Public Works & Utility Committee Agenda/ Packet
Town of Lisbon · Waukesha County · meeting of Jul 15, 2026 · Agenda packets
Open the original document More from Town of Lisbon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF LISBON
W234 N8676 Woodside Rd
Lisbon, WI 53089-1545
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
Join Zoom Online: https://us06web.zoom.us/j/88319721129?pwd=Rm1tdkgzcW9PMG5HY051MlBpbzR4UT09
Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 883 1972 1129 Passcode: 027704
MEETING AGENDA
PUBLIC WORKS & UTILITY COMMITTEE – LISBON VILLAGE HALL
Wednesday, July 15, 2026, at 5:00P.M.
1. Call to Order & Roll Call
2. Pledge of Allegiance
3. Citizen Comments – Please limit comments to three minutes
4. Approval of Meeting Minutes
• 6/17/2026 Public Works & Utility Committee
5. Department Reports
A. Dept. of Public Works – DPW Director
B. Utility District – Engineer
C. Special Projects - Administrator
6. Unfinished Business
A. Discussion only re: Stormwater Fund status.
B. Discussion only re: Compost Fund and annual Brush Pickup.
7. New Business
A. Discussion and necessary action re: potential replacement of WAM mowers with zero-turn mowers.
B. Discussion and necessary action re: mowing of retention ponds.
C. Discussion only re: sewer utility costs for facility upgrades.
8. Items to be Placed on a Future Agenda
9. Adjournment
NOTE: It is possible that members and/or a quorum of other governmental bodies may attend the above meeting to gather information.
No action will be taken by any governmental body other than specifically noticed above. Citizens with disabilities who require assistance
to participate in this meeting should contact Village Hall at least 72 hours in advance.
VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PUBLIC WORKS & UTILITY COMMITTEE
LISBON VILLAGE HALL – June 17, 2026 at 5:00 PM
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
Committee Chair Marc Moonen called the meeting to order at 5:09 p.m.
Roll Call
Present: Trustees Marc Moonen and Linda Beal; Members Jane Mueller, Joe Eberle, and Randy Chmiel;
Engineer Don Neitzel; Administrator Dan Green; DPW Director Nick Wilichowski; and Deputy Clerk-
Finance Lisa Tremper.
Approval of Meeting Minutes
05/27/2026 Public Works & Utility Committee
Motion by Eberle, second by Chmiel, to approve the minutes as presented. Motion carried
unanimously.
Department Reports
Public Works
Director Wilichowski reported on several recent departmental activities from the last month (see
attached report).
Discussion arose with the mowing of retention ponds. Committee Chair Moonen recommended that
this topic be added to next month’s agenda for further discussion.
The committee briefly discussed the recently adopted ATV/UTV ordinance, noting that signage is
posted village wide.
Utility District
Engineer Neitzel gave an overview of monthly flows and run time for the Jeanine, Plainview, Willow
Springs, and Richmond lift stations, as well as the various well readings. It was noted that Next Electric
is working on the application with WE Energies to relocate electrical service to the road at Willow
Springs. It was also noted that the scheduled sewer televising at the Richmond School Lift Station was
delayed due to a scheduling miscommunication. Engineer Neitzel will follow up regarding the updated
scheduled date. One final note that Engineer Neitzel mentioned is that the backup pump is being
repaired and will be stored at the DPW shop.
Public Works & Utility Committee
Meeting Minutes
June 17, 2026
Page 2 of 3
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Special Projects
Administrator Green reported that the joint meeting regarding the final areas for sewer service
amendments went well, with the service area on HWY 164 expanding beyond what was initially
proposed. The next step is to have Plan Commission go through the comprehensive plan review and
update, anticipated to begin at the July meeting.
Administrator Green also proposed implementing a $10 administrative fee for incomplete checks for
sewer utility payments. The next step would be to bring this proposal to village board for approval.
The committee recognized outgoing committee member Dan Plese for his many years of service, and
welcomed new committee member Randy Chmiel, who brings experience from Lisbon’s DPW and the
City of Pewaukee.
