Road & Traffic Safety Committee Meeting — Agenda packet
Town of Oregon · Dane County · Road & Traffic Safety Committee Meeting · meeting of Aug 14, 2025 · Agenda packets
Open the original document More from Town of Oregon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Oregon
Road & Traffic Safety Committee Agenda
Thursday, August 14, 2025 at 9:00am
Oregon Town Hall, 1138 Union Road, Oregon, WI 53575
1. Call meeting to order
2. Roll Call
3. Approval of Minutes
4. Public Comments
5. Discussion and possible Action re: discussion with Dane County about a joint project to install culvert between
Locust Grove Road and Anderson Farm County Park
6. Discussion and possible Action re: 2nd driveway request at McKay Nursery, 5655 Lincoln Rd.
7. Discussion and possible action re: school bus stop at 6141 Purcell Road
8. Update on 2025 road projects re: cost overrun
9. Discussion of proposed revisions to contract language for future seal coating projects, including:
a. Joints between private driveways and new pavement
b. Provision for the Town of Oregon to approve project work between pulverizing and paving step
c. Contractor’s responsibility for clean-up upon completion of project
d. Add provisions that require an independent expert to inspect and sign off on completed project
10. Update on 2025 pavement markings project and plans for 2026
a. Possible collaboration with Town of Fitchburg to stripe Purcell Road
b. Review for striping sections of Sun Valley Parkway, Lincoln Road, Hillcrest (from A to Lincoln Road),
and Glenway north of A.
11. Discussion and possible action re: Bellbrook Bridge and availability of grant money, per WiDOT’s Local
Program Symposium on 2026-2031 Funding Cycle (May 22, 2025).
12. Discussion and possible action re: road and traffic safety concerns:
a. Discussion and possible Recommendation re: Ironman 70.3 Event 9/6/2025
b. Possible next steps for pursuing discussion of improving visibility and sight distance at intersection of
Hillcrest Road and County A (reply to letter from Charlene Schmid of Dane County).
c. Review concerns presented by Residents at the July 10, 2025, meeting re: improving safety for
pedestrians crossing MM at Kennedy Road by
i. Reducing speed limits on MM (speed study, review of past traffic counts and accident statistics,
coordination with Village
ii. Adding signage and pavement markings
d. Movable message board: update on availability of used message boards
e. Resident Concern re: Speed on Netherwood Road from Fish Hatchery 6:30am-8:30am/3:00pm-5:30pm
f. Update on Dane County Sheriff Speed Board on Glenway
13. Discussion and possible action re: informing Residents of the need to keep Rights of Way clear of vegetation
and visual obstructions
14. Discussion and possible action re: 2026 road work plan
a. PASR ratings for 2025
b. Identify projects for 2026
15. Set future meeting date
16. Adjournment
Posted 07/16/25
Note: Agendas are subject to amendment after publication. Check the posting locations Town of Oregon Hall, 1138 Union Road and the Town website at
www.townoforegonwi.gov. It is possible that members of and possibly a quorum of members of other governmental bodies of the town maybe in attendance at any of
the meetings to gather information; however, no action will be taken by any governmental body at said meeting other than the governmental body specifically referred
to in the meeting notice. Requests from people with disabilities who need assistance to participate in this meeting or hearing should be made to the Clerk’s office 608-
835-3200 with 48-hour notice.
1
Town of Oregon
Road and Traffic Safety Committee Meeting Minutes
Thursday, July 10, 2025
1. Call Meeting to Order: 9:00 a.m.
2. Roll Call: Members present—Arlan Kay, Abel Schultz, Chuck Crawford, Jeff
Jones, Susan LeBrun, Robert Pultz, Corey Inman, Laurie Fitzgerald. Absent: Steve
Sommerfeld
3. Approval of May 22, 2025, minutes: Pultz (1); Crawford (2) Motion carried.
4. Public Comments:
a. David and Kathleen Batker: clump of willows obstructing visibility
for motorists in right-of-way at intersection of Alpine and Glenway
Roads. The Batkers requested permission to spray the willows
with Crossbow. Motion to approve Batkers’ request: Kay (1); Pultz
(2). Motion carried.
b. Eugene Lewis requested the Committee to lower speed limit on
County MM where pedestrians cross from Kennedy Park over to
Bicentennial Park. Heavy traffic on MM, including gravel trucks
coming from Mandt. The Committee will follow up: LeBrun will
reach out to Village of Oregon to propose coordinating on a speed
study. Motion: Road and Traffic Safey Committee will
recommend to the Board of Supervisors approve further study of
this issue (including traffic study): Kay (1); Crawford (2). Motion
carried.
c. Jennifer Dorl asked the Committee whether provisions will be
made to protect the nesting habitat for swallows at Bellbrook
Bridge if the bridge is replaced during nesting season. Inman: the
bridge would be replaced during nesting season, but there is a
procedure to net the swallow habitat during construction.
5. Discussion and possible action re: discussion with Dane County about a joint
project to install culvert between Locust Grove Road and Anderson Farm County
Park—LeBrun contacted Dane County, but has not received reply.
