Parks Committee Agenda/ Packet
Town of Lisbon · Waukesha County · meeting of Mar 11, 2026 · Agenda packets
Open the original document More from Town of Lisbon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF LISBON
W234 N8676 Woodside Rd
Lisbon, WI 53089-1545
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
Join Zoom Online: https://us06web.zoom.us/j/86865236485?pwd=RG5yRmY3N0Z6VlFYMmFJTVgyV0dZZz09
Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 868 6523 6485 Passcode: 705103
MEETING AGENDA
PARKS COMMITTEE – LISBON VILLAGE HALL
MARCH 11, 2026, at 5:00P.M.
1. Call to Order & Roll Call
2. Pledge of Allegiance
3. Citizen Comments – Please limit comments to three minutes
4. Approval of Meeting Minutes
• 2/11/2026 Parks Committee
5. Staff Reports
A. Parks Department – Parks Supervisor Lund
B. Special Projects – Administrator Green
6. New Business
A. Parkitecture presentation of conceptual Park Plan options, discussion and feedback re: same.
7. Event Planning
A. Final planning for 2026 Easter Egg-stravaganza.
B. Continued planning for 2026 Community Festival.
8. Adjournment
NOTE: It is possible that members and/or a quorum of other governmental bodies may attend the above meeting to gather information.
No action will be taken by any governmental body other than specifically noticed above. Citizens with disabilities who require assistance
to participate in this meeting should contact Village Hall at least 72 hours in advance.
VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PARKS COMMITTEE
LISBON VILLAGE HALL – FEBRUARY 11, 2026, at 5:00 PM
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
Vice-Chair Marlene Kumitsch called the Parks Committee meeting to order at 5:03p.m.
Roll Call
Present: Members Kumitsch, Nelson, Mayrack, Normington, and Plazak ; Parks Supervisor Lund;
Administrator Green; and Deputy Clerk Haugland.
Absent: Chair Quinn and Member Wandsnider
Pledge of Allegiance
The Pledge of Allegiance was recited by all those present.
Public Comments
None.
Approval of Meeting Minutes
January 14, 2026 Parks Committee
Member Normington requested that the January 14, 2026 minutes be amended to reflect that due to
weather there was concern with the pouring of concrete pads and gravel below it for the bleachers at
the baseball diamond.
Motion by Mayrack, second by Nelson , to approve meeting minutes as amended . Motion carried
unanimously.
Parks Supervisor’s Report
Parks Supervisor Mike Lund gave a brief update on current Parks Department projects and
accomplishments. No action was taken.
Event Planning
A. Final planning for 2026 Easter Egg-stravaganza.
Vice chair Kumitch stated there are nine organizations committed to having tables at the event.
Additional businesses have been contacted but have no t responded. It was confirmed that the
Easter Bunny will be a member of the scout troop. Logistics of the event were discussed including
arrival time and set up times , specific job duties, traffic control, egg hiding and collection and
safety guidelines. It was stated that the event will be held rain or shine.
Parks Committee Minutes
February 11, 2026
Page 2 of 2
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Items to be Placed on a Future Agenda
No additions were requested.
Adjournment
There being no further business, motion by Normington, second by Nelson, to adjourn the meeting at
5:58p.m. Motion carried unanimously.
Respectfully Submitted,
Jasmine Haugland
Deputy Village Clerk
March Supervisors report
• We drained the ice rink for the season.
• Worked on rebuilding the spray bars on the 3pt sprayer and UTV sprayer.
• Replaced some damaged boards on the Brighton estates boardwalk.
• We started working on cleaning up plow damage around the parks.
• Replaced the rotten bench section on the eagle bench by the waterfall.
• Added additional shop lights in the maintenance building.
• We went through all the parks cleaning up downed branches from over the winter.
• Cut down dead trees at LCP .
• I worked on organizing the baseball schedule.
• We washed and sealed the concrete pads at the LCP baseball field.
• We also backfilled the concrete pads with gravel.
• We performed equipment maintenance.