New Business
Discussion only re: Stormwater Fund Status.
Administrator Green provided a historical overview of the stormwater utility fee, noting it was
established in 2006 at $40 per household and last increased in 2013 to $48. The current fund balance
is approximately $650,000, though anticipated expenditures could reduce that balance substantially.
The committee discussed broadening the authorized uses of the stormwater fund to include a
proportional share of road project costs attributable to stormwater facilities, as well as a transfer
toward capital equipment used in ditching and culvert work. A preliminary budget model suggested
a 50% fee increase to approximately $72 a household, which would increase annual revenue from
approximately $253,000 to $380,000. The committee directed staff to track labor and equipment time
attributable to stormwater activities beginning this year, and to report on stormwater fund status on
a quarterly basis. No action taken.
Discussion only re: Compost Fund & Brush Pickup.
Administrator Green reported that the compost fund currently carries approximately $35,000 in
revenue against $21,000 in expenditures year-to-date but is projected to end the year in a deficit
largely due to the cost of a second grinding cycle from tornado debris cleanup and record compost
site use. The committee discussed the structural challenge of funding the compost operation solely
through past revenue, noting equipment depreciation, wear and tear, and the costs of roadside brush
pickup are not fully reflected in the current budget. The committee also discussed the option of
eliminating roadside brush pickup entirely and instead opening the compost site to all village
residents at no charge, redirecting labor and equipment resources to higher-priority infrastructure
tasks. The committee agreed to continue the discussion at the July meeting. No action taken.
Discussion & necessary action re: Replace Box Culvert at Richmond Road.
Administrator Green presented the condition and proposed replacement of a culvert on Richmond
Road, which was washed out during the heavy rain event in April. The proposed replacement involves
Public Works & Utility Committee
Meeting Minutes
June 17, 2026
Page 3 of 3
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
a repositioned box culvert designed to improve hydraulic efficiency by eliminating the current
inefficient flow angle, along with a guardrail for safety and an additional smaller culvert to manage
overflow. Engineer Neitzel added the project will require a DNR general permit with a 30-day review
period, and that environmental classification of the stream could extend the timeline. The committee
concurred that design, permitting, and bid document preparation should proceed immediately so the
project can be awarded as soon as permits allow.
Motion by Mueller, second by Eberle, to recommend that Village Board proceed with design and
planning, and to prepare contract documents for bidding the Richmond Road culvert replacement
project. Motion carried unanimously.
Unfinished Business
Discussion and necessary action re: quotes for valve replacement at lift stations, and
recommendation to Village Board
Engineer Neitzel presented updated quotes for valve replacement at the three lift stations. Committee
member Eberle advocated for completing all replacements at once, noting that deferral risks valve
failure, labor efficiencies favor consolidating the work, and the cost of an emergency repair would
likely exceed the cost of proactive replacement.
Motion by Eberle, second by Chmiel, to recommend that Village Board proceed with replacement of
all six check valves and six plug valves at the three lift stations based on quotes dated June 17, 2026.
Motion carried unanimously.
Adjournment
There being no further business, motion by Moonen, second by Beal, to adjourn the meeting at 6:50
p.m. Motion carried unanimously.
Respectfully submitted,
Lisa Tremper
Lisa Tremper
Deputy Clerk-Treasurer
DPW Monthly Report
June 2026
Highway:
• Roadside Mowing
• Weed Spraying
• Replace Driveway Culverts
• Tree Removal on Tamarack Road
• Grading and ditch reshaping on Fox Hollow Dr.