6. Discussion and possible action regarding school bus stop at 6141 Purcell
Road—Schultz has not heard back from the bus service as to whether the
route will be reversed for 2025-2026 school year. In the meantime, he plans to
install the second warning sign the Committee approved.
7. Discussion and possible action re: Update on 2025 Road Work—The Raven
Oaks Project came in with a $50,000 plus overage. LeBrun and Schultz have
2
reviewed the charges and determined that Payne and Dolan 1) used different
measurements for number of square yards of road than the Town used in
preparing the request for bids; and 2) applied a thicker layer of gravel than
Town requested (5 inches versus 3.5 inches). To Do : LeBrun, Jones, Inman,
and Schultz will work with Payne and Dolan and have results ready to share
with the Town Board at the August meeting. Kay asked that the August report
to the Town Boad include the recommendation to add a clause in our road
contracts requiring an independent party to inspect and sign off on final
projects.
8. Discussion of proposed revisions to contract language for future seal coating
projects—Work to identify possible revisions is ongoing. To do:
a) Crawford and Pultz will prepare revisions for review at August
meeting;
b) LeBrun proposed adding a 5 percent retainer to the contract as safety
net contingent upon satisfactory completion of projects;
c) LeBrun will check DOT quality control specifications for sealcoating
projects for guidance the Town can follow in future contracts.
9. Pavement markings 2025 project and plans for 2026—Residents’ response to
striping has been positive. Committee discussed candidates for 2026 striping.
Motion: Request bids from Dane County for striping the following town roads
in 2026
a) Lincoln Road west of intersection with Fish Hatchery
b) Glenway between County A and Lincoln Road
c) Hillcrest between A and Lincoln Road
d) Union Road for one mile north of A
LeBrun (1); Jones (2) Motion carried;
Le Brun will request the bids
10. Update and possible action re: Bellbrook Bridge and availability of grant
money, per WIDOT’s Local Program Symposium on 2026-2031 Funding Cycle
(May 22, 2025). Inman: no word yet from WiDOT.
11. Discussion and possible action re: road and traffic safety concerns:
a) Improving visibility and sight distance at intersection of Hillcrest Road
and County A (outreach to Clement Abongwa at Dane County)—In an
e-mail dated June 13, 2025, Charlene Schmid (P.E., Dane County)
replied to Town’s request for help at this intersection She wrote: “our
initial investigation leads us to believe that it would require a
3
significant effort and possibly retaining wall design to stay within our
right of way. We will look to incorporate this work within a future
project on CTH A. In the meantime, we will continue to monitor the
growth and provide mowing as needed.” Schultz noted the County
has been doing a better job of mowing at this intersection, which has
improved visibility.
b) Movable message board (possible uses)—Steve Jernegan is looking
for used message boards that the Town could purchase.
12. Discussion and possible action re: informing Residents of the need to keep
Rights of Way clear of vegetation and visual obstructions. Pultz has drafted a
letter to Residents. Committee discussed: 1) enclosing this letter with the tax
bills that are sent to residents at the end of the year; 2) posting it on the web
site; 3) Ryan and Abel dropping it off at resident’s homes when violations are
identified. To do for next Committee meeting:
a) Pultz will prepare final draft;
b) Schultz and Pultz will compile a list of violations that need to be
addressed.
c) Schultz will take another look at vegetation in right-of-way on north
side of intersection at Glenway and A. Brush was removed earlier this
summer, but there may be additional growth.
13. Discussion and possible action re: 2026 road plan--Committee discussed
tasks to do as the Committee prepares 2026 plan and budget request:
a) Compile PASR ratings for 2025 (LeBrun)
b) Frenchtown Project: adjust cost to $70,000
c) Compile culvert inventory; ideally, the Town would align plans for
replacing culverts with the five-year road work plan
d) Culvert replacement and tree removal at 941 Wesley Road. Culvert
was installed in resident’s yard, causing water to flow through the
yard, causing a tree to die. Resident has asked Town who is
responsible for removing the tree.
e) Submit request to apply our TRIP grant money to upcoming work on
Rome Corners Road. Town’s request to use the grant money for 2025
Raven Oaks project was denied.
14. Set future meeting date: 9 a.m., Thursday, Aug. 14, 2025
15. Adjournment: 11:45 a.m.
4
o gl v1aps
5655 Lincoln Rd
Seconcl,H'Y Driveway
Measure distance
Imagery ©2025 Airbus, Maxar Technologies, Map data ©2025 200 ft
Total distance: 696.47 ft (212.29 m)
5
1
Jennifer Hanson
From: Abbey VanValkenburg <Abbey.VanValkenburg@ironman.com>
Sent: Thursday, July 17, 2025 11:20 PM
To: Jennifer Hanson; Stephanie Goth
Subject: Re: New Submission from Website Contact form
Attachments: 2025 Dane County Full Ironman Application Road Use Permit.pdf; 2025 Dane County
Ironman 70.3 Application Road Use Permit.pdf
Sure. Attached is both the Saturday and Sunday event. We are only in the Town of Oregon on Saturday.
