City Council Meeting - March 18, 2026
City of Amery · Polk County · meeting of Mar 18, 2026 · Agendas
Open the original document More from City of Amery
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Amery
COMMON COUNCIL MEETING AGENDA
The City of Amery does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in employment or provision of services, programs or activities.
NOTE: Upon reasonable notice, the City of Amery will accommodate the needs of disabled individuals through aids or services. For additional information or to request this service, contact the Clerk-Treasurer’s office at
(715) 268-3410 by Noon the previous day so that arrangements can be made.
Pursuant to Wisconsin Statutes 19.84, Notice is hereby given to the public that a meeting of the Common Council of the City of Amery will be held on:
March 18, 2026 at Amery City Hall - 104 Maple St. W, Amery, WI at 5:00 PM.
Call to Order
Pledge of Allegiance
Roll Call
Adoption of Agenda
*Although the public may speak on any item that is not included on this agenda as a “Public Hearing or Forum” the Council will not respond or discuss the
issue brought forward at this time. In accordance with open meeting laws the Council must notice an item on the agenda to take action on that matter. Your
comments will be considered and may be placed on a future agenda for further discussion. Any person wishing to submit a
public comment digitally may email them to Cityhall@amerywi.gov until noon of the day of the meeting. Although your comments will be presented to the
Council they may or may not be read aloud or discussed during the meeting. The Public Comment Portion will be limited to 3 minutes total per speaker with
the total duration to be at the Chair’s discretion. The council may act on any item that is noticed on the agenda.
Taylor Larson
Clerk/Treasurer
**Posted: March 12, 2026 on the City Website (www.amerywi.gov); and at Amery City Hall, Amery Public Library, and the Amery
Police Department.
Order of
Items Agenda Item
1 Public Comment
2 Class “B” Fermented Malt Beverage and “Class C” Wine License for 113 Elm St, Amery, WI 54001
3 Building Inspector's Annual Report
4 Pay Application No. 20 for the Wastewater Treatment Center
5 Wayfinding Professional Services Proposal
6 Council Comment
7 Closed Session – Wis. Stat. §19.85(1)(e) Deliberating or negotiating the purchasing of public properties,
the investing of public funds, or conducting other specified public business, whenever competitive or
bargaining reasons require a closed session
-Soldier’s Field Development
8 Open Session – Possible Action on Closed Session Agenda
9 Adjournment.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
TO: The Common Council of Amery
FROM: Taylor Larson, Clerk-Treasurer
DATE: 3/12/2026
RE: Liquor License – Anndrews Event Center LLC
Summary:
The owners of Anndrew’s Event Center have applied for a Class “B” Fermented malt beverage and “Class
C” Liquor (Wine Only) License
Background:
Anndrew’s Lofts LLC DBA Anndrew’s Event Center has had a Class “B” Fermented Malt Beverage and
“Class C” wine license for 113 Elm St W. The owner of Anndrew’s Lofts LLC have created a new LLC,
Anndrews Event Center LLC and would like the liquor license to be in the new LLC’s name. Anndrew’s
Lofts LLC will be relinquishing its Class “B” Fermented Malt Beverage and “Class C” Liquor (wine only)
license when Anndrews Event Center LLC is granted the licenses that are being applied for.
Recommendation:
City staff recommends the approval of the Class “B” Fermented Malt Beverage and “Class C” Liquor
(Wine Only) license for Anndrews Event Center LLC.
1
License List for March 18, 2026 Council Meeting
CLASS “B” BEER and “CLASS C” WINE:
Nancy A. Anderson, Agent, Anndrews Event Center LLC, 113 Elm St W. Premises: Event/Banquet Room, Bar & outside
area of bar, dressing room, catering kitchen, 2 meeting rooms in lower level, office, 2 teaching room, choir lofts, storage
rooms. 2250 sq. ft at 113 W. Elm Street, Amery, WI 54001
Engineers | Architects | Planners | Sci entists
Short Elliott Hendrickson Inc., 8 09 North 8 th Street, Suite 205, Sheboygan, WI 53081
SEH is 100% employee-owned | sehinc.com | 920.287.0828 | 800.472.5881 | 888.90 8.8166 fax
March 6, 2026 RE: City of Amery
WWTP Improvements
SEH Project No. AMERY 178514
Taylor Larson
City of Amery Clerk/Treasurer
104 Maple St W, Suite A
Amery, WI 54001
Dear Taylor:
Attached is a signed Application for Payment No. 20 from Market & Johnson for work completed from
February 1, 2026 – February 28, 2026.
This application includes payment for work primarily consisting of
temporary facilities, metal wall panels for Building 50, HVAC, process piping, valves, and pump
installation in Buildings 20 and 50, electrical in Buildings 30 and 40, equipment installation, and work
included with Change Order 1 and 3. I have reviewed this application for payment and believe it to
accurately represent the work completed as presented by the contractor through the above-mentioned
date.
In accordance with the contract, after 50% of the work is completed no further retainage is required on
completed work. However, retainage of 2.65% of comp leted work is being held for this pay period.
Additionally, retainage of 5% of stored materials is still being held. The itemized retainage percenta ges
are shown on page one of the attached payment reque st. The total requested amount is $313,011.02 for
which I recommend payment.
If you have any questions regarding this application for payment, please call me at 414-892-4761.
