoor amplified performances was appropriately tailored, given that occasional weddings
and deck events have historically included some level of music. It was noted that removing
Condition 5 and instead routing such events through the Village Board temporary use approval
process would preserve flexibility while mainta ining oversight. Planner Sumwalt noted that these
two approaches—a flat prohibition versus a board approval pathway —are in tension and would
need to be reconciled in the revised conditions. Staff was directed to address this in the revised
CUP draft.
Standards G through J: The Commission briefly reviewed the remaining standards. On Standard G
(effect on neighborhood property values), Attorney Larson noted that no appraisal or documented
evidence of diminished property values had been submitted; one res ident had expressed a belief
that values were being reduced, while a professional developer testified that proximity to the ski
hill increases property desirability. The Commission found no substantial evidence of harm to
property values. Standards H (orde rly development), I (public interest), and J (other standards of
the ordinance) were reviewed without significant concern or dissent.
Following the review of all standards and the extensive discussion of conditions requiring further
development, the Commission agreed that the matter should be tabled to allow staff time to revise
and supplement the conditions document prior to the next meeting. President Gehrke emphasized
that the revised materials must be distributed to Commissioners with sufficient time for review
before the meeting —well in advance, not the day before. Attorney Larson summarized the
Commission's legal posture: the standa rds had been found to be met, subject to the creation of
PLAN COMMISSION
August 26, 2026
Page 12 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
sufficient conditions to address the concerns raised, and staff would work with the applicant to
develop workable and reasonable conditions for the Commission's consideration at the next
meeting. Motion by Lesser, second by Howard to table the item . Motion carried unanimously.
B. Ausblick, Inc. for SPPOO Amendment for existing Ski Hill at W260N6395 Mary Hill Rd
The Commission agreed that the Site Plan/Plan of Operation amendment is directly dependent
upon the disposition of the CUP application and cannot be acted upon independently. No
substantive discussion was held on this item. Motion by Eberle, second by Lesser, to table the
item. Motion carried unanimously.
C. Dolce Vita Farms for new SPPOO for equine-assisted therapy/coaching at W239N8960 North Road
Planner Sumwalt introduced this item, explaining that the applicant, Desirae Koning, resides on the
subject property at W239N8960 North Road and operates an equine -assisted coaching and
therapeutic service, working with individuals in recovery from grief and trauma. The applicant uses
her own horses on the property and hosts clients for sessions. Planner Sumwalt noted that the A -
10 zoning district lists certain agricultural business -related uses as permitted subject to site
plan/plan of operation approval, and that while the specific use is not enumerated in the code,
staff determined it to be sufficiently similar to other agricultural business -related uses to be
approvable under that framework, subject to the Commission's concurrence. He noted no
concerns with the use, subject to the standard boilerplate conditions in the staff review.
Commissioner Oelhafen, who acknowledged misreading the application initially, confirmed upon
clarification that the applicant's animals remain on -site at all times and that no external animals
are brought onto the property for the sessions. Ms. Koning confirmed this.
Motion by Lesser, second by Howard, to approve the Site Plan/Plan of Operation for Dolce Vita
Farms, LLC, as presented and subject to conditions as listed in the staff review. Motion carried
unanimously.
D. Heartland Ecological for new SPPOO for ecological consulting at W230N5000 Betker Dr, Suite B
Planner Sumwalt introduced the request from Kate Kraemer of Heartland Ecological Group, an
ecological consulting and restoration business proposing to occupy Suite B of the multi -tenant
industrial building at W230N5000 Betker Drive, in the M-2 Zoning District. He described the business
as conducting prairie restoration and wetland enhancement work, with staff who conduct field -
based wetland delineations and related ecological services. Equipment is stored on -site, with
exterior storage space available at the rear of the building, and the majority of materials are stored
inside. Planner Sumwalt noted no concerns with the use and commended the applicant for a
thorough and detailed submittal.
The applicant, Kate Kraemer, appeared via Zoom and expressed appreciation for the
Commission's support in moving through the approval process.
