27cited violations
7serious tier
6inspections

Establishment

Type
Pool / recreational water (Pool - Moderate)
Inspected by
Washington Ozaukee Public Health
License / ID
HSAT-7QXEZ5
Status
Permitted
Phone
(262) 438-1500
Official record
Washington Ozaukee Public Health inspection reports

Other public records for this business

Year by year

YearInspectionsViolationsSerious
2026121
2025250
20242186
2023120

Inspections

  1. Nov 12, 2026 Routine · 1 critical, 1 non-critical
    • Not serious Non-critical

      ALKALINITY

      The total alkalinity is 220.

      Correction: Maintain the total alkalinity of the water between 60 and 180 ppm as calcium carbonate or be able to demonstrate to the department or its agent that another level of total alkalinity produces chemically balanced water.

      Code ATCP 76.14(5)(d) - ALKALINITY

    • Serious Critical

      MINIMUM DISINFECTANT RESIDUAL

      Minimum disinfectant level for the spa is 3.0 PPM. The spa is currently at 1.2 PPM.

      Correction: Close the pool until disinfectant level reaches 3.0 PPM.

      Code ATCP 76.14(5)(a) - MINIMUM DISINFECTANT RESIDUAL

  2. Dec 15, 2025 Routine · 1 non-critical, 1 repeat
    • Not serious Non-critical Repeat

      ELECTRONIC MONITORING FREQUENCY OF TESTING

      The pool, with an electronic monitoring device, has not been manually tested at least once a day with an approved test kit for pH and disinfectant or sanitizer residual.

      Correction: Manually test the pool at least once a day for pH and disinfectant or sanitizer residual with an approved test kit.

      Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ

  3. Jan 16, 2025 Routine · 4 non-critical, 3 repeat
    • Not serious Non-critical Repeat

      COMBINED CHLORINE PLAN PRESENT

      The operator has not developed and implemented a plan to minimize combined chlorine in the spa.

      Correction: Develop and implement a plan to minimize combined chlorine in the pool. Inspector will send over templates of the combined chlorine management template that if filled out and kept on site, can be used to meet the requirement.

      Code ATCP 76.14(5)(e)1. - PLAN PRESENT

    • Not serious Non-critical Repeat

      WHIRLPOOL, THERAPY POOL, EXERCISE POOL,COMBINED CHLORINE

      Chlorine is used and spa water is not tested at least once per day for the combined chlorine level. On January 16th, when this inspection took place, only two tests for combined chlorine had occurred this month.

      Correction: Test spa water daily for the combined chlorine level.

      Code ATCP 76.18(2)(b) - COMBINED CHLORINE, WHIRLPOOL, EX, THERAPY

    • Not serious Non-critical

      WHIRLPOOL, THERAPY POOL, EXERCISE POOL, ALKALINITY

      Pool water not tested at least once a week for total alkalinity. On January 16th, when this inspection occurred, only one alkalinity test had been taken this month.

      Correction: Test pool water at least once a week for total alkalinity.

      Code ATCP 76.18(2)(c) - ALKALINITY, WHIRL, EX, THERAPY

    • Not serious Non-critical Repeat

      ELECTRONIC MONITORING FREQUENCY OF TESTING

      The spa, with an electronic monitoring device, has not been manually tested at least once a day with an approved test kit for pH and disinfectant or sanitizer residual. The spa is only tested Monday to Friday and no tests on weekends have been occurring.

      Correction: Manually test the spa at least once a day for pH and disinfectant or sanitizer residual with an approved test kit.

      Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ

  4. May 2, 2024 Follow Up · 2 critical, 6 non-critical, 8 repeat
    • Not serious Non-critical Repeat

      FLOWMETER, VALVE, OR GAUGE NOT MAINTAINED

      The flow meter is not being maintained in operating condition.

      Correction: Repair or replace the flow meter.

