Common Council January 14, 2025 Page 1
CITY OF OCONTO FALLS
COMMON COUNCIL
MEETING
Council Chambers – Municipal Building
500 N. Chestnut Avenue - Oconto Falls, WI. 54154
JANUARY 14, 2025 – 6:00 pm
MINUTES
1. Meeting called to order at 6:00pm by Mayor Clint Braun
2. Pledge of Allegiance
3. Roll Cal l Present: Aldermen: Marty Coopman (via phone) , Jeff M cDonald, Tim Holman
Mathew McDermid
Also Present: Mayor Clint Braun, Administrator Peter Wills, Police Chief Olsen, Deputy
Clerk Jenny Friedman, Street Superintendent Wally Remic, Warren Bluhm with Time Herald,
Utility Manager Greg Kuhn, Michelle Tester, Mike Frievalt, Kim Pytleski
Absent: Aldermen Ashley Bahrke and Aldermen Devin Wirtz
4. Approval of Minutes - Common Council 12.10.24
MOTION: McDermid/McDonald
Motion to approve the minutes as presented for the Common Council 12.10.24.
Voice Vote: All present voting aye - MOTION CARRIED
5. Treasurer’s Report-November
MOTION: McDermid/Holman
Motion to approve the Treasure’s report for November as presented and placed on file as
presented.
Voice Vote: All present voting aye - MOTION CARRIED
6. Bills Payable – December
MOTION: McDermid/McDonald
Motion to approve the Bills Payable as presented for December and place on file.
Voice Vote: All present voting aye - MOTION CARRIED
7. Reports: Written reports submitted
✓ Administrator Report
✓ Police Department Report
✓ Municipal Court Report
✓ Fire Department Report
✓ Street Department Report
✓ Street Superintendent
✓ Building Inspector Report
Common Council January 14, 2025 Page 2
✓ Library Report
MOTION: Holman/McDonald
Motion to place reports as presented on file.
Voice Vote: All present voting aye - MOTION CARRIED
8. OPPORTUNITY FOR CITIZENS TO ADDRESS THE COUNCIL - Citizen in-put will
be limited to 3 minutes.
Deputy Clerk Friedman showed the plaque that was ordered in memory of Honorable Larry
Jeske. This plaque will be placed by a tree that will be also planted in his honor in the spring
by City Hall. The plaque reads (Honorable Larry L. Jeaske 08.04.1940-12.15.2024,
A man of great intellect and dedication. The City of Oconto Falls will never forget his
loyalty and commitment to our community.)
DISCUSSION AND POSSIBLE ACTION ON ANY OR ALL OF THE FOLLOWING:
9. Committee Reports
Board of Review N/A
Emergency Management Committee Report-N/A
Finance Committee N/A
Joint Review Board N/A
Library Board- N/A
Main Street Committee Report 12.18.24
Park & Recreation Committee Report-N/A
Personnel Committee Report N/A
Planning Commission Report N/A
Ordinance Commission N/A
Utility Commission Report 12.16.24
No Action Taken
Old Business:
10. WI DOA NEIGHBORHOOD INVESTMENT GRANT- FIRE STATION PROJECT
UPDATE
Fire Chief Tim Magnin has the grant paperwork finished and is waiting on the
Department of Administration for final action.
No Action Taken
11. Columbia Street Reconstruction Project Updates
The Columbia Street Reconstruction Project is going to be completed from March 2025 through
December 2025. Trees that are planned to be removed are marked with a pink x. The City will
notify homeowners at residence 1-2 business days before the start to cut, in case there is a need
to block driveway or street. Letters to citizens will be mailed out on January 15,2025 to update
the citizens of the construction. On the Oconto Falls Municipal Utility website at
Common Council January 14, 2025 Page 3
https://www.ofmu.org/ there is a detour map also for people to view before the construction
starts.
No Action Taken
12. 782 N. Main Street -Former Hardees Status Update
Edna&M’s is still on track to open up in the 2025 year to do food manufacturing. At this
time there is no further updates.
NO ACTION TAKEN
13. City Hall Boiler & HVAC Recommendation
a. ACC Boiler Replacement two Lochnivar 400 Boilers $58,413.00
The City Hall boiler is at its end of life and is need of repair or replacement. The City
Administrator has been working with Automated Comfort Controls, Energy Control &
Design and JF Ahern to get estimates for City Hall. The best purchasing option was for the
city to go with Automated Comfort Controls (ACC).
MOTION: McDermid/McDonald
Motion to approve Automated Comfort Controls (ACC) BID replace Boiler and ACE for
the amount of $140,428.00.
Roll Call Vote: McDermid-yes, McDonald-yes, Coopman-yes, Holman-yes, Wirtz-
Absent, Bahrke-Absent Motion Carried
b. Annual Maintenance Agreement $3,114.72/year
MOTION: McDermid/Holman
Motion to approve the Automated Comfort Controls (ACC) Annual Maintenance
Agreement for $3,114.72/ year.
Voice Vote: All present voting aye - MOTION CARRIED
14. City Hall Technology, Key cards & Cameras Recommendation
a. YEALINK Meeting Board $10,991
Yearlink Meeting board is an all-in-one unit. The Yearlink Board has auto framing,
speaker tracking, picture-in-picture, Smart Collaboration Whiteboard, Full Device
Ecosystem. An 89inch meeting board was initially in the estimate. Mike Frievalt
stated that an 89inch meeting board would be too big for the council chamber so a
65inch would work better.
b. Keycard System & Camera Controller $10,483
The current keycard system and camera controller has been in place since 1999. The
system can no longer add or edit current users. The new system would be video log in
and the city then would own the system.
c. City Hall Cameras $21,287
Direct-to-cloud cameras offer microSD or premium cloud storage. The
GV-GEBF4911 features event-triggered onboard sirens and lights for
security. All models support AI search to identify specific details, such
as gender or clothing color.
Common Council January 14, 2025 Page 4
d. Four Facilities cameras conversion $13,126.80
Total for Upgrades $55,887.70
MOTION: McDonald/McDermid
Motion to approve YEALINK Meeting Board, Keycard System & Camera Controller,
City Hall Cameras and Four Facilities cameras conversion for the amount of $53,000.
Roll Call Vote: McDonald-yes, McDermid-yes, Coopman-yes, Holman-yes, Wirtz-
Absent, Bahrke-Absent Motion Carried
15. Oconto Falls Municipal Utilities Bucket Truck purchase by City
a. Authorize the City to purchase OFMU Bucket Truck using $20,000 of the Utilities
30% = $42,128 portion of City Hall Boiler & HVAC upgrades.
The old 2005 F550 Utility Bucket Truck is no longer needed by the Oconto Falls Municipal
Utilities. This could be utilized by the Street Department the utilities would still do the
inspections on it.
MOTION: McDermid/Holman
Motion to approve purchase Oconto Falls Municipal Utilities 2005 F550 Utility Bucket
Truck for twenty thousand dollars.
Voice Vote: All present voting aye - MOTION CARRIED
16. Street Department Brine Storage Tank & Stainless Pump
a. Brine Storage Tank
b. Stainless Steel Pump
The DNR has been monitoring how much salt the municipalities are using and where
the salt goes in the environment. DNR is encouraging municipalities to go to brining. The
brining and pretreating of the streets will save Oconto Falls about ten to twenty tons of salt
usage. The new sprayer equipment and storage tank are now being used. The Brine Storage
Tank does not make the brine it is strictly for holding the brine. Currently when brine is
needed the city will go to the county to restock the brine tank. Street Superintendent has
gotten estimates for brine storage holding tank and stainless-steel pump. This would
eliminate the city workers going to the city for brine. The County has applied for a grant that
may allow a holding tank to be placed in Oconto Falls. The city then would have access to
the brine stored. At this time the City will wait to purchase a tank to see the out come of the
County grant.
No Action Taken
17. Former Fire Station 98 Jackson Street use by Street Dept
Street Superintendent Remic expressed that former Fire Station at 98 Jackson Street would
be of great use and fit almost all of the street departments equipment and be able to utilize
the building if council permits.
MOTION: McDermid/McDonald
Motion to approve the Street Department to relocate their headquarters to 98 Jackson
Street.
Common Council January 14, 2025 Page 5
Voice Vote: All present voting aye - MOTION CARRIED
18. RESOLUTION 25-01 a Resolution authorizing 2025 salary increases for employees
following 2025 Budget.
MOTION: Coopman/ Holman
Motion to approve the RESOLUTION 25-01 a Resolution authorizing 2025 salary
increases for employees following 2025 Budget and removing the Police Chief Olsen
from the resolution.
Voice Vote: All present voting aye - MOTION CARRIED
19. Oconto Falls Municipal Utilities Sewer Rate Case
The Oconto Falls Municipal Utilities has evaluated the current sewer rates and are in
need to be adjusted. The last sewer rate adjustment was in 2018. The adjustment amount
would be an increase of 6.56% or $3.94 a month. That would equal about $47.71 per year
for the average customer.
MOTION: McDermid/Mc Donald
Motion to approve OFMU sewer Rate Case.
Voice Vote: All present voting aye - MOTION CARRIED
20. Adjournment
Mayor Clint Braun asked if there was any further business before the meeting is adjourned.
Having no further business, he declared the meeting adjourned at 7:18 pm.
____________________________
City Administrator Peter Wills
1
To: Mayor & City Council
From: Peter A. Wills, City Administrator
Date: Feb 2025
Re: Administrator’s Report
Projects/Grants:
Columbia St Reconstruction Project
Street Department and Municipal Utilities have begun cutting trees on Columbia Street.
Each resident has received a letter updating the construction timeline and planned
detour to start in March. We met with the School district to go over the detour plan to
avoid Columbia Street and route traffic to County I and Main Street to avoid directing
traffic using Wisconsin and Milwaukee, due to damage to the street and underground
pipes. The detour has been sent out by the school district on social media.