VILLAGE OF LISBON
W234 N8676 Woodside Rd
Lisbon, WI 53089-1545
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
STAFF MEMORANDUM
DATE: March 2, 2026
TO: Parks Committee
FROM: DPW Director Nick Wilichowski
RE: Concrete Installation Inspection – LCP Baseball Diamond
Background
Several questions and concerns have been raised regarding the quality and final product of the
concrete slabs that were poured this winter. The concerns specifically relate to:
• Thickness of the concrete slabs
• Time of year the concrete was poured
• Base material beneath the slabs
• Undermining at slab corners
The following provides a detailed explanation addressing each concern.
Thickness of the Concrete Slabs
The slabs were designed and poured at a nominal thickness of 3½ inches. Field verification confirms
that the vast majority of the slab meets this specification. There are minor variations along certain
edges where thickness measures slightly under 3½ inche s. These variations are isolated to the
perimeter and do not extend across load-bearing sections of the slab.
It is important to note:
• The slab incorporates fiber mesh reinforcement throughout the concrete mix. Fiber
reinforcement significantly increases tensile strength, reduces shrinkage cracking, and
improves overall durability.
• The slab is intended to support bleachers and pedestrian traffic, not vehicular loads.
• A 3½ -inch reinforced slab on a properly prepared aggregate base exceeds the structural
demand required for this type of installation.
Even accounting for minor edge variations, the slab maintains structural integrity well within
acceptable tolerances for this application. There is no indication of structural deficiency or
compromised performance.
Time of Year the Concrete Was Poured
Concrete placement during winter months is a common and accepted practice in Wisconsin and
other cold-climate regions. Cold-weather concreting procedures are well established within industry
standards.
STAFF MEMORANDUM
RE: Concrete Slab Concerns
Page 2 of 6
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
Key considerations:
• Cold temperatures slow the curing process but do not weaken properly placed and protected
concrete.
• Winter pours are often advantageous in reducing rapid moisture loss and shrinkage cracking
that can occur in hot weather.
• The finish specified for this slab was a broom finish, which does not require the same extended
finishing window as decorative or polished concrete.
Provided proper mix design and cold-weather placement practices were followed (which they were),
there is no structural or durability concern associated with pouring during winter conditions. The time
of year does not negatively impact the slab’s long-term performance.
Base Material Beneath the Slab
The subgrade and base preparation for this project exceed typical residential and light commercial
standards.
Due to frost depths exceeding 12 inches at the time of excavation:
• Additional unsuitable material had to be removed.
• More than 12 inches of compacted stone base was installed beneath the slab.
For comparison:
• Typical residential patios often utilize 3–4 inches of base.
• Standard driveway installations frequently use 6 inches of compacted base.
The installed base depth on this project is well beyond minimum requirements for a non -vehicular
slab. The additional stone provides:
• Enhanced load distribution
• Improved drainage
• Reduced frost heave potential
• Increased long-term stability
From an engineering standpoint, the slab is supported by a base system that is more than adequate
and can reasonably be described as over-engineered for its intended use.
Undermining of Slab Corners
Voids that were observed at certain slab corners were temporary and resulted from environmental
conditions and construction sequencing.
The primary causes were:
• Forms were removed prior to immediate backfilling.
• The aggregate base material was frozen at the time of placement.
STAFF MEMORANDUM
RE: Concrete Slab Concerns
Page 3 of 6
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
• As thawing occurred, expansion and minor displacement of stone caused material to shift
outward from beneath the slab edges.
This movement created visible voids at some slab perimeters. However:
• The structural support of the slab was not compromised.
• Parks staff subsequently backfilled and compacted gravel into all affected areas.
• The voids have been eliminated and edge support restored.
It is important to emphasize that this condition was cosmetic and temporary in nature, not structural.
Overall Assessment
After reviewing slab thickness, reinforcement, cold -weather placement, base preparation, and the
observed edge conditions, there is no evidence of structural defects, installation failure, or improper
construction practices.
The concrete installation:
• Meets its design thickness
• Includes reinforcement to enhance durability
• Was placed using accepted winter construction practices
• Is supported by a base that exceeds standard requirements
• Has had minor perimeter voids properly corrected
Based on these factors, the slab is structurally sound and fully suitable for its intended purpose of
supporting bleachers and pedestrian use.