      Code ATCP 76.11(5)(a) - FLOWMETER, VALVE, GAUGE NOT MAINTAINED

    • Not serious Non-critical Repeat

      COMBINED CHLORINE PLAN PRESENT

      The operator has not developed and implemented a plan to minimize combined chlorine in the spa.

      Correction: Develop and implement a plan to minimize combined chlorine in the spa. Inspector gave operator a copy of the combined chlorine management plan template during the inspection.

      Code ATCP 76.14(5)(e)1. - PLAN PRESENT

    • Not serious Non-critical Repeat

      WHIRLPOOL, THERAPY POOL, EXERCISE POOL,COMBINED CHLORINE

      Chlorine is used in the spa and spa water is not tested at least twice a week for the combined chlorine level.

      Correction: Test spa water at least twice a week for the combined chlorine level.

      Code ATCP 76.18(2)(b) - COMBINED CHLORINE, WHIRLPOOL, EX, THERAPY

    • Not serious Non-critical Repeat

      ELECTRONIC MONITORING FREQUENCY OF TESTING

      The spa, with an electronic monitoring device, has not been manually tested at least once a day with an approved test kit for pH and disinfectant or sanitizer residual. The primary operator has been out multiple days this month and no other staff have tested the spa.

      Correction: Manually test the spa at least once a day for pH and disinfectant or sanitizer residual with an approved test kit.

      Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ

    • Not serious Non-critical Repeat

      BIOHAZARD KIT-AVAILABLE

      A biohazard kit is not available.

      Correction: Provide a biohazard kit for the spa.

      Code ATCP 76.27(2)(a) - BIOHAZ KIT AVAILABLE

    • Not serious Non-critical Repeat

      FILES MAINTAINED PERMANENT-ATCP 76 CURRENT COPY

      A copy of the most current version of ch. ATCP 76 was not permanently maintained on premises:

      Correction: Maintain a copy of the most current version of ch. ATCP 76 on premises.

      Code ATCP 76.32(3)(a)1. - CURRENT ATCP 76 COPY

    • Serious Critical Repeat

      OPERATOR KNOWLEDGE- ELECTRICAL INTERLOCK FUNCTION

      The person responsible is not able to describe how the chemical feeder electrical interlock functions.

      Correction: Ensure that operator can describe how the chemical feeder electrical interlock functions. Inspector is going to send the operator a copy of the chemical interlock checklist so the operator know what components he/she must understand.

      Code ATCP 76.13 (1)(c)2.b - HOW ELECTRICAL INTERLOCK FUNCTIONS

    • Serious Critical Repeat

      INTERLOCK CHALLENGE TEST

      Monthly challenge testing of the chemical feeder system has not been conducted to assess the interlock. The monthly main spa log pump safety check completed has been marked for this month but no interlock challenge test was completed.

      Correction: Challenge test the chemical feeder system monthly to assess the interlock. When completed, mark the pump safety check completed box.

      Code ATCP 76.13 (1)(c)3. - INTERLOCK MONTHLY TEST

  5. Apr 24, 2024 Routine · 4 critical, 6 non-critical
    • Not serious Non-critical

      FLOWMETER, VALVE, OR GAUGE NOT MAINTAINED

      The flow meter is not being maintained in operating condition.

      Correction: Repair or replace the flow meter.

      Code ATCP 76.11(5)(a) - FLOWMETER, VALVE, GAUGE NOT MAINTAINED

    • Not serious Non-critical

      COMBINED CHLORINE PLAN PRESENT

      The operator has not developed and implemented a plan to minimize combined chlorine in the spa.

      Correction: Develop and implement a plan to minimize combined chlorine in the spa. Inspector gave operator a copy of the combined chlorine management plan template during the inspection.

      Code ATCP 76.14(5)(e)1. - PLAN PRESENT

    • Not serious Non-critical

      WHIRLPOOL, THERAPY POOL, EXERCISE POOL,COMBINED CHLORINE

      Chlorine is used in the spa and spa water is not tested at least twice a week for the combined chlorine level.

