RecordWell Data

Country Inn & Suites Activity Pool

130 PATRIOT DR, Little Chute, WI 54140 · Outagamie County

17cited violations
4serious tier
4inspections

Establishment

Type
Pool / recreational water (Zero-Depth Entry)
Inspected by
Outagamie County Public Health
License / ID
JVUE-DC8N3K
Status
Permitted
Official record
Outagamie County Public Health inspection reports

Other public records for this business

Year by year

YearInspectionsViolationsSerious
2026171
2025231
2024172

Inspections

  1. Jul 28, 2026 Routine · 1 critical, 6 non-critical, 1 repeat
    • Not serious Non-critical

      RECIRCULATION (TURNOVER) RATE NOT MET

      The recirculation turnover rate has not been met for wading pool. Turnover rate is currently at 1.54 hours.

      Correction: Notified operator. Operator shall immediately adjust or repair equipment to operate at a turnover rate of 1 hour or less. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.

      Code ATCP 76.11(4)(c) - RECIRCULATION RATE

    • Not serious Non-critical

      FLOWMETER, VALVE, OR GAUGE NOT MAINTAINED

      The pressure gauge for the left sand filter is non-operational and was reading 0 PSI during the time of the inspection.

      Correction: Notified operator. Operator was attempting to fix the affected pressure gauge during the time of the inspection and was reading at 10 PSI before the end of the inspection. PIC shall assess the gauge to determine its functionality and replace or repair as needed. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.11(5)(a) - FLOWMETER, VALVE, GAUGE NOT MAINTAINED

    • Not serious Non-critical

      ALKALINITY

      The total alkalinity is at 40 PPM.

      Correction: Notified operator. Operator shall maintain the total alkalinity of the water between 60 and 180 ppm as calcium carbonate or be able to demonstrate to the department or its agent that another level of total alkalinity produces chemically balanced water within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.14(5)(d) - ALKALINITY

    • Not serious Non-critical

      REAGENTS REPLACED

      Multiple bulk containers of test kit reagents are not replaced as recommended by the manufacturer and or passed its expiration date.

      Correction: Notified operator. Operator shall discard expired reagents. Replace test kit reagents as recommended by the manufacturer within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.17 (2)(b) - REAGENTS REPLACED

    • Not serious Non-critical

      EMERGENCY BLANKETS

      Two emergency blankets in good condition are not available in the pool area.

      Correction: Notified operator. Operator shall provide two emergency blankets in good condition in the pool area within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.27(3) - EMERGENCY BLANKETS

    • Not serious Non-critical

      POSTING SIGNAGE- NO PROLONGED BREATH HOLDING

      Signage or other communication warning against prolonged breath-holding is not posted or otherwise provided.

      Correction: Notified operator. Operator shall provide signage or provide other communication warning against prolonged breath holding within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.29(1)(f) - NO PROLONGED BREATH HOLDING

    • Serious Critical Repeat

      VGBA-EXISTING POOLS, PUMP CURVE AND DRAIN COVER INFO

      The operator of an existing pool does not have the pump curve or drain cover specifications.

      Correction: Notified operator. Operator shall obtain a pump curve and information that describes make, model and gpm rating for the drain covers within 30 days. Once obtained, operator shall sent proof of curve and information to Outagamie County Public Health for verification. Failure to comply will result in a re-inspection.

      Code ATCP 76.38(1)(b) - PUMP CURVE

  2. Jul 2, 2025 Routine · 1 critical
    • Serious Critical

      VGBA-EXISTING POOLS, PUMP CURVE AND DRAIN COVER INFO

      The operator of an existing pool does not have the pump curve or drain cover specifications.

      Correction: Notified person-in-charge (PIC). PIC shall obtain a pump curve and information that describes make, model and gpm rating for the drain covers and retain records for review within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in a re-inspection.

      Code ATCP 76.38(1)(b) - PUMP CURVE

  3. Feb 19, 2025 Pre-inspection Follow Up · 2 non-critical, 2 repeat
    • Not serious Non-critical Repeat

      ALKALINITY

      The total alkalinity was observed at 43 PPM.

