City Council Meeting - August 19, 2026
City of Amery · Polk County · meeting of Aug 19, 2026 · Agendas
Open the original document More from City of Amery
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Amery
COMMON COUNCIL MEETING AGENDA - AMENDED
The City of Amery does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in employment or provision of services, programs or activities.
NOTE: Upon reasonable notice, the City of Amery will accommodate the needs of disabled individuals through aids or services. For additional information or to request this service, contact the Clerk-Treasurer’s office at
(715) 268-3410 by Noon the previous day so that arrangements can be made.
Pursuant to Wisconsin Statutes 19.84, Notice is hereby given to the public that a meeting of the Common Council of the City of Amery will be held on:
August 19, 2026 at Amery City Hall - 104 Maple St. W, Amery, WI at 5:00 PM.
Call to Order
Pledge of Allegiance
Roll Call
Adoption of Agenda
*Although the public may speak on any item that is not included on this agenda as a “Public Hearing or Forum” the Council will not respond or discuss the
issue brought forward at this time. In accordance with open meeting laws the Council must notice an item on the agenda to take action on that matter.
Your comments will be considered and may be placed on a future agenda for further discussion. Any person wishing to submit a public comment digitally
may email them to Cityhall@amerywi.gov until noon of the day of the meeting. Although your comments will be presented to the Council they may or may
not be read aloud or discussed during the meeting. The Public Comment Portion will be limited to 3 minutes total per speaker with the total duration to be
at the Chair’s discretion. The council may act on any item that is noticed on the agenda.
Taylor Larson
Clerk/Treasurer
**Posted: August 13, 2026 and Amended August 17, 2026 on the City Website (www.amerywi.gov); and at Amery City Hall,
Amery Public Library, and the Amery Police Department.
Order of
Items
Agenda Item
1 Public Comment
2 Recreational Facility Use Agreement between the City of Amery and the Amery Pickleball Club for use of the
Pickleball Courts
3 Waiving Zoning Fees for Charitable Organizations Installing Temporary Access to Residences
4 Pay Application #24 for the Wastewater Treatment Plant
5 Pay Application #25 for the Wastewater Treatment Plant
6 Resolution 12-2026 Amending the Annual Budget the 2026 Sewer Utility (Fund 620) Budget
7 Council Comment
8 Closed Session – Wis. Stat. §19.85(1)(e) –Deliberating or negotiating the purchasing of public
properties, the investing of public funds, or conducting other specified public business, whenever
competitive or bargaining reasons require a closed session
-Development at 750 Sundance St
9 Open Session – Possible Action on Closed Session Agenda
10 Adjournment.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
TO: The Common Council of Amery
FROM: Alex Mansfield, City Administrator
DATE: 8/13/2026
RE: Pickleball Court Facility Use Agreement Renewal
Summary: Staff recommends that the City of Amery readopt the Recreational Facility Use Agreement
between the City of Amery and the Amery Pickleball Club for a one-year term beginning September 1,
2026 and ending August 31, 2027. All terms carry forward unchanged from the current agreement,
including the $1,000 annual fee, the scheduled court use at South Twin Park, and the insurance and
indemnification requirements.
Background: The Council approved the initial Recreational Facility Use Agreement in 2025. It granted
the Amery Pickleball Club scheduled use of the eight pickleball courts at South Twin Park while keeping a
portion of the courts open to the general public at all times. The agreement entered into in 2025
provides for optional annual renewal. No concerns regarding the agreement or its administration have
been brought before the City to date. The renewal carries the same terms:
• Regular use: Exclusive Club use of six of the eight courts, Monday through Friday, 8:00 a.m. to
12:00 p.m. The remaining two courts stay open to the public on a first-come, first-served basis.
• League and tournament use: Up to 12 full-day reservations of all eight courts per calendar year,
requested in writing at least 30 days in advance. The City may deny a request based on
previously scheduled events or other City obligations but will not unreasonably withhold
approval.
• Insurance and indemnification: The Club must carry commercial general liability coverage of at
least $1,000,000 per occurrence, name the City as an additional insured, and provide a
certificate of insurance before any full-day use. The Club indemnifies the City, and event
participants must sign a waiver.
• Term and termination: One year with optional annual renewals. Either party may terminate for
cause if the other fails to cure a material breach within 30 days of written notice.
Fiscal Impact: The Club will pay the City $1,000, due in full upon execution, to support maintenance,
repair, and the eventual resurfacing of the courts. The City's maintenance obligation is unchanged and
remains consistent with other public park facilities, so the fee offsets existing costs rather than adding
new ones.
Recommendation: Staff recommends that the Common Council approve readoption of the Recreational
Facility Use Agreement with the Amery Pickleball Club for the term of September 1, 2026 through
August 31, 2027, and authorize execution of the agreement on behalf of the City.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
TO: The Common Council of Amery
FROM: Taylor Larson, Zoning Administrator
DATE: 8/10/2026
RE: Policy Discussion and Possible Action – Waiving Zoning Fees for Charitable Organizations Installing
Temporary Access to Residences
Summary
Staff requests Council action to waive zoning permit fees when a charitable organization installs a
temporary, removable ramp or similar means of ingress and egress at a private residence to accommodate
an occupant with limited mobility. The waiver covers fees only. All applicable zoning standards continue
to apply, and the installation still requires a zoning permit application so the City retains a record of the
improvement. The Plan Commission reviewed this proposal at its June 25, 2026 meeting, concurred, and
recommended it to the Council.
Background
Service clubs, faith organizations, and nonprofit accessibility programs periodically build and donate
ramps for Amery residents who cannot safely enter or leave their homes. These installations are typically
modular or wood -framed units that rest on the g round or on surface blocking, are assembled in a day,
and are removed once the occupant no longer needs them or leaves the residence. The sponsoring
organization absorbs the material and labor cost, and the resident pays nothing.
Under the zoning code, a ramp is an improvement that requires a zoning permit so staff can verify
setbacks, right-of-way encroachment, and vision triangle clearance. That review remains appropriate. The
permit fee, however, falls on a volunteer -funded project that produces a direct public benefit at no cost
to the City, and the dollar amount is small enough that it generates more friction than revenue. Wis. Stat.
sec. 66.0628 requires that a fee imposed by a political subdivision bear a reasonable relations hip to the
service for which it is imposed. Nothing in that section obligates the City to charge a fee where the Council
determines the cost is better absorbed as a service to residents.
Staff recommends the waiver apply only where all of the following are met:
• The work is performed by a nonprofit, charitable, or service organization at no cost to the property
occupant.
• The ramp or lift is temporary and removable, meaning it is not set on frost footings or a permanent
foundation and can be dismantled without altering the structure of the dwelling.
• The installation serves an occupant of the dwelling with a documented mobility limitation.
• A zoning permit application is filed and approved before installation, at no charge, and the ramp
is removed within a reasonable period after it is no longer needed.
Fiscal Impact
Minimal. The City would receive only a few permits of this type in a given year, and the current zoning
permit fee under t he adopted fee schedule is $75 . Based on expected volume, the forgone revenue is
expected to be under $225 annually. Staff review time is unchanged, since the application is still filed and
reviewed. Building permit fees for permanent ramps are not affected and continue to be collected under
the existing contract with West Wisconsin Inspection Agency.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
Alternatives
Permanent ramps remain fully permitted and inspected. A ramp set on frost footings, poured piers, or a
permanent foundation, or one that is structurally attached to the dwelling, is permanent construction
subject to the Wisconsin Uniform Dwelling Code. Tho se projects require a building permit and the
associated inspections, and the fees for them are n ot waived under this proposal. For permanent ramps
footing depth, guard and handrail construction, landing dimensions, and slope are life -safety items that
warrant an inspector on site, and there is a real third-party inspection cost for that work.
The Council could instead take no action and continue charging the zoning permit fee on all ramps. This
preserves a small amount of revenue and avoids drawing a line between temporary and permanent
construction, at the cost of leaving a modest financial barrier in front of donated accessibility work.
The Council could also extend the waiver to building permit and inspection fees for permanent charitable
ramps. Unlike the zoning permit, the building permit carries an out -of-pocket cost to the City for
inspection services, and waiving it shifts that cost to the general fund rather than eliminating it.
Recommendation:
The Plan Commission voted to recommend that the City Council adopt the policy of not charging zoning
permit fees for charitable organizations seeking to install temporary means of egress/ingress to a
residential property. The City Administrator is recusing himself due to his membership in the Amery Lions
Club, one such charitable organization that performs this work.
