RecordWell Data

BOA-26-29, 7056 Camden Hwy. -Rev 2 (County) - Staff Report

City of Sumter · Sumter County · Other

Open the original document More from City of Sumter

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Sumter City-County Board of Zoning Appeals October 14, 2026 BOA-26-29, 7056 Camden Hwy. (County) The Board of Zoning Appeals will consider a request from Harmoni Gateway Towers, LLC to establish a 279 ft. tall telecommunications tower on the property. The Zoning Administrator has referred this request to the Board of Zoning Appeals consistent with Article 5.b.4: Communication Towers and Antenne of the Sumter County Zoning & Development Standards Ordinance. The property is located at 7056 Camden Hwy., is zoned Agricultural Conservation (AC), and is identified as TMS# 088-00-03-028. 2 Sumter City-County Zoning Board of Appeals October 14, 2026 BOA-26-29, 7056 Camden Hwy. (County) I. THE REQUEST Applicant(s): Harmoni Gateway Towers, LLC Status of the Applicant: Authorized Agent (Leaseholder) Request: Request to establish a 279 ft. tall telecommunications tower on the property. County Council District: 1 Location: 7056 Camden Hwy. Zoning: Agricultural Conservation (AC) Tax Map Reference: 088-00-03-028 II. B ACKGROUND Communications towers and/or antenna may be treated as Conditional Uses in Sumter County without further review by the Sumter City- County Board of Zoning Appeals if the Zoning Administrator determines all applicable conditions in the Ordinance are met. The Zoning Administrator has referred the request by Harmoni Gateway Towers, LLC to construct a 279 ft. self-supported telecommunications tower at 7056 Camden Hwy. for decision by the Board of Zoning Appeals consistent with Article 5.b.4: Communication Towers and Antennae. The property is zoned Agricultural Conservation (AC) and is located on Camden Hwy (US-521). 3 approximately 950 ft. south of the intersection of Camden Hwy and Dais Rd. The property is shown in red on the map on the previous page. Under the AC district zoning regulations which govern the property, telecommunications towers are evaluated in accordance with Article 1.h.4.c and Article 3.d.4 and in accordance with Article 5.b.4. of the Sumter County Zoning & Development Standards Ordinance. A copy of the overall property boundary with the proposed tower lease area identified, the proposed site development plan, and elevation drawing of the tower are included as Exhibit 1. Figure 1 - Property boundary with proposed tower lease area identified in the northwest corner 4 Figure 2 – Proposed site development plan Figure 3 – Proposed tower elevation drawing with Antenna Locations Identified 5 Figure 4 - Photo Simulation of Proposed Tower from Camden Hwy (US-521) Looking South Figure 5 - Photo Simulation of Proposed Tower from Camden Hwy (US-521) Looking North 6 Below is a list of exhibits pertaining to this case: Exhibit # Description 1 Site Plans titled “Harmoni Tower ID SC0009812”, sheets T-1, Survey, Z-1, Z-2, and Z-3, last revised January 16, 2026 2 Structural Design Report for 279’ S3TL Series HD2 Self-Supporting Tower, Site: Borden, SC, Site Number: SC0009812, Dated January 21, 2026. 3 NEPA Report for Site, Prepared by Trileaf Environmental Architecture and Engineering, Dated January 23, 2026 4 Signed Unrecorded Memorandum of Easement Agreement, executed by buyer and seller on February 2, 2026 5 ASR Registration Search Record for Registration 1332844, retrieved September 3, 2026 6 ULS License, PCS Broadband License – KNLH718 – Cellco Partnership, retrieved June 11, 2026 7 Tower Removal Agreement Letter Dated June 8, 2026 8 Letter from Harmoni Towers Gateway, LLC certifying that facilities will comply with government rules and regulations and will maintain general liability insurance, Dated April 1, 2026 9 Certificate of Liability Insurance, Dated March 20, 2026 10 Photo-simulation images depicting proposed tower visual impact (2 images, one facing north on US-521 and one facing south on US-521) 11 Tower Fall Radius Letter – Nello 280’ NSX Lattice Self Support Tower, Dated June 5, 2026 12 Tower Fall Radius Letter – Nello 280’ NSX Lattice Self Support Tower, Dated July 10, 2026 13 Letter from Applicant Attorney to County Attorney, and attached plans dated October 5, 2026 III. SPECIAL EXCEPTION REVIEW CRITERIA In the AC zoning district under Article 3, Exhibit 3 -5, telecommunications towers are special exception uses requiring the review and approval of the BZA, unless the Zoning Administrator determines all applicable conditions in the Ordinance are met. Special exception requests for telecommunications towers are evaluated in accordance with Article 1.h.4.c. and Article 5.b.4. as contained in the Sumter County Zoning & Development Standards Ordinance. Article 1.h.4.c: Special Exceptions Permits for Special Exceptions shall be evaluated by the Board of Zoning Appeals on the basis of the following criteria: 1. That the Special Exception complies with all applicable development standards contained elsewhere in this Ordinance, including landscaping and bufferyards, off -street parking, and dimensional requirements; 7 Case Facts: 1. Telecommunications tower development standards are discussed later in this report. There are no general Ordinance- specified development standards applicable to this site that have not been addressed. 2. That the special exception will be in substantial harmony with the area in which it is located; Case Facts: 1. The subject property and parcels immediately adjacent on all sides are zoned Agricultural Conservation (AC). 2. The parcel on which the tower is proposed is undeveloped and is currently an open field. 3. There is a single-family residence located +/- 500 ft. to the southwest of the proposed tower location and a single-family home located +/- 150 ft. the north across Camden Hwy. 4. The proposed 279 ft. self-support telecommunications tower is approximately 55 ft. from the edge of the existing public road right-of-way. 3. That the special exception will not discourage or negate the use of surrounding property for use(s) permitted by right. Case Facts: 1. The subject property and parcels immediately adjacent on all sides are zoned Agricultural Conservation (AC). 2. There is a single-family residence located +/- 500 ft. to the southwest of the proposed tower location and a single -family home located +/ - 150 ft. the north across Camden Hwy. 3. The proposed 279 ft. self -support telecommunications tower approximately 55 ft. from the edge of the existing public road right-of-way 8 Article 5.b.4. Communication Towers and Antennae: Application Requirements: The applicant for a permit for construction of a communications tower or the placement of a communications antenna on an existing structure other than a tower previously permitted must file with the Zoning Administrator an application accompanied by a fee of $500.00 and the following documents: 1. Specifications 2. Site Plan 3. Tower Location Map 4. Antenna Capacity – Wind Load 5. Antenna Owners 6. Owner Authorization 7. FCC License 8. Visual Impact Analysis 9. Removal Agreement Case Facts: • The applicant has submitted all aforementioned documents via Minor Site Plan #MSP-26-24. Conditions: Applicant must show that all of the following conditions are met: 1. Location and Visual Impact : The proposed tower, antenna or accessory structure will be placed on site in such a manner that it will minimize the visual impact on the surrounding properties; Case Facts: • The applicant is proposing to install a 279 ft. self-support telecommunications tower approximately 55 ft. from the edge of the existing public road right-of- way. • Figures #4 and #5 as submitted by the applicant represent photo simulation of the proposed tower as viewed from Camden Hwy. 2. Inability to locate on existing structures: The applicant must show that a proposed antenna and equipment cannot be accommodated and function as required by applicable regulations and the applicants’ technical design requirements without unreasonable modifications on any existing structure or tower under control of applicant, or to locate on an available and suitable nearby tower at reasonable costs (i.e., at or below local area rent average); Case Facts: • There are no known telecommunications towers within the immediate area of the site. 3. Necessity for location in residential district: The applicant must show that the portion of the county intended to receive coverage cannot be adequately served by a 9 communications tower or antenna placed in a non-residential district for valid technical reasons; Case Facts: • The proposed site is not in a residential zoning district. 4. Public property or other private property not suitable: Prior to consideration of a permit for location on private property which must be acquired, the applicant must show that available publicly owned sites, and available privately owned sites occupied by a compatible use, are unsuitable for operation of the facility under applicable communications regulations and the applicant’s technical design requirements; Case Facts: • There are no suitable publicly-owned sites within the vicinity of the proposed site. 5. Design for multiple use: Applicants must show that a new tower is designed to accommodate additional antennae equal to applicant’s present and future requirements; Case Facts: • The applicant’s design plans indicate three separate antenna arrays. The top array is identified for future Verizon antennas, and the two additional arrays are unspecified as to future users. 6. Safety Codes Met: Applicant must show that all applicable health, nuisance, fire, building, and life safety code requirements are met; Case Facts: • The project is subject to Sumter County building permit requirements. The Building Department has not completed review of the application to date, • All code requirements must be addressed by the applicant as a condition of any building permit issuance. 7. Paint and illumination: A communications tower must not be painted or illuminated unless otherwise required by state or federal regulations; Case Facts: • The tower is not proposed to be painted or illuminated, except for required safety beacons at the top and midpoint of the tower. 8. Distance from existing tower: A permit for a proposed tower site within 1,000 ft. of an existing tower shall not be issued unless the applicant certifies that the existing tower does not meet the applicant’s structural specifications and design requirements, or that a co-location agreement could not be obtained; 10 Case Facts: • There is a Verizon Wireless tower located +/- 1,900 linear feet to the northwest of the site. There are no towers within 1,000 ft. of the proposed site. 9. Indemnity and claims resolution: The applicant must show by certification from a registered professional engineer that the proposed facility will contain only equipment meeting FCC rules, and must file with the Zoning Administrator a written indemnification of Sumter County and proof of liability insurance or financial ability to respond to claims up to $1,000,000.00 dollars in the aggregate which may arise from the operation of the facilities during its life, at no cost to the county and in a form approved by the County Attorney. Case Facts: • The applicant has submitted a written indemnification of Sumter County and proof of liability insurance. 10. Minimum Setback: Non-Residential Zoning: Towers located on non-residentially zoned properties must be set back from all lot lines by distances equal to the district setback requirement or the tower’s fall zone, whichever is greater. Fall zones less than the full height of the tower shall be determined by an engineer licensed in the state of South Carolina in a letter that includes the engineer’s signature and seal. Case Facts: • The applicant submitted a fall radius letter signed and sealed by South Carolina-licensed professional engineer Jason Mark Lambert dated June 5, 2026. In the letter, Mr. Lambert states that the tower has been designed using 119 mph 3-second gust wind with no ice and a 30 mph 3-second wind gust with 1 inch of ice. In the letter, Mr. Lambert stated “Although we cannot guarantee exactly how a tower would fall if it were to fail, the most likely mode of failure would be a buckling failure of one of the tower sections due to excessive wind loading. The tower leg with the highest stress ratio is located at the 220’ – 240’ level. The stress ratio in that leg is calculated to be 91% of the code-permitted design loading. Given that the tower section with the highest stress ratio will most likely fail first, the proposed tower would fail at the 220’ level with the top 60’ of the tower collapsing. Depending on the conditions at the time of failure and the stress levels in structural material below, the top 60’ of the tower would likely fall within a 60’ fall radius”. (Exhibit 11) • After staff questioned the stated fall zone of 60’ as being inclusive of a portion of the right-of-way for US-521, the applicant submitted a revised fall radius letter signed and sealed by South Carolina-licensed professional engineer Adam N. Howe dated July 10, 2026. In the letter, Mr. Howe states that the 11 tower has been designed using 119 mph 3-second gust wind with no ice and a 30 mph 3-second wind gust with 1 inch of ice. In the letter, Mr. Howe stated “Although we cannot guarantee exactly how a tower would fall if it were to fail, the most likely mode of failure would be a buckling failure of one of the tower sections due to excessive wind loading. The tower leg with the highest stress ratio is located at the 220’ – 240’ level. The stress ratio in that leg is calculated to be 91% of the code-permitted design loading. Given that the tower section with the highest stress ratio will most likely fail first, the proposed tower would fail at the 220’ level with the top 60’ of the tower collapsing. Depending on the conditions at the time of failure and the stress levels in structural material below, the top 60’ of the tower would likely fall within a 37.5’ fall radius”. (Exhibit 12) 11. Technical Assistance: Prior to issuing a permit, the Zoning Administrator may make use of professional technical services to determine if the standards in Article 5.b.4.d. are met; Case Facts: • The Zoning Administrator has not utilized any outside professional technical services in the consideration of this request. 12. Maintenance: The communications tower shall be maintained by common corrosion control procedures so it continuously maintains a minimum visual impact on surrounding properties Case Facts: • All code requirements must be addressed by the applicant as a condition of any building permit issuance. 12 Special Exception: A tower, pole, or antenna may be permitted by Special Exception together with the findings considered in Section 1.h.4.c. after a public hearing along with the fol lowing criteria: 1. All application requirements and conditions imposed by 5.b.4.d. and 5.b.4.e. are met except height limitations and setbacks; Case Facts: 1. All application materials required by Article 5.b.4.d. have been submitted by the applicant. 2. If additional tower height is required, the total tower height will not exceed one hundred-fifty (150%) percent of the maximum height permitted in the district. In unincorporated portions of Sumter County, radio and television towers are exempt at the Board of Appeals from tower height limits (this rule does not apply within the corporate limits of the City of Sumter); Case Facts: 1. N/A, No additional tower height is required beyond the maximum height permitted. 3. The applicant has demonstrated that additional height above that permitted by the regulations is necessary for service to occupants of an area within the City or County of Sumter; Case Facts: 1. N/A, No additional tower height is required beyond the maximum height permitted. 4. Setback requirements and additional conditions are established by the Zoning Board of Appeals as it deems necessary to remove dangers to public health and safety and to protect adjacent property; Case Facts: 1. 279 ft. self-support telecommunications tower is proposed to be placed 55 ft. from the edge of the existing public road right-of-way. 5. Prior to approving a permit by Special Exception or on appeal from the Zoning Administrator, the Board may make use of professional technical services to determine that the standards in 5.b.4.d and 5.b.4.e. are met. 13 IV. STAFF RECOMMENDATION The proposed tower’s placement close to Camden Hwy (US -521) carries significant risk to the Sumter community. Camden Hwy. is a principal arterial roadway, and functions as a critical link within Sumter County and between Sumter and areas to the north. Introducing a facility which, in the event of failure, would potentially block this critical corridor is a hazard mitigation risk. While engineers can design telecommunications towers to buckle or fold over on themselves, the proposed fall zone represents only 13.4% of the tower's total height. Expecting a freestanding structure of this size to collapse so perfectly that no part of it lands beyond that distance is highly unrealistic and outside standard engineering safety margins . W here manufacturers provide certified "fall zone letters" utilizing advanced hinge -point calculations, the legal and physical minimum limit typically stops at 33% to 50% of the total height. If the board makes the necessary findings to approve this request, then staff recommends the following conditions be applied: 1. If the foundation design used in association with this tower is performed by a third party, Nello (the entity that prepared the fall zone letter) must review the design in order to confirm the fall radius remains satisfactory. A report shall be provided concerning this condition prior to building permit approval for any component of the project. V. DRAFT MOTIONS FOR BOA-26-29 A. I move the Zoning Board of Appeals approve BOA-26-29, subject to the findings of fact and conclusions developed by the BZA and so stated: [reference specific findings as developed based on facts presented in the staff report, exhibits, and/or during the public hearing.] B. I move the Zoning Board of Appeals deny BOA-26-29, subject to the following findings of fact and conclusions developed by the BZA and so stated: [reference specific findings as developed based on facts presented in the staff report, exhibits, and/or during the public hearing.] C. I move the Zoning Board of Appeals enter an alternative motion for BOA-26-29. VII. BOARD OF APPEALS – September 9, 2026 The Sumter City -County Board of Appeals at its meeting on Wednesday, September 9, 2026, deferred the request referenced above until the next Board of Zoning Appeals meeting on Wednesday, October 14, 2026. VII. BOARD OF APPEALS –October 14, 2026 Exhibit 1 SITE INFORMATION COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC CAMDEN HIGHWAY REMBERT, SC 29128 T-1 THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF HARMONI TOWERS. HARMONI SITE NAME: BORDEN NEW 279' SELF-SUPPORT TOWER 11.16.26 TM 08.25.25ISSUED FOR REVIEW JDK 0 68160 HARMONI TOWER ID # : SC0009812 VZW FUZE PROJECT #: 17333601 HERMITAGE, PA 16148 www.t-sqrd.com 2501 SHENANGO VALLEY FREEWAY, SUITE 3 T-SQUARED SITE SERVICES HERMITAGE, PA 16148 www.t-sqrd.com T-SQUARED SITE SERVICES 2501 SHENANGO VALLEY FREEWAY, SUITE 3 724.308.7855724.308.7855 6210 ARDREY KELL ROAD SUITE 375 CHARLOTTE, NC 28277 HARMONI TOWERS FINAL ZDS PROJECT TEAM DRAWING INDEX SHEET SHEET DESCRIPTION PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO ENHANCE BROADBAND CONNECTIVITY AND CAPACITY TO THE EXISTING ELIGIBLE WIRELESS FACILITY. THE PARTIES ABOVE HEREBY APPROVE AND ACCEPT THESE DOCUMENTS AND AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE CONSTRUCTION DESCRIBED HEREIN. ALL CONSTRUCTION DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL BUILDING DEPARTMENT AND ANY CHANGES AND MODIFICATIONS THE MAY IMPOSE. LOCATION MAP APPLICABLE CODES / REFERENCE DOCUMENTS CALL SOUTH CAROLINA ONE CALL (800) 721-7877 CALL 3 WORKING DAYS BEFORE YOU DIG! HARMONI TOWER ID: BORDEN AT&T SITE NAME: 17333601 SITE ADDRESS: CAMDEN HIGHWAY REMBERT, SC 29128 COUNTY: SUMTER COUNTY E-911 ADDRESS: TBD AREA OF CONSTRUCTION: RAWLAND LATITUDE: 34.067385° LONGITUDE: -80.509680° LAT/LONG TYPE: NAD83 JURISDICTION: SUMTER COUNTY ZONING: AF - AGRICULTURAL/FORESTRY OCCUPANCY CLASSIFICATION: AGRE 4 TYPE OF CONSTRUCTION: II-B A.D.A. COMPLIANCE: FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION LAND OWNER: JOSEPH AND JOANN TAYLOR LIFE ESTATE 1479 LONGFELLOW AVE BRONX NY 10460 KENNETH TAYLOR (803) 968-0732 copsandteens@aol.com TOWER OWNER: HARMONI TOWERS, LLC 6210 ARDREY KELL ROAD CHARLOTTE, NC 28277 ELECTRICAL SERVICE PROVIDER: BLACK RIVER ELECTRIC COOPERATIVE INC. 803-469-8060 TELCO PROVIDER: WINDSTREAM XXX-XXX-XXXX · INSTALL 279' SELF-SUPPORT TOWER · INSTALL CHAIN LINK FENCING · INSTALL (1) UTILITY H-FRAME · INSTALL (2) FIBER VAULTS · INSTALL ACCESS ROAD T-1 TITLE SHEET DIRECTIONS: Z-1 ENLARGED SITE PLAN ALL DRAWINGS CONTAINED HEREIN ARE FORMATTED FOR 11X17 CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS AND CONDITIONS ON THE JOB SITE AND SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME. ELEVATION Z-2 SURVEY SURVEY PLAT SITE PLAN ZONING DRAWINGS ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT CONFORMING TO THE LATEST EDITIONS OF THE FOLLOWING CODES. · 2021 INTERNATIONAL BUILDING CODE · 2023 NATIONAL ELECTRIC CODE · 2009 INTERNATIONAL ENERGY CONSERVATION CODE · 2018 INTERNATIONAL EXISTING BUILDING CODE · 2021 INTERNATIONAL FIRE CODE · 2021 INTERNATIONAL MECHANICAL CODE · 2021 INTERNATIONAL RESIDENTIAL CODE Z-3 HARMONI TOWER ID: SC0009812 HARMONI SITE NAME: BORDEN AT&T SITE ID: 17333601 SITE ADDRESS: CAMDEN HIGHWAY REMBERT, SC 29128 JURISDICTION: SUMTER COUNTY SITE TYPE: 279' SELF-SUPPORT E-911 ADDRESS: ### HARMONI TOWERS VESTED IN: KENNETH TAYLOR Document 1190, Page 1626 APN: 088-00-03-028 75'x75' Leased Premises 5625 sq ft, 0.1291 acres S 55°29'32" E 75.00' S 34°30'28" W 75.00' N 55°29'32" W 75.00' N 34°30'28" E 75.00' 30' Access & Utility Easement545 sq ft, 0.0125 acres Now or Formerly: GEORGE NATHANIEL TAYLOR & YVONNE B. TAYLOR, Trustees Document 1302-1594 088-00-02-021 Camden Highway 14 L1 L2 L3 L4 L5 L6 N 34°30'28" E 297.83' S 51°16'32" E 443.97' MSI Project No. 61711 Sheet No.1 Harmonin Tower ID#SC009812 Camden Highway Parcel 088-00-03-028 City of Rembert County of Sumter State of South Carolina of2 Date Signed: SITE VICINITY MAP NORTH PM:Drafter: CALCAL REVISION HISTORY PC: TRM SPECIAL PURPOSE SURVEY PREPARED FOR: HARMONI TOWERS, LLC Transforming the Industry Land Surveys Zoning Compliance Environmental Consulting Property Condition Assessment Seismic Risk Analysis Appraisal Millman Surveying, Inc. d.b.a CBRE Land Surveying Corporate Headquarters 950 Main Avenue, Cleveland, OH 44113 Phone: 800-520-1010 Fax: 330-342-0834 www.millmanland.com landsurveyors@cbre.com Surveyor's Seal GRAPHIC SCALE ” ” ” ” ” 30' ACCESS AND UTILITIES EASEMENT: FLOOD ZONE: OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY COMMITMENT NO. 01-25025513-01T- SCHEDULE A: CERTIFICATION: MISCELLANEOUS NOTES: SYMBOL LEGEND ” ” ” ” ” 75'X75' LEASED PREMISES: OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY COMMITMENT NO. 01-25025513-01T- SCHEDULE B, SECTION II: X 11-21-2025 N 40°53'32" W 672.80' N 34°30'28" E 297.83' S 51°16'32" E 443.97' S 08°54'28" W 482.11' 65.35' N 40°51'32" W 118.42' 607.45' VESTED IN: KENNETH TAYLOR Document 1190, Page 1626 APN: 088-00-03-028 Now or Formerly: GEORGE NATHANIEL TAYLOR & YVONNE B. TAYLOR, Trustees Document 1302-1594 088-00-02-021 Now or Formerly: WILLIAM J. KENDRICK Document 1306-4535 088-00-03-050 Now or Formerly: ORA SPANN Document 1006-671 088-00-03-013 Lease Premises Access Easement 6.27' 475.84' Camden Highway Sheet No.2of2 Date Signed: NORTH Transforming the Industry Land Surveys Zoning Compliance Environmental Consulting Property Condition Assessment Seismic Risk Analysis Appraisal Millman Surveying, Inc. d.b.a CBRE Land Surveying Corporate Headquarters 950 Main Avenue, Cleveland, OH 44113 Phone: 800-520-1010 Fax: 330-342-0834 www.millmanland.com landsurveyors@cbre.com Surveyor's Seal GRAPHIC SCALE MSI Project No. 61711 Harmonin Tower ID#SC009812 Camden Highway Parcel 088-00-03-028 City of Rembert County of Sumter State of South Carolina PM:Drafter: CALCAL PC: TRM SPECIAL PURPOSE SURVEY PREPARED FOR: HARMONI TOWERS, LLC 11-21-2025 ~Grass~ Camden Highway 75' Wide - Public - Asphalt Pavement 14 12.5' Right-of-Way Book 1319, Page 2276 N 40°53'32" W 672.80' S 08°54'28" W 482.11' COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC CAMDEN HIGHWAY REMBERT, SC 29128 Z-1 THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF HARMONI TOWERS. HARMONI SITE NAME: BORDEN NEW 279' SELF-SUPPORT TOWER 11.16.26 TM 08.25.25ISSUED FOR REVIEW JDK 0 68160 HARMONI TOWER ID # : SC0009812 VZW FUZE PROJECT #: 17333601 HERMITAGE, PA 16148 www.t-sqrd.com 2501 SHENANGO VALLEY FREEWAY, SUITE 3 T-SQUARED SITE SERVICES HERMITAGE, PA 16148 www.t-sqrd.com T-SQUARED SITE SERVICES 2501 SHENANGO VALLEY FREEWAY, SUITE 3 724.308.7855724.308.7855 6210 ARDREY KELL ROAD SUITE 375 CHARLOTTE, NC 28277 HARMONI TOWERS FINAL ZDS ~Grass~ Camden Highway 75' Wide - Public - Asphalt Pavement 14 12.5' Right-of-Way Book 1319, Page 2276 COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC CAMDEN HIGHWAY REMBERT, SC 29128 Z-2 THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF HARMONI TOWERS. HARMONI SITE NAME: BORDEN NEW 279' SELF-SUPPORT TOWER 11.16.26 TM 08.25.25ISSUED FOR REVIEW JDK 0 68160 HARMONI TOWER ID # : SC0009812 VZW FUZE PROJECT #: 17333601 HERMITAGE, PA 16148 www.t-sqrd.com 2501 SHENANGO VALLEY FREEWAY, SUITE 3 T-SQUARED SITE SERVICES HERMITAGE, PA 16148 www.t-sqrd.com T-SQUARED SITE SERVICES 2501 SHENANGO VALLEY FREEWAY, SUITE 3 724.308.7855724.308.7855 6210 ARDREY KELL ROAD SUITE 375 CHARLOTTE, NC 28277 HARMONI TOWERS FINAL ZDS COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC CAMDEN HIGHWAY REMBERT, SC 29128 Z-3 THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF HARMONI TOWERS. HARMONI SITE NAME: BORDEN NEW 279' SELF-SUPPORT TOWER 11.16.26 TM 08.25.25ISSUED FOR REVIEW JDK 0 68160 HARMONI TOWER ID # : SC0009812 VZW FUZE PROJECT #: 17333601 HERMITAGE, PA 16148 www.t-sqrd.com 2501 SHENANGO VALLEY FREEWAY, SUITE 3 T-SQUARED SITE SERVICES HERMITAGE, PA 16148 www.t-sqrd.com T-SQUARED SITE SERVICES 2501 SHENANGO VALLEY FREEWAY, SUITE 3 724.308.7855724.308.7855 6210 ARDREY KELL ROAD SUITE 375 CHARLOTTE, NC 28277 HARMONI TOWERS FINAL ZDS Exhibit 3 NEPA Report January 23, 2026 Borden Client #SC0009812 Camden Highway Rembert, Sumter County, South Carolina 29128 Trileaf # 772867 Prepared For: Prepared By: Harmoni Towers LLC Trileaf Corporation 10801 Executive Center Dr 1775 The Exchange SE, Suite 525 Little Rock, AR 72211 Atlanta, GA 30339 NEPA Report Summary Site Name/Location: Borden / Client #SC0009812 / Trileaf #772867 Camden Highway, Rembert, Sumter County, South Carolina 29128 Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W Project Description: Harmoni Towers LLC proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. 