      Correction: Test spa water at least twice a week for the combined chlorine level.

      Code ATCP 76.18(2)(b) - COMBINED CHLORINE, WHIRLPOOL, EX, THERAPY

    • Not serious Non-critical

      ELECTRONIC MONITORING FREQUENCY OF TESTING

      The spa, with an electronic monitoring device, has not been manually tested at least once a day with an approved test kit for pH and disinfectant or sanitizer residual. The primary operator has been out multiple days this month and no other staff have tested the spa.

      Correction: Manually test the spa at least once a day for pH and disinfectant or sanitizer residual with an approved test kit.

      Code ATCP 76.18(3)(a) - ELECTRONIC MONITORING TEST FREQ

    • Not serious Non-critical

      BIOHAZARD KIT-AVAILABLE

      A biohazard kit is not available.

      Correction: Provide a biohazard kit for the spa.

      Code ATCP 76.27(2)(a) - BIOHAZ KIT AVAILABLE

    • Not serious Non-critical

      FILES MAINTAINED PERMANENT-ATCP 76 CURRENT COPY

      A copy of the most current version of ch. ATCP 76 was not permanently maintained on premises:

      Correction: Maintain a copy of the most current version of ch. ATCP 76 on premises.

      Code ATCP 76.32(3)(a)1. - CURRENT ATCP 76 COPY

    • Serious Critical

      OPERATOR KNOWLEDGE- ELECTRICAL INTERLOCK FUNCTION

      The person responsible is not able to describe how the chemical feeder electrical interlock functions.

      Correction: Ensure that operator can describe how the chemical feeder electrical interlock functions. Inspector is going to send the operator a copy of the chemical interlock checklist so the operator know what components he/she must understand.

      Code ATCP 76.13 (1)(c)2.b - HOW ELECTRICAL INTERLOCK FUNCTIONS

    • Serious Critical

      INTERLOCK CHALLENGE TEST

      Monthly challenge testing of the chemical feeder system has not been conducted to assess the interlock. The monthly main spa log pump safety check completed has been marked for this month but no interlock challenge test was completed.

      Correction: Challenge test the chemical feeder system monthly to assess the interlock. When completed, mark the pump safety check completed box.

      Code ATCP 76.13 (1)(c)3. - INTERLOCK MONTHLY TEST

    • Serious Critical

      PH

      The pH is far above 8.0 when measured using the Taylor kit. The spa needs to be closed in accordance with DATCP policy REC-GUD-007.

      Correction: Maintain the pH at 7.2 to 7.8. The facility has a controller with a pH meter that was reading 7.4 but it appears this pH meter is not working accurately. The spa was closed during inspection.

      Code ATCP 76.14(5)(c) - PH

    • Serious Critical

      MAXIMUM CHLORINE

      The maximum chlorine residual exceeds 10 ppm.

      Correction: Close the spa until the chlorine residual is in compliance with ATCP 76.14 Table A. The spa was closed during inspection.

      Code ATCP 76.14(5)(f) - MAXIMUM FREE CHLORINE

  6. May 16, 2023 Routine · 2 non-critical, 1 repeat
    • Not serious Non-critical Repeat

      COMBINED CHLORINE

      The combined chlorine is 2 ppm.

      Correction: Treat the pool with breakpoint chlorination using a chlorine product or a nonchlorinated oxidizer.

      Code ATCP 76.14(4)(e)

    • Not serious Non-critical Corrected on site

      CHLORINE TOO LOW

      The chlorine residual was .6 ppm at the time of the inspection.

      Correction: Close the pool and raise the chlorine residual to 3 ppm before re-opening.

      Code [A] ATCP 76.14(4)(a)

Source: Washington Ozaukee Public Health. History last read Nov 20, 2026. Violation text is the inspector's wording. “Serious” is the source's own top tier. About this data.