CITY OF ANTIGO
ADVERTISEMENT FOR BIDS
2019 Replacement of Concrete Masonry Sidewalks
The City of Antigo is accepting sealed bids for materials and workmanship
involved with the replacement of concrete masonry sidewalks. Information and
specifications may be obtained from the Public Works’ office, 700 Edison Street, Antigo,
WI 54409 or on the City website at www.antigo-city.org
Bid sheets should be submitted in a sealed envelope marked “Sidewalk Bids” to
the Clerk-Treasurer’s office, 700 Edison Street, Antigo, WI 54409, on Tuesday, May 14,
2019 by 10:00 a.m.
Bids will be opened at that time in the Public Works’ office at 700 Edison Street,
Antigo, WI 54409.
The City of Antigo reserves the right to reject any or all bids and to accept the bid
deemed most advantageous to the city. No bid may be withdrawn for a period of 30
days after the opening date.
Charley Brinkmeier
Surveyor/Project Manager
2019 CONCRETE SIDEWALK AND
DRIVEWAY REPLACEMENT PROGRAM
BID FORM
Bidder Info:
Date: _______________________________
Company: _________________________________________________________
Contact Name: ______________________________________________________
Address: __________________________________________________________
Phone: __________________________________________________________
E-Mail: ___________________________________________________________
Scope of Program :
Sidewalk and Driveway Replacement Program = Approximately 4200 Sq Ft
( See Map for Replacement Locations ).
Bid Price Must Include: Removal of Sidewalk and Driveway, Replacement of Existing
Concrete Sidewalk and Driveway, and Sealer.
All Work Shall Meet City of Antigo Specifations.
The Program Must be Completed by September 1, 2019
(see specifations regarding penalties for late completion).
Bid Price:
Total = (Price Per Sq Ft) ($) ______________ X 4200 sq ft = ($)__________________
DETAILED SPECIFICATIONS
REMOVE AND REPLACE 6” SIDEWALK AND DRIVEWAY APPROACHES
DESCRIPTION
This work will consist of removing and replacing concrete masonry sidewalks along with any necessary
driveway approaches, also removed by the contractor, of the dimensions and design as indicated on
Detail Sheet and placed in one course on the prepared subgrade or base, at the locations and to the
required lines and grades, all as shown on the plans and provided by the contract
Completion Date: September 15th.
MATERIALS
The materials furnished and used in the work will conform to the following requirements:
A. Concrete Masonry: Mix will be six (6) bags per yard, air content will be a minimum of 4%
and a maximum of 7%, maximum slump will be 4”.
B. Expansion Joint Material: Expansion joint filler will be performed cork or bituminous fiber
conforming to latest ASCII Specifications, Designation: M153, Types I, II, III.
EQUIPMENT
Equipment and tools necessary for performing all parts of the work are to be supplied by the contractor,
including barricades. They will be satisfactory as to design, capacity, and mechanical condition for the
purposes intended. Any equipment which is not maintained in full working order, or which as used by the
contractor is proven unsatisfactory, will be repaired, improved, replaced or supplemented to obtain the
progress and workmanship contemplated by the contract.
PREPARATION OF THE BASE
The base will be prepared by excavating to the required elevation of the bottom of the base. All soft or
unsuitable material will be removed and replaced with suitable material. 18” of granular backfill material
will be placed under the new 6" sidewalk. There will also be 18" of granular backfill material under the
new 6" driveway approach. These courses will be compacted thoroughly, wetting or drying as needed to
secure at least 95% of the maximum dry density at optimum moisture. The base will be finished to a fir m,
true surface and moistened immediately before the concrete is placed. The base will be sufficiently wide
enough to permit placing of forms and performing the required work. All base material will be furnished
by the contractor.
TREE ROOTS
Tree roots that have raised a sidewalk slab or driveway approach to be replaced will be cut by the
contractor at least six (6”) inches outside of the sidewalk or driveway area. All roots within six (6”)
inches of the sidewalk or driveway approach subgrade must be removed. Cuts will be made
perpendicular to the length of root and will be done in a manner so as not to splinter the wood. Cost of
this work will be included in price bid per square foot of 6” sidewalk removal and replacement.
SIDEWALK AND DRIVEWAY APPROACH THICKNESS
The thickness of all sidewalks and drive approaches under this contract will be 6” thick, and all public
corners and handicap ramps will be 6” thick.
FORMS
Forms will be cleaned and oiled each time they are used. Forms will remain in p lace for at least 24 hours
after concrete is placed. The forms will be smooth, free from warp, of sufficient strength to resist
springing out of shape and of a depth to conform to the depth of the proposed work. All foreign material
will be removed from forms that have been previously used. The forms used must be a full six (6") inches
in depth, and staked and set to establish lines, their upper edges conforming to the grade of the finished
work. The construction of sidewalks without forms is prohibited. The side pitch of sidewalks will be 1/4
inch per foot and shall slope toward the street. The driveway approach will pitch from the sidewalk to the
back of curb.
