Road & Traffic Safety Committee Meeting — Agenda packet
Town of Oregon · Dane County · Road & Traffic Safety Committee Meeting · meeting of Jan 8, 2026 · Agenda packets
Open the original document More from Town of Oregon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Oregon
Road and Traffic Safety Committee Agenda Thursday,
January 8, 2026, 9:00 a.m.
Oregon Town Hall, 1138 Union Road, Oregon, WI 53575
1. Call meeting to order
2. Roll Call
3. Approval of Minutes
4. Public Comments
5. Discussion and possible Action re Windridge Road extension
6. Public Works Report
a. School bus stop on Purcell Road (Schultz)
b. Collaboration with Parks Committee to implement traffic calming strategies (per
(signage) at intersection of MM and Kennedy Park
c. Collaborations with Town of Montrose on Judd Road maintenance (Schultz)
d. Visibility problems on Blizzard Road (collaboration with City of Fitchburg
7. Update on resolution of Town’s dispute with overage for Raven Oaks project (LeBrun)
8. Revised contract for seal coating projects (Crawford and Pultz)
9. Discussion and possible action re: Road work plan 2026-2030
a. PASR ratings
b. 2026 Budget
c. 2027-2030 priorities
10. Grant eligibility
a. Bellbrook bridge grant eligibility
b. Culvert inventory (6 to 20 feet)
c. LRIP –Tipperary, Judd, Locust Grove, Union, others?
11. Removing Encroachments, Road Safety, and Entering Private Lands and Orders for
Removal
12. Letter to Residents re: following speeding limits to prevent accidents prevention
13. Shoulder maintenance on Lincoln Road and other town roads as safety measure for
motorists, cyclists
14. Future Agenda Items
15. Set future meeting date
16. Adjournment
Posted 11/24/25 Amended 01/06/26
Note: Agendas are subject to amendment after publication. Check the posting locations Town of Oregon Hall, 1138 Union Road and the
Town website at www.townoforegonwi.gov. It is possible that members of and possibly a quorum of members of other governmental
bodies of the town maybe in attendance at any of the meetings to gather information; however, no action will be taken by any
governmental body at said meeting other than the governmental body specifically referred to in the meeting notice. Requests fro m
people with disabilities who need assistance to participate in this meeting or hearing should be made to the Clerk’s office 608-8353200
with 48-hour notice.
Page: 1 of 1
Statement Date: 01-06-2026
OREGON TOWN OF TREASURER
1138 UNION RD
OREGON, WI, 53575
US
Statement of Accounts For:
STATEMENT
Payne & Dolan, Inc.
N3W23650 Badinger Road
Waukesha, WI, 53187
USA
Telephone: 262-524-1700 Fax: --
117013 - OREGON TOWN OF TREASURER
Contact:
Item Date Job
Original
Amount Discount Retainage
Outstanding
Amount
Outstanding
RetainageType
310232-001 05-21-2025 310232 517,334.38 0.00 0.00 11,254.17 0.00Invoice
24333 07-08-2025 310232 -464,669.00Payment
24439 11-03-2025 310232 -41,411.21Payment
Current
0.00
31-60
0.00
61-90
0.00
91-120
0.00
Over 120
11,254.17
Amount Due
11,254.17
PLEASE MAIL PAYMENTS TO:
PO BOX 781
WAUKESHA, WI 53187
1.03
Payment fraud is on the rise! Please verify any payment instructions you receive from us (new or
revised) by calling us at (262) 524-1700 and asking to speak to our accounts receivable department. 3
ACH payments preferred! Please email AR.CREDIT.GROUP.SOUTH@WALBECGROUP.COM for ACH instructions.