1. Is the facility located in an officially designated wilderness area? [47 CFR 1.1307 (a)(1)] Yes No Data Sources: Site Reconnaissance Review of 7.5-Minute USGS Topographic Map (Appendix B) National Wilderness Preservation System Website (www.wilderness.net) 2. Is the facility located in an officially designated wildlife preserve? [47 CFR 1.1307 (a)(2)] Yes No Data Sources: Site Reconnaissance Review of 7.5-Minute USGS Topographic Map (Appendix B) US Fish & Wildlife Service National Wildlife Refuge System Map (Appendix B) 3. Will the facility: (i) affect listed threatened or endangered species or designated critical habitats; or (ii) jeopardize the continued existence of any proposed endangered or threatened species; or is it likely to result in the destruction or adverse modification of proposed critical habitats, as determined by the Secretary of the Interior pursuant to the Endangered Species Act of 1973? [47 CFR 1.1307 (a)(3)] Yes No Data Sources: Site Reconnaissance Review of US Fish & Wildlife Service Critical Habitat and Federally Listed Endangered Species (Appendix D) Informal Biological Assessment (Appendix D) South Carolina Department of Natural Resources 4. Will the facility affect districts, sites, buildings, structures, or objects significant in American history, architecture, archeology, engineering or culture, that are listed, or are eligible for listing on the State or National Registers of Historic Places? [47 CFR 1.1307 (a)(4)] Yes No Data Sources: Site Reconnaissance Cultural Resource Investigation (Appendix E) State Historic Preservation Office Section 106 Review (Appendix E) 5. Will the facility affect an Indian religious site? [47 CFR 1.1307 (a)(5)] Yes No Data Sources: Site Reconnaissance Correspondence with Native American Tribes via FCC TCNS (Appendix F) Review of Bureau of Indian Affairs Indian Reservation Map (Appendix B) 6. Will the facility be located in a "floodplain", and not be placed at least one (1) foot above the base flood elevation of the floodplain? [47 CFR 1.1307 (a)(6)] Yes No Data Sources: Review of FEMA Flood Map (Appendix B) 7. Will the construction of the facility involve significant change in surface features (e.g. wetland fill, deforestation, or water diversion)? [47 CFR 1.1307 (a)(7)] Yes No Data Sources: Site Reconnaissance Review of 7.5-Minute USGS Topographic Map (Appendix B) Review of US Fish & Wildlife Service National Wetlands Inventory Map (Appendix B) Review of USDA NRCS Web Soil Survey Map (Appendix B) 8. Will the antenna tower or supporting structure be equipped with high intensity white lights and located in a residential neighborhood, as defined by the applicable zoning law? Yes No Data Sources: Construction Drawings (Appendix A) It is assumed that clients will not utilize high intensity white lights in residential areas 9. Will the facility cause human exposure to levels of radiofrequency radiation in excess of Commission-adopted guidelines? Yes No Data Sources: Construction Drawings (Appendix A) and/or interviews with clients Clients will comply with the established criteria regarding radio frequency exposure limits , as established at the time of this report January 23, 2026 Signature Date Hannah Dell Trileaf Corporation Name Company 1 NEPA Report Introduction Trileaf Corporation (Trileaf) completed a NEPA Review for the above -referenced Harmoni Towers LLC (Harmoni Towers) site. The purpose of a NEPA Review is to comply with the National Environmental Policy Act (NEPA) of 1969. Trileaf performed extensive research by consulting with appropriate state and federal agencies and reviewing readily available published lists, files, data, and maps to provide our clients with a complete NEPA document. The following summarizes the scope of work Trileaf performed in accordance with the Federal Communications Commission’s (FCC’s) rules implementing NEPA (47 CFR Section 1.1307 (a) (1) through (8) to determine whether any of the below listed FCC special interest items would be affected by the proposed action. Referenced materials are included as attachments, where applicable and available. Harmoni Towers proposes to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50 -foot by 50-foot fenced area within a 75- foot by 75-foot (5,625-square- foot) lease area. The project includes a 12 -foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed project site is located at approximately Camden Highway, Rembert, Sumter County, South Carolina 29128 at 34° 4’ 2.5869” North latitude and 80° 30’ 34.8467” West longitude. During Trileaf’s site reconnaissance, it was observed that the site is currently located within an agricultural field, and the areas surrounding the site are currently agricultural development and wooded land. 1. Will the facility be located in an officially designated wilderness area? Trileaf reviewed the USGS 7.5-minute topographic map titled “Rembert” Quadrangle, South Carolina and information from the National Wilderness Preservation System (NWPS) ( http://www.wilderness.net) to determine if the site is located within an officially designated wilderness area. There are cur rently seven (7) officially designated wilderness areas in the State of South Carolina. The closest wilderness area to the project site is the Congaree National Park Wilderness Area, which is located approximately 22 miles southwest of the project site. Based on this review, the project site is not located within an officially designated wilderness area. 2. Will the facility be located in an officially designated wildlife preserve? Trileaf reviewed the USGS 7.5-minute topographic map titled “Rembert” Quadrangle, South Carolina, and information from the National Wildlife Refuge (NWR) System (http://www.fws.gov/refuges) to determine if the site is located within an officially designated wildlife preserve or refuge. Based on this review, the project site is not located within an officially designated wildlife preserve or refuge. A copy of the NWR System map is located in Appendix B. 2 3. Will the facility (i) affect listed threatened or endangered species or designated critical habitat; or (ii) likely jeopardize the continued existence of any proposed endangered or threatened species or likely result in the destruction or adverse modification of proposed critical habitats, as determined by the Secretary of the Interior pursuant to the Endangered Species Act of 1973? The Endangered Species Act (ESA) of 1973 (16 U.S.C. §§ 1536), as amended, protects endangered and threatened species and the ecosystems upon which they depend. As interpreted and implemented by 50 CFR 402, Section 7 of the ESA directs Federal agencies, in consultation with and with the assistance of the Secretary of the Interior, to utilize their authorities to further the purposes of the ESA. It also requires every Federal agency to ensure that any action it authorizes, funds or carries out, is not likely to jeopardize the continued existence of any endangered or threatened species or results in the destruction or adverse modification of critical habitat. On September 26, 2025 , a Trileaf representative visited and photographed the project site to conduct an Informal Biological Assessment (IBA). In addition, Trileaf reviewed the United States Fish and Wildlife Service (USFWS) critical habitat information and determined that the site is not located within designated critical habitat. Based on the results of our assessment, impacts to listed and/or proposed, threatened and endangered species or critical habitats resulting from the proposed action are not an ticipated. Therefore, Trileaf determined that the proposed project site will have “no effect” on the species, their habitats, or designated critical habitats. Copies of the IBA and critical habitat review are located in Appendix D. FEDERAL On October 17, 2025, Trileaf reviewed the Section 7 Consultation guidance set forth by the USFWS – South Carolina Ecological Services Field Office. According to guidance dated January 3, 2023, “f or all sites with potential projects that have no effect or impact upon federally protected species or designated critical habitat, no further coordination with the Service is necessary at this time ”. Therefore, as Trileaf determined the project would have no effect on listed or proposed threatened or endangered species or critical habitats, no further consultation with the USFWS was required. A copy of the USFWS’ Section 7 guidance is located in Appendix D. STATE On October 17, 2025, Trileaf submitted project information to the South Carolina Department of Natural Resources (SCDNR) through the online portal . An automated project analysis was generated which indicated there are no records for species of concern within the project area. Therefore, no further consultation with the SCDNR was required. A copy of the SCDNR project analysis is located in Appendix D. 4. Will the facility affect districts, sites, buildings, structures, or objects significant in American history, architecture, archeology, engineering, or culture that are listed, or are eligible for listing, in the National Register of Historic Places? Trileaf referred to Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (16 U.S.C. §§ 470 et seq.), the Advisory Council on Historic Preservation (ACHP) implementing regulations (36 CFR Part 800) and the Nationwide Programmatic Agreement (NPA) for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission dated September 2004 to determine if the project site is contained in, on, or within the viewshed of a building, site, district, structure, or object, significant in American history, architecture, archaeology, engineering, or culture, that is listed, or eligible for listing on the National Registers of Historic Places, or located in or on an Indian Religious Site. 3 A search of the National Historic Landmarks (NHL), National Register of Historic Places (NRHP), State Historic Preservation Office (SHPO) files, and a field survey was conducted by Mr. Jason Flay, Secretary of Interior-qualified Archaeologist contracted by Trileaf through Acheulean Consulting , to identify any cultural resources within the area of direct effects and within a 0.75-mile radius for visual effects. It was determined that there were no historic properties identified within the Area of Potential Effects (APE) for direct effects, and no historic properties identified within the APE for visual effects. Additionally, the identification process did not locate archaeological materials that would be directly affected, or sites that are of cultural or religious significance to Tribes/NHOs. Documentation of these reviews was submitted to the SHPO via Form 620 on November 26, 2025. The SHPO concurred that the proposed undertaking would have no direct or visual effects on historic properties in a response letter dated December 28, 2025. A copy of the SHPO concurrence letter, Form 620, and associated documents are located in Appendix E. On September 22, 2025, the Sumter County Planning Department and the Sumter County Genealogical Society were notified of the proposed project and invited to comment on the proposed project’s potential effect on Historic Properties as well as indicate whether they are interested in consulting further on the proposed project. Additionally, a legal notice rega rding the proposed telecommunications tower construction was posted in The Sumter Item on September 24, 2025. No comments from the local government, historical society, or legal notice have been received by Trileaf. Copies of the correspondence and legal notice are located in Appendix E. NATIONAL SCENIC TRAILS On October 5, 1999, the Cellular Telecommunications Industry Association, Personal Communications Industry Association, Appalachian Trail Conference, American Hiking Society, and representative Managing and Supporting Trails Organizations (MSTOs) for the National Scenic Trails signed a resolution for the Siting of Wireless Telecommunications Facilities Near National Scenic Trails. This resolution states that if a wireless telecommunications or site management company plans a new or significantly expanded facility within one mile of a National Scenic Trail, it will notify the non- profit group that supports the trail. In order to determine if the site is located within one mile of a National Scenic Trail, Trileaf reviewed information from the National Park Service (NPS) National Trails System created by the National Trails System Act of 1968. Based on this review, the project site is not located within 1 mile of a National Scenic Trail. A copy of the trails map is located in Appendix B. 5. Will the facility affect any Indian religious sites? Trileaf referred to Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (16 U.S.C. §§ 470 et seq.), the Advisory Council on Historic Preservation (ACHP) implementing regulations (36 CFR Part 800) and the Nationwide Programmatic Agreement (NPA) for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission dated September 2004 to determine if the project site is located in or on an Indian Religious Site. On September 16, 2025, Trileaf submitted project information through the Tower Construction Notification System (TCNS) to the FCC who initiated contact with the tribes on September 19, 2025. As of January 23, 2026, all tribes have confirmed clearance either directly or by default via the FCC referral process. Trileaf determined that the subject Property is not located on or near a Native American Religious or Sacred Site. However, if archaeological remains or resources are unearthed during construction activities, Trileaf recommends that the client stop construction and notify our office immediately. Tribal consultation documentation and associated correspondence is located in Appendix F. 4 6. Will the facility be located in a floodplain and not be placed at least one (1) foot above the base flood elevation of the floodplain? Trileaf reviewed the relevant Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) Panel #45085C0100E, dated September 28, 2018, to determine if the project was located within the 100-year floodplain. Trileaf determined that the property is located in Zone X, areas determined to be outside the 500- year floodplain. Therefore, the project site is not located within a 100-year floodplain. A copy of the FEMA FIRM showing the project site location is located in Appendix B. 7. Will the construction of the facility involve significant change in surface features (e.g. wetland fill, deforestation, or water diversion)? Trileaf determined through site reconnaissance, review of the relevant USGS 7.5-minute topographic map titled “Rembert” Quadrangle, South Carolina , and review of the relevant USFWS National Wetlands Inventory Map ( http://www.fws.gov/wetlands/Data/Mapper.html) that there are no federally designated wetlands on or in the immediate vicinity of the proposed project site. Trileaf’s site assessment did not reveal any evidence of potential wetlands or hydrophytic vegetation located on or in the immediate vicinity of the project site. Additionally, a review of the United States Department of Agriculture (USDA) Soil Survey (http://websoilsurvey.sc.egov.usda.gov) did not indicate hydric soils at the project site. Based on this review, no designated wetland areas were located within the vicinity o f this project and no significant changes in surface features resulting from the proposed undertaking are anticipated. Copies of the soil map and wetlands map are located in Appendix B. 8. Zoning/High Intensity White Lights/Radio Frequency As a standard practice, Harmoni Towers does not construct facilities requiring high intensity white lights that are to be located in residentially zoned neighborhoods. According to Harmoni Towers, high intensity white lights will not be used for towers less than 500 feet in height. 9. Radio Frequency FCC licensees transmitting from antennas mounted on Harmoni Towers owned antenna structures will comply with the established criteria regarding radio frequency exposure limits in accordance with the Second Report and Order, as well as the FCC Code of Federal Regulations [47 CFR § 1.1307, § 1.1310] published at the time of this report. 5 Conclusion A NEPA Review of the proposed undertaking was performed by Trileaf Corporation in conformance with the FCC rules and regulations for implementing NEPA; 47 CFR 1.1301 to 1.1319. Based on data obtained during the Site visit, consultation with government agencies, and a review of readily available information from other sources, the preparation and filing of an Environmental Assessment will not be required and no further NEPA-related action is required for the proposed undertaking. Qualifications Hanna h Dell Assistant Project Manager Laura Elston Quality Assurance Morg an Rasmussen Senior Project Manager Appendix A Site Plans Appendix B Site Maps Site Location & Surrounding Properties Site Location Aerial Photographs (2024) Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Easement Rembert Quadrangle, South Carolina (2018) Contour Interval = 10 Feet Scale 1 Inch = ~2,000 Feet Latitude: 34° 4’ 2.5868” N, Longitude: 80° 30’ 34.8467” W  North Site Vicinity Map Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Site Location National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes. Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 9/9/2025 at 3:29 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 80°30'54"W 34°4'17"N 80°30'16"W 34°3'48"N Basemap Imagery Source: USGS National Map 2023 Borden U.S. Fish and Wildlife Service, National Standards and Support Team, wetlands_team@fws.gov Wetlands Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine September 9, 2025 0 0.1 0.20.05 mi 0 0.2 0.40.1 km 1:7,523 This page was produced by the NWI mapper National Wetlands Inventory (NWI) This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site. Soil Map—Sumter County, South Carolina (b8840f18-9019-11f0-95a3-eb93979c98bf) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2025 Page 1 of 3 3769590 3769620 3769650 3769680 3769710 3769740 3769770 3769800 3769830 3769860 3769890 3769590 3769620 3769650 3769680 3769710 3769740 3769770 3769800 3769830 3769860 3769890 545140 545170 545200 545230 545260 545290 545320 545350 545140 545170 545200 545230 545260 545290 545320 545350 34° 4' 7'' N 80° 30' 39'' W 34° 4' 7'' N 80° 30' 30'' W 34° 3' 57'' N 80° 30' 39'' W 34° 3' 57'' N 80° 30' 30'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,500 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Sumter County , South Carolina Survey Area Data: Version 22, Aug 29, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 15, 2022—May 10, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Sumter County, South Carolina (b8840f18-9019-11f0-95a3-eb93979c98bf) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2025 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI DoB Dothan-Norfolk complex, 2 to 6 percent slopes 0.3 100.0% Totals for Area of Interest 0.3 100.0% Soil Map—Sumter County, South Carolina b8840f18-9019-11f0-95a3- eb93979c98bf Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2025 Page 3 of 3 U.S. Fish and Wildlife Service National Wildlife Refuge System Map  North USFWS – Wildlife Refuge Map Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Site Location North American Migration Flyways  North Migratory Bird Flyways – Location Map Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Site Location National Park Service National Historic Trails and Scenic Routes  North National Park Service – Trails and Routes Map Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Site Location Bureau of Indian Affairs Indian Reservation Map  North Bureau of Indian Affairs – Reservation Map Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Site Location Appendix C Site Photographs Site Photograph 1 – Looking north at the Site Site Photograph 2 – Looking south at the Site Site Photographs Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Photographed: September 26, 2025 Site Photograph 3 – Looking east at the Site Site Photograph 4 – Looking west at the Site Site Photographs Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Photographed: September 26, 2025 Site Photograph 5 – Looking north away from the Site Site Photograph 6 – Looking south away from the Site Site Photographs Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Photographed: September 26, 2025 Site Photograph 7 – Looking east away from the Site Site Photograph 8 – Looking west away from the Site Site Photographs Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Photographed: September 26, 2025 Site Photograph 9 – Looking south along the access/utility easement Site Photograph 10 – Looking northeast away from the access/utility easement Site Photographs Harmoni Towers LLC – Borden Camden Highway Rembert, South Carolina 29128 Photographed: September 26, 2025 Appendix D Documentation of Officially Designated Wilderness Areas, Wildlife Preserves and Endangered Species United States Department of the Interior FISH AND WILDLIFE SERVICE 176 Croghan Spur Road, Suite 200 Charleston, South Carolina 29407 U.S. Fish and Wildlife Service Clearance Letter for Species and Habitat Assessments Updated: January 3, 2023 The U.S. Fish and Wildlife Service (Service) is one of two lead Federal Agencies mandated with the protection and conservation of Federal trust resources, including threatened and endangered (T&E) species and designated critical habitat as listed under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) (ESA). Development of lands in So uth Carolina have the potential to impact federally protected species. Accord ingly, obligations under the ESA, National Environmental Policy Act (NEPA), Clean Water Act (CWA), Federal Power Act (FPA), and other laws, require project proponents to perform an environmental impact review prior to performing work on the site. These projects may include a wide variety of activities including, but not limited to, residential or commercial developments, energy production, power transmission, transportation, infrastructure repair, maintenance, or reconstruction of existing facilities on previously developed land. Project applicants, or their designated representatives, may perform initial species assessments in advance of specific development proposals to determine the presence of T&E species and designated critical habitat that are protected under the ESA. These reviews are purposely speculative and do not include specific project or site development plans. Many of these speculative proposals are for previously developed or disturbed lands such as pasture lands, agricultural fields, or abandoned industrial facilities. Due to historical uses and existing conditions, these sites often do not contain suitable habitat to support T&E species. Therefore, an assessment may conclude that any future development of the site would have no effect to T&E species or adversely modify designated critical habitat. If the applicant, or their designee, determines there is no effect or impact to federally protected species or designated critical habitat, no further action is required under the ESA. Clearance to Proceed For all sites with potential projects that have no effect or impact upon federally protected species or designated critical habitat, no further coordination with the Service is necessary at this time. This letter may be downloaded and serve as the Service’s concurrence or agreement to the conclusions of the species assessment. Any protected species survey or assessment conducted for the property should be included with this letter when submitting the project to Federal permitting agencies. Due to obligations under the ESA potential impacts must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner which was not considered in this assessment; or (3) a new species is listed or critical habitat is designated that may be affected by the identified action. Please note this Clearance Letter applies only to assessments in South Carolina and may not be used to satisfy section 7 requirements for projects that have already been completed or currently under construction. If suitable habitat for T&E species or designated