Abbey VanValkenburg
Race Director
IRONMAN Wisconsin
C: 616-460-8172
-----------------------------
IRONMAN®
https://www.ironman.com/races/im-wisconsin
https://www.ironman.com/races/im703-wisconsin
From: Jennifer Hanson <jhanson@townoforegonwi.gov>
Date: Wednesday, July 16, 2025 at 4:57 PM
To: Abbey VanValkenburg <Abbey.VanValkenburg@ironman.com>, Stephanie Goth
<sgoth@townoforegonwi.gov>
Subject: RE: New Submission from Website Contact form
Hi Abbey, Would you be able to send me a copy of the application you submitted to Dane County? Thank you,
Jennifer
From: Abbey VanValkenburg <Abbey.VanValkenburg@ironman.com>
Sent: Wednesday, July 16, 2025 3:46 PM
To: Jennifer Hanson <jhanson@townoforegonwi.gov>; Stephanie Goth <sgoth@townoforegonwi.gov>
Subject: Re: New Submission from Website Contact form
Hi Jennifer,
Sorry I didn’t include the date! The Ironman 70.3 event is 9/6/2025. Yes I just recently submitted to Dane
County and I have also been working with the Village of Oregon.
Thanks,
Abbey VanValkenburg
Race Director
IRONMAN Wisconsin
C: 616-460-8172
-----------------------------
IRONMAN®
https://www.ironman.com/races/im-wisconsin
https://www.ironman.com/races/im703-wisconsin
6
2
From: Jennifer Hanson <jhanson@townoforegonwi.gov>
Date: Monday, July 14, 2025 at 10:50 AM
To: Abbey VanValkenburg <Abbey.VanValkenburg@ironman.com>, Stephanie Goth
<sgoth@townoforegonwi.gov>
Subject: RE: New Submission from Website Contact form
Hello Abbey,
What is the date of your event? Have you completed an application with Dane County?
Thank you,
Jennifer
From: Abbey VanValkenburg <noreply@municipal.email>
Sent: Saturday, July 12, 2025 4:53 PM
To: Jennifer Hanson <jhanson@townoforegonwi.gov>; Stephanie Goth <sgoth@townoforegonwi.gov>
Subject: New Submission from Website Contact form
Name: Abbey VanValkenburg
Email: abbey.vanvalkenburg@ironman.com
Phone: 6164608172
Message:
Hello, I wanted to introduce myself. My name is Abbey VanValkenburg and I am the new Race Director of
Ironman Wisconsin and 70.3. Ryan Richards (the former Race Director since its inception) will be
accompanying me with this handoff. He has moved to the Mi
dwest Regional Director role for Ironman, so
he will still be around সহ. Permit – I am looking to get this submitted but I don’t see anything formal on
the website? Can you please send me the paperwork needed? Routes - As of now, we are not planning
for any changes to the bike routes from last year (per any roadway construction projects, etc). Thank you
all and we look forward to another great year! Abbey VanValkenburg Race Director IRONMAN Wisconsin -
---------------------------- IRONMAN® https://www.ironman.com/races/im-wisconsin
https://www.ironman.com/races/im703-wisconsin
7
Dane County Department of Highway and Transportation
2302 Fish Hatchery Road Madison, Wisconsin 53713-2495
Phone: (608) 266-4261 FAX: (608) 266-4269
PERMIT APPLICATION
For
Special Use of County Trunk Highways
(Limited to Dane County Highways Only)
* PERMIT APPLICATION CHECKLIST *
Submit the following materials when applying for a permit:
Note: Items 1, 2, and 3 are included in this packet.
1.
Only complete applications containing all required information shall be considered
Other items to note:
Dane County does not authorize the use of any Municipal, Town, or State roads for this event.
Event officials must coordinate all local road use with the affected municipalities and must contact
the Wisconsin Department of Transportation to request permission to use any State Highways.
No Markings of any kind are allowed on Dane County Trunk Highways.
This permit is required and shall be issued in accordance with the provisions of Chapter 79 of the Dane
County Code of Ordinances.
1. Completed Permit Application including Signed Indemnification / Hold Harmless
2. Completed Event Route Information Page
Dane County must be notified of any route changes made after submission or approval of
application
3. Signed “Requirements for Permit to Use County Trunk Highway” Page
4. Detailed Map of the Event Route
5. Certificate of Insurance naming Dane County as additional insured
See item number 3 on the Requirements page for complete details.
6. Submit application to our office via e-mail to eslick.kevin@danecounty.gov, U.S. Mail to the
above address or fax to (608) 266-4269
Applications must be submitted at least 30 days prior to your scheduled event
8
Page 1
PERMIT APPLICATION FOR SPECIAL USE OF DANE COUNTY TRUNK HIGHWAYS
EVENT DETAILS
Event Name Event Sponsor Event Website Address
Event Date Number of Participants Type of Start
Staggered Mass
Event Type
Festival Parade Run Walk Bicycle Ride Other (describe):
Total Time of Event from Setup to Teardown Actual Time Participants will be on the Road
Start Time
A.M.