Outlook
Fw: Another document
From Sue LeBrun <slebrun@townoforegonwi.gov>
Date Mon 1/5/2026 11:13 AM
To Laurie Fitzgerald <lfitzgerald@townoforegonwi.gov>; Jeff Jones (grayowls@charter.net) <grayowls@charter.net>; Cory Inman
<cinman@uwalumni.com>; Arlan Kay <akay@townoforegonwi.gov>; Chuck Crawford <gogator64@yahoo.com>; Abel Schultz
<aschultz@town.oregon.wi.us>
Cc Robert Pultz <farmandrural.law@gmail.com>; Jennifer Hanson <jhanson@townoforegonwi.gov>
1 attachment (114 KB)
Agreement & Contract Roads Oregon Town.pages;
Hi Everyone,
AƩached is the draŌ of the document that will be our template for road work contracts, as discussed at our Dec. 4 work session. Be
prepared to approve (or possibly make minor revisions) at our upcoming meeƟng Jan. 8.
Another email will be forwarded shortly with the NoƟce to Proceed document.
Thank you,
Sue
From: Robert Pultz <farmandrural.law@gmail.com>
Sent: Friday, January 2, 2026 7:07 AM
To: Sue LeBrun <slebrun@townoforegonwi.gov>
Subject: Re: Another document
Attached is the latest, hopefully the last draft.££
Spoke to Cory and he did not want to change the liquidated damages amount.£
Jeff Jones had no changes.££
I cleaned it up and ran spell check again.£
I'll just leave this draft in the Word format as it seems easier for everyone.££
This has to be run by Town's Legal Counsel.£ I would be careful and tell them only a review and
suggestions.£ Otherwise the bill will be huge.££
Happy New Year to you and Tim
On Thu, Jan 1, 2026 at 7:07 PM Sue LeBrun <slebrun@townoforegonwi.gov> wrote:
Hi Bob,
Checking if you want to have a draŌ of the revised contract in our packet for Jan 8 meeƟng, and/or if you'd like me to send out to
the commiƩee ahead of Ɵme.
Wishing you a Happy New Year Bob!
Sue
From: Robert Pultz <farmandrural.law@gmail.com>
Sent: Monday, December 8, 2025 10:36 AM
To: Sue LeBrun <slebrun@townoforegonwi.gov>
Subject: Re: Another document
£
Not sure about the£wordy language£here. I would£not want to interpret it for a 3nd party because£I'm not
sure what it means myself.££
The following is from a Dane Co. Contract (obtained via Open Records) Standard Terms and Conditions
section-with a few revisions. (to replace the insurance£section in the draft)
Contractor is required to submit to the Town a Certificate(s) of Contractor's Commercial Business
and Automobile Liability Insurance in the amounts of not less than $1,000,000 each occurrence.
Such coverage shall include liability£for owned, non-owned, and hired automobiles, which may be
satisfied by way of endorsement to the Commercial General Liability£Policy or a separate£Business
Auto Liability£Policy. Contractor is required to maintain Workers Compensation at Wisconsin
statutory limits. Such coverages shall be maintained by Contractor throughout the pendency of
this Agreement.£
Adequate? What do you think?£
On Fri, Dec 5, 2025 at 11:52 AM Sue LeBrun <slebrun@townoforegonwi.gov> wrote:
Hi Bob,
Here is some insurance info typed out as requested: 2 AlternaƟves are listed. I like B beƩer just because it is shorter but you
can decide which is beƩer from a legal standpoint.
Thanks Bob for all of your work on this!
Sue
A. As copied from Dane Co. HMA contract. This is a bit more wordy than we probably need but is very specific
Insurance: Contractor is required to submit to The Town a cerƟficate of liability insurance prior to commencing
any work under this contract.
1. Commercial General Liability – Contractor agrees to maintain Commercial General Liability insurance at a
limit of not less than $1,000,000 per occurrence. Coverage shall include, but not be limited to, bodily injury
and property damage to third parƟes, contractual liability, personal injury and adverƟsing injury liability,
premises-operaƟons, independent vendors and subcontractors, and fire legal liability. The policy shall not
exclude explosion, collapse, and underground property damage liability coverage. The policy shall list Town
of Oregon as an addiƟonal insured.
2. Commercial/Business Automobile Liability – Contractor agrees to maintain Commercial/Business
Automobile Liability insurance at a limit of not less than $1,000,000 each occurrence. Contractor further
agrees coverage shall include liability for owned, non-owned & hired automobiles. In the event Contractor
does not own automobiles, Contractor agrees to maintain coverage for hired & non-owned auto liability,
which may be saƟsfied by way of endorsement to the Commercial General Liability policy or separate
Business Auto Liability policy.