Sincerely,
Kate Healy
Project Manager
Docusign Envelope ID: 49AD3029-D27A-4E86-905A-EBB94B2DCC40
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Fi nish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
01 99 00 5,000.00 - - 5,000 .00
01 99 10 5,000.00 850.00 850.00 17% 4,1 50.00
01 99 20 50,000.00 - - 50,00 0.00
00 10 00 181,666.47 181,666.47 181,666.47 100% -
01 21 00 31,482.00 29,907.90 29,907.90 95% 1,574.1 0
02 41 16 110,086.00 110,086.00 110,086.00 100% -
02 41 16 926,786.99 852,644.03 18,535.74 871,179.77 94% 55,607.22
02 41 16 102,053.44 91,848.10 91,848.10 90% 10,205. 34
03 30 00 610,401.77 610,401.77 610,401.77 100% -
03 30 00 899,897.00 899,897.00 899,897.00 100% -
03 30 00 188,256.00 188,256.00 188,256.00 100% -
03 30 00 44,972.00 44,972.00 44,972.00 100% -
03 30 00 3,232.00 - - 3,232 .00
03 30 00 84,334.00 84,334.00 84,334.00 100% -
03 20 00 21,787.00 21,787.00 21,787.00 100% -
03 20 00 42,395.18 42,395.18 42,395.18 100% -
03 20 00 101,562.50 101,562.50 101,562.50 100% -
03 20 00 197,679.69 197,679.69 197,679.69 100% -
03 20 00 6,786.00 6,786.00 6,786.00 100% -
03 20 00 13,208.17 13,208.17 13,208.17 100% -
03 20 00 1,274.00 1,274.00 1,274.00 100% -
03 20 00 2,479.69 2,479.69 2,479.69 100% -
03 20 00 3,841.50 3,649.43 3,649.43 95% 192.0 7
03 20 00 7,477.04 7,477.04 7,477.04 100% -
03 20 00 670.24 670.24 670.24 100% -
03 41 00 311,498.00 311,498.00 311,498.00 100% -
03 41 00 133,881.00 133,881.00 133,881.00 100% -
04 22 00 85,245.00 85,245.00 85,245.00 100% -
05 12 00 185,124.00 179,662.84 5,461.16 185,124.00 100% -
05 12 00 52,625.75 52,625.75 52,625.75 100% -
06 10 53 104,240.07 102,155.27 102,155.27 98% 2,084.80
07 13 00 20,104.00 20,104.00 20,104.00 100% -
07 27 00 2,000.00 2,000.00 2,000.00 100% -
07 61 00 35,948.00 35,948.00 35,948.00 100% -
07 61 00 20,514.00 20,514.00 20,514.00 100% -
07 61 00 236,751.00 236,751.00 236,751.00 100% -
07 61 00 29,795.00 20,856.50 4,469.25 25,325.7 5 85% 4,469.25
07 92 00 16,280.00 6,512.00 6,512.00 40% 9,768 .00
08 11 13 & 08 16 00 & 08 71 00 40,876.00 40,876.00 40,876.00 100% -
08 31 13 13,665.00 13,665.00 13,665.00 100% -
08 36 13 16,731.00 16,731.00 16,731.00 100% -
08 43 00 & 8 80 00 5,213.00 4,170.40 4,170.40 80% 1,042 .60
08 45 00 47,217.00 47,217.00 47,217.00 100% -
09 30 00 6,000.00 - - 6,000 .00
09 51 13 2,460.00 - - 2,460 .00
09 97 20 3,660.00 3,660.00 3,660.00 100% -
09 97 20 10,540.00 10,540.00 10,540.00 100% -
Precast Wall and Plank Supply and Install Treatment Building (10)
Structural Steel Install
Sectional Steel Overhead Doors Supply and Install
Contractor's Application
Testing of Concrete
Mobilization
Temporary Facilities, Safety, Trucking, Equipment
Demolition Existing Structure Per Spec
Concrete Foundation Administration/Treatment Building (50)
G
%
(F / B)
Concrete Foundation Treatment Building (10)
Concrete Foundation Thin WAS and Centrate Storage (30)
Concrete Foundation SBR (15)
Concrete Foundation TWAS Storage (40)
Concrete Foundation Pumping Building (20)
20
3/3/2026
Bond & Insurances
A
Electric Service Upgrades Stated Allowance
Application Period: 2/1/2026 - 2/28/2026 Application Date:
Gas Service Modifications Stated Allowance
F
Project: Amery Wastewater Treatment Plant Improvemen ts
Application Number:
Rebar Labor Administration/Treatment Building (50)
Precast Wall and Plank Supply and Install Pumping Building (20)
Aluminum-Framed Storefront & Translucent Wall and Roof Assemblies and Glazing
Acoustical Panel Ceilings
Joint Sealants
Hollow Metal & Corrosion Resistant Doors, Frames, and Hardware Material
Rebar Labor Treatment Building (10)
Rebar Material Treatment Building (10)
Rebar Labor SBR (15)
Rebar Material SBR (15)
Rebar Labor Pumping Building (20)
Rebar Material Administration/Treatment Building (50)
Rebar Material for CMU
City Shop SCADA Systems Allowance
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
Rebar Material Pumping Building (20)
Access Doors and Frames Material
Sheet Waterproofing
Air Barriers
Masonry Material & Labor Treatment Building (10)
Miscellaneous Rough Carpentry
Administration/Treatment Building Roofing (50)
Painting and Coating Treatment Building (10) Labor
Tiling
Rebar Labor Thin WAS and Centrate Storage (30)
Rebar Material Thin WAS and Centrate Storage (30)
Administration/Treatment Building Metal Wall Panels (50)
Structural Steel Framing
Aluminum-Framed Storefront & Glazing
Painting and Coating Treatment Building (10) Material
Treatment Building Roofing (10)
Pumping Building Roofing (20)
Docusign Envelope ID: 49AD3029-D27A-4E86-905A-EBB94B2DCC40
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Fi nish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
20
3/3/2026
A
Application Period: 2/1/2026 - 2/28/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvemen ts Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
09 97 20 9,900.00 9,405.00 9,405.00 95% 495.0 0
09 97 20 26,700.00 25,365.00 25,365.00 95% 1,335.0 0
10 14 19 1,884.00 942.00 942.00 1,884.00 100% -
10 14 23 1,795.00 - - 1,795 .00
10 44 00 893.00 893.00 893.00 100% -
10 53 00 12,700.00 - 8,822.16 8,822.16 69% 3,877.84
23 00 00 305,800.00 302,742.00 302,742.00 99% 3,058.00
23 00 00 650,000.00 572,731.77 43,171.30 615,903.07 95% 34,096.93
40 23 00 5,000.00 5,000.00 5,000.00 100% -
40 23 10 185,360.00 185,360.00 185,360.00 100% -
40 23 20 116,700.00 116,700.00 116,700.00 100% -
40 23 20 93,940.00 93,940.00 93,940.00 100% -
40 23 10 53,550.00 53,550.00 53,550.00 100% -
40 23 20 6,800.00 6,800.00 6,800.00 100% -
40 23 20 22,400.00 22,400.00 22,400.00 100% -
40 23 10 20.2B 95,300.00 95,300.00 95,300.00 100% -
40 23 10 20.2B 58,520.00 58,520.00 58,520.00 100% -
40 23 10 70,770.00 70,062.30 707.70 70,770. 00 100% -
40 23 30 38,850.00 38,850.00 38,850.00 100% -
40 23 20 46,200.00 45,738.00 462.00 46,200. 00 100% -
40 23 10 8,700.00 8,700.00 8,700.00 100% -
40 23 30 23,940.00 23,940.00 23,940.00 100% -
40 23 10 35,660.00 35,660.00 35,660.00 100% -
40 23 30 8,800.00 8,800.00 8,800.00 100% -
40 23 10 32,260.00 30,647.00 1,613.00 32,260.0 0 100% -
40 23 30 5,000.00 4,750.00 250.00 5,000. 00 100% -
40 23 20 26,400.00 25,080.00 1,320.00 26,400.0 0 100% -
26 00 00 432,180.00 338,482.20 338,482.20 78% 93,697.80
26 00 00 425,320.00 425,320.00 425,320.00 100% -
26 00 00 197,470.00 197,470.00 197,470.00 100% -
26 00 00 167,090.00 150,381.00 150,381.00 90% 16,709.00