P.M. End Time
A.M.
P.M. Start Time
A.M.
P.M. End time
A.M.
P.M.
CONTACT INFORMATION
Contact Person Day Phone Evening Phone Fax
Mailing Address City, State, Zip E-Mail Address
LOGISTICAL DETAILS
Type of Support Provided by Event Sponsor (Check all that Apply)
Traffic Control Support Vehicles Medical Other (describe):
Do you feel you need law enforcement traffic control? Yes No
If yes, would you like to be contacted by the Dane County Sheriff’s Office
about hiring off-duty law enforcement officers to perform traffic control? Yes No
INDEMNIFICATION / HOLD HARMLESS
I/We, , sponsor(s) and/or co-sponsors
(name/organization)
of ,
(name of event)
shall indemnify, hold harmless, and defend Dane County, its officers, agents, and employees from and against all
claims, damages, losses, and expenses, including attorneys’ fees, which arise from or out of the above specified
event.
Each party warrants for its elf that it has complied with all necessary requirements to execute this Agreement and
that the person(s) executing this Agreement on the event sponsor’s behalf is authorized to do so.
Signature of Responsible officer, event sponsor/co-sponsor Date
Signature of Responsible officer, event sponsor/co-sponsor Date
Event Route Information is to be completed on the next page.
9
Page 2
EVENT ROUTE (required information) Event Name:
In this section list all County Trunk Highways (CTH), the beginning and ending location of each continuous section
and each Town, Village or City contained in the continuous section. For the municipalities use the following
designations T=Town, V=Village, C=City. (see example below)
ROUTE INFORMATION EXAMPLE
CTH: KP Begin: USH 14 End: USH 78
Municipalities: T/V Cross Plains, T/V Black Earth, T Berry
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
Additional roads should be listed in this format on a separate sheet of paper.
A Map of the Event Route must accompany this application
PLEASE NOTE: Event officials must coordinate all local road use with the affected municipalities. Dane County does
not authorize the use of Municipal roads.
10
Page 3
REQUIREMENTS FOR PERMIT TO USE COUNTY TRUNK HIGHWAYS
All of the following requirements must be complied with for consideration of a permit.
1. It is necessary that we receive permit requests for use of a County Trunk Highway at least one month in advance of the
scheduled event. It is possible that a permit may not be issued for an untimely event permit request.
2. No printed materials should be distributed to the public on intended event routes prior to obtaining permission from all
affected governmental units and law enforcement agencies for the use of their roads , streets, or highways for the
event(s). There are certain roads and highways which we and other agencies will not allow to be used or crossed for
such events, and this may affect planned routes that have been prematurely released to the public (NOTE: the Wisconsin
Department of Transportation does not issue permits to use or cross any highway in the State Highway System for these
types of events).
3. The event sponsor must be covered by adequate liability insurance for this type of event, and must provide t his
Department with a proper certificate of insurance AT THE TIME AN EVENT PERMIT IS REQUESTED. The certificate
should be sent along with the permit request to the address shown on the reverse, and should indicate the following:
a) Dane County, 210 Marti n Luther King Jr. Blvd., Madison, WI 53703, shall be added as an ad ditional insured for the
event.
b) Participants, volunteers, organization employees and spectators must be covered for the minimum amounts of
$1,000,000 for bodily injury AND $1,000,000 for property damage, not in the aggregate.
4. A standard “INDEMNIFICATION/HOLD HARMLESS” disclaimer clause must be signed by a responsible officer of the
event sponsor relieving Dane County from any and all liability that could arise as a result of the event. The disclaimer is
located on page 1 of this permit application and must be signed by a responsible officer of the event sponsor along with
the permit request.
5. It is the event sponsor’s responsibility to contact and obtain permission from all governmental units and/or law
enforcement agencies that would have jurisdictional responsibilities over any part of the route used. Failure to obtain
such permission could result in the County not issuing a permit for the currently scheduled event, or future events o n its
highways.
6. The event sponsor is also responsible for surveying the intended route prior to the event to look for potential traffic
hazards to the participants. Those traffic hazards should be corrected or participants protected by securely closing of f
those particular hazardous areas to participants. Sponsor shall insure that all participants stay within permitted areas.
7. The event sponsor must also notify the local municipal unit EMS agency in advance so they are aware of the date and
time of the eve nt, type of event, and the number of participants. For larger and more strenuous events, it is strongly
advised that the event sponsor schedule EMS personnel and equipment to be present at the event. If significant traffic
restrictions and/or road closures are required for the event, the event sponsor should also contact the nearest 911 center
so emergency police, fire, and EMS units are aware of traffic restrictions in the area as they respond to any emergency
calls.
8. Normal “rules of the road” must be followed during the event if the public road, street, or highway is open to traffic. Must
obey all federal, state and local statutes and regulations.
9. If it is necessary to temporarily close and detour a County Trunk Highway in order to conduct the event, the event sponsor
shall be responsible for the erection and removal of all necessary signing, and providing all uniformed police officers that
may be required for safe and proper traffic direction. Any and all expense in providing the signing and/or uniforme d
officers shall be assumed by the event sponsors.