3.
Environmental Impairment (polluƟon) Liability – Contractor agrees to maintain Environmental Impairment
(PolluƟon) Liability insurance at a limit of not less than $1,000,000 per occurrence for the bodily injury,
property damage, and environmental cleanup costs caused by polluƟon condiƟons, both sudden and non-
sudden. This requirement can be saƟsfied by either a separate environmental liability policy or through a
modificaƟon to the Commercial General Liability policy. Evidence of either must be provided.
B. As copied from Dane Co. Permit to work in right of way (abbreviated and revised to apply to Town of Oregon)
In order to protect itself and Town of Oregon, its officers, boards, employees and representaƟves, the Contractor will
at all Ɵmes during the project keep in full force and effect comprehensive general liability and auto liability insurance policies
issued by a company or companies authorized to do business in the State of Wisconsin and licensed by the Wisconsin
Insurance Department, with liability coverage provided in the amount of at least $1,000,000 Combined Single Limits.
[addiƟonal verbiage available, see screenshot below]
Screenshot of Dane Co. Permit to work in right of way. Used as basis for B. above
From: Robert Pultz <farmandrural.law@gmail.com>
Sent: Wednesday, December 3, 2025 11:16 AM
To: Sue LeBrun <slebrun@townoforegonwi.gov>
Subject: Another document
£
Attached is the Notice to Proceed.£ If you can add this to the other docs and have the Clerk's Office
prepare a meeting packet?£
I'll have a checklist and am willing to explain how all this works together and lead discussion, answer
questions. If you prefer to lead discussion, have at it.£ The£plan all came together as I did the work. At
least I have a roadmap now in my head of how we get this done.££
If our members are in agreement with this path forward, we may only need an hour. Not predicting.££
As I have consistently stated: this all needs to be run by the Town's legal counsel.££
Bob££
Outlook
Fw: Notice to Proceed draft document
From Sue LeBrun <slebrun@townoforegonwi.gov>
Date Mon 1/5/2026 11:16 AM
To Laurie Fitzgerald <lfitzgerald@townoforegonwi.gov>; Arlan Kay <akay@townoforegonwi.gov>; Jeff Jones
(grayowls@charter.net) <grayowls@charter.net>; Chuck Crawford <gogator64@yahoo.com>; Robert Pultz
<farmandrural.law@gmail.com>; Cory Inman <cinman@uwalumni.com>; Abel Schultz
<aschultz@town.oregon.wi.us>
Cc Jennifer Hanson <jhanson@townoforegonwi.gov>
1 attachment (777 KB)
Notice to Proceed.pages;
Hi All,
As noted in the last email, here is the NoƟce to Proceed draŌ document. We will discuss & hopefully
approve in our Jan. 8 meeƟng.
Best Regards,
Sue
From: Robert Pultz <farmandrural.law@gmail.com>
Sent: Friday, January 2, 2026 7:09 AM
To: Sue LeBrun <slebrun@townoforegonwi.gov>
Subject:
The notice to proceed.££
Plus there has to be a method of alerting The Contractor to these new documents
and requirement to comply with£the new proceed.££
Outlook
Fahey Heights neighborhood roads
FromSue LeBrun <slebrun@townoforegonwi.gov>
Date Thu 11/20/2025 12:42 PM
To clerk@town.rutland.wi.us <clerk@town.rutland.wi.us>; chairknutson@town.rutland.wi.us
<chairknutson@town.rutland.wi.us>
Cc supervisornedveck@town.rutland.wi.us <supervisornedveck@town.rutland.wi.us>;
supervisorwilliams@town.rutland.wi.us <supervisorwilliams@town.rutland.wi.us>;
supervisordorn@town.rutland.wi.us <supervisordorn@town.rutland.wi.us>;
supervisorporter@town.rutland.wi.us <supervisorporter@town.rutland.wi.us>; Jennifer Hanson
<jhanson@townoforegonwi.gov>
Hello Chair Knutson,
At the Town of Oregon, our Road & Traffic Safety committee is putting together a plan for addressing our
older roads. One of the roads that came up with a lower PASER rating was Eisenhower St. (also Taft St.)
in Fahey Heights. We were checking if any of the Fahey Heights neighborhood roads in Rutland
(Eisenhower, Truman, Hoover, Roosevelt) are coming up in the next few years in your projects so we can
possibly explore doing a joint project.
