Tanner's Grill & Bar Swimming Pool
730 S RAILROAD ST, Kimberly, WI 54136 · Outagamie County
Establishment
- Type
- Pool / recreational water (Swimming)
- Inspected by
- Outagamie County Public Health
- License / ID
- NFRY-9PHE7V
- Status
- Permitted
- Phone
- (920) 788-7275
- Official record
- Outagamie County Public Health inspection reports
Year by year
| Year | Inspections | Violations | Serious |
|---|---|---|---|
| 2026 | 3 | 11 | 3 |
| 2025 | 2 | 16 | 8 |
| 2024 | 3 | 28 | 10 |
Inspections
-
Jun 16, 2026 Routine · No items found
No violations cited.
-
Jun 16, 2026 Re-inspection · 1 critical, 3 non-critical, 4 repeat
-
Not serious
Non-critical
Repeat
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation turnover rate is above 6 hours and has not been met.
Correction: Notified operator. Operator shall immediately adjust to increase flow rate or repair equipment to operate at a proper turnover rate within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
Repeat
SOAP-PROVIDED
Soap not provided in permanently-installed dispensing device in men's bathroom.
Correction: Notified operator. Operator shall provide soap in a permanently-installed dispensing device within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.33 (2)(e)1. - SOAP
-
Not serious
Non-critical
Repeat
VGBA-DRAIN COVER INFO-DOCUMENTS-DRAIN COVER LOG PRESENT
A log can not be reviewed during the inspection to evaluate the drain covers, and there is no alternative form of proof available about drain cover replacement.
Correction: Notified operator. Operator shall maintain a log that can be used to evaluate the drain covers, or keep receipts or affidavits that show make and model of drain cover. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.38(2)(a) - DRAIN COVER LOG
-
Serious
Critical
Repeat
DRINKING FOUNTAIN PROVIDED
There is no drinking fountain provided.
Correction: Notified operator. Operator shall provide a drinking fountain within 300 feet walking distance within 30 days. This will be reviewed during the re-inspection in 30 days. Failure to comply will result in a charged re-inspection of $115.00 and may result in further enforcement actions.
Code ATCP 76.33(1)(g)1. DRINKING FOUNTAIN PROVIDED
-
Not serious
Non-critical
Repeat
-
Jun 12, 2026 Routine · 2 critical, 5 non-critical, 4 repeat
-
Not serious
Non-critical
Repeat
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation turnover rate is above 6 hours and has not been met.
Correction: Notified operator. Operator shall immediately adjust to increase flow rate or repair equipment to operate at a proper turnover rate within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
COMBINED CHLORINE TEST
Chlorine is used and pool water is not tested at least twice a week for the combined chlorine level.
Correction: Notified operator. Operator shall test pool water at least twice a week for the combined chlorine level. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.18(1)(b) - WATER TESTED COMBINED CHLORINE,
-
Not serious
Non-critical
POSTING SIGNAGE-MAX PATRON LOAD
Maximum patron load is left empty on the pool rule signage.
Correction: Notified operator. Operator shall write on the pool rule signage to include the total maximum patron load allowed for the pool within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.29(1)(e) - MAX PATRON LOAD
-
Not serious
Non-critical
Repeat
SOAP-PROVIDED
Soap not provided in permanently-installed dispensing device in men's bathroom.
Correction: Notified operator. Operator shall provide soap in a permanently-installed dispensing device within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.33 (2)(e)1. - SOAP
-
Not serious
Non-critical
VGBA-DRAIN COVER INFO-DOCUMENTS-DRAIN COVER LOG PRESENT
A log can not be reviewed during the inspection to evaluate the drain covers, and there is no alternative form of proof available about drain cover replacement.
Correction: Notified operator. Operator shall maintain a log that can be used to evaluate the drain covers, or keep receipts or affidavits that show make and model of drain cover. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.38(2)(a) - DRAIN COVER LOG
-
Serious
Critical
Repeat
MINIMUM DISINFECTANT RESIDUAL
Minimum disinfectant or sanitizer level is at 0.13 PPM for free chlorine.
Correction: Notified operator. Operator shall close the pool until disinfectant level is in compliance with ATCP 76.14 Table A. Once level is achieved, the pool can be re-opened. A re-inspection will be conducted within 7 days to verify that minimum disinfectant levels are within range. Failure to comply will result in pool closure and will result in a charged re-inspection of $115.00.
Code ATCP 76.14(5)(a) - MINIMUM DISINFECTANT RESIDUAL
-
Serious
Critical
Repeat
DRINKING FOUNTAIN PROVIDED
There is no drinking fountain provided.