10. No trespassing on private property.
11. No defacing of public property, including pavement markings.
12. Immediately after completion of the event, the event sponsor shall be responsible for removing from the high way and
highway right-of-ways any trash, signs, and/or other materials that may have been accumulated or used during the event.
I certify that the information I have provided on this application is accurate and complete. I further certify
that I have notified all other municipalities of this event as required by the permit process. I understand that
this permit may be denied or revoked for providing false or incomplete information.
Signature Title Date
DO NOT WRITE BELOW THIS LINE – FOR OFFICE USE ONLY
Reviewed by DC Highway Reviewed by DC Sheriff
11
Dane County Department of Highway and Transportation
2302 Fish Hatchery Road Madison, Wisconsin 53713-2495
Phone: (608) 266-4261 FAX: (608) 266-4269
PERMIT APPLICATION
For
Special Use of County Trunk Highways
(Limited to Dane County Highways Only)
* PERMIT APPLICATION CHECKLIST *
Submit the following materials when applying for a permit:
Note: Items 1, 2, and 3 are included in this packet.
1.
Only complete applications containing all required information shall be considered
Other items to note:
Dane County does not authorize the use of any Municipal, Town, or State roads for this event.
Event officials must coordinate all local road use with the affected municipalities and must contact
the Wisconsin Department of Transportation to request permission to use any State Highways.
No Markings of any kind are allowed on Dane County Trunk Highways.
This permit is required and shall be issued in accordance with the provisions of Chapter 79 of the Dane
County Code of Ordinances.
1. Completed Permit Application including Signed Indemnification / Hold Harmless
2. Completed Event Route Information Page
Dane County must be notified of any route changes made after submission or approval of
application
3. Signed “Requirements for Permit to Use County Trunk Highway” Page
4. Detailed Map of the Event Route
5. Certificate of Insurance naming Dane County as additional insured
See item number 3 on the Requirements page for complete details.
6. Submit application to our office via e-mail to eslick.kevin@danecounty.gov, U.S. Mail to the
above address or fax to (608) 266-4269
Applications must be submitted at least 30 days prior to your scheduled event
12
Page 1
PERMIT APPLICATION FOR SPECIAL USE OF DANE COUNTY TRUNK HIGHWAYS
EVENT DETAILS
Event Name Event Sponsor Event Website Address
Event Date Number of Participants Type of Start
Staggered Mass
Event Type
Festival Parade Run Walk Bicycle Ride Other (describe):
Total Time of Event from Setup to Teardown Actual Time Participants will be on the Road
Start Time
A.M.
P.M. End Time
A.M.
P.M. Start Time
A.M.
P.M. End time
A.M.
P.M.
CONTACT INFORMATION
Contact Person Day Phone Evening Phone Fax
Mailing Address City, State, Zip E-Mail Address
LOGISTICAL DETAILS
Type of Support Provided by Event Sponsor (Check all that Apply)
Traffic Control Support Vehicles Medical Other (describe):
Do you feel you need law enforcement traffic control? Yes No
If yes, would you like to be contacted by the Dane County Sheriff’s Office
about hiring off-duty law enforcement officers to perform traffic control? Yes No
INDEMNIFICATION / HOLD HARMLESS
I/We, , sponsor(s) and/or co-sponsors
(name/organization)
of ,
(name of event)
shall indemnify, hold harmless, and defend Dane County, its officers, agents, and employees from and against all
claims, damages, losses, and expenses, including attorneys’ fees, which arise from or out of the above specified
event.
Each party warrants for its elf that it has complied with all necessary requirements to execute this Agreement and
that the person(s) executing this Agreement on the event sponsor’s behalf is authorized to do so.
Signature of Responsible officer, event sponsor/co-sponsor Date
Signature of Responsible officer, event sponsor/co-sponsor Date
Event Route Information is to be completed on the next page.
13
Page 2
EVENT ROUTE (required information) Event Name:
In this section list all County Trunk Highways (CTH), the beginning and ending location of each continuous section
and each Town, Village or City contained in the continuous section. For the municipalities use the following
designations T=Town, V=Village, C=City. (see example below)
ROUTE INFORMATION EXAMPLE
CTH: KP Begin: USH 14 End: USH 78
Municipalities: T/V Cross Plains, T/V Black Earth, T Berry
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
CTH: Begin: End:
Municipalities:
Additional roads should be listed in this format on a separate sheet of paper.
A Map of the Event Route must accompany this application
PLEASE NOTE: Event officials must coordinate all local road use with the affected municipalities. Dane County does
not authorize the use of Municipal roads.
14
Page 3
REQUIREMENTS FOR PERMIT TO USE COUNTY TRUNK HIGHWAYS
All of the following requirements must be complied with for consideration of a permit.
1. It is necessary that we receive permit requests for use of a County Trunk Highway at least one month in advance of the
scheduled event. It is possible that a permit may not be issued for an untimely event permit request.