26 00 00 60,760.00 48,608.00 6,076.00 54,684.00 90% 6,076.00
26 00 00 45,570.00 22,785.00 18,228.00 41,013.00 90% 4,557.00
26 00 00 288,610.00 245,318.50 245,318.50 85% 43,291.50
31 22 10 37,670.00 37,670.00 37,670.00 100% -
02 41 19 127,025.00 72,090.69 72,090.69 57% 54,934. 31
31 25 10 13,690.00 10,443.00 10,443.00 76% 3,247.0 0
31 22 10 408,965.00 290,564.68 290,564.68 71% 118,400.3 2
31 22 10 74,400.00 46,171.36 46,171.36 62% 28,228. 64
31 23 16 86,290.00 86,227.75 86,227.75 100% 62.25
31 23 16 129,445.00 129,445.00 129,445.00 100% -
31 23 16 45,385.00 45,385.00 45,385.00 100% -
31 23 16 25,125.00 25,125.00 25,125.00 100% -
31 23 16 26,840.00 26,840.00 26,840.00 100% -
31 23 19 273,100.00 273,100.00 273,100.00 100% -
31 23 20 118,175.00 118,175.00 118,175.00 100% -
32 11 26 29,000.00 13,961.12 13,961.12 48% 15,038. 88
Process Valves Material Building (50)
Process Piping Install Building (50)
Process Valves Install Building (30)
Process Valves Material Building (15)
Painting and Coating Treatment Building (50) Labor
Site Demo
Dimensional Letter Signage and Plaques Material
Process Valves Material Building (10)
Safety Specialties Material
Panel Signage Material
Process Piping, Valves, Pump Install Building (10)
Process Piping Material Building (20)
St-A Hvac
Mobilization & General Conditions
Process Piping Material Building (10)
Process Piping & Valves Install Building (15)
McCabe Mob Charge
Dewatering
Preparing the Foundation Earth Retention
Process Piping Material Building (40)
Process Valves Install Building (40)
Stainless Piping Material Building (15)
Stainless Piping Material Install Building (15)
Process Valves Material Building (20)
Building 50 - Fill Cells
Weir Box Excavation & Backfill
Erosion Control/Restoration
Site Grading - Labor & Equipment
Site Grading - Material
Building 10 Excavation & Backfill
Building 15 Excavation & Backfill
Crushed Agg. Base Course - Labor and Equipment
Electrical Building 30
Electrical Building 40
Building 20 Excavation & Backfill
Electrical Building 50
Electrical Building 20
Site Electrical
Process Piping Material Building (15)
Electrical Building 15
Electrical Building 10
Process Piping, Valves, Pump Install Building (20)
Process Piping Material Building (30)
Painting and Coating Treatment Building (50) Material
Plumbing Building (10) Labor
Process Piping Material Building (50)
Architectural Canopies Supply and Install
Docusign Envelope ID: 49AD3029-D27A-4E86-905A-EBB94B2DCC40
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Fi nish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
20
3/3/2026
A
Application Period: 2/1/2026 - 2/28/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvemen ts Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
32 11 26 15,000.00 7,192.20 7,192.20 48% 7,807 .80
33 05 20 73,920.00 73,920.00 73,920.00 100% -
33 05 20 7,000.00 7,000.00 7,000.00 100% -
33 11 00 25,185.00 24,398.66 24,398.66 97% 786.34
33 11 00 13,300.00 13,077.22 13,077.22 98% 222.78
33 31 00 50,000.00 48,500.64 48,500.64 97% 1,499.3 6
33 31 00 50,000.00 48,500.65 48,500.65 97% 1,499.3 5
33 41 00 5,880.00 3,110.00 3,110.00 53% 2,770 .00
33 41 00 4,500.00 2,380.00 2,380.00 53% 2,120 .00
33 42 20 8,550.00 8,550.00 8,550.00 100% -
33 42 20 12,000.00 12,000.00 12,000.00 100% -
40 23 00 279,610.00 265,635.13 265,635.13 95% 13,974.87
40 23 00 80,000.00 72,952.51 72,952.51 91% 7,047.4 9
32 12 18 42,890.00 42,890.00 42,890.00 100% -
32 12 18 98,925.00 - - 98,92 5.00
32 18 40 64,860.39 31,781.59 31,781.59 49% 33,078.80
32 92 12 20,000.00 6,000.00 6,000.00 30% 14,000.00
32 31 13 39,781.00 11,272.50 11,272.50 28% 28,508. 50
40 05 59 25,040.00 25,040.00 25,040.00 100% -
40 23 00 275,435.12 261,663.36 5,508.71 267,172.07 97% 8,263.05
41 22 00 92,224.00 92,224.00 92,224.00 100% -
43 21 15 87,640.00 87,640.00 87,640.00 100% -
43 21 36 89,970.00 89,970.00 89,970.00 100% -
46 21 39 171,960.00 171,960.00 171,960.00 100% -
46 23 63 322,000.00 305,900.00 305,900.00 95% 16,100.00
46 23 63 69,000.00 69,000.00 69,000.00 100% -
46 53 53 2,387,822.00 2,352,753.24 2,352,753.24 99% 35,068.76
46 66 00 169,000.00 169,000.00 169,000.00 100% -
46 71 33 379,879.00 360,885.05 18,993.95 379,879.00 100% -
98 00 00 32,136.36 12,101.03 12,101.03 38% 20,035. 33
98 00 01 8,228.25 4,114.12 4,114.13 8,228.2 5 100% -
98 00 02 7,089.55 7,089.55 7,089.55 100% -
98 00 03 27,041.22 26,229.98 811.24 27,041. 22 100% -
98 00 04 27,695.38 27,695.38 27,695.38 100% -
98 00 05 1,675.40 1,675.40 1,675.40 100% -
98 00 06 12,205.62 12,205.62 12,205.62 100% -
98 00 07 1,853.38 1,853.38 1,853.38 100% -
98 00 08 3,621.27 3,621.27 3,621.27 100% -
98 00 09 1,833.94 1,833.94 1,833.94 100% -
98 00 10 210,798.22 - 188,750.00 188,750 .00 90% 22,048.22
98 00 11 (2,015.02) (2,015.02) (2,015.02) 100% -
98 00 12 18,249.00 18,249.00 18,249.00 100% -
98 00 13 5,265.24 5,265.24 5,265.24 100% -
98 00 14 16,577.46 16,577.46 16,577.46 100% -
98 00 15 12,825.88 12,825.88 12,825.88 100% -
98 00 16 (8,545.87) (8,545.87) (8,545.87) 100% -
- -
Change Order #02 - COR 11B
Change Order #02 - COR 12
Change Order #02 - COR 13
Change Order #02 - COR 14
Change Order #02 - COR 15
Change Order #02 - COR 17
Grit Removal Equipment
Pipe Culverts - Labor & Equipment
Pipe Culverts - Materail
Exterior Process Piping - Labor & Equipment
Exterior Process Piping - Material
Strom Sewer System - Labor & Equipment
Turf Establishment
HDD Pipe Installation - Labor & Equipment
Change Order #01 - COR 03
Water Utilities - Labor & Equipment
Water Utilities - Material
Ultraviolet Light Disinfection Equipment
Lift Station - Labor & Equipment
Concrete Side Walks, Safety Isalnds and Steps
Chain Link Fence Material & Install
Equipment Install
Rotary Lobe Pumps
Fine Screening Equipment
TWAS Storage Tank Mixing System
SBR Treatment System
Crushed Agg. Base Course - Material
Sanitary Sewerage Utilities - Labor & Equipment
Sanitary Sewerage Utilities - Material
Monorails, Hoists, Trolleys and Davit Cranes
Strom Sewer System - Material
Submersible Pumps
Hydraulic Gates and Stop Plates
Rotary Drum Thickening Equipment
HDD Pipe Installation - Material
Hot Mix Asphalt Pavement
Change Order #04 - COR 24
Change Order #04 - COR 25B
Change Order #04 - COR 25C
Change Order #04 - COR 26
Change Order #04 - COR 19
Change Order #04 - COR 20
Change Order #01 - COR 06
Change Order #01 - COR 07
Change Order #03 - COR 11A
