_01282026-548
Town of Lisbon · Waukesha County · meeting of Jan 28, 2026 · Minutes
Open the original document More from Town of Lisbon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PUBLIC HEARING(S) & PLAN COMMISSION
RICHARD JUNG FIRE STATION – JANUARY 28, 2026, at 6:30 PM
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
President Gehrke called the Public Hearings and Plan Commission meeting to order at 6:**p.m.
Roll Call
Present: Village President Gehrke; Trustee Beal and Baum; Commissioners Oelhafen, Eberle, Howard,
McCormack, and Lesser; Planner Sumwalt; Engineer Leisses; Attorney Larson; Administrator Green; and
Clerk Cappozzo.
Public Hearing No. 1: Village Board and Plan Commission will consider a request by owner/applicant
Mary Fallon to rezone approximately 5 acres in the southeastern-most corner of the property located
at N56W26106 Richmond Road/ LSBT 0260.994 from the A -10 Agricultural district to the A-5 Mini Farm
district. *No changes are proposed to any lands within the C -1 Conservancy or Shoreland Overlay
districts.
Clerk Cappozzo read the published Notice of Public Hearing into the record and President Gehrke
opened the Hearing.
Planner Sumwalt explained that the petitioner owns approximately 34 acres and proposes to rezone
about 5 acres in the southeast corner near Richmond Road and Mary Hill Road. The purpose is to
facilitate the creation of a new parcel for the petitioner's son as a new home site. The application was
originally intended to include a certified survey map (CSM), but the requested waiver for excluding the
remnant portion could not be considered because the village's rules require a minimum of 40 acres
to entertain such a waiver. The petitioner will need to decide whether to have the rest of the parcel
surveyed for the CSM. A draft showing the proposed 5 -acre lot (approximately 380 by 575 feet) was
presented, and the parcel has had perk tests and soil borings completed showing it can be served by
a septic system.
Sumwalt noted the proposed zoning is consistent with the low-density residential land use designation
for the area. Staff recommended conditions of approval, including that the rezoning be subject to
village approval of a certified survey map. The differen ce from the original plan is that the CSM will
need to include a second lot for the petitioner's farmstead parcel.
Mary Fallon, the petitioner, came forward but did not have anything to add to Sumwalt's presentation.
PLAN COMMISSION
January 28, 2026
Page 2 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
President Gehrke opened the floor for questions from the commission. Commissioner Eberle asked the
village engineer about the dedication on Mary Hill Road shown in the draft CSM, noting it appears to
be 33 feet but should match the dedication across the st reet in October Fields, which he believed
might be 50 feet. He wanted to ensure consistency with the right -of-way width. Engineer Leisses
indicated he would verify the October Fields dedication. Commissioner Lesser clarified that October
Fields is kitty-corner rather than directly across from the 5-acre parcel.
There being no further comments, President Gehrke closed the Public Hearing at 6:42p.m.
******
Public Hearing No. 2: Plan Commission will consider a request by applicant Haley Gibbon, on behalf
of owners Brett and Thomas Hart, for a Conditional Use Permit to allow an In -Law Unit as part of new
residential construction on the property located at N59W25935 Amberwood Court/ LSBT 0255.076 in
the R-1 Single Family Residential district.
Clerk Cappozzo read the public hearing notice into the record, describing the request by Haley Gibbon
on behalf of Brett and Thomas Hart for a conditional use permit to allow an in -law unit as part of new
residential construction in the October Fields subdivision.
Planner Sumwalt explained this is a conditional use permit for an in -law suite in new home
construction, which differs from the previous similar case (Dalla Piazza) that involved renovation of an
existing home. The proposed approximately 65,000 -square-foot home will include an in-law suite on
one end of the first level for the owners' parents, with the remainder of the house for the main family.
The home will meet all standard single -family zoning requirements and will have connections to
sanitary sewer and municipal water, with Waukesha County Environmental Health Department
approval required for the well and septic systems.
A unique aspect is that the home will have two garages: one side-loaded for the main house and one
front-loaded on the east end aligned with the in -law unit. The petitioner is not requesting an interior
door separating the in-law unit from the remainder of the house—it will be open and free-flowing. The
plans show a two-story lobby area at the main entrance with offices along the front and a mezzanine
on the upper level, with production and warehouse space in the back.
