RecordWell Data

Net Zero Continuity Congressional Review Emergency Amendment Act of 2026 (Circulation Draft)

Council of the District of Columbia · District of Columbia County · meeting of Oct 2, 2026 · Other

Open the original document More from Council of the District of Columbia

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 ___________________________ 2 Councilmember Janeese Lewis George 3 4 5 A BILL 6 7 _________________________ 8 9 10 IN THE COUNCIL OF THE DISTRICT OF COLUMBIA 11 12 _________________________ 13 14 15 To amend, on an emergency basis, due to congressional review, the Green Building Act of 2006 to 16 exempt certain District-owned and -funded residential and nonresidential projects from 17 complying with net-zero-energy standards and to modify net-zero-energy standard 18 compliance requirements for nonresidential and residential projects; to amend section 2 of 19 the Clean Energy DC Building Code Amendment Act of 2022 to modify the definition of 20 the net-zero-energy standard and the types of projects to which the net-zero-energy standard 21 applies; and for other purposes. 22 23 BE IT ENACTED BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this act 24 may be cited as the “Net Zero Continuity Congressional Review Emergency Amendment Act of 25 2026”. 26 Sec. 2. The Green Building Act of 2006, effective March 8, 2007 (D.C. Law 16-234; D.C. 27 Official Code § 6-1451.01 et seq.), is amended as follows: 28 (a) Section 2 (D.C. Official Code § 6-1451.01) is amended as follows: 29 (1) Paragraph (1) is amended to read as follows: 30 “(1) “Addition” shall have the meaning ascribed to it in the Building Codes.”. 31 (2) The existing paragraph (2A) is redesignated as paragraph (2B). 32 (3) A new paragraph (2A) is added to read as follows: 33 2 “(2A) “Aquatic center” means a structure intended for swimming or recreational 34 bathing that contains water over 24 inches deep and includes the pool, decks, and surrounding 35 structure, locker rooms, electrical and mechanical rooms, and IT controls that support the pool.”. 36 (4) A new paragraph (3A) is added to read as follows: 37 “(3A) “Building Codes” means the portions of the Construction Codes designated as 38 the Building Code, the Energy Conservation Code, and the Existing Building Code.”. 39 (5) Paragraphs (6) and (7) are amended to read as follows: 40 “(6) “Construction Codes” shall have the same meaning as in section 2(2) of the 41 Construction Codes Approval and Amendments Act of 1986, effective March 21, 1987 (D.C. Law 6-42 216; D.C. Official Code § 6-1401(2)). 43 “(7) “Construction documents” shall have the meaning ascribed to it in the Building 44 Codes.”. 45 (6) Paragraph (8) is repealed. 46 (7) Paragraph (14) is amended to read as follows: 47 “(14) “Existing building” shall have the meaning ascribed to it in the Building Codes.”. 48 (8) Paragraph (22) is amended to read as follows: 49 “(22) “Gross floor area” shall have the meaning ascribed to it in the Building Codes.”. 50 (9) A new paragraph (31B) is added to read as follows: 51 “(31B) “Level 3 alteration” shall have the meaning ascribed to it in the Building 52 Codes.”. 53 (10) A new paragraph (32C) is added to read as follows: 54 “(32C) “Natatorium” means a building or complex housing one or more indoor pools 55 featuring HVAC and humidity controls to manage the environment.”. 56 3 (11) Paragraph (40A) is amended to read as follows: 57 “(40A) “Temporary building” means a: 58 “(A) Trailer; or 59 “(B) Structure that is used or intended for supporting or sheltering any use or 60 occupancy on a non-permanent timeframe for an interim use during construction of a permanent 61 structure.”. 62 (b) Section 3(a) (D.C. Official Code § 6-1451.02(a)) is amended as follows: 63 (1) The lead-in language of paragraph (1) is amended by striking the phrase 64 “substantial improvement” and inserting the phrase “Level 3 alterations” in its place. 65 (2) Paragraph (2) is amended as follows: 66 (A) Subparagraph (C) is amended by striking the phrase “; and” and inserting a 67 semicolon in its place. 68 (B) Subparagraph (D) is amended to read as follows: 69 “(D) Be built to comply with the net-zero-energy standard, as defined in section 70 2(a)(3) of the Clean Energy DC Building Code Amendment Act of 2022, effective September 21, 71 2022 (D.C. Law 24-177; D.C. Official Code § 6-1453.01(a)(3)) (“Clean Energy DC Building Act”), 72 unless the project is for the construction of: 73 “(i) A temporary building; 74 “(ii) An addition less than 10,000 square feet; 75 “(iii) A police, fire, emergency response, or Office of Unified 76 Communications facility; except, that, that the facility need not comply with energy conservation and 77 obtainment standards otherwise required by section 2(a)(3)(A) and (B) of the Clean Energy DC 78 Building Act (D.C. Official Code § 6-1453.01(a)(3)(A) and (B)), until the effective date of the final 79 4 regulations issued by the Mayor pursuant to section 2(b)(1) of the Clean Energy DC Building Act 80 (D.C. Official Code § 6-1453.01(b)(1)); 81 “(iv) A natatorium; except, that, that the aquatic center in which the 82 natatorium is located need not comply with energy conservation and obtainment standards otherwise 83 required by section 2(a)(3)(A) and (B) of the Clean Energy DC Building Code Act (D.C. Official 84 Code § 6-1453.01(a)(3)(A) and (B)), until the effective date of the final regulations issued by the 85 Mayor pursuant to section 2(b)(1) of the Clean Energy DC Building Code Act (D.C. Official Code § 86 6-1453.01(b)(1)); or 87 “(v) A project for which all permits necessary to begin construction 88 were submitted before October 1, 2024, and that were not submitted to GBAC before February 1, 89 2026; and”. 