      Correction: Notified person-in-charge (PIC). PIC shall maintain the total alkalinity of the water between 60 and 180 ppm as calcium carbonate or be able to demonstrate to the department or its agent that another level of total alkalinity produces chemically balanced water. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.14(5)(d) - ALKALINITY

    • Not serious Non-critical Repeat

      LIFEGUARD, ATTENDANT STAFFING PLAN REQUIRED

      No attendant staffing plan is available. Attendant staffing plan under previous owner does not meet requirements under ATCP 76.

      Correction: Notified person-in-charge (PIC). License will be released conditionally pending an attendant staffing plan. Operator shall prepare and maintain an attendant staffing plan. This will be reviewed during the re-inspection in 7 days. Failure to comply may result in license being suspended and or revoked.

      Code ATCP 76.22(1)(a) - LIFEGUARD, ATTENDANT STAFFING PLAN REQUIR

  4. Dec 26, 2024 Pre-inspection · 2 critical, 5 non-critical
    • Not serious Non-critical

      ALKALINITY

      The total alkalinity was observed at 43 PPM.

      Correction: Notified person-in-charge (PIC). PIC shall maintain the total alkalinity of the water between 60 and 180 ppm as calcium carbonate or be able to demonstrate to the department or its agent that another level of total alkalinity produces chemically balanced water. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.14(5)(d) - ALKALINITY

    • Not serious Non-critical

      CERTIFIED OPERATOR REQUIRED AT WATER ATTRACTION

      The water attraction does not have a certified operator.

      Correction: Notified person-in-charge (PIC). PIC shall provide a certified operator for the water attraction within 90 days. Once obtained, PIC shall email a copy to Outagamie County Public Health. Failure to comply will result in a $150 fee and may lead to suspension of license.

      Code ATCP 76.20(2)(a)1 - CERTIFIED OPERATOR REQUIRED, WATER ATTRC

    • Not serious Non-critical

      LIFEGUARD, ATTENDANT STAFFING PLAN REQUIRED

      No attendant staffing plan is available. Attendant staffing plan under previous owner does not meet requirements under ATCP 76.

      Correction: Notified person-in-charge (PIC). License will be released conditionally pending an attendant staffing plan. Operator shall prepare and maintain an attendant staffing plan. This will be reviewed during the re-inspection in 7 days. Failure to comply may result in license being suspended and or revoked.

      Code ATCP 76.22(1)(a) - LIFEGUARD, ATTENDANT STAFFING PLAN REQUIR

    • Not serious Non-critical

      POOL DECK-GOOD REPAIR

      Wood pole that restricts access by the wading pool is starting to rot and is not secured.

      Correction: Notified person-in-charge (PIC). PIC shall maintain pool deck area in good repair within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.33(1)(b)1.a. - DECK GOOD REPAIR

    • Not serious Non-critical

      POOL EQUIPMENT-PROPERLY INSTALLLED

      The containment for the shepherds crook is in poor repair and not working to contain the shepherds crook.

      Correction: Notified person-in-charge (PIC). PIC shall ensure that the pool equipment is properly installed within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.

      Code ATCP 76.33(1)(e)2. - INSTALLATION OF POOL EQPT.

    • Serious Critical

      DRINKING FOUNTAIN PROVIDED

      The water fountain provided is not in working order.

      Correction: Notified person-in-charge (PIC). PIC shall provide a drinking fountain within 300 feet walking distance within 7 days. Failure to comply may result in license being suspended and or revoked.

      Code ATCP 76.33(1)(g)1. DRINKING FOUNTAIN PROVIDED

    • Serious Critical

      WATER ATTRACTIONS-WATERSLIDES 6 FEET OR HIGHER, INSPECTION

      A waterslide 6 feet or higher has not been inspected by an engineer or the signed report from the engineer is missing.

      Correction: Notified person-in-charge (PIC). PIC shall have an engineer evaluate the waterslide for the structural stability and integrity of the slide and platform and maintain the signed report from the engineer within 30 days. Once obtained, operator shall email a copy of the report for review to Outagamie County Public Health. Failure to comply may result in license suspension and or revocation.

      Code ATCP 76.37(2)(c) - WATERSLIDE INSPECTED BY ENGINEER

Source: Outagamie County Public Health. History last read Oct 19, 2026. Violation text is the inspector's wording. “Serious” is the source's own top tier. About this data.