Sumwalt outlined the proposed conditions of approval, including a deed restriction stating the in -law
unit is to be occupied by no more than two persons related by blood, adoption, or marriage to the
family occupying the principal unit, and that the condit ional use is not transferable without formal
approval of the plan commission. Additionally, the property owner must annually file with the village
clerk's office a list of who is living in the in -law unit to ensure compliance. Condition 6 requires the
facility to operate in compliance with applicable use regulations to prevent nuisance uses involving
chemicals, odors, noises, or hazardous waste.
PLAN COMMISSION
January 28, 2026
Page 3 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Haley Gibbon, representing the applicants, stated she had nothing to add but provided an update
that they received sanitary permit approval that day and obtained HOA approval from the October
Fields subdivision earlier in the week.
Commissioner Eberle raised a concern about the soils report in the packet showing approval for 3 to
5 bedrooms, while the floor plan shows 7 bedrooms. He emphasized the importance of having the
county acknowledge the correct number of bedrooms on the sanitary permit to protect the client and
avoid future issues with property sales. Gibbon explained that the county based the permit on the
number of people in the home versus bedrooms, and the septic company indicated the mound would
support up to 12 people (a ssuming 2 per bedroom). However, Eberle insisted on obtaining written
confirmation from the county that they reviewed the floor plans and approved the septic system for 7
or 8 bedrooms (counting the office with a closet). Building Inspector Oelhafen confir med that any
room with a built -in closet and a door is considered a bedroom, and recommended obtaining
something in writing from the county acknowledging the bedroom count and mound size.
Commissioner Lesser raised concerns about the conditional use permit transferability and
enforcement. He asked what happens if the property is sold —whether the new owners would need to
reapply for the conditional use permit to use the in -law suite. Attorne y Larson explained that the
property can be sold, but the conditional use is not transferable without plan commission approval.
The purchaser could use it as a single family home or apply to have the conditional use extended to
them, which typically would be granted if they operate it the same way. Lesser also questioned how
the village would ensure only family members live in the in -law suite. Larson explained that condition
3 requires annual filing with the clerk's office listing who lives in the in -law unit, and if a non -family
member is listed, the property would be in violation.
Commissioner Howard questioned whether the home looks like a duplex due to the two separate
garages, and asked how the 800 -square-foot limit for the in -law unit was calculated. Gibbon
explained the calculation used interior dimensions stopping at the hallw ay opening. Howard noted
that using exterior dimensions (28 feet by 30 feet) yields 840 square feet. Building Inspector Oelhafen
performed calculations accounting for 2x6 walls and determined the interior space to be
approximately 796 square feet, which satisfied the commission.
Significant discussion occurred about whether the architecture appears as a single-family residence,
as required by the standards. Commissioner Howard expressed concern that the two separate
garages make it look like a duplex rather than a single-family home. Commissioner Lesser suggested
the applicant could redesign to have a single 4-car garage with a common entrance, eliminating the
separate garage on the in -law suite side. Attorney Larson clarified that the commission must review
what was submitted and determine whether it meets the standards, not conduct architectural design
review.
PLAN COMMISSION
January 28, 2026
Page 4 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
President Gehrke asked if anyone else had thoughts. Building Inspector Oelhafen noted he has seen
other single-family homes in Lisbon with more than one attached garage, and the village code does
not prohibit two garages. Planner Sumwalt confirmed there is no maximum number of garages, only
a minimum size requirement.
Attorney Larson recommended the commission walk through the conditional use standards to
determine whether each has been met, given the state law limitations on conditional use review under
Act 67. He noted the commission must base its decision on whether the standards are met using the
substantial evidence presented.
The commission proceeded through the standards. On the issue of whether the architecture is
compatible with the adjacent residential neighborhood and appears to be a single -family residence,
Commissioner Howard moved that the proposal does not meet this co ndition (condition e).
Commissioner Lesser seconded. Discussion followed about whether the two -garage design makes
the home appear as a duplex. Building Inspector Oelhafen stated a duplex would typically have two
front doors and be symmetrical from the cen ter, and he would vote against denying based on this
criteria. President Gehrke indicated he understood the concern but did not find the design extremely
unique, noting the HOA approved it. The motion failed 2 -5, with Howard and Lesser voting in favor.