critical habitat occurs on, or nearby, the project site, a determination of no effect/impact may not be appropriate. In these cases, direct consultation requests with the Service should be initiated by the Federal action agency. Additional coordination with the Service may also be required if the potential project requires an evaluation under another resource law such as, but not limited to, NEPA, CWA, FPA, and the Coastal Zone Management Act. The Service appreciates your cooperation in the protection of federally listed species and their habitats in South Carolina. Thomas D. McCoy Field Supervisor Sincerely, 2 Informal B iological Assessment Harmoni Towers, LLC Project Name: Borden / Client #SC0009812 - Trileaf #7 72 867 Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W Trileaf performed an Informal Biological Assessment for the subject site. The purpose is to docum ent whether the proposed undertaking will affect listed or proposed threatened or endangered species , designated critical habitat s, wetlands, and migratory birds. A project description, site photographs , topogr aphical maps, wetland maps, and soil maps a re included in this report. Proposed Project Description: The Site is l ocated at C amden Highway, Rembert, Sumter County, South Carolina 29128, and cons ists of the construction of a 279-foot Se lf-Support Communications Tower, with an overall hei ght of 283 feet and associated equipment wit hin a 50-foot by 50-foot fenced area within a 75- foot by 75-foot (5,625-square-foot) lease area. T he project i ncludes a 12-foot-wide gravel drive within an access/utilit y easement, measuring 30 fee t wide, extending approximately 20 feet gene rally northeast away from the lease area towards Camden Highway. The proposed acc ess/utility easement and tower compound lease area are located wit h an agricultur al field. The proposed structure site is approximately 241.79 feet above mean sea level. Site and Surrounding Habitat: The Site is currently located w ithin an agricultural field. Dur ing the area reconnaissance, no trees along the access road, and generally throughout the ar ea were identified to be removed. The surrounding habitat within a 0.5-m ile radius of the proposed site consists predominantly of agricultural development and wooded land. To the north is Camden Highway, followed by wooded land interspersed with rural residences, followed by Dais Road, followed by additional wooded land. To the east is Camden Highway, followed by wooded land interspersed with rural residences, followed by additional wooded land. To the south is agricultural development interspersed with rural residences. To the west is an agricultural field, followed by wooded land, followed by residential development, followed by Dennis Road, followed by additional wooded land. The current habitat is not mapped as critical habitat, nor does it qualify as sufficient habitat for Federal or State listed species. Wetlands: Trileaf has reviewed the topographic map, soil composition, as well as the National Wetlands Inventory Map to determine if the proposed lease area and easements would have an impact on any wetlands or require significant amounts of fill or grading. Trileaf determined that the site is not located in a recognized national wetland area. Trileaf performed a field visit and identified surface water bodies. Using local maps in combination with an area reconnaissance the following water bodies have been identified in the table below: Borden Trileaf #772867 Water Body Type Water Body Name Direction from Structure Distance from Structure Freshwater Forested Shrub Wetland Unnamed WNW 0.10 miles Stream Unnamed WNW 0.16 miles Stream Unnamed ESE 0.18 miles Freshwater Forested Shrub Wetland Unnamed SW 0.19 miles Freshwater Forested Shrub Wetland Unnamed N 0.42 miles Stream Unnamed ESE 0.49 miles Freshwater Forested Shrub Wetland Unnamed E 0.49 miles Migratory Birds: The proposed Site and design process for this project could not conform to all the USFWS recommendations to decrease potential effects on migratory birds. Therefore, it has included mitigating factors such as structure placement within minimally sensitive areas, avoiding placement near wetlands and large water bodies, and eliminating the need for guy wires. While the proposed Site is located near the Atlantic flyway, our site investigation has determined that the project area is not located in an NWI mapped wetland, waterway, wildlife refuge, national wilderness area, native grassland or forest area, ridgeline, mountain top, coastline or area commonly known to have high incidences of fog or low clouds, where migratory birds may be found. Based upon the efforts undertaken during this IBA as well as the current data made available, we have concluded that this project will not have a significant effect on migratory birds; however, the presence of migratory birds cannot be ruled out. Soils: According to the U.S. Department of Agriculture Natural Resources Conservation Service Web Soil Survey of Sumter County, South Carolina, the Site is underlain by Dothan-Norfolk complex, 2 to 6 percent slopes . Dothan soils consist of well drained soils that are formed from l oamy fluviomarine deposits and are found in marine terraces. The depth to the most restrictive feature is 32 to 55 inches to plinthite. The depth to the water table is about 40 to 58 inches. A typical profile of Dothan soil consists of a surface layer of loamy sand extending from 0 to 8 inches and two (2) distinct subsurface layers of sandy clay loam extending from 8 to 80 inches. Dothan soils have no frequency of flooding or ponding. Norfolk soils consist of well drained soils that are formed from loamy fluviomarine deposits and are found in marine terraces. The depth to the most restrictive feature is 61 to 69 inches to plinthite. The depth to the water table is about 40 to 68 inches. A typical profile of Norfolk soil consists of a surface layer of loamy sand extending from 0 to 9 inches, subsur face layers of loamy sand extending from 9 to 11 inches, and two (2) distinct layers of sandy clay loam extending from 11 to 80 inches. Norfolk soils have no frequency of flooding or ponding. Dothan-Norfolk complex, 2 to 6 percent slopes, is not considered a hydric soil, and no hydrophytic vegetation or surface water was observed. Borden Trileaf #772867 Threatened or Endangered Species: Trileaf has researched the listed or proposed threatened or endangered species and designated critical habitat for the project area. This includes any such species that have been reported to exist within the action area where the project is located. The list of federally threatened or endangered species was acquired through the U.S. Fish and Wildlife Service's Information, Planning, and Consultation system (IPaC) and is site specific. The state list of threatened or endangered species was acquired from The South Carolina Department of Natural Resources (SCDNR). The lease area is not located within an aquatic environment; therefore, any obligate aquatic species should not be directly impacted by this project and are not included in the table below. A list of remaining species and site observations are summarized in the following table: Species / Resource Name Federal / State Status Habitat Description Recommendation of Effect Notes / Documentation Tricolored Bat (Perimyotis subflavus) Federal- Proposed Endangered Foliage or in high tree cavities and crevices preferring edge habitats near areas of mixed agricultural use No effect Habitat assessment indicated no potential habitat present Red-cockaded Woodpecker (Picoides borealis) Federal- Threatened State- Endangered Open pine forest maintained by frequent fires, especially mature longleaf pine forests No effect Habitat assessment indicated no potential habitat present Southern Hognose Snake (Heterodon simus) Federal- Proposed Threatened State- Threatened Sandhills, fallow fields, and longleaf pine-turkey oak; xeric sandy habitats such as pine flatwoods, sand ridges, and coastal dunes; may persist in agricultural or suburban areas with suitable sandy soils No effect Habitat assessment indicated no potential habitat present Monarch Butterfly (Danaus plexippus) Federal- Proposed Threatened Breeding habitat must contain milkweeds. Adults can be found in a variety of sunny, open spaces, both natural and disturbed No effect Habitat assessment indicated no potential habitat present Borden Trileaf #772867 Species / Resource Name Federal / State Status Habitat Description Recommendation of Effect Notes / Documentation American Chaffseed (Schwalbea americana) Federal- Endangered Open, moist pine flatwoods; fire-maintained savannas, ecotonal areas between peaty wetlands; xeric sandy soils No effect Habitat assessment indicated no potential habitat present Canby’s Dropwort (Oxypolis canbyi) Federal- Endangered Wetlands with acidic organic soils and patchy or no canopy cover No effect Habitat assessment indicated no potential habitat present Spotted Turtle (Clemmys guttata) State- Threatened Heavily vegetated, shallow wetlands with standing or slowly flowing water; bays, bogs, swamps, marshes, wet meadows, and even tidally- influenced brackish streams No effect Habitat assessment indicated no potential habitat present Rafinesque's Big- eared Bat (Corynorhinus rafinesquii) State- Endangered Mature forests, including bottomland and upland hardwoods and pine flatwoods with water nearby; roosting sites are usually dimly lit sheltered areas, such as dilapidated buildings, bridges, hollow trees, loose bark, rock shelters, and the entrance zones of caves and mines No effect Habitat assessment indicated no potential habitat present Swallow-tailed Kite (Elanoides forficatus) State- Endangered Breed in swamps, lowland forests, and marshes; nesting and foraging habitat includes slash pine wetlands, edges of pine forest, cypress swamps, wet prairies, freshwater and brackish marshes, hardwood hammocks, and mangrove forests No effect Habitat assessment indicated no potential habitat present Borden Trileaf #772867 Species / Resource Name Federal / State Status Habitat Description Recommendation of Effect Notes / Documentation Bald Eagle (Haliaeetus leucocephalus) State-Threatened Areas close to coastal areas, bays, rivers, lakes; nest in tall trees (mostly pine) that provide clear view of surrounding area No effect Habitat assessment indicated no potential habitat present Carolina Gopher Frog (Lithobates capito) State- Endangered Burrows of the gopher tortoise (Gopherus polyphemus), stump holes, root tunnels and mammal and crayfish burrows; breeding sites are upland ephemeral ponds in longleaf pine savannas No effect Habitat assessment indicated no potential habitat present Least Tern (Sternula antillarum) State- Threatened Nest in colonies on sandy, shelly beaches or islands on coastlines and rivers; sometimes also nest in gravel pits, on dredge spoil, on flat gravel rooftops, or on dry mudflats No effect Habitat assessment indicated no potential habitat present Conclusions: Based on the efforts undertaken during our IBA, project specifications, and the current data made available, we have concluded that there is no potential for the proposed project to have a significant effect on listed or proposed, threatened and endangered species, their designated critical habitat, or migratory birds. It should be noted that this informal biological assessment was conducted in accordance with the Scope of Work and does not constitute a Section 7 Biological Assessment under the Endangered Species Act (50 CFR Part 402.01). Hannah Dell Natural Resource Specialist Please refer to Appendix B for Site Maps Please refer to Appendix C for Site Photographs Please refer to Appendix B for Site Maps Sumter County, South Carolina DoB—Dothan-Norfolk complex, 2 to 6 percent slopes Map Unit Setting National map unit symbol: 2pfs7 Elevation: 180 to 300 feet Mean annual precipitation: 42 to 55 inches Mean annual air temperature: 51 to 75 degrees F Frost-free period: 202 to 253 days Farmland classification: All areas are prime farmland Map Unit Composition Dothan and similar soils: 59 percent Norfolk and similar soils: 41 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Dothan Setting Landform: Marine terraces Landform position (two-dimensional): Summit, shoulder, backslope Landform position (three-dimensional): Interfluve Down-slope shape: Convex, linear Across-slope shape: Convex, linear Parent material: Loamy fluviomarine deposits Typical profile Ap - 0 to 8 inches: loamy sand Bt - 8 to 37 inches: sandy clay loam Btv - 37 to 80 inches: sandy clay loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: 32 to 55 inches to plinthite Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: About 40 to 58 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Hydric soil rating: No Map Unit Description: Dothan-Norfolk complex, 2 to 6 percent slopes---Sumter County, South Carolina b8840f18-9019-11f0-95a3- eb93979c98bf Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2025 Page 1 of 2 Description of Norfolk Setting Landform: Marine terraces Landform position (two-dimensional): Summit, shoulder, backslope Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across-slope shape: Convex Parent material: Loamy fluviomarine deposits Typical profile Ap - 0 to 9 inches: loamy sand E - 9 to 11 inches: loamy sand Bt - 11 to 61 inches: sandy clay loam Btv - 61 to 80 inches: sandy clay loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: 61 to 69 inches to plinthite Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: About 40 to 68 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Hydric soil rating: No Data Source Information Soil Survey Area: Sumter County, South Carolina Survey Area Data: Version 22, Aug 29, 2024 Map Unit Description: Dothan-Norfolk complex, 2 to 6 percent slopes---Sumter County, South Carolina b8840f18-9019-11f0-95a3- eb93979c98bf Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/12/2025 Page 2 of 2 09/30/2025 22:22:01 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE South Carolina Ecological Services 176 Croghan Spur Road, Suite 200 Charleston, SC 29407-7558 Phone: (843) 727-4707 Fax: (843) 727-4218 In Reply Refer To: Project Code: 2025-0157205 Project Name: Borden Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological Project code: 2025-0157205 09/30/2025 22:22:01 UTC    2 of 10 ▪ evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws.gov/sites/default/files/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project-related impacts. Any activity resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts, see https://www.fws.gov/program/migratory-bird-permit/what-we-do. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project-related stressors or minimize the exposure of birds and their resources to the project-related stressors. For more information on avian stressors and recommended conservation measures, see https:// www.fws.gov/library/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation- migratory-birds. We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): Official Species List Project code: 2025-0157205 09/30/2025 22:22:01 UTC    3 of 10 ▪ ▪ ▪ USFWS National Wildlife Refuges and Fish Hatcheries Bald & Golden Eagles Migratory Birds OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: South Carolina Ecological Services 176 Croghan Spur Road, Suite 200 Charleston, SC 29407-7558 (843) 727-4707 Project code: 2025-0157205 09/30/2025 22:22:01 UTC    4 of 10 PROJECT SUMMARY Project Code: 2025-0157205 Project Name: Borden Project Type: Communication Tower New Construction Project Description: Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625- square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. Project Location: The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@34.0674004,-80.50967575061141,14z Counties: Sumter County, South Carolina Project code: 2025-0157205 09/30/2025 22:22:01 UTC    5 of 10 1. ENDANGERED SPECIES ACT SPECIES There is a total of 6 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. 1 Project code: 2025-0157205 09/30/2025 22:22:01 UTC    6 of 10 MAMMALS NAME STATUS Tricolored Bat Perimyotis subflavus No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/10515 General project design guidelines: https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/ generated/9721.pdf Proposed Endangered BIRDS NAME STATUS Red-cockaded Woodpecker Dryobates borealis No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/7614 Threatened REPTILES NAME STATUS Southern Hognose Snake Heterodon simus No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/3248 Proposed Threatened INSECTS NAME STATUS Monarch Butterfly Danaus plexippus There is proposed critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/9743 Proposed Threatened FLOWERING PLANTS NAME STATUS American Chaffseed Schwalbea americana No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/1286 General project design guidelines: https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/ generated/9753.pdf Endangered Canby's Dropwort Oxypolis canbyi No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/7738 General project design guidelines: https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/ generated/9753.pdf Endangered Project code: 2025-0157205 09/30/2025 22:22:01 UTC    7 of 10 1. 2. 3. CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HA VE EFFECTS ON ALL ABOVE LISTED SPECIES. USFWS NATIONAL WILDLIFE REFUGE LANDS AND FISH HATCHERIES Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA. BALD & GOLDEN EAGLES Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act (MBTA) . Any person or organization who plans or conducts activities that may result in impacts to Bald or Golden Eagles, or their habitats, should follow appropriate regulations and consider implementing appropriate avoidance and minimization measures, as described in the various links on this page. The Bald and Golden Eagle Protection Act of 1940. The Migratory Birds Treaty Act of 1918. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act (MBTA). Any person or organization who plans or conducts activities that may result in impacts to Bald or Golden Eagles, or their nests, should follow appropriate regulations and implement required avoidance and minimization measures, as described in the various links on this page. The data in this location indicates that no eagles have been observed in this area. This does not mean eagles are not present in your project area, especially if the area is difficult to survey. Please review the 'Steps to Take When No Results Are Returned' section of the Supplemental Information on Migratory Birds and Eagles document to determine if your project is in a poorly surveyed area. If it is, you may need to rely on other resources to determine if eagles may be present (e.g. your local FWS field office, state surveys, your own surveys). Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats, should follow appropriate regulations and consider implementing 2 1 Project code: 2025-0157205 09/30/2025 22:22:01 UTC    8 of 10 1. 2. 3. appropriate conservation measures, as described in the links below. Specifically, please review the ''Supplemental Information on Migratory Birds and Eagles''. MIGRATORY BIRDS The Migratory Bird Treaty Act (MBTA) prohibits the take (including killing, capturing, selling, trading, and transport) of protected migratory bird species without prior authorization by the Department of Interior U.S. Fish and Wildlife Service (Service). The Migratory Birds Treaty Act of 1918. The Bald and Golden Eagle Protection Act of 1940. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the "Probability of Presence Summary" below to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON American Kestrel Falco sparverius paulus This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9587 Breeds Apr 1 to Aug 31 Painted Bunting Passerina ciris This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9511 Breeds Apr 25 to Aug 15 PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence ( ) Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season ( ) Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. 1 Project code: 2025-0157205 09/30/2025 22:22:01 UTC    9 of 10 ▪ ▪ ▪ ▪  no data survey effort breeding season probability of presence Survey Effort ( ) Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data ( ) A week is marked as having no data if there were no survey events for that week. SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC American Kestrel BCC - BCR Painted Bunting BCC - BCR Additional information can be found using the following links: Eagle Management https://www.fws.gov/program/eagle-management Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoiding-and-minimizing-incidental-take-migratory-birds Nationwide avoidance and minimization measures for birds Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/ media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- project-action Project code: 2025-0157205 09/30/2025 22:22:01 UTC    10 of 10 IPAC USER CONTACT INFORMATION Agency: Trileaf Corporation Name: Hannah Dell Address: 1775 The Exchange SE Address Line 2: Suite 525 City: Marietta State: GA Zip: 30339 Email h.dell@trileaf.com Phone: 7063621745 01/22/2026 13:32:54 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE South Carolina Ecological Services 176 Croghan Spur Road, Suite 200 Charleston, SC 29407-7558 Phone: (843) 727-4707 Fax: (843) 727-4218 In Reply Refer To: Project Code: 2025-0157205 Project Name: Borden Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological Project code: 2025-0157205 01/22/2026 13:32:54 UTC    2 of 10 ▪ evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws.gov/sites/default/files/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project-related impacts. Any activity resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts, see https://www.fws.gov/program/migratory-bird-permit/what-we-do. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project-related stressors or minimize the exposure of birds and their resources to the project-related stressors. For more information on avian stressors and recommended conservation measures, see https:// www.fws.gov/library/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation- migratory-birds. We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): Official Species List Project code: 2025-0157205 01/22/2026 13:32:54 UTC    3 of 10 ▪ ▪ ▪ ▪ USFWS National Wildlife Refuges and Fish Hatcheries Bald & Golden Eagles Migratory Birds Wetlands OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: South Carolina Ecological Services 176 Croghan Spur Road, Suite 200 Charleston, SC 29407-7558 (843) 727-4707 Project code: 2025-0157205 01/22/2026 13:32:54 UTC    4 of 10 PROJECT SUMMARY Project Code: 2025-0157205 Project Name: Borden Project Type: Communication Tower New Construction Project Description: Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625- square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. Project Location: The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@34.0673977,-80.50967833432742,14z Counties: Sumter County, South Carolina Project code: 2025-0157205 01/22/2026 13:32:54 UTC    5 of 10 1. ENDANGERED SPECIES ACT SPECIES There is a total of 6 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. 1 Project code: 2025-0157205 01/22/2026 13:32:54 UTC    6 of 10 MAMMALS NAME STATUS Tricolored Bat Perimyotis subflavus No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/10515 General project design guidelines: https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/ generated/9721.pdf Proposed Endangered BIRDS NAME STATUS Red-cockaded Woodpecker Dryobates borealis No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/7614 Threatened REPTILES NAME STATUS Southern Hognose Snake Heterodon simus No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/3248 Proposed Threatened INSECTS NAME STATUS Monarch Butterfly Danaus plexippus There is proposed critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/9743 Proposed Threatened FLOWERING PLANTS NAME STATUS American Chaffseed Schwalbea americana No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/1286 General project design guidelines: https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/ generated/9753.pdf Endangered Canby's Dropwort Oxypolis canbyi No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/7738 General project design guidelines: https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/ generated/9753.pdf Endangered Project code: 2025-0157205 01/22/2026 13:32:54 UTC    7 of 10 1. 2. 3. CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HA VE EFFECTS ON ALL ABOVE LISTED SPECIES. USFWS NATIONAL WILDLIFE REFUGE LANDS AND FISH HATCHERIES Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA. BALD & GOLDEN EAGLES Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act (MBTA) . Any person or organization who plans or conducts activities that may result in impacts to Bald or Golden Eagles, or their habitats, should follow appropriate regulations and consider implementing appropriate avoidance and minimization measures, as described in the various links on this page. The Bald and Golden Eagle Protection Act of 1940. The Migratory Birds Treaty Act of 1918. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act (MBTA). Any person or organization who plans or conducts activities that may result in impacts to Bald or Golden Eagles, or their nests, should follow appropriate regulations and implement required avoidance and minimization measures, as described in the various links on this page. The data in this location indicates that no eagles have been observed in this area. This does not mean eagles are not present in your project area, especially if the area is difficult to survey. Please review the 'Steps to Take When No Results Are Returned' section of the Supplemental Information on Migratory Birds and Eagles document to determine if your project is in a poorly surveyed area. If it is, you may need to rely on other resources to determine if eagles may be present (e.g. your local FWS field office, state surveys, your own surveys). Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats, should follow appropriate regulations and consider implementing 2 1 Project code: 2025-0157205 01/22/2026 13:32:54 UTC    8 of 10 1. 2. 3. appropriate conservation measures, as described in the links below. Specifically, please review the ''Supplemental Information on Migratory Birds and Eagles''. MIGRATORY BIRDS The Migratory Bird Treaty Act (MBTA) prohibits the take (including killing, capturing, selling, trading, and transport) of protected migratory bird species without prior authorization by the Department of Interior U.S. Fish and Wildlife Service (Service). The Migratory Birds Treaty Act of 1918. The Bald and Golden Eagle Protection Act of 1940. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the "Probability of Presence Summary" below to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON American Kestrel Falco sparverius paulus This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9587 Breeds Apr 1 to Aug 31 Painted Bunting Passerina ciris This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9511 Breeds Apr 25 to Aug 15 PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence ( ) Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season ( ) Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. 1 Project code: 2025-0157205 01/22/2026 13:32:54 UTC    9 of 10 ▪ ▪ ▪ ▪  no data survey effort breeding season probability of presence Survey Effort ( ) Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data ( ) A week is marked as having no data if there were no survey events for that week. SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC American Kestrel BCC - BCR Painted Bunting BCC - BCR Additional information can be found using the following links: Eagle Management https://www.fws.gov/program/eagle-management Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoiding-and-minimizing-incidental-take-migratory-birds Nationwide avoidance and minimization measures for birds Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/ media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- project-action WETLANDS Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section 404 of the Clean Water Act, or other State/Federal statutes. For more information please contact the Regulatory Program of the local U.S. Army Corps of Engineers District. Please note that the NWI data being shown may be out of date. We are currently working to update our NWI data set. We recommend you verify these results with a site visit to determine the actual extent of wetlands on site. THERE ARE NO WETLANDS WITHIN YOUR PROJECT AREA. Project code: 2025-0157205 01/22/2026 13:32:54 UTC    10 of 10 IPAC USER CONTACT INFORMATION Agency: Trileaf Corporation Name: Hannah Dell Address: 1775 The Exchange SE Address Line 2: Suite 525 City: Marietta State: GA Zip: 30339 Email h.dell@trileaf.com Phone: 7063621745 LEAD AGENCY CONTACT INFORMATION Lead Agency: Federal Communications Commission 01/22/2026 13:42:24 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE South Carolina Ecological Services 176 Croghan Spur Road, Suite 200 Charleston, SC 29407-7558 Phone: (843) 727-4707 Fax: (843) 727-4218 In Reply Refer To: Project code: 2025-0157205 Project Name: Borden Federal Nexus: yes Federal Action Agency (if applicable): Federal Communications Commission Subject: Record of project representative’s no effect determination for 'Borden' Dear Hannah Dell: This letter records your determination using the Information for Planning and Consultation (IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on January 22, 2026, for 'Borden' (here forward, Project). This project has been assigned Project Code 2025-0157205 and all future correspondence should clearly reference this number. Please carefully review this letter. Ensuring Accurate Determinations When Using IPaC The Service developed the IPaC system and associated species’ determination keys in accordance with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) and based on a standing analysis. All information submitted by the Project proponent into IPaC must accurately represent the full scope and details of the Project. Failure to accurately represent or implement the Project as detailed in IPaC or the Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key (Dkey), invalidates this letter. Answers to certain questions in the DKey commit the project proponent to implementation of conservation measures that must be followed for the ESA determination to remain valid. Determination for the Northern Long-Eared Bat and/or Tricolored Bat Based upon your IPaC submission and a standing analysis, your project has reached the following effect determinations: Species Listing Status Determination Tricolored Bat (Perimyotis subflavus) Proposed Endangered No effect Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  2 of 12 ▪ ▪ ▪ ▪ ▪ Federal agencies must consult with U.S. Fish and Wildlife Service under section 7(a)(2) of the Endangered Species Act (ESA) when an action may affect a listed species. Tricolored bat is proposed for listing as endangered under the ESA, but not yet listed. For actions that may affect a proposed species, agencies cannot consult, but they can confer under the authority of section 7(a) (4) of the ESA. Such conferences can follow the procedures for a consultation and be adopted as such if and when the proposed species is listed. Should the tricolored bat be listed, agencies must review projects that are not yet complete, or projects with ongoing effects within the tricolored bat range that previously received a NE or NLAA determination from the key to confirm that the determination is still accurate. To make a no effect determination, the full scope of the proposed project implementation (action) should not have any effects (either positive or negative), to a federally listed species or designated critical habitat. Effects of the action are all consequences to listed species or critical habitat that are caused by the proposed action, including the consequences of other activities that are caused by the proposed action. A consequence is caused by the proposed action if it would not occur but for the proposed action and it is reasonably certain to occur. Effects of the action may occur later in time and may include consequences occurring outside the immediate area involved in the action. (See § 402.17). Under Section 7 of the ESA, if a federal action agency makes a no effect determination, no consultation with the Service is required (ESA §7). If a proposed Federal action may affect a listed species or designated critical habitat, formal consultation is required except when the Service concurs, in writing, that a proposed action "is not likely to adversely affect" listed species or designated critical habitat [50 CFR §402.02, 50 CFR§402.13]. Other Species and Critical Habitat that May be Present in the Action Area The IPaC-assisted determination key for the northern long-eared bat and tricolored bat does not apply to the following ESA-protected species and/or critical habitat that also may occur in your Action area: American Chaffseed Schwalbea americana Endangered Canby's Dropwort Oxypolis canbyi Endangered Monarch Butterfly Danaus plexippus Proposed Threatened Red-cockaded Woodpecker Dryobates borealis Threatened Southern Hognose Snake Heterodon simus Proposed Threatened You may coordinate with our Office to determine whether the Action may affect the animal species listed above and, if so, how they may be affected. Next Steps If there are no updates on listed species, no further consultation/coordination for this project is required with respect to the species covered by this key. However, the Service recommends that project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  3 of 12 of the Project changes (includes any project changes or amendments); 2) new information reveals the Project may impact (positively or negatively) federally listed species or designated critical habitat; or 3) a new species is listed, or critical habitat designated. If any of the above conditions occurs, additional coordination with the Service should take place to ensure compliance with the Act. If you have any questions regarding this letter or need further assistance, please contact the South Carolina Ecological Services and reference Project Code 2025-0157205 associated with this Project. Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  4 of 12 Action Description You provided to IPaC the following name and description for the subject Action. 1. Name Borden 2. Description The following description was provided for the project 'Borden': Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@34.0673977,-80.50967833432742,14z Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  5 of 12 1. 2. 3. 4. 5. DETERMINATION KEY RESULT Based on the information you provided, you have determined that the Proposed Action will have no effect on the species covered by this determination key. Therefore, no consultation with the U.S. Fish and Wildlife Service pursuant to Section 7(a)(2) of the Endangered Species Act of 1973 (87 Stat. 884, as amended 16 U.S.C. 1531 et seq.) is required for those species. QUALIFICATION INTERVIEW Does the proposed project include, or is it reasonably certain to cause, intentional take of listed bats or any other listed species? Note: Intentional take is defined as take that is the intended result of a project. Intentional take could refer to research, direct species management, surveys, and/or studies that include intentional handling/encountering, harassment, collection, or capturing of any individual of a federally listed threatened, endangered or proposed species? No Is the action area wholly within Zone 2 of the year-round active area for northern long- eared bat and/or tricolored bat? Automatically answered No Does the action area intersect Zone 1 of the year-round active area for northern long-eared bat and/or tricolored bat? Automatically answered Yes Your project overlaps with an area where northern long-eared bats or tricolored bats may be present and roosting in trees year-round. Do you understand that your project may impact bats roosting in trees at any time during the year? Yes Does any component of the action involve leasing, construction or operation of wind turbines? Answer 'yes' if the activities considered are conducted with the intention of gathering survey information to inform the leasing, construction, or operation of wind turbines. No Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  6 of 12 6. 7. 8. 9. 10. 11. 12. Is the proposed action authorized, permitted, licensed, funded, or being carried out by a Federal agency in whole or in part? Note for projects in Pennsylvania: Projects requiring authorization under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act would be considered as having a federal nexus. Since the U.S. Army Corps of Engineers (Corps) has issued the Pennsylvania State Programmatic General Permit (PASPGP), which may be verified by the PA Department of Environmental Protection or certain Conservation Districts, the need to receive a Corps authorization to perform the work under the PASPGP serves as a federal nexus. As such, if proposing to use the PASPGP, you would answer ‘yes’ to this question.  Yes Is the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA), or Federal Transit Administration (FTA) funding or authorizing the proposed action, in whole or in part? No Are you an employee of the federal action agency or have you been officially designated in writing by the agency as its designated non-federal representative for the purposes of Endangered Species Act Section 7 informal consultation per 50 CFR § 402.08? Note: This key may be used for federal actions and for non-federal actions to facilitate section 7 consultation and to help determine whether an incidental take permit may be needed, respectively. This question is for information purposes only. Yes Is the lead federal action agency the Environmental Protection Agency (EPA) or Federal Communications Commission (FCC)? Is the Environmental Protection Agency (EPA) or Federal Communications Commission (FCC) funding or authorizing the proposed action, in whole or in part? Yes [Semantic] Is the action area located within 0.5 miles of a known bat hibernaculum or winter roost? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your state wildlife agency. Automatically answered No Does the action area contain any winter roosts or caves (or associated sinkholes, fissures, or other karst features), mines, rocky outcroppings, or tunnels that could provide habitat for hibernating bats? No Does the action area contain (1) talus or (2) anthropogenic or naturally formed rock shelters or crevices in rocky outcrops, rock faces or cliffs? No Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  7 of 12 13. 14. 15. 16. 17. 18. 19. Will the action cause effects to a bridge? Note: Covered bridges should be considered as bridges in this question. No Will the action result in effects to a culvert or tunnel at any time of year? No Are trees present within 1000 feet of the action area? Note: If there are trees within the action area that are of a sufficient size to be potential roosts for bats answer "Yes". If unsure, additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines at: https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey- guidelines. Yes Does the action include the intentional exclusion of bats from a building or building-like structure? Note: Exclusion is conducted to deny bats’ entry or reentry into a building. To be effective and to avoid harming bats, it should be done according to established standards. If your action includes bat exclusion and you are unsure whether northern long-eared bats or tricolored bats are present, answer “Yes.” Answer “No” if there are no signs of bat use in the building/structure. If unsure, contact your local Ecological Services Field Office to help assess whether northern long-eared bats or tricolored bats may be present. Contact a Nuisance Wildlife Control Operator (NWCO) for help in how to exclude bats from a structure safely without causing harm to the bats (to find a NWCO certified in bat standards, search the Internet using the search term “National Wildlife Control Operators Association bats”). Also see the White-Nose Syndrome Response Team's guide for bat control in structures. No Does the action involve removal, modification, or maintenance of a human-made building- like structure (barn, house, or other building) known or suspected to contain roosting bats? No Will the action cause construction of one or more new roads open to the public? For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). No Will the action include or cause any construction or other activity that is reasonably certain to increase average night-time traffic permanently or temporarily on one or more existing roads? Note: For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). . No Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  8 of 12 20. 21. 22. 23. 24. 25. 26. Will the action include or cause any construction or other activity that is reasonably certain to increase the number of travel lanes on an existing thoroughfare? For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). No Will the proposed Action involve the creation of a new water-borne contaminant source (e.g., leachate pond, pits containing chemicals that are not NSF/ANSI 60 compliant)? Note: For information regarding NSF/ANSI 60 please visit https://www.nsf.org/knowledge-library/nsf-ansi- standard-60-drinking-water-treatment-chemicals-health-effects No Will the proposed action involve the creation of a new point source discharge from a facility other than a water treatment plant or storm water system? No Will the action include drilling or blasting? No Will the action involve military training (e.g., smoke operations, obscurant operations, exploding munitions, artillery fire, range use, helicopter or fixed wing aircraft use at night)? No Will the proposed action involve the use of herbicides or pesticides (e.g., fungicides, insecticides, or rodenticides)? No Will the action include or cause activities that are reasonably certain to cause chronic or intense nighttime noise (above current levels of ambient noise in the area) in suitable summer habitat for the northern long-eared bat or tricolored bat during the active season? Chronic noise is noise that is continuous or occurs repeatedly again and again for a long time. Sources of chronic or intense noise that could cause adverse effects to bats may include, but are not limited to: road traffic; trains; aircraft; industrial activities; gas compressor stations; loud music; crowds; oil and gas extraction; construction; and mining. Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines at: https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey- guidelines. No Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  9 of 12 27. 28. 29. 30. 31. 32. 33. Does the action include, or is it reasonably certain to cause, the use of permanent or temporary artificial lighting within 1000 feet of suitable northern long-eared bat or tricolored bat roosting habitat? Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines at: https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey- guidelines. No Will the action include tree cutting or other means of knocking down or bringing down trees, tree topping, or tree trimming? No Will the proposed action result in the use of prescribed fire? Note: If the prescribed fire action includes other activities than application of fire (e.g., tree cutting, fire line preparation) please consider impacts from those activities within the previous representative questions in the key. This set of questions only considers impacts from flame and smoke. No Does the action area intersect the tricolored bat species list area? Automatically answered Yes Is the action area located within 0.5-mile of radius of an entrance/opening to any known tricolored bat hibernacula or winter roost? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your state wildlife agency. Automatically answered No [Semantic] Is the action area located within 0.25 miles of a culvert that is known to be occupied by northern long-eared or tricolored bats? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency. Automatically answered No Your project overlaps with an area where tricolored bats may be present and roosting in trees year-round. Has a presence/probable absence survey for the tricolored bat following the Service’s Range-wide Indiana Bat and Northern Long-Eared Bat Survey Guidelines been conducted within the project area? If unsure, answer “No.” No Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  10 of 12 34. 35. Your project overlaps with an area where tricolored bats may be present and roosting in trees year-round. Is suitable tricolored bat habitat present within 1000 feet of project activities? Note: If there are trees within the action area that may provide potential roosts for tricolored bats (e.g., clusters of leaves in live and dead deciduous trees, Spanish moss (Tillandsia usneoides), clusters of dead pine needles of large live pines) answer "Yes." Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines at: https://www.fws.gov/media/range-wide-indiana-bat- and-northern-long-eared-bat-survey-guidelines. Yes Do you have any documents that you want to include with this submission? No Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  11 of 12 PROJECT QUESTIONNAIRE Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC DKey Version Publish Date: 01/14/2026  12 of 12 IPAC USER CONTACT INFORMATION Agency: Trileaf Corporation Name: Hannah Dell Address: 1775 The Exchange SE Address Line 2: Suite 525 City: Marietta State: GA Zip: 30339 Email h.dell@trileaf.com Phone: 7063621745 LEAD AGENCY CONTACT INFORMATION Lead Agency: Federal Communications Commission County Scientific Name Common Name G Rank S Rank Federal Status State Status Group Type Sumter Acipenser brevirostrum Shortnose Sturgeon G3 S3 LE: Federally Endangered SE: State Endangered Zoological Sumter Clemmys guttata Spotted Turtle G5 S2 ARS: At-Risk Species ST: State Threatened Zoological Sumter Corynorhinus rafinesquii Rafinesque's Big-eared Bat G3G4 S2 Not Applicable SE: State Endangered Zoological Sumter Dryobates bor ealis Red-cockaded Woodpecker G3 S2 LT: Federally Threatend SE: State Endangered Zoological Sumter Elanoides forficatus Swallow-tailed Kite G5 S2 MBTA: Migratory Bird T reaty Act SE: State Endangered Zoological Sumter Elassoma boehlkei Carolina Pygmy Sunfish G2 S1 Not Applicable ST: State Threatened Zoological Sumter Eurycea chamberlaini Chamberlain's Dwarf Salamander G4 S3 ARS: At-Risk Species Not Applicable Zoological Sumter Haliaeetus leucocephalus Bald Eagle G5 S3B,S3N Bald & Golden Eagle Protection Act ST: State Threatened Zoological Sumter Heter odon simus Southern Hog-nosed Snake G2 S1 Not Applicable ST: State Threatened Zoological Sumter Lasiurus cinereus Hoary Bat G3G4 S2 ARS: At-Risk Species Not Applicable Zoological Sumter Lithobates capito Carolina Gopher Frog G2G3 S1 ARS: At-Risk Species SE: State Endangered Zoological Sumter Lobelia boykinii Boykin’ s Lobelia G1G2 S2? ARS: At-Risk Species Not Applicable Botanical Sumter Myotis lucifugus Little Brown Bat G3G4 S2 ARS: At-Risk Spe cies Not Applicable Zoological Sumter Noturus sp. 2 Broadtail Madtom G2 S1 Not Applicable ST: State Threatened Zoological Sumter Perimyotis subflavus T ricolored Bat G3G4 S3 LEP: Federally Endangered (Proposed) Not Applicable Zoological Sumter Schwalbea americana Chaf fseed G2 S2 LE: Federally Endangered Not Applicable Botanical Sumter Sternula antillarum Least Tern G4 S2B MBTA: Migratory Bird Treaty Act ST: State Threatened Zoological Sumter T iedemannia canbyi Canby's Cowbane G2 S2 LE: Federally Endangered Not Applicable Botanical HANNAH DELL ASSISTANT PROJECT MANAGER Education Biology, B. S. University of North Georgia / Gainesville, GA Areas of Expertise Ms. Dell has experience performing site inspections and conducting environmental due diligence pursuant to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for commercial real estate and lending projects. Additionally, Ms. Dell has experience performing National Environmental Policy Act (NEPA) reviews for wireless telecommunications projects. Environmental service expertise includes: Phase I Environmental Site Assessments Historical City Directories Information Section 7 Consultation National Wetland Inventory Maps Flood Insurance Rate Maps Critical Habitat Maps Environmental Evaluation Summaries Archaeological and Architectural Impacts Soil Characterization Field Reconnaissance Section 106 Compliance NEPA Environmental Assessments Migratory Bird Evaluations Form 620/621 Submittals Historical Topographic Maps and Aerial Imagery Local Government Consultation Native American Consultation Land Use History Certifications/Affiliations ANSI/FCC RF Radiation Safety Competent Person Basic Wetland Delineation (2023) Professional Resume Requested on Friday, October 17, 2025 by Hannah Dell. PO Box 167 Columbia, SC 29202 (803) 734-1396 speciesreview@dnr.sc.gov Re: Request for Threatened and Endangered Species Consultation Hannah Dell - Borden - Communication/Cell Tower - Sumter County, South Carolina The South Carolina Department of Natural Resources (SCDNR) has received your request for threatened and endangered species consultation of the above named project in Sumter County, South Carolina. The following map depicts the project area and a 1 mile buffer surrounding: S W E N RaftingCreek 521 Din kin s M ill Rd Scotts Branch Rd Easy St T B W right Rd De nnis Rd Dais Rd Ellerbees Mill 253 ft 521 Da is Rd Spe nce rRd Spence rRd M cDaniel Rd Ma yra nt R d Dinkins Mill Rd Hin es Rd Hin es Rd Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/ METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Esri, NASA, NGA, USGS, FEMA 0 0.25 0.50.13 Miles This report includes the following items: A - A report for species which intersect the project area B - A report for species which intersect the buffer around the project area C - A list of best management practices relevant to species near to or within the project area D - A list of best management practices relevant to the project type E - A list of state & federally listed species within the county of the project area F - Other important information on conservation status, listed species, and how to submit observations to the program. Please be advised: The contents of this report, including all tables, maps, recommendations, and various other text, are produced as a direct result of the information a user provides at the time of submission. The SCDNR assumes that all information submitted by the user represents the project scope as proposed, and recommends that additional reports be requested should the scope deviate from how the project was initially represented to the SCDNR. The technical comments outlined in this report are submitted to speak to the general impacts of the activities as described through inquiry by parties outside the South Carolina Department of Natural Resources. These technical comments are submitted as guidance to be considered and are not submitted as final agency comments that might be related to any unspecified local, state or federal permit, certification or license applications that may be needed by any applicant or their contractors, consultants or agents presently under review or not yet made available for public review. In accordance with its policy 600.01, Comments on Projects Under Department Review, the South Carolina Department of Natural Resources, reserves the right to comment on any permit, certification or license application that may be published by any regulatory agency which may incorporate, directly or by reference, these technical comments. Interested parties are to understand that SCDNR may provide a final agency position to regulatory agencies if any local, state or federal permit, certification or license applications may be needed by any applicant or their contractors, consultants or agents. For further information regarding comments and input from SCDNR on your project, please contact our Office of Environmental Programs by emailing environmental@dnr.sc.gov or by visiting www.dnr.sc.gov/environmental. Pursuant to Section 7 of the Endangered Species Act, requests for formal letters of concurrence with regards to federally listed species should be directed to the USFWS. Should you have any questions or need more information, please do not hesitate to contact our office by email at speciesreview@dnr.sc.gov or by phone at 803-734-4080. Sincerely, Megan Levinson Heritage Trust Program SC Department of Natural Resources Camden H wy 521 There are 0 tracked species records found within the project foot print. The following table outlines occurrences found within the project footprint (if any), sorted by listing status and species name. Please keep in mind that this information is derived from existing databases and do not assume that it is complete. Areas not yet inventoried may contain significant species or communities. You can find more information about global and state rank status definitions by visiting Natureserve's web page. Please note that certain sensitive species found on site may be listed in this table but are not represented on the map. Please contact speciesreview@dnr.sc.gov should you have further questions related to sensitive species found within the project area. Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the A. Project Area - Species Report No records for species of concern are found within the project area 521 Dinkins Mil l Rd Sco tts Bra nch R d El lerb e Mi llRd T B Wri ght R d Ellerbees Mill Dais Rd Ci mmaro n Rd Spe ncer Rd B. Buffer Area - Species Report The following table outlines rare, threatened or endangered species found within 1 miles of the project footprint, arranged in order of protection status and species name. Please keep in mind that this information is derived from existing databases and do not assume that it is complete. Areas not yet inventoried may contain significant species or communities. You can find more information about global and state rank status definitions by visiting Natureserve's web page. Please note that certain sensitive species found within the buffer area may be listed in this table but are not represented on the map. Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Esri, NASA, NGA, USGS, FEMA No records for species of concern are found within the buffered search distance area Camden H wy C. Species Best Management Practices (1 of 1) SCDNR offers the following comments and best management practices (BMPs) regarding this project's potential impacts to species of concern which may be found on or near to the project area. Please contact speciesreview@dnr.sc.gov should you have further questions with regard to survey methods, consultation, or other species-related concerns. Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS BMP Output Three listed species of bats have been known to occur in the coastal plain ecoregions of South Carolina, including the state- endangered Rafinesque’s big-eared bat (Corynorhinus rafinesquii); the federally endangered northern long-eared bat (NLEB) (Myotis septentrionalis); and the federally at-risk & proposed endangered tricolored bat (Perimyotis subflavus). Please note that take of a state endangered species is prohibited under S.C. Code of Laws §50-15-30. Prior to any land-clearing activities in the proposed project area, the SCDNR recommends a threatened and endangered species assessment be conducted to identify suitable habitat and provided to SCDNR for review. Regarding Rafinesque's big-eared bat (1 of 2): Suitable habitat for Rafinesque’s big-eared bat is defined as swamp forests, hardwood or mixed mature bottomlands, maritime forests and black gum (Nyssa sylvatica) and water tupelo (Nyssa aquatic) stands (Cochran 1999, Hofmann et al. 1999, Lance et al. 2001, Gooding and Langford 2004, Trousdale and Beckett 2005).If suitable habitat exists within the project, the SCDNR recommends assumption of presence of Rafinesque’s big-eared bat within areas of forested wetlands and to further protect these areas, surround them with a 1000-foot buffers and avoid tree clearing from May 1st to July 31st to minimize disturbance and destruction of habitat that may be used by females during gestation or maternal care for pups. All other tree clearing outside of the forested wetlands and its associated buffer may occur in areas that are not wetlands or other aquatic resources in non-Rafinesque’s big-eared bat maternity roosting habitat anytime. Where wetlands occur that are not Rafinesque’s big- eared bat habitat, but they are spotted turtle habitat, tree clearing should only occur August to December to prevent impacts to spotted turtles during reproduction. However, if wetlands are dry January to June, they may be cleared, but they must be completely dry (no surface water present).For future right-of-way management (if applicable), use heavy equipment and herbicide treatment for right-of- way vegetation management in wetlands only during the months of July to November. If wetlands are completely dry (no surface water present), heavy equipment may be used January to June, but the wetlands must be completely dry. Please note that tricolored bat was proposed for listing by the U.S. Fish and Wildlife Service on September 13, 2022. Therefore, due to the conservation concerns surrounding this species, the SCDNR strongly suggests acoustic surveys be conducted by a qualified individual during the summer months to assess the use of the area to be cleared by tricolored bats. Should the species occur in the proposed area slated for clearing, coordination should occur with SCDNR and USFWS regarding avoidance and minimization measures. Tricolored bat utilize caves, rock crevices, tree foliage and basal cavities, Spanish moss and man-made structures, such as houses, barns and culverts, as maternity roosts during the summer months and they will use more than one roost location. If this species are found on-site, please contact the U.S. Fish & Wildlife Service and SCDNR. The SCDNR recommends the assumption of presence of the the species and abide by a clearing moratorium from May 1st to July 31st if suitable habitat for the species is likely or are explicitly identified within the project footprint. D. Project Best Management Practices (1 of 2) Camden H wy SCDNR offers the following comments and best management practices (BMPs) regarding this project's potential impacts to natural resources within or surrounding the project area. Please contact our Office of Environmental Programs at environmental@dnr.sc.gov should you have further questions with regard to best management practices related to this project area. Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS BMP Output • All necessary measures must be taken to prevent oil, tar, trash and other pollutants from entering the adjacent offsite areas/wetlands/ water.• Once the project is initiated, it must be carried to completion in an expeditious manner to minimize the period of disturbance to the environment. • Upon project completion, all disturbed areas must be permanently stabilized with vegetative cover (preferable), riprap or other erosion control methods as appropriate. • The project must be in compliance with any applicable floodplain, stormwater, land disturbance, shoreline management guidance or riparian buffer ordinances. • Prior to beginning any land disturbing activity, appropriate erosion and siltation control measures (e.g. silt fences or barriers) must be in place and maintained in a functioning capacity until the area is permanently stabilized. • Materials used for erosion control (e.g., hay bales or straw mulch) will be certified as weed free by the supplier. • Inspecting and ensuring the maintenance of temporary erosion control measures at least: a. on a daily basis in areas of active construction or equipment operation; b. on a weekly basis in areas with no construction or equipment operation; and c. within 24 hours of each 0.5 inch of rainfall. • Ensuring the repair of all ineffective temporary erosion control measures within 24 hours of identification, or as soon as conditions allow if compliance with this time frame would result in greater environmental impacts. • Land disturbing activities must avoid encroachment into any wetland areas (outside the permitted impact area).Wetlands that are unavoidably impacted must be appropriately mitigated. • Your project may require a Stormwater Permit from the SC Department of Health & Environmental Control, please visit <LINK>https://www.scdhec.gov/environment/water-quality/stormwater</LINK> D. Project Best Management Practices (2 of 2) Camden H wy SCDNR offers the following comments and best management practices (BMPs) regarding this project's potential impacts to natural resources within or surrounding the project area. Please contact our Office of Environmental Programs at environmental@dnr.sc.gov should you have further questions with regard to best management practices related to this project area. Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS BMP Output • Maintenance clearing or mowing of rights-of-way should not occur between April 15 and August 1 of a given year to avoid nesting season for a majority of migratory birds. The mower deck should be set no lower than 6 inches high so native herbaceous vegetation will not be damaged.• The SCDNR recommends you follow the current guidelines outlined in the US Fish and Wildlife Service’s Recommended Best Practices for Communication Tower Design, Siting, Construction, Operation, Maintenance, and Decommissioning (https://www.fws.gov/media/recommended-best-practices-communication-tower-design-siting-construction- operation)• Pertinent suggestions discussed in the guidelines that effect birds include using flashing lights only, not situating the tower near wetlands, reducing or eliminating tension wires which are impact hazards, and that vegetation removal be done outside of the nesting season to avoid mortality to eggs and chicks. Migrating bats such as hoary bats sometimes do hit wires and tall structures so reducing guy wires or using a lattice instead per these guidelines might help. Additional tower guidelines for federally protected Northern long-eared bat conservation can be found in the Federal Communications Commission’s Tower Construction Guidance for Protection of Northern Long-Eared Bat Under the Endangered Species Act (https://www.fcc.gov/document/tower- guidance-northern-long-eared-bat.) County Scientific Name Common Name G Rank S Rank Federal Status State Status Group Type Sumter Acipenser brevirostrum Shortnose Sturgeon G3 S3 LE: Federally Endangered SE: State Endangered Zoological Sumter Clemmys guttata Spotted Turtle G5 S2 ARS: At-Risk Species ST: State Threatened Zoological Sumter Corynorhinus rafinesquii Rafinesque's Big-eared Bat G3G4 S2 Not Applicable SE: State Endangered Zoological Sumter Dryobates borealis Red-cockaded Woodpecker G3 S2 LT: Federally Threatend SE: State Endangered Zoological Sumter Elanoides forficatus Swallow-tailed Kite G5 S2 MBTA: Migratory Bird Treaty Act SE: State Endangered Zoological Sumter Elassoma boehlkei Carolina Pygmy Sunfish G2 S1 Not Applicable ST: State Threatened Zoological Sumter Eurycea chamberlaini Chamberlain's Dwarf Salamander G4 S3 ARS: At-Risk Species Not Applicable Zoological Sumter Haliaeetus leucocephalus Bald Eagle G5 S3B,S3N Bald & Golden Eagle Protection Act ST: State Threatened Zoological Sumter Heterodon simus Southern Hog-nosed Snake G2 S1 Not Applicable ST: State Threatened Zoological Sumter Lasiurus cinereus Hoary Bat G3G4 S2 ARS: At-Risk Species Not Applicable Zoological Sumter Lithobates capito Carolina Gopher Frog G2G3 S1 ARS: At-Risk Species SE: State Endangered Zoological Sumter Lobelia boykinii Boykin’s Lobelia G1G2 S2? ARS: At-Risk Species Not Applicable Botanical Sumter Myotis lucifugus Little Brown Bat G3G4 S2 ARS: At-Risk Species Not Applicable Zoological Sumter Noturus sp. 2 Broadtail Madtom G2 S1 Not Applicable ST: State Threatened Zoological Sumter Perimyotis subflavus Tricolored Bat G3G4 S3 LEP: Federally Endangered (Proposed) Not Applicable Zoological Sumter Schwalbea americana Chaffseed G2 S2 LE: Federally Endangered Not Applicable Botanical Sumter Sternula antillarum Least Tern G4 S2B MBTA: Migratory Bird Treaty Act ST: State Threatened Zoological Sumter Tiedemannia canbyi Canby's Cowbane G2 S2 LE: Federally Endangered Not Applicable Botanical The South Carolina Department of Natural Resources’ Heritage Trust Program organizes a database that captures and tracks element of occurrence data for rare, threatened and endangered species, both federal and state. Please keep in mind that this information included within this report is derived from existing databases, and do not assume that it is complete. Areas not yet inventoried may contain significant species or communities. If your project requires the assessment of potential threatened or endangered species that could be within the project area, the SCDNR asks that you include a review of the state listed species within the county or watershed in addition to those that may be within the report as being within the project footprint or within 1-mile of the proposed project area. Consideration should be given to the occurrence of suitable habitat onsite, species movement and connectivity of habitat when assessing the likelihood of a state listed species on the project area. E. State & Federally Listed Species in Sumter County Camden H wy 521 Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS 1) Follow https://arcg.is/1a0jzC0 or use the QR code here. 2) Select ‘Open in browser’ or 'Open in the Survey123 field app' depending on your preference. The browser option will only work when connected to the internet. 3) If using in the Survey123 field app, be sure to download the app from your app store beforehand. The SC Natural Heritage Dataset relies on continuous monitoring and surveying for species of concern throughout the state. Any records of species of concern found within this project area would greatly benefit the quality and comprehensiveness of the statewide dataset for rare, threatened and endangered species. Below are instructions for how to download the SC Natural Heritage Occurrence Reporting Form through the Survey123 App. F. Important Information & Instructions for Submitting Species Observations Camden H wy Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS Instructions for accessing the SC Natural Heritage Occurrence Reporting Form Conservation Ranks & SWAP Priority Status The SC Natural Heritage Program assigns S Ranks for species tracked within the state of South Carolina based on ranking methodology developed by NatureServe and its state program network. For information conservation rank definitions, please visit https://explorer.natureserve.org/AboutTheData/Statuses The SCDNR maintains and updates it's State Wildlife Action Plan (SWAP) every 10 years. This plan categorizes species of concern by Moderate, High, and Highest Priority. Please visit https://www.dnr.sc.gov/swap/index.html for more information about the SC SWAP. The South Carolina Department of Natural Resources’ Heritage Trust Program organizes a database that captures and tracks element of occurrence data for rare, threatened and endangered species, both federal and state. Please keep in mind that this information included within this report is derived from existing databases, and do not assume that it is complete. Areas not yet inventoried may contain significant species or communities. If your project requires the assessment of potential threatened or endangered species that could be within the project area, the SCDNR asks that you include a review of the state listed species within the county or watershed in addition to those that may be within the report as being within the project footprint or within 1-mile of the proposed project area. Consideration should be given to the occurrence of suitable habitat onsite, species movement and connectivity of habitat when assessing the likelihood of a state listed species on the project area. To view these lists please visit our county and watershed dashboards at our website: https://natural-heritage-program-scdnr.hub.arcgis.com/#track Important Information Regarding Element Occurrence Data: State-listed Species Guidance The South Carolina Department of Natural Resources has released a document to provide clarity for the avoidance of a take of a state listed species and what may be needed from permit applicants, for each species listed as threatened or endangered under SC Code of Regulations 123-150 and 123-150.2. Please review this document for information on species-habitat requirements, survey protocol, and other information regarding environmental review: https://dnr.sc.gov/environmental/docs/SCDNRStateListedSpeciesProtectionGuidance.pdf Appendix E Section 106 Review 1775 The Exchange SE, Suite 525, Atlanta, GA 30339 - 678-653-8673 - www.trileaf.com November 26, 2025 South Carolina Department of Archives and History 8301 Pa rklane Road Columbia, SC 29223 Phone: 803- 896-6196 RE: Harmoni Towers LLC – Borden – Client #SC 0009812 – Trileaf Project #772867 Camde n Highway, Rembert, South Carolina 29128 Sumter County, Rembert Quadrangle (USGS) Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W To Whom It May Concern, Tril eaf Corporation is in the process of completing a NEPA review at the referenced property. Our client proposes to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The antenna will be licensed by the Federal Communications Commission (FCC). In acc ordance with the Nationwide Programmatic Agreement for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission, dated September 2004, a cultural resource investigation has been conducted. Our investigation includes determining if the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed, or eligible for listing on the State or National Registers of Historic Places, or located in or on an Indian Religious Site. Summa ry reports of this investigation, maps, photographs and other information are provided in the attached Form 620. As noted in Attachment 5, there are No Historic Properties in the APE for Direct Effects and No Historic Properties in the APE for Visual Effects. Therefore, it is recommended that the proposed undertaking proceed without further archaeological review. We app reciate your cooperation in this regard and anticipate your concurrence with these findings. Please call me at (706) 362-1745 or email h.dell@trileaf.com if you need any additional information or have any questions. Thank you for your assistance. Sinc erely, Hannah Dell Assistant Project Manager FCC Form FCC Wireless Telecommunications Bureau Approved by OMB 3060 – 1039 Notification Date: See instructions for File Number: public burden estimates General Information 1) (Select only one) ( ) NE – New UA – Update of Application WD – Withdrawal of Application 2) If this application is for an Update or Withdrawal, enter the file number of the pending application currently on file. File Number: Applicant Information 3) FCC Registration Number (FRN): 4) Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Contact Information 10) P.O. Box: And /Or 11) Street Address: 12) City: 13) State: 14) Zip Code: 15) Telephone Number: 16) Fax Number: 17) E-mail Address: Consultant Information 18) FCC Registration Number (FRN): 19) Name: Principal Investigator 20) First Name: 21) MI: 22) Last Name: 23) Suffix: 24) Title: Principal Investigator Contact Information 25) P.O. Box: And /Or 26) Street Address: 27) City: 28) State: 29) Zip Code: 30) Telephone Number: 31) Fax Number: 32) E-mail Address: Harmoni Towers, LLC 0025999053 Jennifer Brown 10801 Executive Center Drive Little Rock AR 72211 (501)799-6390 0011724176 Acheulean Consulting on behalf of Trileaf Corporation Jennifer.Brown@harmonitowers.com Jason Flay 1503 Cypress Street Paris KY 40361 (678)653-8673 h.dell@trileaf.com 1 of 13 NE 620 FCC Form 620 New Tower (/0 NT/1) Submission Packet 0011798220 7AM EST 11/28/2025 May 2014 Professional Qualification 33) Does the Principal Investigator satisfy the Secretary of the Interior’s Professional Qualification Standards? ( ) Yes ( ) N o 34) Areas of Professional Qualification: ( ) Archaeologist ( ) Architectural Historian ( ) Historian ( ) Architect ( ) Other (Specify) __________________________________________________________________________________________ Additional Staff 35) Are there other staff involved who meet the Professional Qualification Standards of the Secretary of the Interior? ( ) Yes ( ) N o If “YES,” complete the following: X X X 36) First Name: 37) MI: 38) Last Name: 39) Suffix: 40) Title: 41) Areas of Professional Qualification: ( ) Archaeologist ( ) Architectural Historian ( ) Historian ( ) Architect ( ) Other (Specify) ____________________________________________________________________________________________ 2 of 13 FCC Form 620 May 2014 Site Information Tower Construction Notification System 1) TCNS Notification Number: Site Information 2) Positive Train Control Filing Subject to Expedited Treatment Under Program Comment: ( ) Yes ( ) No 3) Site Name: 4) Site Address: 5) Detailed Description of Project: 6) City: 7) State: 8) Zip Code: 9) County/Borough/Parish: 10) Nearest Crossroads: 11) NAD 83 Latitude (DD-MM-SS.S): ( ) N or ( ) S 12) NAD 83 Longitude (DD-MM-SS.S): ( ) E or ( ) W Tower Information 13) Tower height above ground level (include top-mounted attachments such as lightning rods): ___________________ ( ) Feet ( ) Meters 14) Tower Type (Select One): ( ) Guyed lattice tower ( ) Self-supporting lattice ( ) Monopole ( ) Other (Describe): Project Status 15) Current Project Status (Select One): ( ) Construction has not yet commenced ( ) Construction has commenced, but is not completed Construction commenced on: _______________ ( ) Construction has been completed Construction commenced on: _______________ Construction completed on: _______________ 301523 Borden Camden Highway Rembert SC SUMTER 29128 34-04-02.6 080-30-34.8 X X 86.3 X /32 3 of 13 X X FCC Form 620 Camden Highway and Dais Road May 2014 Camden Highway and Dais Road Harmoni Towers LLC proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. X Determination of Effect 14) Direct Effects (Select One): ( ) No Historic Properties in Area of Potential Effects (APE) ( ) No Effect on Historic Properties in APE ( ) No Adverse Effect on Historic Properties in APE ( ) Adverse Effect on one or more Historic Properties in APE 15) Visual Effects (Select One): ( ) No Historic Properties in Area of Potential Effects (APE) ( ) No Effect on Historic Properties in APE ( ) No Adverse Effect on Historic Properties in APE ( ) Adverse Effect on one or more Historic Properties in APE 4 of 13 X X FCC Form 620 May 2014 Tribal/NHO Involvement 1) Have Indian Tribes or Native Hawaiian Organizations (NHOs) been identified that may attach religious and cultural significance to historic properties which may be affected by the undertaking within the APEs for direct and visual effects? ( ) Yes ( ) No 2a) Tribes/NHOs contacted through TCNS Notification Number: ___________________ Number of Tribes/NHOs: _________________ 2b) Tribes/NHOs contacted through an alternate system: Number of Tribes/NHOs: _________________ 301523 6 X 0 Tribe/NHO Contacted Through TCNS 3) Tribe/NHO FRN: 4) Tribe/NHO Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Dates & Response 10) Date Contacted ______________ 11) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Catawba Indian Nation 09/18/2025 X Dr. Wenonah Haire DMDG THPO and Executive Director Tribe/NHO Contacted Through TCNS 3) Tribe/NHO FRN: 4) Tribe/NHO Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Dates & Response 10) Date Contacted ______________ 11) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Cherokee Nation 09/17/2025 X Gwen Terrapin 5 of 13 FCC Form 620 May 2014 Tribal/NHO Involvement 1) Have Indian Tribes or Native Hawaiian Organizations (NHOs) been identified that may attach religious and cultural significance to historic properties which may be affected by the undertaking within the APEs for direct and visual effects? ( ) Yes ( ) No 2a) Tribes/NHOs contacted through TCNS Notification Number: ___________________ Number of Tribes/NHOs: _________________ 2b) Tribes/NHOs contacted through an alternate system: Number of Tribes/NHOs: _________________ 301523 6 X 0 Tribe/NHO Contacted Through TCNS 3) Tribe/NHO FRN: 