City Hall Technology Upgrades -The wiring for City Hall cameras, key card access is
being installed this month. The whiteboard is expected towards the end of the month.
Cameras at the other buildings will continue being upgraded through February and
March.
Marketing- Business News ran an article on local business Berken Solutions in
January. February I and the Mayor will be in a promotional video for the NFL draft done
by TEDCOR promoting Oconto County proximity to Green Bay as a place to shop, stay
and play.
Industrial Park-Submitted industrial park parcels for a site request for business that is
working TEDCOR.
2024 Audit-Kerber Rose Audit of the City and Municipal Utilities is underway. The
Auditors were on site in January to begin the review and will continue through May
2025.
Ordinance Updates- Working on Downtown Zoning Ordinances to update to include
upper floor housing, single and multifamily homes and apartments. Additionally
removing parking restrictions that would be prohibitive of being bale to rebuild existing
businesses in the same footprint.
CITY OF OCONTO FALLS
500 NORTH CHESTNUT PO BOX 70
OCONTO FALLS, WI 54154-0070
PHONE: 920-846-4505
FAX: 920-846-4516
2
Comprehensive Plan Update-on the February Agenda is approval of funding of
updating comprehensive plan and housing plan that was last updated in 2008.The
comprehensive plan is an 18-month process that will numerous public meetings
between Planning Commission, public and city council. The updated comprehensive
plan update and revised ordinances for downtown will enable the City property owners
to apply for Wisconsin Housing and Economic Development (WHEDA) funding
programs.
Personnel-Working on leadership and training development of staff throughout multiple
departments to improve expertise in specific areas and prepare for succession planning.
CITY OF OCONTO FALLS
STREET DEPT. REPORT
January 2025
* Parks
Keeping the parking lot at Eastside Beach open for access to the river
Maintained the ice rink
*Streets
Leaf collection on Columbia St prior to Tree removal
Removed 9 trees from Columbia St for the upcoming road project
Ground stumps at City Hall, Hyland Square and Washington Street
Continued GIS Mapping of storm sewers and catch basins and manhole locations
Continued GIS Mapping of terrasse and park trees
Removed and stored holiday decorations
Pretreated with brine prior to snow and ice events
Plowed and or salted 5 winter events
Took delivery of 125 tons of salt
*Building Maintenance
Completed monthly fire extinguisher inspections of the street department
buildings and vehicles.
Moved from West side shop to the former fire station, organized and painted
Shut off water and winterized west side shop
Turned off heat at west side shop
*Street Dept Equipment
Removed and had the DPF cleaned for C24
Performed services on C12 and C9
Replaced the battery in the new squad car
*Personnel
Completed Lifting and Ladder Safety Training
Street Superintendent
Wally Remic
Monthly Report
February 2025
Oconto Falls Community Library
251 North Main Street
Oconto Falls, WI 54154
920-846-2673
2024 state and federal tax forms have arrived: forms are inside the main library to the
right. lf we don't have the form you need, a staff member can print it for you. There are
no charges for any tax forms.
Regular Programs:
. Playgroup - Mondays at 10:30 AM
. Storytime - Tuesdays at 10:30 AM
. Craft and book visits to Meadowlands (3'd Tuesday of the month)
. Sewing classes w/ Lori Harrison (March/April classes to be announced Feb. 17th).
. St. Anthony's 4K Storytime every other Monday
. Monthly Storytime with craft at Encompass Child Care
Disney on lce and Monster Jam Reading Challenges:
. Kids aged 2-12: pick up a slip from the library, read 5 books, bring slip back to be
stamped. Once completed, slip can be redeemed for FREE Kid's ticket to Disney
on lce (Feb. 19-22) or Monster Jam (March 21-23) at Resch Center in Green Bay.
(Must purchase adult ticket to redeem free kid's ticket.) See staff at circ desk!
Upcoming Programs:
Bilingual Storytime (English and Spanish) Tuesday, Feb. l Bth at 10:30 AM.
Clifford giveaway books provided by Safe Kids Oconto County (thank you!).
Friends of the Oconto Falls Library Midwinter Book Sale will be Friday, Feb. 21't
from 9 AM to 5 PM and Sat. Feb.22'd from 9 AM to noon. Fill a bag for a donation
of any amount - we need cleanup volunteers for Saturday afternoon.
Make your own Play-Doh w/ the Green Bay Children's Museum: K-5 kids on Mon.
March 3'd, 3:30 PM (Professional Development Day for Oconto Falls). Sign up
available soon!
Youth Art Month Reception for students and families: Thursday, March 6th, 5:00 to
7:00 PM. (Student art will be displayed in the library for the month)
K*lf*
Rachel }rr"o", Library Director
OCONTO COUNTY TRANSIT
for Residents of Oconto County
CALL 1-877-648-9287 (Menominee Regional Transit)
PROVIDED BY
Oconto County contracts with Menominee Regional Transit to provide transportation to elderly and
disabled citizens as part of the Department of Transportation’s 85.21 grant. This service was
previously provided by Oconto County Commission on Aging.
WHO CAN RIDE?
As a part of our partnership, transportation is available to all Oconto County Residents. Vehicles are
ADA compliant and equipped with wheelchair lifts.
COST?
Fares or mileage reimbursement are requested for rides. Reduced fares are available to residents
age 55 + as well as individuals with disabilities.
NEEDS?
This transportation service is provided for individuals who need rides for medical appointments,
nutritional needs (groceries), social or recreational purposes, and personal business.
WHERE and WHEN?
City of Oconto Route: rides are available Monday - Friday.
Medical Escort Program: for individuals living throughout Oconto County specifically with medical
appointments, rides can be pre-scheduled Monday - Friday.
Oconto County Rural Route:
Mondays: Northern route (Townships of Townsend, Lakewood, Doty, Riverview, Mountain, and
Northern Brazeau)
Tuesdays: Central route (Townships of Breed, Bagley, Southern Brazeau, How, Maple Valley,
Spruce, Underhill, and Gillett)
Wednesdays: Oconto Falls route (Oconto Falls township and the city of Oconto Falls)
Thursday: Eastern route (Townships of Lena, Little River, Stiles, and Oconto (not City of Oconto )
Fridays: Southern route (Townships of Morgan, Abrams, Pensaukee, Chase and Little Suamico)
FOR MORE INFORMATION
Please visit these websites for additional information: www.mitwbus.com and www.co.oconto.wi.us.
SCHEDULE
City of Oconto Route: rides are available Monday - Friday.
Medical Escort Program: for individuals living throughout Oconto County specifically with medical
appointments, rides can be pre-scheduled Monday - Friday.
Oconto County Rural Route:
Mondays: Northern route (Townships of Townsend, Lakewood, Doty, Riverview, Mountain, and
Northern Brazeau)
Tuesdays: Central route (Townships of Breed, Bagley, Southern Brazeau, How, Maple Valley,
Spruce, Underhill, and Gillett)
Wednesdays: Oconto Falls route (Oconto Falls township and the city of Oconto Falls)
Thursday: Eastern route (Townships of Lena, Little River, Stiles, and Oconto (not City of Oconto )
Fridays: Southern route (Townships of Morgan, Abrams, Pensaukee, Chase and Little Suamico)
FOR MORE INFORMATION
Please visit these websites for additional information: www.mitwbus.com and www.co.oconto.wi.us.
DESTINATION RESIDENTS INDIVIDUALS AGE 55+ OR
WITH DISABILITY
City of Oconto Route $3.00 $2.00
Oconto County Rural Route $6.00 $5.00
MEDICAL ESCORT PROGRAM FARES
Oconto County $10.00 $5.00
Green Bay / Fox Valley /
Iron Mountain $20.00 $10.00
Milwaukee / Madison $40.00 $20.00
ONE-WAY FARES
OCONTO COUNTY TRANSIT
for Residents of Oconto County
CALL 1-877-648-9287 (Menominee Regional Transit)
Personnel Committee February 04.2025 Page 1
CITY OF OCONTO FALLS
PERSONNEL COMMITTEE MEETING
Council Chambers – Municipal Building
500 N. Chestnut Avenue
Oconto Falls, WI 54154
IMMEDIATELY FOLLOWING PLANNING COMMISSION
TUESDAY FEBRUARY 4, 2025 – 6:00 PM
MINUTES
Chairman Mathew McDermid called the meeting to order at 6:02pm.
Roll Call
Present: Mathew McDermid, Marty Coopman, Ashley Bahrke, Devin Wirtz, Jeff McDonald and Peter
Wills (non-voting),
Absent: Tim Holman
Also Present : Mayor Clint Braun, Deputy Clerk Jenny Friedman, Police Chief Brad Olsen, Street
Superintendent Wally Remic, Fire Chief Tim Magnin, Utility Manager Greg Kuhn, Michelle Tester
DISCUSSION AND POSSIBLE RECOMMENDATION/ACTION ON THE FOLLOWING:
2. Approval of Minutes- Personnel Committee 5.08.2024
MOTION: Bahrke/Coopman
Motion to approve Personnel Committee 5.08.2024
Voice Vote: all voting aye – MOTION CARRIED
3. City Workplan 2025-2026
City administrator gave an update on what was going on in City Hall with the departments.
NO ACTION TAKEN
4. Manager Paid Time Off (PTO) in lieu of Compensation Time
The department head managers do not receive compensation time or overtime when working
past forty hours a week.
MOTION: McDonald/Coopman
Motion to approve eighty hours of manager time off (PTO) in lieu Compensatory time for City
Administrator, Police Chief, Fire Department Chief, Street Superintendent, Utility Manager.