Engineers | Architects | Planners | Sci entists
Short Elliott Hendrickson Inc., 8 09 North 8 th Street, Suite 205, Sheboygan, WI 53081
SEH is 100% employee-owned | sehinc.com | 920.287.0828 | 800.472.5881 | 888.90 8.8166 fax
August 5, 2026 RE: City of Amery
WWTP Improvements
SEH Project No. AMERY 178514
Taylor Larson
City of Amery Clerk/Treasurer
104 Maple St W, Suite A
Amery, WI 54001
Dear Taylor:
Attached is a signed Application for Payment No. 24 from Market & Johnson for work compl eted from
June 1, 2026 – June 30, 2026. This application includes payment for work primarily consisting of turf
establishment, SBR winch outlets, and Change Orders 5 and 6. I have reviewed this application f or
payment and believe it to accurately represent the work completed as presented by the contractor
through the above-mentioned date.
In accordance with the contract, after 50% of the work is completed, no further retainage is required on
completed work. However, retainage of 2.46% of completed work is being held for this pay period.
Additionally, retainage of 5% of stored materials is still being held. The itemized retaina ge percentages
are shown on page one of the attached payment request. The total requested amount is $33,652.55 for
which I recommend payment.
If you have any questions regarding this application for payment, please call me at 414-892 -4761.
Sincerely,
Kate Healy
Project Manager
8/5/26
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
01 99 00 5,000.00 - - 5,000.00
01 99 10 5,000.00 850.00 850.00 17% 4,150.00
01 99 20 50,000.00 - - 50,000.00
00 10 00 181,666.47 181,666.47 181,666.47 100% -
01 21 00 31,482.00 31,482.00 31,482.00 100% -
02 41 16 110,086.00 110,086.00 110,086.00 100% -
02 41 16 926,786.99 926,786.99 926,786.99 100% -
02 41 16 102,053.44 102,053.44 102,053.44 100% -
03 30 00 610,401.77 610,401.77 610,401.77 100% -
03 30 00 899,897.00 899,897.00 899,897.00 100% -
03 30 00 188,256.00 188,256.00 188,256.00 100% -
03 30 00 44,972.00 44,972.00 44,972.00 100% -
03 30 00 3,232.00 3,232.00 3,232.00 100% -
03 30 00 84,334.00 84,334.00 84,334.00 100% -
03 20 00 21,787.00 21,787.00 21,787.00 100% -
03 20 00 42,395.18 42,395.18 42,395.18 100% -
03 20 00 101,562.50 101,562.50 101,562.50 100% -
03 20 00 197,679.69 197,679.69 197,679.69 100% -
03 20 00 6,786.00 6,786.00 6,786.00 100% -
03 20 00 13,208.17 13,208.17 13,208.17 100% -
03 20 00 1,274.00 1,274.00 1,274.00 100% -
03 20 00 2,479.69 2,479.69 2,479.69 100% -
03 20 00 3,841.50 3,841.50 3,841.50 100% -
03 20 00 7,477.04 7,477.04 7,477.04 100% -
03 20 00 670.24 670.24 670.24 100% -
03 41 00 311,498.00 311,498.00 311,498.00 100% -
03 41 00 133,881.00 133,881.00 133,881.00 100% -
04 22 00 85,245.00 85,245.00 85,245.00 100% -
05 12 00 185,124.00 179,662.84 5,461.16 185,124.00 100% -
05 12 00 52,625.75 52,625.75 52,625.75 100% -
06 10 53 104,240.07 104,240.07 104,240.07 100% -
07 13 00 20,104.00 20,104.00 20,104.00 100% -
07 27 00 2,000.00 2,000.00 2,000.00 100% -
07 61 00 35,948.00 35,948.00 35,948.00 100% -
07 61 00 20,514.00 20,514.00 20,514.00 100% -
07 61 00 236,751.00 236,751.00 236,751.00 100% -
07 61 00 29,795.00 25,325.75 25,325.75 85% 4,469.25
07 92 00 16,280.00 16,280.00 16,280.00 100% -
08 11 13 & 08 16 00 & 08 71 00 40,876.00 40,876.00 40,876.00 100% -
08 31 13 13,665.00 13,665.00 13,665.00 100% -
08 36 13 16,731.00 16,731.00 16,731.00 100% -
08 43 00 & 8 80 00 5,213.00 5,213.00 5,213.00 100% -
08 45 00 47,217.00 47,217.00 47,217.00 100% -
09 30 00 6,000.00 6,000.00 6,000.00 100% -
09 51 13 2,460.00 2,460.00 2,460.00 100% -
09 97 20 3,660.00 3,660.00 3,660.00 100% -
09 97 20 10,540.00 10,540.00 10,540.00 100% -
Precast Wall and Plank Supply and Install Treatment Building (10)
Structural Steel Install
Sectional Steel Overhead Doors Supply and Install
Contractor's Application
Testing of Concrete
Mobilization
Temporary Facilities, Safety, Trucking, Equipment
Demolition Existing Structure Per Spec
Concrete Foundation Administration/Treatment Building (50)
G
%
(F / B)
Concrete Foundation Treatment Building (10)
Concrete Foundation Thin WAS and Centrate Storage (30)
Concrete Foundation SBR (15)
Concrete Foundation TWAS Storage (40)
Concrete Foundation Pumping Building (20)
24
7/6/2026
Bond & Insurances
A
Electric Service Upgrades Stated Allowance
Application Period: 6/1/2026-6/30/2026 Application Date:
Gas Service Modifications Stated Allowance
F
Project: Amery Wastewater Treatment Plant Improvements
Application Number:
Rebar Labor Administration/Treatment Building (50)
Precast Wall and Plank Supply and Install Pumping Building (20)
Aluminum-Framed Storefront & Translucent Wall and Roof Assemblies and Glazing
Acoustical Panel Ceilings
Joint Sealants
Hollow Metal & Corrosion Resistant Doors, Frames, and Hardware Material
Rebar Labor Treatment Building (10)
Rebar Material Treatment Building (10)
Rebar Labor SBR (15)
Rebar Material SBR (15)
Rebar Labor Pumping Building (20)
Rebar Material Administration/Treatment Building (50)
Rebar Material for CMU
City Shop SCADA Systems Allowance
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
Rebar Material Pumping Building (20)
Access Doors and Frames Material
Sheet Waterproofing
Air Barriers
Masonry Material & Labor Treatment Building (10)
Miscellaneous Rough Carpentry
Administration/Treatment Building Roofing (50)
Painting and Coating Treatment Building (10) Labor
Tiling
Rebar Labor Thin WAS and Centrate Storage (30)
Rebar Material Thin WAS and Centrate Storage (30)
Administration/Treatment Building Metal Wall Panels (50)
Structural Steel Framing
Aluminum-Framed Storefront & Glazing
Painting and Coating Treatment Building (10) Material
Treatment Building Roofing (10)
Pumping Building Roofing (20)
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
24
7/6/2026
A
Application Period: 6/1/2026-6/30/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
09 97 20 9,900.00 9,900.00 9,900.00 100% -
09 97 20 26,700.00 26,700.00 26,700.00 100% -
10 14 19 1,884.00 942.00 942.00 1,884.00 100% -
10 14 23 1,795.00 1,795.00 1,795.00 100% -
10 44 00 893.00 893.00 893.00 100% -
10 53 00 12,700.00 3,877.84 8,822.16 12,700.00 100% -
23 00 00 305,800.00 305,800.00 305,800.00 100% -
23 00 00 650,000.00 650,000.00 650,000.00 100% -
40 23 00 5,000.00 5,000.00 5,000.00 100% -
40 23 10 185,360.00 185,360.00 185,360.00 100% -
40 23 20 116,700.00 116,700.00 116,700.00 100% -
40 23 20 93,940.00 93,940.00 93,940.00 100% -
40 23 10 53,550.00 53,550.00 53,550.00 100% -
40 23 20 6,800.00 6,800.00 6,800.00 100% -
40 23 20 22,400.00 22,400.00 22,400.00 100% -
40 23 10 20.2B 95,300.00 95,300.00 95,300.00 100% -
40 23 10 20.2B 58,520.00 58,520.00 58,520.00 100% -
40 23 10 70,770.00 70,770.00 70,770.00 100% -