Change Order #01 - COR 05
Docusign Envelope ID: 49AD3029-D27A-4E86-905A-EBB94B2DCC40
Progress Estimate - Lump Sum Work
B C D Materials Presently Total Completed Balance to Fi nish
Stored (not in C or D)
and Stored to Date
(B - F)
(C + D + E)
Contractor's Application
G
%
(F / B)
20
3/3/2026
A
Application Period: 2/1/2026 - 2/28/2026 Application Date:
F
Project: Amery Wastewater Treatment Plant Improvemen ts Application Number:
Specification Section No. Description Scheduled Value
($)
From Previous
Application (C+D) This Period
E Work Completed
- -
- -
15,316,535.28 14,089,857.45 313,011.02 15,225.32 14,418,09 3.79 94% 898,441.49 Totals
Docusign Envelope ID: 49AD3029-D27A-4E86-905A-EBB94B2DCC40
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
TO: Arts, Park, and Recreation Committee
FROM: Alex Mansfield, City Administrator
DATE: 3/11/2026
RE: Wayfinding Project Proposal
Summary: This memorandum provides the Council with a summary of the City's wayfinding solicitation
process, an assessment of the single proposal received, a candid analysis of the budget gap between
available funding and project requirements, and a staff recommendation on how to proceed.
Background: The 2045 Comprehensive Plan identifies a pedestrian and vehicular wayfinding system as a
high-priority implementation item for the City of Amery. In support of that goal, the Capital
Improvement Plan (CIP) included $10,000 for design and planning services in 2026 and $20,000 for
implementation in 2027, funded from savings realized on a separate project, for a combined available
budget of $30,000.
Following the City's Purchasing Policy, staff issued a Request for Proposals (RFP) for professional
wayfinding planning and design services and solicited proposals from ten qualified firms. One firm,
Destination by Design Planning LLC (DbD) of Boone, North Carolina, submitted a response by the
deadline. The proposal was received on February 15, 2026.
Summary of Proposal Received: Destination by Design is a well-qualified, multidisciplinary planning and
design firm with demonstrated experience in municipal wayfinding systems comparable to Amery's
needs. Their proposal is professionally structured and technically responsive to the scope described in
the RFP. The proposed scope includes four tasks:
• Task 1 — System Audit and Discovery (site visit, stakeholder engagement, destination
identification): $5,000
• Task 2 — Wayfinding Location and Directional Plan (GIS-based sign location mapping and
content framework): $15,000
• Task 3 — Wayfinding Signage Design (two concept alternatives, design standards, materials):
$21,000
• Task 4 — Final Deliverables and Installation Support (master plan documentation, bidding
support): $10,000 + 10% CA
Total proposed professional services fee: $51,000 plus 10% construction administration. Fabrication
and installation costs are not included and would be borne separately by the City.
Fiscal Analysis: The DbD proposal significantly exceeds the City's available budget. The planning-phase
cost alone ($51,000) is $41,000 more than the total combined CIP allocation of $30,000. Implementation
costs — the physical fabrication and installation of signs — are entirely separate and unfunded.
Staff notes that this gap is not a reflection of an unreasonable proposal. DbD priced the work as
described in the RFP, which requested a comprehensive Wayfinding Master Plan and Implementation
Program, a scope that realistically carries a market cost of $40,000–$60,000 for professional services in
the current environment. The mismatch is attributable to a $30,000 combined budget for design and
implementation of a citywide wayfinding system, while reasonable for a small community, is insufficient
for the scope described in the Comprehensive Plan.
104 Maple Street W., Suite A Office: 715.268.7486
Amery, WI 54001 Fax: 715.268.4870
Staff also notes that committing to a $51,000 professional services contract without a clear and funded
implementation path would not be consistent with the City's financial management objectives.
Staff Recommendation: Staff recommends the following course of action:
1. Decline the Destination by Design proposal.
The proposal should be respectfully declined. DbD is a qualified firm and their proposal is a fair response
to the RFP as written. The decision to decline is based entirely on the City's inability to fund the
proposed scope, not on any deficiency in the proposal itself. Staff will notify DbD accordingly and
document the decision in the purchasing records as required by policy.
2. Defer the wayfinding project to the 2027-2031 CIP.
Staff recommends deferring the wayfinding project to the 2027-2031 Capital Improvement Plan, to be
funded from anticipated debt proceeds in a manner consistent with the City's Debt Management Policy.
A one-year delay allows staff to establish a more realistic budget that reflects what the City can actually
afford to build.
3. Re-budget the project with a realistic and fully-funded allocation.
Staff recommends the Council direct the 2027 CIP to include a wayfinding project budget in the range of
$55,000–$75,000, structured as follows:
• Professional planning and design services: $15,000–$20,000
• Sign fabrication and installation: $35,000–$50,000 (competitive bid to a sign fabricator using
the location plan as the bid document; many fabricators provide design services at low or no
cost when awarded the fabrication contract)
This structure separates the planning and implementation procurements, keeps professional services
costs proportionate to Amery's scale, and ensures the City does not commission a planning document it
cannot afford to act on.
4. Redirect the $30,000 in current CIP savings.
The $30,000 currently identified for wayfinding was derived from savings on a separate project. Staff
recommends the Council either return these funds to the Capital Fund for use in the future wayfinding
implementation project.
The wayfinding program remains a valid and worthwhile priority consistent with the 2045
Comprehensive Plan. The issue is one of timing and budget alignment, not project merit. Staff is
confident that with a realistic budget and a clear separation of planning and implementation
procurements, the City can deliver a functional and community-appropriate wayfinding system in 2027,
pending financial availability.
