DC Water 2026 Performance Oversight Pre-Hearing Responses
Council of the District of Columbia · District of Columbia County · meeting of Mar 13, 2026 · Other
Open the original document More from Council of the District of Columbia
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
2026 PERFORMANCE OVERSIGHT
COUNCIL OF THE DISTRICT OF COLUMBIA
THE HONORABLE CHARLES ALLEN, CHAIRPERSON
COMMITTEE ON TRANSPORTATION AND THE ENVIRONMENT
PRE-HEARING QUESTIONS & ANSWERS
FRIDAY, FEBRUARY 20, 2026
PART I: GENERAL QUESTIONS
Governance and Personnel:
1. Please provide a complete and current organizational chart for the agency and each division and
subdivision within the agency, including:
a. The names and titles of all senior personnel;
b. A description of the roles and responsibilities for each division and subdivision;
c. A narrative explanation of any changes to the organizational chart made since last year’s
responses; and
d. An indication of whether any positions in the chart are vacant.
DC Water Response:
Please refer to the pdf attachments:
Org Chart - DC Water 1-1-2026.pdf
Org Chart - Administration - 1.1-2026.pdf
Org Chart - Engineering 1-1-2026.pdf
Org Chart - Finance, Procurement and Compliance 1-1-2026.pdf
Org Chart- Government and Legal Affairs - 1.1-2026.pdf
Org Chart - Independent Offices -1.1.2026.pdf
Org Chart- Information Technology -1-1-2026.pdf
Org Chart - Operations 1-1-2026.pdf
Org Chart- People and Talent -1-1-2026.pdf
Org Chart- Strategy and Performance -1-1-2026.pdf
Kindly note that the information provided is current as of January 1, 2026.
2. Please provide a copy of your agency’s Schedule A. Please note the date that the information was
collected in your response.
DC Water Response:
Please refer to the excel attachment: “Position Inventory Report”. The information provided is
current as of December 31, 2025.
3. Please provide a complete, up-to-date list of contract workers working directly for your agency,
ordered by program and activity, and including the following information for each position:
a. Title of position;
b. Indication that the position is filled or vacant;
c. Date employee began in the position;
d. Whether the position must be filled to comply with federal or local law;
e. If applicable, the federal or local law that requires the position be filled;
f. The entity from which they are contracted; and
g. The hourly rate and contracted annual cost.
DC Water Response:
Please refer to the pdf attachment: “DC Water Current Contract Workers”.
4. Please provide, for each month in FY25 and FY26, to date, the total number of personnel
separated from and hired by the agency.
DC Water Response:
FY25 FY26
Oct
2024
Nov
2024
Dec
2024
Jan
2025
Feb
2025
Mar
2025
Apr
2025
May
2025
June
2025
July
2025
Aug
2025
Sep
2025
Oct
2025
Nov
2025
Dec
2025
Jan
2026**
Hired 4 6 8 3 7 14 4 5 3 2 1 4 2 4 1 4
Separated 8 9 3 8 4 6 6 11 6 10 8 9 10 3 6 5
** as of 1/6/2026
5. Please provide the number of District residents employed by the agency, broken down by
position type (e.g., continuing, term/temporary, and contract).
DC Water Response:
District residents employed as personnel:
Position Type Number of District Residents
Continuing 186
Term / Temporary 0
Contract 0
6. Please provide a table with the current membership of the Board of Directors, and, if any, the
number of unfilled Board seats. For each seat, please provide the following:
a. The member’s name;
b. The jurisdiction in which they reside;
c. The jurisdiction, agency, or organization the member represents;
d. When the member’s term expires;
e. For any vacant seats, how long has the seat been vacant; and
f. Attendance record for all official Board meetings.
DC Water Response:
Please refer to the pdf attachment: “Board of Directors”.
7. Does the agency conduct annual performance evaluations of all its employees? If so, who
conducts such evaluations? What steps are taken to ensure that all office employees meet
individual job requirements?
DC Water Response:
Yes, annual performance reviews are conducted annually for non-union employees, and
this was done in FY 2025.
The employee’s manager conducts the evaluation, and the employee can provide a self-
evaluation.
Employees are evaluated on competencies, organizational values and performance goals.
The number of goals varies. This is based on a 5-level rating scale. (Exceptional, Exceeds
Expectations, Meets Expectations, Needs Improvement and Unsatisfactory).
Steps taken to ensure that all agency non- union employees are meeting individual job
requirements are:
o Formalized SMART Goal Setting
o Goal alignment to our Strategic Plan, Blueprint 2.0
o Performance Coaching
o Continuous and ongoing feedback
o Training and workshops
o Frequent Check-ins
If an employee does not meet individual job requirements the manager can address the
issues during the recommended check-ins. If the behavior does not improve the employee
is provided with a Plan of Action (POA) which provides detailed instructions on how to
improve their performance. If an employee continues to fail to perform satisfactorily in the
role, additional discipline can result up to and including possible termination.
8. Please provide the following for each collective bargaining agreement that is currently in effect
for DC Water employees:
a. The bargaining unit (name and local number);
b. The start and end date of each agreement;
c. The number of employees covered;
d. Whether the agency is currently bargaining;
e. If currently bargaining, the anticipated completion date;
f. For each agreement, the union leader’s name, title and contact information; and
g. A copy of the ratified collective bargaining agreement.
DC Water Response:
Please refer to the pdf attachment: “Collective Bargaining Agreement”.
9. Please list any strikes or other organized labor actions impacting DC Water or any DC Water-
related contracts conducted in FY25 and FY26, to date, and provide a status update on the
negotiations to resolve any ongoing actions.
DC Water Response:
Strikes are prohibited under each of the five DC water collective bargaining agreements. In
addition, there are no other related labor actions beyond typical grievances related to working
conditions.
10. Please list all administrative complaints or grievances that the agency received in FY25 and
FY26, to date. For each complaint, list:
a. The source of complaint;
b. The process utilized to respond to the complaint or grievance;
c. Any changes to agency policies or procedures that resulted from the complaint or
grievance; and
d. If resolved, describe the resolution.
DC Water Response:
Please refer to the pdf attachment: “Grievances”. There have been no changes to agency policies
or procedures as a result of a complaint or grievance.
Finance and Budget:
11. Please provide a chart showing the agency’s approved budget, actual spending, and any
variance between the two, broken down by division and subdivision, for FY25 and FY26, to date.
Please provide an explanation for any variance between the approved budget and actual spending.
DC Water Response:
On March 6, 2025, the DC Water Board of Directors amended the FY 2025 Operating Budget by
reallocating $5.5 million from Debt Service to the Cash Financed Capital Improvements (CFCI)
for PAYGO to reduce future borrowing costs. The overall FY 2025 budget remained at the Board
adopted level of $788.2 million. The total operating expenditures were below the revised FY 2025
budget by $52.3 million, mainly in:
Operations and maintenance – Overall underspending of $25.3 million was driven in part by
spending restrictions implemented during middle of the fiscal year to comply with the
mandated Continuing Resolution that reduced authorized spending by $51 million. The
underspending of $11.8 million in personnel services was due to higher than anticipated
vacancies offset by higher overtime costs to respond to emergencies. Other areas of
underspending include $12.3 million in contractual services mainly to align with spending
restrictions; $1.8 million in water purchases, and $0.5 million in utilities mainly due to lower
than anticipated cost of water used in treatment processes. There was higher spending of $1.2
million on supplies and small equipment due to the impact of inflation on critical spare parts
and equipment.
Debt Service & CFCI – Underspending of $19.5 million in debt service due to deferred bond
issuance, refunding and achieving lower interest than projected. The underspending of $7.5
million in CFCI reflects lower than anticipated utilization of PAYGO to align with the overall
spending mandate.
FY 2025 FY 2025 VarianceRevised Budget Actual Favorable/ (Unfavorable) Customer Care 16,636,234 15,771,221 865,013 Clean Rivers 4,107,740 3,550,938 556,802 Engineering and Technical Services 25,394,628 19,915,400 5,479,228 Wastewater Engineering 3,722,461 5,251,220 (1,528,759)CIP Infrastructure Management 5,965,239 827,113 5,138,126 Permit Operations 5,286,000 5,877,700 (591,700)Wastewater Treatment Operations 99,253,586 99,532,253 (278,668)Clean Water and Technology 5,055,132 3,870,678 1,184,454 Resource Recovery 7,775,267 7,570,116 205,150 Maintenance Services 24,762,614 23,230,252 1,532,362 Process Engineering 8,533,824 7,775,867 757,957 Water Operations 85,196,571 84,646,264 550,307 Pumping and Sewer Operations 45,092,066 44,142,057 950,009 Secretary to the Board 875,228 845,361 29,867 Office of Chief Executive Officer 2,711,592 2,690,021 21,571 Internal Audit 839,471 772,340 67,131 Marketing and Communication 4,349,021 4,354,433 (5,412)Office of Chief Operating Officer 1,691,818 2,758,506 (1,066,688)Office of Chief Administration Officer 1,466,111 793,873 672,238 Office of Emergency Management 1,682,069 1,676,728 5,341 Fleet Management 7,191,024 7,032,867 158,157 Occupational Safety 2,858,564 3,527,582 (669,018)Facilities Management 10,777,794 11,411,858 (634,064)Security 11,057,064 10,585,446 471,618 Finance 30,061,874 22,943,960 7,117,914 Procurement 7,610,973 6,653,775 957,198 Non-Ratepayer Revenue Fund 500,000 - 500,000 Compliance & Business Development 2,317,590 1,303,577 1,014,013 Strategy and Performance 2,737,963 2,755,187 (17,224)People and Talent 9,684,988 9,124,247 560,741 Information Technology 11,006,433 11,231,992 (225,558)Government and Legal Affairs 8,312,391 6,765,235 1,547,156 Total O&M Expenditures 454,513,331 429,188,067 25,325,264 Debt Service 243,968,818 224,505,843 19,462,975 Cash Financed Capital Improvements 65,962,683 58,438,012 7,524,671 Payment in Lieu of Taxes 18,696,216 18,696,216 - Right of Way 5,100,000 5,100,000 - Total Non-O&M Expenditures 333,727,717 306,740,071 26,987,646 Total Operating Expenditures 788,241,048 735,928,138 52,312,910 Personnel Charged to Capital Projects (34,086,882) (25,788,538) (8,298,344)Total Net Operating Expenditures 754,154,167 710,139,600 44,014,566
Departments
Personnel Services: Overall underspending on personnel costs across multiple departments was mainly
due to higher than anticipated vacancies, coupled with the restriction on hiring to comply with the spending
restriction in the Continuing Resolution. Spending was offset in part by higher overtime costs to respond
to emergencies
Customer Care: Underspending within personnel services costs due to higher than anticipated vacancies,
coupled with lower than anticipated spending on hardware and software maintenance costs
Clean Rivers: Underspending in personnel services due to higher than anticipated vacancies for hard to fill
positions and lower spending on the maintenance and repairs of the various Green Infrastructure facilities
Engineering and Technical Services: Underspending was in personnel services and contractual services
due to a reorganization during middle of the fiscal year that resulted in reallocation of staff to other parts of
the Engineering Cluster within the Authority
Wastewater Engineering: Overspending was in personnel services due to reorganization during middle of
the fiscal year that resulted in reallocation of staff from the Engineering and Technical Services department
CIP Infrastructure Management: Underspending was mainly in personnel services due to a
reorganization that resulted in reallocation of staff to other parts of the Engineering Cluster within the
Authority
Permit Operations: Overspending was primarily in personnel costs due to position transfers that were part
of the Engineering Cluster reorganization which resulted in reassignment of water and sewer construction
inspection activities to Permit Operations
Wastewater Treatment Operations: The department experienced overspending primarily due to higher
than anticipated costs for personnel, industrial cleaning services and other maintenance and repairs costs
Clean Water and Technology: The department achieved overall underspending on personnel costs due to
higher-than-expected vacancies and various professional services that supported operations
Maintenance Services: Underspending was mainly on personnel services due to higher vacancies
Process Engineering: Underspending was mainly in personnel services due to higher vacancies, offset in
part by increased costs for equipment maintenance and repairs
Water Operations: Underspending on the purchase of drinking water from the Washington Aqueduct,
partly offset by overspending on personnel overtime costs needed to respond to various emergencies
Pumping and Sewer Operations: Underspending was mainly personnel services due to vacancies,
supplies and various contractual services resulting from the mandated spending restrictions. Areas of higher
spending included electricity costs and overtime expenses to respond to emergency work
Office of the Chief Operating Officer (OCOO): Overspending was primarily in personnel costs due to
position transfers that were part of the Engineering Cluster reorganization
Office of Chief Administration Officer (OCAO): Underspending on personnel service costs, coupled
with various professional services due to budget restrictions from the Continuing Resolution
Occupational Safety: Overspending was driven by reallocation of the fire systems maintenance and repair
services from the Security Department
Security: Underspending was primarily due to reallocation of the fire systems maintenance and repair
services to the Occupational Safety Department
Facilities Management: Increased janitorial cleaning costs primarily attributed to the department’s
overspending. However, part of the overspending was offset by lower personnel costs due to increased
vacancies
Finance: Underspending mainly on contractual services due to spending restrictions to comply with the
mandated Continuing Resolution. These include lower than anticipated spending on financial & bond
advisory and management services. Additionally, expenditure on various strategic activities occurred in
other areas, resulting in funds being reprogrammed to cover these expenses
Procurement: The underspending was primarily due to vacancies within the department, driven by
mandated hiring restrictions
Compliance and Business Development: The underspending was primarily due to vacancies within the
department, as well as other contractual services spending constraints in response to the reduced spending
mandate
Non-Rate Payer Fund: Funding from this account was approved for reprogramming to offset costs in other
user departments once specific requirements are met
People and Talent: Underspending was due to reduced contractual services related to recruitment activities
such as advertising, office support, and the internship program. This was a result of the spending restrictions
to comply with the Continuing Resolution
Office of Government and Legal Affairs: Underspending was primarily driven by lower than anticipated
requirements for legal contingency coupled with lower spending on outside legal matters, and personnel
services due to higher vacant positions
FY 2026 YTD: The Approved FY 2026 operating budget is $838.1 million as adopted by the Board of
Directors on March 6, 2025.
At the end of December 2025, operating expenditures (including debt services and the Right-of-Way and
Payment in Lieu of Taxes fees) totaled $178.3 million, or 21.3 percent of the approved budget. The year-
to-date operating expenditures were lower than the budget mainly due to underspending on personnel
services, small equipment, contracts services, utilities, and debt service, offset in part by overspending on
chemicals and supplies due to higher than anticipated unit prices.
These numbers include estimated, incurred but unpaid invoices and are subject to revision in the subsequent
months. The following provides DC Water’s comparative expenditures by major object category through
December 31, 2025.
