VILLAGE OF LISBON
W234 N8676 Woodside Rd
Lisbon, WI 53089-1545
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
Join Zoom Online: https://us06web.zoom.us/j/87565604848?pwd=UndQT2taMndwY3pzblJsT0Z5ZnlKdz09
Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 875 6560 4848 Passcode: 333394
JOINT MEETING AGENDA
VILLAGE BOARD, PLAN COMMISSION, PUBLIC WORKS & UTILITY
Richard Jung Fire Station – N54W26455 Lisbon Rd. (CTH K)
WEDNESDAY, MARCH 25, 2026, at 6:30P.M.
(or following Plan Commission, whichever is later)
1. Call to Order & Roll Call
2. New Business
A. Open discussion regarding long -term development planning related to possible areas to
include in future expansions of the sewer service area.
3. Adjournment
NOTE: It is possible that members and/or a quorum of other governmental bodies may attend the above meeting to
gather information. No action will be taken by any governmental body other than specifically noticed above. Citizens with
disabilities who require assistance to participate in this meeting should contact Village Hall at least 72 hours in advance.
VILLAGE OF RICHFIELD - WASHINGTON CO
VILLAGE OF MENOMONEE FALLS
VILLAGE OF LANNON
VILLAGE OF MENOMONEE FALLS
VILLAGE OF SUSSEX
TOWN OF MERTON
VILLAGE OF MERTON
VILLAGE OF HARTLAND
CITY OF PEWAUKEE
VILLAGE OF PEWAUKEE
WAUKESHA CO
UV
164
UV
74
")
MD
")
VV
")
F
")
K
")
K
")
VV
")
Q
")
KF
RYAN RD
DUPLAINVILLE RD
SILVER SPRING DR
HIGH RD
MAPLE AVE
NORTH RD
CENTER OAK RD
N L I S B O N
R D
WAUKESHA AVE
COLGATE RD
TOWN LINE RD
WOODSIDE RD
MARY HILL RD
LISBON RD
CANADIAN NATIONAL RR
HILLSIDE RD
L YNNDALE RD
LAKE FIVE RD
GOOD HOPE RD
MAIN ST
L I N D S A Y R D
COUNTY LINE RD
HICKORY RD
SILVER SPRING DR
LISBON RD
PLAINVIEW RD
UNION PACIFIC RR
RICHMOND RD
SEWRPC SSA (Approved 208 Boundary)
Planned Sussex SSA
Potential Additional SSAs
Memorandum
1
Ballpark Commons Office Building
7044 South Ballpark Drive, Suite 200
Franklin, WI 53132
(414) 336-7900
foth.com
January 21, 2026
TO: Dan Green, Village Administrator
CC: Nick Wilichowski, DPW, Mike Yeager PE, Andy Schult z PE
FR: Tom Ludwig PE
RE: Village of Lisbon SSA Study, Focus Area 1-- Ric hmond School Sewershed
1. Study Summary To-Date
We have reviewed existing Sussex intermunicipal sewer agreements, approved Sanitary Sewer
Service Areas (SSA’s), planned SSA’s, and potential existing sewer connections to the Sussex
Wastewater Treatment Facility as part of the overall SSA study. The goal of the study is to
provide a comprehensive sewer plan to eventually submit for review and approval to the
Southeastern Wisconsin Regional Planning Commission (SEWRPC). This plan will provide a
mechanism to allow for future sewer extensions to serve planned sewered areas as identified
by the Village Planning Commission (PC) and Board. The intent is for this plan to be conducted
in concert with the Village’s Comprehensive Land Use Plan. The Village Planner will facilitate
the discussion described further in this memo.
We have identified five (5) focus areas to study in more detail and to break into manageable PC
discussion sessions to solicit input for desired sewer system areas. Focus Area (FA) 1 is the
Richmond School sewershed, as it may be necessary to submit this area to SEWRPC before the
completion of the study due to the school’s ongoing sewage lift station issues. Attached please
find FA1 Land Use Map, FA 1 Sewer Study Map, and a sewer computation sheet. The following
is a description of the tasks that have been completed and pertinent map features to consider
during the discussions.