90 (C) A new subparagraph (E) is added to read as follows: 91 “(E) Be built to comply with section 2(a)(3)(D) of the Clean Energy DC 92 Building Code Act (D.C. Official Code § 6-1453.01(a)(3)(D)).”. 93 (3) Paragraph (3) is amended as follows: 94 (A) The lead-in language is amended by striking the phrase “If a residential 95 project includes” and inserting the phrase “If a residential project is for new construction and 96 includes” in its place. 97 (B) Subparagraph (A) is amended to read as follows: 98 “(A) Be built to comply with the net-zero-energy standard; except, that a 99 project need not comply with the renewable energy requirements otherwise required by section 100 2(a)(3)(A), (B), and (C) of the Clean Energy DC Building Act (D.C. Official Code § 6-101 1453.01(a)(3)(A), (B), and (C)), until the effective date of the final regulations issued by the Mayor 102 5 pursuant to section 2(b)(1) of the Clean Energy DC Building Act (D.C. Official Code § 6-103 1453.01(b)(1)); and”. 104 (C) Subparagraph (B) is amended by striking the acronym “DCRA” and 105 inserting the acronym “DOB” in its place. 106 (D) Subparagraph (C) is repealed. 107 (4) Paragraph (6) is amended by striking the phrase “maintain net-zero-energy 108 compliance” and inserting the phrase “shall be built to comply with the net-zero-energy standard” in 109 its place. 110 Sec. 3. Section 2 of the Clean Energy DC Building Code Amendment Act of 2022, effective 111 September 21, 2022 (D.C. Law 24-177; D.C. Official Code § 6-1453.01), is amended as follows: 112 (a) Subsection (a) is amended as follows: 113 (1) A new paragraph (2A) is added to read as follows: 114 “(2A) “Level 3 alteration” shall have the same meaning ascribed to it in the 115 Building Codes.”. 116 (2) Paragraph (3) is amended as follows: 117 (A) Subparagraph (A) is amended by striking the phrase “; and” and inserting a 118 semicolon in its place. 119 (B) Subparagraph (B) is amended to read as follows: 120 “(B) A building obtains energy from renewable energy sources in the amount 121 that would be required by the most recent version of Appendix Z;”. 122 (C) New subparagraphs (C) and (D) are added to read as follows: 123 “(C) Renewable energy shall be generated at the building site wherever 124 feasible; and”. 125 6 “(D) On-site fuel combustion shall not be permitted for the provision of thermal 126 energy to the building except for backup power generation.”. 127 (b) Subsection (b) is amended as follows: 128 “(b)(1) By December 31, 2027, the Mayor, pursuant to pursuant to Title I of the 129 District of Columbia Administrative Procedure Act, approved October 21, 1968 (82 Stat. 1204; D.C. 130 Official Code § 2-501 et seq.), shall issue final regulations requiring all new construction or Level 3 131 alterations to covered buildings to be constructed to a net-zero-energy standard. 132 “(2) By December 31, 2026, the Mayor, pursuant to Title I of the District of Columbia 133 Administrative Procedure Act, approved October 21, 1968 (82 Stat. 1204; D.C. Official Code § 2-501 134 et seq.), shall issue final regulations prohibiting the use of on-site fuel combustion for the provision of 135 thermal energy for all new construction of covered buildings and additions greater than 10,000 square 136 feet to covered buildings. 137 “(3) No permit application for new construction of covered buildings or an addition 138 greater than 10,000 square feet to covered buildings submitted after December 31, 2026, shall be 139 approved if the building or addition design provides for the use of on-site fuel combustion for the 140 provision of thermal energy for space heating and water heating. 141 “(4) Notwithstanding any other provision of law, no building permit application for 142 new construction of covered buildings, an addition greater than 10,000 square feet to covered 143 buildings, or Level 3 alteration to covered buildings submitted after December 31, 2026, shall be 144 approved unless the building design is such that the building conserves an amount of energy 145 attributable to building operation that is equal to or greater than the amount that would be conserved if 146 such building complied with the 2024 International Energy Conservation Code.”. 147 7 (c) Subsection (c)(1) is amended by striking the phrase “newly constructed or substantially 148 improved covered buildings” and inserting the phrase “covered buildings that were newly constructed 149 or underwent Level 3 alterations” in its place. 150 Sec. 4. Repealers. 151 (a) The Green Housing Coordination Temporary Amendment Act of 2025, effective 152 February 12, 2026 (D.C. Law 26-90; 73 DCR 3), is repealed. 153 (b) The Net Zero Modification and Preservation Temporary Amendment Act of 2026, 154 effective May 21, 2026 (D.C. Law 26-123; 73 DCR 5075), is repealed. 155 Sec. 5. Fiscal impact statement. 156 The Council adopts the fiscal impact statement of the Budget Director as the fiscal impact 157 statement required by section 4a of the General Legislative Procedures Act of 1975, approved 158 October 16, 2006 (120 Stat. 2038; D.C. Official Code § 1-301.47a). 159 Sec. 6. Effective date. 160 This act shall take effect following approval by the Mayor (or in the event of veto by the 161 Mayor, action by the Council to override the veto), and shall remain in effect for no longer than 90 162 days, as provided for emergency acts of the Council of the District of Columbia in section 412(a) of 163 the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat. 788; D.C. Official 164 Code § 1-204.12(a)). 165

Source: Council of the District of Columbia website. First collected Oct 6, 2026.