Correction: Notified operator. Operator shall provide a drinking fountain within 300 feet walking distance within 30 days. This will be reviewed during the re-inspection in 30 days. Failure to comply will result in a charged re-inspection of $115.00 and may result in further enforcement actions.
Code ATCP 76.33(1)(g)1. DRINKING FOUNTAIN PROVIDED
-
Not serious
Non-critical
Repeat
-
Jul 7, 2025 Re-inspection · 2 critical, 3 non-critical, 5 repeat
-
Not serious
Non-critical
Repeat
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation (turnover) rate has not been met and is at 6.8 hours.
Correction: Immediately adjust or repair equipment to operate at a proper turnover rate to meet the 6 hour turnover time requirement. Correct within 7-10 days. A re-inspection will occur on July 7th to determine compliance. Failure to comply will result in additional charged re-inspection of $103.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
Repeat
SOAP-PROVIDED
Soap not provided in permanently-installed dispensing device in both the restroom showers.
Correction: Provide soap in a permanently-installed dispensing device within 7-10 days. Compliance will be determined during the re-inspection on July 7th. Failure to comply during the re-inspection will result in additional charged re-inspection with a fee of $103.
Code ATCP 76.33 (2)(e)1. - SOAP
-
Not serious
Non-critical
Repeat
POOL BASIN MAINTAINED FREE OF DEFECTS
Pool basin has multiple cracks thoughout the basin and is missing tiles in multiple areas.
Correction: Discussed with person in charge. He stated they have a company scheduled to redo the pool basin during the off season. Maintained the pool basin free of cracks or other defects, and repaired or refinished as necessary to maintain it in a cleanable condition within 90 days. Compliance will be determined during the next routine inspection.
Code ATCP 76.33(1)(a)2 - POOL BASIN GOOD REPAIR
-
Serious
Critical
Repeat
CHEMICAL STORAGE LOCATION
Drums of liquid chlorine and sulphuric acid are stored outside.
Correction: Discussed with person in charge. Store all chemicals in clean, dry, well-ventilated, locked area away from flammables, incompatible chemicals and heat sources within 7-10 days. A re-inspection will be conducted on Monday July 7th. Failure to comply during the re-inspection will result an an addiitonal charged re-inspection with a fee of $103.
Code ATCP 76.12 (2)(b) - CHEMICAL STORAGE LOCATION
-
Serious
Critical
Repeat
DRINKING FOUNTAIN PROVIDED
There is no drinking fountain provided.
Correction: Provide a drinking fountain within 300 feet walking distance within 90 days. Compliance will be determined during the next routine inspection.
Code ATCP 76.33(1)(g)1. DRINKING FOUNTAIN PROVIDED
-
Not serious
Non-critical
Repeat
-
Jun 27, 2025 Routine · 6 critical, 5 non-critical, 2 repeat
-
Not serious
Non-critical
Repeat
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation (turnover) rate has not been met and is at 6.8 hours.
Correction: Immediately adjust or repair equipment to operate at a proper turnover rate to meet the 6 hour turnover time requirement. Correct within 7-10 days. A re-inspection will occur on July 7th to determine compliance. Failure to comply will result in additional charged re-inspection of $103.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
REAGENTS REPLACED
Reagents are expired in the Taylor test kit.
Correction: Discard expired reagents.Discussed with person in charge. He stated he would order a new test kit. Replace test kit within 10 days. Compliance will be determined druring the re-inspection on Monday July 7th. Failure to comply will result in an additional charged re-inspection with a fee of $103.
Code ATCP 76.17 (2)(b) - REAGENTS REPLACED
-
Not serious
Non-critical
FILES RETAINED 2 YEARS-DAILY INSPECTIONS AND OPERATIONAL TESTS
Daily inspection and operational tests records not maintained on premises for 2 years.
Correction: Discussed with person in charge. He stated he keeps the readings on his computer at his home. Maintain on premises for 2 years reports of daily inspections and operational tests within 7-10 days. A paper log was provided to the operator to use on site. Compliance will be determined during the re-inspection on July 7th. Failure to comply during the re-inspection will result in an additional charged
Code ATCP 76.32(3)(b)4. - DAILY INSPECTION AND OPERATIONAL TESTS
-
Not serious
Non-critical
SOAP-PROVIDED
Soap not provided in permanently-installed dispensing device in both the restroom showers.
Correction: Provide soap in a permanently-installed dispensing device within 7-10 days. Compliance will be determined during the re-inspection on July 7th. Failure to comply during the re-inspection will result in additional charged re-inspection with a fee of $103.