Feel free to call me or email, whichever is easier.
Thank you,
Sue LeBrun,
Town of Oregon Road & Traffic Safety Committee chair
608-215-8617
1P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
Inspection Report for
P-13-209
BELL BROOK RD over BR STORY CREEK
Sep 25, 2025
Type Prior Date Prior Team Leader Frequency (mos) Performed
Routine 09-24-24 Leden, Andrew (9705) 12 X
Deck evaluation 06-20-23 Carmichael, Adam (9714) 60
Scour plan of action 09-24-24 Leden, Andrew (9705) 48
SIA review 09-24-24 Leden, Andrew (9705) 48
SNBI 09-24-24 Leden, Andrew (9705) 0 X
Uw-Profile 09-24-24 Leden, Andrew (9705) 24
Latitude 42°52'30.90" N Owner TOWN
Longitude 89°27'41.40" W Maintainer TOWN
Team members
Time Log Hours
0
Minutes
40
Leden, Andrew: Team Leader
Weather Temperature (f)
50
Condition
Overcast
Name Number Signature Signature Date
Inspector
Leden, Andrew 9705
Andrew Leden
09-25-25E-signed by Andrew Leden(atleden)
2P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 2
Identification & Location
Feature On:
BELL BROOK RD
Section Town Range:
S29 T05N R09E
Structure Number:
P-13-209Feature Under:
BR STORY CREEK
County:
DANE
Location
1.5M E JCT CTH D
Municipality:
OREGON
Structure Name:
Geometry Traffic
measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern
Approach Roadway Width:
28
Bridge Roadway Width:
23.0
Total Length:
23.0 On 2 88 2015 two way traffic
Approach Pavement Width:
20
Deck Width:
25.9
Deck Area (sq ft):
596
Capacity Load Rating
Inventory rating:
HS15
Overburden depth (in):
1.0
Last rating date:
07-23-09
Controlling:
SLAB Positive Moment
Operating rating:
HS25
Deck surface material:
Low Slump Concrete
Control location:
0.5 SPAN 1
Posting:
Narrow Bridge
Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N): Re-rate notes:
Hydraulic Classification
Scour Critical Code(113):
Critical- unstable foundations (3)
Q100 (ft3/sec):
0
High water elevation (ft):
0.0
Velocity (ft/sec):
0.0
Sufficiency #:
53.4
Field Measured Rail(s)
Rail Location Type Measurement (in)
Primary Rail left outer Concrete thru girder (3ft x 9in) 43.0
Primary Rail right outer Concrete thru girder (3ft x 9in) 43.0
Approach Transitions North West Beam guard 24.0
Approach Transitions South West Beam guard 26.0
Departure Transitions North East Beam guard 26.0
Departure Transitions South East Beam guard 26.0
Span(s)
Span # Material Configuration Depth (in) Length (ft) Main
1 CONCRETE Slab - Solid - Flat 21.5 Y
Expansion joint(s) Temperature: File:55 New:50
Clearance
Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Construction History
Year Work Performed FOS id
1923 New Structure
1973 Overlay - Concrete
3P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 3 Structure No.:P-13-209
Maintenance Items History
Item Recommended by Status Status change Year completed
IMP-Structure Replacement Pilgrim, Mark (9501) COMPLETE 11/16/17 2017
Comment: Status Comment:
Maintenance Items
Item Priority Recommended by Status Status change
Misc - Cut Brush High Leden, Andrew (9705) IDENTIFIED 09/25/25
Comment:
Remove brush and trees at wingwalls.