Voice Vote: all voting aye – MOTION CARRIED
5. Leadership Development & Training Planning
There is a need for some of the departments to receive more training on equipment and learn
new skills that would benefit the city in their position. The employees are willing to take the
trainings that are suggested.
NO ACTION TAKEN
6. Minimum Time Commitment for Training Reimbursement
Some of the trainings that employees have are at a higher cost and time consuming. The city
is looking to implement a policy that an employee has to maintain employment for a certain
Personnel Committee February 04.2025 Page 2
amount of time and if they leave employment after training is complete there may be a
payback policy.
NO ACTION TAKEN
7. The Committee may go into closed session to discuss matters of employment, promotion,
compensation, or performance evaluation data of public employees pursuant to 19.85 (1)(C)
Wis. Stats.
a. Re: Contract Negotiation
MOTION: Bahrke/Wirtz
Motion to go into closed session at 6:28pm The Committee may go into closed session to
discuss matters of employment, promotion, compensation, or performance evaluation data of
public employees pursuant to 19.85 (1)(C) Wis. Stats.
Voice Vote: all voting aye – MOTION CARRIED
Those remaining in closed session were Mayor Clint Braun, Mathew McDermid, Marty Coopman,
Ashley Bahrke, City Administrator Peter Wills, Police Chief Brad Olsen, Deputy Clerk Jenny
Friedman.
8. The Committee will return to open session and may take action on matters discussed in
closed session.
1. Re: Contraction Negotiation
MOTION: McDonald/McDonald
Motion to return to open session at 6:50pm.
Voice Vote: all voting aye – MOTION CARRIED
MOTION: Wirtz/Bahrke
Motion to recommend the Police Chiefs amended contract negotiations and recommend to
council.
Voice Vote: all voting aye – MOTION CARRIED
9. Adjournment.
Having no further business, Chairman McDermid declared the meeting adjourned at 6:52 pm.
________________________________
City Administrator Peter Wills
A quorum of the Common Council was in attendance of this meeting.
Planning Commission February 4, 2025 1
CITY OF OCONTO FALLS
PLANNING COMMISSION MEETING
Council Chambers – Municipal Building
500 N. Chestnut Avenue
Oconto Falls, WI 54154
TUESDAY FEBRUARY 4, 2025– 5:00 PM
MINUTES
Chairman Coopman called the meeting to order at 5:00 PM.
Roll Call
Present: Marty Coopman, Jeff McDonald, and Chique Tousey-Tabar, Judy Kostreva
Also Present: Mayor Clint Braun, City Administrator Peter Wills, Deputy Clerk Jenny Friedman,
Michelle Tester, Utility Manager Greg Kuhn, Devin Wirtz, Ashley Bahrke
(arrived at 5:45pm), Kayler Belahch, Shannon Smith, Keaton Schultz, Jim
Lundberg
Absent: William Zietlow, Brad Rice
DISCUSSION AND POSSIBLE RECOMMENDATION/ACTION ON THE
FOLLOWING:
3. Approval of Minutes – Approval of minutes Planning Commission11.06.2024 and Planning
Commission Public Hearing 12.04.2024
MOTION: Tousey-Tabar/ McDonald
Motion to approve the minutes for Planning Commission 11.06.2024 and Planning
Commission Public Hearing 12.04.2024
Voice Vote: All present voting aye - MOTION CARRIED
Old Business
4. McDermid Park & Allen Purucco, Certified Survey Map
Allen Perucco,113 Jackson St request to purchase strip of property adjacent to McDermid
Park Allen Perucco has maintained small section of city land since he purchased his
property in 1982 adjacent to this city land. He has asked if he can purchase the land from
the city. The City agreed to the purchase with Allen Perucco to pay cost of survey and
closing cost of sale.
MOTION: McDonald/ Tousey-Tabar
Motion to approve Certified Survey Map for McDermid Park and Allen Purucco and
move to Common Council.
Voice Vote: All present voting aye - MOTION CARRIED
New Business
5. Derek Konop, merge two lots, 344 S Franklin St, Certified Survey Map
Derek Konop would like to combine his two lots. This lot does fit within the city
Planning Commission February 4, 2025 2
ordinances.
MOTION: McDonald/ Kostreva
Motion to approve Certified Survey Map for 344 S. Franklin St. merging the two lots
together and move to Common Council.
Voice Vote: All present voting aye - MOTION CARRIED
6. Application for Zoning Variance Rapid Housing LLC 249 Birch Ave
Rapid Housing LLC would like the zoning variance for to place two more homes on open
sites. Questions and concerns that were brought up;
• Are the lots big enough? Yes, the houses will be made to fit on the lot.
• In the past has the lots had houses on them? Yes
• Will the houses meet the ordinances and setbacks? Yes
MOTION: McDonald/ Tousey-Tabar
Motion to approve the Zoning Variance for Rapid Housing LLC at 249 Birch Ave and
move to Common Council.
Roll Call; McDonald- aye, Tousey-Tabar-aye, Kostreva-aye, Coopman-No-MOTION
CARRIED
7. Bay Lake Regional Plan Commission proposal to update City’s Comprehensive Plan
The city is looking to update its Comprehensive Plan. The last Comprehensive Plan was
updated in 2008. The city ordinance will also need to be updated to go with the
Comprehensive Plan. If the Comprehensive Plan is updated that benefit the city if it was
going to work on capital projects and WEDA program.
MOTION: Tousey-Tabar/ McDonald
Motion to approve the Bay Lake Regional Plan Commission proposal to update City’s
Comprehensive Plan and move to Common Council and utilizing previously authorized
funds.
Voice Vote: All present voting aye - MOTION CARRIED
8. Discussion on City owned lot by Post Office
The city has owned the parking lot by the Post Office. The Post Office has utilized this
parking lot for many years. The City has never received compensation for anyone using
the parking lot. City Administrator is to look into possibly receiving compensation for the
use of the parking lot.
NO ACTION TAKEN
9. Adjournment
Having no further discussion, Chairman Coopman declared the meeting adjourned at 5:57PM.
______________________________
City Administrator Peter Wills
A quorum of the Common Council was in attendance of this meeting
OCONTO FALLS MUNICIPAL UTILITIES
WATER & LIGHT ⚫ SEWAGE DISPOSAL
MINUTES OF MONDAY, JANUARY 20, 2025
CALL TO ORDER:
The regular meeting of the Oconto Falls Municipal Utilities Commission was called to order in Council Chambers of the
Oconto Falls Municipal Building, 500 North Chestnut Avenue, Oconto Falls, Wisconsin, by President Kardoskee at 6:00
p.m.
ROLL CALL:
Schindel, Anastasopoulos, Pytleski, Coopman, and Kardoskee, present.
Also Present: Utility Manager Greg Kuhn, Customer Service Representative Beth Rank, City Administrator Peter Wills,
Mayor Clint Bruan, and Michelle Tester.
MINUTES:
President Kardoskee asked for any additions or corrections to the minutes of the regular meeting on Monday, December
16, 2024 and the meeting of Monday, January 13, 2025. President Kardoskee declared the minutes of the regular meeting
of Monday, December 16, 2024 accepted as corrected and the minutes of the meeting of Monday, January 13, 2025
accepted as presented.
TREASURERS REPORTS: None
BILLS:
It was moved by Anastasopoulos, seconded by Schindel, that an order be drawn authorizing payment of payroll vouchers
104312-104327, accounts payable vouchers 027318-027346, and wire transfers 001829-001856. Roll call:
Anastasopoulos, Schindel, Pytleski, Coopman, and Kardoskee, voting aye. Motion carried.
PRESENTATIONS AND OPPORTUNITY TO ADDRESS THE COMMISSION: - None
CORRESPONDENCE/INFORMATION – None
MANAGERS REPORT:
Manager’s Report – Kuhn informed the Commissioners that the electric crew will be cutting trees along Columbia Street
over the next few weeks. System trimming will also be happening. The Lemorande Substation feeder has been re-routed.
Water meter changeouts continue to occur. We have one customer on a water run at this time. There was a sewer backup
on Columbia Street. Roots were pulled out and the blockage was cleared. One customer was affected, no real property
damage but the customer was able to use the no-fault sewer insurance the Utility carries to recover the cost of the cleaning
bill. The frost is approximately 18-20”. The new accounting software is in use and Eve Wallace and Beth Rank have been
doing a fantastic job
OLD BUSINESS
ELECTRIC
Update on Substation/Voltage Conversion /Engineering Services Agreement Addendum for Forster – Kuhn
informed the Commission that the control panel bid should be made public in the next few weeks. Kuhn presented the
Commission with a Cost Estimate Breakdown created by Forster. Schindel questioned what acceptance testing entailed.
Kuhn answered that acceptance testing is done on all equipment to verify it is going to operate how it is meant to. In 2023,
the substation project was proposed to be $6,690,343. To date, with actual and a few remaining estimated costs, the
substation project is projecting to cost $6,258,307. The engineering portion of t he project was approved at $283,500.
Forster presented Kuhn with an Engineering Servies Agreement Addendum for $396,000. Forster stated they have more
time invested than originally planned. Forster expenses have increased since the original bid. Kuhn stated that Forster is
doing an exceptional job working with the Utility and the contractors. Kuhn felt the cost Forster is asking for is acceptable
given the market we are in. It was moved by Schindel, seconded by Coopman, to approve the Engineering Services
Agreement Addendum in the amount of $396,000 wit h Forster with the caveat that included in this price , a project
management inspection occur onsite biweekly. Roll call: Schindel, Coopman, Pytleski, Anastasopoulos, and Kardoskee,
voting aye. Motion carried.
SEWER
Sewer Rate Case – Kuhn informed the Commission that the City Council approved the Sewer rate case.
NEW BUSINESS
GENERAL
Employee Recognition – The Commission recognized John Salscheider and Justin VanderBloemen for 15 years of
service with the Utility. The Commission thanked both for their years of service.
