Town of Merton
Plan Commission Meeting
Minutes of July 2nd, 2025
• Meeting Called to Order by Chairman Klink at 5:30 p.m.
• Pledge of Allegiance led by Chairman Klink
• Minutes of June 4th, 2025, Plan Commission Meeting. A motion to approve the minutes as presented
was made by Commissioners Siepmann/Good. Motion carried.
Present: Chairman Klink, Commissioners Olson, Queoff, Siepmann, and Good, Planner Haroldson, and Deputy
Clerk Claas
Commissioner Griffin
Also Present: James Graff, Matt Schneider, Rick & Melissa Theiler, Lynn & Gary Martens, Kelly Berens,
David & Julie Peck, Mark & Roberta Thompson, EJ Schweitzer, Steve Gramann, Andy Martens, and
Michelle VanDyck
Old Business: None
New Business:
Request for an Exception to the Height Regulations as an Exception per 17.21(2)(e) – Subject to the Approval
of the Plan Commission – To Build an Accessory Structure up to 25 ft in Height – Requested by Rick and
Melissa Theiler – Tax Key MRTT0378-016 – Planner Haroldson said they met the offsets and the setback. The
setback from Tamron Lane is 225 ft, the side offset will be 31 ft, and they meet the floor area ratio.
A motion to approve the request to increase the height for an accessory building requested by Rick and
Melissa Theiler, N71W29484 Tamron Lane, Hartland, WI 53029, subject to the petitioners submitting building
plans to the building inspector for approval and receiving a building permit was made by Commissioners
Queoff/Good. Motion carried.
Plan of Operation and Site Plan – Requested by Andrew Hettwer – Mechanic Business for Forestry Equipment
– Tax Key MRTT0349-956 – Planner Haroldson stated Mr. Hettwer cannot be here tonight, so he will be
moved to the next meeting, and he may have to submit, and the other tenants may need to submit, to
Waukesha County as well since the building is in shoreland jurisdiction. No action taken.
Update for the Stone Bank Community Park by Mark Thompson – Operated by the Lions Club – Requested by
the Town Planner – Tax Key MRTT0362-991-001 – Thompson reviewed park information stating they had their
annual clean-up event, and they were able to get some gravel from the Town and fill some low areas around
the foundations and trip hazards. Cut ‘N’ Go provided the aerial truck to clean out the gutters and inspected
the roof on the west pavilion. They organized, planned, and oversaw the rebuilding of the playing surfaces of
Fields 1, 2 and 3. The septic system is installed and inspected. They had a new water pump put in. A new
entity called Stone Bank Community Connect (SBCC) has joined with the Stone Bank Lions to run the park.
Stone Bank Community Connect will bring together the operation of the park, the parade, the car show, and
the traditions of Stone Bank Park. They will take the lead on fundraising for the restrooms/concession. They
are currently talking about resurrecting the fall festival.
They will publicly introduce Stone Bank Community Connect and launch their major fundraising for the
building at the parade. Fundraiser cards will be distributed along the parade route.
Chairman Klink questioned if Stone Bank Community Connect is going to be part of Stone Bank Lions and little
league or is Stone Bank Lions going away and they’re taking over park operations. Thompson responded that
Stone Bank Community Connect will take over all of these activities and would include the park operations.
Planner Haroldson questioned if some of the Lions Club are part of this new organization. Thompson said this
is a brand-new organization and there are members involved as officers from the Stone Bank Lions. The Lions
Lease is up for the Park on December 31. Chairman Klink stated that the group would have to come to the
Town for a new lease agreement for the park. Roberta Thompson, the President of the Stone Bank Lions Club,
has talked with the group regarding the lease, liquor license, operator licenses, permits, and Wisconsin Sales
and Use Tax Reporting. Chairman Klink said by the end of December everything should be in place, and the
group should be coming to the Board to take over the park lease. Chairman Klink thanked the Lions for
running the park as long as they have.