4) Tribe/NHO Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Dates & Response 10) Date Contacted ______________ 11) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Eastern Shawnee Tribe of Oklahoma 09/18/2025 09/18/2025 X Lora Nuckolls Director Tribe/NHO Contacted Through TCNS 3) Tribe/NHO FRN: 4) Tribe/NHO Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Dates & Response 10) Date Contacted ______________ 11) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Prairie Island Indian Community 09/17/2025 X Noah White IIIC THPO 6 of 13 FCC Form 620 May 2014 Tribal/NHO Involvement 1) Have Indian Tribes or Native Hawaiian Organizations (NHOs) been identified that may attach religious and cultural significance to historic properties which may be affected by the undertaking within the APEs for direct and visual effects? ( ) Yes ( ) No 2a) Tribes/NHOs contacted through TCNS Notification Number: ___________________ Number of Tribes/NHOs: _________________ 2b) Tribes/NHOs contacted through an alternate system: Number of Tribes/NHOs: _________________ 301523 6 X 0 Tribe/NHO Contacted Through TCNS 3) Tribe/NHO FRN: 4) Tribe/NHO Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Dates & Response 10) Date Contacted ______________ 11) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Thlopthlocco Tribal Town 09/17/2025 X Ryan Morrow Mekko Tribe/NHO Contacted Through TCNS 3) Tribe/NHO FRN: 4) Tribe/NHO Name: Contact Name 5) First Name: 6) MI: 7) Last Name: 8) Suffix: 9) Title: Dates & Response 10) Date Contacted ______________ 11) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Tuscarora Nation 09/17/2025 X Bryan Printup TCNS Rep 7 of 13 FCC Form 620 May 2014 Other Tribes/NHOs Contacted Tribe/NHO Information 1) FCC Registration Number (FRN): 2) Name: Contact Name 3) First Name: 4) MI: 5) Last Name: 6) Suffix: 7) Title: Contact Information 8) P.O. Box: And /Or 9) Street Address: 10) City: 11) State: 12) Zip Code: 13) Telephone Number: 14) Fax Number: 15) E-mail Address: 16) Preferred means of communication: ( ) E-mail ( ) Letter ( ) Both Dates & Response 17) Date Contacted _______________ 18) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other 8 of 13 FCC Form 620 May 2014 Historic Properties Properties Identified 1) Have any historic properties been identified within the APEs for direct and visual effect? ( ) Yes ( ) No 2) Has the identification process located archaeological materials that would be directly affected, or sites that are of cultural or religious significance to Tribes/NHOs? ( ) Yes ( ) No 3) Are there more than 10 historic properties within the APEs for direct and visual effect? If “Yes”, you are required to attach a Cultural Res ources Report in lieu of adding the Historic Property below. ( ) Yes ( ) No Historic Property 4) Property Name: 5) SHPO Site Number: Property Address 6) Street Address: 7) City: 8) State: 9) Zip Code: 10) County/Borough/Parish: Status & Eligibility 11) Is this property listed on the National Register? Source: _______________________________________________________________________________________ ( ) Yes ( ) No 12) Is this property eligible for listing on the National Register? Source: _______________________________________________________________________________________ ( ) Yes ( ) No 13) Is this property a National Historic Landmark? ( ) Yes ( ) No 14) Direct Effects (Select One): ( ) No Effect on this Historic Property in APE ( ) No Adverse Effect on this Historic Property in APE ( ) Adverse Effect on this Historic Property in APE 15) Visual Effects (Select One): ( ) No Effect on this Historic Property in APE ( ) No Adverse Effect on this Historic Property in APE ( ) Adverse Effect on this Historic Property in APE X X X 9 of 13 FCC Form 620 May 2014 Local Government Involvement Local Government Agency 1) FCC Registration Number (FRN): 2) Name: Contact Name 3) First Name: 4) MI: 5) Last Name: 6) Suffix: 7) Title: Contact Information 8) P.O. Box: And /Or 9) Street Address: 10) City: 11) State: 12) Zip Code: 13) Telephone Number: 14) Fax Number: 15) E-mail Address: 16) Preferred means of communication: ( ) E-mail ( ) Letter ( ) Both Dates & Response 17) Date Contacted _______________ 18) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Additional Information 19) Information on local government’s role or interest (optional): Sumter County Planning Department To Whom It May Concern 12 West Liberty Street Sumter SC 29150 (803)774-1660 planningdepartment@sumtersc.gov 09/22/2025 X X 10 of 13 FCC Form 620 May 2014 Other Consulting Parties Other Consulting Parties Contacted 1) Has any other agency been contacted and invited to become a consulting party? ( ) Yes ( ) No Consulting Party 2) FCC Registration Number (FRN): 3) Name: Contact Name 4) First Name: 5) MI: 6) Last Name: 7) Suffix: 8) Title: Contact Information 9) P.O. Box: And /Or 10) Street Address: 11) City: 12) State: 13) Zip Code: 14) Telephone Number: 15) Fax Number: 16) E-mail Address: 17) Preferred means of communication: ( ) E-mail ( ) Letter ( ) Both Dates & Response 18) Date Contacted _______________ 19) Date Replied _______________ ( ) No Reply ( ) Replied/No Interest ( ) Replied/Have Interest ( ) Replied/Other Additional Information 20) Information on other consulting parties’ role or interest (optional): X Sumter County Genealogical Society To Whom It May Concern 122 N Washington St. Sumter SC 29150 (803)774-3901 genealogy@ftc-i.net X 09/22/2025 X 11 of 13 FCC Form 620 May 2014 Designation of SHPO/THPO 1) Designate the Lead State Historic Preservation Officer (SHPO) or Tribal Historic Preservation Officer (THPO) based on the location of the tower. SHPO/THPO Name: ___________________________________________________________________________________________________________ 2) You may also designate up to three additional SHPOs/THPOs if the APEs include multiple states. If the APEs include other countries, enter the name of the National Historic Preservation Agency and any state and provincial Historic Preservation Agency. SHPO/THPO Name: ________________________________________________________________________________________________ SHPO/THPO Name: ________________________________________________________________________________________________ SHPO/THPO Name: ________________________________________________________________________________________________ Certification I certify that all representations on this FCC Form 620 Submission Packet and the accompanying attachments are true, correct, and complete. Party Authorized to Sign First Name: MI: Last Name: Suffix: Signature: Date: _______________ FAILURE TO SIGN THIS APPLICATION MAY RESULT IN DISMISSAL OF THE APPLICATION AND FORFEITURE OF ANY FEES PAID. WILLFUL FALSE STATEMENTS MADE ON THIS FORM OR ANY ATTACHMENTS ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. Code, Title 18, Section 1001) AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. Code, Title 47, Section 312(a)(1)), AND/OR FORFEITURE (U.S. Code, Title 47, Section 503). 12 of 13 FCC Form 620 Department of Archives and History Hannah Dell 11/26/2025 Hannah Dell May 2014 Attachments : Type Description Date Entered Other SHPO Cover Letter 11/26/2025 Resumes/Vitae Attach1 - Resumes 11/26/2025 Photographs Attach2 - Photos 11/26/2025 Map Documents Attach3 - Maps 11/26/2025 Additional Site Information Attach4 - Site Info 11/26/2025 Area of Potential Effects Attach5 - APE 11/26/2025 Tribal/NHO Involvement Attach6 - Tribes 11/26/2025 Historic Properties for Direct Effects Attach7 - Direct APE 11/26/2025 Historic Properties for Visual Effects Attach8 - Visual APE 11/26/2025 Local Government Involvement Attach9 - Local Gov 11/26/2025 Public Involvement Attach10 - PN 11/26/2025 State-Specific Forms Attach11 - SHPO Specific Forms 11/26/2025 FCC Form 620 May 2014 13 of 13 ATTACHMENT 1. CONSULTANT INFORMATION Provide a current copy of the resume or curriculum vitae for the Principal Investigator and any researcher or other person who contributed to, reviewed, or provided significant input into the research, analysis, writing or conclusions presented in this filing. A current copy of the resume for the Principal Investigator and any researcher or other person who contributed to, reviewed, or provided significant input into the research, analysis, writing, or conclusions presented in this filing. HANNAH DELL ASSISTANT PROJECT MANAGER Education Biology, B. S. University of North Georgia / Gainesville, GA Areas of Expertise Ms. Dell has experience performing site inspections and conducting environmental due diligence pursuant to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for commercial real estate and lending projects. Additionally, Ms. Dell has experience performing National Environmental Policy Act (NEPA) reviews for wireless telecommunications projects. Environmental service expertise includes: Phase I Environmental Site Assessments Historical City Directories Information Section 7 Consultation National Wetland Inventory Maps Flood Insurance Rate Maps Critical Habitat Maps Environmental Evaluation Summaries Archaeological and Architectural Impacts Soil Characterization Field Reconnaissance Section 106 Compliance NEPA Environmental Assessments Migratory Bird Evaluations Form 620/621 Submittals Historical Topographic Maps and Aerial Imagery Local Government Consultation Native American Consultation Land Use History Certifications/Affiliations ANSI/FCC RF Radiation Safety Competent Person Basic Wetland Delineation (2023) Professional Resume ATTACHMENT 2. SITE INFORMATION – PHOTOGRAPHS You are required to provide photographs and maps as part of this filing. Additional site information can be provided in an optional attachment. Photograph Requirements: Except in cases where no Historic Properties were identified within the Areas of Potential Effects, submit photographs as described below. Photographs should be in color, marked so as to identify the project, keyed to the relevant map or text, and dated; the focal length of the lens and the height of the camera should be noted. The source of any photograph included but not taken by the Applicant or its consultant (including copies of historic images) should be identified on the photograph. a. Photographs taken from the site should show views from the proposed location in all directions. The direction (e.g., north, south, etc.) should be indicated on each photograph, and, as a group, the photographs should present a complete (360 degree) view of the area around the proposed site. Please reference the following directional photographs of the project area, which were taken by Jason C. Flay on October 07, 2025, unless otherwise noted. b. If any listed or eligible properties are visible from the proposed site, photographs looking at the site from each historic property. The approximate distance in feet (meters) between the site and the historic property should be included. If any listed or eligible properties are within the APE, photos looking at each historic property should be included. N/A c. Photographs of all listed in and eligible properties within the Areas of Potential Effects. Aerial photographs of the site were obtained via Google Earth, imagery is dated to 2024. View west, of APE-DE View north from APE View east from APE View south from APE View west from APE Please refer to Appendix B for Site Maps ATTACHMENT 3. SITE INFORMATION – MAP REQUIREMENTS Include one or more 7.5-minute quad USGS topographical maps that: a. Identify the Areas of Potential Effects for both Direct and Visual Effects. If a map is copied from the original, include a key with the name of quad and date. b. Show the location of the proposed site and any access roads or other easements including excavations. c. Show the locations of each property listed. d. Include keys for any symbols, colors, or other identifiers. e. Submit color maps whenever possible. The following maps have been attached to this report: • Site Vicinity Map • 7.5-min Topographic Quad Map with Project Location, 2025 • Aerial Map • Modern Soil Map with Project Location • Historic Resources Buffer Map Please refer to Appendix B for Site Maps 7.5-min Topographic Quad Map with Project Location, 2025 Aerial Map Modern Soil Map with Project Location Historic Resources Map ATTACHMENT 4. SITE INFORMATION – ADDITIONAL SITE INFORMATION Describe any additional structures, access roads, utility lines, fences, easements, or other construction planned for the site. The project consists of construction of a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The project area is located in an agricultural field covered in crops. The total area of disturbance is 0.14 acre (0.0567 hectares). Please refer to Appendix A for Site Plans ATTACHMENT 5. AREA OF POTENTIAL EFFECTS You ar e required to provide two attachments regarding the Determination of Effect: Areas of Potential Effect and Mitigation of Effect (if applicable). AREAS OF POTENTIAL EFFECT GUIDELINES: a. Describe the APE for direct effects and explain how this APE was determined. Under the NPA for FCC Projects, the Direct APE (APE-DE) "is defined as the area of potential ground disturbance and any property, or any portion thereof that will be physically altered or destroyed by the undertaking" (FCC 2004). On November 24, 2008, the FCC further clarified that the APE-DE is limited to the tower or non-tower structure on which the collocation will be mounted and the lease area, including the access route and utility corridor. The APE -DE is located in a previously undeveloped area. The APE -DE comprises the lease parcel for the construction of the proposed cellular tower, the turnaround area, and access road. The proposed ground disturbance should be restricted to the lease parcel. b. Describe the APE for visual effects and explain how this APE was determined. Per the NPA, the Visual APE (APE-VE) is the "geographic area in which the project has the potential to introduce visual elements that diminish or alter the setting, including the landscape, where the setting is a character-defining feature of a historic property that makes it eligible for listing on the National Register of Historic Places (NRHP)" (FCC 2004). The presumed APE-VE for construction of new facilities is the area from where the tower will be visible: a. Within a ½ mile from the tower site if the proposed tower is 200 feet or less; b. Within ¾ of a mile from the tower site if the proposed tower is more than 200 but no more than 400 feet in overall height; or c. Within 1½ miles from the tower site if the proposed tower is more than 400 feet in overall height. Takin g into consideration the maximum height of the proposed undertaking (283 feet) and the minimal scale of the installation, Acheulean determined that the current project's APE for visual effects will encompass a 0.75-mile radius from the subject property. ATTACHMENT 5. CONTINUED MITIGATION OF EFFECT GUIDELINES: In the case of where an Adverse Visual Effect or Adverse Direct Effect has been determined you must provide the following: a. Copies of any correspondence and summaries of any oral communication with the SHPO/THPO and any consulting parties. N/A b. Describe any alternatives that have been considered that might avoid, minimize, or mitigate any adverse effects. Explain the Applicant 's conclusion regarding the feasibility of each alternative. N/A For each property identified as a Historic Property in the online e-106 form: a. Indicate whether the Applicant believes the proposed undertaking would have a) no effect; b) no adverse effect; or, c) an adverse effect. Explain how each such assessment was made. Provide supporting documentation where necessary. Acheulean Principal Investigator Jason Flay performed this survey in response to the planned use of the above-described parcel and the potential impacts of such use on any archaeological and architectural cultural resources within the project area. Jason Flay meets the Secretary of the Interior's Historic Preservation Professional Qualifications Standards for Archaeology. Background research, including a review of archival sources, was conducted for the current project location prior to the initiation of field investigations. The aim of this research was to determine the likelihood of encountering sensitive historic propert ies within the current project area. A review of previously recorded archaeological sites and surveys was conducted using the South Carolina ArchSite system on October 05, 202 5. This study identified any previous archaeological investigations, previously recorded archaeological sites within a 1- mile buffer, and previously recorded historic resources within a 0.75-mile buffer of the APE- DE. ATTACHMENT 5. CONTINUED A review of the South Carolina ArcSite Historic Resources Inventory Map, and through the National Register Information System website (http://www.nr.nps.gov/) was conducted on October 05, 2025. There are 0 Historic Districts and 0 individual property within the 0.75-mile buffer of the APE - DE. Of the resources, 0 districts and 0 individual properties are NRHP-eligible or -listed. There is 1 Below-Ground resources identified in the 1-mile buffer, 0 are NRHP eligible or listed. It is determined that there are No Historic Properties in the APE-DE or APE-VE. Please see the attached Cultural Resources Survey Report for additional information. A PHASE I CULTURAL RESOURCE INVESTIGATION FOR BORDEN , REMBERT , SUM TER COUNTY, SC T RILEAF N UMBER : 772867 APN: CR - 202 5 - 0 84 JASON C . FLAY , MA , RPA ACHEULEAN CONSULTING 1503 Cypress St. Paris, KY 40361 OCTOBER 11 , 202 5 Ph. 315 - 292 - 0563 www.acheuleanconsulting.com A Phase I Cultural Resource Investigation For Borden, Rembert, Sumter County, SC Submitted by: Acheulean Consulting 1503 Cypress St. Paris , KY 40 361 Prepared for: Trileaf Lead Agency: Federal Communications Commission October 11, 2025 _______________________________________ Jason C. Flay, MA, RPA Principal Investigator Contact AcheuleanConsulting@gmail.com 315 - 292 - 0563 www.acheuleanconsulting.com Trileaf : 772867 APN: CR - 202 5 - 0 84 1775 The Exchange SE, Suite 525 Atlanta, GA 30339 ABSTRACT T his is an abbreviated technical report describing a no - find survey from a Phase I archaeological investigation conducted on October 7, 2025 . Trileaf contacted Acheulean Consulting (Acheulean) to conduct a Phase I archaeological survey for a proposed cellular tower project in Rembert, SC 34.067385, -80.509680 (34° 4’ 2.5868 N, 80° 30’ 34.8467” W )). The project is Borden, Project Number 772867 , located at Camden Highway , Rembert, Sumter County , South Carolina . The proposed ground disturbance should be restricted to the lease parcels. The total acreage of the new construction area is approximately 0.14 acre (0.0567 hectares) (Fig. 1.1 ). The archaeological survey involved a visual inspection of the entire APE - DE for prehistoric or historic features or materials. Acheulean determined that five shovel tests within the lease area would efficiently cover the project area ( Fig. 3.2 ). Each STP was excavated no less than 35 cm in diameter to a depth of no less than 20 cm into the subsoil. All soils were screened through a ¼" mesh. Photographs and GPS points were taken . No further archaeological work is recommended within the APE - DE , and construction may proceed as planned. Table of Contents 1.0 Introduction ............................................................................................................................................ 1 1.1. Regulatory Authority ................................ ................................ ................................ ......................... 1 1.2 Purpose and Scope of Work ................................ ................................ ................................ ............... 1 1.3 Project Area Description ................................ ................................ ................................ .................... 2 1.4 Environmental Setting ................................ ................................ ................................ ........................ 5 1.5 Records Search ................................ ................................ ................................ ................................ .... 5 1.6 Project Staff and Principal Investigator ................................ ................................ .............................. 6 1.7 Curation ................................ ................................ ................................ ................................ .............. 6 2.0 Previous Investigations and Summary of Known Sites .......................................................................... 7 2.1 Historical Documentation ................................ ................................ ................................ .................. 7 2.2 Previous Archaeological Investigations ................................ ................................ ............................... 7 2.3 Known Archaeological Sites ................................ ................................ ................................ ............... 7 2.4 Historic Resources ................................ ................................ ................................ .............................. 8 3.0 Methods and Results .............................................................................................................................. 9 3.1 Implemented Field Methods ................................ ................................ ................................ .............. 9 3.1.2 Visual Inspection ................................ ................................ ................................ ........................ 10 3.2 Evaluation of Field Methods ................................ ................................ ................................ ............ 13 4.0 Summary and Recommendations ......................................................................................................... 14 4.1 Summary ................................ ................................ ................................ ................................ ........... 14 4.2 Recommendations ................................ ................................ ................................ ............................ 14 5.0 References ............................................................................................................................................. 15 Engineering Plans ....................................................................................................................................... 16 List of Figures Fig. 1.1 - Project Location Map ................................ ................................ ................................ ..................... 3 Fig. 1.2 – Project Aerial Map ................................ ................................ ................................ ......................... 4 Fig. 1.3 – Soils within the APE - DE ................................ ................................ ................................ ............... 5 Fig. 2.1 – Historic Resources Inventory Map ................................ ................................ ................................ .. 8 Fig. 3.1 – Representational STP Soil Drawing ................................ ................................ .............................. 10 Fig. 3.2 – Representational STP ................................ ................................ ................................ ................... 10 Fig. 3.3 - View west, of APE - DE ................................ ................................ ................................ ................. 11 Fig. 3.4 – View north from APE - DE ................................ ................................ ................................ ........... 11 Fig. 3.5 - View east from APE - DE ................................ ................................ ................................ .............. 12 Fig. 3.6 - View south from APE - DE ................................ ................................ ................................ ............ 12 Fig. 3.7 - View west from APE - DE ................................ ................................ ................................ ............. 13 Page | 1 1.0 INTRODUCTION Th is is an abbreviated technical report describing a no - find survey from a Phase I archaeological investigation conducted on October 07, 2025 . Trileaf contacted Acheulean Consulting (Acheulean) to conduct a Phase I archaeological survey for a proposed cellular tower project in Rembert , SC ( 34.067385, - 80.509680 ( 34° 12' 56.55" N 80° 42' 30.05" W)) . The project is Borden , Project Number 772867 , located at Camden Highway , Rembert , Sumter County , SC 29128 ( Fig. 1.1 ). Per Section VI.D.2 of the Federal Communications Commission ' s (FCC) 2004 Nationwide Programmatic Agreement, Acheulean conducted a field survey to identify any archaeological or historic properties that may lie within the Area of Potential Effects - Direct Effects (APE - DE). The FCC has defined the APE - DE as " the area of potential ground disturbance and any property, or any portion thereof, [which] will be physically altered or destroyed by the undertaking. " Areas outside of the lease parcel , access , and utilit y easements , as shown on the project plans (buffer zones) , were not surveyed because these areas are not part of the APE - DE , and the applicant does not have permission or legal or financial arrangement with the property owner to use and/ or modify those areas. The APE - DE is located in a previously undeveloped area. The APE - DE comprises the lease parcel for the construction of the proposed cellular tower, the turnaround area, and access road. The proposed ground disturbance should be restricted to the lease parce ls. 1.1. Regulatory Authority The F ederal A gency overseeing the survey is the Federal Communications Commission ( FCC ) . The survey was conducted in compliance with guidelines established by the South Carolina Institute of Archaeology and Anthropology (SCAII) , various interested THPOs, the National Historic Preservation A ct of 1966 (P L 89 - 655; 80 Stat. 915, 16 U S C 470 et seq), the National Environmental Policy Act of 1969 (PL 910190; 83 Stat. 852, 42 U SC 4321 et seq) Procedures of the Advisory Council on Historic Preservation (36CFR800), Executive Order 11593, Protection and Enhancement of the Cultural Environment (16 U SC 470; sup. 1, 1971). 