PLACING CONCRETE
Before placing concrete, the base and forms will be checked and approved by the Engineer or Inspector.
All water and mud will be removed from the subgrade before the concrete is placed. The concrete will be
placed on a moist sub-base, deposited to the proper depth, and consolidated and spaded sufficiently to
bring the mortar to the surface. All equipment for mixing and transporting the concrete will be cleaned; all
debris will be removed from the places to be occupied by the concrete and the forms will be thoroughly
oiled. No concrete that has partially hardened or been contaminated by foreign material will be deposited
on the work, nor will re-tempered concrete be used.
DRIVEWAY APPROACHES ABUTTING EXISTING SIDEWALK
Where new driveway approaches abuts any existing sidewalk, the Contractor will install one half (1/2")
inch coated reinforcement rods, eighteen (18") inches long, and at two (2') foot intervals. These will be
drilled nine (9") inches into the existing sidewalk with the remaining nine (9") inches extending into the
new pour. If this isn't feasible to do because of the thickness of the existing walk, the Contractor will
undermine the existing sidewalk two (2") along the new pour to assure stability.
ABUTTING EXISTING SIDEWALK
Where the new 6" sidewalk abuts an existing walk, the Contractor will install three ( 3) 1/2" coated
reinforcement rods twelve (12") inches long (drilled six (6") inches into the existing sidewalk and the
remaining six (6") inches will extend into the new pour). If this isn't feasible to do to the existing walk
because of its thickness, the Contractor will undermine the existing sidewalk two (2") inches under and
two (2") inches in.
SIDEWALK "SHUT-OFFS"
The Contractor will install a "shut-off" at the end of each concrete pour for sidewalk. This "shut-off" will
have an extra 1 1/2" board attached horizontally and centered along the six(6") inch shut-off. The keyed
side will protrude into the fresh pour of concrete.
FINISHING OF CONCRETE
The concrete will be struck off, then floated with a wood float until the surface has a true contour. The
surface will then be trowelled smooth and brushed with a calcimine brush dipped in water to roughen the
surface. Excessive trowelling will not be permitted. The edges at the sides and joints are to be rounded
with an edger or groover of 1/4” radius to prevent chipping.
CURING
As soon after finishing operations as the free water has disappeared, the concrete surface will be sealed
by spraying on it a uniform coating of curing material, meeting the requirements of Subsection 409.2.7.1
of Standard Specifications for Road and Bridge Construction, or an application of AK-2 concrete sealer or
equivalent, in such a manner as to provide a continuous water-impermeable film on the entire concrete
surface.
In order to ensure uniform consistency and dispersion of pigment in the curing material, it will be well
agitated in the supply drum immediately before transfer to the distributor and kept thorough ly agitated
during application.
The curing compound will be applied by means of power spraying equipment. The material will be
applied to form a uniform coverage at the rate of not less than one half gallon per 100 square feet of
surface area.
The curing compound may be applied in either one or two applications in accordance with the directions
of the manufacturer. However, if applied in two coatings, the second will be applied not later than 30
minutes after the first.
In the event the coating is damaged within 72 hours after being applied due to joint sawing operations or
otherwise, the affected areas will be re-coated without delay and at the same rate as prescribed above for
the original application.
Should the spraying equipment fail and duplicate spraying equipment is not immediately available, further
placing of concrete will be suspended until properly operating spraying equipment is provided, and the
portion of finished concrete not satisfactorily coated with the curing compound will be cured by other
means satisfactory to the Engineer.
Within 30 minutes after the forms have been removed, the edges of sidewalk will be coated with the
curing compound, applied at the same rate as on the surface. Hand operated sprayers may be used for
spraying the edges.
Failure to comply with the strict interpretation of this section will be cause for rej ection of the portion of the
work affected.
TRANSVERSE JOINTS
For sidewalks of uniform width, transverse joints will be constructed at right angles to the centerline of the
sidewalk. Transverse joints will be placed at intervals of approximately 5 feet and will be formed by
inserting a metal parting strip in the concrete after it has been struck off and consolidated and while the
concrete is still workable. Insertion of the metal parting strip will be 1/4 (one fourth) of the walk depth or 1
1/4 inches. The edges of the sidewalk along the forms, joints, and metal slab division forms will be
rounded with an edger of 1/4” radius. When the sidewalk is constructed in partial width slabs, transverse
joints in adjacent slabs will be placed in line with like joints in the previously constructed slabs.