2. No printed materials should be distributed to the public on intended event routes prior to obtaining permission from all
affected governmental units and law enforcement agencies for the use of their roads , streets, or highways for the
event(s). There are certain roads and highways which we and other agencies will not allow to be used or crossed for
such events, and this may affect planned routes that have been prematurely released to the public (NOTE: the Wisconsin
Department of Transportation does not issue permits to use or cross any highway in the State Highway System for these
types of events).
3. The event sponsor must be covered by adequate liability insurance for this type of event, and must provide t his
Department with a proper certificate of insurance AT THE TIME AN EVENT PERMIT IS REQUESTED. The certificate
should be sent along with the permit request to the address shown on the reverse, and should indicate the following:
a) Dane County, 210 Marti n Luther King Jr. Blvd., Madison, WI 53703, shall be added as an ad ditional insured for the
event.
b) Participants, volunteers, organization employees and spectators must be covered for the minimum amounts of
$1,000,000 for bodily injury AND $1,000,000 for property damage, not in the aggregate.
4. A standard “INDEMNIFICATION/HOLD HARMLESS” disclaimer clause must be signed by a responsible officer of the
event sponsor relieving Dane County from any and all liability that could arise as a result of the event. The disclaimer is
located on page 1 of this permit application and must be signed by a responsible officer of the event sponsor along with
the permit request.
5. It is the event sponsor’s responsibility to contact and obtain permission from all governmental units and/or law
enforcement agencies that would have jurisdictional responsibilities over any part of the route used. Failure to obtain
such permission could result in the County not issuing a permit for the currently scheduled event, or future events o n its
highways.
6. The event sponsor is also responsible for surveying the intended route prior to the event to look for potential traffic
hazards to the participants. Those traffic hazards should be corrected or participants protected by securely closing of f
those particular hazardous areas to participants. Sponsor shall insure that all participants stay within permitted areas.
7. The event sponsor must also notify the local municipal unit EMS agency in advance so they are aware of the date and
time of the eve nt, type of event, and the number of participants. For larger and more strenuous events, it is strongly
advised that the event sponsor schedule EMS personnel and equipment to be present at the event. If significant traffic
restrictions and/or road closures are required for the event, the event sponsor should also contact the nearest 911 center
so emergency police, fire, and EMS units are aware of traffic restrictions in the area as they respond to any emergency
calls.
8. Normal “rules of the road” must be followed during the event if the public road, street, or highway is open to traffic. Must
obey all federal, state and local statutes and regulations.
9. If it is necessary to temporarily close and detour a County Trunk Highway in order to conduct the event, the event sponsor
shall be responsible for the erection and removal of all necessary signing, and providing all uniformed police officers that
may be required for safe and proper traffic direction. Any and all expense in providing the signing and/or uniforme d
officers shall be assumed by the event sponsors.
10. No trespassing on private property.
11. No defacing of public property, including pavement markings.
12. Immediately after completion of the event, the event sponsor shall be responsible for removing from the high way and
highway right-of-ways any trash, signs, and/or other materials that may have been accumulated or used during the event.
I certify that the information I have provided on this application is accurate and complete. I further certify
that I have notified all other municipalities of this event as required by the permit process. I understand that
this permit may be denied or revoked for providing false or incomplete information.
Signature Title Date
DO NOT WRITE BELOW THIS LINE – FOR OFFICE USE ONLY
Reviewed by DC Highway Reviewed by DC Sheriff
15
July 30, 2025
Ms. Joleen Stinson, Director
Dane County Parks Department
5201 Fen Oak Drive, Room 208, Madison, WI 53718
Dear Joleen,
On behalf of Anderson Park Friends, Inc., I'd like to share a summary of one of the discussion topics from our
annual APF-Dane County Parks review meeting held on December 16, 2024. Specifically, we want to follow up
on the potential development of the western parcel of Anderson Farm County Park-identified as Item #1 in
our land management plan.
A key point raised during the meeting was the need to improve access to this portion of the park. Currently,
the only access point is located next to the railroad trestle. This entry is low-lying, poorly drained, lacks a
culvert, and is often wet or muddy from March through May. In addition, its location near an elevated trestle
creates a blind spot for drivers approaching from the east on Locust Grove Road-a rural road where vehicles
often travel at higher speeds. We have reported several near-accidents at this site to DCP staff in recent years.
To gather additional input, I met with the Town of Oregon Transportation Committee on May 13 to review the
issues related to drainage, access, and road safety. The committee agreed that improvements are needed and
expressed interest in a cooperative solution between the Town and Dane County Parks.
Based on that discussion, we respectfully recommend the following actions:
A. Close the current access point and collaborate with the Town of Oregon to address the drainage issues in
that area.
B. Develop a new access point near the park's western boundary, including installation of a culvert, gravel
driveway, and a small parking area to accommodate 7-8 vehicles.
C. Consider installing a second access point east of the trestle to serve the Anderson Farm Center parcel, which
is also used by the local snowmobile club.
Given the increased activity anticipated this fall and winter by both DCP staff and APF volunteers, we believe
these improvements would significantly enhance safety and access.