1.2 Purpose and Scope of Work As technology progresses in t elecommunications, more stress is put on wireless communications and wireless internet bandwidth. T owers and ancillary tower facilities must be maintained to fulfill the need. To facilitate this, the client intends to construct a new with attachments. The archaeological field crew was tasked with performing a visual inspection and shovel testing areas of less than 15% slope that w as not previously disturbed by construction activity and visually inspect ing the entire Page | 2 project area. The purpose of this work was to identify any archaeological resources which might have existed within the APE - DE and to record their extent, significance, and the potential impact of the proposed project on these cultural resources. 1.3 Project Area Description The project is Borden, Project Number 772867, located at Camden Highway , Rembert, SC 39739 located on the Rembert, SC Quadrangle USGS 7.5' topographical map (34.067385, -80.509680 (34° 4’ 2.5869” N, 80° 30’ 34.8467” W )). The project consists of building a 279 -foot lattice tower with antenna extending to a height of 283 -feet. The tower is located on a 75-foot x 75 -foot lease area at the western end of an approximately 50’-foot by 30’ access road extending west from Camden H ighway in Borden, Sumter County, SC (34.067385, - 80.509680 (34° 4’ 2.5868” N, 80° 30’ 34.8467” W)). The project area is located in an agricultural field covered in crops. The total area of disturbance is 0.14 acre (0.0567 hectares). (Fig. 1.1 - 2). Page | 3 Fig. 1. 1 - Project Location Map Page | 4 Fig. 1.2 – Project Aerial Map Page | 5 1.4 Environmental Setting The APE - DE is in the Sand Hills region of the Atlantic Plain physiographic zone. The Atlantic Plain is made up of sandy beaches, marshlands, bays, and barrier islands. It is the flattest of the U.S. physiographic divisions and stretches over 2,200 miles (3,500 km) in length from Cape Cod to the Mexican border and southward an additional 1,000 miles (1,600 km) to the Yucatán Peninsula. (NRCS 202 5 ). The predominate soils are DoB — Dothan - Norfolk complex, 2 to 6 percent slopes . “ The Dothan series consists of very deep, well drained soils that formed in thick beds of unconsolidated, medium to fine - textured marine sediments. Dothan soils are on interfluves. Slopes range from 0 to 15 percent. Mean annual temperature is about 18 degre es C (65 degrees F), and the mean annual precipitation is about 1360 millimeters (53 inches). ” ( NRCS 202 5 ). Fig. 1. 3 – Soils within the APE - DE 1.5 Records Search A review of the South Carolina ArcSite Historic Resources Inventory Map, and through the National Register Information System website (http://www.nr.nps.gov/) was conducted on October 05 , 202 5 . Page | 6 There are 0 Historic Districts and 0 individual property within the 0.5 - mile buffer of the APE - DE. Of the resources, 0 district s and 0 individual properties are NRHP - eligible or - listed. There is 1 Below - Ground resources identified in the 1 - mile buffer, 0 are NRHP eligible or listed . I t is recommended that project will have No Effect on any Historic Properties in the APE - DE and APE - VE. This will be discussed further in Section 2.3 Known Archaeological Sites . 1.6 Project Staff and Principal Investigator T he Principal Investigator for this project is Jason C. Flay, MA, RPA . He holds an MA in Archaeology and Heritage from the University of Leicester and a BA in Anthropology from the University of Kansas. Jason C. Flay has conducted archaeological fieldwork for over 20 years and has been researching and writing archaeological reports for over 1 0 years. 1.7 Curation There are no artifacts to curate. Field notes and a copy of this report will be filed at the office of Acheulean Consulting at 1503 Cypress St reet , Paris , KY 40 361 . Page | 7 2.0 PREVIOUS INVESTIGATIONS AND SUMMARY OF KNOWN SITES 2.1 Historical Documentation A review of historic maps was conducted online, including: Hagood , SC 1: 62 , 5 00 (19 38 ), Hagood , SC 1: 62 , 5 00 (19 45 ) , Rembert , SC 1: 24,000 ( 19 57 ) USGS topographic maps . The area has been undeveloped throughout the 20 th and 21 st century . 2.2 Previous Archaeological Investigations Report Number Title Author Report Date N/A Cultural Resources Survey of a 10.22 - Kilometer Section of US 521 for the South Carolina Department of Transportation's Rural Roads Safety Project Baluha and Dantuma 2023 2.3 Known Archaeological Sites Site_# Site Name Site Type Date NR Status 38SU1130 5260 - 4 (Mt. Pisgah MBC Cemetery) African American Cemetery 1882 - pres Not Eligible Page | 8 2.4 Historic Resources Fig. 2.1 – Historic Resources Inventory Map Inventory ID Address National Register Status Name Resource Category Date Built N/A N/A N/A N/A N/A N/A Project # and Status of Subject Property Photograph of Subject Property Description of Subject Property Summary of Effects on Subject Property N/A N/A N/A N/A Page | 9 3.0 METHODS AND RESULTS In this section, the field methods employed during this study are described. These methods include fieldwork activities, their application in different portions of the project, reflection upon conditions encountered, and an evaluation of their effectiveness. Fieldwork was conducted on October 07, 2025 . 3.1 Implemented Field Methods Fieldwork was conducted per the guidelines established by the South Carolina Institute of Archaeology and Anthropology ( SCIAA ), and guidelines from Tribal Historic Preservation Offices (THPOs) interested in the conducted work. Before conducting the survey, test points were plotted at 15 - meter (50 - foot) intervals throughout the APE - DE. Crews were prepared to excavate STPs on slopes less than 15%. A 1 - in diameter soil probe was used in areas to determine the presence and extent of disturbed soils. The archaeological survey involved a visual inspection of the entire APE - DE for prehistoric or historic features or materials. Acheulean determined that five shovel tests within the lease area would efficiently cover the project area ( Fig . 3.2 ). Each STP was excavated no less than 35 cm in diameter to a depth of no less than 20 cm into the subsoil. All soils were screened through a ¼" mesh. Photographs and GPS points were taken. No cultural material or features were discovered during this archaeological survey. Total archaeological field time: 1 person, 2 hours. Based on the findings of this survey, Acheulean is determined that there are No Historic Properties in the APE - DE or APE - VE. It is therefore recommended that project clearance be granted with no further investigation or evaluation of the project area. Page | 10 3.1.1 Shovel Testing/ Geomorphological Sampling 10 Y r 4/4 S aLo 1 8 cm 10 Y r 4/5 S iLo 43 cm STP 4 Fig . 3.1 – Representational STP Soil Drawing Fig . 3.2 – Representational STP 3.1.2 Visual Inspection The entire APE - DE was walked to identify the presence of archaeological materials and/ or features ; none were identified. Photographs of the surrounding areas were taken with corresponding GPS points. Page | 11 Fig. 3.3 - View west , of APE - DE Fig . 3.4 – View north from APE - DE Page | 12 Fig . 3.5 - View east from APE - DE Fig . 3.6 - View south from APE - DE Page | 13 Fig. 3.7 - View west from APE - DE 3.2 Evaluation of Field Methods South Carolina Institute of Archaeology and Anthropology (SCIAA) , and guidelines from Tribal Historic Preservation Offices (THPOs) interested in the conducted work. The fieldwork did not identify any cultural material within the APE - DE. Page | 14 4.0 SUMMARY AND RECOMMENDATIONS 4.1 Summary This is an abbreviated technical report describing a no - find survey from a Phase I archaeological investigation conducted on October 07, 2025 . Trileaf contacted Acheulean Consulting (Acheulean) to conduct a Phase I archaeological survey for a proposed cellular tower project in Rembert , SC (30.5823612°, - 89.0749278 (30 34’56.05”, 89 04 '29.74"). The project is Borden , Project Number 772867 , located at Camden Highway , Rembert , Sumter County , South Carolina ( Fig. 1.1 ). The archaeological survey involved a visual inspection of the entire APE - DE for prehistoric or historic features or materials. Acheulean determined that five shovel tests within the lease area would efficiently cover the project area (Fig. 3.2). Each STP was excavated no less than 35 cm in diameter to a depth of no less than 20 cm into the subsoil. All soils were screened through a ¼" mesh. Photographs and GPS points were taken . No archaeological materials or features were identified. No further archaeological work is recommended within the APE - DE. 4.2 Recommendations Based on the findings of this survey, Acheulean determined that the project will have n o e ffect as there are No Historic Properties in the APE - DE and APE - VE . Due to the research and field data, i t is therefore recommended that clearance be granted with no further investigation or evaluation of the project area . Page | 15 5.0 REFERENCES NRCS 202 5 . Natural Resources Conservation Service, Web Soil Survey , United States Department of Agriculture, http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey. S tewart, R.A. 20 0 4 , South Carolina Physiographic Provinces , United States Geological Society, Accessed 10 / 0 7/202 5 USGSa. 202 5 . Rembert , SC 1:24,000, United States Geological Survey, Accessed 10 / 0 7 /202 5 , https://ngmdb.usgs.gov/topoview/viewer/#14/31.7105/ - 89.0932 Page | 16 ENGINEERING PLANS Page | 17 ATTACHMENT 6. TRIBAL AND NHO INVOLVEMENT At an early stage in the planning process, the Nationwide Agreement requires the Applicant to gather information from appropriate Indian Tribes or Native Hawaiian Organizations ("NHOs") to assist in the identification of Historic Properties of religious and cultural significance to them. Describe measures taken to identify Indian tribes and NHOs that may attach religious and cultural significance to Historic Properties that may be affec ted by the construction within the Areas of Potential Effects ("APE") for direct and visual effects. If such Indian tribes or NHOs were identified, list them and provide a summary of contacts by either the FCC, the Applicant, or the Applicant 's representative. Provide copies of relevant documents, including correspondence. If no such Indian tribes or NHOs were identified, please explain. Trileaf Corporation completed the Tower Construction Notification System (TCNS) on September 16, 2025, and received the notification of interested tribes on September 19, 2025. The attached FCC Notification email lists the Tribes identified through the TCNS process. A second notice will be sent to all interested tribes/organizations, after a period of 30 days and the consultation process will continue per the FCC's guidelines. Any relevant comments from Tribes received by Trileaf will be forwarded to your office. 1 Michael Romanoski From: towernotifyinfo@fcc.gov Sent: Friday, September 19, 2025 2:02 AM To: Tribal Cc: tcnsweekly@fcc.gov Subject: NOTICE OF ORGANIZATION(S) WHICH WERE SENT PROPOSED TOWER CONSTRUCTION NOTIFICATION INFORMATION - Email ID #9325921 Categories: Mike CAUTION: This email originated from outside of the organiza. on. Do not click links or open aƩachments unless you recognize the sender and know the content is safe. Dear Applicant: Thank you for using the Federal CommunicaƟons Commission's (FCC) Tower ConstrucƟon NoƟficaƟon System (TCNS). The purpose of this electronic mail message is to inform you that the following authorized persons were sent the noƟficaƟon that you provided through TCNS, which relates to your proposed antenna structure. The informaƟon was forwarded by the FCC to authorized TCNS users by electronic mail and/or regular mail (leƩer). We note that the review period for all parƟes begins upon receipt of the Submission Packet pursuant to SecƟon VII.A of the NPA and noƟficaƟons that do not provide this serve as informaƟon only. Persons who have received the noƟficaƟon that you provided include leaders or their designees of federally- recognized American Indian Tribes, including Alaska NaƟve Villages (collecƟvely "Tribal NaƟons"), NaƟve Hawaiian OrganizaƟons (NHOs), and State Historic PreservaƟon Officers (SHPOs). For your convenience in idenƟfying the referenced Tribal NaƟons and NHOs and in making further contacts, the City and State of the Seat of Government for each Tribal NaƟon and NHO, as well as the designated contact person, is included in the lisƟng below. We note that Tribal NaƟons may have SecƟon 106 cultural interests in ancestral homelands or other locaƟons that are far removed from their current Seat of Government. Pursuant to the Commission's rules as set forth in the NaƟonwide ProgrammaƟc Agreement for Review of Effects on Historic ProperƟes for Certain Undertakings Approved by the Federal CommunicaƟons Commission (NPA), all Tribal NaƟons and NHOs listed below must be afforded a reasonable opportunity to respond to this noƟficaƟon, consistent with the procedures set forth below, unless the proposed construcƟ on falls within an exclusion designated by the Tribal NaƟon or NHO. (NPA, SecƟon IV.F.4). The noƟficaƟon that you provided was forwarded to the following Tribal NaƟons and NHOs. A Tribal NaƟon or NHO may not respond unƟl a full Submission Packet is provided. If, upon receipt, the Tribal NaƟon or NHO does not respond within a reasonable Ɵme, you should make a reasonable effort at follow-up contact, unless the Tribal NaƟon or NHO has agreed to different procedures (NPA, SecƟon IV.F.5). In the event a Tribal NaƟon or NHO does not respond to a follow-up inquiry, or if a substanƟve or procedural disagreement arises between you and a Tribal NaƟon or NHO, you must seek guidance from the Commission (NPA, SecƟon IV.G). These procedures are further set forth in the FCC's Second Report and Order released on March 30, 2018 (FCC 18-30). 1. TCNS Rep Bryan Printup - Tuscarora NaƟon - 5226 Walmore Rd Via: Lewiston, NY - bprintup@heƞ.org - 716-264- 6011 (ext: 103) - electronic mail 2 If the applicant/tower builder receives no response from the Tuscarora NaƟon within 30 days aŌer noƟficaƟon through TCNS, the Tuscarora NaƟon has no interest in parƟcipaƟng in pre-construcƟon review for the proposed site. The Applicant/tower builder, however, must immediately noƟfy the Tuscarora NaƟon in the event archaeological properƟes or human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and applicable law. 2. THPO Noah C White III - Prairie Island Indian Community - 5636 Sturgeon Lake Road Welch, MN - celltower@piic.org - 651-385-4175 - electronic mail If the applicant/tower builder receives no response from the Prairie Island Indian Community within 30 days aŌer noƟficaƟon through TCNS, the Prairie Island Indian Community has no interest in parƟcipaƟng in pre-construcƟon review for the proposed site. The Applicant/tower builder, however, must immediately noƟfy the Prairie Island Indian Community in the event archaeological properƟes or human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and applicable law. 3. Gwen Terrapin - Cherokee NaƟon - (PO Box: 948) Tahlequah, OK - historicpreservaƟon@cherokee.org; gwen- terrapin@cherokee.org - 918-772-4165 - electronic mail Exclusions: Please email all review documents for FCC Form 620/621 (i.e. archeologist report, photos, SHPO response, etc.) to historicpreservaƟon@cherokee.org or gwen-terrapin@cherokee.org. You may also mail a cover leƩer and a CD or flash drive containing the review documents and FCC forms to: Cherokee NaƟon: AƩn: Gwen Terrapin, PO Box 948, Tahlequah, OK 74465. Should you have any quesƟons, please do not hesitate to email or call 918.772.4165. Wado, Cherokee NaƟon 4. Director Lora Nuckolls - Eastern Shawnee Tribe of Oklahoma - 70400 East HWY 60 WyandoƩe, OK - celltower@estoo.net - 918-238-5151 (ext: 1840) - regular mail Exclusions: Submit one printed color copy by US postal mail or other parcel carrier of all documentaƟon to: Eastern Shawnee Tribe AƩn: Cell Tower Program 70500 E. 128 Rd. WyandoƩe, OK 74370 Provide a 1-page cover leƩer with the following informaƟon: a. TCNS Number b. Company Name c. Project Name, City, County, State d. Project type 3 e. Project coordinates f. Contact informaƟon The Eastern Shawnee Procedures document is available and highly recommended for guidance; send an email to celltower@estoo.net requesƟng our most current copy. If the applicant/tower builder receives no response from the Eastern Shawnee Tribe of Oklahoma within 30 days aŌer noƟficaƟon through TCNS, the Eastern Shawnee Tribe of Oklahoma has no interest in parƟcipaƟng in pre- construcƟon review for the proposed site. The Applicant/tower builder, however, must immediately noƟfy the Eastern Shawnee Tribe of Oklahoma in the event archaeological properƟes or human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and applicable law. 5. Mekko Ryan Morrow - Thlopthlocco Tribal Town - P .O. Box 188 Okemah, OK - thpo@Ʃtown.org - 000-000-0000 - electronic mail Exclusions: Thlopthlocco Tribal Town requests that all iniƟal review materials required by applicable law be submiƩed by email directly to thpo@Ʃtown.org. In addiƟon, in the event archeological or cultural materials or human remains are discovered at any Ɵme during this undertaking, please noƟfy Thlopthlocco Tribal Town immediately. 6. THPO and ExecuƟve Director Dr. Wenonah G Haire DMD - Catawba Indian NaƟon - 1536 Tom Steven Road Catawba Cultural Center Rock Hill, SC - Wenonah.Haire@catawba.com; Caitlin.Rogers@catawba.com - 803-417-9057 - regular mail Exclusions: Please do not email documentaƟon; it will be deleted without being opened. Mail one printed color copy of all documentaƟon to address: Dr. Wenonah G. Haire Tribal Historic PreservaƟon Office 1536 Tom Steven Road Rock Hill, SC 29730 Please submit by US Postal mail or other parcel carrier complete informaƟon for all telecommunicaƟon projects: 1. Please provide 1 page cover leƩer with following informaƟon a. TCNS Number b. Company Name c. Project Name, City, County, State d. Project Type e. Project coordinates f. Contact informaƟon 2. We also request photographs of project area, previous land use history and copy of SHPO LeƩer. If yo u have any quesƟons about our process or Ɵmeline of project noƟficaƟons you can email Caitlin Rogers at Caitlinh@ccppcraŌs.com 4 The noƟficaƟon that you provided was also forwarded to the following SHPOs in the State in which you propose to construct and neighboring States. The informaƟon was provided to these SHPOs as a courtesy for their informaƟon and planning. You need make no effort at this Ɵme to follow up with any SHPO that does not respond to this noƟficaƟon. Prior to construcƟon, you must provide the SHPO of the State in which you propose to construct (or the Tribal Historic PreservaƟon Officer, if the project will be located on certain Tribal lands), with a Submission Packet pursuant to SecƟon VII.A of the NPA unless the project is excluded from SHPO review under SecƟon III D or E of the NPA. 7. Environmental Review Coordinator Renee GledhillEarley - NC State Historic PreservaƟon Office - 4617 Mail Service Center Raleigh, NC - renee.gledhill-earley@ncmail.net - 919-733-4763 - electronic mail 8. Deputy SHPO David Brook - Historic PreservaƟon Office - 4610 Mail Service Center Raleigh, NC - david.brook@ncmail.net - 919-807-7283 - electronic mail 9. Project Review Coordinator John Sylvest - Department of Archives and History - 8301 Parklane Road Columbia, SC - jsylvest@scdah.sc.gov - 803-896-6129 - electronic mail TCNS automaƟcally forwards all noƟficaƟons to all Tribal NaƟons and SHPOs that have an expressed interest in the geographic area of a proposal. However, if a proposal for PTC wayside poles falls within a designated exclusion, you need not expect any response and need not pursue any addiƟonal process with that Tribal NaƟon or SHPO. In addiƟon, a parƟcular Tribal NaƟon or SHPO may also set forth policies or procedures within its details box that exclude from review certain faciliƟes (for example, a statement that it does not review collocaƟons with no ground disturbance; or that indicates that no response within 30 days indicates no interest in parƟcipaƟng in pre-construcƟon review). Please be advised that the FCC cannot guarantee that the contact(s) listed above have opened and reviewed an electronic or regular mail noƟficaƟon. If you learn that any of the above contact informaƟon is no longer valid, please contact the FCC by emailing tcnshelp@fcc.gov. The following informaƟon relaƟng to the proposed tower was forwarded to the person(s) listed above: NoƟficaƟon Received: 09/16/2025 NoƟficaƟon ID: 301523 Excluded from SHPO Review: No Tower Owner Individual or EnƟty Name: Harmoni Towers, LLC Consultant Name: Michael Romanoski Street Address: 1515 Des Peres Rd. Ste 200 Suite 200 City: St. Louis State: MISSOURI Zip Code: 63131 Phone: 314-997-6111 5 Email: tribal@trileaf.com Structure Type: LTOWER - Laƫce Tower LaƟtude: 34 deg 4 min 2.6 sec N Longitude: 80 deg 30 min 34.8 sec W LocaƟon DescripƟon: Camden Highway City: Rembert State: SOUTH CAROLINA County: SUMTER Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. Ground ElevaƟon: 73.7 meters Support Structure: 85.0 meters above ground level Overall Structure: 86.3 meters above ground level Overall Height AMSL: 160.0 meters above mean sea level If you have any quesƟons or comments regarding this noƟce, please contact the FCC using the electronic Help Request form located on the FCC's website at: hƩps://urldefense.proofpoint.com/v2/url?u=hƩps-3A__www.fcc.gov_wireless_available-2Dsupport- 2Dservices&d=DwIFaQ&c=euGZstcaTDllvimEN8b7jXrwqOf- v5A_CdpgnVfiiMM&r=tVy9dfE6fJUkHc15_Itk39MNoGtgWe1vmeedh3_FbFk&m=xuiZwBxPrrSZc80Qlv-s_t4MZ3- 4W43LAQuZILpwSmamvP77ioLuOxWQSxov-Grt&s=7pP426Lnov_hso07F0PYDL9dZUmZSUhpCoajHchF3q4&e= You may also call the FCC Support Center at (877) 480-3201 (TTY 717-338-2824). Hours are from 8:00 a.m. to 6:00 p.m. Eastern Time, Monday through Friday (except Federal holidays). To provide quality service and ensure security, all telephone calls are recorded. Thank you, Federal CommunicaƟons Commission ---------- This email has been scanned for spam and viruses by Proofpoint EssenƟals. Visit the following link to report this email as spam: hƩps://us1.proofpointessenƟals.com/app/report_spam.php?mod_id=11&mod_opƟon=logitem&report=1&type=easysp am&k=k1&payload=53616c7465645f5f7c8c95c304975a1603a9de986fdea90adf0ĩcd871dad7a98ec00c339035a5c34f7a 76df77222347df7c3465237ab8fc46265ce14133d361f6cce50718162a0ea8c679559ccbc6ddf26aa1ed0f691d0e004979ce4 2de0733c4257e4c4cf71474817c8e1f4a74eddd5f580a008ac18bddd5d39f3afc95777642632cd41a6f10039b6f4b5b7aa31 62e312a8e8b3c100c584719b434eced4789 ATTACHMENT 7. HISTORIC PROPERTIES DIRECT EFFECTS a. List all Below-Ground Resources within the APE-DE. b. Provide the name and address (including U.S. Postal Service ZIP Code) of each property in the APE for direct effects, not listed in part "a" (above), that the Applicant considers to be eligible for listing in the National Register because of the Applicant's research. For each such property, describe how it satisfies the criteria of eligibility (36 C FR Part 63). For each property that was specifically considered and determined not to be eligible, describe why it does not satisfy the criteria of eligibility. There are no additional properties in the APE for direct effects not listed in part "a." Site_# Site Name Site Type Date NR Status 38SU1130 5260-4 (Mt. Pisgah MBC Cemetery) African American Cemetery 1882-pres Not Eligible ATTACHMENT 7. CONTINUED a. Describe the techniques and the methodology, including any field survey, used to identify Historic Properties within the APE for direct effects. 1 If no archeological field survey was performed, provide a report substantiating that: i) the depth of previous disturbance exceeds the proposed construction depth (excluding footings and other anchoring mechanisms) by at least 2 feet; or, ii) geomorphological evidence indicates that cultural resource-bearing soils do not occur within the project area or may occur but at depths that exceed 2 feet below the proposed construction depth. 