STAFF MEMORANDUM
RE: Concrete Slab Concerns
Page 4 of 6
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
Before Pictures of concrete slabs poured at LCP.
STAFF MEMORANDUM
RE: Concrete Slab Concerns
Page 5 of 6
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
After Pictures of concrete slabs poured at LCP
STAFF MEMORANDUM
RE: Concrete Slab Concerns
Page 6 of 6
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
32 16 16
484056
72 727296
12
1824
48"1,22M
60"1,53M
72"1,83M108"2,75M
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C1.0CONCEPT PLAN - LISBON COMMUNITY PARK
100'200'0'
1Ex. Ice RInk Area2Ex. Sledding Hill3Ex. Shelter/Pavilion4Ex. Vault Toilet (Remove)LEGEND
5Ex. Parking Area6Ex. Park Shop7Ex. Baseball Diamond8Pr. Playground Renovation9Pr. Restroom/Pavilion10Pr. Parking Expansion11Pr. Disc Golf Course/Walking Path12Pr. Fishing Pier/Kayak Launch13Pr. Parking Area14Pr. Path/Trail Improvement
12
34 5
5
5
56
7 89
1011
11
1111
12
13
14
14
14
OAKWOOD ROAD
15Pr. Archery Area Improvement
15
ARCHERYTOWER
16Nature Art Sculptures
16
1616
16
NATURE ARTSCULPTURES
14
32 16 16
484056
72 727296
12
1824
48"1,22M
60"1,53M
72"1,83M108"2,75M
1Pr. Parking Area (41 stalls)2Pr. Restroom/Pavilion3Pr. Septic Field4Pr. Path/Trail ImprovementLEGEND
5Pr. Playground (hill play)6Pr. Playground (5-12)7Pr. Playground (2-5)8Pr. Playground (zipline)9Pr. Playground (swings)10Pr. Playground (independent)11Pr. Disc Golf Course/Walking Path12Ex. Baseball Diamond
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C1.1CONCEPT PLAN ENLARGEMENT - LISBON COMMUNITY PARK
13Ex. Well House14Ex. Gazebo/Fountain1
23
4
4
5 6
7 8
9 1010
1112
13 14
HILL PLAY
SWINGS
INDEPENDENT PLAY
25'50'0'
1Pr. Parking Area Expansion (18)2Pr. Fishing Pier/Kayak Launch3Pr. Disc Golf Course/Walking Path4Pr. Path/Trail ImprovementLEGEND
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C1.2CONCEPT PLAN ENLARGEMENT - LISBON COMMUNITY PARK
25'50'0'
1
2
3
4
4
FISHING PIER/PLATFORMDISC GOLF COURSE/WALKING PATH
ADA KAYAK LAUNCH
2'-0" 36'-0" 2'-0"40'-0"
2'-0"16'-0"16'-0"16'-0"16'-0"16'-0"2'-0"84'-0"
5" WIDE LAMINATED LOW PITCH BEAM
5" X 8-1/4" PORTORFORD COLUMN
STORAGE
WOMEN
MEN
VENT
VENT
FLOOR PLAN
HEADER
HEADER
2' X 10' STAINLESS SHELFHI-LO DRINKING FOUNTAIN W/ BOTTLE FILLER
STACKED CEDARTIMBER WALLLOW PITCH BEAM(B-2)
5" X 51/2" PORTORFORD CEDARCOLUMN (C-1)
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C1.3NTS
CONCEPT PLAN RESTROOM - LISBON COMMUNITY PARK
123
RIGHT SIDE ELEVATION
FRONT ELEVATION
29 GA. MAX-RIB METAL ROOFING, OVERSYNTHETIC ROOFING UNDERLAYMENT30 AND #1 2"X 6" S.Y. PINE T & GDECKING WITH VEE GROOVES ONFINISH FACE