12. Please provide a status report, including timeframe of completion, for all projects for which your
agency currently has capital funds available.
DC Water Response:
A summary of the major capital activities and a detailed listing for each project in DC Water’s
Approved FY 2026 - FY 2035 Capital Improvement Program is found in Section V of the FY 2026
Approved Budget Book.
Link: https://www.dcwater.com/sites/default/files/document/2025-
05/documents/FY2026%20Capital%20Improvement%20Program.pdf
13. Please provide copies of all budget enhancement requests (The Form B or similar form)
submitted in the formulation of the FY25 and FY26 proposed budgets.
DC Water Response:
DC Water operates within its overall Board-adopted levels. There were no budget enhancement
requests submitted to the District for the formulation of the adopted budgets for FY25 and FY26.
14. Please list all budget enhancements in FY26 and provide a status report on the implementation
of each enhancement.
CATEGORYAnnual BudgetYTD Budget Actual% of BudgetVariance $ Fav(Unfav)Variance % Fav(Unfav)Personnel $217,462 53,070$ $51,560 23.7% $1,510 2.8%Contractual Services 102,284 26,296 25,765 25.2% 530 2.0%Water Purchases 48,149 10,845 10,244 21.3% 601 5.5%Supplies & Chemicals 57,491 14,485 14,920 26.0% (436) (3.0%)Utilities 41,659 11,354 10,430 25.0% 924 8.1%Small Equipment 1,531 388 377 24.6% 11 2.9%SUBTOTAL O&M $468,576 $116,438 $113,297 24.2% $3,141 2.7%Debt Service 271,489 63,788 58,913 21.7% 4,875 7.6%PILOT/ROW 24,170 6,043 6,043 25.0% 0 0.0% Cash Financed Capital Improvements 73,897 0 0 0.0% 0 0.0%TOTAL OPERATING $838,133 $186,268 $178,252 21.3% $8,016 4.3%Capital Labor (30,907) (7,929) (5,537) 17.9% (2,392) 30.2%TOTAL NET OPERATING $807,226$178,339$172,71621.4%$5,6243.2%Year-to-Date PerformanceFY 2026
DC Water Response:
DC Water operates within its overall Board-adopted levels. There are no budget enhancement
requests submitted to the District in FY26.
15. Please fill out the attached spreadsheet titled “Question 15 Grants Received,” and list all federal
and private grants received by your agency in FY25 and FY26, to date, current balances, and
indicate any that lapsed during or at the end of FY25 or FY26.
a. Please submit the completed document in both Excel and PDF formats.
b. Please include your Agency Code in the filename (e.g., question_15_AB0_2026.xls).
DC Water Response:
Please refer to the excel attachment: “Grants Received”.
16. List all grants issued by your agency in FY25 and FY26, to date in the attachment labeled
“Question 16 Grants Issued”.
a. Please submit the completed document in both Excel and PDF formats.
b. Please include your Agency Code in the filename (e.g., Question_16_AB0_2026.xls).
DC Water Response:
DC Water does not issue grants to any agencies.
Operations:
17. For any boards or commissions associated with your agency, please provide a chart listing the
following for each member:
a. Their names (or an indication the seat is vacant);
b. The date of their confirmation;
c. The date their term ends;
d. Whether the member is a District resident; and
e. Attendance at each meeting in FY25 and FY26, to date.
DC Water Response:
Please refer to the pdf attachment: “Board of Directors”.
18. Please provide the Committee with a list of all vehicles owned or leased by the agency,
including:
a. The purpose of the vehicle;
DC Water Response:
The purpose of the vehicle is specific to the operational need of the assigned department.
b. The division the vehicle is assigned to, if applicable; and
DC Water Response:
Please refer to excel attachment: “Vehicles”.
c. Whether the vehicle is assigned to an individual employee.
DC Water Response:
All vehicles are assigned to departments, except for David Gadis, CEO and GM, and
Chris Collier, VP of Water Operations.
19. Please provide a list of all positions for which the agency is currently providing, at the agency’s
expense, a cell phone or other mobile communication device, or any related cellular or wireless
data plan.
a. Please provide the total cost to the agency for mobile communication devices and any
related cellular or wireless data plan in FY25 and FY26, to date.
DC Water Response:
Please refer to the excel attachments: “Wireless Data” and “Total Cost for Wireless Service”.
20. For each objective and activity in the agency’s FY25 Performance Plan, please list:
DC Water Response:
In FY 2021, DC Water launched a strategic planning initiative, creating Blueprint 2.0, our strategic
plan. The updated and comprehensive new strategic plan contains new imperatives, themes,
and goals and a robust reporting structure.
As with previous submittals to the Council, DC Water’s performance is assessed and reported via
a Blueprint 2.0 Annual Performance Report. The Blueprint 2.0 Annual Report is in the pdf
attachment: “FY25 Blueprint 2.0 Annual Report”.
Included in the Blueprint 2.0, within our Reliable imperative, we have a theme of “Integrated
Enterprise-Wide Strategic Management.” That theme has a goal to improve our Enterprise Risk
Management (ERM) capability. We are focusing on that goal for this year’s response with details
below:
a. The measure of greatest improvement for the agency, and the actions the agency took to
improve that measure’s outcome, efficiency or quantity; and
DC Water Response:
The enterprise-wide adoption and integration of ERM through a bottom-up risk
management model. The Authority successfully implemented an ISO 31000 aligned ERM
framework, establishing a consistent enterprise methodology for risk identification,
prioritization, and monitoring. The Enterprise Performance Management Office
(EPMO) was supported by 100% of DC Water’s cluster engagement, achieved through
targeted departmental ERM roadshows that equipped leadership and staff to
directly identify and document risks within the Origami ERM platform. In addition, all
departments with Grade 17 and above employees completed ERM 201 training,
strengthening enterprise risk awareness and capability across the Authority.
b. For all measures with missed targets (if any), the actions the agency is taking to improve
that measure’s outcome, efficiency, or quantity.
DC Water Response:
To address greater participation in ERM training, the Authority is implementing a focused
set of actions to improve completion rates, efficiency, and enterprise impact.
ERM trainings will be available through additional session offerings, flexible scheduling,
and on-demand options to reduce participation barriers. Completion metrics will be
actively monitored and reported to leadership, with targeted outreach to underrepresented
clusters and departments.
21. List all new objectives, activities and projects in the agency’s FY26 Performance Plan and
explain why they were added.
DC Water Response:
Below are three programs, facilitated via DC Water’s Strategy & Performance team. Each
describes new initiatives that are being advanced in FY26 and will contribute to improved
performance at the enterprise level.
a. The EPMO serves as the enterprise facilitator for Non-Revenue Water (NRW) risk
mitigation within the broader Revenue Erosion & Expenditure Increase risk, leveraging its
enterprise governance and ERM framework. Through the Enterprise Risk Management
Committee (ERMC), the EPMO ensures that NRW risk mitigation activities are
consistently prioritized, that risk treatment plans are aligned across clusters, and that
progress is tracked against defined KPIs and KRIs. By standardizing communication,
reporting, and escalation, and consolidating information into executive dashboards, the
EPMO reduces siloed decision-making and embeds NRW mitigation into enterprise
decision-making, supporting measurable reductions in revenue erosion and increases in
expenditure.
b. In conjunction with People & Talent, the EPMO Policy Management
Function provides direct support and assistance toward the completion of
a comprehensive inventory of HR-related Standard Operating Procedures (SOPs) and
policies while updating or retiring outdated critical HR Policy documents. This project
addresses the Authority’s need to stay up-to-date and organized on policy management for
a crucial function within the organization.
c. Leveraging an innovative contract delivery mechanism, progressive design-build, DC
Water is advancing the design and construction of a Discovery Center at the Blue Plains
Advanced Wastewater Treatment Plant. The Discovery Center groundbreaking will take
place in summer 2026 and serve multiple purposes to help improve our water supply
resilience. It will pilot technologies to assess water treatment capabilities. It will educate
the public, regulators, and other water professionals about the capabilities of water
recycling opportunities and the importance of protection of our water resources. Finally, it
will serve as a research hub, advancing the water sector’s knowledge development on
water reclamation applications and technologies.
22. Describe problems and challenges in agency-owned or leased facilities, including chronic
maintenance issues and design flaws.
a. What capital or operating projects arose from these issues in FY25 and FY26, to date,
including cost and actions taken?
DC Water Response:
Please refer to the excel attachment: “Facilities”.
23. Please list each new initiative or program implemented by the agency during FY25 and FY26,
to date. For each new initiative or program, please provide:
a. A description of the initiative/program;
b. Actual start date;
c. Actual or anticipated end date;
d. The funding required to implement the initiative/program;
e. Whether the initiative/program was mandated by legislative action;
f. Problems or challenges faced in the initiative/program’s implementation;
g. The metrics the agency is collecting to measure the initiative/program’s success; and
h. An assessment of the initiative/program’s success thus far.
DC Water Response:
DC Water High School Engagement and Workforce Development Program
a. Description of the initiative/program: In FY25, DC Water launched the High School
Engagement and Workforce Development Program to strengthen early-career and talent
pipeline efforts aimed at increasing the hiring of District residents. The program is designed
to spark interest in the utility sector among District high school juniors and seniors by
introducing them to career pathways within DC Water and through the DC Water Works
program.
Participants receive exposure to public utility operations, professional workplace
environments, and potential employment and training opportunities. The initiative is
particularly focused on students who may not be pursuing college immediately or who are
still exploring post-secondary options.
b. Actual start date: June 23, 2025 (program launched during FY25)
c. Actual or anticipated end date: August 15, 2025 (continuing into FY26 and beyond)
d. Funding required to implement the initiative/program: The program is supported
through existing DC Water Works operating resources and staff capacity. No separate or
new dedicated funding allocation was required to implement the initiative during FY25 or
FY26.
e. Whether the initiative/program was mandated by legislative action: This initiative was
not mandated by legislative action. It was implemented at the discretion of DC Water
Works to advance workforce development and local hiring goals.
f. Problems or challenges faced in the initiative/program’s implementation: Initial
challenges included coordinating student placements within operational departments,
aligning student schedules with agency work requirements, and ensuring adequate staff
capacity for mentorship and supervision. These challenges were managed through internal
planning and departmental coordination.
g. Metrics the agency is collecting to measure the initiative/program’s success:
DC Water is tracking the following metrics:
Number of District high school students participating
Student retention and continued participation
Progression into internships, training programs, or employment pathways through
DC Water or DC Water Works
h. Assessment of the initiative/program’s success thus far: The program has demonstrated
early success. In FY25, four (4) District high school students participated and were placed
within Sewer Services, Human Capital Management, and Legal Affairs. Three (3)
participants transitioned to full-time employment with DC Water, and one (1) student will
return in FY26 to continue participation, indicating sustained engagement and program
effectiveness.
Pure Water DC
a. A description of the initiative/program: In late 2025, DC Water launched the Pure Water
DC program to diversify the District’s water supply. This new strategy sets forth a bold
vision for regional water supply resilience, building on regional collaboration and
technological innovation in the water sector. Pure Water DC lays out a portfolio of solutions
over various timeframes to fully address the needs of the whole region. The program sets
out interconnected strategic priorities: protecting our first source, developing a second
source, optimizing distribution, and collaborating with regional partners on expanding
storage and coordinating operations. The program will be guided by evidence-based
decision making, regional collaboration, and fiscal responsibility, with milestones
including the summer 2026 groundbreaking and 2027 opening of the Pure Water DC
Discovery Center and ongoing engagement with regulators and stakeholders which will
inform options and full-scale solutions to be implemented in future years.
b. Actual start date: The program launched on November 21, 2025.
c. Actual or anticipated end date: Pure Water DC will be a long-term (years), multi-faceted
program, evolving from strategy, to concept, to construction, and ultimately operation.
Early-year technology and regulatory assessment will determine the final schedule and we
will continue to update the Council as more information is available.
d. The funding required to implement the initiative/program: Current efforts are funded
via the Authority’s Capital Improvement Plan with $21m in seed funding authorized by the
Board of Directors in November 2025 for FY26, 27, and 28. To develop this portfolio, in
late 2025, DC Water’s Board of Directors approved $21 million in s
e. Whether the initiative/program was mandated by legislative action: This program is
not mandated by legislative action, rather it is driven by the city’s and region’s need for a
more reliable source of water for the District of Columbia.
f. Problems or challenges faced in the initiative/program’s implementation: The program
is still in the very early stages of implementation, and the project team is assessing potential
challenges, gaps, and needs and working to plan for those issues before they delay the
program. This includes program readiness by the Authority, regulatory approvals, and long-
term financial approaches, among others.
g. The metrics the agency is collecting to measure the initiative/program’s success:
Ultimately, this program will increase the water supply resilience of the District of
Columbia and potential neighboring jurisdictions. This can and will be measured by
operational metrics such as hours, days, or weeks of water supply backup.
h. An assessment of the initiative/program’s success thus far: Thus far, the program has
successfully launched with support of the EPA Headquarters, local utilities, regional water
stakeholders, and industry experts. We are continuing to engage with regional partners
through a US EPA Water Reuse Action Plan (WRAP) initiative, signaling DC Water’s
leadership and intent to collaborate with neighboring utilities and federal partners. In
parallel, the Authority is moving forward with procurement of early-stage equipment for a
Pure Water DC Discovery Center which will pilot technical solutions, educate the public,
and accelerate near- and medium-term actions while longer-term regional storage projects
mature.
Building the Next Generation of DC Water Leaders
a. A description of the initiative/program: At DC Water, delivering one of the region’s most
essential services requires more than just technical excellence, but strong leaders who can
guide teams through an increasingly complex operating environment. With the relaunch of
Leading Blue, DC Water’s mid-level leadership development program, the Authority is
strengthening its commitment to further develop the people who keep our organization
moving. Mid-level managers play a crucial role across the utility. They translate strategic
goals into day-to-day operations, support frontline employees, uphold safety and regulatory
standards, and ensure our values show up in every customer and community interaction. In
a sector where technical expertise meets public service, these leaders are essential
connectors. They bring together engineering, operations, customer care, compliance, and
administrative functions to keep our systems running and our mission moving forward. As
the water sector faces challenges such as aging infrastructure, climate volatility, new
technology, and a shifting workforce, the need for adaptable and forward thinking leaders
is greater than ever. With many longtime employees approaching retirement, knowledge
transfer and succession planning are more important than ever. Mid-level managers are
uniquely positioned to mentor emerging talent, preserve institutional knowledge, and
strengthen the culture of continuous learning that defines DC Water. Leading Blue equips
these leaders with practical skills in strategic thinking, change management,
communication, and cross-functional collaboration. The program helps participants build
high-performing teams, make data-driven decisions, and prepare for roles of increasing
responsibility across the Authority. More than a training initiative, Leading Blue represents
DC Water’s commitment to cultivating a strong and sustainable leadership pipeline. By
developing our internal talent, we ensure continuity, deepen organizational expertise, and
strengthen our ability to meet the region’s evolving water and wastewater needs.