DRIVEWAYS
In areas where sidewalks exist and new curb and gutter is being installed, all driveway approaches will be
“poured concrete”.
In areas where sidewalks DO NOT exist and new curb and gutter is being installed, all driveway
approaches will be replaced with bituminous pavement or concrete. The Property Owner has the right to
determine either bituminous pavement or concrete as replacement. Replacement will be up to the
property line or as determined by the Engineer or Inspector in the field.
Blacktop driveways behind new sidewalk: The Inspector will determine and mark, how far back the
asphalt drive (behind the new sidewalk) will be repaired. A total asphalt amount will be determined prior
to the bid process and it will be listed as a separate item on the bid sheet. The Contractor will saw - cut
the existing asphalt driveway where it is marked, remove the old asphalt, excavate out this area for 3” of
asphalt, compact this area and the Contractor will pave it with “surface material”.
These driveway approaches will be installed according to the Typical Sections and Detail Sheet in the
plans.
Payment for this will be paid at the contract unit price per square foot under its respective bid item.
CONTRACTION JOINTS
Contraction joints will be cut at intervals with 3/16 inch metal blades. These joints will be cut 1 1/2 inches
deep. Joints will be cut at approximately five foot intervals unless ordered otherwise by the Engineer.
EXPANSION JOINTS
Where walks are built up to the curb, either at crosswalks or in front of private property, a half (1/2) inch
bituminous expansion joint, the minimum width to be equal to the thickness of the walk, will be properly
installed between the curb and the walk. The expansion material will extend entirely through the concrete
so as to provide a half (1/2) inch separation between sidewalk and curb. The sidewalk surface when
abutting a curb will be 1/2 inch above the curb grade, unless surface drainage is affected in doing so.
Expansion joints will be placed wherever the new sidewalk abuts buildings, other rigid structures,
foundations, or as determined by the Engineer or the Inspector in the field. If concrete is poured between
the sidewalk and curb, 1/2 inch expansion joint is required continuously along the curb.
NOTE: Whenever the entire area between the back of curb and the right-of-way of a lot line is to be
constructed with concrete sidewalk and when a permanent structure is located within such area or on the
right-of-way or lot line, the sidewalk will be constructed first, after that area is finished and has set, the
area between the sidewalk and curb will then be constructed as to retain a uniform slope.
PROTECTION OF NEW SIDEWALK AND DRIVEWAY APPROACH
The Contractor will provide and use sufficient tarpaulins to completely cover all sections that have been
placed within the preceding twelve (12) hours. The Contractor will provide, erect, and maintain suitable
barricades to protect the finished surface. The Contractor will provide for a minimum of one finisher to
remain on the project site after final finishing of the sidewalks and driveway approaches until such time as
the concrete sidewalks and driveway approaches have hardened to resist surface scarr ing caused by
footprints, handprints, or any other type of imprint, malicious or otherwise. The cost for providing the
finisher will be included in the price per square foot of sidewalk and driveway approaches. Sections of
work damaged by traffic or other causes occurring prior to the acceptance of the work will be repaired or
replaced, as the Engineer may direct, by the Contractor at his own expense and in a manner satisfactory
to the Engineer.
CONTACT OF PROPERTY OWNERS
Prior to construction of sidewalks and driveway approaches, the contractor will be responsible for
contacting and giving notification to the property owners that no traffic will be allowed on the new
driveway approach for a minimum of seven (7) days following placement. All prope rty owners will be
given twenty-four (24) hours notice to remove the vehicles from their driveway.
DISPOSAL OF DEBRIS
The Contractor will remove all broken concrete, excess dirt, debris and the like created by his work and
dispose of it with his own resources. Removal and disposal of old concrete, etc. will be included in bid
price per square foot of sidewalk. All debris is to be removed daily. No stockpiling on the street is
allowed.
BACKFILLING AND RESTORING THE SITE OF THE WORK
After the concrete has cured and the forms removed, the spaces along the sides will backfilled with a
minimum of 4” of screened topsoil and thoroughly compacted to assure no settlement. If settlement
occurs along these areas, it will be the responsibility of the Contractor to backfill these areas again and
must meet approval of the Engineer or Inspector. Prior to backfilling along these areas all stones,
concrete, and any other debris will be removed by the Contractor. Said top soil will be free of lumps,
stones, sticks, or any other foreign materials, and must be approved by the Engineer or Inspector prior to
placement. The Contractor must furnish and haul all necessary backfill and top soil material and his
responsibility to determine such amounts. Any backfill or top soil material that is placed and not
acceptable to the Engineer or Inspector will be removed at the Contractor’s expense. However, any other
lawn damage adjacent to the construction project (equipment damage, etc.) will be repaired by the
Contractor in the same like manner as previously stated. The Contractor is advised to disturb as little as
possible of existing lawns. Restoration shall include topsoil, fertilizer, seeding, and mulch in all disturbed
areas. Seed mix must be approved by the Engineer or Inspector. All lawn areas disturbed will be seeded
- 1 pound per 400 square feet. The Contractor will restore the site of the work to a neat and workmanlike
condition. “REMOVED ONLY” means backfilled and restored by the Contractor.