Code ATCP 76.33 (2)(e)1. - SOAP
-
Not serious
Non-critical
POOL BASIN MAINTAINED FREE OF DEFECTS
Pool basin has multiple cracks thoughout the basin and is missing tiles in multiple areas.
Correction: Discussed with person in charge. He stated they have a company scheduled to redo the pool basin during the off season. Maintained the pool basin free of cracks or other defects, and repaired or refinished as necessary to maintain it in a cleanable condition within 90 days. Compliance will be determined during the next routine inspection.
Code ATCP 76.33(1)(a)2 - POOL BASIN GOOD REPAIR
-
Serious
Critical
CHEMICAL STORAGE LOCATION
Drums of liquid chlorine and sulphuric acid are stored outside.
Correction: Discussed with person in charge. Store all chemicals in clean, dry, well-ventilated, locked area away from flammables, incompatible chemicals and heat sources within 7-10 days. A re-inspection will be conducted on Monday July 7th. Failure to comply during the re-inspection will result an an addiitonal charged re-inspection with a fee of $103.
Code ATCP 76.12 (2)(b) - CHEMICAL STORAGE LOCATION
-
Serious
Critical
Repeat
MINIMUM DISINFECTANT RESIDUAL
Minimum disinfectant or sanitizer level is 0.67 ppm for chlorine.
Correction: Discussed with person in charge. He shocked the pool with additional chlorine. Close the pool until disinfectant level is in compliance with ATCP 76.14 Table A. Continue to maintain minimum chlorine residual at all times. Compliance will be determined during the re-inspection in 10 days on Monday July 7th. Failure to comply during the re-inspection will result in additional charged re-inspection o
Code ATCP 76.14(5)(a) - MINIMUM DISINFECTANT RESIDUAL
-
Serious
Critical
SHEPHERD'S CROOK PIECES SECURELY CONNECTED
The shepherd's crook is held together with a piece of rope and duct tape.
Correction: Discussed with person in charge. Provide a shepherd's crook that is one piece or with sections that are securely connected within 10 days. A re-inspection will be conducted on Monday July 7th. Failure to comply during the re-inspection will lead to an additional charged re-inspection with a fee of $103.
Code ATCP 76.26(1)(b)1.c. - SHEPHERD'S CROOK PIECES SECURELY CONN
-
Serious
Critical
TELEPHONE ACCESSIBLE
The emergency phone in the pool enclosure is not in working order.
Correction: Discussed with person in charge. He stated the had recent work completed and the line to the phone was cut accidently. A new phone line is set to be run by the company next week Thursday. Provide a working telephone or other technology capable of connecting with emergency services in 7-10 days. A re-inspection will be conducted on Monday July 7th. Failure to comply during the re-inspection will re
Code ATCP 76.26(2)(a) - TELEPHONE ACCESSIBLE
-
Serious
Critical
DRINKING FOUNTAIN PROVIDED
There is no drinking fountain provided.
Correction: Provide a drinking fountain within 300 feet walking distance within 90 days. Compliance will be determined during the next routine inspection.
Code ATCP 76.33(1)(g)1. DRINKING FOUNTAIN PROVIDED
-
Serious
Critical
CO ALARM-POOL EQUIPMENT ROOM
There is a fuel-burning device in the equipment room but no functional CO alarm in the equipment room.
Correction: Provide a CO alarm in the equipment room and install per manufacturer's instructions within 7-10 days. A re-inspection will occur on July 7th to determine compliance. Failure to comply will result in an additional charged re-inspection with a fee of $103.
Code ATCP 76.33(4)(d)1. -CO ALARM EQPT ROOM
-
Not serious
Non-critical
Repeat
-
Jul 1, 2024 Re-inspection 2 · 2 critical, 5 non-critical, 7 repeat
-
Not serious
Non-critical
Repeat
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation turnover rate has not been met. Current turnover rate observed at 9.7 hours.
Correction: Notified operator. Operator shall immediately adjust or repair equipment to operate at a proper turnover rate. This will be reviewed during the re-inspection in 7-10 days. Failure to comply may result in further enforcement actions.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
Repeat
ELECTRONIC MONITORING FREQUENCY OF TESTING
There is no proof or log that pool testing has been done at all.
Correction: Notified operator. Operator shall manually test the pool at least once a day for pH and disinfectant or sanitizer residual with an approved test kit immediately. This will be reviewed during the re-inspection in 7 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ
-
Not serious
Non-critical
Repeat
SIGNAGE 'NO LIFEGUARD ON DUTY'
A pool not required to have a lifeguard, does not have a 'no lifeguard on duty' sign.