Please refer to the pdf attachment: “DC Water 2025 Annual Report” for more information on new
initiatives or programs.
24. Please list any legislation that impacts your agency passed in FY25 and FY26, to date, and
provide a status report on the agency’s implementation related to each piece of legislation.
a. For any legislation passed prior to FY25 or FY26, please provide any update on any new
challenges related to implementation or enforcement.
DC Water Response:
To date, there has been no legislation passed in FY25 or FY26 that impacts DC Water. As such,
there are no updates regarding implementation or challenges related to legislation for these fiscal
years. Additionally, there are no new challenges related to the implementation or enforcement of
any prior legislation.
25. What has the agency done to make the activities of the agency more transparent to the public in
FY25 and FY26, to date?
DC Water Response:
DC Water has maintained a strong commitment to transparency and collaboration over the past
year. As a municipal utility, we recognize our responsibility to act in the public's best interest, and
have implemented numerous programs and projects to support that mission. All Board of Directors
meetings are streamed live, and meeting materials and agendas are posted online at
(www.dcwater.com). We also use multiple communication channels, including various social
media sites, to promote monthly Board meetings and emphasize that they are open to the public.
Our Freedom of Information Act website, https://www.dcwater.com/foia, provides access to many
frequently requested records including a list of our employees and the union and non-union pay
scales; Board-approved resolutions, agendas, and meeting minutes; addresses with lead service
lines; annual budgets and information regarding the expenditure of funds; and a list of our
employees and the union and non-union pay scales. In response to Council requests, DC Water
now also publishes the results of administrative hearings.
As required by the DC Water Transparency Act, we publish annual reports on the Clean Rivers
Impervious Area Charge (CRIAC) and the Emergency and Lead Pipe Replacement Program
(LPRAP). Our Lead Free DC webpage (https://www.dcwater.com/resources/lead) includes a
program overview, link to begin the replacement process, as well as a construction dashboard for
Lead Service Replacements (LSRs).
We also maintain a section on our website dedicated to the ratemaking process, updated regularly
with current rate information: https://dcwater.com/ratemaking-process. The site includes links to
the FY2026 Adopted Budget (https://www.dcwater.com/about-dc-water/finance) and the FY2027
Proposed Budget & Two-Year Rate Proposal, which can be found here:
https://www.dcwater.com/about-dc-water/finance/ratemaking-process/budget-and-rate-review-
documents.
DC Water continues to engage the community by hosting and participating in numerous in-person
and virtual community meetings. These sessions support the Lead Free DC Program, share
information about construction projects, offer information about customer assistance resources and
programs, inform residents about construction projects in their neighborhoods, and provide
environmental education to District students.
Customers can also access essential datasets through DC Water's Open Data Portal
(https://dcwater.com/open-data-portal). Available information includes the status of every fire
hydrant in the District, historical sanitary sewer overflow data, and materials used for water mains
and service lines.
DC Water will hold be holding Town Hall Meetings in the Spring of 2026, in advance of the rates
public hearing, to: Inform customers about the proposed FY 2027 and FY 2028 rates; discuss the
Capital Improvement Program; and promote all the existing and new customer assistance programs.
The meetings will be widely publicized through numerous channels, including: Councilmember
Offices, Advisory Neighborhood Commissions (ANCs), DCWater.com website, X (formerly
Twitter), Facebook, Instagram, and BlueSky, Nextdoor, Paid digital and print advertising.
26. Please describe how the agency solicited feedback from customers (i.e., District residents
served) in FY25 and FY26, to date? Please describe.
a. What has the agency learned from this feedback?
b. How has the agency changed its practices because of such feedback?
DC Water Response:
During FY25 and FY26 to date, DC Water did not conduct a customer feedback survey. Our survey
cadence occurs every two years; the most recent Voice of the Customer Survey was completed in
FY24. The next Customer Satisfaction Survey (CSAT) is scheduled for the summer of FY26.
Laws, Audits, and Reports
27. Please identify any legislative modifications that would enable the agency to better meet its
mission.
DC Water Response:
There are no legislative modifications that DC Water requires or has sought in order to better meet
its mission.
28. Please identify any regulatory impediments to your agency’s operations.
DC Water Response:
Water and Sewer Operations Amendment Act of 2002, effective October 1, 2002 (D.C. Law 14-
190, § 3902; D.C. Official Code, § 34-2107 et seq.) prohibits DC Water from charging customers
the costs for treating groundwater discharged from improved real property. This results in higher
sewer rates for all rate payers to compensate for the lost revenue from the customers that receive
free sewer treatment for their groundwater discharges. Revisions to this statute would authorize DC
Water to charge for these costs and address equity, compliance and budget issues. DC Water would
like to work with the Council to amend this legislation.
29. Please list and describe any ongoing investigations, audits, or reports on your agency or any
employee of your agency, or any investigations, studies, audits, or reports on your agency or any
employee of your agency that were completed during FY25 and FY26, to date.
DC Water Response:
Please refer to the PowerPoint presentation attachment: “Internal Audit Monthly Status Meeting
February 2026”.
30. Please identify any recommendations made during the previous three years by the following
entities, and provide an update on what actions have been taken to address:
a. Office of the Inspector General;
b. D.C. Auditor;
c. Internal audit; and
d. Any other federal or local oversight entities.
DC Water Response:
DC Water has not received any recommendations from the Office of the Inspector General, D.C.
Auditor, or any other federal or local oversight entities over the past three years. Therefore, there
are no updates or actions to report regarding these entities.
For our internal audit, please refer to the excel file: “Internal Audit”, which highlights the key
findings and recommendations stemming from Internal Audit over the past 3 years.
31. Please list all pending lawsuits in which the agency, or its officers or employees acting in their
official capacities, are named as defendants, and for each case provide the following:
a. The case name;
b. Court where the suit was filed;
c. Case docket number;
d. Case status; and
e. A brief description of the case
DC Water Response:
Please refer to the excel attachment: “Pending Lawsuits”.
32. Please list each settlement the agency or the District, on behalf of the agency, entered into in
FY25 and FY26, to date, that involved claims against the agency, or its officers or employees in
their official capacity, including any settlements covered by D.C. Code § 2-402(a)(3). For each
settlement, provide:
a. The amount of the settlement;
b. If related to litigation, the case name and brief description; and
c. If unrelated to litigation, please describe the underlying issue or reason for the settlement
(e.g. administrative complaint, etc.).
DC Water Response:
Please refer to the excel attachment: “Settlements”.
33. Please list the total amount of money the agency or the District, on behalf of the agency,
expended to settle claims against it, or its officers or employees acting in their official capacities,
in FY25 and FY26, to date.
DC Water Response:
Below are the FY 2025 Litigation Stats:
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter FY 2025 YTD
Cases Managed 35 32 33 33 49
New Cases 3 3 4 11 21
Cases Closed 6 3 10 5 24
Amount Demanded of
DC Water in Closed
Cases
$1,184,637.55 $2,950,000.00 $4,227,500.00 $780,000.00 $9,142,137.55
Amount Paid by DC
Water in Closed Cases $80,000.00 $15,000.00 $126,500.00 $194,000.00 $415,500.00
34. Please list all administrative complaints or grievances that the agency received in FY25 and
FY26, to date. For each complaint, list:
a. The source of complaint;
b. The process utilized to respond to the complaint or grievance;
c. Any changes to agency policies or procedures that resulted from the complaint or
grievance; and
d. If resolved, describe the resolution.
DC Water Response:
Please refer to the pdf attachment: “Grievances”. There have been no changes to agency
policies or procedures as a result of the complaint or grievance.
35. Is the agency, or are any of its officers or employees acting in their official capacity, currently
party to any active non-disclosure agreements? If so, please provide all allowable information
on all such agreements, including:
a. The number of agreements;
b. The department(s) within the agency associated with each agreement; and
c. Whether Does the agency require any employees to sign, execute, or otherwise agree to a
non-disclosure agreement as a condition of serving in certain positions or roles (If so,
please list each position by division and program and indicate whether the position is
contracted).
DC Water Response:
Several contracts require NDAs prior to data being released. All personnel in Procurement &
People and Talent are required to sign nondisclosure agreements.
Data
36. In a filterable and sortable spreadsheet, please list all electronic databases maintained by your
agency, including the following:
a. A detailed description of the information tracked within each system;
b. The age of the system and any discussion of substantial upgrades that have been made or
are planned to the system; and
c. Whether the public can be granted access to all or part of each system.
If the District’s Enterprise Data Inventory provides a complete and accurate description of the
electronic databases managed by the agency, you may direct the Committee to that resource in
lieu of submitting a new spreadsheet.
DC Water Response:
Please refer to the excel attachment: “Databases”. Please note, per our security guidelines, we do
not name specific database names or server names or versions.
37. Please provide a list of all studies, research papers, and analyses (“studies”) the agency or an
agency’s employee requested, prepared, presented, or contracted for during FY25 or FY26, to
date. For each study, please list:
a. The status;
b. The purpose; and
c. A link (if published) to the study, research paper, or analysis.)
DC Water Response:
Please refer to the pdf attachment: “Publications”.
Part II:
Water Service Billing and Disconnection
38. During last year’s performance oversight hearing, DC Water discussed a directive from its Board
of Directors to address nearly $35 million in unpaid water service charges by launching a more
organized campaign to discontinue water service at properties in arrears. Please provide an
assessment of the campaign’s success.
DC Water Response:
FY25 ended with $33.3 million in 60‑day‑plus arrears, a reduction of $1.7 million from the start of
the fiscal year. This progress is largely attributable to DC Water’s decision to refocus our
collections campaign around DCW Cares, prioritizing proactive outreach and customer‑centered
support. As part of this effort, we expanded the use of flexible payment terms across all customer
classes to help customers maintain or restore good standing.
In addition, the Payment Plan Incentive Program (PPIP) for residential customers has played a
meaningful role in reducing arrears. The program saw strong engagement, with 2,251 participants
in FY25 and 871 participants in FY26 month‑to‑date, helping more customers enter sustainable
payment arrangements.
a. What is the total amount of unpaid charges currently owed to DC Water?
DC Water Response:
Month-end January 2026 60‑day‑plus arrears totaled $31.9 million.
39. Please provide an update on the data collected pursuant to B26-0322, the “DC Water Disconnection
and Billing Clarification Temporary Amendment Act of 2025” in FY26, including:
a. The number of properties that received notice of disconnection, broken down by ward;
DC Water Response:
Ward Oct Nov Dec Jan
1 195 192 257 278
2 338 326 352 396
3 711 711 720 744
4 1924 1928 3572 2708
5 3180 2920 4365 4220
6 1206 1188 1608 1536
7 4424 3766 11165 7315
8 3152 3448 5408 5888
b. The number of properties that actually experienced a disconnection, broken down by ward;
DC Water Response:
Ward Oct Nov Dec Jan
1 77 15 17 44
2 24 17 4 18
3 43 10 6 14
4 205 22 49 105
5 242 31 43 43
6 71 24 6 2
7 342 28 120 40
8 165 86 73 71
c. The number of properties that had service restored following a disconnection, broken down
by ward and the basis for the restoration of service (e.g., payment by owner, tenants
assumed account, disconnection was in error, restoration was unauthorized, etc.); and
DC Water Response:
Payment made on the accounts were the drivers for reconnections.
Ward Count
1 552
2 168
3 240
4 1381
5 1383
6 385
7 1988
8 1499
d. The number of properties were placed in receivership.
DC Water Response:
3 properties were placed in receivership.
40. For FY26, please provide the average time between:
a. A customer’s initial delinquency and when DC Water provided notice of a potential
disconnection;
DC Water Response:
The average time between the customers’ initial delinquency and the notice for potential
disconnection is 9 days after the due date of the bill.
b. The notice of the potential disconnection and the actual disconnection of service;
DC Water Response:
Between notice of disconnection and actual disconnection of service is 30 days.
c. The disconnection of service and the restoration of service.
DC Water Response:
Within 24 hours.
41. Over the course of FY25, the Committee received several complaints from residential and
commercial ratepayers regarding sharp increases in their water usage or their water bill, sometimes
resulting in bills that are as much as ten times what they historically have been. Please provide the
Committee with an update on DC Water’s efforts to detect and inform customers of anomalous
increases in water usage.
DC Water Response:
High Water Usage Alerts (HUNA) system proactively detects and notifies (Email, Text, Phone)
customers of anomalous increases in water consumption. When usage exceeds normal patterns for
a specific property, HUNA automatically issues an alert to the customer. These notifications often
serve as the first indication of potential issues—such as a leaking toilet, broken pipe, or other
abnormal usage—allowing customers to identify and address problems quickly. HUNA helps
customers prevent high consumption and avoid unexpected high bills.
Consecutive Usage Notifications help customers identify potential issues when their water is
running continuously. When our system detects uninterrupted usage over several hours—often a
sign of leaks, malfunctioning fixtures, or other problems—we automatically issue an alert (Email,
Text, Phone) to the customer. These real‑time notifications provide an early warning so customers
can address issues promptly and prevent unexpectedly high bills.
42. Please describe the billing dispute resolution process, including:
a. How are customers instructed to dispute their bills;
DC Water Response:
Customers receive instructions on how to dispute charges on the back of their bill, on DC
Water's website, through the IVR system, and from our Call Center Agents.
b. How many customers disputed a bill in FY25 and FY26, to date; and
DC Water Response:
In FY25, the number of disputes was 2,543. As of January 31, 2026, in FY26, there have
been 798 disputes.
c. How many of the disputes initiated by customers resulted in DC Water revising the
customer’s bill.
DC Water Response:
FY 25: 117
FY26: 13 bills.
43. Please provide the Committee with information on the Office of the People’s Counsel’s oversight
of the agency, as provided in the DC Water Consumer Protection Amendment Act of 2018.
a. Did DC Water and OPC have regular, proactive meetings during FY25 and FY26, to date,
outside of interactions responsive to specific customer concerns or complaints? If so, please
provide a list of those meetings.
DC Water Response:
In FY 25, DC Water and OPC scheduled once-per month regular check-in meetings. These
were held on an as-needed basis if either party had any issues to discuss. These meetings
tapered off upon the departure of OPC’s primary point-of-contact in August 2025.
Additionally, from May 2025-August 2025 DC Water met weekly with a group of local
legal organizations, including OPC, to discuss matters related to disconnection of
multifamily properties.