With this communication, our role in this matter is complete. We trust DCP's planning team will coordinate
next steps and maintain communication with the Town of Oregon as appropriate. The primary contact for the
Town is Sue LeBrun, Chair of the Transportation Committee. She can be reached at (608) 575-7466 or
slebrun@uwalumni.com.
Please don't hesitate to reach out if you need additional information or clarification. We appreciate your
partnership and thank you for considering these recommendations.
Warm regards,
President
Anderson Park Friends, Inc.
1560 Partridge Hill Drive I Oregon. WI 53575 I 608.835.3580 I www.andersonparkfriends.org
A mission to develop Anderson Farm County Park, Town of Oregon. Wisconsin
16
7/30/25, 12:29 PM
• Outlook
Mail - Jennifer Hanson - Outlook
Fw: Now Available - Application Materials for the Local Bridge Improvement Assistance Program
2026-2031 Program Cycle
From Jennifer Hanson <jhanson@townoforegonwi.gov>
Date Wed 7/30/2025 12:29 PM
To Sue LeBrun <slebrun@uwalumni.com>; Sue LeBrun <slebrun@townoforegonwi.gov>; Arlan Kay
<akay@townoforegonwi.gov>; Carl Walser <cwalser@townoforegonwi.gov>; Abel Schultz
<aschultz@town.oregon.wi.us>; Ryan Zurfluh <rzurfluh@town.oregon.wi.us>
For Your Information
From: WisDOT Local Programs <DOTLocalPrograms@dot.wi.gov>
Sent: Wednesday, July 30, 2025 9:21 AM
To: Jennifer Hanson <jhanson@townoforegonwi.gov>
Subject: Now Available - Application Materials for the Local Bridge Improvement Assistance Program 2026-2031
Program Cycle
Application materials for the Local Bridge Improvement Assistance Program 2026-2031 Program Cycle
are now available on the WisDOT website. The application materials are available on the following
dedicated program webpage:
< httP-s://wisconsi nd ot.gov /Pages/doing-bus/local-gov /astnce-P-g ms/highway /local bridge .aSP-X >
This 2026-2031 Local Bridge Program Cycle solicitation is for both design and construction projects to be
scheduled during the State Fiscal Year (SFY) 2026-2031 time period.
WisDOT will administer project review and selection by first assessing applications for program eligibility.
Projects that are deemed eligible will then compete for funding.
Applications for the 2026-2031 Local Bridge Program Cycle are due by 5:00 pm on Friday, October 31,
2025.
If you have any questions, please send them to < DOTLocalPrograms@dot.wi.gov>.
Thank you,
WisDOT Local Programs
https://outlook.office.com/mail/inbox/id/MQkAGMwY2M2NGRkLWlzYzYINDFiNy05M2FiLWNkNDJmNjgxNjFIYgAQALZXwyo8aqBLu2IqekJBqT8%3D... 1/1
17
8/4/25, 9:20 AM Mail - Jennifer Hanson - Outlook
• Outlook
RE: CTH MM - Village of Oregon limits to CTH A
From Schmid, Charlene <Schmid.Charlene@danecounty.gov>
Date Mon 8/4/2025 7:20 AM
To Sue LeBrun <slebrun@townoforegonwi.gov>
Cc Arlan Kay <akay@townoforegonwi.gov>; Jennifer Hanson <jhanson@townoforegonwi.gov>; Abongwa,
Clement <Abongwa.Clement@danecounty.gov>
Hi Sue,
We appreciate you for forwarding on this concern to us. As we are in the height of our construction season, and
due to current workloads, please allow us at least 3 weeks to conduct an investigation and provide a response. If
you have any other questions or concerns in the meantime, please do not hesitate to reach out to me directly.
Thank you,
CIJarlene Schmid, 'P. :C:
Highway Engineer
Dane County Highway and Transportation
2302 Fish Hatchery Rd, Madison, WI 53713
Phone: (608) 206-6940
E-mail: schmid.charlene@danecounty..,gov
Note: The Dane County Highway and Transportation office is closed Fridays from mid-April through mid-September.
From: Abongwa, Clement <Abongwa.Clement@danecounty.gov>
Sent: Sunday, August 3, 2025 11:06 PM
To: 'Sue LeBrun' <slebrun@townoforegonwi.gov>; Schmid, Charlene <Schmid.Charlene@danecounty.gov>
Cc: Arlan Kay <akay@townoforegonwi.gov>; Hanson, Jennifer <jhanson@townoforegonwi.gov>
Subject: RE: CTH MM - Village of Oregon limits to CTH A
Sue,
Thank you for forwarding this concern to the County. I have assigned this municipal
request to staff to research and review the said section of CTH MM and get back to us
on the findings of the research. Staff will keep you in the loop as the research evolves.