ELECTRIC
2025 WPPI Funds – Community Contributions increased from $1,500 in 2024 to $2,500 in 2025. Kuhn suggested that
$1,000 be given to Badger State Girls, $1,000 be given to Oconto Falls Memorial Day Fireworks, $250 be given to Oconto
Falls Sunset Concerts, and $250 be donated a t a later date. It was moved by Pytleski, seconded by Coopman, to donate
$1,000 to Badger State Girls, $1,000 to Oconto Falls Memorial Day Fireworks, $250 to Oconto Falls Sunset Concerts,
leaving $250 to be donated at the discretion of the Utility Manager at a later date. Roll call: Pytleski, Coopman, Schindel,
Anastasopoulos, and Kardoskee, voting aye. Motion carried.
There being no other business, the meeting was adjourned at 6:43 p.m.
Respectfully submitted,
Beth Rank, Customer Service Representative
Serving Wisconsin’s Municipalities for Over 20 Years!
Who’s Your Team?
Account Coordinator
Dana Remien
danar@accurateassessor.com
Statutory Assessor
Dana Remien
2024 Review
Last market update
was 2018
2024 Ratio – 61% Maintenance Year Uniformity was set at
the last revaluation;
values do not change
unless something
changed on the
parcel.
Examples: remodels,
additions, removal of
property, classification
changes (residential use to
commercial,
farming/agricultural to
residential use)
Field team visited 89
parcels checking on
permits pulled,
parcels flagged for a
visit from prior year,
or parcels that
clarifying information
was required.
2025 Plan - Interim
Market Update (IMU)
Timeline:
BOR set for September 4th
Open Book starts July 30th
Notices mailing out July 11th
Field visits completed by
Letters go out to parcel owners of
properties we intend to visit in
person notifying we will be coming
within 60 days of the letter.
To start July
30th 2025
Board of
Review
September 4th
2025
Intentional Education Plan
• Dedicated Marketing Director & Social Media Coordinator
• Live assessors you can call or email anytime
• Educational materials posted on Facebook/Social Media
• Newsletters
• Board Meetings
info@accurateassessor.com 920-749-8098
Education Plan
• Facebook Posts
• FAQ Handouts
• Newsletters
• Utility Bill Inserts
• Council Meetings
• Custom Videos
Municipality Name: Oconto Falls
Date: 2/10/25
Open Book: 7/30/25 1:00 – 5:00 pm
Board of Review: 9/4/25 5:00 – 7:00 pm
Contract End Date: 2028
Last Revaluation: 2018
2022 Assessment Ratio: 61%
Compliance: No
Accurate Account Coordinator: Dana Remien
Email: danar@accurateassessor.com
Phone: 920-572-7767
Statutory Assessor: Dana
Recurring Meeting Schedule:
4 required meetings (Kickoff, Pre-open book, Pre-BOR, End of Year)
Clerk: Jenny Friedman
Email: dclerk@ci.ocontofalls.wi.us
Phone: 920-846-4505
Admin: Peter Wills
Email: admin@ci.ocontofalls.wi.us
Phone: 920-846-4505
Finance:
Email:
Phone:
Building Inspector:
Jane Meissner
Email: nebuildinginspector@gmail.com
Phone: 715-245-1708
https://public.tableau.com/app/profile/research.policy/viz/Assesse
dValues0_2/Story1
Other notes:
Expectations
Review current contract – Mtc, Reval, A-IMU, IMU 1st
Go over timeline – New Construction, Permits, Etc
Open Book Process
Board of Review Process
Verify the municipal website is updated
Make sure property link/s work (on tax portal and website)
Identify the tax system – ascent, gcs?
How are building permits submitted
Special Instructions from Municipality
Ensure contact info is all correct on website
Discuss education –
Open Book 2025
Open Book Process for IMU year: Same online process, however No
video this year. Instead, it will be replaced with a page that has
educational marketing material to look at if they choose and they can
click next if they do not want to look at the material.
Approve open book letter: approve the letter in February or early
March.
Notices mailed by: July 3
rd
Identify any issue properties/owners – set special procedures:
Pre- BOR Meeting
What to expect for BOR:
• When objections are due to assessor:
• Date: 48 hours prior
• Send all objection forms as soon as rec’d to account coordinator
• Account coordinator and Assessor will keep a list and share with you
• Schedule objection appointments for the board of review
• https://www.revenue.wi.gov/DOR%20Publications/pa502.pdf
Checklist
Verify at least 1 board member is trained
Affidavit
Board Agenda (share our copy)
Signing of roll
Filing SOA after board
Estimated MAR submit to state
Final MAR submitted to state and muni
TID’s - new or changes for following year
End of the year meeting
BOR Guide 2025:
https://www.revenue.wi.gov/DOR%20Publications/pb056.pdf
Clerks Guide 2025:
https://www.revenue.wi.gov/DOR%20Publications/pa502.pdf
Property Owners Guide:
https://www.revenue.wi.gov/DOR%20Publications/pb060.pdf
Other notes about BOR:
t
AC
GM
EMGM
EMGMGM
EMEM
GM
EMGM
GM
GMEM
EMGM
EMAC AC
AC
EO
WM
SS
SS
SS
LOT 2CSM #2516BY OTHERS
POS BY PLS #2502DATED: 6-10-23
POS BY PLS #1259DATED: 9-28-1999POS BY PLS #2265DATED: 10-09-2008
LOT 9LOT 8LOT 7LOT 6LOT 5LOT 4LOT 3LOT 2LOT 1
POS BY PLS #2502DATED: 05-12-2011
BLOCK 3JAMES F. O'NEILS ADDITIONBY OTHERS
ASSESSOR'S PLAT
OUTLOT 2ASSESSOR'S PLAT
OUTLOT 2ASSESSOR'S PLATBY OTHERS
VACATED BIRCH STREET PER VOL. 1117, PG. 114197,655 Sq. Feet4.538 AcresTOTAL AREA
N 00°49'46" E(N 01°27'21" E)(N 00°40'11" E)(N 00°01'21" E)
S 87°21'43" E(S 86°44'24" E)(S 87°35'09" E)
S 00°40'45" W(S 00°29'53" W)S 87°20'16" E(S 86°42'48" W)(S 87°35'09" W)
S 00°43'01" W(S 01°20'23" W)(S 00°29'53" W)
N 87°22'30" W(N 87°35'09" W)(N 86°44'41" W)
410.14'(410.23')(410.17')
411.03'(411.54')(411.17')(411.20')
530.32'(530.21')(530.00')(529.67')
243.99'(243.96')
120.04'(120.00')
165.92'(165.98')
103.72'(103.67')(103.75')140.27'
29.79'136.13'(136.05')
140.62'(140.60')
39.44'
69.56'
100.66'(100.50')
59.86'(60.00')153.33'(153.23')(153.29')30.19'(30.08')(30.11')100.14'(100.23')(100.26')20.02'(19.99')(20.01')107.35'(107.86')
127.50'
100.11'(100.00')
102.53'(102.56')
99.99'(100.15')
100.19'(100.00')
61.71'S 00°40'45" W633.76'
PARCEL NO. 2660607314510DOC #728238PARCEL NO. 2660607314482
DOC #744847PARCEL NO. 2660607314484SE1/4 - SE1/4
BENCHMARK #2ELEV=724.48
BENCHMARK #1ELEV=726.41
30'R/W VARIES30'30'30'R/W VARIES
30'30'60'
VACATED BIRCH STREET PER VOL. 1117, PG. 114
VACATED BIRCH STREET PER VOL. 1117, PG. 114
PointBeginningof
30' UTILITY EASEMENTPER VOL. 791, PG. 363
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEETC1.04941 Kirschling CourtStevens Point, WI 54481715.344.9999 (PH) 715.344.9922 (FX)
SCHULTZ REAL ESTATE GROUPOCONTO FALLS MHCCITY OF OCONTO FALLSOCONTO COUNTY, WI
LAYOUT PLAN
JJLJJL01/03/2025
UTILITY DISCLAIMER:0'30'60'1" = 30'
COMPREHENSIVE PLAN UPDATE
SCOPE OF SERVICES AND COST PROPOSAL
City of Oconto Falls
Oconto County, Wisconsin
January 16, 2025
This Page Intentionally Left Blank
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL i
Table of Contents
INTRODUCTION .......................................................................................................... 1
OBJECTIVES ................................................................................................................ 1
SCOPE OF SERVICES .................................................................................................. 2
Phase 1: Project Kickoff ...................................................................................................................... 2
Phase 2: Update Required Comprehensive Plan Elements........................................................... 2
Phase 3: Project Coordination and Collaboration ......................................................................... 2
Phase 4: Final Products ....................................................................................................................... 2
PLANNING PROCESS AND TIMELINE ......................................................................... 3
DIVISION OF WORK .................................................................................................... 4
PROJECT COST ........................................................................................................... 4
PROJECT TEAM AND QUALIFICATIONS .................................................................... 5
Work Experience ................................................................................................................................. 6
Capability Statement ......................................................................................................................... 6
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL ii
This Page Intentionally Left Blank
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL 1
Introduction
The Bay-Lake Regional Planning Commission (“Commission”) has prepared this scope of services
as a response to the City of Oconto Falls (“City”) request for a plan update that complies with
relevant State requirements and that better aligns future land use planning with the City ’s goals
and vision for growth.
Wis. Stats. 66.1001 requires every governmental jurisdiction
that regulates the use of land through a land division
ordinance, shoreland zoning ordinance, general purpose
zoning ordinance, or official map to have an adopted
comprehensive plan. In addition, as part of the State Statute
requirements, a comprehensive plan must be updated at a
minimum of every 10 years. The Commission understands that
the City’s desire to update the plan’s content is not only to
meet State Statute requirements, but also to ens ure the City
has an up-to-date tool to make informed land use decisions.