40 23 30 38,850.00 38,850.00 38,850.00 100% -
40 23 20 46,200.00 46,200.00 46,200.00 100% -
40 23 10 8,700.00 8,700.00 8,700.00 100% -
40 23 30 23,940.00 23,940.00 23,940.00 100% -
40 23 10 35,660.00 35,660.00 35,660.00 100% -
40 23 30 8,800.00 8,800.00 8,800.00 100% -
40 23 10 32,260.00 32,260.00 32,260.00 100% -
40 23 30 5,000.00 5,000.00 5,000.00 100% -
40 23 20 26,400.00 26,400.00 26,400.00 100% -
26 00 00 432,180.00 432,180.00 432,180.00 100% -
26 00 00 425,320.00 425,320.00 425,320.00 100% -
26 00 00 197,470.00 197,470.00 197,470.00 100% -
26 00 00 167,090.00 167,090.00 167,090.00 100% -
26 00 00 60,760.00 60,760.00 60,760.00 100% -
26 00 00 45,570.00 45,570.00 45,570.00 100% -
26 00 00 288,610.00 288,610.00 288,610.00 100% -
31 22 10 37,670.00 37,670.00 37,670.00 100% -
02 41 19 127,025.00 127,025.00 127,025.00 100% -
31 25 10 13,690.00 13,690.00 13,690.00 100% -
31 22 10 408,965.00 408,965.00 408,965.00 100% -
31 22 10 74,400.00 74,400.00 74,400.00 100% -
31 23 16 86,290.00 86,290.00 86,290.00 100% -
31 23 16 129,445.00 129,445.00 129,445.00 100% -
31 23 16 45,385.00 45,385.00 45,385.00 100% -
31 23 16 25,125.00 25,125.00 25,125.00 100% -
31 23 16 26,840.00 26,840.00 26,840.00 100% -
31 23 19 273,100.00 273,100.00 273,100.00 100% -
31 23 20 118,175.00 118,175.00 118,175.00 100% -
32 11 26 29,000.00 29,000.00 29,000.00 100% -
Process Valves Material Building (50)
Process Piping Install Building (50)
Process Valves Install Building (30)
Process Valves Material Building (15)
Painting and Coating Treatment Building (50) Labor
Site Demo
Dimensional Letter Signage and Plaques Material
Process Valves Material Building (10)
Safety Specialties Material
Panel Signage Material
Process Piping, Valves, Pump Install Building (10)
Process Piping Material Building (20)
St-A Hvac
Mobilization & General Conditions
Process Piping Material Building (10)
Process Piping & Valves Install Building (15)
McCabe Mob Charge
Dewatering
Preparing the Foundation Earth Retention
Process Piping Material Building (40)
Process Valves Install Building (40)
Stainless Piping Material Building (15)
Stainless Piping Material Install Building (15)
Process Valves Material Building (20)
Building 50 - Fill Cells
Weir Box Excavation & Backfill
Erosion Control/Restoration
Site Grading - Labor & Equipment
Site Grading - Material
Building 10 Excavation & Backfill
Building 15 Excavation & Backfill
Crushed Agg. Base Course - Labor and Equipment
Electrical Building 30
Electrical Building 40
Building 20 Excavation & Backfill
Electrical Building 50
Electrical Building 20
Site Electrical
Process Piping Material Building (15)
Electrical Building 15
Electrical Building 10
Process Piping, Valves, Pump Install Building (20)
Process Piping Material Building (30)
Painting and Coating Treatment Building (50) Material
Plumbing Building (10) Labor
Process Piping Material Building (50)
Architectural Canopies Supply and Install
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
24
7/6/2026
A
Application Period: 6/1/2026-6/30/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
32 11 26 15,000.00 15,000.00 15,000.00 100% -
33 05 20 73,920.00 73,920.00 73,920.00 100% -
33 05 20 7,000.00 7,000.00 7,000.00 100% -
33 11 00 25,185.00 25,185.00 25,185.00 100% -
33 11 00 13,300.00 13,300.00 13,300.00 100% -
33 31 00 50,000.00 50,000.00 50,000.00 100% -
33 31 00 50,000.00 50,000.00 50,000.00 100% -
33 41 00 5,880.00 5,880.00 5,880.00 100% -
33 41 00 4,500.00 4,500.00 4,500.00 100% -
33 42 20 8,550.00 8,550.00 8,550.00 100% -
33 42 20 12,000.00 12,000.00 12,000.00 100% -
40 23 00 279,610.00 279,610.00 279,610.00 100% -
40 23 00 80,000.00 80,000.00 80,000.00 100% -
32 12 18 42,890.00 42,890.00 42,890.00 100% -
32 12 18 98,925.00 98,925.00 98,925.00 100% -
32 18 40 64,860.39 64,860.39 64,860.39 100% -
32 92 12 20,000.00 6,000.00 14,000.00 20,000.00 100% -
32 31 13 39,781.00 39,781.00 39,781.00 100% -
40 05 59 25,040.00 25,040.00 25,040.00 100% -
40 23 00 275,435.12 275,435.12 275,435.12 100% -
41 22 00 92,224.00 92,224.00 92,224.00 100% -
43 21 15 87,640.00 87,640.00 87,640.00 100% -
43 21 36 89,970.00 89,970.00 89,970.00 100% -
46 21 39 171,960.00 171,960.00 171,960.00 100% -
46 23 63 322,000.00 322,000.00 322,000.00 100% -
46 23 63 69,000.00 69,000.00 69,000.00 100% -
46 53 53 2,387,822.00 2,387,822.00 2,387,822.00 100% -
46 66 00 169,000.00 169,000.00 169,000.00 100% -
46 71 33 379,879.00 379,879.00 379,879.00 100% -
98 00 00 32,136.36 32,136.36 32,136.36 100% -
98 00 01 8,228.25 8,228.25 8,228.25 100% -
98 00 02 7,089.55 7,089.55 7,089.55 100% -
98 00 03 27,041.22 27,041.22 27,041.22 100% -
98 00 04 27,695.38 27,695.38 27,695.38 100% -
98 00 05 1,675.40 1,675.40 1,675.40 100% -
98 00 06 12,205.62 12,205.62 12,205.62 100% -
98 00 07 1,853.38 1,853.38 1,853.38 100% -
98 00 08 3,621.27 3,621.27 3,621.27 100% -
98 00 09 1,833.94 1,833.94 1,833.94 100% -
98 00 10 210,798.22 210,798.22 210,798.22 100% -
98 00 11 (2,015.02) (2,015.02) (2,015.02) 100% -
98 00 12 18,249.00 18,249.00 18,249.00 100% -
98 00 13 5,265.24 5,265.24 5,265.24 100% -
98 00 14 16,577.46 16,577.46 16,577.46 100% -
98 00 15 12,825.88 12,825.88 12,825.88 100% -
98 00 16 (8,545.87) (8,545.87) (8,545.87) 100% -
98 00 17 8,026.41 8,026.41 8,026.41 100% -
Change Order #02 - COR 12
Change Order #02 - COR 13
Change Order #02 - COR 14
Change Order #02 - COR 15
Change Order #02 - COR 17
Grit Removal Equipment
Pipe Culverts - Labor & Equipment
Pipe Culverts - Materail
Exterior Process Piping - Labor & Equipment
Exterior Process Piping - Material
Strom Sewer System - Labor & Equipment
Turf Establishment
HDD Pipe Installation - Labor & Equipment
Change Order #01 - COR 03
Water Utilities - Labor & Equipment
Water Utilities - Material
Ultraviolet Light Disinfection Equipment
Lift Station - Labor & Equipment
Concrete Side Walks, Safety Isalnds and Steps
Chain Link Fence Material & Install
Equipment Install
Rotary Lobe Pumps
Fine Screening Equipment
TWAS Storage Tank Mixing System
SBR Treatment System
Crushed Agg. Base Course - Material
Sanitary Sewerage Utilities - Labor & Equipment
Sanitary Sewerage Utilities - Material
Monorails, Hoists, Trolleys and Davit Cranes
Strom Sewer System - Material
Submersible Pumps
Hydraulic Gates and Stop Plates
Rotary Drum Thickening Equipment
HDD Pipe Installation - Material
Hot Mix Asphalt Pavement
Change Order #04 - COR 19
Change Order #04 - COR 20
Change Order #01 - COR 06
Change Order #01 - COR 07
Change Order #03 - COR 11A
Change Order #01 - COR 05
Change Order #02 - COR 11B
Change Order #04 - COR 24
Change Order #04 - COR 25B
Change Order #04 - COR 25C
Change Order #04 - COR 26
Change Order #05 - COR 21 Realign 4" Yard Piping
