1
___________________________ 2
Councilmember Janeese Lewis George 3
4
5
A BILL 6
7
_________________________ 8
9
10
IN THE COUNCIL OF THE DISTRICT OF COLUMBIA 11
12
_________________________ 13
14
15
To amend, on an emergency basis, due to congressional review, the Green Building Act of 2006 to 16
exempt certain District-owned and -funded residential and nonresidential projects from 17
complying with net-zero-energy standards and to modify net-zero-energy standard 18
compliance requirements for nonresidential and residential projects; to amend section 2 of 19
the Clean Energy DC Building Code Amendment Act of 2022 to modify the definition of 20
the net-zero-energy standard and the types of projects to which the net-zero-energy standard 21
applies; and for other purposes. 22
23
BE IT ENACTED BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this act 24
may be cited as the “Net Zero Continuity Congressional Review Emergency Amendment Act of 25
2026”. 26
Sec. 2. The Green Building Act of 2006, effective March 8, 2007 (D.C. Law 16-234; D.C. 27
Official Code § 6-1451.01 et seq.), is amended as follows: 28
(a) Section 2 (D.C. Official Code § 6-1451.01) is amended as follows: 29
(1) Paragraph (1) is amended to read as follows: 30
“(1) “Addition” shall have the meaning ascribed to it in the Building Codes.”. 31
(2) The existing paragraph (2A) is redesignated as paragraph (2B). 32
(3) A new paragraph (2A) is added to read as follows: 33
2
“(2A) “Aquatic center” means a structure intended for swimming or recreational 34
bathing that contains water over 24 inches deep and includes the pool, decks, and surrounding 35
structure, locker rooms, electrical and mechanical rooms, and IT controls that support the pool.”. 36
(4) A new paragraph (3A) is added to read as follows: 37
“(3A) “Building Codes” means the portions of the Construction Codes designated as 38
the Building Code, the Energy Conservation Code, and the Existing Building Code.”. 39
(5) Paragraphs (6) and (7) are amended to read as follows: 40
“(6) “Construction Codes” shall have the same meaning as in section 2(2) of the 41
Construction Codes Approval and Amendments Act of 1986, effective March 21, 1987 (D.C. Law 6-42
216; D.C. Official Code § 6-1401(2)). 43
“(7) “Construction documents” shall have the meaning ascribed to it in the Building 44
Codes.”. 45
(6) Paragraph (8) is repealed. 46
(7) Paragraph (14) is amended to read as follows: 47
“(14) “Existing building” shall have the meaning ascribed to it in the Building Codes.”. 48
(8) Paragraph (22) is amended to read as follows: 49
“(22) “Gross floor area” shall have the meaning ascribed to it in the Building Codes.”. 50
(9) A new paragraph (31B) is added to read as follows: 51
“(31B) “Level 3 alteration” shall have the meaning ascribed to it in the Building 52
Codes.”. 53
(10) A new paragraph (32C) is added to read as follows: 54
“(32C) “Natatorium” means a building or complex housing one or more indoor pools 55
featuring HVAC and humidity controls to manage the environment.”. 56
3
(11) Paragraph (40A) is amended to read as follows: 57
“(40A) “Temporary building” means a: 58
“(A) Trailer; or 59
“(B) Structure that is used or intended for supporting or sheltering any use or 60
occupancy on a non-permanent timeframe for an interim use during construction of a permanent 61
structure.”. 62
(b) Section 3(a) (D.C. Official Code § 6-1451.02(a)) is amended as follows: 63
(1) The lead-in language of paragraph (1) is amended by striking the phrase 64
“substantial improvement” and inserting the phrase “Level 3 alterations” in its place. 65
(2) Paragraph (2) is amended as follows: 66
(A) Subparagraph (C) is amended by striking the phrase “; and” and inserting a 67
semicolon in its place. 68
(B) Subparagraph (D) is amended to read as follows: 69
“(D) Be built to comply with the net-zero-energy standard, as defined in section 70
2(a)(3) of the Clean Energy DC Building Code Amendment Act of 2022, effective September 21, 71
2022 (D.C. Law 24-177; D.C. Official Code § 6-1453.01(a)(3)) (“Clean Energy DC Building Act”), 72
unless the project is for the construction of: 73
“(i) A temporary building; 74
“(ii) An addition less than 10,000 square feet; 75
“(iii) A police, fire, emergency response, or Office of Unified 76
Communications facility; except, that, that the facility need not comply with energy conservation and 77
obtainment standards otherwise required by section 2(a)(3)(A) and (B) of the Clean Energy DC 78
Building Act (D.C. Official Code § 6-1453.01(a)(3)(A) and (B)), until the effective date of the final 79
4
regulations issued by the Mayor pursuant to section 2(b)(1) of the Clean Energy DC Building Act 80
(D.C. Official Code § 6-1453.01(b)(1)); 81
“(iv) A natatorium; except, that, that the aquatic center in which the 82
natatorium is located need not comply with energy conservation and obtainment standards otherwise 83
required by section 2(a)(3)(A) and (B) of the Clean Energy DC Building Code Act (D.C. Official 84
Code § 6-1453.01(a)(3)(A) and (B)), until the effective date of the final regulations issued by the 85
Mayor pursuant to section 2(b)(1) of the Clean Energy DC Building Code Act (D.C. Official Code § 86
6-1453.01(b)(1)); or 87
“(v) A project for which all permits necessary to begin construction 88
were submitted before October 1, 2024, and that were not submitted to GBAC before February 1, 89
2026; and”. 90
(C) A new subparagraph (E) is added to read as follows: 91