LOW PITCH BEAM(B-1)12' FASCIA BOARD
12' FASCIA BOARD
18' FASCIA BOARD
5" X 51/2" PORTORFORD CEDARCOLUMN (C-1)STEEL BASESHOE(SC-1)
2" X 8" ALASKAN YELLOWCEDAR FASCIA
LAP SIDINGTIMBER FRAMEWALL
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C1.4CONCEPT PLAN RESTROOM - LISBON COMMUNITY PARK
NTS
INTERIOR
EXTERIOR
72
647264
16
7272
1Pr. Parking Area Expansion (4'W)2Pr. Porta Potty Enclosure3Pr. ADA Parking4Pr. Path/Trail ImprovementLEGEND
5Pr. Playground (2-12)6Pr. Yard Games (Bags, etc.)7Pr. Tree Buffer (foulball protection)
WOODLAND OAKS DR
25'50'0'Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C2.0CONCEPT PLAN - LISBON OAKS PARK
PORTA POTTYSCREEN
YARD GAME AREA
PAVED PATHWAY
IMPROVED PLAYGROUND
MEADOW WOOD LN
1
2 3
4
5
6
7
8Ex. Gazebo9Ex. Ball Diamond10Ex. Basketball Court11Ex. Soccer Fields
8
9
10
11
144"GZ144"GZ
156"GZ156"GZ
48"1,22M
60"1,53MPlayWood Access Gate
132"
144"
PlayWood Access Gate132"4'3'2'1'
PARTNO
PARTNO
PARTNO
PARTNO
GATEWAY/BELT CONNECTOR
ANCHOR/ROPEBRIDGE CONNECTOR
PEDESTAL/TWISTED NET CONNECTOR
60"
72"
48"
HAMMOCK NET ONLY
ZIG ZAG NET ONLY
CARGO NET ONLY
PARTNO
PARTNO
PARTNO
PARTNO
PARTNO
PARTNO
PARTNO
1Pr. Parking Area Expansion2Pr. Payground Relocation & Exp.3Pr. ADA Parking4Pr. Path/Trail Improvement (ADA)LEGEND
5Ex. Gazebo6Ex. Ball Diamond
25'50'0'Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C3.0CONCEPT PLAN - STONEY HALQUIST PARK
PARKVIEW DR
1
23 44 5
6
TREE THEMEDPLAYGROUND
ADA WALKWAY,INTEGRATEDPLAY/LANDSCAPE
1Pr. Parking Area Reconstruction2Pr. Shelter/Restrooms3Pr. ADA Parking4Pr. Path/Trail Improvement (ADA)LEGEND
5Ex. Playground6Ex. Ball Diamond
50'100'0'Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C4.0CONCEPT PLAN - STONE FAMILY PARK
PLANEVIEW PKWYPLANEVIEW ROAD
FOREST HILL LN
INSET B
INSET A
INSET B - 1"=20'INSET A - 1"=40'
PAVED PATHWAY
SHELTER/RESTROOMS
1 1
2
2
3
3
3
3
4
5
6 6
16'-0"20'-0"
16'-0"20'-0"
8'-0"44'-0" 2'-0"8'-0"
WOMEN'S
8'-0"8'-0"8'-0"
2'-0"2'-0"
MEN'S
2'-0"
FRONT ELEVATION
MEN
VENTVENT
STORAGE
FLOOR PLAN
RIGHT SIDE ELEVATION
LOW PITCH BEAM(B-1)312
8'-012"
5" X 51/2" PORTORFORDCEDAR COLUMN (C-1)
5" X 51/2" PORTORFORD CEDARCOLUMN (C-1)
STEEL BASESHOE(SC-1)
2" X 8" ALASKANYELLOWCEDAR FASCIA
STACKED CEDARTIMBER WALL
LAP SIDINGTIMBER FRAMEWALL
29 GA. MAX-RIB METAL ROOFING,OVER SYNTHETIC ROOFINGUNDERLAYMENT 30 AND #1 2"X 6"S.Y. PINE T & G DECKING WITH VEEGROOVES ON FINISH FACE
LOW PITCH BEAM(B-2)B4A4
DECKING
ATTACH FASCIASPLICE (FS-1) PLATETO INSIDE FACE OFGABLE END FASCIA
GABLE END FASCIA