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
24
7/6/2026
A
Application Period: 6/1/2026-6/30/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
98 00 18 2,299.23 2,299.23 2,299.23 100% -
98 00 19 34,685.08 34,685.08 34,685.08 100% -
98 00 20 3,996.81 3,996.81 3,996.81 100% -
98 00 21 6,612.89 6,612.89 6,612.89 100% -
98 00 22 8,928.59 - 8,928.59 8,928.59 100% -
98 00 23 3,970.09 3,970.09 3,970.09 100% -
98 00 24 17,068.34 17,068.34 17,068.34 100% -
98 00 25 645.64 645.64 645.64 100% -
98 00 26 1,276.50 1,276.50 1,276.50 100% -
98 00 27 (634.70) (634.70) (634.70) 100% -
98 00 28 3,979.43 3,979.43 3,979.43 100% -
98 00 29 6,564.11 6,564.11 6,564.11 100% -
98 00 30 8,898.07 8,898.07 8,898.07 100% -
98 00 31 2,563.78 2,563.78 2,563.78 100% -
98 00 32 5,720.89 5,720.89 5,720.89 100% -
98 00 33 12,118.11 12,118.11 12,118.11 100% -
98 00 34 21,954.63 21,954.63 21,954.63 100% -
98 00 35 5,637.48 5,637.48 5,637.48 100% -
98 00 36 700.56 700.56 700.56 100% -
98 00 37 21,341.95 21,341.95 21,341.95 100% -
98 00 38 (34,048.76) (34,048.76) (34,048.76) 100% -
98 00 39 5,340.25 5,340.25 5,340.25 100% -
98 00 40 2,576.71 2,576.71 2,576.71 100% -
98 00 41 10,636.44 10,636.44 10,636.44 100% -
98 00 42 7,883.19 7,883.19 7,883.19 100% -
98 00 43 6,118.54 6,118.54 6,118.54 100% -
98 00 44 1,878.23 1,878.23 1,878.23 100% -
98 00 45 586.95 586.95 586.95 100% -
98 00 46 37,555.71 37,555.71 37,555.71 100% -
98 00 47 1,840.43 1,840.43 1,840.43 100% -
98 00 48 (1,112.08) (1,112.08) (1,112.08) 100% -
98 00 49 8,239.94 8,239.94 8,239.94 100% -
98 00 50 4,603.93 4,603.93 4,603.93 100% -
98 00 51 3,829.81 3,829.81 3,829.81 100% -
98 00 52 29,775.17 29,775.17 29,775.17 100% -
98 00 53 (13,117.76) (13,117.76) (13,117.76) 100% -
98 00 54 3,176.54 3,176.54 3,176.54 100% -
98 00 55 4,024.96 4,024.96 4,024.96 100% -
98 00 56 7,371.76 - - 7,371.76
98 00 57 1,017.76 - 1,017.76 1,017.76 100% -
98 00 58 1,817.39 1,817.39 1,817.39 100% -
98 00 59 3,947.90 - 3,947.90 3,947.90 100% -
98 00 60 1,361.96 1,361.96 1,361.96 100% -
98 00 61 3,062.87 3,062.87 3,062.87 100% -
98 00 62 2,104.78 2,104.78 2,104.78 100% -
98 00 63 3,976.83 3,976.83 3,976.83 100% -
98 00 64 25,572.68 25,572.68 25,572.68 100% -
Change Order #05 - COR 37 RFI 102 Beam in north garage crawl space
Change Order #05 - COR 38 RFI #100 Water Line Connection in Building 50
Change Order #05 - COR 39 RFQ #08 WAS line to Building 30 Reroute
Change Order #05 - COR 41 RFI #107 Existing Garage Power Feed
Change Order #05 - COR 42 Additional Gas Piping on Building 50 Roof
Change Order #05 - COR 45 RFI 98&106 Sanitary hook-up and added trench drains
Change Order #05 - COR 46 RFI 86 Sludge Removal 30 and 60
Change Order #05 - COR 22 SN-15 and Sewer Pipe Location
Change Order #05 - COR 27R3 RFQ#07 Building 50 Doors and Openings
Change Order #05 - COR 28 RFI#97 Influent Sampler Location in Building 10
Change Order #05 - COR 29R1 FO #09 Flow Meter in Building 20
Change Order #05 - COR 32 RFI #80 SBR Winch Outlets
Change Order #05 - COR 33 RFI #81 Grit Equipment FV 1-11-1
Change Order #05 - COR 34 RFI #83 Panel 1-3-1 Level Transmitter
Change Order #05 - COR 35 RFI #82 Screening & Grit Room Fixture Location
Change Order #05 - COR 36 RFI #94 NPW Line from Building 10 to Building 50
Change Order #06 - COR 76 Fencing Removal
Change Order #05 - COR 52R1 RFQ 15 Driveway and Bollards
Change Order #05 - COR 53 RFQ 13 Keep blue silos and pump house
Change Order #05 - COR 54 RFQ 14 Fence Privacy Slats
Change Order #05 - COR 55 RFQ 12 RPZ Drain line in building 50
Change Order #05 - COR 56 RFQ 10 Trench drain in bldg 10/Rm 1012, including RPZ drain
Change Order #05 - COR 57 Needed reducers & spool piece for FCV 5-8-1
Change Order #05 - COR 58 Added 18” RCP and 48” Storm Manhole
Change Order #05 - COR 66 RFI #125 Painting Electrical Room
Change Order #06 - COR 75 Labor/Markup for COR #38 Water Line Connection Bldg 50
Change Order #06 - COR 70 Remove Existing 6" Valve
Change Order #06 - COR 71 Sludge Load Out Over Pressure Switch
Change Order #06 - COR 72 Building 10 LCS Power Source Modifications
Change Order #06 - COR 73 RFI #120 Control Panel Cut Outs in Building 10
Change Order #06 - COR 74 RFI #132 Power to Building 70 Pump House
Change Order #06 - COR 57R1 Accessories for FCV 5-81-1 CO5 Adjustment
Change Order #06 - COR 59 RFI #110 Process Piping Changes in Chemical Room
Change Order #06 - COR 62 RFI #108 Water Heater Building 50
Change Order #06 - COR 63A RFI #123 Exposed Site Piping
Change Order #06 - COR 64 RFQ #18 Driveway to Street
Change Order #06 - COR 65 RFI #131 Building 40 Stairs
Change Order #06 - COR 68 RFQ #17 Office Annex Receptacles
Change Order #06 - COR 40R2 RFQ #9 Building 20 Sludge Loadout Pipe
Change Order #06 - COR 44 RPZ Bypass Line in Building 10
Change Order #05 - COR 47 RFI 88 Existing Digester and Contaminated Soil
Change Order #05 - COR 48 RFI 99 Thin WAS Connection to RDT
Change Order #06 - COR 77 Workshop Receptacles
Change Order #06 - COR 78 UV Lifting Hooks
Change Order #06 - COR 79 Filtrate to Blue Silo
Change Order #05 - COR 49 RFI 113 Fuel Run from Building 50 to Building 20
Change Order #05 - COR 67 RFI #125 Painting Mechanical Room
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
24
7/6/2026
A
Application Period: 6/1/2026-6/30/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
98 00 65 (2,707.70) (2,707.70) (2,707.70) 100% -
98 00 66 2,024.80 - 2,024.80 2,024.80 100% -
98 00 67 3,497.51 3,497.51 3,497.51 100% -
98 00 68 1,708.01 - 1,708.01 1,708.01 100% -
98 00 69 2,025.49 - 2,025.49 2,025.49 100% -
- - -
15,629,459.41 15,509,590.54 33,652.55 15,225.32 15,558,468.41 100% 70,991.00
COR #88 - Additional Paving
Totals
Change Order #06 - COR 84 Filtrate FM Insulation 50 Driveway
Change Order #06 - COR 86 Effluent Sampler Flow Pacing Signal
Change Order #06 - COR 80 Doorway Saw Cutting Deduct
Change Order #06 - COR 81 Power Pole Access Gate
Engineers | Architects | Planners | Sci entists
Short Elliott Hendrickson Inc., 8 09 North 8 th Street, Suite 205, Sheboygan, WI 53081
SEH is 100% employee-owned | sehinc.com | 920.287.0828 | 800.472.5881 | 888.90 8.8166 fax
August 5, 2026 RE: City of Amery
WWTP Improvements
SEH Project No. AMERY 178514
Taylor Larson
City of Amery Clerk/Treasurer
104 Maple St W, Suite A
Amery, WI 54001
Dear Taylor:
Attached is a signed Application for Payment No. 25 from Market & Johnson for work compl eted from July
1, 2026 – July 31, 2026. This application includes payment for work consisting of administration building
metal wall panels. I have reviewed this application for payment and believe it to accurately represe nt the
work completed as presented by the contractor through the above-mentioned date.