For Finance and Budget related issues, during FY 2025 and to date in FY 2026, as part of
the budget review process for FY 2027 and FY 2028, DC Water met with the Office of
People's Counsel and provided detailed briefings of the Authority’s proposed Operating
Expenditure, Operating Revenues, Two-Year Retail Rates, Ten-year Capital Improvement
Program, Ten-Year Financial Plan and the Customer Assistance Programs.
b. How many issues or claims has OPC brought to DC Water on behalf of ratepayers in FY25
and FY26, to date?
DC Water Response:
In FY25, OPC contacted DC Water’s Executive Office mailbox about 185 customer
accounts. In FY26, OPC has contacted the mailbox about 71 accounts. Additionally, the
DC Water call center received interactions with OPC for 26 accounts in 2025 and 1 account
in 2026.
c. Does DC Water have any recommendations to strengthen its relationship with OPC or its
ability to be responsive to issues brought to the agency by OPC?
DC Water Response:
DC Water will continue to have conversations with OPC about its rates, budget, capital
investments, and look for ways to partner. The primary recommendation DC Water can
provide is the re-establishment of a primary point-of-contact individual with OPC.
Working through this method, DC Water and OPC were able to effectively manage
numerous disputes in FY25.
Sustainability
44. Please provide an update on the renewable natural gas project (“RNG”) at Blue Plains,
including whether RNG production has yielded the results the agency anticipated.
DC Water Response:
The Renewable Natural Gas project was reevaluated in late 2025 based on changes in market and
political conditions that year. That evaluation estimated that the RNG project would generate
revenue after expenses of approximately $20 million annually. It also estimated a $100 million
capital cost, of which approximately $40 million would be reimbursed by the Federal government
as an Investment Tax Credit if certain conditions were met, most notably, completing the project
by December 2028.
DC Water has not proceeded with this project. DC Water estimates that it will take at least 2.5 years
to procure a contractor for the project, increasing the risk that the estimated return will not be
realized, and increasing effective project cost by $40 million.
45. Please provide an update on DC Water’s solar program, including a description of the status of DC
Water’s plan to install solar panels over its roofs, tanks, and on other properties.
a. How much energy have solar panel installations at these sites generated, to date?
DC Water Response:
DC Water has an active program to add solar panels to its facilities where doing so will not
interfere with operations and can provide a sufficient financial return. At Blue Plains, there
are four active solar panel installations. Outside of Blue Plains, there is one active solar
installation. These installations have produced just over 25,000 MWh since January 2016.
Facility Location Capacity Date in Service Production
through Dec-25
COF Parking Lot
Lights
Blue Plains 9 kW
(original)
January 2016 17 MWh
Perimeter
Security Cameras
Blue Plains 1 kW January 2018 10 MWh
Gate A Guard
Booth
Blue Plains 13 kW September 2018 75 MWh
Blue Plains
Phase 1
Blue Plains 3,460 kW April 2021 25,000 MWh
Sewer Services
Phase 1
3101 Ames
Place NE
53 kW January 2022 176 MWh
DC Water anticipates signing a contract to add solar panels to the Fort Reno Reservoir and
Fort Reno Water Pump Station in FY26. No other solar projects are approved for
development at this time.
b. As of last year, Phase 2 was approved to get to 60% design. What is the current status?
DC Water Response:
A study of necessary upgrades to the electrical system at Blue Plains remains in progress,
as it was last year.
c. What is the timeline for design and installation for Phase 2?
DC Water Response:
At this time there is no timeline for design and installation of Phase 2.
46. Has DC Water been able to expand the renewable energy credits (“RECs”) program?
a. How much revenue did DC Water generate in RECs in FY25 and FY26, to date?
DC Water Response:
REC revenue for FY25 totaled $5.7M in FY25 and $3.3M to date in FY26. We registered three
new small sources of renewable energy in our Combined Heat and Power System (CHP) at
Blue Plains, making use of wastewater effluent for cooling this past year. This coming year
we will turn on the curing pad solar panels, which will generate about 1/3 MW of power,
$60K/yr in savings, and $150K/yr in SREC revenue. We are also in the early planning stages
for a solar installation at the Ft Reno reservoir, scheduled for completion in FY27.
Blue Drop
47. Please provide an update on any new program, projects, or services that the agency has undertaken
through the agency’s Blue Drop affiliate nonprofit arm, including:
a. How much revenue was raised in FY24, FY25 and FY26, to date? Please break down this
revenue based on the programs and services offered.
DC Water Response:
FY24 - $5,303,711 net operating income
FY25 - $7,123,958 net operating income
FY26 (to date) - $2,900,475 net operating income
Average percentage by business line:
70% REC sales
7% Bloom sales
4% Cell Tower leases
4% Events
4% IP Royalties
b. How have these funds been spent in FY25 and FY26, to date?
DC Water Response:
Last year Blue Drop sent $10.5M back to DC Water so it could issues credits on the Blue
Plains operating bill for all IMA partners, fulfilling the mission of reducing operating costs
for all rate payers. This represented the accumulated net revenue from the first 8 years of
Blue Drop’s operation. In addition, Blue Drop spent revenue on equipment and
professional services to help expand the Bloom program and the generation of RECs for
DC Water.
c. How does DC Water envision Blue Drop evolving in FY26 and beyond?
DC Water Response:
Blue Drop will facilitate the generation of mare renewable energy projects for DC Water
to affect more savings and generate more revenue from REC sales. Blue Drop will form
strategic partnerships with innovators and tech firm start-ups to help serve the industry and
generate licensing fees for DC Water.
48. Please provide an update on DC Water’s production and sale of Bloom and other biosolids.
a. How much Bloom did DC Water produce in FY25 and FY26, to date?
DC Water Response:
FY25 – 96460 tons, FY26 to date – 24,492 tons
b. How much Bloom was DC Water able to sell?
DC Water Response:
FY25 – 50,292 tons, FY26 to date – 19,177
c. Which vendors did DC Water use to sell Bloom?
DC Water Response:
Blue Drop markets and sells all Bloom for DC Water, and contracts for the land application
of the remainder.
d. How much revenue did Bloom and other biosolid sales generate in FY25 and FY26, to
date?
DC Water Response:
FY25 - $388K, FY26 to date - $106K
e. How has DC Water continued to address concerns about Per- and Polyfluorinated
Substances (“PFAS”) from the use of Bloom? Has DC Water conducted any tests of Bloom
in response to concerns of PFAS, such as those that were identified by the Montgomery
County Government in 2023?
DC Water Response:
We have been proactive in our testing and research to determine if the low levels of PFAS
in in Bloom are acceptable. We have been testing since 2019, long before it was required.
Bloom is the product of a municipal biosolids with little industrial flow, and therefore has
societal, background levels of PFAS concentrations, similar to what is in the average
American’s bloodstream. We are collaborating with Va Tech and U of AZ on PFAS related
research. We are working with regulators and legislators in VA and MD to ensure they
implement workable, science based PFAS regulations. We have met several times and
cooperated with MD officials over the past 9 month. Proposed draft limits would allow for
Blue Drop to continue marketing Bloom in MD.
f. What is the current status of the use of Bloom in Maryland?
DC Water Response:
Bloom is currently marketed freely and without restriction to farmers, landscapers, soil
blenders, and construction firms. Nearly all of what Blue Drop sells is sold into MD.
g. In previous performance oversight responses, DC Water noted that Bloom is classified as
a “Class B” material, which limits DC Water’s ability to sell Bloom in Virginia. What is
the current status of the use of Bloom in Virginia?
DC Water Response:
This is not quite correct. VA DEQ recognizes our Bloom as Class A EQ biosolids, but
when we attempt to market into VA, VA imposes all the same site restrictions on our
product as if it were a Class B biosolids, making it impossible to market in the state. We
have been working with VA DEQ to try to get a Class A EQ marketing and distribution
(D&M) permit but they have been hesitant because of the PFAS issue. VA is closely
monitoring the MD PFAS discussion and will likely follow suit with limits this year. Once
these limits are set, we will again attempt to obtain a D&M permit for Bloom, which should
open up VA for Bloom marketing.
h. Similarly, in previous performance oversight responses, DC Water said that the District
Department of Transportation (“DDOT”) guidelines currently limit the ability to use
Bloom in development projects in the District. What is the current status of the use of
Bloom in the District, including any applicable guidance from DDOT or other relevant
agencies?
DC Water Response:
Restrictions on Boom use in DC have been lifted by DDOT, after long discussions and
proactive outreach by the Bloom team.
i. What recommendations does DC Water have to expand the use of Bloom in the District
and greater Washington Metropolitan Region?
DC Water Response:
We are actively engaged in efforts to set up systems so we can do inventory control. Every
winter our customer base dwindles because of field access, and in the spring we have more
customers than we have product – demand outstrips supply. We want to have winter storage
for inventory control, so we sell more in the spring. We are investigating several sites for
such activities, including a farm purchase in MD.
Personnel
49. Please provide an update on the DC Water Works Initiative, including:
a. How many DC Water Works graduates were hired by DC Water in FY25 and FY26, to
date?
b. How many graduates have found other employment opportunities? What percentage of the
total number of graduates does this amount to?
DC Water Response:
In FY 2025 and 2026 to date, the DC Water Works program conducted six (6) skills
training programs. The participation for the programs is as follows:
Skills Training Program # of
Enrollees
# District
Resident
Enrollees
# of
Graduates
# of
Graduates
Employed
% of
Graduates
Employed
# of
Graduates
Employed
with DC
Water
Completed Programs
Lead Free DC Community
Activators (Cohort 2)
Twelve
(12)
Twelve
(12) Eleven (11) Eleven (11) 100% Ten (10)
DC Water Works 2025 Summer
Youth Internship Seven (7) Seven (7) Seven (7)
Four (4)
Remining
three are
still in
school
57%
Employed Two (2)
DC Water Local Engagement and
Workforce High School
Development Program
Four (4) Four (4) Four (4) Three (3) 75%
Employed Three (3)
Ongoing Training Programs
DC Water Apprenticeship
Program (Cohort II)
Fifteen
(15)
Fourteen
(14)
Five (5)/
Five
Apprentices
Five (5) 100% Five (5)
are
remaining
Lead Free DC Community
Activators (Cohort 3)
Twelve
(12)
Twelve
(12) N/A N/A N/A N/A
DC Water Local Engagement and
Workforce High School
Development Program (Cohort 2)
Two (2) Two (2) N/A N/A N/A N/A
Totals Fifty Two
(52)
Fifty One
(51)
Twenty-
Seven (27)
Twenty-
Three (23)
Eighty-
Five
Percent
(85%)
Twenty
(20)
c. What percentage of DC Water contracts were awarded to certified business enterprises in
FY25 and FY26, to date?
DC Water Response:
The District of Columbia Water and Sewer Authority (DC Water) is committed to
promoting economic and business development in the District of Columbia and the region
it serves. In carrying out its mission, DC Water shall not discriminate on the basis of race,
color, national origin, or sex in the award and performance of any projects. DC Water
remains fully committed to serving our community and ensuring fairness in contracting, in
strict compliance with all applicable laws and regulations. As such, DC Water encourages
the participation of certified business enterprises in its contracting and procurement
activities.
In FY25, DC Water approved forty-three (43) large procurement actions, totaling $607.44
Million. Of this total, certified firms were awarded $220.66 million (36.33%) in prime and
subcontracting opportunities.
50. Please describe any other efforts DC Water undertook to increase its hiring of District residents
in FY25 and FY26, to date.
DC Water Response:
As part of DC Water’s Strategic Initiatives, the DC Water Works program continues to encourage
and support the development and employment of District and local residents as employees on DC
Water construction and service projects. Between October 1, 2024, and September 30, 2025, 102
labor positions were filled by contractors (construction and services). Of this amount, 89 positions
were filled by local residents (87%), including 30 with District residents. Moreover, the recruitment
of the participants for apprenticeship and skills training programs particularly focused on District
residents.
In FY25, DC Water undertook additional targeted efforts to increase the hiring of District residents
by strengthening early-career and talent pipeline initiatives. These efforts included the launch of
the DC Water High School Engagement and Workforce Development Program designed to spark
interest in the utility sector among District high school juniors and seniors.
By engaging District youth earlier and connecting them to structured career pathways, DC Water
is expanding its long-term local hiring pipeline and advancing its commitment to increasing District
resident participation.
51. Please provide a comprehensive update on all hiring related to current agency construction projects,
including the number and percentage of DC residents (vs. Maryland or Virginia residents) on each
project, broken down by which construction contractor or subcontractor they are working for or
whether they are directly employed by DC Water.
DC Water Response:
As part of its continuing efforts to support local employment, DC Water continues to operate under
its DC Water Works initiative, which sets specific local hiring requirements for all construction
and service contracts which includes a goal that at least 75% of new jobs created by DC Water
contracts or procurements must be filled by local residents. For the purposes of Dc Water Works,
local residents are those who live within the user jurisdiction, consisting of the District of Columbia,
Montgomery and Prince George’s counties in Maryland, and Fairfax and Loudoun Counties in
Virginia.
In FY25, DC Water construction contractors filled eighty-two (82) positions with local residents,
including 25 positions with District residents. The following table summarizes the FY25 new hire
activity by DC Water construction contractors.
Contract # Prime
Contractor
Total # of
Project
Contractors
with New
Hires in FY25
Total
Number
of New
Hires in
FY25
Total # of
DC
Resident
New
Hires
Total # of MD
Resident New
Hires
(Montgomery
and Prince
Geroge's
Counties)
Total # of
VA
Resident
New Hires
(Fairfax
and
Loudoun
Counties)
Total # of
New Hires
from Outside
the DC Water
User
Jurisdiction
140150 Salini
Impregilo 1 2 1 1
150070 Spinello 2 3 1 1 1
160070 Insituform 1 2 2
180030 Spinello 1 2 1 1
180060
American
Contracting
and
Environmental
1 2 2
190040 Anchor 1 2 1 1
200020 Spinello 1 2 1 1
200020.01 Spinello 1 2 1 1
200030 Capitol
Paving 1 2 1 1
200100 Capitol
Paving 19 23 9 12 0 2
220040 Anchor 4 4 2 1 1
220110 Capitol
Paving 1 1 1
220160 Spinello 2 2 1 1
230020.02 Sagres
Construction 2 2 2
230020.04 Capitol
Paving 1 1 1
230030.03 Anchor 1 1 1
230030.09 Capitol
Paving 1 1 1
230030.1 Spinello 3 3 2 1
230030.11 Murphy
Pipeline 5 5 2 2 1
230060 Spinello 2 4 2 2
230080 Fort Myer 4 5 2 1 2
230200 Spinello 1 2 1 1
240040 Clark
Construction 1 3 2 1
210080A Allan Myers 4 4 2 1 1
210080b
American
Contracting
and
Environmental
2 2 1 1
Totals 63 82 25 36 11 10
52. Please provide an update regarding how DC Water is working with contracting companies to ensure
that, among other things, working conditions and wages fully comply with District and Federal
law. Please provide specific examples of how the agency has worked to improve its contracting
processes to ensure fair wages and safe working conditions across all its projects.