Correction: Notified operator. Operator shall provide a sign to indicate 'no lifeguard on duty' that is at least 4 inches high within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.23(2)- NO LIFEGUARD ON DUTY
-
Not serious
Non-critical
Repeat
MAX PATRON LOAD POOL
The pool does not have a maximum patron load sign posted.
Correction: Notified operator. Operator shall calculate the maximum patron load to provide at least 15 square feet per patron in the shallow portion and 25 square feet per patron in the deep portion and do not allow maximum patron load to be exceeded and have that posted within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.25(2)(a) - POOL
-
Not serious
Non-critical
Repeat
POOL RULES POSTED
The pool rules are not posted and or missing.
Correction: Notified operator. Operator shall post the pool rules within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.29(1)(a)1. - SIGNAGE POSTED
-
Serious
Critical
Repeat
COMBINED CHLORINE TEST
There is no proof or log to verify that the pool has been tested.
Correction: Notified operator. Operator shall rest pool water at least twice a week for the combined chlorine level. This will be reviewed during the re-inspection. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(1)(b) - WATER TESTED COMBINED CHLORINE,
-
Serious
Critical
Repeat
ALKALINITY TEST
There is no proof or log to verify that pool testing has been done.
Correction: Notified operator. Operator shall test pool water at least once a week for total alkalinity. This will be reviewed during the re-inspection. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(1)(c) - WATER TESTED ALKALINITY
-
Not serious
Non-critical
Repeat
-
Jun 17, 2024 Re-inspection · 3 critical, 6 non-critical, 9 repeat
-
Not serious
Non-critical
Repeat
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation turnover rate has not been met. Current turnover rate observed at 9.7 hours.
Correction: Notified operator. Operator shall immediately adjust or repair equipment to operate at a proper turnover rate. This will be reviewed during the re-inspection in 7-10 days. Failure to comply may result in further enforcement actions.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
Repeat
ELECTRONIC MONITORING FREQUENCY OF TESTING
There is no proof or log that pool testing has been done at all.
Correction: Notified operator. Operator shall manually test the pool at least once a day for pH and disinfectant or sanitizer residual with an approved test kit immediately. This will be reviewed during the re-inspection in 7 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ
-
Not serious
Non-critical
Repeat
SIGNAGE 'NO LIFEGUARD ON DUTY'
A pool not required to have a lifeguard, does not have a 'no lifeguard on duty' sign.
Correction: Notified operator. Operator shall provide a sign to indicate 'no lifeguard on duty' that is at least 4 inches high within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.23(2)- NO LIFEGUARD ON DUTY
-
Not serious
Non-critical
Repeat
MAX PATRON LOAD POOL
The pool does not have a maximum patron load sign posted.
Correction: Notified operator. Operator shall calculate the maximum patron load to provide at least 15 square feet per patron in the shallow portion and 25 square feet per patron in the deep portion and do not allow maximum patron load to be exceeded and have that posted within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.25(2)(a) - POOL
-
Not serious
Non-critical
Repeat
FIRST AID KIT-EYE WASH SOLUTION
The first aid kit is missing eye wash solution.
Correction: Notified operator. Operator shall provide eye wash solution for the first aid kit within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.27(1)(b)5. - EYE WASH SOLUTION
-
Not serious
Non-critical
Repeat
POOL RULES POSTED
The pool rules are not posted and or missing.
Correction: Notified operator. Operator shall post the pool rules within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.29(1)(a)1. - SIGNAGE POSTED
-
Serious
Critical
Repeat
CHEMICAL STORAGE ACCESS RESTRICTED
Chemical storage area access not restricted to authorized personnel. There is no door and is open to the chemical storage room.
Correction: Notified operator. Operator shall restrict access to chemical storage area to only authorized personnel by adding a door and restricting access within 7 days. This will be reviewed during the re-inspection in 7-10 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.12 (2)(d) - ACCESS RESTRICTED
-
Serious
Critical
Repeat
COMBINED CHLORINE TEST
There is no proof or log to verify that the pool has been tested.
Correction: Notified operator. Operator shall rest pool water at least twice a week for the combined chlorine level. This will be reviewed during the re-inspection. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(1)(b) - WATER TESTED COMBINED CHLORINE,
-
Serious
Critical
Repeat
ALKALINITY TEST
There is no proof or log to verify that pool testing has been done.
Correction: Notified operator. Operator shall test pool water at least once a week for total alkalinity. This will be reviewed during the re-inspection. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(1)(c) - WATER TESTED ALKALINITY
-
Not serious
Non-critical
Repeat
-
Jun 10, 2024 Routine · 5 critical, 7 non-critical
-
Not serious
Non-critical
RECIRCULATION (TURNOVER) RATE NOT MET
The recirculation turnover rate has not been met. Current turnover rate observed at 9.7 hours.