Condition has been met.
The commission continued reviewing standards, confirming the home has one common entrance, no
interior door separating the in -law unit (which the petitioner provided a detailed written explanation
for), smoke alarm requirements, site plan adequacy, complia nce with zoning district regulations, and
that it would not be detrimental to public health, safety, or welfare. Commissioner Eberle's earlier
concern about septic capacity was incorporated into the conditions.
Attorney Larson noted that having found all standards met, the commission is obligated under Act 67
to approve the conditional use with reasonable conditions. He suggested modifying condition 5b to
add "including a written acknowledgment from the county he alth department which approves the
septic system for all bedrooms shown in the plans."
Regarding enforcement and preventing rental use , Commissioner Howard asked if a condition could
prohibit adding a door between the in-law unit and main house. Attorney Larson indicated this would
be difficult to enforce but could be added if the commission has concerns about easy conversion to
a duplex.
There being no further comments, President Gehrke closed the Public Hearing at 7:09p.m.
*********************************
Citizen Comments
PLAN COMMISSION
January 28, 2026
Page 5 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
None.
Approval of Meeting Minutes – 12/3/2025 Plan Commission
Review of the December meeting minutes was postposed to the next meeting. No formal action taken.
New Business
A. Rezone a 5-acre portion of N56W26106 Richmond Road/ LSBT 0260.994 from A -10 to A-5
Motion by Howard, second by Baum, to recommend Village Board approval to rezone the
southeasternmost 5 acres of the Fallon parcel located at N56W26106 Rich mond Road from A -10
Agricultural to A-5 Mini Farm, subject to Planner and Engineer comments:
1. The subject property to be rezoned from the A -5 Mini Farm District to A -10 Agricultural District shall be
limited to LSBT 0260.994
2. Subject to the Village of Lisbon’s approval of a Certified Survey Map.
3. The Village of Lisbon Staff is directed to draft the rezoning ordinance and place it in final form consistent
with the Village of Lisbon’s discussion.
4. The Petitioner and/or Property Owner shall, on demand, reimburse the Village of Lisbon for all costs and
expenses of any type incurred by the Village in connection with the review and approval of this application,
including, but not limited to, the cost of professional services incurred by the Village for the review and
preparation of required documents, attendance at meetings or other related professional services as well
as to enforce the conditions in this approval due to a violation of these conditions. Additionally, any unpaid
bills owed to the Village of Lisbon by the Subject Property Owner and/or Agent, for reimbursement of
professional fees (as described above); or for personal property taxes; or for real property taxes; or for
licenses, permit fees or any other fees or forfeitures owed to the Village of Lisbon must be paid on demand
and prior to issuance of any permits and shall be placed upon the tax roll for the Subject Property if not
paid within thirty (30) days of the billing by the Village of L isbon, pursuant to Section 66.0627, Wisconsin
Statutes. Such unpaid bills also constitute a breach of the requirements of this conditional approval that is
subject to all remedies available to the Village of Lisbon, including possible cause for termination of the
conditional approval.
Motion carried unanimously.
B. CUP to allow an In-Law Suite at N59W25935 Amberwood Court/ LSBT 0255.076
Motion by Eberle, seconded by Baum, to approve a conditional use permit for an In-Law Unit as
part of the new residential construction on the property located at N59W25935 Amberwood Court,
with modifications to condition 5b to include written acknowledgment from the county health
department approving the septic system for the floor plan of the proposed structure, and the
additional provision that no door be established between the in-law unit and the remainder of the
single-family home, and subject to Planner comments:
1. The Conditional Use approval is limited to LSBT 0255.076.
2. A Deed Restriction shall be filed in the Waukesha County Register of Deeds Office and a copy of the recorded
document presented to the Building Inspector prior to issuance of the Building Permit. This Deed Restriction
shall state that the in law unit is to be occupied by not more than two persons related by blood, adoption or
marriage to the family occupying the principal unit and that the conditional use is not transferable without
formal approval of the Plan Commission without necessity of a public hearing.