In accordance with the contract, after 50% of the work is completed, no further retainage is required on
completed work. However, retainage of 2.46% of completed work is being held for this pay period.
Additionally, retainage of 5% of stored materials is still being held. The itemized retaina ge percentages
are shown on page one of the attached payment request. The total requested amount is $4,469.25 for
which I recommend payment.
If you have any questions regarding this application for payment, please call me at 414-892 -4761.
Sincerely,
Kate Healy
Project Manager
7/31/2026
Docusign Envelope ID: 1F754979-48A7-8BAD-83A9-2C1B6144082D
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
01 99 00 5,000.00 - - 5,000.00
01 99 10 5,000.00 850.00 850.00 17% 4,150.00
01 99 20 50,000.00 - - 50,000.00
00 10 00 181,666.47 181,666.47 181,666.47 100% -
01 21 00 31,482.00 31,482.00 31,482.00 100% -
02 41 16 110,086.00 110,086.00 110,086.00 100% -
02 41 16 926,786.99 926,786.99 926,786.99 100% -
02 41 16 102,053.44 102,053.44 102,053.44 100% -
03 30 00 610,401.77 610,401.77 610,401.77 100% -
03 30 00 899,897.00 899,897.00 899,897.00 100% -
03 30 00 188,256.00 188,256.00 188,256.00 100% -
03 30 00 44,972.00 44,972.00 44,972.00 100% -
03 30 00 3,232.00 3,232.00 3,232.00 100% -
03 30 00 84,334.00 84,334.00 84,334.00 100% -
03 20 00 21,787.00 21,787.00 21,787.00 100% -
03 20 00 42,395.18 42,395.18 42,395.18 100% -
03 20 00 101,562.50 101,562.50 101,562.50 100% -
03 20 00 197,679.69 197,679.69 197,679.69 100% -
03 20 00 6,786.00 6,786.00 6,786.00 100% -
03 20 00 13,208.17 13,208.17 13,208.17 100% -
03 20 00 1,274.00 1,274.00 1,274.00 100% -
03 20 00 2,479.69 2,479.69 2,479.69 100% -
03 20 00 3,841.50 3,841.50 3,841.50 100% -
03 20 00 7,477.04 7,477.04 7,477.04 100% -
03 20 00 670.24 670.24 670.24 100% -
03 41 00 311,498.00 311,498.00 311,498.00 100% -
03 41 00 133,881.00 133,881.00 133,881.00 100% -
04 22 00 85,245.00 85,245.00 85,245.00 100% -
05 12 00 185,124.00 179,662.84 5,461.16 185,124.00 100% -
05 12 00 52,625.75 52,625.75 52,625.75 100% -
06 10 53 104,240.07 104,240.07 104,240.07 100% -
07 13 00 20,104.00 20,104.00 20,104.00 100% -
07 27 00 2,000.00 2,000.00 2,000.00 100% -
07 61 00 35,948.00 35,948.00 35,948.00 100% -
07 61 00 20,514.00 20,514.00 20,514.00 100% -
07 61 00 236,751.00 236,751.00 236,751.00 100% -
07 61 00 29,795.00 25,325.75 4,469.25 29,795.00 100% -
07 92 00 16,280.00 16,280.00 16,280.00 100% -
08 11 13 & 08 16 00 & 08 71 00 40,876.00 40,876.00 40,876.00 100% -
08 31 13 13,665.00 13,665.00 13,665.00 100% -
08 36 13 16,731.00 16,731.00 16,731.00 100% -
08 43 00 & 8 80 00 5,213.00 5,213.00 5,213.00 100% -
08 45 00 47,217.00 47,217.00 47,217.00 100% -
09 30 00 6,000.00 6,000.00 6,000.00 100% -
09 51 13 2,460.00 2,460.00 2,460.00 100% -
09 97 20 3,660.00 3,660.00 3,660.00 100% -
09 97 20 10,540.00 10,540.00 10,540.00 100% -
Rebar Labor Thin WAS and Centrate Storage (30)
Rebar Material Thin WAS and Centrate Storage (30)
Administration/Treatment Building Metal Wall Panels (50)
Structural Steel Framing
Aluminum-Framed Storefront & Glazing
Painting and Coating Treatment Building (10) Material
Treatment Building Roofing (10)
Pumping Building Roofing (20)
E Work Completed
Rebar Material Pumping Building (20)
Access Doors and Frames Material
Sheet Waterproofing
Air Barriers
Masonry Material & Labor Treatment Building (10)
Miscellaneous Rough Carpentry
Administration/Treatment Building Roofing (50)
Painting and Coating Treatment Building (10) Labor
Tiling
F
Project: Amery Wastewater Treatment Plant Improvements
Application Number:
Rebar Labor Administration/Treatment Building (50)
Precast Wall and Plank Supply and Install Pumping Building (20)
Aluminum-Framed Storefront & Translucent Wall and Roof Assemblies and Glazing
Acoustical Panel Ceilings
Joint Sealants
Hollow Metal & Corrosion Resistant Doors, Frames, and Hardware Material
Rebar Labor Treatment Building (10)
Rebar Material Treatment Building (10)
Rebar Labor SBR (15)
Rebar Material SBR (15)
Rebar Labor Pumping Building (20)
Rebar Material Administration/Treatment Building (50)
Rebar Material for CMU
City Shop SCADA Systems Allowance
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
Contractor's Application
Testing of Concrete
Mobilization
Temporary Facilities, Safety, Trucking, Equipment
Demolition Existing Structure Per Spec
Concrete Foundation Administration/Treatment Building (50)
G
%
(F / B)
Concrete Foundation Treatment Building (10)
Concrete Foundation Thin WAS and Centrate Storage (30)
Concrete Foundation SBR (15)
Concrete Foundation TWAS Storage (40)
Concrete Foundation Pumping Building (20)
25
8/3/2026
Bond & Insurances
A
Electric Service Upgrades Stated Allowance
Application Period: 7/1/2026 - 7/31/2026 Application Date:
Gas Service Modifications Stated Allowance
Precast Wall and Plank Supply and Install Treatment Building (10)
Structural Steel Install
Sectional Steel Overhead Doors Supply and Install
Docusign Envelope ID: 1F754979-48A7-8BAD-83A9-2C1B6144082D
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
E Work Completed F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
Contractor's Application
G
%
(F / B)
25
8/3/2026
A
Application Period: 7/1/2026 - 7/31/2026 Application Date:
09 97 20 9,900.00 9,900.00 9,900.00 100% -
09 97 20 26,700.00 26,700.00 26,700.00 100% -
10 14 19 1,884.00 942.00 942.00 1,884.00 100% -
10 14 23 1,795.00 1,795.00 1,795.00 100% -
10 44 00 893.00 893.00 893.00 100% -
10 53 00 12,700.00 3,877.84 8,822.16 12,700.00 100% -
23 00 00 305,800.00 305,800.00 305,800.00 100% -
23 00 00 650,000.00 650,000.00 650,000.00 100% -
40 23 00 5,000.00 5,000.00 5,000.00 100% -
40 23 10 185,360.00 185,360.00 185,360.00 100% -
40 23 20 116,700.00 116,700.00 116,700.00 100% -
40 23 20 93,940.00 93,940.00 93,940.00 100% -
40 23 10 53,550.00 53,550.00 53,550.00 100% -
40 23 20 6,800.00 6,800.00 6,800.00 100% -
40 23 20 22,400.00 22,400.00 22,400.00 100% -
40 23 10 20.2B 95,300.00 95,300.00 95,300.00 100% -
40 23 10 20.2B 58,520.00 58,520.00 58,520.00 100% -
40 23 10 70,770.00 70,770.00 70,770.00 100% -
40 23 30 38,850.00 38,850.00 38,850.00 100% -
40 23 20 46,200.00 46,200.00 46,200.00 100% -
40 23 10 8,700.00 8,700.00 8,700.00 100% -
40 23 30 23,940.00 23,940.00 23,940.00 100% -
40 23 10 35,660.00 35,660.00 35,660.00 100% -
40 23 30 8,800.00 8,800.00 8,800.00 100% -
40 23 10 32,260.00 32,260.00 32,260.00 100% -
40 23 30 5,000.00 5,000.00 5,000.00 100% -
40 23 20 26,400.00 26,400.00 26,400.00 100% -
26 00 00 432,180.00 432,180.00 432,180.00 100% -
26 00 00 425,320.00 425,320.00 425,320.00 100% -
26 00 00 197,470.00 197,470.00 197,470.00 100% -