Pedestrian & Vehicular
Wayfinding Master Plan
and Implementation
City of Amery, WI
February 15, 2026
Destination by Design Planning LLC
136 Furman Rd, ste 6
Boone, NC 28607
(828) 386-1866
Zach Hoffman, Business Development
zach@dbdplanning.com
PREPARED BY:
ii
Cover Letter
Destination by Design (DbD) is pleased to submit this proposal in response
to the City of Amery’s Request for Proposals for professional services
related to the development of a Pedestrian and Vehicular Wayfinding
Master Plan and Implementation Program. This project represents an
important opportunity to create a clear, intuitive, and durable wayfinding
system that strengthens Amery’s identity as the “City of Lakes,” improves
navigation along Highway 46, and better connects residents and visitors to
downtown, trail systems, civic destinations, and recreational amenities.
Destination by Design is a multidisciplinary planning, design, branding, and
communications firm specializing in wayfinding systems for municipalities,
downtowns, and destination communities. Our work focuses on developing
scalable, legible wayfinding programs that balance functionality, visual
clarity, regulatory compliance, and long-term implementation realities. For
communities like Amery, we understand that wayfinding must do more
than provide directions—it must reinforce local character, support trail-
and recreation-based tourism, improve access to civic and community
services, and contribute to broader economic development and downtown
vitality goals.
Our recent and ongoing wayfinding work includes community-scaled
systems in Sisters, Oregon; downtown and corridor-based wayfinding
strategies across multiple communities in Michigan and New York; and
extensive wayfinding planning and design throughout North Carolina in
small towns, lake communities, and Main Street environments. We have
also completed wayfinding projects in recreation-driven regions where
signage must serve both residents and visitors navigating trail networks,
gateways, downtown districts, and civic destinations. Across these efforts,
we bring deep experience balancing signage hierarchy, visibility, cost,
durability, and maintenance considerations while working within state DOT
requirements and MUTCD standards.
DbD’s integrated approach combines field-based audits, stakeholder
engagement, wayfinding strategy, GIS-informed location planning, design
development, and implementation guidance into a single, cohesive
process. We recognize that the City of Amery is seeking not only a cohesive
family of signage designs, but a practical and well-documented system
that clearly identifies priority destinations, establishes appropriate sign
types and locations, aligns with WisDOT requirements along Highway 46,
and includes realistic documentation to support bidding, fabrication, and
phased implementation.
Collaboration will be central to our work. We will engage City leadership,
staff, and community stakeholders through a structured and transparent
process to ensure the final wayfinding system reflects Amery’s character,
supports connections between downtown and trail assets, complements
ongoing community initiatives, and provides a clear framework for long-
term use and maintenance.
Thank you for the opportunity to submit this
proposal. Destination by Design would be
honored to partner with the City of Amery to
deliver a wayfinding system that improves
access, strengthens sense of place, and
supports the community’s long-term vision.
Dear Alex Mansfield and Members of the Selection Committee,
Eric Woolridge, AICP
Principal Planner, Destination by Design
eric@dbdplanning.com, (828) 386-1866
www.destinationbydesign.com
01
Destination by Design (DbD) is a multi-disciplinary placemaking and marketing
firm. We specialize in economic development strategies that increase visibility
and enhance quality of life. Our team collaborates to create the places you love
by developing and promoting vibrant Main Streets and destination-quality parks,
trails, and recreation areas.
For nearly 15 years, we have partnered with communities to
develop and leverage assets for sustainable growth, while
providing branding solutions to tell their stories.
Our Communications division takes a hands-on approach, working closely with
communities and facilitating a process to help them discover their authentic
identity. Beginning with boots-on-the-ground, we engage stakeholders, perform
market research, and extract insights to shape a community-led vision for the
brand.
Using what we discover, our creative team develops a strategy to serve as the
cornerstone for all marketing and communication efforts. By crafting intentional
brand language—including positioning, promise, voice, and taglines—we ensure a
cohesive identity and messaging.
Building on this framework, we translate the brand visually through logo designs,
photography, videos, websites, signage, and marketing collateral. Our designers
provide comprehensive art direction to ensure that the visual brand remains
consistent with the strategy, and recognizable in diverse environments.
We bring deep experience in designing branded wayfinding systems that help
communities connect people to place. From signage typology and wayfinding
planning to fabrication coordination and implementation, our team delivers
functional and visually compelling wayfinding solutions for towns, counties, and
regional destinations across the Southeast.
Place Branding
& Wayfinding
02
Project Team
As a multidisciplinary firm integrating planning, wayfinding design, branding, GIS,
and communications under one roof, Destination by Design (DbD) offers an efficient,
fully in-house process that carries wayfinding projects from initial audit and analysis
through strategy, conceptual design, and implementation planning. Our team brings
extensive experience working with small cities, downtown districts, trail networks,
parks, and civic environments—ensuring the City of Amery receives a wayfinding
program that is visually cohesive, technically sound, and grounded in real-world
municipal and regulatory conditions, including WisDOT and MUTCD requirements.
Eric Woolridge, Principal Planner, will provide executive oversight for the project,
guiding overall direction, confirming alignment with City priorities, and leading quality
assurance and quality control throughout the engagement.
Jonathan Scott, Project Manager, will manage day-to-day coordination and
lead development of the wayfinding strategy, destination hierarchy, messaging
framework, and user-journey priorities—ensuring the system clearly connects
residents and visitors to downtown, trail systems, civic destinations, and recreational
amenities.
Pooja Bonde, Environmental Designer, will guide conceptual design development,
ensuring all recommendations address accessibility and ADA considerations, long-
term durability, maintenance requirements, and compatibility within active streets,
trail corridors, and state highway right-of-way environments.
Keagan Massie, GIS Planner, will lead mapping and spatial analysis to support
sign placement, hierarchy, visibility, and phasing, providing a clear, data-informed
framework to guide implementation and future expansion.
Together, this team delivers all components of the wayfinding effort in-house—from
field audits and stakeholder coordination to GIS-informed location planning, design
development, and implementation guidance—resulting in a cohesive, practical
wayfinding program that the City of Amery can implement over time and leverage to
support phased investment and future funding opportunities.
Planning Director, AICP
Wayfinding Lead &
Senior Project Manager
With more than twenty years of local
government planning experience, Eric’s
passion is to combine destination
planning and place-branding to create
compelling infrastructure recreation
development, tourism and sustainable
economic development.
Eric has led planning efforts pertaining
to recreation, greenways, downtown
revitalization, and place-branding
for more than 150 local government
jurisdictions.
For more than a decade, Jonathan
has managed creative and structural
projects across a wealth of industries,
molding him into an effective and
creative problem solver. He especially
enjoys working on environmental
projects. Jonathan’s passion is ‘Aloha
Āina’, which means respect for the land.