PLAN COMMISSION
January 28, 2026
Page 6 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
3. The property owner shall annually place on file with the Village Clerk’s Office a list of who is living in the in -
law unit to ensure the dwelling is still meeting the definition of an in-law unit pursuant to Section 18.02 of the
Village zoning code.
4. The Village of Lisbon Staff is directed to draft the conditional use permit and place it in final form consistent
with the Village of Lisbon’s discussion.
5. The Conditional Use approval shall not be in full force and effect until such time as the Petitioner obtains the
necessary approvals and satisfies all comments, conditions, and concerns of the:
a. Village of Lisbon Plan Commission and Board, Village Engineer, Village Planner and Village Attorney
with respect to the submitted plans, documents, and specifications.
b. Waukesha County Environmental Health Department for the well and septic system.
6. The Conditional Use Permit shall be filed with the Waukesha County Register of Deeds and approved as to
form by the Village Attorney.
7. The Petitioner and/or Property Owner shall, on demand, reimburse the Village of Lisbon for all costs and
expenses of any type incurred by the Village in connection with the review and approval of this application,
including, but not limited to, the cost of professional services incurred by the Village for the review and
preparation of required documents, attendance at meetings or other related professional services as well as
to enforce the conditions in this approval due to a violation of these conditions. Additionally, any unpaid bills
owed to the Village of Lisbon by the Subject Property Owner and/or Agent, for reimbursement of professional
fees (as described above); or for personal property taxes; or for real property taxes; or for licenses, permit
fees or any other fees or forfeitures owed to the Village of Lisbon must be paid on demand and prior to
issuance of any permits and shall be placed upon the tax roll for the Subject Property if not paid within thirty
(30) days of the billing by the Village of Lisbon, pursuant to Section 66.0627, Wisconsin Statutes. Such unpaid
bills also constitute a breach of the requirements of this conditional approval that is subject to all remedies
available to the Village of Lisbon, including possible cause for termination of the conditional approval.
8. Other Conditions.
a. No use is hereby authorized unless the use is conducted in a lawful, orderly, and peaceful manner.
Nothing in this permit shall be deemed to authorize any public or private nuisance or to constitute a
waiver, exemption or exception to any law, ordinance, order, or rule of either the municipal governing
body, the County of Waukesha, the State of Wisconsin, the United States of America, or other duly
constituted authority, except only to the extent that it authorizes the use of the subject property above
described in any specific respects described herein. This permit shall not be deemed to constitute a
building permit, nor shall this permit constitute any other license or permit required by Village ordinance
or other law.
b. This Conditional Use hereby authorized shall be confined to the subject property described, without
extension or expansion other than as noted herein, and shall not vary from the purposes herein
mentioned unless expressly authorized in writing by the Village of Lisbon Plan Commission as being in
compliance with all pertinent ordinances.
c. Should the permitted Conditional Use be abandoned in any manner, or discontinued in use for twelve
(12) months, or continued other than in strict conformity with the conditions of the original approval,
or should the petitioner be delinquent in payment of any monies due and owing to municipality, or
should a change in the character of the surrounding area or the use itself cause it to be no longer
compatible with the surrounding area or for similar cause based upon consideration of public health,
safety or welfare, the Conditional Use may be terminated by action of the Village of Lisbon Plan
Commission, pursuant to the enforcement provisions of this Conditional Use Permit.
d. Any change, addition, modification, alteration and/or amendment of any aspect of this Conditional Use,
including but not limited to an addition, modification, alteration, and/or amendment to the use,
premises, structures, lands, or owners, other than as specifically authorized herein, shall require a new
permit and all procedures in place at the time must be followed.
e. Should any paragraph or phrase of this Conditional Use Permit be determined by a Court to be unlawful,
illegal, or unconstitutional, said determination as to the particular phrase or paragraph shall not void
the rest of the Conditional Use and the remainder shall continue in full force and effect.
PLAN COMMISSION
January 28, 2026
Page 7 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
f. If any aspect of this Conditional Use Permit or any aspect of any plan contemplated and approved
under this Conditional Use is in conflict with any other aspect of the Conditional Use or any aspect of
any plan of the Conditional Use, the more restrictive p rovision shall be controlling as determined by
the Village of Lisbon Plan Commission.
*
Motion carried 6-1, with Commissioner Lesser dissenting.