Status Comment:
Deck - Clean and Sweep Deck/Drains High Leden, Andrew (9705) IDENTIFIED 09/25/25
Comment:
Sweep flowlines and clear drains.
Status Comment:
Deck - Seal Surface Cracks Medium Leden, Andrew (9705) IDENTIFIED 09/25/25
Comment:
Seal deck cracks.
Status Comment:
Approach - Wedge Approach Medium Leden, Andrew (9705) IDENTIFIED 09/25/25
Comment:
Wedge/resurface both approaches.
Status Comment:
Deck - Patching Low Leden, Andrew (9705) IDENTIFIED 09/25/25
Comment:
Replace unsound patches with partial or full depth concrete
surface repairs.
Status Comment:
IMP-Structure Replacement Low Leden, Andrew (9705) IDENTIFIED 09/25/25
Comment:
Recommend replacing the bridge
Status Comment:
4P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 4 Structure No.:P-13-209
Elements
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 38
Reinforced Concrete Slab SF 595 106 385 104 0
1080
Delamination - Spall - Patched Area SF 0 60 34 0
Spall at SW drain (2’ x 2’), SE drain (1’ x 1’) - 5 SF CS3.
N. side has 6"x3' spall w/ exposed rusting rebar near N edge, W half - 3 CS3.
1'x4' spall w/ exposed rusting rebar near S edge, W half - 4 SF CS3.
1'x3' spall w/ exposed rusting rebar near S edge at midspan - 3 SF CS3.
1'x4' & 1’ x 8’ spalls w/ exposed rusting rebar at CL - 12 SF CS3.
5 scattered 1’ x 1’ spalls with exposed rebar - 5 SF CS3.
1’ x 2’ spall near N edge, E half with exposed rebar - 2 SF CS3.
Multiple delams throughout (est. 10% - 60 SF)
1130
Cracking (RC) SF 0 325 70 0
N. side map cracking w/ delamination and heavy efflorescence and stalactites full length x 3-feet wide - 70
CS3.
Numerous mod. long. cr., delam., and spalls w/ eff. - 56 CS2.
Full width by 4' long at each end has light efflorescence.
About 50% of curb is cracked.
8904
Discoloration SF 06 00 0
Approximately 10% with staining/discoloration scattered throughout.
8514
Concrete Overlay SF 595 0 466 126 3
3210
Debonding/Spall/Patched Area/Pothole SF 0 80 70 3
East: Unsound AC patches at the east deck end - 2.5’ avg x 20’ wide = 50 SF CS3; 12"x18" and 10"x12"
potholes - 3 SF CS4
West: Unsound AC patches at the west deck end - 20 SF CS3.
W. and E. ends cracked/spalled and patched with asphalt, failing.
N. half of WBL is delaminated - 100 SF CS2.
3220
Crack (Wearing Surface) SF 0 386 56 0
Widespread moderate map cracking - 411 CS2
1/8" wide, full-length cracks 2' south and 8' north of CL - 56 CS3.
X 110
Reinforced Concrete Open Girder LF 44 0 0 41 3
(Railing)
1080
Delamination - Spall - Patched Area LF 0 0 19 3
South girder: spalled 15" high x 2" to 4" deep x full length- 19 LF CS3; 3' exposed rusting rebar with approx
30% SL at 1/4 points - 3 LF CS4. (Spalls on inside and outside faces)
North girder: spalls along inside curb face, up to 6” deep - CS3 (overlaps cracking)
1130
Cracking (RC) LF 0 0 22 0
N. girder has full length horiz. 1/8" wide crack, 2' up from bottom along edge. North girder: vertical cracks
every 2'+/-. Cracking at N. deck edge throughout with stalactites - 22CS3.
X 215
Reinforced Concrete Abutment LF 52 0 43 9 0
1080
Delamination - Spall - Patched Area LF 0 0 8 0
W Abut: Spall at SW corner w/exposed rusting rebar below waterline - 4 CS3 (not found 2024 due to high
water).
W Abut: Spall at NW corner below waterline - 3CS3 (not found 2024 due to high water).