2. Focus Area 1
2.1 General Study Tasks/Mapping/Computations
The first attachment, the Land Use Map identifies current land uses that were used in the sewer
flow calculations. Standard flow values per household were used and full buildout was
assumed for the sewershed. The sewershed boundary, the pink line, is the estimated area that
2
can contribute basement gravity flow to the CTH K interceptor . Gravity flow is the most cost
effective manner to convey sewage. Other key map attributes are as follows:
2.1.1 Approved SEWRPC 208 Boundary
Indicated with a purple boundary. These are areas previously identified and approved through
the formal SEWRPC process. Capacity has been reserved in the Sussex Wastewater Treatment
Facility (WWTF).
2.1.2 Planned Sussex WWTF Areas
Indicated with a blue dashed boundary. These areas, outside of the aforementioned 208 areas,
have been included in the Sussex WWTF capacity sizing via intermunicipal agreements.
2.1.3 CTH K Sewershed
Indicated with a pink boundary. As indicated, this is an estimated FA 1 boundary for basement
gravity sewer service to the western terminus of the 15” sewer in CTH K (solid blue line).
Parcels can be served adjacent to this boundary. A gravity extension (green line) can be
extended adjacent to CTH K and would eliminate the Richmond School Lift Station. There are
two “satellite” planned and approved sewer 208 areas depicted on the map that could also
connect with some extensions to the CTH K interceptor further downstream if septic systems
fail and/or there is desired higher density development in the southern portion of the Village.
2.2 Capacity and Estimated Flow
The FA 1 sewershed was delineated into subcatchment areas for the purpose of flow
generation, sewer pipe routing and sizing on a planning level basis. See the second and third
attachments for the topographic map and flow computation sheet, respectively. By agreement,
Lisbon can contribute a peak flow of 829,483 gallons per day (gpd) to Sussex through the west
end of the interceptor. We estimate, based on current land uses, a peak flow of 593,000 gpd.
The 15” pipe can physically convey 1,750,000 gallons per day. See the balloon callout on the
map. In other words, Lisbon can convey an additional 829,483-593,000 = 236,000 gpd of peak
flow by agreement to this connection. This can be realized by either higher densities or a larger
sewershed.
The other two balloons summarize flows for the two satellite areas, where they could connect,
and the associated agreement capacities.
3. Requested PC Sewershed Feedback
When considering the following feedback areas, review existing and potential development
sewer needs that are substantially located in the pink sewered boundary and in and around the
two satellite areas. The pink boundary identifies the general area to provide gravity sewer
service, which is the most cost-effective service to provide in the long term. Areas can be
located adjacent and outside of the boundary but should be limited in the amount of expansion
due to cost of service and ultimate capacity limits.
3
Once we have gathered feedback, we will recompute sewer flows and compare them to the
agreement and physical pipe and treatment plant capacities. We will follow this procedure for
the subsequent FA’s 2-5. We fully anticipate that this may be an iterative process to match
desired land use/flows with contractual and system capacities. The end results may be
commensurate with Sussex agreement capacities or may necessitate future Sussex sewer
planning amendments, capacity adjustments and negotiations, if so desired by the Village of
Lisbon.
3.1 Review established development/neighborhoods and advise on likelihood of sewer
service. Reserve capacity or delete from sewer consideration.
3.2 Any potential redevelopment areas requiring sewer service?
3.3 Any undeveloped areas that require or could support sewer service?
3.4 Any high density, high water use development areas desired for FA 1?
.