“(E) Be built to comply with section 2(a)(3)(D) of the Clean Energy DC 92
Building Code Act (D.C. Official Code § 6-1453.01(a)(3)(D)).”. 93
(3) Paragraph (3) is amended as follows: 94
(A) The lead-in language is amended by striking the phrase “If a residential 95
project includes” and inserting the phrase “If a residential project is for new construction and 96
includes” in its place. 97
(B) Subparagraph (A) is amended to read as follows: 98
“(A) Be built to comply with the net-zero-energy standard; except, that a 99
project need not comply with the renewable energy requirements otherwise required by section 100
2(a)(3)(A), (B), and (C) of the Clean Energy DC Building Act (D.C. Official Code § 6-101
1453.01(a)(3)(A), (B), and (C)), until the effective date of the final regulations issued by the Mayor 102
5
pursuant to section 2(b)(1) of the Clean Energy DC Building Act (D.C. Official Code § 6-103
1453.01(b)(1)); and”. 104
(C) Subparagraph (B) is amended by striking the acronym “DCRA” and 105
inserting the acronym “DOB” in its place. 106
(D) Subparagraph (C) is repealed. 107
(4) Paragraph (6) is amended by striking the phrase “maintain net-zero-energy 108
compliance” and inserting the phrase “shall be built to comply with the net-zero-energy standard” in 109
its place. 110
Sec. 3. Section 2 of the Clean Energy DC Building Code Amendment Act of 2022, effective 111
September 21, 2022 (D.C. Law 24-177; D.C. Official Code § 6-1453.01), is amended as follows: 112
(a) Subsection (a) is amended as follows: 113
(1) A new paragraph (2A) is added to read as follows: 114
“(2A) “Level 3 alteration” shall have the same meaning ascribed to it in the 115
Building Codes.”. 116
(2) Paragraph (3) is amended as follows: 117
(A) Subparagraph (A) is amended by striking the phrase “; and” and inserting a 118
semicolon in its place. 119
(B) Subparagraph (B) is amended to read as follows: 120
“(B) A building obtains energy from renewable energy sources in the amount 121
that would be required by the most recent version of Appendix Z;”. 122
(C) New subparagraphs (C) and (D) are added to read as follows: 123
“(C) Renewable energy shall be generated at the building site wherever 124
feasible; and”. 125
6
“(D) On-site fuel combustion shall not be permitted for the provision of thermal 126
energy to the building except for backup power generation.”. 127
(b) Subsection (b) is amended as follows: 128
“(b)(1) By December 31, 2027, the Mayor, pursuant to pursuant to Title I of the 129
District of Columbia Administrative Procedure Act, approved October 21, 1968 (82 Stat. 1204; D.C. 130
Official Code § 2-501 et seq.), shall issue final regulations requiring all new construction or Level 3 131
alterations to covered buildings to be constructed to a net-zero-energy standard. 132
“(2) By December 31, 2026, the Mayor, pursuant to Title I of the District of Columbia 133
Administrative Procedure Act, approved October 21, 1968 (82 Stat. 1204; D.C. Official Code § 2-501 134
et seq.), shall issue final regulations prohibiting the use of on-site fuel combustion for the provision of 135
thermal energy for all new construction of covered buildings and additions greater than 10,000 square 136
feet to covered buildings. 137
“(3) No permit application for new construction of covered buildings or an addition 138
greater than 10,000 square feet to covered buildings submitted after December 31, 2026, shall be 139
approved if the building or addition design provides for the use of on-site fuel combustion for the 140
provision of thermal energy for space heating and water heating. 141
“(4) Notwithstanding any other provision of law, no building permit application for 142
new construction of covered buildings, an addition greater than 10,000 square feet to covered 143
buildings, or Level 3 alteration to covered buildings submitted after December 31, 2026, shall be 144
approved unless the building design is such that the building conserves an amount of energy 145
attributable to building operation that is equal to or greater than the amount that would be conserved if 146
such building complied with the 2024 International Energy Conservation Code.”. 147
7
(c) Subsection (c)(1) is amended by striking the phrase “newly constructed or substantially 148
improved covered buildings” and inserting the phrase “covered buildings that were newly constructed 149
or underwent Level 3 alterations” in its place. 150
Sec. 4. Repealers. 151
(a) The Green Housing Coordination Temporary Amendment Act of 2025, effective 152
February 12, 2026 (D.C. Law 26-90; 73 DCR 3), is repealed. 153
(b) The Net Zero Modification and Preservation Temporary Amendment Act of 2026, 154
effective May 21, 2026 (D.C. Law 26-123; 73 DCR 5075), is repealed. 155
Sec. 5. Fiscal impact statement. 156
The Council adopts the fiscal impact statement of the Budget Director as the fiscal impact 157
statement required by section 4a of the General Legislative Procedures Act of 1975, approved 158
October 16, 2006 (120 Stat. 2038; D.C. Official Code § 1-301.47a). 159
Sec. 6. Effective date. 160
This act shall take effect following approval by the Mayor (or in the event of veto by the 161
Mayor, action by the Council to override the veto), and shall remain in effect for no longer than 90 162
days, as provided for emergency acts of the Council of the District of Columbia in section 412(a) of 163
the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat. 788; D.C. Official 164
Code § 1-204.12(a)). 165