Objectives
The Commission has specified the following objectives in
updating the City of Oconto Falls’s Comprehensive Plan:
To work with the City Plan Commission (or other
assigned entity) to prepare an update to the City of
Oconto Falls Comprehensive Plan which will comply
with the requirements of Wis. Stats. 66.1001.
To encourage citizen participation and to coordinate
planning efforts between the City and neighboring
jurisdictions during the plan development process.
To review and update the existing conditions and
background data within the plan, as necessary.
To incorporate amendments to the c omprehensive
plan that have been adopted since the City’s current
plan was developed (i.e., 2008).
To consider existing City planning studies, as well as comprehensive plans adopted by
nearby communities and Oconto County.
To assist with update s to the vision statement, recommendations, goals, and strategies
designed to guide future growth and development of the City for the next 20 years.
To assist the City in the adoption of the plan by preparing the resolution and ordinance for
adoption of the comprehensive plan by the City Planning Commission.
To prepare a plan that can be updated, cost-effectively, on a five-to-10-year cycle.
The Commission will be available at the request of the City to provide additional planning
assistance to implement the updated comprehensive plan.
Bay-Lake Regional Planning
Commission
The Bay-Lake Regional Planning
Commission is a multi- service
planning agency within
Wisconsin that delivers a variety
of federal, state, and local
programs. It provides planning
and technical assistance to
member local units of
government in n ortheast
Wisconsin and is accountable
to its members. The Commission
also serves as an effective
partner for state and federal
governments.
Commission Contact:
Brandon Robinson,
Executive Director
Email: brobinson@baylakerpc.org
Phone: 920-448-2820, ext. 105
Website: www.baylakerpc.org
Address: 1861 Nimitz Drive
De Pere, WI 54115
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL 2
Scope of Services
Through a contract agreement between the Commission and the City , the Commission will
update the City’s Comprehensive Plan by coordinating and drafting the plan document , along
with assisting with meeting facilitation.
The following work plan is intended to describe the process to update the plan. The Commission
is flexible in refining the details to best suit the City’s desired outcomes.
Phase 1: Project Kickoff
The Commission proposes to facilitate one (1) kickoff meeting at the outset of the project to
provide an opportunity to discuss the project, clarify project objectives and schedule, and begin
discussing key technical issues with the City’s core project team (planning staff, the City Planning
Commission representatives, etc.).
Prior to this meeting, the Commission will review relevant and existing plans and studies, as
provided by the City , to better understand recent planning efforts and existing conditions. The
Commission will additionally prepare a draft public participation plan, to be discussed at the
kickoff meeting and subsequently refined.
Phase 2: Update Required Comprehensive Plan Elements
The Commission will prepare an update to the City of Oconto Falls Comprehensive Plan. The
updated Comprehensive Plan will meet the requirements of Wis. Stats. 66.1001. Commission staff
will work with the city to reorganize, simplify, or add new topics/chapters to the plan (as needed)
while addressing the required elements per Wis. Stats. 66.1001. The Commission will update the
following components:
Accomplishments since the adoption of the previous 2008 Comprehensive Plan
Background information, including data from the U.S. Census, American Community
Survey, and/or other public available data
Vision statement, policies, and recommendations
Comprehensive Plan elements and maps, including changes to the future land use plan
Phase 3: Project Coordination and Collaboration
To facilitate the development of the plan and to ensure that the plan is a statement of City policy,
the Commission will meet with the City core team, or other assigned entity or committee, to review
and discuss comments related to the text and mapping updates in up to four (4) meetings. In
addition, t he Commission will seek comments and feedback from the City project team (or
assigned entity/committee) as updates are drafted. Further, the City may seek feedback from the
community via public survey.
Phase 4: Final Products
Upon review of the draft plan update by the City , the Commission will refine and prepare a
hearing-ready comprehensive plan. Commission staff will format the plan document into a digital
file to facilitate future revisions and amendments. The Commission will attend one (1) open house/
public hearing of the City to present the plan update in anticipation of adoption . Prior to the
hearing, the Commission will help prepare the resolution and ordinance for adoption of the
comprehensive plan.
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL 3
Planning Process and Timeline
The Commission anticipates a 14-month planning timeframe to update the City of Oconto Falls
Comprehensive Plan (see Exhibit 1 ). This timeline is based on the scope of s ervices as outlined
earlier in the document. This includes up to four project meetings with the City project
team/advisory committee , as well as ample time and opportunity for citizen involvement , and
thorough review of content by the City. Upon City approval of this scope of services and over the
course of the project, the timeline may be amended if there are unforeseen issues or delays in the
planning process.
For the Commission to complete a quality plan in a timely manner, the City will be required to
review and make comments on the c omprehensive plan update as it is written. The Commission
will revise the materials as directed by the City.
Exhibit 1. Proposed Project Timeline
Phase 1: Project Kickoff
Phase 2: Update Required Plan Elements
Phase 3: Project Coordination/Collaboration
Phase 4: Finalize Plan Update
Kickoff Meeting Project Meetings
Public Survey/ Open House/Public Hearing
Public Input Effort
13 14
MonthPhase
1 2 3 4 5 6 7 8 9 10 11 12
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL 4
Division of Work
Commission staff will be responsible for:
Attending one (1) project kickoff meeting, up to four (4) project meetings, and one (1)
open house/ public hearing.
Updating relevant data, maps, and content.
Preparing an open house, an online survey (if requested), and summarizing survey results.
Formatting the Comprehensive Plan document (including text, maps, and other exhibits),
as requested following City review of the updated plan.
Assisting the City with preparation of a Resolution, Ordinance, and Public Hearing
materials.
City staff will be responsible for:
Reviewing and revising, as necessary, the City’s Public Participation Plan prior to beginning
the comprehensive plan update process.
Posting and sending out meeting notices and survey notices to citizens and other
interested and required parties.
Providing a meeting space for all in-person meetings.
Reviewing and revising, as needed, the Comprehensive Plan update, including:
o Required plan elements (e.g. background and data).
o 20-Year Vision Statement and Goals & Objectives.
o 20-Year development strategy and corresponding mapping.
o Implementation Element.
Lastly, City officials are encouraged to attend meetings and provide input, as requested.
Project Cost
The Commission’s fee for completing the City of Oconto Falls Comprehensive Plan will be $18,515
(see Exhibit 2 ). The Commission prepared this budget based on recent, relevant experience
preparing other comprehensive plan updates in the region.
Additional meetings, document copies, summary poster, story map, and other work activities
requested by the City, beyond those listed in this scope of services , will be at an additional cost
to the City. That cost would be at a mutually agreed upon fee.
Exhibit 2. Proposed Budget for the Comprehensive Plan Update
Cost of Comprehensive Plan Update $20,365
Membership cost savings* ($1,850)
Commission/City Contract Amount $18,515
*Transportation element partially updated through the Commission's Rural Transportation Work Program
and the Economic Development element partially updated through the Commission's EDA Work Program
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL 5
Project Team and Qualifications
The Commission uses a team approach for its planning projects under the guidance of an
experienced and qualified team leader who acts as the project coordinator. The Commission’s
team for the City of Oconto Falls Comprehensive Plan Update consists of the following:
Executive Director will oversee the project and ensure diligent completion.
o Brandon Robinson - Brandon has been with Bay -Lake RPC since 1998. In addition
to his management duties as the Commission’s Executive Director, Brandon is
extensively involved with the community assistance program, including
comprehensive and other long -range planning, and as sists with plan
implementation and ordinance development. Brandon also offers technical
assistance by writing and administering grants under these program areas.
Brandon earned his Bachelor’s Degree from the University of Wisconsin - Oshkosh in
Urban and Regional Studies and in Geography.
Community Assistance Planner will serve as the project lead and will be the primary
contact for the project.
o Kyle Robison - Kyle joined the Bay-Lake RPC in July 2024. His duties include a range
of planning activities such as developing comprehensive plans, hazard mitigation
plans, and other long -range planning documents, researching policies and
legislation related to communit y development, and engaging with various
agencies and local stakeholders. Kyle has developed a diverse skill set from his prior
experiences in aviation, engineering design, and community engagement. He is a
US Air Force veteran and holds a Bachelor of Science in Landscape Architecture
from Purdue University.
GIS Specialist will provide mapping, data collection and analysis, and other visualization
for this project.
o Natalie Blackert - Natalie joined the Bay -Lake RPC in January 2024. Her duties
involve leading the development, implementation, and management of
Geographic Information Systems for the Bay -Lake Region. Natalie brings
experience with GIS -based environmental research, and hist orical infrastructure
analysis. She graduated from the University of Wisconsin-Eau Claire with a Bachelor
of Arts Degree in Environmental Geography, and with minors in History and Latin
American Studies.
CITY OF OCONTO FALLS COMPREHENSIVE PLAN UPDATE: SCOPE OF SERVICES & COST PROPOSAL 6
Work Experience
The preparation of county and local comprehensive plans by the Commission dates back to the
early 1970’s. Since Wisconsin enacted the “Smart Growth” law in 1999 , the Commission has
prepared over 100 comprehensive plans along with other land use plans throughout the eight
county Bay-Lake Region.
The Commission’s overall planning experience includes development of:
Comprehensive Plans and plan elements for Towns, Villages, Cities, and Counties
Land Use Site Plans
Farmland Preservation Plans
Zoning Ordinances and Codes
Area Development Plans
Park and Recreation Plans
Hazard Mitigation Plans
Tax Incremental Financing Plans
Natural Resource Plans
Sewer Service Area Plans
Transportation Corridor Studies and Plans
Pavement Management Surveys
In addition, the Commission has experience writing and administering:
Public Facility Grants
Economic Development Grants
CDBG Planning Grants
Housing Grants
Coastal Management Grants
Transportation Grants
Capability Statement
As a public and official area -wide planning agency for northeastern Wisconsin since 1972, the
Commission has the expertise and resources to successfully achieve the objectives of th is
proposed planning project for the City of Oconto Falls.