DRAFT
DRAFT
Project: Wastewater Conveyance Facility Plan CIPP 0.01 Type Density
(DU/ac)
Loading
(GPD/ac) Type Loading
(GPD/ac)
Client: Village of Lisbon CMP 0.028 Rural Density 0.05 12 Industrial 1000
Sanitary Sewer Computation Sheet DIP 0.011 Suburban Density II 0.25 60 Mixed Use 900
HOBAS 0.009 Suburban Densitry I 0.45 108 Business/Commerical 800 Peaking Factor 2.5
HDPE 0.01 Low Density Residential 1.08 259 Gov & Institutional 600
Manning's Formula PVC 0.012 Medium Density Residentail 3.48 835 Ag, Parks, & Open Space neglible
Q/A = V = (1.49*R^2/3*S^1/2)/n RCP 0.012 High Density Residentail 14.52 3485 Other
VCP 0.013 *100 gpd/cap & 2.4 ppl/DU
Manhole
No.
Manhole
No.
MH Start
STA
MH End
STA
Rim
Elevation
Depth UP
MH Length Pipe Size
(in) Invert UP Invert DWN Slope
%
Pipe
Material n Velocity
(fps)
Q
(cfs)
Q
(MGD)
Q
(% Full)
RD
(ac)
Ave RD
Flow
(gpd)
SDII
(ac)
Ave SDII
Flow
(gpd)
SDI
(ac)
Ave SDI
Flow
(gpd)
LDR
(ac)
Ave LDR
Flow
(gpd)
MDR
(ac)
Ave MDR
Flow
(gpd)
HDR
(ac)
Ave HDR
Flow
(gpd)
Industrial
(ac)
Ave Indu
Flow
(gpd)
Mixed
Use
(ac)
Ave Mixed
Use Flow
(gpd)
Bus/Com
(ac)
Ave
Bus/Com
Flow
(gpd)
Gov/Inst
(ac)
Ave
Gov/Inst
Flow
(gpd)
Other
(ac)
Ave Other
Flow
(gpd)
Total Ave
Flow
(MGD)
Peaking
Factor
Design
Flow
(MGD)
2.5
35 34 140+00 136+00 1060.25 10.55 400.00 8 1049.70 1048.10 0.40% PVC 0.012 2.37 0.83 0.54 2.5
34 33 136+00 132+00 1073.00 25.00 400.00 8 1048.00 1036.30 2.93% PVC 0.012 6.41 2.24 1.45 2.5
33 32 132+00 128+00 1059.50 23.30 400.00 8 1036.20 1034.60 0.40% PVC 0.012 2.37 0.83 0.54 2.5
32 31 128+00 124+00 1046.00 11.50 400.00 8 1034.50 1032.90 0.40% PVC 0.012 2.37 0.83 0.54 2.5
31 30 124+00 120+00 1046.00 13.20 400.00 8 1032.80 1031.20 0.40% PVC 0.012 2.37 0.83 0.54 2.5
30 29 120+00 116+00 1048.00 16.60 400.00 8 1031.40 1029.80 0.40% PVC 0.012 2.37 0.83 0.54 2.5
29 28 116+00 112+00 1048.00 18.30 400.00 8 1029.70 1028.10 0.40% PVC 0.012 2.37 0.83 0.54 15.6% 6.90 83 128.40 33,281 0.033 2.5 0.083
28 27 112+00 108+00 1053.00 25.00 400.00 8 1028.00 1021.10 1.72% PVC 0.012 4.93 1.72 1.11 7.5% 2.5
27 26 108+00 104+00 1046.00 25.00 400.00 8 1021.00 1017.10 0.97% PVC 0.012 3.70 1.29 0.84 10.0% 2.5
26 25 104+00 100+00 1042.00 25.00 400.00 8 1017.00 1009.50 1.88% PVC 0.012 5.14 1.79 1.16 7.2% 2.5
25 24 100+00 96+00 1033.75 24.35 400.00 8 1009.40 1007.80 0.40% PVC 0.012 2.37 0.83 0.54 15.6% 2.5
24 23 96+00 92+00 1032.50 24.80 400.00 8 1007.70 1006.10 0.40% PVC 0.012 2.37 0.83 0.54 15.6% 2.5
23 22 92+00 88+00 1031.00 25.00 400.00 8 1006.00 1003.10 0.72% PVC 0.012 3.19 1.11 0.72 18.6% 77.70 20,140 0.020 2.5 0.050
22 21 88+00 84+00 1028.00 25.00 400.00 8 1003.00 989.60 3.35% PVC 0.012 6.86 2.40 1.55 8.6% 2.5
21 20 84+00 80+00 1014.50 25.00 400.00 8 989.50 969.35 5.04% PVC 0.012 8.42 2.94 1.90 7.9% 55.20 5,962 0.61 488 0.006 2.5 0.016