DC Water Response:
As applicable, DC Water projects require contracts to pay prevailing wages, either Davis Bacon
wages for construction or Service Contract Act for service projects. The wage determinations for
these projects are issued by the Department of Labor, Wage and Hour Division and incorporated
into the applicable solicitations.
As part of their obligations, prime contractors are responsible for full compliance of all sub-
contractors with Department of Labor standard provisions applicable to a project including:
Payments of prevailing wage rates and fringe benefits.
Wage determinations are incorporated in bid solicitations and related contracts.
Fringe Benefits are paid in cash or actual benefits (health, dental, retirement, etc.)
are covered at employer’s discretion.
o Posting applicable prevailing wage rates.
Employer/contractors must post WH-1321 “Employee Rights Under the Davis-Bacon Act”
and wage determination at the project site:
o Correct classification of workers.
o Ensuring workers are paid weekly.
o Submitting certified payrolls to DC Water using Standard Form, “WH-347” or
similar approved form.
For construction projects, this requirement is enforced through the submission of weekly certified
payroll reports (as required by the US Department of Labor). For service contracts, project
contractors submit periodic wage surveys, classification(s) used on the project and the
corresponding rate(s) of pay and fringe benefits.
In either case, DC Water reviews the certified payrolls and surveys to ensure that contractor workers
are paid the correct wages.
Additionally, DC Water conducts periodic site interviews with the contractor’s project employees.
Site interviews are conducted Semi-Annually on most projects/ Quarterly on others (DOL standard
is Semi-Annual).
The purpose of the visits is to:
Ensure proper display of Department of Labor posters and wage rates.
Observe workers in natural setting and confirm that work matches classification(s).
Random interview(s) with workers to determine whether the prevailing wages and other labor
standards provisions of the contract are being fully complied with, and that there is no
misclassification of employees.
All answers and statements made by the employees, whether orally or in writing, are treated
as confidential. An employee’s identity is not disclosed to the contractor.
Lastly, as part of the signage posted on the jobsite, is a hotline where contractor workers can call
DC Water concerning any question or concern(s) they may have concerning their rates, fringe
benefits, or classification.
53. At an October 29, 2025 special meeting of the Board of Directors, the Board ratified a resolution
to approve a two-year contract extension for CEO and General Manager, David L. Gadis. Has the
agency complied with the requirements of D.C. Official Code § 2–536 regarding the publication of
information related to his contract extension?
DC Water Response:
On October 29, 2025, the DC Water Board of Directors ratified a resolution approving a two year
extension of the Chief Executive Officer and General Manager contract for David L. Gadis,
extending his term through September 30, 2028. DC Water publicly announced this action in a
media release dated October 30, 2025, posted on the Authority’s official website, which describes
the board action and the rationale for the extension. -year extension of the Chief Executive Officer
and General Manager contract for David L. Gadis, extending his term through September 30, 2028.
DC Water publicly announced this action in a media release dated October 30, 2025, posted on the
Authority’s official website, which describes the board action and the rationale for the extension.
The announcement includes the name, title, and extended term of the CEO and situates the
leadership action in the context of DC Water’s organizational priorities and accomplishments.
Public disclosure on the Authority’s media page satisfies the core requirement of § 2-536 to make
executive employment information publicly available without a special request.
Based on the publicly accessible official DC Water media announcement of the October 29, 2025
contract extension and the statutory transparency mandate in § 2-536, DC Water has complied with
the requirements to publish key information about the contract extension of its CEO and General
Manager.
All salaries are available here at the link:
https://www.dcwater.com/sites/default/files/hcm_docs/employee_database.pdf
Link: https://www.dcwater.com/about-dc-water/media/news/dc-water-board-directors-extends-
contract-ceo-and-general-manager-david-l
Clean Rivers Project & CRIAC Relief Program
54. During FY25 and FY26, to date, how many times were Combined Sewer Overflows (“CSO”)
released into the District’s waterways? How does this number compare to previous fiscal years?
a. Is this number on pace with goals set by the Clean Rivers Project and the amount of work
completed?
DC Water Response:
On March 20, 2018, DC Water placed into operation the first major phase of the Anacostia
River Tunnel System. This phase of the DC Clean Rivers Project included approximately
7 miles of 23-foot diameter tunnel, which provides over 100 million gallons of storage
capacity, and connections to all of the CSO outfalls along the Anacostia River. The tunnel
system flows by gravity to the Blue Plains Advanced Wastewater Treatment Plant, where
a new 225 million gallons per day (mgd) Tunnel Dewatering Pumping Station and 225
mgd Enhanced Clarification Facility were constructed to treat the flows captured by the
tunnel system.
On September 15, 2023, DC Water placed in operation the Northeast Boundary Tunnel
which was the final phase of the Anacostia River Tunnel system. This tunnel adds
approximately 90 million gallons of storage capacity to the system and completes the CSO
controls required for the Anacostia River
During FY2025, there was 1 CSO event to the Anacostia River, 48 CSO events to the
Potomac River, and 29 CSO events to Rock Creek. A comparison of these totals to previous
fiscal years is provided in the table that follows.
During FY2026, to date (October to December 2025), there were no CSO events to the
Anacostia River, 11 CSO events to the Potomac River, and 2 CSO events to Rock Creek.
Fiscal Year
Rainfall
(inches,
DCA gauge)
Anacostia River Potomac River Rock Creek
Total
Overflow
Volume (MG)1
Volume Captured
By Tunnel (MG)1
Overflow
Volume
(MG)2
Percent
Captured by
Tunnel
# of
CSOs1
Overflow
Volume (MG)2 # of CSOs1
Overflow
Volume
(MG)2
# of
CSOs1
2016 37.41 N/A 875 N/A 54 430 48 40 30 1345
2017 35.35 N/A 1163 N/A 49 606 38 57 26 1826
2018 54.35 3190 615 N/A (partial
year) 26 1240 59 182 36 2037
2019 47.48 3140 228 93% 14 754 64 101 41 1083
2020 52.21 2622 414 86% 10 1134 78 195 33 1743
2021 55.17 3211 107 97% 7 1095 67 131 34 1334
2022 38.43 2230 51 97% 5 684 59 53 32 788
20233 34.96 1129 3 212 3 84% 3 12 3 431 62 46 31 689
2024 40.99 2089 125 94.3% 4 601 51 16 13 742
2025 37.15 1853 6 99.7% 1 246 48 5 29 257
2026
(Oct - Dec
2025) 4.58 111 0 100% 0 38 9 1 2 39
Notes:
1. For the Potomac River and Rock Creek, overflow volumes and frequencies are based on model results
using actual rainfall data. For the Anacostia River prior to March 20, 2018, overflow volumes and
frequencies are based on model results using actual rainfall data. After March 20, 2018, flow meters
were installed in specified outfalls along the Anacostia River as part of tunnel construction. For these
overflows, directly measured flows are reported.
2. A portion of the Anacostia River Tunnel System from Blue Plains to CSO 019 was placed in service
on March 20, 2018. The tunnel system was in service for approximately half of FY2018 and the entirety
beginning FY2019. The Northeast Boundary Tunnel was placed in operation on September 15, 2023.
This tunnel was in service for the last two weeks of FY2023 and the entirety beginning FY2024
3. To place the Northeast Boundary Tunnel in operation, the CSO 019 diversion to the Anacostia River
Tunnel was taken out of service from approximately July 2023 to Sept 2023. This was necessary for
construction worker safety since personnel were inside the tunnel system making the connection
between the tunnels. This temporary outage resulted in an increase in CSOs for this period.
55. Please provide an update on the progress of the Clean Rivers Project. For each component of the
Project, including tunnel development and green infrastructure installation, please provide:
a. A description;
b. A status report, including a timeframe for completion and milestones reached in FY25 and
FY26, to date;
c. The amount of capital funds spent and the amount remaining in FY25 and FY26, to date;
d. Planned remaining spending each year until completion in 2032;
e. Annual maintenance costs for any completed projects; and
f. The anticipated maintenance costs per year once the projects are complete.
DC Water Response:
The purpose of the Clean Rivers Project is to control combined sewer overflows (CSOs) to District
waters. In the older sections of the District, there is a single combined sewer pipe in the street which
handles both stormwater runoff and sanitary sewage from homes and businesses. During dry
weather, sewage is conveyed to DC Water's Advanced Wastewater Treatment Plant at Blue Plains
(Blue Plains), located in the southwestern part of the District on the east bank of the Potomac River.
When the capacity of a combined sewer pipe is exceeded during storms, the excess flow, which is
a mixture of sewage and stormwater runoff, is discharged to the Anacostia and Potomac Rivers,
Rock Creek, and tributary waters. This excess flow is called combined sewer overflow or CSO.
The Clean Rivers Project consists of deep tunnels, targeted sewer separation and Green
Infrastructure (GI) designed to reduce CSO discharges to District waters. The project is necessary
to bring CSOs into compliance with the District’s water quality standards. After completion, the
volume of CSO discharges in an average year of rainfall will be reduced by 96% system wide, with
the following reductions for each receiving water: 98% reduction to the Anacostia; a 93% reduction
to the Potomac; and a 90% reduction to Rock Creek. US EPA and the District Department of the
Environment have determined that the plan will bring CSOs into compliance with the District’s
water quality standards, subject to post construction monitoring.
The project is required by a Federal Consent Decree signed by US EPA, the Department of Justice,
the District and DC Water. The Consent Decree dictates a schedule for implementation and
includes many interim milestones. Stipulated penalties can be assessed for failure to meet Consent
Decree deadlines. The project is on schedule to meet the Consent Decree deadlines to place
projects in operation to control CSOs in accordance with the specified deadlines. The major
milestones in the Consent Decree are as follows:
Anacostia River Projects
o March 23, 2018 - the Anacostia River Tunnel system from Blue Plains to RFK Stadium
including a new Wet Weather Treatment System at Blue Plains was required to be placed
in operation by this date. DC Water met this deadline by placing this portion of the tunnel
system in service on March 20, 2018.
o March 23, 2025 - the Northeast Boundary Tunnel which runs from Robert F. Kennedy
(RFK) Stadium to 6th and R St NW was required to be placed in operation by this date. DC
Water met this deadline by placing this portion of the tunnel system in service on
September 15, 2023, more than 1.5 years ahead of schedule.
o From March 20, 2018, through December 31, 2025, the system has performed
exceptionally well, capturing over 19.5 billion gallons of CSO and removing more than
12,536 tons of trash and debris, preventing it from being discharged to the Anacostia River.
Potomac River
o February 8, 2030 - the Potomac Tunnel which addresses the major Potomac River CSOs is
required to be placed in operation by this date. DC Water awarded a design build contract
for this project in November 2023 and construction is underway. The contractor has
mobilized to 7 of the 9 construction sites, and is preparing to start tunneling in spring of
2026.
Rock Creek
o November 23, 2029 – The Piney Branch Tunnel which addresses the largest CSO outfall
to Rock Creek is required to be placed in operation by this date. DC Water awarded the
preliminary construction management at risk contract in July 2025, and the overall contract
was awarded in January 2026. The contractor mobilized to the mining site adjacent to the
CSO 049 outfall in November 2025 and construction is underway.
o March 23, 2030 – green infrastructure managing 92 acres of impervious surface is required
to be placed in operation by this deadline. This is being constructed via four principal
projects, two of which are complete. Construction is underway on the 3rd project, 13 of
the 43 green infrastructure sites have been completed. The 4th project is in planning.
Status Report, Capital Funds Spent and Available, Planned Remaining Spending
Please refer to the “Clean Rivers Project Component Update” attachment which includes a status
report on component of the Clean Rivers Project, the amount of capital funds spent and available,
and the planned remaining spending.
Operation and Maintenance Costs
Completed Projects
o Estimated operation and maintenance costs for tunnels and appurtenances is
approximately $600,000 per year, while the cost of the Tunnel Dewatering Pumping
Station and Wet Weather Treatment Facilities at Blue Plains is approximately
$5,400,000 per year.
o The Potomac Project A and Rock Creek Projects A and B Green infrastructure projects
and other green infrastructure work constructed under DC’s stormwater regulations
(ex. NEBT surface work) manage approximately 60 impervious acres at 1.2” of
rain. Maintenance costs are approximately $1,240,000 per year.
Future Projects
o The estimated operation and maintenance costs for tunnels and appurtenances when
the tunnel system is complete is approximately $1.65 million per year (2026 dollars),
while the cost of the Tunnel Dewatering Pumping Station and Wet Weather Treatment
Facilities at Blue Plains is approximately $6,000,000 per year.
For the green infrastructure, ultimate build out will comprise GI managing 92 impervious acres
in Rock Creek and the GI demonstration project in the Potomac which manages approximately
8 impervious acres for a total of 100 acres. We estimate the annual operation and maintenance
cost to be approximately $2.4M to $3.2M per year in 2026 dollars when all acres are complete.
Please refer to the pdf attachment: : Clean Rivers Project Component Update”.
56. Please update the Committee on how DC Water is funding the Clean Rivers Project, including what
bonds, loans, grants, or other funding sources are being drawn from to pay for the project each year.
a. How much of the ratepayers’ CRIAC fee is going towards debt service and interest vs.
directly into the project?
DC Water Response:
The Clean Rivers program is funded primarily by the Clean Rivers Impervious Area Charge
(CRIAC), the sewer volumetric rate, grants, and wholesale contributions. In FY26 the CRIAC is
expected to generate $122.1 million and the sewer volumetric rate will generate $65.2 million for
the Clean Rivers Program, for a total of about $187.3 million. Of this amount about 37% is used as
cash (to reduce borrowing) and 63% is used to service debt issued for the project.
The following Green Bonds totaling $1.1 billion and have been issued to fund the project:
Series 2014A = $350 million
Series 2015A = $100 million
Series 2017A = $100 million
Series 2018A = $100 million
Series 2019A = $125 million
Series 2022B = $100 million
Series 2025B = $150 million
Series 2016B (Environmental Impact Bond) = $25 million
Prior to 2013, Clean Rivers was funded as part of general debt issued for capital projects.
a. The project is also funded by Federal CSO Grants. In FY25, DC Water received $8.0
million. The Office of Management and Budget (OMB) has confirmed $2,673,600 in FY26
CSO funding available under Public Law 119-14 which has not been received as of this
report. Life to date through FY25, DC Water has received $308.8 million (excluding $12.7
million in interest earned Life to Date on CSO funds) in Federal CSO Grants through direct
congressional appropriation. However, it is not certain if DC Water will receive any
Federal CSO Grants funding in the future.
b. As per the Inter-Municipal Agreement (IMA) and an agreement by the IMA Leadership
Committee, the Wholesale customers contribute approximately 7.1 percent of eligible
project costs.
c. Approximately 63 percent of ratepayers’ funds (CRIAC and from sewer volumetric rate
under a “shift” that was fully implemented in 2022 – see more information below) are
going toward debt service and interest and 37 percent directly to the project.