• Grade and remove stumps on Tamarack Road
• Replace knuckle on Boom mower
• Strip truck 16 box and clean and prep frame
• Spot Shouldering
Parks:
• Prep for Community Fest
• Mowing
• Cedar split fence install
• Weed spraying
• Maintenance on baseball and soccer fields
DPW Director:
• Help with driveway culvert replacements
• Help with Fox Hollow ditching
• Check October fields base patch work
• Topcoat/surface laid in October fields
• Work on getting the annual Recycling event set up
• Pre con meeting for Tamarack Road
• Grade out the S curve on Tamarack Road
• Road meeting with Dan & Mitch
• Work on Parks mowing operations and possible upgrade in equipment
• Order equipment approve from the borrowing
107 Parallel Street Beaver Dam, WI 53916 • 1115 S Main Street West Bend, WI 53095 • T 920-356-9447
www.kunkelengineering.com
July 9, 2026
To: Village of Lisbon Utility Committee
From: Don Neitzel
Re: Monthly Report (June)
__________________
The monthly engineer’s report for the Village of Lisbon Public Works & Utility Committee is as follows:
• June 2026 Flows – Flows for the month of June were continuing to trend downward from the prior
month of May.
o The Jeanine Lift Station had an average flow of 19 GPM (average 24,000 GPD) for the month of
June, while the month of May was 22 GPM (average 29,000 GPD).
o The Plainview Lift Station for the month of June had an average flow of 20 GPM (average
28,000 GPD), while the month of May was 31 GPM (42,000 GPD).
o Willow Springs flows for the month of June were once again averaged due to an electric service
issue with the flow meter. An average flow of 26.5 GPM was used for the month based on
historical data for this same time period. WE Energies service application was completed and
submitted by Next Electric, so the electric service and panel will be at the flow meter location. I
also spoke to the property manager for Willow Springs and explained to him that the electric
service and panel will now be out at the flow meter.
As you will note on the historical monthly flow charts, the flows for all three lift station sites for the month
of June fell below the recorded flows of 2024 and 2025 for the same month.
• Richmond School Lift Station –
o June 2026 - The lift station had a total run time of approximately 97.6 hours for the month of
June, with about 47.7 hours on Pump #1 (average of 1.6 hrs run time/day) and 49.9 hours on
Pump #2 (1.7 hrs run time/day).
o A portion of the school’s internal sewer was televised by the Sewer Ninjas on July 1st. I spoke
with Erik Ulvog with Sewer Ninjas and he said that they were able to televise the main run of
sewer in the building which consists of both pvc and cast-iron pipe. They were also able to
televise several branch lines as well, but could not get into all of them due to the older portions
of the building not having any cleanouts. He said they would need to start pulling toilets to get
these other areas done. They did find one section of cast iron sewer that is showing signs of
107 Parallel Street Beaver Dam, WI 53916 • 1115 S Main Street West Bend, WI 53095 • T 920-356-9447
www.kunkelengineering.com
failure and they are going to get a quote put together for the school for repairing this section, but
based on everything they witnessed and televised, they really didn’t see much sign of inflow or
infiltration. That said, things have dried up a fair amount from where they were a couple of
months ago which shows with the current lift station flows and run times. I explained to him the
sewer flow information we have from the temporary flow meter and that we compared that to
the water usage at the well, which shows sewer flows well in excess of the water being used. I
will be sharing this information with him, so that we can discuss this further. He is also sending
me the televised data that they have from their July 1
st work.
o Dorner will be completing the lift station draw down and inspection at Richmond School during
the week of July 20th. I will touch base with them next week to confirm the day and time for this
work to be done. I will have the results of that inspection on the August agenda.
o The well reading for the month of June was 26,700 gallons and for the prior month of May it was
40,400 gallons. (see attached water usage chart and sewer flow information). As you will note
on the flow chart, the water usage for the month of June 2026 does fall well below what was
recorded for the same month during the previous two years.
• Fire station Well –
o June 2026 - The water usage for the month of June was 6,800 gallons, while the water usage in
the prior month of May was 5,800 gallons. (see attached water usage chart). This remains in-line
with the monthly flows for both 2025 and 2026 thru the month of June.