Providing cooperative planning and funding solutions to foster
healthy and thriving communities within the region.
• Community and Economic Development
• Geographic Information Systems
• Environmental
• Transportation
Bay-Lake Regional Planning Commission
1861 Nimitz Drive
De Pere, WI 54115
920 448 2820
www.baylakerpc.org
DRAFT
Memorial Field and Oconto Falls Softball Fields MOU
The City of Oconto Falls (hereafter, City) and the Oconto Falls Public Schools (hereafter, District) agree that
the named facilities are prepared and maintained to allow mutual use of these two facilities.
Memorial Field Baseball Field
The Memorial Field Baseball field will be available for the Oconto Falls Public School District to use
for the high school baseball program’s practices and/or games.
A schedule will be made available to the City Administrator and his/her designee(s).
City of Oconto Falls Responsibilities ● Irrigation
○ Watering the field
○ Maintenance of the irrigation equipment
● Maintenance of Grass (at Expense of the City)
○ Cutting
○ Fertilizer
○ Weed Control
● Supply a port-a-potty to be available during the
High School baseball season
Oconto Falls Public Schools Responsibilities ● Maintenance/Preparation of Field for Oconto
Falls High School games
Oconto Falls Public Schools Softball Fields
The Oconto Falls Softball Field(s) will be available for City of Oconto Falls Community youth
baseball/softball organizations to use for practices and/or games.
A schedule will be made available to the Oconto Falls Public Schools Building and Grounds
Supervisor and his/her designee(s).
Oconto Falls Public Schools Responsibilities ● Irrigation
○ Watering the field
○ Maintenance of the irrigation equipment
● Maintenance of Grass (at expense of the OF District)
○ Cutting
○ Fertilizer
○ Weed Control
● Ensure the bathrooms are available
City of Oconto Falls Responsibilities ● Maintenance/Preparation for and/or during City
of Oconto Falls Community Youth games.
The Oconto Falls School District shall not discriminate on the basis of race, religion, creed, political affiliation, physical, mental, emotional, or
learning disabilities, handicap, gender, gender orientation, age, national origin, citizenship, marital, parental or pregnancy status, ancestry, color,
or any other reason prohibited by state or federal law.
DRAFT
Current Inventory at Memorial Field that belongs to the Oconto Falls Public Schools
Baseball Scoreboard
All equipment in the storage shed
Smithco Groomer
Concession stand and all equipment inside
2 Bleachers at Baseball diamond
2 Large Bleachers at Football field
Scoreboard on football field
The terms of this memorandum of understanding will be effective as of _________________ through
December 31, 2030.
City of Oconto Falls Oconto Falls Public Schools
_______________________ _________ ______________________ __________
Peter Wills Date Dean Hess Date
City Administrator Superintendent
The Oconto Falls School District shall not discriminate on the basis of race, religion, creed, political affiliation, physical, mental, emotional, or
learning disabilities, handicap, gender, gender orientation, age, national origin, citizenship, marital, parental or pregnancy status, ancestry, color,
or any other reason prohibited by state or federal law.
Work Plan 2025-2026
City of Oconto Falls
1 | P a g e
Departments
ADMINISTRATION
PROJECTS In Process:
WI DOA Fire Station infrastructure grant tracking on going
Columbia Street Reconstruction March 2025-December 2025
Park Projects April 2025-September 2025
Memorial Field Playground April 2025-September 2025
City Hall HVAC Replacement January 2025-March 2025
City Hall Technology Upgrades January 2025-March 2025
City Buildings Cameras upgrade February 2025-April 2025
New Copiers Jan 2025
Upgrade Key Cards & Cameras City Hall Feb-March 25
Upgrade East & West side Beach, Street Dept, Cameras March25-April 25
Large Display interactive Board Council Chambers March 25
Columbia Street CDBG February 2024
2% Fire Dues ESLA Reporting January 2025
Enforcement of Nuisance Ordinance Downtown November 2024-August 2025
Street Dept Equipment Replacement November 2024-February 2025
2025 Stormwater Repair January 2025-September 2025
Street Repair Mastic Equipment January 2025-February 2025
Former Fire station 98 Jackson Setup for Street Dept January 2025-February 2025
2024 WI DNR Urban Forestry Grant Wrap Up January 2025
2025 WI DNR Urban Forestry Grant Implementation January -June 2025
Update City Comprehensive Plan & Housing Plan February 2025-July 2026
Paid Time off Review
Personnel Manual Updates
Job Description Review February-August 2025
Compensation and Classification Review April -August 2025
WI DNR Knowles-Nelson Stewardship Grant Application May 1, 2025
Department Head Reviews July-August 2025
Former Westside Street Shop Review July-August 2025
Ongoing/Waiting: Last Update
Property Development
Apartment Development Property 1.21.2025
Residential Development Property
Memorial Field
High School Contract Negotiations 1.30.2025
Farmers Market Discussions 1.24.2025
Middle School/Youth Football 1.14.2025
Work Plan 2025-2026
City of Oconto Falls
2 | P a g e
Youth Baseball/Softball 1.13.2025
Sno-Jokers/Memorial Weekend
Library Consolidation
Ordinances: Last Update:
Downtown Housing Ordinance Rewrite 1/21/2025
Subdivision Ordinance 1/21/2025
Water/Utility Ordinance
Façade Revolving Loan Program 2025-2026
Assessor Priority:
Assessor Citywide Property Revaluation Feb -July 2025
Kickoff Meeting Feb 11th
Update Council on Revaluation Feb 11th
Open Book July 30th
Board of Review September 4th
Treasurer Priority:
WI DOA Fire Station Infrastrure Grant Tracking
Caselle new accounting system training Oct-Nov 2024
Caselle adopt new payroll, AP/AR Dec-Feb 2025
Tax Collections Dec 2024-Feb 2025
Tax Dispersal February 2025
W-2, 1099, Federal Filings, Sales Tax (City, Utility, Library) January-February 25
Dog Licenses Dec-April 25
2024 Pre audit January 2025-May 2025
DSPS Injury Report January 2025
Post Employment actuarial Studies February 2025
Flex Spending non-discrimination February 2025
WRS Reconciliation
Columbia Street CDBG February 2024
Audit all financials February-April
Clerk
Public Voter machine Test Feb 10 2025
Spring Primary Feb 18 2025
Absentee Ballots
Spring Election April 1, 2025
Annual Appointments & Oaths April 2025
New Liquor/Tobacco Licenses
Chicken License Renewal
Fire Department Priority:
Work Plan 2025-2026
City of Oconto Falls
3 | P a g e
Replacement Equipment Planning 7.2024-8.2026
Confined Space Training 1.2025-3.2025
Personnel Review 12.2024-8.2025
Emergency Management Priority:
Communications and Technology
Emergency Operations Plan Update 2025-2026
Library Priority:
Library Planning 2025-2026
Municipal Court Priority:
Judge Training Spring 2025
Police Priority:
Police Dept Leadership Succession Planning ongoing
DARE Training Jan- Feb 2025
Instructor Development Certification April-May 2025
Street Department Updated:
General Capital
New Street Sweeper Training April 2025
New Truck Lift January 2025
Brine Tank Evaluation Dec 2024-March 2025
Projects 2025-2026
Columbia Street Project
Mark and remove trees Jan 2025-Feb 2025
Assist with detour signage
General Operations
Street Dept Relocation
Street Dept Buildings evaluation Jan 2025-Aug 2025
GIS Map Development joint Utility 2025-2026
Stormwater Repair & Replacements 2025-2026
Personnel
Leadership Development Nov 2024-Dec 2026
Work Plan 2025-2026
City of Oconto Falls
4 | P a g e
Arborist Training 2025-2026
Stormwater Training 2025-2026
Roadwork Training 2025-2026
Parks – Capital and Operations
Ice Rink Improvements & Maintenance Dec 2024-March2025
McDermid Park Improvement(s) 2025
Tree Planting Project/WI DNR Grant 4/25-6/25
Westside Beach Water/Sewer for Bathrooms 2/25-4/25
Tree Inventory 2025-2026
Utility Department
Columbia Street Project
Mark and remove trees Jan 2025-Feb 2025
Lift Station #2 March 2025-Aug 25
Preconstruction Lateral Cust Contacts Jan- Feb 2025
New Electric Substation
Water Meter Replacement Project 2025-2026
Sanitary Sewer Rate Study Done Dec 2024
Utility Cost Allocations 2025-2026
Electric Rate Increase PSC 2024-2026
GIS Map Development 2025-2026
City Fiber Network
Cross Connections
35
475 FLEXIBLE BENEFIT PLAN
The City has established a flexible spending plan based on IRS and third party administrator
guidelines, which may from time to time be changed or updated by the Common Council, including
but not limited to maximum amount of employee contribution. All WRS eligible employees are
eligible to participate in the plan. Limits on how much an employee can contribute will be
determined periodically by the IRS and/or Common Council. Current employees may join the plan
only during open enrollment periods which will generally be in November to begin at the first of the
upcoming calendar year. New employees are eligible to sign up within 30 days of their date of hire
or during open enrollment. It shall be the employ ee’s responsibility to notify the Deputy Treasurer
and obtain the necessary paperwork to join the pl an after the familiarization period. Any employee
who joins the program in the inter im basis shall have the spending limi ts pro rata to the first of the
year. Council will review annually and will adjust, see the City Administrator for current
allowance.
The benefit limit may from time to time be changed or updated by the Common Council.