He loves getting out and exploring new
places and hearing how communities
are finding creative ways to co-exist with
their environments.
Eric Woolridge
Jonathan Scott
03
Alex Gotherman
Keagan Massie Ed McLean Case Neal
Matt Wagoner
Jessie Schottanes
Design Director, PLA
GIS Planner Landscape Architect, PLA Senior Landscape Architect, PLA
Senior Art Director
Associate Planner
Pooja Bonde
Environmental Graphic Designer
04
Project Understanding
The City of Amery is seeking to develop a clear, cohesive wayfinding system that improves navigation, strengthens community
identity, and better connects residents and visitors to downtown, trail systems, civic destinations, and recreational amenities.
As Amery continues to invest in its downtown, lakefront environment, trail connections, and community facilities, a coordinated
wayfinding strategy is needed to help people understand where they are, how destinations relate to one another, and how to move
confidently through the community—particularly along Highway 46 and between trail corridors and the downtown core.
Key destinations—including downtown businesses, trail access points associated with the Stower Seven Lakes and Cattail Trails,
lake and riverfront amenities, civic facilities, schools, the hospital, and the library—serve a wide range of users with varying levels
of familiarity, mobility needs, and travel modes. Residents, trail users, motorists passing through on Highway 46, and visitors to the
“City of Lakes” each experience Amery differently. A successful wayfinding system must account for these varied user journeys
while unifying vehicular, pedestrian, and trail-oriented environments into a single, legible system.
Clear, accessible, and ADA-conscious wayfinding is central to this effort. Legible typography, appropriate color contrast, logical
message hierarchy, and thoughtful placement supporting both vehicular and pedestrian movement are essential to serving
a broad range of users, including first-time visitors and trail-based tourists. Equally important is the need for a modular and
maintainable system—one that can adapt as destinations evolve, new facilities come online, and additional signage locations are
introduced over time. This requires clearly defined sign families, flexible content frameworks, and realistic cost considerations to
support phased implementation.
Amery’s public rights-of-way—particularly along state highway corridors—also present coordination challenges related to visibility,
safety, aesthetics, and regulatory requirements. Inconsistent signage, limited visibility, or message clutter can reduce clarity
and detract from the community’s character. The wayfinding plan must therefore establish clear guidance for sign hierarchy,
placement, and future expansion, balancing placemaking goals with WisDOT and MUTCD compliance and practical installation
realities. Ultimately, the goal is a wayfinding system that improves access to recreation and services, supports downtown vitality
and local economic activity, and reinforces community pride while providing the City of Amery with a clear, implementable
roadmap for long-term investment.
05
TASK 1.1: PROJECT INITIATION AND
KICKOFF
Lead a structured kickoff meeting to formally launch
the project and establish a shared foundation for
collaboration. This session will introduce all key
team members and stakeholders, clarify roles
and responsibilities, and set expectations for
communication protocols. The meeting will also
accomplish the following:
• Strategic Alignment: Refine and expand upon
the project’s core goals by aligning expectations
across all parties. This includes identifying
early opportunities, constraints, and strategic
priorities that will guide the project’s approach.
• Preliminary Timeline: Present a preliminary
timeline outlining key phases, decision
points, and deliverables. This roadmap will
help coordinate schedules, align stakeholder
expectations, and ensure momentum is
maintained throughout the project.
• Scope Review: Review and confirm the scope
of work, deliverables, and team roles. This step
reinforces alignment and provides a strong
foundation before design and development
begins.
TASK 1.2: SITE VISIT AND SIGN SYSTEM
AUDIT
Conduct a site visit to audit the existing wayfinding
system across the City of Amery. Using GIS-
compatible mapping and documentation tools,
inventory all signage assets, including vehicular,
pedestrian, and parking-related signs. The audit will
evaluate:
• Physical condition and maintenance status
• Sign placement and visibility
• Functional effectiveness for navigation
• ADA compliance and accessibility
• Alignment with the project committee’s selected
brand and its character.
Findings from this audit will inform recommendations
for upgrades, removals, relocations, or additions
within the proposed wayfinding framework.
TASK 1.3: STAKEHOLDER ENGAGEMENT
Facilitate up to 2 focused stakeholder engagement
sessions—either in-person or virtual—with
representatives from with the Amery Community
Club, City staff, and downtown business owners
These interviews and roundtable-style conversations
will explore:
• Perceptions of the current signage system
• User challenges and unmet needs
• Further define the Amery Brand aesthetic
• Input on potential enhancements or technology
integration
Feedback gathered will directly inform both strategic
and design decisions in later project phases.
TASK 1.4: DESTINATION IDENTIFICATION
Work with project stakeholders to identify and
verify key civic destinations within city limits. This
destination list will form the foundation for the
signage location plan and messaging hierarchy.
Project Approach
System Audit and
Discovery
OBJECTIVE
This initial phase focuses on
establishing project alignment, auditing
existing wayfinding infrastructure, and
gathering insights from stakeholders
and the public. These efforts will build
the foundation for a cohesive and
community-informed signage system.
TASK 1:
06
TASK 2.1: PRELIMINARY WAYFINDING
LOCATION PLAN DEVELOPMENT
Using data from the site audit and stakeholder
engagement, develop a draft wayfinding location and
directional plan. This plan will identify recommended
locations for Park Entrance signs, vehicular and
pedestrian welcome signs, Informational/interpretive
signs, Pedestrian and parking directionals with
attention to visibility and accessibility. Respective
sign content will include directional arrows and key
destination/ route references rules and safety and
educational content that will be provided by project
leadership. The plan will include a detailed matrix of
all sign types and individual map locations of each
sign type along with the contents of each sign.
TASK 2.2: COORDINATION AND
INTERNAL REVIEW
Present the draft wayfinding location and directional
plan to project stakeholders and staff in a working
session to review proposed placements and content.
During this meeting, Destination by Design will walk
through sign family groupings, logic, and content
strategies. Feedback will be gathered regarding
the location of preferred sign types, refinements
to existing locations, and any policy, infrastructure
or regulatory constraints that may influence final
placement.
TASK 2.3: FINAL LOCATION PLAN
PRESENTATION AND DOCUMENTATION
Incorporating feedback from the review session,
finalize the comprehensive Wayfinding Location and
Directional Plan. This deliverable will include GIS-
compatible files, refined content for each signage
location, and clear identification of priority phases,
if applicable. The final plan will comply with all
applicable state and county sign regulations and will
support fabrication planning and cost estimating.
The final presentation will be delivered to project
stakeholders for approval and integration into the
broader signage master plan.
Wayfinding Location and
Directional Plan
OBJECTIVE
This phase will translate stakeholder
input, site analysis, and audit findings
into a fully realized location and
directional plan.