57. Please provide the projected CRIAC per equivalent residential unit (“ERU”) that ratepayers will
be charged in the remainder of FY26 and beyond for which DC Water has projections.
a. Please describe DC Water’s efforts in FY25 and FY26, to date to decrease these rising
charges for ratepayers.
DC Water Response:
The chart below shows the approved CRIAC charges for FY 2025 - FY 2034 and the proposed
CRIAC charges for the FY 2026 - FY 2035 financial plan. Approximately 63 percent of the revenue
from the CRIAC pays debt service costs and 37 percent is used as PAYGO for the project. The
approved FY26 monthly CRIAC charge is $24.23 per ERU.
History of actions to reduce the growth of CRIAC
DC Water has taken a number of actions over the years to reduce CRIAC. DC Water has refinanced
much of its old debt to achieve the lowest possible interest rates. Due to best management practices,
DC Water’s credit ratings were re-affirmed with stable outlooks from all three rating agencies with
AAA from S&P, AA+ from Fitch Ratings, and Aa1 from Moody’s as of February 2026. These ratings
have helped us to achieve some of the lowest costs of financing.
$24.23$26.99$28.28$31.13$32.73$29.37$29.40 $29.41$28.37$25.50$27.22$29.25$31.54$32.51$28.74$28.75$28.76$28.11$0.00$5.00$10.00$15.00$20.00$25.00$30.00$35.00FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035FY 2025 - FY 2034 Approved Financial PlanFY 2026 - FY 2035 Proposed Financial PlanClean Rivers IAC
Shift of a portion of Clean Rivers costs to the sewer volumetric rate
In 2019, DC Water proposed a change to the way that the Clean Rivers project was funded and
proposed to “shift” a portion of those costs from the CRIAC to the sewer volumetric rates. Flow to
the tunnels is comprised of both stormwater and sanitary flow, and sanitary flow comprises about 37
percent of the flows that reach the Clean Rivers tunnels. After discussion with the DC Water
Stakeholder Alliance, DC Water proposed a shift of 37 percent of the Clean Rivers costs to the sewer
volumetric rate, to be phased in over three years. After a discussion with customers in Town Hall
meetings in each of the eight wards and a public hearing, the Board, after a recommendation from
the Retail Rates Committee, adopted rates that included the “shift.” The FY20 rates included a shift
of 18 percent of costs, and the FY21 rates moved 28 percent, and the FY22 rates moved 37 percent.
Improvements to the rate-making process
DC Water has also aligned its Cost of Service Studies to its two-year rate proposals. DC Water
operates on a cost-recovery model and does not generate profit. To help ensure that costs are being
properly recovered (water costs are recovered through the water rate, for example), DC Water
conducts regular Cost of Service studies. Previously, the studies were done every three years, but in
2020 DC Water began conducting two-year Cost of Service Studies to fully align the study with the
two-year rate proposal. Additionally, DC Water has established a dedicated webpage on the
ratemaking process to improve transparency into our budget and rate making process to our rate
payers and customers. Please see the link: https://www.dcwater.com/ratemaking-process.
We have also worked to brief the Office of People’s Counsel on our budget to increase their
understanding of our work in advance of this year’s ratemaking process. This year, as part of the
FY27 and FY28 budget process, DC Water met with the Office of People's Counsel to discuss the
budget, proposed rates and CRIAC update.
Stormwater Best Management Practices
In FY19, the Stakeholder Alliance voiced concern about the 4 percent CRIAC credit provided for
Stormwater Best Management Practices. These are credits that customers can receive for installing
rain barrels, rain gardens, or other improvements that reduce stormwater. The DC Water Board
approved to increase the Clean Rivers Impervious Surface Area Charge (CRIAC) Incentive Discount
Program maximum credit from 4 percent to 20 percent for Stormwater Best Management Practices
(BMP) effective from October 1, 2019 (FY 2020).
Independent review of DC Water’s rates
In 2019, DC Water commissioned an independent review of its rates by a consultant. Arcadis
conducted the independent review, which also included a review of the Customer Assistance
Programs. DC Water asked Arcadis to review the method of charging for the Clean Rivers Program;
DC Water also asked them if costs associated with operating the tunnels and the Wet Weather
Treatment Facilities should be recovered through the CRIAC. The Independent Review of Rate
Structure and Customer Assistance Programs verified that the current method for recovering most
costs related to the Clean Rivers Program is appropriate. Arcadis recommended that the CRIAC be
utilized for recovering costs related to the Clean Rivers Project as is current practice.
Initiative to ensure suburban customers share in Clean Rivers operating costs
In March 2020, DC Water worked with the IMA partners on an agreement on the jurisdictional users
(non-District share) of the operating costs associated with the Clean River tunnels and the Wet
Weather Treatment Facility. The framework for allocation of operational costs is specified in the
derivative agreements of the 2012 Inter-municipal Agreement (IMA). The Technical Committee,
which is a working group of the Regional Committee, has vetted a methodology to split operating
costs, based on the derivative agreements in the IMA. Overall, these operating costs are about $6
million a year for the currently commissioned tunnel system from Blue Plains to Robert F. Kennedy
(RFK) stadium that was placed in operation in 2018. We anticipate that most of those costs (about 90
percent) will be eligible to be shared with the jurisdictions. The other 10 percent of the costs represent
facilities that only benefit DC, such as facilities that serve DC-only drainage areas or flood control
elements.
In March 2020, the Regional Committee approved Technical Memo 2 from the Technical Committee
detailing the O&M cost split methodology for the in-service Tunnel System and the Wet Weather
Treatment Facilities. This memorandum calls for all O&M cost associated with the Wet Weather
Treatment Facilities to be considered as part of Blue Plains and billed using the calculated Blue Plains
cost share formula. The O&M Cost associated with the in-service tunnel, the Anacostia River Tunnel
System, is being billed using a Multi-Jurisdictional Use Facility (MJUF) formula based on actual
flow ratios.
Achieving the Lowest Cost of Borrowing for Clean Rivers
An important way to reduce the impact of the cost of the Clean Rivers program on ratepayers is to
finance a portion of those costs. This helps ensure that all generations that will benefit from the
program share in the costs, and that today’s ratepayers do not bear the entire burden of the $3.56
billion program. Maintaining high bond ratings is critical to keeping borrowing costs low.
Green Bond Framework
The DC Water Board adopted a Green Bond Framework in 2021, which is aligned with the four
ICMA (International Capital Market Association) Principles regarding use of proceeds, project
selection, management of proceeds, and reporting.
Please see the link:
https://www.dcwater.com/sites/default/files/finance/Green%20Bond%20Framework.pdf
Impact and Resilience Report
For years, DC Water has been the leader in the municipal water sector on non-financial disclosure.
Our most recent Impact & Resilience report discloses activities and risks related to our impact on the
environment, in our community, and via our organizational governance. The report specifically
outlines our resilience efforts including our Enterprise Risk Management (ERM) program and
how we’ve prepared to respond to a variety of events. Our progress is tracked and reported using the
Sustainability Accounting Standards Board (SASB) metrics for water utilities. Programs and
activities in this report emerge from our strategic plan, Blueprint 2.0, and are integrated into our
team’s daily activities.
For the report please use the link: https://www.dcwater.com/impact-reporting
Green Bond Report
DC Water continues to offer green bonds, attracting diverse investors including a new class of
socially and environmentally conscious investors. Each year DC Water produces its Green Bond
report.
For the reports, please use the link: https://www.dcwater.com/green-bonds
Clean Rivers Project Cost
The Clean Rivers Project (DCCR) adopted a risk management approach to control costs on these
projects. The risk management approach begins during project planning and continues through
construction. To ensure a successful implementation, the following is performed:
a. Participation from key project team members with experience relevant to the project.
b. Holding qualitative workshops on a regular basis to stay up to date with the issues.
c. Performing quantitative analysis on a regular basis to re-assess the project contract cost
contingency before contract award and the cost estimate at completion and schedule after
contract award.
d. Assigning risk champions to each risk item and making them own it. This will ensure that
mitigation measures, identified during the qualitative risk workshops, are implemented as
planned, reducing exposure to the risk item.
e. Re-evaluating risks as the project progresses.
f. Assigning a risk manager to oversee the entire process and ensure its effective
implementation. This continuous process of risk assessment and re-assent throughout the
life cycle of a project offers DCCR the opportunity to identify and update individual risk
items and manage their mitigation effectively, reducing exposure to potentially increased
project costs.
58. Please provide an update on DC Water’s Customer Affordability Programs, including the
CRIAC Relief Program in FY25 and FY26, to date, including:
a. A description of the relief programs available (e.g., (CAP Plus, CAP, CAP2, CAP3, RAP,
Non-Residential CRIAC Relief, Homeowners Assistance Fund);
b. The number of residential households enrolled in a program, broken down by the type of
relief program;
c. The number of non-profit entities enrolled in a program, broken down by the type of relief
program;
d. The cumulative value of the financial support provided through each program; and
e. How many customers received the 100% credit for the Water System Replacement Fee in
FY25 and FY26, to date?
DC Water Response:
59. Please explain the recent pause in the implementation of the updated impervious area
measurements for CRIAC billing, including how long the pause is intended to remain in effect,
and when the new measurements will be applied to CRIAC charges that are reflected on customer
bill statements? Additionally, please provide an update on outreach and engagement efforts to
ensure customers are notified and educated about the updated measurements and stormwater
management options, and how they will affect their bills.
DC Water Response:
DC Water has decided not to implement the proposed CRIAC ERU measurement changes at this
time. Instead, we are reassessing the process to ensure it is fair, accurate, and transparent. This
pause will allow for better evaluation of implementation options, improved communication, and
stronger coordination with partners and stakeholders. While annual CRIAC rate adjustments will
continue through the budget process, no ERU measurement changes will occur before FY29
(October 1, 2028).
All customers previously contacted about the proposed CRIAC changes have since received
updated communications notifying them of the pause and additional review. Customers were also
informed about opportunities to reduce stormwater runoff by participating in DOEE’s River Smart
Rewards and DC Waters Impervious Area Charge Incentive programs. Both programs require
eligibility determined by DOEE but offer percentage discounts towards the Clean Rivers
Impervious Area Charge.
60. At last year’s performance oversight hearing, the agency discussed a pandemic-era Multifamily
Assistance Program that it discontinued. Please describe, in detail, the following:
a. The purpose of this program (vs. other Customer Assistance Programs);
b. The start and end date of the program;
c. How the program was administered;
d. How many customers were enrolled in the program, broken down by each year the
program was in effect;
e. How the program was funded, and the amount of funding allocated to the program; and
f. Any challenges encountered when the program was in effect, and any recommendations
for opportunities to revive the program.
DC Water Response:
The Multifamily Assistance Program (MAP) was established in 2021 using DC Water (Rate
Stabilization) funds to provide additional financial relief to low‑income customers in response to
the COVID‑19 pandemic. Unlike the traditional Customer Assistance Programs (CAP), which
support individual residential customers who each have their own DC Water account, MAP is
designed for multifamily properties—such as apartment buildings—that are master‑metered and
serve multiple tenants under a single account.
The program started February FY21 and ended September FY23.
Occupant eligibility was determined through property or agency records (AHU/DHCD, DOEE,
DHS). DC Water partnered with DHCD, DOEE, and DHS agencies to share their affordable
housing units (AHU) per address. Customers could also apply through DOEE to determine
eligibility if they were not already qualified for an AHU. DC Water created a MAP (Multi-Family
Assistance Program) database that managed the AHU data received from agency partnerships;
customers approved assistance through DOEE, and the owner's approval. Additionally, we created
an application site for owners and tenants. Program credits were determined by a 12-month account
review, the higher of the average bill over 6 months vs the total past due on the account. The
calculation for the MAP credit was up to a max of $2k per unit. These credits were posted to the
DC Water account. The property owners would offset the credit amount on their accounting records
for participating units representing the tenant's portion of the water service.
Below is the breakdown of customer enrollments by fiscal year:
FY21 – 5,978
FY22 - 4,313
FY23 – 3,038
The MAP program was funded through the Rate Stabilization Fund. The budget originally
allocated for the program was $6.28 million.
The challenge was that 86% of DC Water eligible multi-family properties did not participate in the
MAP program. More target outreach could have increased the participation of enrollment numbers.
Water Rates and Customer Assistance Programs
61. Please provide a schedule of proposed and approved rates for DC Water’s previous three
ratemaking cycles.
DC Water Response:
62. On July 3, 2025, DC Water adopted a final rulemaking that took effect on October 1, 2025. Please
explain how the adjusted fees in this final rulemaking will or will not affect the upcoming
ratemaking process.
DC Water Response:
On July 3, 2025, the Board approved changes to the Miscellaneous Fees and Permit Fees, which
became effective October 1, 2025 (FY26).
The upcoming proposed rulemaking is intended to establish multi-year rates for FY27 and FY28
for Water, Sewer, Clean Rivers Impervious Area Charge (CRIAC), Groundwater, and High Flow
Filter Backwash Sewer. These are separate matters: one pertains to fees and charges, while the
other relates to rates. The previously approved Miscellaneous and Permit Fees will have no impact
on the proposed rulemaking for Water, Sewer, CRIAC, Groundwater, and High Flow Filter
Backwash rates.
63. When will DC Water schedule public meetings in 2026 to discuss its upcoming ratemaking
process? Will DC Water pursue another multi-year rate proposal that includes FY28, as it did in
FY24 for FY25 and FY26?
DC Water Response:
The proposed multi-year rates for FY 2027 and FY 2028 are under review and consideration by the
Board of Directors. DC Water will hold multiple Town hall meetings during Spring 2026 to inform
customers about the proposed rates and promote existing customer assistance programs. The public
hearing is scheduled for May 14, 2026. The Board meeting to review and consider approval of the
proposed rates is scheduled for July 2, 2026.
a. How does DC Water inform residents about the dates and locations of these meetings?
DC Water Response:
DC Water will employ a comprehensive approach to inform residents about the dates and
locations of its public meetings regarding the upcoming ratemaking process. These efforts
include a combination of both traditional and digital communication channels:
Press Release/Media Advisory: Official press releases and advisories are
distributed to the media to reach a broad audience.