PEDESTRIAN WALKWAYS AND INTERSECTIONS
The Contractor will be required to maintain pedestrian walkways throughout the job wherever sidewalks
now exists. If walks are removed, a gravel base must be placed and maintained until the sidewalk is
constructed. Crosswalks across all streets at all intersections must be maintained at all times.
STREET AND STOP SIGNS
In the event that the Contractor must remove a street or stop sign to facilitate the construction of the
sidewalk, he will replace it in the proper place and condition as specified by the Engineer or City Sign
Man.
PROPERTY IRONS
There are property irons existing in various locations of this project. Most of these irons are located at lot
corners, angle points or at points of curvature in the right-of-way. The Contractor will be responsible for
damage to any and all property irons. Any property irons that are bent, removed or damaged by the
Contractor will be replaced by a registered land surveyor at the Contractor’s expense.
CURB BOXES, MANHOLES AND WATER STOP BOXES
If curb boxes, manholes, or water stop boxes are encountered with the removal and replacement of
sidewalk, care should be taken to preserve them. If damage is done to any of the above mentioned items
through carelessness by the Contractor in their operations, he will immediately notify the Engineer or
Inspector. The Engineer or Inspector will notify the appropriate City Department and that department will
repair the damaged item. All labor, materials and equipment used in these repairs will be charged to the
Contractor.
STREET DAMAGE AND CLEANUP
The Contractor will be liable for any damage to streets caused by his operations. This also includes any
damage to the streets which occurs beyond the construction area, or along haul routes. The Contractor
will be responsible to clean up all mud, gravel, top dirt or debris from any street or haul route which was
deposited by his operations. The Contractor will be required to clean these streets daily if required by the
Engineer or Inspector at his expense.
SAWING OF CONCRETE
All saw cutting of concrete in this project as specified will be included in the bid price per square foot for
sidewalk.
PROTECTION DURING COLD WEATHER
Except by specific written authorization by the Engineer, concreting operations will not be continued when
a descending air temperature in the shade and away from artificial heat falls below 40 F., nor resumed
until an ascending air temperature in the shade and away from artificial heat reaches 35 F.
NO CONCRETE SHALL BE POURED AFTER SEPT 1ST
The City requires that all concrete be poured before the 1st day of September. The overall completion of
the program shall not exceed the 31st of September. Failure to meet either required deadline will result in
a $50.00 per day penalty until the deadlines are met.
IDENTIFICATION
The Contractor will imprint each end of a repaired or new section of walk with his stamp. The stamp will
have on it the Contractor’s name and current year.
METHOD OF MEASUREMENT
4” and 6” sidewalks and driveway approaches will be measured by area in square feet, and the quantity
measured for payment will be the amount actually completed and accepted in accordance with the terms
of this contract, computed from dimensions as shown on plans or as measured in the field by the
Engineer or Inspector along with the Contractor or his representative.
BASIS OF PAYMENT
The area measured as provided above, will be paid for at the contract unit price per square foot for the
items of 6” sidewalk and driveway approach removal and replacement under their respective bid items.
Partial payments for work which is complete and acceptable by the city shall be paid within a reasonable
time to the Contractor, if requested. A ten (10%) percent withholding quantity shall be held by the City for
retainer.
TESTS FOR CONCRETE SAMPLES
TESTING
The City reserves the right to test the concrete if we feel it is necessary.
OTHER CONDITIONS
The abutting property owner can repair the sidewalks themselves; therefore, the City cannot guarantee
any specific quantity. No claims of any sort will be allowed for deviation of quantities of work performed
from amounts listed in the proposal.
All work is to be inspected by a City employee. Any and all unsatisfactory work shall be fixed or replaced
by the contractor and at the contractor’s expense.
The Contractor will only remove sidewalk and driveway approaches, which have been marked by the
City. Any others will not be paid for.
All material removed under this contract will become the property of the Contractor, and will be disposed
of by the Contractor.
The latest edition of the State of Wisconsin, Department of Transportation, Standard Specifications for
Road and Bridge Construction will be considered a part of these specifications and its provisions apply
accept where specifically modified.
The Contractor warrants, and agrees, when signing this contract, that he will replace, within three (3)
years after final acceptance of the work under the contract, any work poured by him that develops
cracking, scaling, or spalling.
The City reserves the right to authorize work outside the target area. Such work will not exceed 20% of
the contract.