PLAN COMMISSION
August 26, 2026
Page 13 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Motion by Eberle, second by Oelhafen, to approve the Heartland Ecological Group new tenant Site
Plan/Plan of Operation, as presented and subject to conditions as recommended by the planner.
Motion carried unanimously.
E. Jordan Smith for Conceptual Review of development options for N88W24882 North Lisbon Road
Planner Sumwalt introduced this conceptual review item, noting that no formal action was
requested. Applicant Jordan Smith, whose family owns the subject property at N88W24882 North
Lisbon Road in the A -5 Zoning District, appeared via Zoom and presented tw o conceptual
development options for the undeveloped land north of the existing family farmstead.
Planner Sumwalt explained the key items for consideration.
● The property is currently zoned A -5. Development of multiple lots in certain configurations
would require a rezoning to another district.
● The zoning ordinance permits development on a shared private driveway without a dedicated
public road under specific conditions, including a minimum lot size of 3 acres for lots not having
frontage on a public road and a minimum driveway width.
● A road reservation from E -Jay Lane through the neighboring property to the east was
established in 1999 as part of a prior Certified Survey Map and has been carried forward on
subsequent CSMs. This reservation represents a potential future right -of-way for access from
E-Jay Lane but is not currently improved or under Village ownership. The neighboring property
owner, Patty, has submitted a written request to have the road reservation removed.
● Mr. Smith confirmed that he has been in communication with both the eastern neighbor
(whose land includes the road reservation) and the neighbor to the north (Cliff Drake), both of
whom are aware of his plans. He stated that he intends to purchase the appr oximately 100-
foot-wide strip from the eastern neighbor to create lot frontage on E -Jay Lane and extinguish
the road reservation.
Mr. Smith reviewed his proposed options for the Commission to consider.
1. Option 1 (Preferred): Acquire the road reservation strip from the eastern neighbor, creating a
new Lot 2 with frontage on E -Jay Lane (approximately 2.1 acres) and a new Lot 1 accessed via
a shared driveway (minimum 3.0 acres). Commissioner Oelhafen raised the observation that
new Lot 2, while meeting the minimum size requirement, would be relatively small compared
to the shared dr iveway easement area it contains, and that the resulting usable parcel area
would be modest. Planner Sumwalt confirmed that the lot dimensions were driven by the
applicable zoning minimums for shared driveway access lots and that there is limited flexibility
to equalize the lot sizes given those constraints. Commissioner McCormack noted that lot sizes
in the range of 1.5 to 2 acres are consistent with surrounding lots on E -Jay Lane.
2. Option 2: Develop only a single new lot of approximately 5.3 acres, also accessed via a shared
driveway, deferring any further division to a future date. The Commission expressed that either
PLAN COMMISSION
August 26, 2026
Page 14 of 14
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
option was acceptable, with the shared driveway approach preferred over the construction of
a new dedicated road, which would require the Village to assume maintenance obligations for
a dead-end cul-de-sac.
On the question of the road reservation, the Commission expressed no objection to its removal.
Planner Sumwalt noted that elimination of the road reservation would require a formal
recommendation from the Plan Commission and action by the Village Board.
Mr. Smith confirmed that his intent was to proceed with the land division through the Certified
Survey Map process within the next year, with construction of a new home to follow within two to
three years.
The Commission provided conceptual support for Land Split Option 1 with a shared driveway as
the applicant's preferred path forward, and indicated no objection to the removal of the E-Jay Lane
road reservation. No action was taken, as this was a conceptual review only.
Quarry Inspection Reports (continued)
A. Payne + Dolan – Commissioner Howard
Planner Report
Planner Sumwalt gave a brief update on recent Planner Appointments and upcoming projects. No
action taken.
Adjournment
There being no further business, motion by Eberle, second by Baum, to adjourn the meeting at 9:58p.m.
Respectfully submitted,
Elisa M. Cappozzo, WCMC