_02182026-551
Town of Lisbon · Waukesha County · meeting of Feb 18, 2026 · Minutes
Open the original document More from Town of Lisbon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PUBLIC WORKS & UTILITY COMMITTEE
LISBON VILLAGE HALL – February 18, 2026 at 5:00 PM
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
Committee Chair Marc Moonen called the meeting to order at 5:05 p.m.
Roll Call
Present: Trustees Marc Moonen and Linda Beal; Members Jane Mueller, Joe Eberle, and Dan Plese;
Engineer Don Neitzel; Administrator Dan Green; DPW Director Nick Wilichowski; and Deputy Clerk-
Finance Lisa Tremper.
Pledge of Allegiance
The Pledge of Allegiance was recited by all those present.
Public Comments
None.
Approval of Meeting Minutes
01/21/2026 Public Works & Utility Committee
Motion by Eberle, second by Beal, to approve the minutes as presented. Motion carried unanimously.
Department Reports
Public Works
Director Wilichowski reported on several recent departmental activities from the last month (see
attached report).
Utility District
Engineer Neitzel gave an overview of monthly flows and run time for the Janine, Plainview, Willow
Springs, and Richmond lift stations, as well as the various well readings. It was noted that the Village
of Sussex has obtained a quote from Next Electric to replace a damaged underground conduit and
electric line for the Willow Springs flow meter. The quote included winter charges and concrete
patching. Engineer Neitzel discussed upcoming maintenance that is needed at all three lift stations
and will have quotes for this maintenance at next month’s meeting. Neitzel also reported that Pump 2
at the Richmond Lift Station failed because of a motor trip malfunction. A spare pump was installed
in place of the failed pump. Neitzel recommended continuing the annual inspection contract with
Sussex.
Special Projects
Public Works & Utility Committee
Meeting Minutes
February 18, 2026
Page 2 of 3
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Administrator Green reported that at the Plan Commission meeting in January, the committee started
to review the first of five areas being examined for sewer expansion. Green recommended the Public
Works & Utility Committee hold a joint meeting with the Plan Commission in March to discuss Area 1
and 2. Administrator Green also reported another grinder pump failed that required replacement,
using the spare pump. The failed pump has been repaired and is now a spare pump.
Unfinished Business
Discussion & necessary action re: options to resolve ongoing I&I issues
Administrator Green stated there were no updates to this item.
Discussion & necessary action re: status update on Lift Stations
Engineer Neitzel gave an update in his report and had nothing further to add. Administrator Green
suggested including a report on the longevity of the lift stations for audit. Neitzel confirmed that a
report would be included in the inspection.
Discussion & necessary action re: Sewer Service Area amendment
Administrator Green provided an update in his report. The Sewer Service Areas will be discussed
further at the March meeting. Green suggested listening to the January Plan Commission meeting for
background.
Discussion & necessary action re: possible future updates to Sewer Service Code
Administrator Green stated that this is tied to the Sewer Service Area Amendment and suggests
waiting on making changes. The consultants will review our code regarding connection fees and
hookup fees. The committee discussed payment of grinder pumps as it is stated in the code currently
and agreed that any changes to grinder pump policies should be made as part of the comprehensive
sewer code update rather than piecemeal. Trustee Beal will bring the topic of grinder pumps up to
the Village Board for direction.
Discussion & necessary action re: Sewer hookup options for LSBT 0193.017
Engineer Neitzel presented an updated analysis of options to provide sewer service to properties in the
area of Golfview Lane and Bramble Drive, where 13 parcels currently lack municipal sewer service. The
analysis examined whether relaying gravity sewer lines could pick up sufficient grade to serve the
area. The committee discussed the need to properly serve this area while also addressing broader
infrastructure concerns. The committee directed Engineer Neitzel to return with a comprehensive
analysis of existing conditions and multiple design options, with cost estimates, to determine the best
approach for providing proper municipal sewer service to all parcels in this area.
New Business
Discussion & necessary action re: Draft Policy for repair vs. replacement of failed grinder pumps
Public Works & Utility Committee
Meeting Minutes
February 18, 2026
Page 3 of 3
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Administrator Green presented a draft policy establishing criteria for determining whether to repair or
replace failed grinder pumps. The policy states if estimated repair costs are 50 percent or more of the
cost of the pump, the district will purchase a new pump. If repair costs are less than 50 percent of the
replacement cost, the district will repair the existing pump. This cost-benefit approach will allow staff
to make timely decisions without bringing each case to the committee.
The committee discussed Policy Item 8, which required deviation approval from both the Public Works
Chair and the Village President. Since both are Village Board members, the committee agreed to strike
“or village president” from that provision.
Motion by Trustee Moonen, second by Mueller, to approve the policy determining whether to repair or
replace failed grinder pumps with the amendment striking “or village president” from Item 8. Motion
carried 4-1 with Beal dissenting.
Items to be Placed on a Future Agenda
Trustee Moonen reviewed the remaining topics coming back to the Committee next month.
Update on Ongoing I & I issues
Update on Lift Stations
Update on Sewer Service Area Amendment
Update on Sewer Service Code
Update on Sewer hookup options for LSBT 0193.017
No further additions were requested.
Adjournment
There being no further business, motion by Eberle, second by Mueller, to adjourn the meeting at 5:58
p.m. Motion carried unanimously.
Respectfully submitted,
Lisa Tremper
Lisa Tremper
Deputy Clerk-Treasurer