Thanks,
Commissioner/Director
Department of Highway & Transportation
Dane County
2302 Fish Hatchery Road
Madison, WI 53713
Office: (608) 266-4039
Cell: (608) 444-7841
https://outlook.office.com/mail/inbox/id/MQkAGMwY2M2NGRkLWlzYzYINDFiNy05M2FiLWNkNDJmNjgxNjFIYgAQADzl5yUIZQ9JpSCplU%2FXUY4... 1/2
18
8/4/25, 9:20 AM Mail - Jennifer Hanson - Outlook
From: Sue LeBrun <slebrun@townoforegonwi.gov>
Sent: Friday, August 1, 2025 3:23 PM
To: Abongwa, Clement <Abongwa.Clement@danecounty gov>
Cc: Arlan Kay <akay..@townoforegonwi.gov>; Hanson, Jennifer <jhanson@townoforegonwi.gov>
Subject: CTH MM - Village of Oregon limits to CTH A
Hello Clement,
I am on the Town of Oregon Road & Traffic safety committee and we received a request from some
residents to consider a pedestrian crossing and lower speed limit on CTH MM at Kennedy Park Rd. (see
attachment and map below south of Oregon). Since it is a county highway, we are interested in discussing
options with Dane County Highway Dept.
Please see the attached letter from the residents.
One concern is that the location has Bicentennial Town Park on the west side of CTH MM and Kennedy
Town Park on the east side of CTH MM, and both parks have had increased use. Residents of Kennedy
Park Rd. are reporting more pedestrians crossing CTH MM at that location.
I Fahey Heights
\-\ayler Ct Eisen ho we coolidge !
ru't
Kennedy Park
Proposed Crosswalk
I Kennedy Park Road
Bicentennial
Park
Thank you,
Sue LeBrun
Town of Oregon Road and Traffic Safety Committee
https://outlook.office.com/mail/inbox/id/MQkAGMwY2M2NGRkLWlzYzYINDFiNy05M2FiLWNkNDJmNjgxNjFIYgAQADzl5yUIZQ9JpSCplU%2FXUY4... 2/2
19
• Outlook
TORE - Speed Board Results - Glenway Rd. (August 2025)
From Collins, Hayley <collins.hayley@danesheriff.com>
Date Tue 8/12/2025 11 :40 AM
To Jennifer Hanson <jhanson@townoforegonwi.gov>; Stephanie Goth <sgoth@townoforegonwi.gov>
Cc Drabik, Daniel <Drabik.Daniel@danesheriff.com>; Schiro, Robert <Schiro.robert@danesheriff.com>; Stumpf,
Kyle <Stumpf@danesheriff.com>; Poquette, Benjamin <Poquette.Benjamin@danesheriff.com>; Fell, Alex
< Fell.Alex@danesheriff.com >; Spoehr, Alexander < Spoehr.Alexander@danesheriff.com >
@J 1 attachment (441 KB)
TORE Speed Board - Glenway Rd 8-2025.pdf;
Good morning, Jennifer and Stephanie,
Our speed board was placed on Glenway Rd. between Town Park Rd. and Glenway Circle from 7 /28 until
8/6/2025 after some complaints about speeders. The speed board faced south, picking up NB traffic
(approaching and receding). Attached is the summary report for your records.
In summary, the posted speed limit on Glenway Rd. is 45mph. The average speed for NB traffic (both
approaching and receding) was 44mph. The max speed was 77mph and 75mph, respectively. The 85th
percentile speed was 51-52mph.
Hope you are having a good week!
Hayley
Deputy Hayley Collins
Dane County Sheriffs Office- West Precinct
W3/W4 Community Deputy
Cross Plains, Middleton, Blue Mounds, Springdale,
Verona, Perry, Primrose, Montrose, Oregon
E-mail: collins.hayle):@danesheriff.com
Office Phone: 608-283-1520
Non-Emergency Dispatch: 608-255-2345
www.danesheriff.com
www.teamdane.com
20
Town of Oredon - Speedboard Results
Glenway Rd., between Glenway Circle and Town Park Rd.
7/28/2025 and 8/6/2025
Traffic Analysis Report
Result Description
File:
Study Title:
Study Run Dates:
Total Study Time:
Study Download Time:
Studv Location:
Study GPS Location:
Studv Timina Interval:
Study Total # of Vehicles:
Study Posted Speed Limit:
Study Total # of Speeders:
Approaching Traffic
Receding Traffic
09560105.csv
TORE
2025/07/28 09: 17: 38 to 2025/08/06 06: 20: 23
8 Days 21 Hours 2 Minutes
2025/08/06 06: 20: 28
Glenway
Unknown
5 minute blocks
14783
45 mph
8771
# of Vehicles:
# of Speeders:
Maximum Soeed:
Averaoe Speed:
Median Speed:
85th Pecentile Soeed:
10 MPH Pace:
# of Vehicles:
# of Speeders:
Maximum Speed:
Averaoe Speed:
Median Speed:
85th Pecentile Speed:
10 MPH Pace:
7534
4530
77 moh
44 mph
45 mph
52 moh
46 to 55 mph
7249
4241
75 mph
44 mph
45 mph
51 mph
41 to so mph
Dane County Sheriff's Office
Deputy H. Collins #1663
8/12/2025
21