Design Flyers and Send to MOCRs, Councilmembers, and ANCs: Flyers are
designed and shared with Members of the Council, Advisory Neighborhood
Commissions (ANCs), and the Mayor's Office of Community Relations and
Services (MOCRs).
Public Service Announcements (PSA): PSAs are created and broadcast on Cable
16 to ensure maximum visibility.
Print and Digital Ads: Ads appear in both print and digital platforms, expanding
outreach to various community groups.
Social Media and Facebook Ads: Social media postings, including targeted
Facebook ads, help engage residents and direct them to the meeting details.
Robo Calls: Automated calls are made to notify residents about the meetings.
Email Blast: A mass email is sent to relevant stakeholders to ensure timely
information delivery.
Initial Notification to MOCRs, Councilmembers, and ANCs: A preliminary
notification is sent to local government representatives to ensure they are aware of
the upcoming meetings.
Team Blue Notifications: Notifications are also sent to Team Blue, which is
responsible for outreach and communication.
Calendar Invitations: Digital calendar invites are sent to stakeholders to encourage
attendance and engagement.
Flyers to Community Leaders, Centers, Businesses, and Organizations: Flyers
are distributed widely to community leaders, local centers, businesses, and various
organizations. We also take promotional flyers to all outreach events and meetings
attended to help spread the word.
Stakeholder Alliance Engagement: DC Water collaborates with the Stakeholder
Alliance to ensure that key partners and influencers help spread the word.
Coordination with District Agencies: Collaboration with other District agencies
such as the Department of Health and Human Services (HHS), DC Housing
Authority (DCHA), and the Department of Aging and Community Living (DACL)
further support the outreach.
Translation Services: Translation services are offered to ensure information is
accessible to non-English speaking residents.
List Serve Postings: Updates are sent through listservs to reach specific community
groups.
Town Hall Virtual and Tele-Town Halls: Virtual town halls and tele-town hall
meetings are held to engage a wider audience, ensuring public participation.
Web Banner: A prominent web banner on the DC Water website announces the
meeting dates.
b. Are any fees expected to be reduced or removed from the schedule for water or sewer
service?
DC Water Response:
The proposed water and sewer rates for FY 2027 and FY 2028 are not expected to be
reduced. However, the Metering Fee, Water System Replacement Fee, Right-of-Way
Fee, and High Flow Filter Backwash rate will remain the same.
A new proposed DDOT Public Inconvenience Fee of $0.42 per CCF will be effective
FY 2027 to recover the charges associated with occupancy permits when construction
projects in public spaces extend beyond 30 days
64. Has DC Water created any new programs to help low-income consumers pay their water bills and
prevent disconnection in FY25 and FY26, to date? If so, please describe the program's eligibility
requirements and the amount of assistance it provided.
DC Water Response:
In FY25, DC Water launched the CAP+ program to provide additional benefits to customers at or
below 20% of the Median Family Income (MFI) determined by DOEE. Qualifying customers
receive discounts up to 6 CCFs of volumetric charges, a 75% discount on CRIAC charges, and a
100% waiver of the WSRF fee
FY25: CAP+
Total Participants 2,174
Total Assistance Provided $1,537,636
FY26: CAP+
Total Participants 231
Total Assistance Provided (Dec 2025) $95,328
In FY25, DC Water launched the Residential Leak Assessment and Repair Programs in partnership
with the District. The programs launched in December 2024. The programs are aimed at helping
residents who are part of the Customer Assistance Program (CAP+, CAP, or CAP2) identify and
repair leaks at their property. Thus increasing affordability by identifying and repairing leaks that
attribute to high bills.
The Residential Leak Assessment Assistance Program (RLAAP) provides a leak
assessment by a licensed plumber for CAP+, CAP, and CAP2 approved customers when a leak
is identified by DC Water’s High Usage or Consecutive Usage alert systems. This program is
funded by DC Water and is allocated $500,000 per year.
The Residential Leak Repair Assistance Program (RLRAP) covers the repairs identified in
the leak assessment and is funded by the DC Government and is allocated $125,000 for FY25.
This portion of the program is allocated for a limited time until funds are depleted. DC Water
hopes that the success of this program will encourage DC Government to continue funding this
program.
Infrastructure and Drinking Water Improvements
65. Please describe all cybersecurity measures that the agency has in place or has considered to
protect infrastructure and electronic systems from cyberattacks, including the “Defense in Depth
layered strategy and the “Mission Critical” resilience capability.
DC Water Response:
The authority employs a comprehensive suite of cybersecurity measures designed to protect its
infrastructure and systems in alignment with both the Defense-in-Depth layered security strategy
and Mission-Critical resilience principles. Our approach begins from the “outside-in,” starting with
the external threat landscape and progressively layering controls inward across people, technology,
and processes. At the user level, the agency prioritizes strong identity and access management by
enforcing multifactor authentication (MFA), implementing Zscaler for secure web access, and
maintaining robust password policies. Additionally, personnel receive continuous cyber awareness
training to strengthen the human layer of defense against social engineering, phishing, and other
user-targeted cyberattacks.
Email security is another major component of our protective strategy. The agency utilizes advanced
email filtering tools that screen inbound messages for known malicious senders, indicators of
compromise, and suspicious attachments. Attachments are scanned for malware; embedded links
are rewritten to route through secure gateways, and banner warnings are added to incoming external
emails to help staff identify potentially unsafe communications. This multilayered approach
significantly reduces the risk of phishing, spoofing, and other email-borne threats.
At the network layer, the authority employs multiple technical safeguards that prevent unauthorized
access and lateral movement within the environment. This includes firewalls, demilitarized zones
(DMZs) for isolating public-facing services, and stringent network segmentation between
operational technology (OT) and office automation (OA) networks. These measures minimize
exposure, protect sensitive systems, and ensure that critical infrastructure remains isolated from
general network traffic.
Together, these controls form a robust Defense-in-Depth model that ensures no single point of
failure can compromise the environment. In alignment with Mission-Critical resilience objectives,
the authority layered strategy ensures that even during cyber incidents, essential systems remain
operational; risk is contained, and recovery can occur swiftly. This holistic combination of
people-centric controls, email protections, network hardening, and secure external-to-internal
posture demonstrates the authority’s commitment to maintaining a resilient and secure
cybersecurity ecosystem.
66. Please describe the agency’s Pure Water DC program, including any specific steps that the
agency expects to take in FY26, any potential impacts on ratepayers, and how the agency will fund
this program beyond its own initial $21 million investment.
DC Water Response:
In November 2025, DC Water launched the Pure Water DC program to diversify the District’s
water supply. This new strategy sets forth a bold vision for regional water supply resilience,
building on regional collaboration and technological innovation in the water sector. Pure Water DC
lays out a portfolio of solutions over various timeframes to fully address the needs of the whole
region. To develop this portfolio, in late 2025, DC Water’s Board of Directors approved $21 million
in seed funding over three years to pilot solutions, educate the public, and accelerate near- and
medium-term actions while longer-term regional storage projects mature. This commitment signals
DC Water’s leadership and intent to collaborate with neighboring utilities and federal partners.
Pure Water DC sets out interconnected strategic priorities: protecting our first source, developing
a second source, optimizing distribution, and collaborating with regional partners on expanding
storage and coordinating operations. The program will be guided by evidence-based decision
making, regional collaboration, and fiscal responsibility, with milestones including the summer
2026 groundbreaking and 2027 opening of the Pure Water DC Discovery Center and ongoing
engagement with regulators and stakeholders which will inform options and full-scale solutions to
be implemented in future years.
DC Water is currently going through a structured planning and screening process to determine the
appropriate infrastructure/technical solution to meet DC Water's resilience challenges, which will
consider project cost and rate payer impact. At this current stage, the final technical solution and
associated cost is unknown. Once preferred option(s) have been identified, detailed planning will
commence to better understand technical, economic, and other key project factors, including the
development of a Funding and Financing Strategy. At this stage, it is envisioned that the program
will be funded through a blend of grants, federal credit programs, and private capital, with the
objective to minimize the impact to rate payers. As part of the detailed planning phase, DC Water
will undertake interim 'affordability' checkpoints to better understand the financial impact and
whether value engineering, descoping, or alternate actions are necessary.
67. Please describe the status of DC Water’s Thermal Hydrolysis and Anaerobic Digester Project,
including:
a. The amount of energy the digesters are currently generating, the percentage of DC Water’s
energy use currently generated by the digesters, and any plans to expand the Digester
Project to create more energy in the future.
DC Water Response:
We have a feasibility study to consider feeding food waste into the digesters. Current
capacity does not allow for this to occur. Significant upgrades needed in order to take more
material.
b. The amount of revenue generated in FY25 and FY26, to date, by the sale of Class A
biosolids produced by the digesters.
DC Water Response:
FY25 - $388K from Bloom sales
FY26 to date - $106K from Bloom sales
68. Please describe the status of the fire hydrant inspection and maintenance program, including:
a. The current number of known mechanically defective hydrants in the District and whether
it is consistent with DC Water’s goal of having less than 1% of fire hydrants out of service;
DC Water Response:
As of January 5, 2025, there were 9852 public fire hydrants, 14 hydrants were mechanically
defective (0.14%).
b. The anticipated timeline for repairing any mechanically defective hydrants; and
DC Water Response:
Mechanically defective hydrants are repaired within 20 business days according to the
MOU. Hydrants not repaired within 20 business days, due to constraints such as critical
customer and infrastructure impacts, coordination, and construction areas, are included in
the daily hydrant report shared with FEMS.
c. The number of hydrants replaced in the District in FY25 and FY26, to date.
DC Water Response:
FY 2025 – 192 hydrants
FY 2026 – 51 as of 1/1/2026 reporting
69. Please provide a status update on all ongoing Sewer Rehabilitation projects, including:
a. A description.
b. The amount of capital funds allotted.
c. A status report, including a timeframe for completion.
d. Planned remaining spending on each of these projects.
e. A list of projects to begin in FY25 and FY26, to date, including expected costs and
completion dates.
DC Water Response:
Please refer to the attached excel file: “Ongoing Sewer Rehabilitation Projects”.
70. Please describe DC Water’s progress with water system upgrades, including the status of the
Potomac River Tunnel Project, during FY25 and FY26, to date.
DC Water Response:
The Potomac Tunnel contract was award in November 2023 and the tunnel is planned to be place
in operation in 2030. The tunnel mining site is at West Potomac Park and the two shafts for mining
have been excavated along with assembly and delivery of plant and equipment necessary to support
tunneling. The tunnel will be constructed using 2 TBMs. The north TBM, primarily in rock, has
been delivered to the site and is being assembled for mining. Tunneling is expected to begin in
spring 2026. The south TBM, primarily in soft ground, will be delivered to the site in 2026. In
addition, construction is underway at the following construction sites: West Potomac park, CSO
020, CSO 022, CSO 024, CSO 027, CSO 028 and CSO 029.
a. What drinking water pumping stations were upgraded in FY25 and FY26, to date, and what
stations will be upgraded in the remainder of FY26?
DC Water Response:
DPSO operates and maintains multiple vertical facilities (pump stations and water storage
reservoirs) to provide drinking water to customers in the region. These facilities are
constantly being assessed, maintained, and improved under various capital improvement
programs. This memorandum summarizes the upgrades implemented at each facility
within the fiscal years of 2025 and 2026 (10/01/2024 to 09/30/2026). Note that there are
many scheduled upgrades which will take place outside of this window.
Pumping Stations:
Anacostia Pump Station had several pumps inspected, rehabilitated, and repaired
during the period. 3 of the pumps were replaced, assigned to different service
zones. Additional upgrades at this facility include processor and PLC updates,
enhancing operations’ capability via SCADA to remotely control and monitor the
station.
Bryant Street Pump Station has had multiple process valves replaced or
reconfigured. A subcomponent of this work is the ongoing upgrade of the spill
header system, which allows flexible operations by routing flows from one
pressure zone to another via pressure control valves. Additional updates include
replacement of several flow meters, software updates, processor upgrades, and
PLC modifications.
16th & Alaska Pump Station has had its surge protection device upgraded to better
protect against power distribution issues. Additional upgrades include processor
and PLC upgrades.
Ft. Reno Pump Station has received upgrades to its PLC, processor and
programming systems. This work enhanced the reliability and versatility of the
stations, ensuring long service life of the assets.
Water Storage Facilities:
The water storage facilities (elevated or underground storage tanks) are drawn down and
cleaned on a rotating basis with a period of approximately 3 years. The work allows for
full inspection and assessment of the structural, process-mechanical, and instrumentation
components of the facilities and identifies issues to be included in rolling CIP projects.
The following facilities were inspected in this period:
Anacostia Tank 1
Ft. Reno Reservoir 1(FRR1)
Soldiers Home Reservoir
St. Elizabeth Tank
Additionally, valves at FRR1 are scheduled to be upgraded this spring, aiding in better
water quality and operational flexibility.
71. How many service interruptions affecting 25 or more customers for a period of one day or longer
occurred during FY24, FY25, and FY26, to date, broken down by Ward (and including the affected
ANCs)?
a. How did DC Water provide updates and other information to impacted residents?
DC Water Response:
DC Water posts work zone alerts for service interruptions on its website at dcwater.com
and notifies customers who have signed up to receive alerts about work in their area.
(customers can sign up to receive alerts on our customer care webpage) In addition, all of
the current water main breaks and active work zones are displayed on a map at
https://www.dcwater.com/customer-center/alerts-and-notifications/workzone-alerts . For
planned work, crews distribute door hangers in advance to notify customers when water
service needs to be interrupted to perform repairs. DC Water also uses several social media
channels, including Facebook, Instagram, X, LinkedIn and YouTube as well as Nextdoor
to inform the public about work as well as unexpected interruptions.
72. How many boil water advisories were issued in FY23, FY25 and FY26, to date, broken down by
ward?
DC Water Response:
There were three BWA’s in FY24:
January, 2024 – Wards 1, 3, 4 and 5
May, 2024 – Ward 3
July, 2024 – Citywide
There were two BWA’s in FY25:
December 2024 – Ward 7
June 2025 – Ward 3 and 4 (precautionary)
There have been no BWA’s issued to date for FY26.
a. How did DC Water provide updates and other information to impacted residents?
DC Water Response:
The BWA notices and interactive maps of the impacted areas were disseminated by DC
Water in English and Spanish through multiple media outlets, DC Water Alerts (to
customers signed up for alerts), direct email, text and phone notifications to customers in
the impacted areas, the DC Water website, emails to key stakeholders, and posts to social
media channels and Nextdoor. In addition, the District of Columbia Homeland Security
and Emergency Management Agency (DC HSEMA) disseminated the BWA public notices
on our behalf, by sending out Wireless Emergency Alerts (WEA) and Alert DC
notifications. We informed the Office of the Mayor, Councilmembers and Advisory
Neighborhood Commissioners. We also reached out to District agencies to coordinate with
schools and other stakeholders in the impacted area.
b. What steps has DC Water taken since each boil water advisory to address the issues that
may have contributed to the issuance of the boil water advisory? Were any other entities
implicated in these boil water advisories, and what role did DC Water identify they played?
