Village of Benton
December 07, 2022
Board Meeting Minutes
Members present: Scott Cruse, Chuck Wartner, John Perkins, David Ralph, Cal Robbins, Jill Knight,
Kenneth Farrey
Absent members:
Village employees present: Sonya Silvers, Eric Mowry, and Brian Hammill
Others Present: Dan Wackershauser. Jim Neyen, Jerry Cullen, Joe Slater
2022 BUDGET PUBLIC HEARING
The public hearing of the Benton Village Board was called to order by Village President, Scott Cruse, at
6:15 p.m. at 244 Ridge Avenue in the conference room of the Benton Business Incubator building on
Wednesday, December 7, 2022. In compliance with the open meeting law, proper notice of the meeting
had been posted in four public places; Benton State Bank, Benton Post Office, Benton Business
Incubator Building and the Zephyr Depot.
Discussion was held regarding the 2023 General Fund Budget.
Motion (Farrey, Perkins) to adjourn. Voice-all ayes. Carried. The Public hearing adjourned at 6:30 p.m.
REGULAR BOARD MEETING
The regular board meeting of the Benton Village Board was called to order by Village President, Scott
Cruse, at 6:30 p.m. in the conference room of the Benton Business Incubator Building at 244 Ridge
Avenue on Wednesday, December 07, 2022. In compliance with the open meeting law, proper notice of
the meeting had been posted in four public places; the Zephyr Depot, Benton State Bank, Benton Post
Office, and the Benton Business Incubator Building.
The minutes from the previous Village Board meeting were presented.
Motion (Farrey, Robbins) to approve the minutes from the regular Village Board meeting held on November
9, 2022. Roll-all ayes. Carried
Jim Neyen and Jerry Cullen from CS Technologies/Cuba City Telephone were present to update the
board on the fiber that will be coming to Benton. CS Technologies will need a central location with
electrical power and gas to place a 8’x10’ electrical hut for the fiber. The group met with Jim Goffinet
last week, who showed them a possible location for the electrical hut at 60 Water Street. The location is
exactly what they were looking for. They will need an agreement with the Village of Benton to put the
electrical hut on 60 Water Street, parcel#107.0170.0000 with either a lease or by donation. They would
place a concrete slab on the property, do a curb cut, and place a driveway. All expenses to install the hut
and driveway will be covered by CS Technologies. The fiber will be installed to every residence in the
Village, approximately 868 structures. The estimated timeline to start is the summer of 2023 and
possibly extending into 2024. Discussion was held and the Village of Benton will offer CS
Technologies/Cuba City Telephone a 99 year lease for 30’x50’ plot of land at 60 Water Street at no cost
for an 8’x10’ electrical hut to facilitate fiber to all Village residents. CS Technologies will also provide
fiber to the Village buildings and parks at no charge in exchange for the plot of land. The Village will
provide the mowing and weed maintenance around the hut. Further details will be in the agreement to
follow.
Motion (Knight, Farrey) to approve entering into an agreement with CS Technologies to offer a 99 year lease
for a 30’x50’ plot of land at 60 Water Street, parcel #107.0170.0000 at no cost for an 8’x10’ electrical hut to
facilitate fiber to all Village residents. CS Technologies will pay all expense related to installation of the
electrical hut and the driveway. CS Technologies will also provide fiber to the Village buildings and parks at
no charge in exchange for the plot of land. The Village will provide the mowing and weed maintenance
around the hut. Further details will be in the agreement to follow.
Roll-all ayes. Carried
Village of Benton
December 07, 2022
Board Meeting Minutes
Eric Mowry reported that they have been busy putting up the Christmas lights on Main Street and getting
all the equipment ready for the winter. Almost everything has been moved out of Swindler’s Ridge
Museum to storage.
Committee Reports:
Scott mentioned that a reduced pressure zone valve at the sewer plant needs to be replaced.
Estimated cost is $7,000 plus labor. This will be put on January’s agenda with more details to
follow.
Scott announced that the Village received the matching DNR Urban Forestry Tree Grant for
$5,000.
Chief Hammill is working on moving his office to the incubator building. He gave a brief stat update for
the month. More information will be coming from the County about the firewall and switch upgrade for
next year and whether that amount will be covered by the LEA grant. There is a Chief Training, January
23-27, 2023 in Madison, WI, that Chief Hammill has requested to attend. The Village would need to
cover the cost of transportation and food. 24 hours of training are required a year. Discussion was held.
Chief Hammill will coordinate with the County for coverage while he is at training. Discussion on the
police phone line was held and will be moved to a police committee meeting at a later date.
Motion (Robbins, Farrey) to approve Chief Hammill’s attendance to the Chief’s training in Madison, WI on
January 23-27, 2023. Roll-all ayes. Carried
Swindlers Ridge museum is 95% empty. The rest of the items will be moved out within the week. Sonya
called Alliant Energy to disconnect and remove the gas utility. Alliant stated it could take up to two
weeks before they could complete removal and no demolition can occur before then. Sonya will receive
a call when completed. The Village needs a DNR permit to raze the building because it is a commercial
building. An environmental study will then be completed. If asbestos is found a professional company
would be called in to remove the asbestos before the building can be razed. The cost of the testing and
removal of the asbestos will come out of the community center funds. Scott will reach out to Terry
Sheffer to see if the VFW is still interested in the windows and doors from the museum before the
building is razed.
Motion (Ralph, Wartner) to raze the Swindler’s Ridge Museum building at 25 W Main Street following the
DNR requirements. Roll-all ayes. Carried
Jill announced that the Village office and the Police Department will now be in the new community
center/library building.
Eric Mowry and Jim Goffinet requested to attend the MEUW Electric Operations Conference & Expo in
the WI Dells, January13-14, 2023.
Motion (Perkins, Robbins) to approve Eric Mowry and Jim Goffinet to attend the MEUW Electric Operations
Conference & Expo in the WI Dells, January 13-14, 2023. Roll-all ayes. Carried
John reported that he spoke with Keith Dalsing of KD Engineering. Keith is working on getting an
estimate of the cost of the Main Street water main project. There were some issues when the main was
Village of Benton
December 07, 2022
Board Meeting Minutes
replaced in 2003/2004 with valves and bolts being lower quality and are not holding up. Scott will
follow up with Keith.
Scott sent the 2028 state/municipal financial agreement for the state-let highway project from the
WisDOT to attorney Eileen Brownlee. Eileen stated there is not a lot of leverage with not fulfilling the
contract for road repaving project.
Motion (Wartner, Robbins) to approve signing of the contract from the WisDOT for the
state/municipal financial agreement for the state-let highway 2028 project. Roll-all ayes. Carried
Resolution #2022-02 was presented to the board to approve the authorization of the borrowing of the
$100,000 loan from Benton State Bank.
Motion (Farrey, Perkins) to approve Resolution #2022-02 of The Village Board authorizing
borrowing. Roll-all ayes. Carried
Resolution #2022-03 was presented to the board to approve exceeding the levy limit by $100,000.
Motion (Robbins, Farrey) to approve Resolution #2022-03 of The Village Board to propose
exceeding the levy limits. Roll-all ayes. Carried
The Final 2023 Budget was presented.
Motion (Knight, Wartner) to approve the 2023 final budget as presented. Roll-all ayes. Carried
The consulting contract for Ryan Carver will be go to a personnel meeting where more discussion will
be held. It will be placed on the agenda for January.
Pay the claims against the Village.
Motion (Knight, Wartner) to pay the claims against the Village. Roll-all ayes. Carried
Meeting adjourned at 7:56 p.m.