TASK 2:
07
TASK 3.1: DESIGN DIRECTION
WORKSHOP AND CREATIVE ALIGNMENT
Initiate the design process with a collaborative
workshop to establish the City’s creative vision.
Using mood boards, precedent images, and sample
materials, this session will explore visual themes
and material inspiration reflective of the City. The
details and ideas shared during this workshop will
be the launchpad of all aesthetic sign design moving
forward.
TASK 3.2: CONCEPT DEVELOPMENT
Develop up to 2 distinct signage system concepts,
each visualized across multiple sign families
(Park Entrance signs, vehicular and pedestrian
directionals). Each concept will include design
mockups and recommendations for color palette,
typography, iconography, materials, and mounting
configurations. These concepts will prioritize legibility,
modularity, and user experience, while aligning with
the character of the city’s broader brand.
TASK 3.3: CONCEPT REVIEW AND
REFINEMENT
Facilitate a formal presentation of the design
concepts with project leaders and stakeholders,
showcasing each option’s visual language
and strategic design approach. Following the
presentation, the team will collect consolidated
feedback and lead up to two collaborative review
meetings. Up to two rounds of refinements will
be completed to ensure the final concept reflects
stakeholder priorities, branding alignment, and
contextual fit.
TASK 4.1: FINAL DOCUMENTATION
PACKAGE
Produce a complete Wayfinding Standards Master
Plan, including final conceptual design, preliminary
wayfinding location and direction plan.
Deliverables will include:
• The final plan in both PDF and editable formats
(Word or InDesign)
• GIS-compatible files showing existing and
proposed signage locations
• Conceptual design documentation including
finishes, material suggestions, and installation
standards
• A summary of all engagement activities and final
design selections
This final package will be presented to the project
committee and serve as a resource needed for
further funding applications and implementation
guidance for the City of Amery.
TASK 4.2: BIDDING AND CONTRACT
ADMINISTRATION
Destination by Design will support the City of Amery
during the bidding and contract administration
phase to ensure the approved wayfinding system
is accurately implemented and consistent with the
established design intent.
Wayfinding Signage
Design
Final Deliverables and
Installation Support
OBJECTIVE
This phase centers on the creative
development of a wayfinding signage
system that blends design excellence
with regulatory compliance and functional
performance. Through an iterative and
collaborative process, our team will guide
the creation of concept alternatives and
visual system standards that reflects the
City’s character.
TASK 3:
TASK 4:
08
Project Schedule
While ideal timelines provide a framework, the
complexities of reality can introduce variables. We
are fully dedicated to ensuring that all deliverables
are accomplished promptly and in accordance
with our commitment to timeliness.
System Audit and Discovery
TASK 1.1 - 1.4
Wayfinding Signage Design
Final Deliverables and
Installation Support
TASK 3.1 - 3.3
TASK 4.1 - 4.2
Wayfinding Location
and Directional Plan
TASK 2.1 - 2.3
00
MONTH
01
MONTH
02
MONTH
03
MONTH
04
MONTH
06
MONTH
05
MONTH
10
MONTH
09
MONTH
08
MONTH
07
MONTH
12
MONTH
11
MONTH
• Project kickoff meeting and confirmed
communication protocols
• Preliminary project schedule and milestone
roadmap
• GIS-supported inventory of existing signage
and conditions
• Summary of audit findings and preliminary
opportunities
• Stakeholder engagement summary
documenting key themes and priorities
• Verified list of priority destinations to inform
sign hierarchy
• Draft wayfinding location and directional
plan
• Stakeholder review and working session
• Final GIS-based location plan with content
framework
• Identification of priority phases and
regulatory considerations
• Design direction workshop and creative
alignment
• Up to two signage system concepts
• Stakeholder review and refinement process
• Final recommended signage concept
• Complete Wayfinding Standards
Master Plan
• Final design and location
documentation
• GIS files and implementation-ready
reference materials
• Final presentation to project
committee
09
Project Fee
Task 1: System Audit and Discovery ........................................... $5,000
1.1: PROJECT INITIATION AND KICKOFF
1.2: SITE VISIT AND SIGN SYSTEM AUDIT
1.3: STAKEHOLDER ENGAGEMENT
1.4: DESTINATION IDENTIFICATION
Task 2: Wayfinding Location and Directional Plan .................$15,000
2.1: PRELIMINARY WAYFINDING LOCATION PLAN DEVELOPMENT
2.2: COORDINATION AND INTERNAL REVIEW
2.3: FINAL LOCATION PLAN PRESENTATION AND DOCUMENTATION
Task 3: Wayfinding Signage Design ...........................................$21,000
3.1: DESIGN DIRECTION WORKSHOP AND CREATIVE ALIGNMENT
3.2: CONCEPT DEVELOPMENT
3.3: CONCEPT REVIEW AND REFINEMENT
Task 4: Final Deliverables and Installation Support ..............$10,000
4.1: FINAL DOCUMENTATION PACKAGE + 10% CA
4.2: BIDDING AND CONTRACT ADMINISTRATION
$51,000 + 10%CA
TOTAL PROJECT COST
The proposed fee for this project is provided as a fixed, all-inclusive lump
sum and includes all professional services necessary to complete the
wayfinding audit, planning, and design work described in the scope. All
typical reimbursable expenses—including travel, meetings, coordination,
data processing, and project communications—are included.
This proposal is based on the assumption that one primary field visit will
be sufficient to document existing conditions and navigation patterns
across downtown, trail access points, civic destinations, and key
corridors. Stakeholder coordination will include meetings with City staff
and designated community representatives as confirmed during project
initiation, with the understanding that meetings may be conducted virtually
unless in-person sessions are requested. The City will provide any available
GIS data, mapping, branding materials, or background information that may
support the planning and design process.
The scope of services is limited to planning, strategy, and design-level
documentation intended to guide future implementation. Fabrication,
permitting, structural engineering, and construction services are not
included. Should the City elect to move forward with implementation,
bidding support and contract administration services may be provided,
with construction administration services billed at 10% of fabrication and
installation costs.
Destination by Design will invoice monthly based on project progress and
milestone completion, following a payment structure aligned with major
deliverables and review milestones.
10
Watauga
County, NC
Located in Western North Carolina, the Watauga County
Tourism Development Authority issued DbD no small
challenge: to create a fully custom wayfinding signage
brand and architectural theme that’s worthy of our premier
destination and its many unique assets. DbD’s design team
spent more than six months focusing solely on branding,
color, materials, and architecture. The result: an upper-
third front sign panel that celebrates the region’s most
compelling landscapes, such as Grandfather Mountain, the
Blue Ridge Parkway, and the New River, and a back panel
that features the many outdoor activities of the NC High
Country while encouraging visitors to “find your adventure.”