26 00 00 167,090.00 167,090.00 167,090.00 100% -
26 00 00 60,760.00 60,760.00 60,760.00 100% -
26 00 00 45,570.00 45,570.00 45,570.00 100% -
26 00 00 288,610.00 288,610.00 288,610.00 100% -
31 22 10 37,670.00 37,670.00 37,670.00 100% -
02 41 19 127,025.00 127,025.00 127,025.00 100% -
31 25 10 13,690.00 13,690.00 13,690.00 100% -
31 22 10 408,965.00 408,965.00 408,965.00 100% -
31 22 10 74,400.00 74,400.00 74,400.00 100% -
31 23 16 86,290.00 86,290.00 86,290.00 100% -
31 23 16 129,445.00 129,445.00 129,445.00 100% -
31 23 16 45,385.00 45,385.00 45,385.00 100% -
31 23 16 25,125.00 25,125.00 25,125.00 100% -
31 23 16 26,840.00 26,840.00 26,840.00 100% -
31 23 19 273,100.00 273,100.00 273,100.00 100% -
31 23 20 118,175.00 118,175.00 118,175.00 100% -
32 11 26 29,000.00 29,000.00 29,000.00 100% -
Plumbing Building (10) Labor
Process Piping Material Building (50)
Architectural Canopies Supply and Install
Electrical Building 30
Electrical Building 40
Building 20 Excavation & Backfill
Electrical Building 50
Electrical Building 20
Site Electrical
Process Piping Material Building (15)
Electrical Building 15
Electrical Building 10
Process Piping, Valves, Pump Install Building (20)
Process Piping Material Building (30)
Painting and Coating Treatment Building (50) Material
Building 50 - Fill Cells
Weir Box Excavation & Backfill
Erosion Control/Restoration
Site Grading - Labor & Equipment
Site Grading - Material
Building 10 Excavation & Backfill
Building 15 Excavation & Backfill
Crushed Agg. Base Course - Labor and Equipment
Dimensional Letter Signage and Plaques Material
Process Valves Material Building (10)
Safety Specialties Material
Panel Signage Material
Process Piping, Valves, Pump Install Building (10)
Process Piping Material Building (20)
St-A Hvac
Mobilization & General Conditions
Process Piping Material Building (10)
Process Piping & Valves Install Building (15)
McCabe Mob Charge
Dewatering
Preparing the Foundation Earth Retention
Process Piping Material Building (40)
Process Valves Install Building (40)
Stainless Piping Material Building (15)
Stainless Piping Material Install Building (15)
Process Valves Material Building (20)
Process Valves Material Building (50)
Process Piping Install Building (50)
Process Valves Install Building (30)
Process Valves Material Building (15)
Painting and Coating Treatment Building (50) Labor
Site Demo
Docusign Envelope ID: 1F754979-48A7-8BAD-83A9-2C1B6144082D
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
E Work Completed F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
Contractor's Application
G
%
(F / B)
25
8/3/2026
A
Application Period: 7/1/2026 - 7/31/2026 Application Date:
32 11 26 15,000.00 15,000.00 15,000.00 100% -
33 05 20 73,920.00 73,920.00 73,920.00 100% -
33 05 20 7,000.00 7,000.00 7,000.00 100% -
33 11 00 25,185.00 25,185.00 25,185.00 100% -
33 11 00 13,300.00 13,300.00 13,300.00 100% -
33 31 00 50,000.00 50,000.00 50,000.00 100% -
33 31 00 50,000.00 50,000.00 50,000.00 100% -
33 41 00 5,880.00 5,880.00 5,880.00 100% -
33 41 00 4,500.00 4,500.00 4,500.00 100% -
33 42 20 8,550.00 8,550.00 8,550.00 100% -
33 42 20 12,000.00 12,000.00 12,000.00 100% -
40 23 00 279,610.00 279,610.00 279,610.00 100% -
40 23 00 80,000.00 80,000.00 80,000.00 100% -
32 12 18 42,890.00 42,890.00 42,890.00 100% -
32 12 18 98,925.00 98,925.00 98,925.00 100% -
32 18 40 64,860.39 64,860.39 64,860.39 100% -
32 92 12 20,000.00 20,000.00 20,000.00 100% -
32 31 13 39,781.00 39,781.00 39,781.00 100% -
40 05 59 25,040.00 25,040.00 25,040.00 100% -
40 23 00 275,435.12 275,435.12 275,435.12 100% -
41 22 00 92,224.00 92,224.00 92,224.00 100% -
43 21 15 87,640.00 87,640.00 87,640.00 100% -
43 21 36 89,970.00 89,970.00 89,970.00 100% -
46 21 39 171,960.00 171,960.00 171,960.00 100% -
46 23 63 322,000.00 322,000.00 322,000.00 100% -
46 23 63 69,000.00 69,000.00 69,000.00 100% -
46 53 53 2,387,822.00 2,387,822.00 2,387,822.00 100% -
46 66 00 169,000.00 169,000.00 169,000.00 100% -
46 71 33 379,879.00 379,879.00 379,879.00 100% -
98 00 00 32,136.36 32,136.36 32,136.36 100% -
98 00 01 8,228.25 8,228.25 8,228.25 100% -
98 00 02 7,089.55 7,089.55 7,089.55 100% -
98 00 03 27,041.22 27,041.22 27,041.22 100% -
98 00 04 27,695.38 27,695.38 27,695.38 100% -
98 00 05 1,675.40 1,675.40 1,675.40 100% -
98 00 06 12,205.62 12,205.62 12,205.62 100% -
98 00 07 1,853.38 1,853.38 1,853.38 100% -
98 00 08 3,621.27 3,621.27 3,621.27 100% -
98 00 09 1,833.94 1,833.94 1,833.94 100% -
98 00 10 210,798.22 210,798.22 210,798.22 100% -
98 00 11 (2,015.02) (2,015.02) (2,015.02) 100% -
98 00 12 18,249.00 18,249.00 18,249.00 100% -
98 00 13 5,265.24 5,265.24 5,265.24 100% -
98 00 14 16,577.46 16,577.46 16,577.46 100% -
98 00 15 12,825.88 12,825.88 12,825.88 100% -
98 00 16 (8,545.87) (8,545.87) (8,545.87) 100% -
98 00 17 8,026.41 8,026.41 8,026.41 100% -
Change Order #04 - COR 24
Change Order #04 - COR 25B
Change Order #04 - COR 25C
Change Order #04 - COR 26
Change Order #05 - COR 21 Realign 4" Yard Piping
Change Order #04 - COR 19
Change Order #04 - COR 20
Change Order #01 - COR 06
Change Order #01 - COR 07
Change Order #03 - COR 11A
Change Order #01 - COR 05
Change Order #02 - COR 11B
Hot Mix Asphalt Pavement
Chain Link Fence Material & Install
Equipment Install
Rotary Lobe Pumps
Fine Screening Equipment
TWAS Storage Tank Mixing System
SBR Treatment System
Crushed Agg. Base Course - Material
Sanitary Sewerage Utilities - Labor & Equipment
Sanitary Sewerage Utilities - Material
Monorails, Hoists, Trolleys and Davit Cranes
Strom Sewer System - Material
Submersible Pumps
Hydraulic Gates and Stop Plates
Rotary Drum Thickening Equipment
HDD Pipe Installation - Material
Water Utilities - Labor & Equipment
Water Utilities - Material
Ultraviolet Light Disinfection Equipment
Lift Station - Labor & Equipment
Concrete Side Walks, Safety Isalnds and Steps
Change Order #02 - COR 12
Change Order #02 - COR 13
Change Order #02 - COR 14
Change Order #02 - COR 15
Change Order #02 - COR 17
Grit Removal Equipment
Pipe Culverts - Labor & Equipment
Pipe Culverts - Materail
Exterior Process Piping - Labor & Equipment
Exterior Process Piping - Material
Strom Sewer System - Labor & Equipment
Turf Establishment
HDD Pipe Installation - Labor & Equipment
Change Order #01 - COR 03
Docusign Envelope ID: 1F754979-48A7-8BAD-83A9-2C1B6144082D
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
E Work Completed F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
Contractor's Application
G
%
(F / B)
25
8/3/2026
A
Application Period: 7/1/2026 - 7/31/2026 Application Date:
98 00 18 2,299.23 2,299.23 2,299.23 100% -
98 00 19 34,685.08 34,685.08 34,685.08 100% -