E. Abut: 6" dia. spall at NE corner - 1 CS3.
1130
Cracking (RC) LF 0 43 1 0
W Abut: Widespread mod. & wide vert & map cracking w/ some eff. - 19 CS2
E Abut: Widespread mod. & wide vert & map cracking w/ eff. - 24 CS2 + some rust stain -1 CS3
5P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 5 Structure No.:P-13-209
X 8400
Integral Wingwall EA 4 0 4 0 0
8903
Wall Deterioration EA 0 4 0 0
All Wings: Widespread insig. to moderate map cracking w/ lt effl - 4 CS2.
SW & NW have 1" to 2" deep spalls at abutment interface - 2 CS2
Assessments
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 9001
Drainage - Ends of Structure EA 4 22 00
Minor erosion behind SW wingwall and at end of NE wingwall.
X 9004
Drainage E A 40040
All are plugged
X 9030
Signs - Object Markers E A 40400
4 tigerboards
NE, SE, and SW are tipped.
NW, NE, & SE have shotgun damage
X 9031
Signs - Narrow Bridge E A 22000
X 9041
Slope Protection- Bare E A 22000
soft silt @ both abutments
X 9323
Approach Roadway - Asphalt EA 2 0 0 20
Both approaches: map cracking and waviness.
Dips in WBL at E. approach and full-width at W. approach.
Condition Ratings
File New
Deck condition rating (C.01) Poor (4) Poor (4)
Superstructure condition rating (C.02) Poor (4) Poor (4)
Substructure condition rating (C.03) Satisfactory (6) Satisfactory (6)
Culvert condition rating (C.04) N/A (Nbi) (N) N/A (Nbi) (N)
Bridge railings condition rating (C.05) Poor (4) Poor (4)
Bridge railing transitions condition rating (C.06) N/A (N) N/A (N)
Bridge bearings condition rating (C.07) N/A (N) N/A (N)
Bridge joints condition rating (C.08) N/A (N) N/A (N)
Channel condition rating (C.09) Good (7) Good (7)
Channel protection condition rating (C.10) Good (7) Good (7)
Scour condition rating (C.11) None (9) None (9)
Underwater inspection condition (C.15)
Channel Bank Slumping (6) Bank Slumping (6)
Waterway Equal Minimum (6) Equal Minimum (6)
Approach Good- No speed reduction (8)
6P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 6 Structure No.:P-13-209
Structure Specific Notes
Animal nesting/roosting presence on structure
X Swallow nests present
Inspection Specific Notes
Inspector Site-Specific Safety Considerations
Routine Specific Procedures
Special Requirements
Chk Hours Cost Comments
Other X Waders
7P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
page 7 Structure No.:P-13-209
Underwater Probe Form
P-13-209
General Site Conditions - Scour
None observed
General Site Conditions - Embankment Erosion/Conditions
Minor erosion behind SW wingwall and at end of NE wingwall.