--
480 COMPENSATORY TIME / FLEX TIME
Pursuant to the Fair Labor Standards Act, the City is permitted to give its employees compensatory
time off in lieu of immediate overtime pay in cash at a rate of not less than one and one-half hours
for each hour of overtime worked, but only pursuant to a collective bargaining agreement, or an
agreement of understanding arrived at between th e City and employee before performance of the
work.
The maximum compensatory time which may be ac crued by an affected employee shall be 120
hours. An employee who has accrued the maximum number of compensatory hours shall be paid
overtime compensation in cash for any additional overtime hours worked.
The City Administrator and Police Chief are eligib le for an extra forty (40) hours per year of
vacation in place of compensatory time.
Payment for accrued compensatory time upon termin ation of employment shall be calculated at the
final regular rate of pay.
Offices may adopt a flex-time arrangement, so l ong as the City Hall remains open to the public
from 8 AM to 4:30 PM Monday through Friday, and those individuals involved in the flex-time
arrangement do so under provisions of their co llective bargaining agreement or with the
concurrence of department head.
At no time shall a flex time arrangement allow an hourly employee to work more than 40 hours per
week.
--
Page 1 of 5
\\msa-ps.com\fs\Project\16\16374\16374016\Contract\16374014_Oconto Falls, City of_Task Order #7_CWF + SDW Application (REVISED).docx
MSA Project Number: 16374016 (Task Order #7)
This REVISED AGREEMENT (Agreement) is made effective ____/____/____ by and between
MSA PROFESSIONAL SERVICES, INC (MSA)
Address: 1500 N. Casaloma Drive, Appleton, WI 54913
Phone: (920) 545-2083
Representative: Brittney Mitchell Email: bmitchell@msa-ps.com
CITY OF OCONTO FALLS (OWNER)
Address: 500 N Chestnut Avenue, Oconto Falls, WI 54154
Phone: 920-846-4505
Representative: Peter Wills Email: admin@ci.ocontofalls.wi.us
Project Name: Oconto Falls 2025 Clean Water Fund and Safe Drinking Water
Application Services
The scope of the work authorized is: See Attachment A: Scope of Services
The schedule to perform the work is: Approximate Start Date: ___/___/___
Approximate Completion Date: 09/30/2025
The lump sum fee for the Clean Water Fund Application work is: $12,000
The lump sum fee for the Safe Drinking Water Fund Application work is: $0
This authorization for the work described above shall serve as the Agreement between MSA
and OWNER. All services shall be performed in accordance with the Master Professional
Services Agreement currently in force. Any attachments or exhibits referenced in this
Agreement are made part of this Agreement. Payment for these services will be on a lump sum
basis.
Approval: MSA shall commence work on this project in accordance with your written
authorization. This authorization is acknowledged by signature of the authorized representatives
of the parties to this Agreement. A copy of this Agreement signed by the authorized
representatives shall be returned for our files.
CITY OF OCONTO FALLS MSA PROFESSIONAL SERVICES, INC.
Clint Braun Brittney Mitchell
Mayor Team Leader-Funding
Date: Date: 10/25/2024
OWNER ATTEST:
Peter Wills Benjamin Andrews
Administrator-Clerk/Treasurer Community Development Specialist
Date: Date: 10/24/2024
Page 2 of 5
(Attachment A: Scope of Services)
\\msa-ps.com\fs\Project\16\16374\16374016\Contract\16374014_Oconto Falls, City of_Task Order #7_CWF + SDW Application (REVISED).docx
ATTACHMENT A:
SCOPE OF SERVICES
SDWLP APPLICATION AND CWFP APPLICATION
Working in conjunction with the City of Oconto Falls (OWNER), MSA agrees to provide
services for the application services of Owner’s CWF and SDW programs as hereinafter
stated. The liability related to the application services and/or other assistance provided
is limited to the stated fee for said assistance. MSA is committed to high quality service
and performance of the scope herein and is not responsible for the actions of others
including but not limited to the agencies associated with these funding sources and
oversight.
SECTION 1: CWFP APPLICATION ASSISTANCE
1A: CWFP APPLICATION – MSA RESPONSIBILITIES:
MSA agrees to assist the OWNER with loan application preparation services including
the following:
1. Assess the fundability of the project using WDNR Priority Scoring as a guideline;
2. Meet with Owner to compile the necessary documentation required for a
complete application (one site visit assumed);
3. Provide funding program coordination with other funds;
4. Complete Green Business Case submittals on behalf of Owner
5. Complete CWFP Application and submit on behalf of the Owner on or before the
anticipated September 30th deadline (application submittal is not a guarantee of
a loan award), including the following documentation:
• Completed Clean Water Fund Application Form 8700-203 including:
o Detailed Project Budget
o Detailed Debt Information
o Detailed General Municipal Info
o Detailed User (and adjusted user) Information
o Four Year Revenue & Expenditure Projection
o Four Year Operation & Maintenance (O&M) Costs
o Replacement Fund Analysis and Schedule Options
o Detailed Info on Refinancing of Existing WW Debt
• Facility Plan Approval Documentation (MSA or owner provided)
• Parallel Cost Approval Documentation
• Green Project Reserve
• Resolution(s) as adopted by the Owner’s governing board
• All MSA Contracts
6. Work with the Owner and the WDNR to compile the necessary documentation
required for CWFP post-application submittals.
Page 3 of 5
(Attachment A: Scope of Services)
\\msa-ps.com\fs\Project\16\16374\16374016\Contract\16374014_Oconto Falls, City of_Task Order #7_CWF + SDW Application (REVISED).docx
1B: CWFP APPLICATION – OWNER RESPONSIBILITIES:
Owner Provided Documentation including:
• Proposed (or Actual) Intermunicipal Agreement*
• User Charge System (current and any projected rate updates*)
• Sewer Use Ordinance*
• Contracts with System Users*
• Past 2 years Municipal Budgets and Audited Financials
• Past 2 years Sewer Utility Budgets (and Audited Financials, if separate)
• All outstanding Sewer Revenue Bonds and Amortization Schedules
• Latest Official Statement
• Contracts for other Professional Services
• Information on Other Funding Sources*
• Debt Instrument to Be Refinanced (Interim Financing Document/Note)
• Bidding Documentation (if available at time of application)*
Page 4 of 5
(Attachment A: Scope of Services)
\\msa-ps.com\fs\Project\16\16374\16374016\Contract\16374014_Oconto Falls, City of_Task Order #7_CWF + SDW Application (REVISED).docx
*Addition to Previously Submitted Task Order*
SECTION 2: SDWLP APPLICATION ASSISTANCE
2A: SDWLP APPLICATION – MSA RESPONSIBILITIES:
MSA agrees to assist the OWNER with loan application preparation services including the
following:
1. Assess the fundability of the project using WDNR Priority Scoring as a guideline
2. Meet with Owner to compile the necessary documentation required for a complete
application (one site visit assumed)
3. Provide funding program coordination with other funds
4. Prepare and submit Endangered Resources Review request on behalf of the Owner
5. Prepare and submit SHPO Comment and Consultation on a Federal Undertaking
request on behalf of the Owner
6. Complete SDWLP Application and submit on behalf of the Owner on or before the June
30th deadline (application submittal is not a guarantee of a loan award), including the
following documentation:
• Completed Safe Drinking Water Loan Application including:
o Detailed Project Budget
o Detailed Non-Core Costs Budget
o Detailed Debt Information
o Detailed General Municipal Info
o Detailed User (and adjusted user) Information
o Four Year Revenue & Expenditure Projection
o Four Year Operation & Maintenance (O&M) Costs
o Replacement Fund Analysis and Schedule Options
o Detailed Info on Refinancing of Existing Water Debt
• Engineering Report Approval Documentation (MSA or owner provided)
• Green Project Reserve (if applicable)
• Required Resolutions
• All MSA Contracts
• Owner Provided Documentation including:
o Proposed (or Actual) Intermunicipal Agreement*
o User Charge System (current and any projected rate updates*)
o Water Use Ordinance*
o Contracts with System Users*
o Past 2 years Municipal Budgets and Audited Financials
o Past 2 years Water Utility Budgets (and Audited Financials, if separate)
o All outstanding Water Revenue Bonds and Amortization Schedules
o Latest Official Statement
o Contracts for other Professional Services
o Information on Other Funding Sources*
o Debt Instrument to Be Refinanced (Interim Financing Document/Note)
o Bidding Documentation (if available at time of application)*
7. Work with the Owner and the WDNR to compile the necessary documentation required
for SDWLP post-application submittals
Page 5 of 5
(Attachment A: Scope of Services)
\\msa-ps.com\fs\Project\16\16374\16374016\Contract\16374014_Oconto Falls, City of_Task Order #7_CWF + SDW Application (REVISED).docx
2B: CWFP APPLICATION – OWNER RESPONSIBILITIES:
The OWNER will:
1 Provide requested information and documentation complete and in a timely manner.
2 Work with and inform MSA regarding interim financing, accounts related to the project or
funds, other projects or funding in process or projected.
3 Seek and retain Bond Council as required.
4 Provide land opinion by Attorney as required.
5 Prepare the rate file case study and update water rates as necessary to PSC prior to
loan closing.
6 Prepare the rate evaluation and update sewer rates as necessary, as required prior to
loan closing.
dnr.wi.govwisconsin.gov WISCONSIN
SUBJECT: OCONTO FALLS WATERWORKS - Warning - Federal Service Line Inventory Violation
Dear OCONTO FALLS CITY OF -ADMINISTRATOR,
The US Environmental Protection Agency's (EPA) 2021 Federal Lead and Copper Rule Revisions (LCRR) require
public water systems (PWS) to prepare an inventory of all service lines connected to the distribution system and
submit the inventory to the state by October 16, 2024i. The LCRR also requires PWS to make the inventory accessible
to the public by October 16, 2024ii, iii.