98 00 20 3,996.81 3,996.81 3,996.81 100% -
98 00 21 6,612.89 6,612.89 6,612.89 100% -
98 00 22 8,928.59 8,928.59 8,928.59 100% -
98 00 23 3,970.09 3,970.09 3,970.09 100% -
98 00 24 17,068.34 17,068.34 17,068.34 100% -
98 00 25 645.64 645.64 645.64 100% -
98 00 26 1,276.50 1,276.50 1,276.50 100% -
98 00 27 (634.70) (634.70) (634.70) 100% -
98 00 28 3,979.43 3,979.43 3,979.43 100% -
98 00 29 6,564.11 6,564.11 6,564.11 100% -
98 00 30 8,898.07 8,898.07 8,898.07 100% -
98 00 31 2,563.78 2,563.78 2,563.78 100% -
98 00 32 5,720.89 5,720.89 5,720.89 100% -
98 00 33 12,118.11 12,118.11 12,118.11 100% -
98 00 34 21,954.63 21,954.63 21,954.63 100% -
98 00 35 5,637.48 5,637.48 5,637.48 100% -
98 00 36 700.56 700.56 700.56 100% -
98 00 37 21,341.95 21,341.95 21,341.95 100% -
98 00 38 (34,048.76) (34,048.76) (34,048.76) 100% -
98 00 39 5,340.25 5,340.25 5,340.25 100% -
98 00 40 2,576.71 2,576.71 2,576.71 100% -
98 00 41 10,636.44 10,636.44 10,636.44 100% -
98 00 42 7,883.19 7,883.19 7,883.19 100% -
98 00 43 6,118.54 6,118.54 6,118.54 100% -
98 00 44 1,878.23 1,878.23 1,878.23 100% -
98 00 45 586.95 586.95 586.95 100% -
98 00 46 37,555.71 37,555.71 37,555.71 100% -
98 00 47 1,840.43 1,840.43 1,840.43 100% -
98 00 48 (1,112.08) (1,112.08) (1,112.08) 100% -
98 00 49 8,239.94 8,239.94 8,239.94 100% -
98 00 50 4,603.93 4,603.93 4,603.93 100% -
98 00 51 3,829.81 3,829.81 3,829.81 100% -
98 00 52 29,775.17 29,775.17 29,775.17 100% -
98 00 53 (13,117.76) (13,117.76) (13,117.76) 100% -
98 00 54 3,176.54 3,176.54 3,176.54 100% -
98 00 55 4,024.96 4,024.96 4,024.96 100% -
98 00 56 7,371.76 - - 7,371.76
98 00 57 1,017.76 1,017.76 1,017.76 100% -
98 00 58 1,817.39 1,817.39 1,817.39 100% -
98 00 59 3,947.90 3,947.90 3,947.90 100% -
98 00 60 1,361.96 1,361.96 1,361.96 100% -
98 00 61 3,062.87 3,062.87 3,062.87 100% -
98 00 62 2,104.78 2,104.78 2,104.78 100% -
98 00 63 3,976.83 3,976.83 3,976.83 100% -
98 00 64 25,572.68 25,572.68 25,572.68 100% -
Change Order #06 - COR 40R2 RFQ #9 Building 20 Sludge Loadout Pipe
Change Order #06 - COR 44 RPZ Bypass Line in Building 10
Change Order #05 - COR 47 RFI 88 Existing Digester and Contaminated Soil
Change Order #05 - COR 48 RFI 99 Thin WAS Connection to RDT
Change Order #06 - COR 77 Workshop Receptacles
Change Order #06 - COR 78 UV Lifting Hooks
Change Order #06 - COR 79 Filtrate to Blue Silo
Change Order #05 - COR 49 RFI 113 Fuel Run from Building 50 to Building 20
Change Order #05 - COR 67 RFI #125 Painting Mechanical Room
Change Order #06 - COR 76 Fencing Removal
Change Order #05 - COR 52R1 RFQ 15 Driveway and Bollards
Change Order #05 - COR 53 RFQ 13 Keep blue silos and pump house
Change Order #05 - COR 54 RFQ 14 Fence Privacy Slats
Change Order #05 - COR 55 RFQ 12 RPZ Drain line in building 50
Change Order #05 - COR 56 RFQ 10 Trench drain in bldg 10/Rm 1012, including RPZ drain
Change Order #05 - COR 57 Needed reducers & spool piece for FCV 5-8-1
Change Order #05 - COR 58 Added 18” RCP and 48” Storm Manhole
Change Order #05 - COR 66 RFI #125 Painting Electrical Room
Change Order #06 - COR 75 Labor/Markup for COR #38 Water Line Connection Bldg 50
Change Order #06 - COR 70 Remove Existing 6" Valve
Change Order #06 - COR 71 Sludge Load Out Over Pressure Switch
Change Order #06 - COR 72 Building 10 LCS Power Source Modifications
Change Order #06 - COR 73 RFI #120 Control Panel Cut Outs in Building 10
Change Order #06 - COR 74 RFI #132 Power to Building 70 Pump House
Change Order #06 - COR 57R1 Accessories for FCV 5-81-1 CO5 Adjustment
Change Order #06 - COR 59 RFI #110 Process Piping Changes in Chemical Room
Change Order #06 - COR 62 RFI #108 Water Heater Building 50
Change Order #06 - COR 63A RFI #123 Exposed Site Piping
Change Order #06 - COR 64 RFQ #18 Driveway to Street
Change Order #06 - COR 65 RFI #131 Building 40 Stairs
Change Order #06 - COR 68 RFQ #17 Office Annex Receptacles
Change Order #05 - COR 37 RFI 102 Beam in north garage crawl space
Change Order #05 - COR 38 RFI #100 Water Line Connection in Building 50
Change Order #05 - COR 39 RFQ #08 WAS line to Building 30 Reroute
Change Order #05 - COR 41 RFI #107 Existing Garage Power Feed
Change Order #05 - COR 42 Additional Gas Piping on Building 50 Roof
Change Order #05 - COR 45 RFI 98&106 Sanitary hook-up and added trench drains
Change Order #05 - COR 46 RFI 86 Sludge Removal 30 and 60
Change Order #05 - COR 22 SN-15 and Sewer Pipe Location
Change Order #05 - COR 27R3 RFQ#07 Building 50 Doors and Openings
Change Order #05 - COR 28 RFI#97 Influent Sampler Location in Building 10
Change Order #05 - COR 29R1 FO #09 Flow Meter in Building 20
Change Order #05 - COR 32 RFI #80 SBR Winch Outlets
Change Order #05 - COR 33 RFI #81 Grit Equipment FV 1-11-1
Change Order #05 - COR 34 RFI #83 Panel 1-3-1 Level Transmitter
Change Order #05 - COR 35 RFI #82 Screening & Grit Room Fixture Location
Change Order #05 - COR 36 RFI #94 NPW Line from Building 10 to Building 50
Docusign Envelope ID: 1F754979-48A7-8BAD-83A9-2C1B6144082D
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Finish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
E Work Completed F
Project: Amery Wastewater Treatment Plant Improvements Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
Contractor's Application
G
%
(F / B)
25
8/3/2026
A
Application Period: 7/1/2026 - 7/31/2026 Application Date:
98 00 65 (2,707.70) (2,707.70) (2,707.70) 100% -
98 00 66 2,024.80 2,024.80 2,024.80 100% -
98 00 67 3,497.51 3,497.51 3,497.51 100% -
98 00 68 1,708.01 1,708.01 1,708.01 100% -
98 00 69 2,025.49 2,025.49 2,025.49 100% -
- - -
15,629,459.41 15,543,243.09 4,469.25 15,225.32 15,562,937.66 100% 66,521.75
Change Order #06 - COR 80 Doorway Saw Cutting Deduct
Change Order #06 - COR 81 Power Pole Access Gate
Change Order #06 - COR 84 Filtrate FM Insulation 50 Driveway
Change Order #06 - COR 86 Effluent Sampler Flow Pacing Signal
Totals
COR #88 - Additional Paving
Docusign Envelope ID: 1F754979-48A7-8BAD-83A9-2C1B6144082D
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
TO: The Common Council of Amery
FROM: Alex Mansfield, City Administrator
DATE: August 10, 2026
RE: FY2026 Sewer Utility (Fund 620) Budget Status and Hyland Street Sewer Main Relining
SUMMARY
The Council has two decisions to make about the Sewer Utility (Fund 620).
First, our sewer cleaning contractor found a sewer main on Hyland Street that may be collapsing. They
believe it needs to be relined now. The estimated cost is $40,000.
Second, staff reviewed all sewer fund activity through August 10. Revenue is running well ahead of budget.
So are debt payments, operating, and capital costs. The 2026 budget needs to be updated to reflect both.