• Casey’s Well –
o June 2026 -The water usage at Casey’s for the month of June was up again from the previous
month, with 65,812 gallons of water being used in June while the well reading for the month of
May was 40,945 gallons. The monthly water usage is up from their overall historical average
throughout the year and over the course of the last two years during the same month. (see
attached water usage chart). I will try contacting Casey’s to check on this.
0
0.2
0.4
0.6
0.8
1
1.2
1.4
0
5
10
15
20
25
30
1st* 2nd 3rd 4th 5th 6th 7th 8th* 9th 10th 11th 12th 13th 14th 15th* 16th 17th 18th 19th 20th 21st 22nd* 23rd 24th 25th 26th 27th 28th 29th* 30th
Rainfall (in)
Flow Totals (Kgals)
* = Monday
Jeanine Daily Flow Totals with Rainfall Data - June
2026
Flow Total Rainfall
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Flows (Kgals)
Jeanine LS Total Monthly Flows with Monthly Average Rainfall Data
Flow 24
Flow 25
Flow 26
Rainfall
24
Rainfall
25
Rainfall
26
0
0.2
0.4
0.6
0.8
1
1.2
1.4
0
5
10
15
20
25
30
35
1st* 2nd 3rd 4th 5th 6th 7th 8th* 9th 10th 11th 12th 13th 14th 15th* 16th 17th 18th 19th 20th 21st 22nd* 23rd 24th 25th 26th 27th 28th 29th* 30th
Rainfall (in)
Flow Totals (Kgals)
* = Monday
Plainview Flow Totals with Rainfall Data - June
2026
Flow Total Rainfall
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0
500
1000
1500
2000
2500
3000
3500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rainfall (in)
Total Flows (Kgals)
Plainview LS Total Monthly Flows and Monthly Average Rainfall Data
Flow 24
Flow 25
Flow 26
Rain 24
Rain 25
Rain 26
0
0.2
0.4
0.6
0.8
1
1.2
1.4
0
5
10
15
20
25
30
35
40
1st* 2nd 3rd 4th 5th 6th 7th 8th* 9th 10th 11th 12th 13th 14th 15th* 16th 17th 18th 19th 20th 21st 22nd* 23rd 24th 25th 26th 27th 28th 29th* 30th
Rainfall (in)
Flow Totals (Kgals)
* = Monday
Willow Springs Flow Totals with Rainfall Data - June
2026
Flow Total Rainfall
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
3,200
3,400
3,600
3,800
4,000
4,200
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rainfall (in)
Total Flows (Kgals)
Willow Springs LS Total Monthly Flows with Monthly Average Rainfall Data
Flow 24
Flow 25
Flow 26
Rain 24
Rain 25
Rain 26
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
75000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Gallons
Richmond Monthly Well Totals
2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Gallons
Firehouse Monthly Well Totals
2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
130000
140000
150000
160000
170000
180000
190000
200000
210000
220000
230000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Gallons
Casey's Monthly Well Totals
2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons
Bittersweet Drive – Driveway Culvert Installation
Scope: Install one 15" x 24' CMPA driveway culvert with repaving and restoration.