Correction: Notified operator. Operator shall immediately adjust or repair equipment to operate at a proper turnover rate. This will be reviewed during the re-inspection in 7-10 days. Failure to comply may result in further enforcement actions.
Code ATCP 76.11(4)(c) - RECIRCULATION RATE
-
Not serious
Non-critical
LABEL, CONSPICUOUS
Main chemical container is not provided with a label to require contents of ATCP 76.12 (1)(a).
Correction: Notified operator. Operator shall provide a conspicuous, easily visible and read label on the chemical container within 7 days. This will be reviewed during the re-inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.12 (1)(a)
-
Not serious
Non-critical
ELECTRONIC MONITORING FREQUENCY OF TESTING
There is no proof or log that pool testing has been done at all.
Correction: Notified operator. Operator shall manually test the pool at least once a day for pH and disinfectant or sanitizer residual with an approved test kit immediately. This will be reviewed during the re-inspection in 7 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ
-
Not serious
Non-critical
SIGNAGE 'NO LIFEGUARD ON DUTY'
A pool not required to have a lifeguard, does not have a 'no lifeguard on duty' sign.
Correction: Notified operator. Operator shall provide a sign to indicate 'no lifeguard on duty' that is at least 4 inches high within 30 days. This will be reviewed during the next routine inspection. Failure to comply may result in further enforcement actions.
Code ATCP 76.23(2)- NO LIFEGUARD ON DUTY
-
Not serious
Non-critical
MAX PATRON LOAD POOL
The pool does not have a maximum patron load sign posted.
Correction: Notified operator. Operator shall calculate the maximum patron load to provide at least 15 square feet per patron in the shallow portion and 25 square feet per patron in the deep portion and do not allow maximum patron load to be exceeded and have that posted within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.25(2)(a) - POOL
-
Not serious
Non-critical
FIRST AID KIT-EYE WASH SOLUTION
The first aid kit is missing eye wash solution.
Correction: Notified operator. Operator shall provide eye wash solution for the first aid kit within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.27(1)(b)5. - EYE WASH SOLUTION
-
Not serious
Non-critical
POOL RULES POSTED
The pool rules are not posted and or missing.
Correction: Notified operator. Operator shall post the pool rules within 30 days. This will be reviewed during the next routine inspection. Failure to comply will result in further enforcement actions.
Code ATCP 76.29(1)(a)1. - SIGNAGE POSTED
-
Serious
Critical
CHEMICAL STORAGE ACCESS RESTRICTED
Chemical storage area access not restricted to authorized personnel. There is no door and is open to the chemical storage room.
Correction: Notified operator. Operator shall restrict access to chemical storage area to only authorized personnel by adding a door and restricting access within 7 days. This will be reviewed during the re-inspection in 7-10 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.12 (2)(d) - ACCESS RESTRICTED
-
Serious
Critical
MINIMUM DISINFECTANT RESIDUAL
Minimum disinfectant or sanitizer level for the pool was observed at 0.11 PPM.
Correction: Notified operator. Operator shall close the pool until disinfectant level is in compliance with ATCP 76.14 Table A or at a minimum of 1.0 PPM before opening. This will be reviewed during the re-inspection in 7-10 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.14(5)(a) - MINIMUM DISINFECTANT RESIDUAL
-
Serious
Critical
TEST KIT APPROVED
Operator is using a Pentair Rainbow Pool & Spa test kit and is not approved for use for testing of pool.
Correction: Notified operator. Operator shall obtain a department approved pool testing kit for testing and monitoring of pool chemistry within 7 days. This will be reviewed during the re-inspection in 7-10 days. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.17 (1) - DEPARTMENT-APPROVED
-
Serious
Critical
COMBINED CHLORINE TEST
There is no proof or log to verify that the pool has been tested.
Correction: Notified operator. Operator shall rest pool water at least twice a week for the combined chlorine level. This will be reviewed during the re-inspection. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(1)(b) - WATER TESTED COMBINED CHLORINE,
-
Serious
Critical
ALKALINITY TEST
There is no proof or log to verify that pool testing has been done.
Correction: Notified operator. Operator shall test pool water at least once a week for total alkalinity. This will be reviewed during the re-inspection. Failure to comply will result in a charged re-inspection of $103 and may result in further enforcement actions.
Code ATCP 76.18(1)(c) - WATER TESTED ALKALINITY
-
Not serious
Non-critical
Source: Outagamie County Public Health. History last read Oct 19, 2026. Violation text is the inspector's wording. “Serious” is the source's own top tier. About this data.