This is a warning letter to inform you that OCONTO FALLS WATERWORKS has incurred a federal violation for
failing to submit an inventory that meets all federal requirements by October 16, 2024:
Violation TypeViolation CategoryViolation CodeContaminant Code
LSL InventoryTreatment Technique 2E 5200 - LCRR
If OCONTO FALLS WATERWORKS does not resolve these violations, the EPA may take enforcement action.iv
RETURN TO COMPLIANCE
OCONTO FALLS WATERWORKS may return to compliance and avoid federal enforcement action from the EPA
by completing all of the following:
1. Review your water system’s service line inventory review checklist (attached). Revise your inventory to
address all deficiencies identified in the checklist.i
• Resources:
Overview of Service Line Inventory Requirements (recorded webinar)
LCRR Service Line Materials Inventory Instructions
Service Line Inventory Review Checklist (attached)
2. Make the revised service line material inventory publicly accessible.ii,iii
STATE OF WISCONSINDEPARTMENT OF NATURAL RESOURCES101 S. WEBSTER STREETBOX 7921MADISON WI 53707-7921
January 21, 2025 PWS ID: 44304964
PWS Type: MC - Oconto County
Violation #: 112367600
OCONTO FALLS CITY OF -ADMINISTRATOR
OCONTO FALLS WATERWORKS
PETER WILLS
PO BOX 70
OCONTO FALLS WI 54154-0070
Tony Evers, Governor
Telephone 608-266-2621
Toll Free 1-888-936-7463
TTY Access via relay - 711
N a t u r a l l y
3. Submit the revised service line inventory to the Wisconsin Department of Natural Resources (Department)
along with the forms below, documenting your inventory’s methods and completeness, and how the updated
inventory was made publicly accessible. Email your inventory and the two forms linked below to
dnrdgleadcopperinventories@wisconsin.gov.
• Forms:
LCRR Inventory Methods & Completeness Form
Public Accessibility Documentation Form
4. Give public notice for this violation, as required by EPA, and send certified copies of both PNs to EPA
Region 5 at R5_GWDWB_PWS@EPA.gov.
Contact R5_GWDWB_PWS@EPA.gov to request PN templates and/or if you have questions about the Tier 2
PN requirements triggered by these violation.
TECHNICAL ASSISTANCE
The department has contracted with Jacobs Engineering to provide free service line inventory technical assistance to
community water systems. To request this free technical assistance, please contact Jacobs Engineering at
wisconsin.lsli@jacobs.com or (414) 465-8649. Jacobs will provide inventory technical assistance on a first-come, first-
served basis, so you are encouraged to request assistance as soon as possible.
To request additional information, or if you believe our records are inaccurate, please contact
dnrdgleadcopperinventories@wisconsin.gov.
Sincerely,
A Hka
Ann Hirekatur
Lead and Copper Section Manager
Drinking Water and Groundwater Program
Ecopy:
Heather Hermes, Megan Scoon, Ros Schulze, Compliance Specialist, Northeast Region
Dave Barkhahn, DNR Field Representative, Fitchburg Service Center
Janelle Merry, Field Supervisor, Green Bay Service Center
Valentine, Jason, jvalentine@ofmu.org
_____________________________
i 40 CFR §141.80(f)(3), CFR §141.84(a), and §141.90(e)(1)
ii 40 CFR §141.84(a)(8) and CFR §141.84(a)(9)
iii Public water systems with no lead, galvanized requiring replacement, or lead status unknown service lines may issue
a written statement to its consumers declaring the distribution system has no lead service lines in accordance with the
requirements of 40 CFR §141.84(a)(9) in lieu of making the full inventory publicly accessible.
iv The federal LCRR inventory requirements are currently in effect. Wisconsin is in the process of revising NR 809 to
include these requirements in our state administrative code. Until this state rulemaking is complete, EPA is responsible
for enforcing these federal regulations.
OCONTO FALLS MUNICIPAL UTILITIES
POSITION DESCRIPTION
Revised 2/4/2025
POSITION TITLE: Water Operator/Assistant Wastewater Operator
DEPARTMENT: Water Utility/Wastewater Utility
SUPERVISOR: Utility Manager/Wastewater Operator/Utility Foreman
RATE: $25.00-$31.00 hour Depending on Qualifications
HOURS: 7:00 a.m. to 3:30 p.m., Monday-Friday, Summer hours Monday-Thursday
6:00 a.m. to 3:30 p.m. Friday 6:00 a.m. to 10 a.m.
GENERAL POSITION DESCRIPTION:
The Water Operator/Assistant Wastewater Operator is a full-time position in the Oconto Falls
Municipal Utilities. The person should be highly self-motivated and organized. The person in
this position will perform a variety of tasks that the individual is expected to understand and
effectively complete in the field of water distribution, treatment, and testing along with
wastewater collection, treatment and testing. Employee will be on a weekend data collection
rotation. The employee must be able to respond to emergency calls in 25 minutes under normal
driving conditions. The operator will receive work assignments and instructions primarily from
the Utility Manager, but may also receive assignments and instruction from the lead Wastewater
Operator and the Utility Foreman.
EDUCATION AND EXPERIENCE REQUIREMENTS:
High school graduate or equivalent. Experience in the installation, maintenance, and repair of
water mains, services, and related appurtenances, or related work, or any equivalent combination
of education and experience providing the knowledge, abilities, and skills listed above. A DNR
Water Operators Grade 1 License in distribution and groundwater is desirable upon appointment.
A groundwater and distribution license will be required within one year of hire. Wisconsin
wastewater license will be required within one year of date of hire.
DUTIES AND RESPONSIBILITIES:
• Work will include the maintenance and repair of water distribution and wastewater
collection facilities.
• Work is performed independently under the supervision of the utility manager, head
wastewater operator, and utility foreman who assigns work and makes frequent
inspections to insure proper performance of work and adherence to city rules, department
policies along with state and federal guidelines.
• Performs Lab tests for both water and wastewater.
• Files appropriate paperwork as required by Wisconsin DNR and EPA both online and
hard copy.
• Maintains accurate water records including all pipe size and material.
• Advises Management on changes in DNR and EPA compliance standards.
• Works as a member of a small-sized crew in the maintenance, repair, and minor
construction of water mains/ wastewater collections and related appurtenances, and
performs emergency repair work, as necessary.
• Should also be able to work independently with little supervision.
• Troubleshoots SCADA problems and schedules repairs.
• Locate water and wastewater facilities in the field for Diggers Hotline.
• Inspects service and main installations. Also able to measure and make simple drawings
of installations.
• Maintains and repairs safety equipment used in water distribution operations.
• Operates, water pumps, portable generators, air hammers, and related equipment.
• Installs and tests water meters at high and low flows to insure adequate performance, and
maintains inventory of meters, parts, supplies, and materials.
• Lowers curb boxes; rebuilds manholes; locates mains, services, and related facilities.
• Performs other duties as assigned.
SKILLS, KNOWLEDGE, AND ABILITIES:
• Knowledge in the installation, maintenance and repair of water mains, services, and
related appurtenances desired.
• Knowledge of the various tools used in water distribution installation, maintenance, and
repair.
• Ability to understand and follow oral and written instructions.
• Ability to establish and maintain effective working relationships with management, other
employees, and the public.
• Ability to work from plans, blueprints, and diagrams.
• Ability to input information into computers and online form submission.
• Ability to perform heavy manual labor for extended periods and under all weather
conditions including confined space.
• Knowledge of hazards and safety precautions associated with working in a water
distribution department.
• Must possess and maintain a valid State of Wisconsin Commercial Driver’s License
within one year of hire.
• Ability to read and comprehend simple instructions, short correspondence, and memos.
Ability to write simple correspondence. Ability to effectively present information in one-
on-one and small group situations to customers, clients and other employees of the
organization.
• Ability to add, subtract, multiply, and divide in all units of measure, using whole
numbers, common fractions, and decimals. Ability to compute rate, ratio, and percent and
to draw and interpret bar graphs.
• Ability to apply common sense understanding to carry out detailed but uninvolved
written or oral instructions. Ability to deal with problems involving a few concrete
variables in standardized situations.
PHYSICAL REQUIREMENTS:
While performing the duties of this job, the employee is frequently required to talk, hear, stand,
walk, sit and use hands to handle or feel objects, tools, or controls. The employee is occasionally
required to reach with hands and arms, climb or balance, bend, lift, carry, push, pull, stoop,
kneel, crouch, crawl, twist and smell.
The employee must frequently lift and/or move up to 50 pounds. Specific vision abilities
required by this job include close vision, distance vision, color vision, peripheral vision, depth
perception, and the ability to adjust and focus.
WORK ENVIRONMENT:
The work environment characteristics described here are representative of those an employee
encounters while performing the essential functions of this job. Reasonable accommodations
may be made to enable individuals with disabilities to perform the essential functions.
While performing the duties of this job, the employee frequently works in outside conditions.
The employee occasionally works near moving mechanical parts, in high, precarious places, and
is frequently exposed to wet and/or humid conditions, and occasionally exposed to fumes or
airborne particles, toxic or caustic chemicals, extreme cold, extreme heat, risk of electrical shock,
risk of radiation, and vibration.
The noise level in the work environment is usually loud and at times very loud.
Oconto Falls Municipal Utility is an Equal Opportunity Employer. In compliance with the
Americans with Disabilities Act, the Utility will provide reasonable accommodations to qualified
individuals with disabilities and encourages both prospective employees and incumbents to
discuss potential accommodations with the employer.
OCONTO FALLS MUNICIPAL UTILITIES
500 N. Chestnut Avenue
P.O. Box 70
Oconto Falls, WI 54154
Source: City of Oconto Falls website. First collected Oct 20, 2026.