Thompson said they are focusing on the fundraiser for the new restroom/concession building. Since the last
formal update, based on input from current and future donors, the building design was enhanced to put glass
rollup doors which will protect from inclement weather and make it a three or four season building and will
expand the use of the park. Thompson said the Town portion of the 50% would increase from $305,000 to
$475,000. Chairman Klink said that was part of the deal originally, but with the cost increase they would need
to talk about it as a Board. The Town did make a commitment.
Thompson said they also noticed they have an increased demand for playground equipment. They’re starting
to see more families coming to the park. They have looked at the costs and that will be a separate fundraising
effort, probably from $70,000.00 to $90,000.00. Something that will require less maintenance. There has
been discussion about putting in a splash pad, but they have concerns about the ability to monitor it, and the
liability associated with it. Thompson also said there’s additional thought given to disability and senior
walking path to go around the park. They are getting more requests for that. They will continue working on
improvements for baseball dugouts and spectator seating as the park continues to evolve.
No action was taken.
Proposed New Shipping Container (Cargo) Container for Future Amendment to 17.22(4)(h) of the Municipal
Zoning Code – Chairman Klink said this is something the Plan Commission has been looking at. It went
through a committee and the Building Inspector. He would like the Plan Commissioners to review the draft
and if there was something missing, needs to be added, or would like changed, to please let the Plan
Commission know.
Planner Haroldson also added that research we did from other municipalities and some of the comments
from the folks that came from the business district gave the committee some input. Commissioner Good
stated that he thought a lot of shipping containers were 53’ long. Planner Haroldson responded that other
municipalities were looked at and the committee went with 45’. The Town lots are only 120’ wide. Planner
Haroldson said 45’ x 8’ or 8.5’ with a maximum of 10’ high and they could have two containers on the
property, but they could not be attached by any kind of roofing. The containers cannot be stacked and must
meet all setbacks, offset and other requirements of the district. No wording or numbers shall be visible on the
cargo container, and the cargo container or shipping container must be located behind the primary
structures. If it’s not for cold storage, it must have a State approved plan. The cargo container must be used
for the primary purpose of the property and is not allowed to be rented or used to generate revenue and is
not allowed to increase traffic or create a nuisance. If the property is located under Waukesha County
Shoreland Protection Ordinance, the owner must apply to Waukesha County Parks and Land Use for
permission and a permit.
Chairman Klink said this will be coming back to the Plan Commission for further discussion. He stated if
anyone is interested, they can get ahold of the Planner to give them a copy to review and give feedback.
Planner Haroldson stated shipping/cargo containers are considered accessory structures and must be
permitted by the Building Inspector.
Oconomowoc River Conservancy Park Event – July 10th – 5 p.m. to 7 p.m. – W307N8280 Laskin Road –
Sponsored in Partnership with Tall Pines – Planner Haroldson said it’s a ribbon cutting for the mini
amphitheater. This is in partnership with Tall Pines, and they want to feature a walk around the cut paths.
They’re hoping to generate interest in the park. Chairman Klink will be cutting the ribbon.
Update on the Maintenance Agreement Responsibilities for the Oconomowoc River Conservancy Park
Between the Town and Tall Pines – Tax Key MRTT0327-997-004 – Planner Haroldson said that DPW Director
Griffin, herself, and the new Director of Tall Pines met and went over the responsibilities. It’s basically what
was being done and nothing really new, but they needed to go over it because of the changeover of the
director, they needed to clarify what the Board and the Director were willing to do with their staff. DPW
Director Griffin agreed that the DPW would do the part of the Town’s responsibilities.
Planner Report – Marilyn Haroldson – updated the Plan Commission regarding the bicycles on Highway K.
She contacted the attorney as directed and Mr. Schmirler was cited with some citations, and the owner of the
property was also sent some citations.
DPW Report – Paul Griffin – No report.
A motion to adjourn was made by Commissioners Siepmann/Olson. Motion carried.
Meeting adjourned at 6:13 p.m.
Respectfully submitted,
Holly R Claas,
Deputy Clerk