Substructure Notes
Chk Unit Max Water Depth(ft) Mode Channel Material Notes
X Cardinal 1.5 Wade Silty Sand East
2.5’ at center of channel
X Non Cardinal 1.5 Wade Silty Sand West
8P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
page 8 Structure No.:P-13-209
Routine Item 1
North elevation view
p13-209_25_Rd12.jpg
Routine Item 2
Longitudinal view looking west
p13-209_25_Rd2.jpg
Routine Item 3
Longitudinal view looking east
p13-209_25_Rd4.jpg
Routine Item 4
Spalls with exposed rebar at centerline
p13-209_25_Rd8.jpg
Linked Element(s):
Reinforced concrete slab
9P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
page 9 Structure No.:P-13-209
Routine Item 5
Cracking with heavy effl. At north deck edge
p13-209_25_Rd10.jpg
Linked Element(s):
Reinforced concrete slab
Routine Item 6
Spalls at south deck underside near west abutment
p13-209_25_Rd17.jpg
Linked Element(s):
Reinforced concrete slab
Routine Item 7
Failed deck patching and cracks at east deck end
p13-209_25_Rd7.jpg
Linked Element(s):
Reinforced concrete slab -> Concrete overlay
10P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
page 10 Structure No.:P-13-209
Routine Item 8
Spalling along north girders/rail
p13-209_25_Rd5.jpg
Linked Element(s):
Reinforced concrete open girder
Routine Item 9
Spall at south girder, west end
p13-209_25_Rd6.jpg
Linked Element(s):
Reinforced concrete open girder
Routine Item 10
Map cracking with effl. at north deck fascia/girder
p13-209_25_Rd11.jpg
Routine Item 11
South girder/deck spalling
p13-209_25_Rd13.jpg
Linked Element(s):
11P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
Reinforced concrete open girder
Routine Item 12
SW deck and girder spalls with exposed rebar
p13-209_25_Rd14.jpg
Linked Element(s):
Reinforced concrete slab
Reinforced concrete open girder
Routine Item 13
East abutment view
p13-209_25_Rd15.jpg
Linked Element(s):
Reinforced concrete abutment
Routine Item 14
West abutment view
p13-209_25_Rd16.jpg
Linked Element(s):
Reinforced concrete abutment
12P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
page 12 Structure No.:P-13-209
Routine Item 15
Spall at SW abutment corner
p13-209_25_Rd9.jpg
Linked Element(s):
Reinforced concrete abutment
Integral wingwall
Routine Item 16
West approach deterioration
p13-209_25_Rd3.jpg
Linked Element(s):
Approach roadway - asphalt
Routine Item 17
West narrow bridge sign
p13-209_25_Rd1.jpg
Linked Element(s):
Signs - narrow bridge
13P-13-209 25-Sep-2025 inspection as of 25-Sep-2025
Specifications for National Bridge Inventory (SNBI) Data items
P-13-209
Span Material and Type (B.SP)
Span 1
(main)
Number Beam Lines:
1
Wearing surface:
Concrete - low slump (C04)
Span Material:
Reinforced concrete - cast-in-place (C01)
Deck Protective system:
None (0)
Span Protective System:
Unknown (U)
Deck reinforcing protective system:
None (0)
Deck Material and Type:
Reinforced concrete - cast-in-place (C01)
Deck Stay In Place Forms:
None (0)
Substructure Material and Type (B.SB)
Non Cardinal
Abutment
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Cardinal
Abutment
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Geometry (B.G)
NBIS bridge length:
20.4
Curved bridge:
Not curved (N)
Maximum bridge height:
6
Inspection Requirements (B.IR)
NSTM Inspection Required:
No (N)
E or E' fatigue Details:
Appraisal (B.AP)
Approach roadway alignment:
Good (G)
Overtopping likelihood:
Remote - once every 100 years or less frequently (1)
1V-13-188 10-Jun-2025 inspection as of 14-Jun-2025
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
Inspection Report for
V-13-188
Purcell Rd over Unnamed Creek at Purcell Rd
Jun 10, 2025
Type Prior Date Prior Team Leader Frequency (mos) Performed
Routine - local small X
Latitude 42°56'35.91" N Owner TOWN
Longitude 89°27'36.53" W Maintainer TOWN
Team members
Time Log Hours
0
Minutes
20
Weather Temperature (f)
75
Condition
Sunny
Name Number Signature Signature Date
Inspector
Polkinghorn, Ray 9688
Ray Polkinghorn
06-14-25E-signed by Ray Polkinghorn(polky)
2V-13-188 10-Jun-2025 inspection as of 14-Jun-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 2
Identification & Location
Feature On:
Purcell Rd