Description Cost
Labor – 6 workers × 6 hours × $60/hr. $2,160.00
2 Tandem Axle Dump Trucks – 4 hrs. @ $90.46/hr. each $723.68
Single Axle Dump Truck – 2 hrs. @ $68.52/hr. $137.04
2 One-Ton Trucks – 1 hr. @ $16.58/hr. each $33.16
Equipment Trailer – 1 hr. @ $24.48/hr. $24.48
Excavator – 6 hrs. @ $67.86/hr. $407.16
Skid Loader – 2 hrs. @ $38.48/hr. $76.96
Asphalt – 8 tons @ $75.00/ton $600.00
Roller Compactor – 1 hr. @ $47.04/hr. $47.04
¾" TB Stone – 20 tons @ $11.26/ton $225.20
Road Saw – 1 hr. @ $75.42/hr. $75.42
2 Plate Compactors – 2 hrs. @ $41.74/hr. each $166.96
15" × 24' CMPA Culvert $630.00
Topsoil, Seed & Straw $600.00
Subtotal
$5,906.42
Notes
• Fuel is not included
Village of Lisbon Public Works
W234 N8676 Woodside Road
Lisbon, WI 53089
262-246-3416
Cost Summary 2026 Brush Pick-Up
Category Calculation Cost
Fuel 1,766 gal × $4.93 $8,706.38
Labor 816 hrs × $60.00 $48,960.00
Loader 24 hrs × $75.10 $1,802.40
Excavator 168 hrs × $67.86 $11,400.48
Truck 546 hrs × $79.49 $43,401.54
Grand Total $114,270.80
Days to complete: 24
Loads hauled to compost site: 763
Average cost per load: $149.77
o $114,270.80 ÷ 763 loads
Average cost per day: $4,761.28
o $114,270.80 ÷ 24 days
Average loads per day: 31.8
o 763 ÷ 24
Cost Breakdown by Percentage
Verified Grand Total: $114,270.80
Submitted by DPW Director
Nick Wilichowski
Category Cost % of Total
Labor $48,960.00 42.8%
Truck $43,401.54 38.0%
Excavator $11,400.48 10.0%
Fuel $8,706.38 7.6%
Loader $1,802.40 1.6%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
22
23
24
26
27
28
29
30
31
32
33
34
35
36
37
38
50
51
52
A B R S T U V W X Y Z
12/31/2021 12/31/2022 12/31/2023 12/31/2024 12/31/2025 1/1/2026 8/30/2026 2026 2027
G/L YEAR END YEAR END YEAR END YEAR END YEAR END APPROVED END OF MONTH ESTIMATED PROPOSED
ACCOUNT PER AUDIT PER AUDIT PER AUDIT PER AUDIT PER AUDIT BUDGET ACTUAL YEAR END BUDGET
REVENUES
INTERGOVERNMENTAL
35-430-431-1100Payments for Municipal Service - - - - - - -
VILLAGE OF MERTON 8,532 8,816 8,606 10,154 9,215 10,332 4,717 10,532 10,332
35-430-431-1102COMPOST - V/MERTON WAGES 5,508 4,266 4,706 5,314 6,155 6,332 977 6,332 6,332
35-440-449-2004COMPOST - V/MERTON PASSES 3,024 4,550 3,900 4,840 3,060 4,000 3,740 4,200 4,000
TOWN OF MERTON 15,508 14,226 14,706 15,387 15,635 17,832 10,701 18,332 17,832
35-430-431-1103COMPOST - T/MERTON WAGES 5,508 4,266 4,706 4,847 4,615 6,332 977 6,332 6,332
35-440-449-2005COMPOST - T/MERTON PASSES 10,000 9,960 10,000 10,540 11,020 11,500 9,724 12,000 11,500
35-440-449-2003COMPOST PASSES - LISBON 15,818 17,510 18,462 20,103 21,636 21,000 18,769 22,500 21,000
35-490-492-1000TRANSFER FROM GENERAL FUND - 58,454 - - - - - - -
35-490-492-2600TRANSFER FROM ARP FUND - 165 - - - - -
TOTAL REVENUES 39,859 99,007 41,774 45,644 46,485 49,164 34,187 51,364 49,164
EXPENSES
35-561-510-1100SALARIES - PT PPL - COMPOST 12,865 12,743 13,712 14,615 14,086 14,000 935 14,000 14,000
35-560-520-1100SALARIES - RECEPTION - COMPOST 2,120 1,858 1,308 1,515 1,519 3,188 419 3,188 3,315
35-560-520-2100FICA - RECEPTION - COMPOST 148 147 107 122 122 244 35 244 254
35-560-520-2200WRS - RECEPTION - COMPOST 142 126 89 104 105 230 30 230 239
35-560-520-2300GROUP INS - RECEPTION - NEW - 252 90 91 87 186 23 186 186
35-561-520-1100SALARIES - FT HWY - COMPOST 15,746 5,014 6,752 3,726 3,963 4,266 1,739 4,266 4,394
35-561-520-1200SALARIES - OT - HWY - COMPOST - 367 471 196 242 - 79 79 -
35-561-520-2100FICA -FT HWY - COMPOST 984 784 1,582 1,404 1,385 1,397 213 1,397 1,397