C. SPPOO for Swiss-Tek Coatings to develop vacant land along Richard Road/ LSBT 0241.999.009
Motion by Baum, second by Eberle, to approve a new Site Plan/ Plan of Operation (SPPOO) for
Swiss-Tek Coatings to construct a new industrial building on the parcel known as LSBT 0241.999.009
along Richard Road, subject to the addition of adequate security (as determined by the Building
Inspector and Fire Department ) of hydrogen storage tanks, and subject to Planner and Engineer
comments:
1. The Site Plan/Plan of Operation approval is limited to Swiss-Tek Coatings, Inc. on the existing parcel known
as LSBT 0241.999.012. Use of the property by any other entity, for any purpose, is not permitted. The
approval shall reflect the following Plan of Operation:
a. Uses and activities: Use is limited to an approximately 65,292 square foot industrial building, for
manufacturing and processing areas, quality assurance and inspection areas, warehouse, offices and
employee support spaces for light manufacturing associate d with the cleaning, coating, and quality
verification of customer-supplied tooling and wear parts using advanced PVD coating technologies.
b. Number of employees:
i. Full-time: 63
ii. Part-time 22
iii. Maximum 75 employees at any given time.
c. Hours of operation:
i. Business Hours: 7:00 a.m. to 5:00 p.m. Monday – Friday, 6:00 a.m. to 2:00 p.m. Saturday (Limited
onsite staffing), 8:00 p.m. to 12:00 a.m. Sunday (Limited onsite staffing)
ii. Operating Hours: Primary business hours as noted above, however the business/property owner
and its staff shall have access to the site 24/7/365.
d. Outdoor storage: Outdoor storage shall be limited to a hydrogen storage enclosure (29.6’ x 19.5’).
2. This Site Plan/Plan of Operation approval is subject to the Petitioner complying at all times with the plans
and documents presented to the Village of Lisbon Plan Commission on January 28, 2026.
3. The developer shall comply with all parts of the Village Gateway Design Standards from Exhibit Q of the
Village’s zoning code.
4. The developer is solely responsible for ensuring the proposed project complies with any private restrictions
(e.g., covenants) and easements that may apply to the subject property.
5. Subject to the submittal of parking calculations including the area of the offices that demonstrate
compliance with Section 18.03 (10) a. 7. of the Village zoning code for review and approval by the Village
Planner.
6. The facility shall be operated in a manner that complies with the applicable use regulations in Section 18.03
(4) g. of the Village’s zoning code.
7. Any business signage shall be required to obtain signage approval through the Village of Lisbon sign
application process.
8. The Petitioner shall satisfy all comments, conditions, and concerns of the Village of Lisbon Plan
Commission and Board, Village Engineer and Village Planner for the site plan, and other documentation.
9. Waukesha County shall review the proposal for potential impacts and any changes required pertaining to
erosion control and provide written documentation to the Village, prior to commencement of the use.
PLAN COMMISSION
January 28, 2026
Page 8 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
10. Building Inspection. The Petitioner and/or Property Owner shall comply with any and all recommendations
by the Village Building Inspector (or designee) prior to the issuance of an occupancy & use permit for the
subject property. Approval by the Village Building Inspector, if granted, shall be solely for the benefit of the
Village of Lisbon, and shall not be relied upon by the petitioner or others as proof of structural integrity or
safety of any structure on the property, or as proof of compliance with any particular construction standard
that would apply to new construction. The petitioner shall independently determine the suitability of all
structures on the property for the petitioner’s intended uses.
11. Fire Inspection. The Petitioner and/or Property Owner shall comply with any and all recommendations by
the Village of Lisbon Fire Department Chief (or designee) prior to the issuance of an occupancy & use permit
for the subject property. Approval by the Village of Lisbon Fire Department Chief (or designee), if granted,
shall be solely for the benefit of the Village of Lisbon, and shall not be relied upon by the petitioner or others
as proof of fire safety o f any structure on the property, or as proof of compliance with any particular fire
safety standard that would apply to new construction. The petitioner shall independently determine the fire
safety and suitability of all structures on the property for the petitioner’s intended uses.