FASCIA SPLICE (FS-1)PLATE
12' FASCIA BOARD
12' FASCIA BOARD
18' FASCIA BOARD16' FASCIA BOARD10' FASCIA BOARD
7'-0"7'-0"2'-0"
5" WIDE LAMINATED LOW PITCH BEAM HI-LO DRINKING FOUNTAIN W/ BOTTLE FILLER
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C4.1NTS
CONCEPT PLAN RESTROOM - STONE FAMILY PARK
200'
72
647264 16
7272
72
647264 16
7272
1Pr. Playground and Relocation2Pr. Shelter Reconstruction3Pr. Volleyball Relocation4Pr. Path/Trail (ADA)LEGEND
5Pr. Pickleball Courts6
50'100'0'Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C5.0CONCEPT PLAN - TOWN HALL PARK
INSET A
INSET A - 1"=50'
7Pr. Town Hall Removal (Shelterw/ Restrooms)8Pr. Prairie Area9Pr. Yard Games Area
10Ex. Ball Diamond Area
1
1
11Ex. Parking Area
2
2
3
3
4
4
5
4
7 7
8
8
10
10
111111
9
9
Ex. Memorial Area
6
6
OPEN AIR SHELTER
IMPROVED PLAYGROUND
PICKLEBALL COURTS
26'-0"30'-0"
16'-0"20'-0"
8'-0"44'-0" 2'-0"8'-0"8'-0"8'-0"8'-0"
2'-0"2'-0" 2'-0"
FRONT ELEVATION
FLOOR PLAN
RIGHT SIDE ELEVATION
LOW PITCH BEAM(B-1)312
5" X 51/2" PORTORFORDCEDAR COLUMN (C-1)
5" X 51/2" PORTORFORD CEDARCOLUMN (C-1)
STEEL BASESHOE(SC-1)
2" X 8" ALASKANYELLOWCEDAR FASCIA
29 GA. MAX-RIB METAL ROOFING,OVER SYNTHETIC ROOFINGUNDERLAYMENT 30 AND #1 2"X 6"S.Y. PINE T & G DECKING WITH VEEGROOVES ON FINISH FACE
LOW PITCH BEAM(B-2)DECKING
ATTACH FASCIASPLICE (FS-1) PLATETO INSIDE FACE OFGABLE END FASCIA
GABLE END FASCIA
FASCIA SPLICE (FS-1)PLATE
12' FASCIA BOARD
12' FASCIA BOARD
18' FASCIA BOARD16' FASCIA BOARD10' FASCIA BOARD5" WIDE LAMINATED LOW PITCH BEAM
Sheet NumberDate:
Revisions:Project Name:
Sheet Title:
Issued For:Project #:2/20/2026Review25.046VILLAGE OF LISBON PARK PLANNINGVARIOUS SITESLISBON, WI 53089608.203.8203Madison.WI.53717PARKITECTURE901 Deming Way, Suite 201+ PLANNINGParkitecture
C5.1NTS
CONCEPT PLAN SHELTER -TOWN HALL PARK
Name
Mike Lund
Organization
Village of Lisbon Parks
Billing Address
N78W26970 Bartlett Pkwy
Hartland
,
WI
53029
Email
mlund@lisbonwi.gov
Phone
(262) 246-7266
Tax Exempt
Yes
Event Start
10:30am Sat, Jun 20, 2026
Event End
4:00pm Sat, Jun 20, 2026
Address
N78W26970 Bartlett Pkwy
Hartland, WI 53029
Surface
Grass - Allow Stakes
Delivery
Drop-Off
Quote ID# 58530261
Book This Event
Contact Details
Event Details
Items
Prices
COLORFUL CUBES Bounce House RENTAL
1
- $160.00
JUMP MIX COMBO JUMPMIX
1
- $299.99
CLOWN SOCCER AND GOLF DARTS
1
- $149.00
DUAL BASKETBALL GAME
8 feet tall) RENTAL
1
- $95.00
Rentals
Delivery Charge
Accidental Damage Waiver
Subtotal
Tax
Total
$703.99
$96.67
$49.28
$849.94
+$0.00
$849.94
Source: Town of Lisbon website. First collected Oct 20, 2026.