Staff recommends approving the Hyland Street work and amending the sewer budget to match what is
actually happening. The amendment adds more revenue than expense. Even so, spending will exceed
revenue by about $17,000 this year. The utility has enough cash on hand to cover that.
BACKGROUND
The Sewer Lining Program
The Capital Improvement Plan the Council adopted in November 2025 includes $40,000 a year for sewer
lining, every year from 2026 through 2030. The goal is to line one section of the system each year.
Faye & Aspen Streets were relined this year. That was a 423 ft. section of sewer main that totaled $37,921
total for the lining. This lining is expected to last 50 years.
Hyland Street would be a second lining project this year. It is on top of what the CIP planned for 2026.
Cash on Hand
The sewer utility has $621,463 in cash it can use. It has another $178,563 in two certificates of deposit.
That CD money is set aside for equipment replacement and is not part of this request.
The treatment plant project is not using this cash. From January through July we received $2,952,633 from
the state loan and paid all of it out to the contractor and the engineer.
FISCAL IMPACT
Revenue Is Running Ahead of Budget
The 2026 revenue budget of $1,183,623 was based on the 2025 adopted figure of $1,024,250, since 2025
had not closed when the budget was prepared. Actual 2025 collections finished at $1,226,060, and 2026
is tracking above that.
Two quarters of billing have brought in $727,193. That is 61 percent of the entire year's budget. At this
pace the year should finish near $1,416,000.
Sewer Revenue Budgeted Expected Difference
Charges for services $1,183,623 $1,412,000 $228,377
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
Sewer Revenue Budgeted Expected Difference
Other revenue $0 $4,000 $4,000
Total $1,183,623 $1,416,000 $232,377
Spending Is Higher Too
The sewer fund has spent $969,781 of its $1,183,624 budget. That leaves $213,843 with about four and a
half months to go.
Category Budgeted Spent to 8/10 Left
Operations and maintenance $690,026 $444,524 $245,502
Debt payments, principal $276,259 $378,619 ($102,360)
Debt payments, interest $217,339 $146,638 $70,701
Capital, sewer lining $40,000 $0 $0
Total $1,223,624 $969,781 $213,843
Operating costs are running about $60,600 a month. That comes to roughly $731,000 for the year against
$690,026 budgeted. Insurance came in at $19,979 instead of $9,000. Biosolids hauling is on pace to pass
its budget as well, partially due to the delay in the operating capacity of the dewatering process at the
WWTP earlier this year.
Debt Payments Are the Bigger Problem
We paid the state $525,257 on April 14. That single payment is already more than the $493,598 budgeted
for the whole year. As the WWTP pr oject continued to utilize contingency, its debt service obligations
increased proportionately.
The loan schedules in the 2025 audit explain why. Both sewer loans charge interest on May 1 and
November 1. Principal is due May 1. So the April payment covered a full year of principal plus half the
year's interest. A second payment, interest only, is due November 1.
2026 Sewer Debt Payments Amount
Paid April 14 $525,257
Estimated November 1 payment $132,913
Total for the year $658,170
Amount budgeted $493,598
Additional amount needed $164,572
The November figure is an estimate based on what is still owed on each loan. The state will send the exact
bill.
Where the Year Ends Up
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
Sewer Utility (Fund 620) Budgeted Expected Difference
Total revenue $1,183,623 $1,416,000 $192,377
Operations and maintenance $690,026 $735,000 ($44,974)
Debt payments $493,598 $658,000 ($164,402)
Capital, sewer lining $40,000 $80,000 ($40,000)
Total spending $1,223,624 $1,473,000 ($249,376)
Revenue minus spending ($0) ($17,000)
The $17,000 gap would come out of the $621,463 in cash. Two things are worth keeping in mind. Nearly
all of the gap is loan principal and the lining work. It is not the cost of running the system day to day. The
utility still takes in what it costs to operate.
Looking Ahead to 2027
The treatment plant loan is still paying out to us. The principal this year came in $45,189 above what the
audit schedule showed, because we borrowed more after that schedule was written. The state will redo
the schedule when the project is finished, and t he payments will go up again. Staff will get the current
schedule before finishing the 2027 budget. Until then, treat the 2027 debt figure as an estimate.
The Cost of the Hyland Street Work
The $40,000 is about 6 percent of the cash on hand. It fits inside the $213,843 still left in the sewer budget.
Relining extends the life of the pipe, so it counts as a capital improvement rather than a repair. That
matches the City's policy and the 20 year life the CIP assigned to this work.
ALTERNATIVES
1. Approve the Hyland Street work and adopt the budget amendment. This fixes the sewer problem now
and brings the budget in line with actual activity in one step. It also puts the full picture in front of the
Council now, rather than leaving it for the auditors to raise next spring. The Council would be accepting a
$17,000 draw on cash.
2. Wait on Hyland Street until 2027. This saves $40,000 now and lets us bid the work as a planned project.
The risk is that the main fails first. A collapse would cost well more than $40,000 to fix. This is not
recommended.
3. Do nothing. Not recommended. The sewer fund will go over budget when the November payment is
made, whatever the Council decides about Hyland Street. And the Hyland Street problem would still be
there.
RECOMMENDATION
Staff recommends Alternative 1. Specifically:
• Adopt the attached resolution amending the 2026 Sewer Utility (Fund 620) budget.
• Approve the Hyland Street sewer main relining, not to exceed $41,000.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
A budget amendment requires a two-thirds vote of the entire Council under Wis. Stat. sec. 65.90(5)(a). A
notice must also be published in the newspaper within fifteen days.
One last note. We have had two sewer main problems in a single year against a progr am that funds one
project a year. Staff is evaluating sewer system conditions and is working with the City’s engineering firms
for options to address system-wide improvements.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
RESOLUTION NO. 12-2026
A RESOLUTION AMENDING THE 2026 SEWER UTILITY (FUND 620) BUDGET
WHEREAS, the Common Council adopted the 2026 annual budget in November 2025, including a Sewer
Utility (Fund 620) appropriation of $1,183,624; and
WHEREAS, sewer revenues have exceeded the amounts budgeted for 2026, and revenues recorded
through August 10, 2026, representing two quarters of billing, support a revised full -year estimate of
$1,416,000; and
WHEREAS, debt payments made to the Wisconsin Department of Administration on April 14, 2026 totaled
$525,257, exceeding the full-year appropriation of $493,598; and
WHEREAS, the Revenue Bonds of 2021A and the Revenue Bonds of 2025 both carry interest dates of May
1 and November 1, and a further payment estimated at $132,913 is due November 1, 2026, bringing total
2026 debt payments to approximately $658,170; and
WHEREAS, the 2026 -2030 Capital Improvement Plan adopted by the Common Council includes project
SEWER2-2026, Sewer Lining Repairs, at $40,000 annually; and
WHEREAS, sewer main relining was performed on Fay & Aspen Street in 2026, and further relining has
been identified as necessary on Hyland Street; and
WHEREAS, Wis. Stat. sec. 65.90(5)(a) allows the Common Council to amend budget appropriations by a
two-thirds vote of the entire membership, subject to publication of a Class 1 notice within fifteen days;
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Amery that the 2026 budget for
the Sewer Utility (Fund 620) is amended as follows:
Sewer Utility (Fund 620) Adopted 2026 Amended 2026 Change
REVENUES
Charges for services $1,183,623 $1,412,000 $228,377
Other revenue $0 $4,000 $4,000
Total revenues $1,183,623 $1,416,000 $232,377
EXPENDITURES
Operations and maintenance $690,025 $735,000 $44,974
Debt payments $493,598 $658,000 $164,402
Capital, sewer lining $40,000 $80,000 $40,000
Total expenditures $1,223,623 $1,473,000 $249,376
BE IT FURTHER RESOLVED that the $17,000 by which amended expenditures exceed amended revenues
is the result of loan principal payments and capital improvements, and is supported by unrestricted cash
of the Sewer Utility, which totaled $621,463 as of August 10, 2026.
BE IT FURTHER RESOLVED that $80,000 is appropriated to account 620-00-51960-810-000 for sewer main
relining, covering the Fay Street project performed in 2026 and the Hyland Street project authorized
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
herein, and that these costs shall be recorded as capital improvements consistent with the City's capital
asset policy.
BE IT FURTHER RESOLVED that the City Administrator is directed to publish a Class 1 notice of this
amendment in the official newspaper of the City within fifteen days of adoption.
Adopted this _____ day of _______________, 2026.
_________________________________
Mayor
_________________________________
City Clerk-Treasurer
Source: City of Amery website. First collected Oct 8, 2026.