20 19 80+00 76+00 994.25 25.00 400.00 8 969.25 955.10 3.54% PVC 0.012 7.05 2.46 1.59 9.4% 2.5
19 18 76+00 72+00 980.00 25.00 400.00 12 955.00 954.10 0.22% PVC 0.012 2.33 1.83 1.18 12.7% 2.5
18 17 72+00 68+00 979.00 25.00 400.00 12 954.00 953.10 0.22% PVC 0.012 2.33 1.83 1.18 20.4% 25.10 301 127.80 33,126 2.20 1,760 1,539 0.037 2.5 0.092
17 16 68+00 64+00 978.00 25.00 400.00 12 953.00 952.10 0.22% PVC 0.012 2.33 1.83 1.18 20.4% 2.5
16 15 64+00 60+00 977.00 25.00 400.00 12 952.00 951.10 0.22% PVC 0.012 2.33 1.83 1.18 20.4% 2.5
15 14 60+00 56+00 976.00 25.00 400.00 12 951.00 949.10 0.47% PVC 0.012 3.39 2.66 1.72 14.1% 2.5
14 13 56+00 52+00 974.00 25.00 400.00 12 949.00 943.10 1.47% PVC 0.012 5.97 4.69 3.03 8.1% 0.11 1 15.20 1,642 1.40 363 0.002 2.5 0.005
13 12 52+00 48+00 968.00 25.00 400.00 12 943.00 929.10 3.47% PVC 0.012 9.16 7.20 4.65 5.3% 2.5
12 11 48+00 44+00 954.00 25.00 400.00 15 929.00 910.10 4.72% PVC 0.012 12.40 15.21 9.83 4.3% 99.10 10,703 230.20 59,668 354 0.071 2.5 0.177
11 10 44+00 40+00 935.00 25.00 400.00 15 910.00 897.00 3.25% PVC 0.012 10.28 12.62 8.15 5.2% 2.5
10 9 40+00 36+00 916.00 19.10 400.00 15 896.90 896.30 0.15% PVC 0.012 2.21 2.71 1.75 24.4% 17.30 1,868 0.002 2.5 0.005
9 8 36+00 32+00 905.50 9.30 400.00 15 896.20 895.60 0.15% PVC 0.012 2.21 2.71 1.75 24.4% 2.5
8 7 32+00 28+00 903.33 7.83 400.00 15 895.50 894.90 0.15% PVC 0.012 2.21 2.71 1.75 24.4% 2.5
7 6 28+00 24+00 902.00 7.20 400.00 15 894.80 894.20 0.15% PVC 0.012 2.21 2.71 1.75 24.4% 2.5
6 5 24+00 20+00 902.00 7.90 400.00 15 894.10 893.50 0.15% PVC 0.012 2.21 2.71 1.75 24.4% 2.5
5 4 20+00 16+00 903.50 10.10 400.00 15 893.40 892.80 0.15% PVC 0.012 2.21 2.71 1.75 24.5% 28.90 347 0.000 2.5 0.001
4 3 16+00 12+00 905.00 12.30 400.00 15 892.70 892.10 0.15% PVC 0.012 2.21 2.71 1.75 32.1% 47.20 5,098 186.60 48,367 0.053 2.5 0.134
3 2 12+00 08+00 907.00 15.00 400.00 15 892.00 891.40 0.15% PVC 0.012 2.21 2.71 1.75 33.9% 0.59 7 35.40 3,823 32.70 8,476 0.012 2.5 0.031
2 1 08+00 04+00 910.00 18.70 400.00 15 891.30 890.70 0.15% PVC 0.012 2.21 2.71 1.75 33.9% 2.5
1 Ex 04+00 914.00 23.40 400.00 15 890.60 890.00 0.15% PVC 0.012 2.21 2.71 1.75 33.9% 2.5
2.5
18.70 4,847 0.005 2.5 0.012
2.5
139.70 36,210 14.60 12,194 0.048 2.5 0.121
2.5
0.291 0.727
Land Use Flow Loadings
CTH K PROPOSED INTERCEPTOR
TIKALSKI
CTH K MISC
Structures Pipe Capacity
DRAFT
Utility Financing 101:
March 25, 2026
2
•Explain general funding concepts for utilities
•Explain generally accepted repayment methods for utility
infrastructure extensions
•Answer your questions!
Why are we here?
3
Why Wisconsin Governments Borrow
• Administrative & operational
• Public safety
• Recreational
Facilities
• Streets