DC Water Response:
The age of our infrastructure is the primary cause of failures in our system. During the
colder months, we expect an increase in breaks. The efforts outlined below will, over time,
mitigate the issues that we are experiencing. We are committed to implementing and
following industry’s best practices to continually improve the reliability and resilience of
the utility systems DC Water is responsible for.
DC Water Engineering and Water Operations departments (including consulting
engineering firms) are actively planning the comprehensive assessment of all large potable
water transmission mains, utilizing a prioritized scoring process that calculates the
consequence and likelihood of failure. Subsequent transmission water main repair and
replacement activities will be included in the approved DC Water CIP.
In addition, DC Water is working on a comprehensive valve and hydrant
assessment/repair/replacement program that will address the critical valve and hydrant
infrastructure deficiencies, thus enabling Water Operations crews to isolate main breaks
efficiently and effectively and minimizing the impact to our governmental, commercial,
and residential customers.
73. How many miles of water mains did DC Water replace in FY25 and in FY26, to date?
a. Please provide a chart of how many small and large water mains were replaced or
rehabilitated in FY25 and FY26, to date, and the projected number to be replaced or
rehabilitated in FY26.
DC Water Response:
Actuals FY25: 6.72 miles
Actuals FY 26: 1.83 miles (Jan 30)
Please refer to the PowerPoint presentation file:“SDWM”.
b. Where DC Water did not meet its stated goal for replacement or is not on pace to do so,
what is the reason for the delay?
DC Water Response:
Please refer to slide 22 of the PowerPoint presentation file: “SDWM”.
c. What is the status of DC Water’s plan to replace, on average, 1% of small-diameter water
mains each year over the next three fiscal years?
DC Water Response:
Two progressive design-build (PDB) SDWMR contracts will start phase 1 (design) at the
start of FY26 with a likely additional PDB package starting later in FY26. The PDB
contracts are expected to increase the overall production capacity and the forecasts for
FY26 and FY27 show this rapid increase in production rate. Changes to program forecasts
to increase mileage production cannot be implemented quickly and must be planned years
in advance. For this reason, the SDWMR Program Management team have implemented a
5-year mileage forecasting tool. This tool predicts future SDWMR mileage renewal rates
based on future known jobs and can be used to inform program planning decisions.
d. Does DC Water plan to accelerate the replacement schedule to compensate for delays? If
so, what is the current replacement schedule?
DC Water Response:
An MOU was signed between DDOT and DC Water in September 2024 to remove
some permitting-related restrictions and delays. It includes the following
improvements:
o DDOT will hire a dedicated team to take care to SDWMR permit applications, and
all applications will be reviewed within15 business days
o DDOT will allow full block closures on local streets
o Work hours extended from 7am to 7pm
o Block closures permitted for up to 4 months
o However the 3-block radius and 1,200 LF rules are still in place
In the short term, the SDWMR Program Management team are working with DC Water
Procurement to expedite the procurement of new SDWMR contracts in FY26.
o This will allow construction on those projects to commence earlier, leading to a
higher mileage achievement in FY26. These contracts will also benefit from
permitting efficiencies of the MOU with DDOT. Since these new contracts will be
the first to benefit from the MOU, the efficiencies will take time to be reflected in
the production rate and have not been able to be quantified yet. Mileage monitoring
in FY26 will track the efficiencies gained as much as possible.
In the longer-term, the SDWMR program is transitioning to Progressive Design-Build
(PDB) contracts with larger scopes (i.e. more locations in one single contract).
o The SDWMR PDB contracts are expected to increase the overall production
capacity because the contractors are able to schedule a greater range of work across
the entire District. Efficiencies are also gained through contractor ownership of the
design and permitting process.
74. Please provide an update on Lead Free DC, the lead service line replacement program in the
District, including:
a. How many full lead service lines were replaced in FY25 and FY26, to date, broken down
by public and private properties?
DC Water Response:
Fiscal Year
Public
Full
Replacem
ent
Private Full
Replacement
Full
Replacement
Public
Partial
Tota
l
2025* 507 1413 1226 31 3,17
7
2026* as of
2/9/26 191 538 340 12 1,08
1
Total 698 1,951 1,566 43 4,25
8
b. How many full lead service lines remain, broken down by public and private properties?
DC Water Response:
For Public and/or Private properties both sides of the service line need material
confirmation, this could result in replacement on the public side only, private side only, or
both sides.
Replacement Type Count
Full Replacement 5,690
Private Only 10,011
Public Only 143
Public and/or Private 13,945
Total 29,789
c. How many partial lead service lines were replaced in FY25 and FY26, to date, broken
down by public and private properties?
DC Water Response:
d. How many partial lead service lines remain, broken down by public and private properties?
DC Water Response:
For Public and/or Private properties both sides of the service line need material
confirmation, this could result in replacement on the public side only, private side only, or
both sides.
Replacement Type Count
Full Replacement 5,690
Private Only 10,011
Public Only 143
Public and/or Private 13,945
Total 29,789
e. How many claims has DC Water received in FY25 and FY26, to date to cover contractor
costs for replacing the private side of the lead service line at properties that previously
received a partial replacement?
DC Water Response:
DC Water does not receive claims from contractors to cover their costs. The only claims
that we address are claims made by the homeowner about alleged damage the contractor
caused during the work on their property.
f. How long it took, on average, for the agency to process these claims?
DC Water Response:
This does not apply to DC Water.
g. When does DC Water estimate that all public lead service lines will be replaced?
DC Water Response:
DC Water estimates that all public lead service lines will be replaced in accordance with
EPA’s Lead and Copper Rule Improvements requirements.
Fiscal Year Public Full
Replacement
Private Full
Replacement
Full
Replacement
Public
Partial Total
2025* 507 1413 1226 31 3,177
2026* as of
2/9/26 191 538 340 12 1,081
Total 698 1,951 1,566 43 4,258
h. How many service lines currently have an “unknown” composition in the agency’s
database?
DC Water Response:
As of February 11, 2026, there are 10,340 premises categorized as “unknown” service line
material.
i. How many filtration jugs did the agency provide to residents in FY25 and FY26, to date?
DC Water Response:
In FY25 DC Water provided at least 3,177 filter pitchers where lead service lines were
replaced. On some occasions, premises are multi units, and each unit will receive one
filter. DC Water also delivered a second filter pitcher to a premise if the
resident identified a crack in the filter or other issue. So far in FY26, through February 10,
2026, DC Water has provided 1,218 filter pitchers to premises where lead service lines
have been replaced.
75. In May 2024, the federal government announced that the District would receive approximately
$28.3 million annually through 2026 for lead water service line replacement work. Please provide
an update on whether these funds were received in full or in part, a spending plan for how those
funds were used in FY25 and FY26, to date, and what steps the agency took or will take to account
for future costs associated with lead water service line replacement work.
DC Water Response:
The tables below show the allocations per fiscal year, spending plans, and amounts received for
each.
Funding Source Amount Spending Received
(Drawdown)
FY22-23 BIL LSL
Allocation $58,895,619.00 FY24 - FY27 By Block
Private Side LSLRs $26,208,800.00
FY22-$28,245,619
FY23 - $30,650,000
FY24 BIL LSL
Allocation $30,722,572.00 FY25- FY29 By Block
Private Side LSLRs $2,893,300.00
FY24 - $28,527,472
FY22 Reallocation
$2,195,000
FY25 BIL LSL
Allocation $40,693,000.00 FY25 - FY30 By Block
Private Side LSLRs
Awaiting Grant
Award
FY24 Reallocation $5,861,000.00
FY23 Reallocation $5,459,000.00
FY22 Reallocation $723,000.00
FY26 BIL LSL
Allocation TBD FY29 -FY32 By Block
Private Side LSLRs $0.00
Total $142,354,191.00
Fiscal
Year
EPA Private Side LSLR
Eligible Grants
FY2026 $ 28,715,567.97
FY2027 $ 36,802,901.30
FY2028 $ 38,136,234.63
FY2029 $ 38,136,234.63
FY2030 $ 34,107,429.13
FY2031 $ 23,128,245.33
FY2032 $ 18,490,000.00
FY2033 $ 11,245,000.00
FY2034 $ 4,000,000.00
FY2035 $ 4,000,000.00
FY2036 $ 4,000,000.00
FY2037 $ 4,000,000.00
76. In FY21, DC Water announced a new Lead Service Line Replacement Planning Model intended
to prioritize DC Water’s lead line replacement work.
a. How has the implementation of the new model changed DC Water’s lead service line
replacement practices? What, if any, changes have impacted how DC Water has identified
new service lines for replacement through 2032?
DC Water Response:
Our model prioritizes projects that have the most lead service lines in communities that are
historically undeserved and experience disproportionately poorer health outcomes. The
prioritization model determines the selection of blocks for lead service line replacements
in the Block- by-Block program and incorporates DC Water’s commitment to water quality
and health equity. Over the past year, DC Water has initiated several contracts to replace
lead service lines in these communities.
To increase customer participation, in May 2023, we announced the launch of the
Community Activators Program, a workforce development training program in partnership
with the District’s Department of Employment Services (DOES) Division of State
Initiatives. We reach more customers with these local team members, who participate in
our door-to-door canvassing and community outreach event efforts. Lead Free DC is
currently working with a third cohort of Activators who will participate until February
2027.
b. Please provide the Committee with any materials (e.g., maps, summary documents, or other
similar materials) memorializing the new priority scheme.
DC Water Response:
See Prioritization Matrix below:
LoL – Likelihood of Lead
CoL – Consequence of Lead
c. Under the new plan, what is DC Water’s estimate for the completion of all lead line
replacements?
DC Water Response:
In early 2023, we improved the accuracy of our water service line inventory records, which
resulted in an increased number of estimated lead service lines in the District from 28,000
to 42,000. This updated number is the result of an intensive review by our team and was
informed by field data collected by test pitting and additional data collected during site
visits.
DC Water plans to replace all lead service lines in accordance with the Lead and Copper
Rule Improvements (LCRI), maximizing the currently available federal BIL funding to pay
for private side replacements. EPA’s LCRI, requires all utilities to replace lead within 10
years, starting as soon as 2027. Utilities are required to complete lead service line
replacements by 2037. DC Water continues to make steady progress on program
milestones, and all 42,000 lead service lines are projected to be removed by, or in advance
of, the 2037 EPA deadline.
77. For several years, the Committee has asked for updates on DC Water’s work with the Mayor to
develop a list of potential members for the Water Quality Advisory Panel. In FY22 responses, DC
Water noted that a potential next step could be for a revised list of recommended disciplines and
agencies to be sent to the Mayor’s Office. What is the status of this effort?
DC Water Response:
DC Water has yet to receive a response from the District regarding the Water Quality Advisory
Panel. The March 2018 submission included individuals who are no longer in their respective roles.
Furthermore, DC Water has not been asked to provide any recommendations
78. What is the status of the sewer rehabilitation project in Soapstone Valley Park, aimed at
rehabilitating approximately 6,200 feet of defective sewer pipe, 37 defective sewer manholes, and
other work that was estimated to be substantially complete in the first half of 2024?
a. If still in process, how has DC Water engaged with the community on this project in FY25
and FY26, to date?
DC Water Response:
In October 2025, the project reached a significant milestone with the successful installation
of Shot #10, the final segment of cured-in-place pipe (CIPP). Albemarle Street, NW was
reopened in December, 2025. The Soapstone project is now complete and Soapstone
Valley Park has also been reopened to the public. DC Water sincerely appreciates the
patience and cooperation of Councilmember Frumin and his Office, Mayor’s Office of
Community Relations and Services, Advisory Neighborhood Commission 3F and other
members representing the Forest Hills community as our team worked to upgrade this
critical portion of sewer infrastructure while helping to restore the Park to its former beauty.
Additionally, execution of this project could not have been possible without our wonderful
agency partners including National Park Service, District Department of Transportation
and District Department of Environment.
79. What progress has DC Water made in working with District agencies to address and implement
recommendations in the Flood Task Force report released in August 2023, which included 27
specific actions for District agencies?
DC Water Response:
DC Water has been actively engaged with District agencies to advance the implementation of the
27 specific action items identified in the Flood Task Force Final Report issued in August 2023.
The Flood Task Force was established by the Office of the City Administrator and co-chaired by
DC Water’s CEO & General Manager alongside the Director of the District Department of Energy
& Environment (DOEE), reflecting a strong multi-agency commitment to enhancing flood
resilience across the District.
Of the 27 recommended actions, DC Water was directly responsible for leading three actions.
Progress to date on these deliverables is as follows:
i. Providing Additional Capacity via 311 to Respond to High Call Volumes for DC Water
During Flood Events
Recognizing that flooding events often generate elevated volumes of resident and property
owner inquiries related to sewer backups, storm impacts, and service disruptions, DC Water
partnered with the District’s 311 customer service operation to enhance call handling
capacity during flood events. This action plan was fully implemented and completed in
Fiscal Year 2025, resulting in a dedicated operational protocol within 311 to manage and
triage storm related calls directed to DC Water. This improvement has increased
responsiveness and reduced customer waiting times during peak demand periods. -handling
capacity during flood events. This action plan was fully implemented and completed
in -related calls directed to DC Water. This improvement has increased responsiveness and
reduced customer wait times during peak demand periods.
ii. Expansion of the Backwater Valve Installation Program
As part of the Task Force’s strategy to reduce interior flooding and sewer backups for
private properties, DC Water advanced Action 4.1: Expand Backwater Valve Installation
Program. This initiative builds upon the existing backwater valve program by broadening
eligibility and support for residents to install backwater prevention devices on sewer laterals.
DC Water has expanded rebate and reimbursement offerings beyond the originally limited
combined sewer areas and updated program guidelines to support greater residential
participation. While portions of this expansion have already been implemented, program
activities remain ongoing, with continued outreach and installation support planned in
alignment with broader flood mitigation efforts.
iii. Incorporation of Backwater Valve Requirements into the DC Code
The Flood Task Force recommended strengthening building code requirements by
mandating backwater valve installation in new and substantially rehabilitated properties in
specified areas prone to sewer surcharge and flood impacts. DC Water has worked
collaboratively with the District’s regulatory and permitting entities to integrate these
requirements into the relevant construction and plumbing code updates. This incorporation
into code has now been completed, institutionalizing a preventive flood resilience measure
for future development and rehabilitation projects. -resilience measure for future
development and rehabilitation projects.
Source: Council of the District of Columbia website. First collected Nov 21, 2026.