35-561-520-2200WRS - HWY - COMPOST - 345 490 268 288 296 137 296 305
35-561-520-2300GROUP INS - HWY - COMPOST - 375 674 328 350 598 126 598 587
35-561-530-3100SUPPLIES - COMPOST 2,086 377 155 80 34 150 23 100 150
Compost Portion of Accounting Software Upgrade
35-561-530-3700GAS/OIL/GREASE - COMPOST 1,467 2,078 1,862 1,491 1,460 1,882 702 2,000 1,882
35-561-530-4400CONTRACTED SVCS - GRINDER 13,890 17,939 17,504 13,200 22,679 22,000 16,335 30,000 22,000
35-561-530-7200TELEPHONE - COMPOST 162 31 50 - - - -
35-561-530-7150ELECTRICITY COMPOST SITE - 204 224 62 162 200 93 200 200
35-561-550-1000MOVING COMPOST SITE 27,246 33,729 19,921 - - - -
35-561-570-8000COMPOST UTIL DEV (CAP OUTLAY) - - - - - - -
TOTAL EXPENSES 76,855 76,370 64,991 37,202 46,484 48,637 20,888 56,784 48,909
NET COMPOST (36,997) 22,637 (23,218) 8,442 2 527 13,299 (5,420) 255
Compost Fund
Page 1 of 1
Village of Lisbon Public Works
W234 N8676 Woodside Road
Lisbon, WI 53089
262-246-3416
Discussion: Replacing Current Parks WAM Mowers with Zero-Turn
Mowers
Purpose
The purpose of this discussion is to present the benefits of replacing the Parks Department's
current WAM (Wide Area Mower) fleet with commercial zero-turn mowers. After observing
mowing operations over the past several years, evaluating multiple equipment options,
conducting mower demonstrations, and comparing productivity, costs, and operational
efficiency, I believe transitioning to zero-turn mowers is the most effective long-term solution.
Current Equipment
The Parks Department currently operates:
• One John Deere 11-foot WAM mower
• One Toro 11-foot WAM mower
• One Toro 6-foot front-mount mower
These mowers are used by two full-time Parks employees and approximately three seasonal
summer employees to maintain all City parks.
Grass mowing occupies a significant portion of the Parks Department's weekly workload. Under
the current operation, it takes approximately 2½ days to mow all park properties.
Challenges with the Current Operation
1. CDL Restrictions Limit Staffing Efficiency
The largest operational issue is that seasonal employees cannot tow the WAM mowers because
of CDL restrictions. As a result, Jeff, one of the full-time Parks employees, must spend much of
each week mowing instead of working alongside Mike on park maintenance and improvement
projects.
This limits productivity during the busiest part of the season when additional labor is available.
2. WAM Mowers Are Slower Than Expected
Although WAM mowers have an 11-foot cutting width, field testing showed they average only
4.5 mph while mowing due to ride quality, terrain, and maneuverability limitations.
After demonstrating several commercial zero-turn mowers, average mowing speeds ranged
between 9 and 10 mph, more than double the speed of the WAMs.
While the WAMs appear much larger on paper, actual productivity tells a different story.
• WAM mower: approximately 5.4 acres per hour
• 72-inch commercial zero-turn: approximately 6 acres per hour
The increased travel speed and significantly better maneuverability around trees, fences,
playgrounds, and other obstacles allow the zero-turn to match or exceed the productivity of a
WAM mower.
3. High Equipment Cost
WAM mowers are expensive to purchase and maintain.
• 2020 WAM purchase price: approximately $67,000
• Ferris ISX3300 72-inch zero-turn: $17,437
In addition to lower purchase costs, zero-turn mowers are simpler machines with lower
maintenance costs, fewer unique replacement parts, and reduced repair expenses.