Section Town Range: Structure Number:
V-13-188Feature Under:
Unnamed Creek at Purcell Rd
County:
DANE
Location
331 feet East of Blizzard Rd
Municipality:
OREGON
Structure Name:
Geometry Traffic
measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern
Approach Roadway Width:
25
Bridge Roadway Width:
25.0
Total Length:
6.9 On 2 two way traffic
Culvert Barrel Length:
50.0
Culvert Width:
6.9
Culvert Height:
6.0
Capacity Load Rating
Inventory rating: Overburden depth (in):
31.0
Last rating date: Controlling:
Operating rating: Deck surface material:
Bituminous
Control location:
Posting: Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N):
Y
Re-rate notes:
auto checked due to overburden initialized to 31.0
Hydraulic Classification
Scour Critical Code(113): Q100 (ft3/sec):
High water elevation (ft): Velocity (ft/sec): Sufficiency #:
Field Measured Rail(s)
Rail Location Type Measurement (in)
Span(s)
Span # Material Configuration Depth (in) Length (ft) Main
1 TIMBER Pipe - Flexible 6.9 Y
Clearance
Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Construction History
Year Work Performed FOS id
9999 New Structure - -
Maintenance Items
Item Priority Recommended by Status Status change
Misc - Cut Brush Medium Polkinghorn, Ray (9688) IDENTIFIED 06/14/25
Comment:
Cut brush at end walls and embankments
Status Comment:
Misc - Remove Vegetation (Spray) Medium Polkinghorn, Ray (9688) IDENTIFIED 06/14/25
Comment:
Spray wild grape and vines at both ends
Status Comment:
Channel - Install Riprap Low Polkinghorn, Ray (9688) IDENTIFIED 06/14/25
Comment:
Recommend installing heavy riprap at the downstream side to
protect the endwalls/toewall from further exposure.
Status Comment:
3V-13-188 10-Jun-2025 inspection as of 14-Jun-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 3 Structure No.:V-13-188
Elements
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 240
Steel Culvert LF 50 05 00 0
6' diam. CMCP x 50' L
1000
Corrosion LF 05 00 0
Bottom has surface rust, F.L. - 50 CS2
Assessments
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 9001
Drainage - Ends of Structure EA 4 4000
X 9030
Signs - Object Markers EA 2 0020
White flexible culvert markers at the NE and SW corners.
Both are obscured by brush.
X 9248
Culvert End Treatment EA 2 0200
Steel end walls at each end.
X 9325
Roadway Over Structure EA 1 0100
Asphalt w/chip seal travel lanes and gravel and turf shoulders.
Unsealed moderate width trans cracks - 1 CS2
Condition Ratings
File New
Deck condition rating (C.01) N/A (N)
Superstructure condition rating (C.02) N/A (N)
Substructure condition rating (C.03) N/A (N)
Culvert condition rating (C.04) Deterioration (6)
Bridge railings condition rating (C.05) N/A (N)
Bridge railing transitions condition rating (C.06) N/A (N)
Bridge bearings condition rating (C.07) N/A (N)
Bridge joints condition rating (C.08) N/A (N)
Channel condition rating (C.09)
Channel protection condition rating (C.10)
Scour condition rating (C.11)
NSTM inspection condition (C.14)
Underwater inspection condition (C.15)
Channel
Waterway
Approach Good- No speed reduction (8)
Structure Specific Notes
Created via VStructure import on 2024-11-13
Animal nesting/roosting presence on structure
X None
Inspection Specific Notes
4V-13-188 10-Jun-2025 inspection as of 14-Jun-2025
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 4 Structure No.:V-13-188
Inspector Site-Specific Safety Considerations
Routine - local small Specific Procedures
Special Requirements
Chk Hours Cost Comments
5V-13-188 10-Jun-2025 inspection as of 14-Jun-2025
page 5 Structure No.:V-13-188
Underwater Probe Form
V-13-188
General Site Conditions - Scour
None
General Site Conditions - Embankment Erosion/Conditions
No erosion observed
Substructure Notes
Chk Unit Max Water Depth(ft) Mode Channel Material Notes
X Cardinal 0.0 Dry Silt
X Non Cardinal 0.0 Dry Silt
6V-13-188 10-Jun-2025 inspection as of 14-Jun-2025
page 6 Structure No.:V-13-188
Local Small Bridge Item 1
Looking East
v13-188_25_xbd1.jpg
Local Small Bridge Item 2
Looking South
v13-188_25_xbd2.jpg
Local Small Bridge Item 3
Looking North
v13-188_25_xbd3.jpg
Source: Town of Oregon website. First collected Oct 20, 2026.