Wayfinding Design, Custom Illustration,
and Implementation
REFERENCE
Wright Tilley
Executive Director
Watauga County Tourism
(828) 266-1345
wtilley@exploreboone.com
Experience & References
11
Historic
Uptown Butte
Montana
Tech
Visitors
Center
FRONT BACK
Historic
Uptown Butte
Montana
Tech
Visitors
Center
FRONT BACK
KIOSK SIGN
(FRONT)
KIOSK SIGN
(BACK)
CONFIDENCE MARKER
SIGN (FRONT)
CONFIDENCE MARKER
SIGN (BACK)
Destination by Design lead the creation of a comprehensive
Wayfinding Plan for Butte-Silver Bow, focused on the
city’s historic Uptown business district. With a unique
concentration of architectural heritage, cultural landmarks,
and a growing investment in revitalization. Our work centered
on documenting existing conditions, guiding stakeholder
visioning, and developing a signage strategy that is
historically sensitive, visually consistent, and highly functional
across pedestrian and vehicular environments.
Wayfinding Directional Plan and
Conceptual Design
BUTTE, MT
Uptown Butte
REFERENCE
Karen Byrnes , Community Development Director
City-County of Butte-SilverBow
(406)497-6467, kbyrnes@bsb.mt.gov
12
Northville, MI
Parks & Recreation
Northville’s park system plays an essential role in daily
community life, connecting neighborhoods to trails,
recreation facilities, and natural spaces. Destination by
Design partnered with Northville Parks and Recreation to
develop a wayfinding strategy that improves navigation
across the system while reinforcing a clear, welcoming sense
of place.
The work focused on creating a cohesive, easy-to-use
wayfinding framework that supports first-time visitors
and regular users alike. Through clear hierarchy, intuitive
messaging, and park-appropriate design, the system helps
orient users, highlight amenities, and strengthen connections
between parks, trails, and surrounding destinations.
The result is a wayfinding approach that enhances usability,
supports active lifestyles, and elevates the overall experience
of Northville’s parks—ensuring the system functions not just
as signage, but as an extension of the community’s public
realm.
Services Provided: Wayfinding Design, and
Branding
REFERENCE
Derek O. Smith
Parks & Recreation Director
Charter Township of Northville, MI
(248) 449-9941
dsmith@twp.northville.mi.us
13
REFERENCE
Melissa Dickerson
Town Manager
Town of Manteo, NC
(252) 473-2133
mdickerson@manteonc.gov
Downtown
Manteo, NC
DbD helped the Town of Manteo, NC to develop a
brand identity for its historic downtown Main Street
area. Although part of Dare County, and adjacent to
the famed Outer Banks, our research determined that
Manteo was in need of a distinct identity that would set
them apart from this popular coastal destination. They
needed to create a destination brand all their own by
embracing their historic walkable downtown, wayfaring
heritage, and friendly, leisurely vibe. The resulting logo
mark and brand concept, Meet Me in Manteo, perfectly
encapsulates this.
Community Branding, Wayfinding,
and Community Engagement
14
City of
Lenoir, NC
Destination by Design worked with the City of
Lenoir to develop a place brand that would bring
the residents together as a community of makers
and musicians while broadcasting that identity to
the surrounding areas. Building on the success of
its award-winning Downtown brand (featuring a
“Together We Create” tagline), the City adopted the
tagline “Create With Us” to reinforce revitalization
efforts Downtown and appeal to tourists as an
inviting and creative destination.
Community Branding, Wayfinding
Design, and Engineering
REFERENCE
Kaylynn Horne
Director Economic Development
Downtown Lenoir, NC
(828) 757-2107
khorn@ci.lenoir.nc.us
15
Wilkes
County, NC
As part of a bold new brand initiative, Wilkes County
partnered with Destination by Design to develop a county
brand and custom wayfinding and signage system
inspired by the “Great State of Wilkes”—a frontier of
innovation, outdoor adventure, and Appalachian culture.
Rooted in the County’s newly launched identity, the
signage system is designed to unify key destinations
across the region, from the downtowns of Wilkesboro and
North Wilkesboro to the mountain trails, rivers, and scenic
byways that define the area’s outdoor appeal. The result
is a cohesive, brand-driven signage system that reflects
the pioneering spirit of Wilkes and invites all to “Follow Your
Frontier.”
Community Branding, Wayfinding
Strategy & Design, Signage System
Development, and Public Engagement
WILKES COUNTY
GATEWAY SIGNAGE OPTION 2
FRONT VIEW SIDE VIEW ISOMETRIC VIEW
Site Renders Material Pallete
Material/Finishes
Corten Powdercoat Brown Powdercoat Acrylic- Off white Acrylic- White
Material Treatment
Corten Perforation 3D Channel Letters Corten Silhouette Backlit
Gateway Signage (Option 2)
A six sided structure with three primary sign panels and Corten finish panel front. Sign panel with customized perforation (Lit) and an additional tree silhouette corten finish panel (back lit) at the base.
Wilkes logo in 3D Channel letters stud mounted, Acrylic front and face lit.. “w” logo to be 3D protruding letter with Acrylic front - face lit with the guitar pick shape lit on the edge.
Other lettering to be cutout of corten panel and face lit with acrylic backing. Sign set with a breakaway bases and landscaping.
16
City of
Beckley, WV
The Beckley Outdoors Plan and the Basecamp
Beckley brand will establish and promote Beckley,
WV as a premier outdoor destination. In addition,
the DbD planning team led a tourism master
planning effort to develop and improve unique
outdoor infrastructure such as trails, greenways,
river accesses, rock climbing areas, parks, public
art, and multi-use public spaces for events
and festivals. These projects aim to create a
vibrant City that attracts and retains businesses,
residents, and visitors.
Destination Branding and
Outdoor Tourism Plan
17
City of
Sisters, OR
Sisters’ downtown is defined by a strong sense of
place, walkable streets, and a distinctive western
character that sets it apart in Central Oregon.
Destination by Design partnered with the City of
Sisters to develop a downtown wayfinding system
that improves navigation while reinforcing the
community’s identity and visitor experience.
The work focused on creating a cohesive, intuitive
wayfinding framework that serves residents,
visitors, and first-time users alike. Through on-site
analysis, stakeholder coordination, and destination
mapping, the system establishes clear hierarchy and
directional logic for vehicles and pedestrians, guiding
people to parking, civic destinations, trails, and key
downtown amenities.
Designed to integrate seamlessly with Sisters’
architectural character and brand, the wayfinding
system balances functionality with visual
consistency. The result is a scalable, implementation-
ready program that enhances orientation, supports
downtown vitality, and strengthens the overall
experience of moving through Sisters’ historic core.
Downtown Wayfinding Signage Planning,
Conceptual Design, and Implementation Plan
18
828-386-1866
zach@dbdplanning.com
Monday-Friday
9:00am-5:00pm
Let’s Get
Started.
Source: City of Amery website. First collected Oct 8, 2026.