Their smaller size also decreases the likelihood of contacting tree limbs or other obstacles
throughout the parks.
Proposed Equipment
Replace the John Deere WAM and one Toro mower with:
• Three Ferris ISX3300 commercial 72-inch zero-turn mowers
After evaluating several manufacturers through demonstrations, the Ferris mower provided the
best combination of:
• Ride quality
• Speed
• Hill performance
• Maneuverability
• Ease of loading and unloading
• Overall value
•
Productivity Improvements
Using three zero-turn mowers provides several operational advantages.
• All mowing could be completed by seasonal employees. This allows full time staff to
perform maintenance, repairs, and park improvement projects throughout the summer
instead of spending multiple days mowing.
• Three mowers can be operating simultaneously.
• Although the combined cutting width of three zero-turns (18 feet) is narrower than two
WAM mowers (22 feet), the higher mowing speeds produce greater overall productivity.
Example:
Current Operation
Two WAM mowers combined cutting width: 22 feet
Average speed: 4.5 mph
Time required to mow 5 acres: approximately 30 minutes
Proposed Operation
Three 72-inch zero-turn mowers combined cutting width: 18 feet
Average speed: 9 mph
Time required to mow 5 acres: approximately 16 minutes
• Reducing mowing time allows seasonal staff to spend more of each week assisting with
park maintenance projects instead of mowing.
Hill Performance and Safety
• One of the primary concerns expressed has been the ability of zero-turn mowers to
safely operate on hills.
• During demonstrations, the proposed zero-turn mowers successfully mowed all park
hills, including conditions immediately following rainfall. They also loaded and unloaded
from trailers safely without any operational concerns.
• Based on these demonstrations, we believe they can safely perform all mowing currently
completed by the WAM mowers.
Maintenance and Equipment Life
Commercial zero-turn mowers are designed for heavy municipal and commercial use and
routinely exceed 3,000 operating hours.
I would recommend replacing each mower at approximately 3,000 hours, or roughly every
seven years, to maintain fleet reliability.
Operating three identical mowers also provides several maintenance advantages:
• Common blades and wear parts
• Shared tires and replacement components
• Simplified maintenance procedures
• Reduced parts inventory
• Increased fleet reliability
Training
Seasonal employees would receive training before operating the equipment.
Training would include:
• Safe mower operations
• Loading and unloading procedures
• Trailer towing
• Daily inspections
• Safe travel routes between parks
A designated mowing route would also be developed to minimize difficult towing situations and
improve efficiency.
Fiscal Impact
The cost for three commercial Ferris zero turn mowers with 72” decks is $52,311.00 Staff
anticipates the sale of the John Deere and Torro to be between $35,000 and $50,000. There
would be some cost to the transition. Staff would propose paying for a portion of the mini
excavator with stormwater funds and using the remaining proceeds of selling equipment to
cover the rest. Below is an example of how this project could be funded:
• Sale of equipment: $40,000
• Stormwater budget allocation to mini excavator: $12,311
• Supplement funds from debt originally for mini to zero turns: $12,311
Recommendation
Based on equipment demonstrations, productivity testing, cost comparisons, and operational
observations, replacing the current WAM mowing operation with three commercial Ferris
ISX3300 zero-turn mowers provides significant advantages.
The proposed fleet would:
• Reduce overall mowing time.
• Allow seasonal employees to complete mowing independently.
• Free full-time Parks staff to focus on maintenance and park improvement projects.
• Lower equipment purchase and maintenance costs.
• Simplify fleet maintenance through standardized equipment.
• Improve maneuverability and efficiency around trees, fences, and other obstacles.
• Maintain safe operation on park terrain, including hills.
Overall, transitioning to commercial zero-turn mowers is the most efficient and cost-effective
solution for the Parks Department while improving productivity, reducing operating costs, and
making better use of both full-time and seasonal staff.
Source: Town of Lisbon website. First collected Oct 20, 2026.