12. This approval is granted for the express conditions stated herein. Changes or alterations including, but not
limited to, a change in use, premises, lands, or ownership of the property in question shall require a new
Site Plan/Plan of Operation permit with all the zoning procedures at the time being followed. The allowed
uses of the property must at no time be hazardous, harmful, obnoxious, offensive, or a nuisance by reasons
of appearance, noise, dust, smoke, odor, or other similar factors. Any use not spec ifically listed, as
permitted, shall be considered to be prohibited, except as may be otherwise specified herein.
13. The Property Owner shall keep the exterior condition of the premises in a neat and orderly condition at all
times so the premises will not detract from neighboring premises. There shall be no outside storage of junk,
debris, construction material, or other refuse materials within the property and all such materials shall be
disposed of promptly and properly.
14. The Property Owner shall allow Village of Lisbon representatives to inspect the premises following a 24 -
hour notice for the purposes of determining compliance with this approval.
15. The Petitioner and/or Property Owner shall obtain the appropriate permits from the Village of Lisbon.
16. The Petitioner and/or Property Owner shall, on demand, reimburse the Village of Lisbon for all costs and
expenses of any type incurred by the Village in connection with the review and approval of this application,
including, but not limited to, the cost of professional services incurred by the Village for the review and
preparation of required documents, attendance at meetings or other related professional services as well
as to enforce the conditions in this approval due to a violation of these conditions. Additionally, any unpaid
bills owed to the Village of Lisbon by the Subject Property Owner and/or Agent, for reimbursement of
professional fees (as described above); or for personal property taxes; or for real property taxes; or for
licenses, permit fees or any other fees or forfeitures owed to the Village of Lisbon must be paid on demand
and prior to issuance of any permits and shall be placed upon the tax roll for the Subject Property if not
paid within thirty (30) days of the billing by the Village of L isbon, pursuant to Section 66.0627, Wisconsin
Statutes. Such unpaid bills also constitute a breach of the requirements of this conditional approval that is
subject to all remedies available to the Village of Lisbon, including possible cause for termination of the
conditional approval.
Motion carried unanimously.
D. Request for feedback on Focus Area #1 for Sewer Service Area amendment
Planner Sumwalt introduced the review of Focus Area 1 for potential sewer expansion. Engineers
from Foth prepared a study, focusing initially on the southwest area due to issues at Richmond
School and the fire station, both using a high -maintenance force m ain. As the road work is
imminent and the area includes undeveloped land, the Plan Commission's role is to assess
PLAN COMMISSION
January 28, 2026
Page 9 of 9
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
appropriate land use considering future sewer service. The suggested sewer boundary is
preliminary and might be revised to align with full parcels rather than dividing them.
Attention was drawn to the memo items 3.1 through 3.4, evaluating the region's land use needs
and compatible areas for potential development or high -density requirements. Presently,
developed areas mix low -density (20,000 to 1.4 -acre lots) and suburban den sities. The existing
infrastructure can handle substantial flow per agreements with Sussex. For proposals,
undeveloped sections assume low-density designations.
President Gehrke queried if calculations leaned towards the lower density end. Sumwalt affirmed,
highlighting the importance of making flexible, long -term plans since a fixed pipe size can't be
modified later. Commissioners shared hesitations about smaller lots; many preferring existing
larger lot configurations to preserve Lisbon's rural charm. Green emphasized growing the sewer
service is necessary, benefiting from wider customer bases to offset infrastructure costs, while
decreased frontage on smaller lots could minimize village maintenance expenses.
The commission stressed including expansive areas ensures flexibility, as changing land
designations now can prevent reassessing potential sewer connections later. In their directive, they
advised keeping the service scope broad but dismissed interest for lots under 40,000 square feet,
except possibly by the industrial zone near Sussex. A further calculation will assess the f inancial
viability of 40,000 -square-foot parcels under proposed extensions. Additional focus areas are
anticipated, continuing detailed land use discussions
Planner Report
Planner Sumwalt gave a brief update on recent Planner Appointments and upcoming projects. No
action taken.
Adjournment
There being no further business, motion by Baum, second by McCormack, to adjourn the meeting at
9:42p.m.
Respectfully submitted,
Elisa M. Cappozzo, WCMC
Lisbon Village Clerk
Source: Town of Lisbon website. First collected Oct 20, 2026.