Town of Oregon
Road and Traffic Safety Committee Meeting Minutes (revised and approved by Committee
at Jan. 8, 2026, meeting)
Thursday, September 18, 2025
1) Call Meeting to Order: 9:00 a.m.
2) Roll Call: Arlan Kay, Chuck Crawford, Susan LeBrun, Robert Pultz, Jeff Jones, Laurie
Fitzgerald, Abel Schultz. Absent: Cory Inman
3) Approval of Oct. 23, 2025, minutes. Pultz, Crawford. Motion carried.
4) Public Comments: Steve Jernegan, 5464 Alan Drive, has been hearing positive
comments about striping from Town residents, including Netherwood Road residents.
The consensus is that striping is making town roads safer for bicyclists. Jernegan also
asked about possible collaboration with Town of Brooklyn for striping Union Road.
Schultz mentioned that the Town has raised this issue with the Town of Brooklyn.
5) Public Works Report
a) School bus stop on Purcell Road: there is one sign still to be installed.
b) Safety concerns at uncontrolled intersection of County MM and Kennedy Park
Road—LeBrun and committee discussed follow-up e-mail (received Oct. 28, 2025,
from Charlene Schmid, Highway Engineer, Dane County Highway and
Transportation. To do: follow-up with Dave Frankson to see if Parks Committee is
working on signs for Hwy MM.
c) Collaboration with Town of Montrose--nothing to report; tabled until Jan. 8, 2026
meeting.
d) Speed study on Glenway (from Glenway Circle to Highway A) was performed upon
request from residents. To do: Remind residents that they may contact the Dane
County Sheriff’s Office to request speed studies (prepare short reminder message
and post information on Town of Oregon web site?).
e) “10-Ton Bridge Ahead” signs for culverts on Lincoln and Storytown Roads have
been ordered and are ready to be posted
6) Raven Oaks cost overrun update: Board of Supervisors approved sending reduced
payment Payne and Dolan ($11,000 less than invoice). Check has been sent.
7) Revision to Contract Language for Seal Coating and HMA projects—Pultz and Crawford
presented draft revisions to contract language. To do: Committee members review the
draft and prepare comments to share at a Work Session to be held on Thursday,
December 4, 2025
8) Discussion and possible action re: Road Work Plan for 2026-2030:
a) PASER ratings are updated
b) 2026 Roadwork budget ($120,000) was approved at the Nov. 10, 2025, Board of
Supervisors meeting.
c) 2027-2030 Priorities--LeBrun presented a revised road project plan extending to
2035. This revision presents a list of priorities for future projects based on PASER
rating and type of repair/maintenance needed, with the goal of
maintaining/repairing approximately 2.2 miles per year.
i) The Bellbrook bridge and two culverts (Lincoln and Storytown Roads) due for
replacement are not included in the revised project plan. LeBrun and
committee will need to determine who is responsible for sizing the culverts and
designing the new bridge when grant money comes through.
ii) We will need to coordinate with the Town of Rutland on the Fahey Heights
Roads (Eisenhower and Taft). LeBrun with reach out of Town of Rutland
iii) Schultz reminded the committee that our Road Work Plan should include
follow-up crack filling and sealcoating within 2-3 years of new pavement as a
means of extending new pavement life to 25 years.
iv) To do: Committee members review the revised road project plan and prepare
comments for discussion at Jan. 8, 2026, Committee meeting.
9) Grant Eligibility
a) Bellbrook Bridge; tabled until Jan. 8,2026 meeting
b) Grants available for 6- to 20-foot culvert installation; tabled until Jan. 8, 2026
c) LRIP grant received for Judd Road. To do: check sunset date for Tipperary Road
grant.
10) Future Agenda Items:
a) Wisconsin Statute 82.03 ROW and visibility issues
b) Safety and speeding reminder for Town Residents
c) Shoulder maintenance on Lincoln Road (and other roads) to enhance safety for
bicyclists and motorists
d) Visibility and safety on Blizzard Road; collaboration with City of Fitchburg
11) Future meeting dates:
a) 9 a.m. Thursday, Dec. 4, 2025—work session for revisions to contract language for
future road work projects
b) 9 a.m. Thursday, January 8, 2026
12) Adjournment: 10:45 a.m.—Crawford, Jones. Motion carried