• Utility systems
• Sidewalks & trails
Infrastructure
• Machinery
• Vehicles
• Computers
Equipment
4
•“Pay as you go”
Use existing budget, cash
&/or reserves
Efficient for short-lived assets
Sometimes difficult to save
enough
Those who “paid” may not
benefit
Types of Municipal Capital Financing
5
•Debt issuance
Preserve existing cash & resources
Cost of asset amortized over useful
life
Asset paid for & benefited by users
Manage & stabilize tax rates, user
fees
Most debt service exempt from levy
limitation
Types of Municipal Capital Financing
6
•General obligation
•Revenue obligation
Types of Pledge & Security
7
•Total amount outstanding – at any time – limited to 5% of
total equalized valuation (Wisc. State Statutes)
•Must be fully retired no later than 20 years from original
issue date
•Debt service exempt from municipal levy limits
General Obligation (G.O.) Debt
G.O. Promissory
Notes
G.O. Bonds
8
•Can be issued to finance “any revenue producing facility or
enterprise owned by a municipality and operated for a
public purpose”
Water, sanitary sewer, electric, nursing home, housing, etc.
Tax increment District (TID) projects
•No dollar limit
•Stated maturity no later than 40 years after original issue
date
•Can levy for revenue insufficiency under levy limits
Revenue Obligations
9
•Debt Service Reserve Fund
Accounts for the accumulation of resources for, and the
payment of, general long-term debt principal and interest
•Debt Coverage Requirement & Additional Bonds Test
Revenue Obligations, Continued…
10
•Sewer User Rates
Annual debt service payments + applicable debt coverage
requirements built into annual user rate revenue requirement
Or annual depreciation and rate of return recovered
Asset cost spread over entire user system
Does the asset benefit system as a whole or just a subset of users?
•Special Assessments
Village special assesses asset to benefitting property owners
How are utility capital costs recovered?
11
Exercise of police powers and lien placed on benefitting
properties
Generally appropriate for assets that benefit a specific area of
the utility.
Typically, payable in lump sum or installments, can also be
deferred until connection, BUT be careful to match revenues to
debt service payments
•Impact Fees and Connection Fees
One time fee to recognize the growth share of new capital
facilities
How are utility capital costs recovered?
12
Payable at issuance of building or occupancy permit
Impact fees require public facilities needs assessment report
Impact fees have 8-year time period for spending or refunding
Generally used for larger, regional assets, oversizing of mains
Require building permits/connections to system to recover
asset costs!
How are utility capital costs recovered?