2 Fieldwork was conducted per the guidelines established by the South Carolina Department of Archives and History , and guidelines from Tribal Historic Preservation Offices (THPOs) interested in the conducted work. Before conducting the survey, test points were plotted at 15 -meter (50 -foot) intervals throughout the APE-DE. Crews were prepared to excavate STPs on slopes less than 15%. A 1 in-diameter soil probe was used in areas to determine the presence and extent of disturbed soils. The archaeological survey involved a visual inspection of the entire APE -DE for prehistoric or historic features or materials. Acheulean determined that five shovel tests within the lease area would efficiently cover the project area (Fig. 3.2). Each STP was excavated no less than 35 cm in diameter to a depth of no less than 20 cm into the subsoil. All soils were screened through a ¼" mesh. Photographs and GPS points were taken. No cultural material was discovered during this archaeological survey. Total archaeological field time: 1 person, 1 hours. Based on the findings of this survey, Acheulean recommends that there are No Below- Ground Historic Properties in the Direct APE. It is therefore recommended that project clearance be granted with no further investigation or evaluation of the project area related to those resources. Please refer to the Cultural Resources Report provided in Attachment 5 for additional information. a. Representational Shovel Test Profile 10 Yr 4/4 Sa 18cm 10 Yr 4/5 Sa 1 Pursuant to Section VI.D.2.a. of the Nationwide Agreement, Applicants shall make a reasonable and good faith effort to identify above ground and archeological Historic Properties, including buildings, structures, and historic districts, that lie within the APE for direct effects. Such reasonable and good faith efforts may include a field survey where appropriate. 2 Under Section VI.D.2.d. of the Nationwide Agreement, an archeological field survey is required even if none of these conditions applies, if an Indian tribe or NHO provides evidence that supports a high probability of the presence of intact archeological Historic Properties within the APE for direct effects. 43cm STP 4 Fig 7.1 – Representational STP Soil Drawing Fig 7.2 – Representational STP ATTACHMENT 8. HISTORIC PROPERTIES VISUAL EFFECTS Historic Properties Identified for Visual Effects Guidelines a. Provide the name and address (including U.S. Postal Service ZIP Code) of each property in the APE for visual effects that is listed in the National Register, has been formally determined eligible for listing by the Keeper of the National Register, or is id entified as considered eligible for listing in the records of the SHPO/THPO, pursuant to Section VI.D.I.a. of the Nationwide Agreement. A review of the SC ArchSite SHPO database of National Register Sites and Districts, Certified Local Districts and Architectural Surveys, Archaeology Viewer, National Register Information System website (http://www.nr.nps.gov/). b. Provide the name and address (including U.S. Postal Service ZIP Code) of each Historic Property in the APE for visual effects, not listed in part "a", identified through the comments of Indian Tribes, NHOs, local governments, or members of the public. Identify each individual or group whose comments led to the inclusion of a Historic Property in this attachment. For each such property, describe how it satisfies the criteria of eligibility (36 CFR Part 63). N/A c. For any properties listed in the above Historic Properties list, that the Applicant considers no longer eligible for inclusion in the National Register, explain the basis for this recommendation. N/A Inventory ID Address National Register Status Name Resource Category Date Built N/A N/A N/A N/A N/A N/A Project # and Status of Subject Property Photograph of Subject Property N/A N/A N/A ATTACHMENT 9. LOCAL GOVERNMENT a. If any local government has been contacted and invited to become a consulting party pursuant to Section V A of the Nationwide Programmatic Agreement, list the local government agencies contacted. Provide a summary of contacts and copies of any relevant documents (e.g., correspondence or notices). On September 22 , 2025, the Sumter County Planning Department was notified of the proposed project. They have been invited to comment on the proposed project’s potential effect on Historic Properties and to indicate whether they are interested in consulting further on the proposed project. A copy of Trileaf Corporation’s correspondence with the Sumter County Planning Department is attached. As of this date, no response has been received from the Sumter County Planning Department. Should a response be received, a copy will be forwarded to all consulting parties as an addendum to this packet. b. If a local government agency will be contacted but has not been to date, explain why and when such contact will take place. N/A 1775 The Exchange SE, Suite 525, Atlanta, GA 30339 - 678-653-8673 - www.trileaf.com September 22, 2025 Sumte r County Planning Department 12 West Liberty Street Sumter, South Carolina, 29150 Phone: (803) 774-1660 Email: planningdepartment@sumtersc.gov RE: Har moni Towers LLC – Borden – Client #SC0009812 – Trileaf Project #772867 Camden Highway, Rembert, South Carolina 29128 Sumter County, Rembert Quadrangle (USGS) Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W To Whom It May Concern, Tri leaf Corporation is in the process of completing a NEPA Review at the referenced property. Our client proposes to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The antenna will be licensed by the Federal Communications Commission (FCC). Our investigation includes determining if the site is contained in, on or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archaeology, engineering or culture, that is listed, or eligible for listing on the State or National Registers of Historic Places, or located in or on an Indian Religious Site. Tri leaf is requesting information regarding this tower’s potential effect on Historic Properties. All information received will be forwarded to the State Historic Preservation Office (SHPO) as part of the Section 106 review process. Additionally, this invitation to comment is separate from any local planning/zoning process that may apply to this project. If you wish to comment or be considered a consulting party, please respond within thirty (30) days of the date of this letter. If a response is not received within thirty (30) days, it will be assumed that you have no objections to this undertaking. A site topography map and aerial photograph are enclosed for your reference. Pleas e call me at (706) 362-1745 or email h.dell@trileaf.com if you need additional information or have any questions. Thank you for your assistance in this regard. Sin cerely, Hann ah Dell Assistant Project Manager ATTACHMENT 10. OTHER CONSU LTING PARTIES AND PUBLIC NOTICE List additional consulting parties that were invited to participate by the Applicant, or independently requested to participate. Provide any relevant correspondence or other documents. On September 22, 2025, the Sumter County Genealogical Society was notified of the proposed project. They were i nvited to comment on the proposed project’s potential effect on Historic Properties and to indicate whether they are interested in consulting further on the proposed proj ect. A copy of Trileaf’s correspondence with the Sumter County Genealogical Society is attached. As of this date, no response has been received from the S umter County Genealogical Society. Should a response be received, a copy will be forwarded to all consulting parties as an adde ndum to this packet. You are required t o p rovide a Public Notice Attachment. Attached, please find a copy of a legal notice regarding the proposed telecommunications tower construction that was posted in the Item on September 25, 2025. No responses have yet been recived. Should a response be received, copies will be forwarded to all consulting parties as an addendum to this submission packet. 1775 The Exchange SE, Suite 525, Atlanta, GA 30339 - 678-653-8673 - www.trileaf.com September 22, 2025 Sumte r County Genealogical Society 122 N Washington St. Sumter, South Carolina 29150 Phone: (803) 774-3901 Email:genealogy@ftc-i.net RE: Har moni Towers LLC – Borden – Client #SC0009812 – Trileaf Project #772867 Camden Highway, Rembert, South Carolina 29128 Sumter County, Rembert Quadrangle (USGS) Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W To Whom It May Concern, Tri leaf Corporation is in the process of completing a NEPA Review at the referenced property. Our client proposes to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The antenna will be licensed by the Federal Communications Commission (FCC). Our investigation includes determining if the site is contained in, on or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archaeology, engineering or culture, that is listed, or eligible for listing on the State or National Registers of Historic Places, or located in or on an Indian Religious Site. Tri leaf is requesting information regarding this tower’s potential effect on Historic Properties. All information received will be forwarded to the State Historic Preservation Office (SHPO) as part of the Section 106 review process. Additionally, this invitation to comment is separate from any local planning/zoning process that may apply to this project. If you wish to comment or be considered a consulting party, please respond within thirty (30) days of the date of this letter. If a response is not received within thirty (30) days, it will be assumed that you have no objections to this undertaking. A site topography map and aerial photograph are enclosed for your reference. Pleas e call me at (706) 362-1745 or email h.dell@trileaf.com if you need additional information or have any questions. Thank you for your assistance in this regard. Sin cerely, Hann ah Dell Assistant Project Manager UmterlTEM Publisheddailyby Osteen PublishingCo., Inc. Sumter,sc 29151. (803)774-1200 STATE OF SOUTH CAROLINA COUNTY OF SUMTER PRINTER AFFIDAVIT INKLYNK. LLC 2300 BETHELVIEW RD # 110-302 Harmeni Towers LLC build 0 self-support communications tower attheapprox. vicinity of Camden a 283-foot Persoiia^y^PRearedbeforeme hjjầة [Laf: 34-4-2.5869, Long:ج regardingpotentialeffectsfrom this siteon historicpropertiesmay be submittedwithin 39 days from"the date of thispublicationto:TrilCar Coip, Hannah Dell, h.dell Ctrlleaf.com,1775 The Exchan'ge SĘ, Suite 525,Atlanta,GA 30339,1745 TheSumterItem,%UàClerk Who being duly sworn,says sticisa Bookkeeping clerkof theOSTEEN PUBLISHING CO., PublisherofTHE ITEM A Newspaper publisliedinsaidstateand county and tlicadvcrtisctiicnt comments Sort Text; Harmoni Towers, LLC Ad Order ID; 362810 was publisliedinsaidnewspaper on 09/24/2025 and a copy oftheadvertisementisattached. Swo ااا-ا٩ Nota^ Public-StateofSouthCarolina My Commission Expires 31,2026May ATTACHMENT 11. SHPO SPECIFIC FORMS N/A 1 Hannah Dell From: towernotifyinfo@fcc.gov Sent: Sunday, December 28, 2025 11:46 PM To: Hannah Dell Subject: Section 106 Notification of SHPO/THPO Concurrence- Email ID #11966099 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. This is to notify you that the Lead SHPO/THPO has concurred with the following filing: Date of Action: 12/28/2025 Direct Effect: No Historic Properties in Area of Potential Effects (APE) Visual Effect: No Historic Properties in Area of Potential Effects (APE) Comment Text: None File Number: 0011798220 TCNS Number: 301523 Purpose: New Tower Submission Packet Notification Date: 7AM EST 11/28/2025 Applicant: Harmoni Towers, LLC Consultant: Acheulean Consulting on behalf of Trileaf Corporation Positive Train Control Filing Subject to Expedited Treatment Under Program Comment: No Site Name: Borden Site Address: Camden Highway Detailed Description of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. Site Coordinates: 34-4-2.6 N, 80-30-34.8 W City: Rembert County: SUMTER State:SC Lead SHPO/THPO: Department of Archives and History NOTICE OF FRAUDULENT USE OF SYSTEM, ABUSE OF PASSWORD AND RELATED MISUSE Use of the Section 106 system is intended to facilitate consultation under Section 106 of the National Historic Preservation Act and may contain information that is confidential, privileged or otherwise protected from disclosure under applicable laws. Any person having access to Section 106 information shall use it only for its intended purpose. Appropriate action will be taken with respect to any misuse of the system. 1 Hannah Dell From: towernotifyinfo@fcc.gov Sent: Wednesday, November 26, 2025 10:17 AM To: Hannah Dell Subject: Section 106 New Filing Submitted- Email ID #11823393 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. The following new Section 106 filing has been submitted: File Number: 0011798220 TCNS Number: 301523 Purpose: New Tower Submission Packet Notification Date: 7AM EST 11/28/2025 Applicant: Harmoni Towers, LLC Consultant: Acheulean Consulting on behalf of Trileaf Corporation Positive Train Control Filing Subject to Expedited Treatment Under Program Comment: No Site Name: Borden Site Address: Camden Highway Detailed Description of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. Site Coordinates: 34-4-2.6 N, 80-30-34.8 W City: Rembert County: SUMTER State:SC Lead SHPO/THPO: Department of Archives and History Consultant Contact Information: Name: Acheulean Consulting on behalf of Trileaf Corporation Title: PO Box: Address: 1503 Cypress Street City: Paris State: KY Zip: 40361 Phone: 678-653-8673 Fax: Email: h.dell@trileaf.com NOTICE OF FRAUDULENT USE OF SYSTEM, ABUSE OF PASSWORD AND RELATED MISUSE Use of the Section 106 system is intended to facilitate consultation under Section 106 of the National Historic Preservation Act and may contain information that is confidential, privileged or otherwise 2 protected from disclosure under applicable laws. Any person having access to Section 106 information shall use it only for its intended purpose. Appropriate action will be taken with respect to any misuse of the system. Appendix F Native American Correspondence Date Requested Information Date Sent Date Comments Catawba Indian Nation 12/2/2025 Sent Letter & Form 620/621 12/30/2025 No immediate concerns with regard to traditional cultural properties, sacred sites or Native American archeological sites within the boundaries of the proposed project areas - Requests inadvertent discovery notification. Cherokee Nation 12/2/2025 Sent Letter & Form 620/621 1/8/2026 the Nation does not object to the project proceeding as long as the following mitigative procedures are followed: • The Nation requests that Trileaf re‐contact this Office if there are any amendments or edits to this project; and • The Nation requests that Trileaf contact this Office if there are any pre‐contact or post‐contact artifacts located throughout the course of this project. Examples of pre‐contact artifacts may include but are not limited to arrowheads, stone‐ground tools, mortars, pestles, pottery shards, or fire pits. Post‐contact artifacts may include but are not limited to cellars, cabins, or ceramic vessels. If the above procedures are observed, the Nation does not object to this project proceeding. - Requests scope change & inadvertent discovery notification. Eastern Shawnee Tribe of Oklahoma 30 days no interest Notify of inadvertent discovery 9/18/2025 We have no interest in this site. - Requests inadvertent discovery notification. Prairie Island Indian Community 30 days no interest Notify of inadvertent discovery 12/2/2025 Sent Letter & Form 620/621 1/1/2026 Cleared per NOO Thlopthlocco Tribal Town 12/2/2025 Sent Letter & Form 620/621 1/23/2026 Cleared by Referral 1/8/2026 Tuscarora Nation 30 days no interest Notify of inadvertent discovery 12/2/2025 Sent Letter & Form 620/621 1/1/2026 Cleared per NOO September 19, 2025FCC Start: FCC Referral Standing Agreements & Comments Tribal Summary Table Tribe TCNS auto-reply Follow Up Request from Tribe Follow Up(s) to Tribe Final Reply Site: Borden TCNS Number: 301523 Site ID: SC0009812 Page 1 of 1 1 Michael Romanoski From: towernotifyinfo@fcc.gov Sent: Friday, September 19, 2025 2:02 AM To: Tribal Cc: tcnsweekly@fcc.gov Subject: NOTICE OF ORGANIZATION(S) WHICH WERE SENT PROPOSED TOWER CONSTRUCTION NOTIFICATION INFORMATION - Email ID #9325921 Categories: Mike CAUTION: This email originated from outside of the organiza. on. Do not click links or open aƩachments unless you recognize the sender and know the content is safe. Dear Applicant: Thank you for using the Federal CommunicaƟons Commission's (FCC) Tower ConstrucƟon NoƟficaƟon System (TCNS). The purpose of this electronic mail message is to inform you that the following authorized persons were sent the noƟficaƟon that you provided through TCNS, which relates to your proposed antenna structure. The informaƟon was forwarded by the FCC to authorized TCNS users by electronic mail and/or regular mail (leƩer). We note that the review period for all parƟes begins upon receipt of the Submission Packet pursuant to SecƟon VII.A of the NPA and noƟficaƟons that do not provide this serve as informaƟon only. Persons who have received the noƟficaƟon that you provided include leaders or their designees of federally- recognized American Indian Tribes, including Alaska NaƟve Villages (collecƟvely "Tribal NaƟons"), NaƟve Hawaiian OrganizaƟons (NHOs), and State Historic PreservaƟon Officers (SHPOs). For your convenience in idenƟfying the referenced Tribal NaƟons and NHOs and in making further contacts, the City and State of the Seat of Government for each Tribal NaƟon and NHO, as well as the designated contact person, is included in the lisƟng below. We note that Tribal NaƟons may have SecƟon 106 cultural interests in ancestral homelands or other locaƟons that are far removed from their current Seat of Government. Pursuant to the Commission's rules as set forth in the NaƟonwide ProgrammaƟc Agreement for Review of Effects on Historic ProperƟes for Certain Undertakings Approved by the Federal CommunicaƟons Commission (NPA), all Tribal NaƟons and NHOs listed below must be afforded a reasonable opportunity to respond to this noƟficaƟon, consistent with the procedures set forth below, unless the proposed construcƟ on falls within an exclusion designated by the Tribal NaƟon or NHO. (NPA, SecƟon IV.F.4). The noƟficaƟon that you provided was forwarded to the following Tribal NaƟons and NHOs. A Tribal NaƟon or NHO may not respond unƟl a full Submission Packet is provided. If, upon receipt, the Tribal NaƟon or NHO does not respond within a reasonable Ɵme, you should make a reasonable effort at follow-up contact, unless the Tribal NaƟon or NHO has agreed to different procedures (NPA, SecƟon IV.F.5). In the event a Tribal NaƟon or NHO does not respond to a follow-up inquiry, or if a substanƟve or procedural disagreement arises between you and a Tribal NaƟon or NHO, you must seek guidance from the Commission (NPA, SecƟon IV.G). These procedures are further set forth in the FCC's Second Report and Order released on March 30, 2018 (FCC 18-30). 1. TCNS Rep Bryan Printup - Tuscarora NaƟon - 5226 Walmore Rd Via: Lewiston, NY - bprintup@heƞ.org - 716-264- 6011 (ext: 103) - electronic mail 2 If the applicant/tower builder receives no response from the Tuscarora NaƟon within 30 days aŌer noƟficaƟon through TCNS, the Tuscarora NaƟon has no interest in parƟcipaƟng in pre-construcƟon review for the proposed site. The Applicant/tower builder, however, must immediately noƟfy the Tuscarora NaƟon in the event archaeological properƟes or human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and applicable law. 2. THPO Noah C White III - Prairie Island Indian Community - 5636 Sturgeon Lake Road Welch, MN - celltower@piic.org - 651-385-4175 - electronic mail If the applicant/tower builder receives no response from the Prairie Island Indian Community within 30 days aŌer noƟficaƟon through TCNS, the Prairie Island Indian Community has no interest in parƟcipaƟng in pre-construcƟon review for the proposed site. The Applicant/tower builder, however, must immediately noƟfy the Prairie Island Indian Community in the event archaeological properƟes or human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and applicable law. 3. Gwen Terrapin - Cherokee NaƟon - (PO Box: 948) Tahlequah, OK - historicpreservaƟon@cherokee.org; gwen- terrapin@cherokee.org - 918-772-4165 - electronic mail Exclusions: Please email all review documents for FCC Form 620/621 (i.e. archeologist report, photos, SHPO response, etc.) to historicpreservaƟon@cherokee.org or gwen-terrapin@cherokee.org. You may also mail a cover leƩer and a CD or flash drive containing the review documents and FCC forms to: Cherokee NaƟon: AƩn: Gwen Terrapin, PO Box 948, Tahlequah, OK 74465. Should you have any quesƟons, please do not hesitate to email or call 918.772.4165. Wado, Cherokee NaƟon 4. Director Lora Nuckolls - Eastern Shawnee Tribe of Oklahoma - 70400 East HWY 60 WyandoƩe, OK - celltower@estoo.net - 918-238-5151 (ext: 1840) - regular mail Exclusions: Submit one printed color copy by US postal mail or other parcel carrier of all documentaƟon to: Eastern Shawnee Tribe AƩn: Cell Tower Program 70500 E. 128 Rd. WyandoƩe, OK 74370 Provide a 1-page cover leƩer with the following informaƟon: a. TCNS Number b. Company Name c. Project Name, City, County, State d. Project type 3 e. Project coordinates f. Contact informaƟon The Eastern Shawnee Procedures document is available and highly recommended for guidance; send an email to celltower@estoo.net requesƟng our most current copy. If the applicant/tower builder receives no response from the Eastern Shawnee Tribe of Oklahoma within 30 days aŌer noƟficaƟon through TCNS, the Eastern Shawnee Tribe of Oklahoma has no interest in parƟcipaƟng in pre- construcƟon review for the proposed site. The Applicant/tower builder, however, must immediately noƟfy the Eastern Shawnee Tribe of Oklahoma in the event archaeological properƟes or human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and applicable law. 5. Mekko Ryan Morrow - Thlopthlocco Tribal Town - P .O. Box 188 Okemah, OK - thpo@Ʃtown.org - 000-000-0000 - electronic mail Exclusions: Thlopthlocco Tribal Town requests that all iniƟal review materials required by applicable law be submiƩed by email directly to thpo@Ʃtown.org. In addiƟon, in the event archeological or cultural materials or human remains are discovered at any Ɵme during this undertaking, please noƟfy Thlopthlocco Tribal Town immediately. 6. THPO and ExecuƟve Director Dr. Wenonah G Haire DMD - Catawba Indian NaƟon - 1536 Tom Steven Road Catawba Cultural Center Rock Hill, SC - Wenonah.Haire@catawba.com; Caitlin.Rogers@catawba.com - 803-417-9057 - regular mail Exclusions: Please do not email documentaƟon; it will be deleted without being opened. Mail one printed color copy of all documentaƟon to address: Dr. Wenonah G. Haire Tribal Historic PreservaƟon Office 1536 Tom Steven Road Rock Hill, SC 29730 Please submit by US Postal mail or other parcel carrier complete informaƟon for all telecommunicaƟon projects: 1. Please provide 1 page cover leƩer with following informaƟon a. TCNS Number b. Company Name c. Project Name, City, County, State d. Project Type e. Project coordinates f. Contact informaƟon 2. We also request photographs of project area, previous land use history and copy of SHPO LeƩer. If yo u have any quesƟons about our process or Ɵmeline of project noƟficaƟons you can email Caitlin Rogers at Caitlinh@ccppcraŌs.com 4 The noƟficaƟon that you provided was also forwarded to the following SHPOs in the State in which you propose to construct and neighboring States. The informaƟon was provided to these SHPOs as a courtesy for their informaƟon and planning. You need make no effort at this Ɵme to follow up with any SHPO that does not respond to this noƟficaƟon. Prior to construcƟon, you must provide the SHPO of the State in which you propose to construct (or the Tribal Historic PreservaƟon Officer, if the project will be located on certain Tribal lands), with a Submission Packet pursuant to SecƟon VII.A of the NPA unless the project is excluded from SHPO review under SecƟon III D or E of the NPA. 7. Environmental Review Coordinator Renee GledhillEarley - NC State Historic PreservaƟon Office - 4617 Mail Service Center Raleigh, NC - renee.gledhill-earley@ncmail.net - 919-733-4763 - electronic mail 8. Deputy SHPO David Brook - Historic PreservaƟon Office - 4610 Mail Service Center Raleigh, NC - david.brook@ncmail.net - 919-807-7283 - electronic mail 9. Project Review Coordinator John Sylvest - Department of Archives and History - 8301 Parklane Road Columbia, SC - jsylvest@scdah.sc.gov - 803-896-6129 - electronic mail TCNS automaƟcally forwards all noƟficaƟons to all Tribal NaƟons and SHPOs that have an expressed interest in the geographic area of a proposal. However, if a proposal for PTC wayside poles falls within a designated exclusion, you need not expect any response and need not pursue any addiƟonal process with that Tribal NaƟon or SHPO. In addiƟon, a parƟcular Tribal NaƟon or SHPO may also set forth policies or procedures within its details box that exclude from review certain faciliƟes (for example, a statement that it does not review collocaƟons with no ground disturbance; or that indicates that no response within 30 days indicates no interest in parƟcipaƟng in pre-construcƟon review). Please be advised that the FCC cannot guarantee that the contact(s) listed above have opened and reviewed an electronic or regular mail noƟficaƟon. If you learn that any of the above contact informaƟon is no longer valid, please contact the FCC by emailing tcnshelp@fcc.gov. The following informaƟon relaƟng to the proposed tower was forwarded to the person(s) listed above: NoƟficaƟon Received: 09/16/2025 NoƟficaƟon ID: 301523 Excluded from SHPO Review: No Tower Owner Individual or EnƟty Name: Harmoni Towers, LLC Consultant Name: Michael Romanoski Street Address: 1515 Des Peres Rd. Ste 200 Suite 200 City: St. Louis State: MISSOURI Zip Code: 63131 Phone: 314-997-6111 5 Email: tribal@trileaf.com Structure Type: LTOWER - Laƫce Tower LaƟtude: 34 deg 4 min 2.6 sec N Longitude: 80 deg 30 min 34.8 sec W LocaƟon DescripƟon: Camden Highway City: Rembert State: SOUTH CAROLINA County: SUMTER Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. Ground ElevaƟon: 73.7 meters Support Structure: 85.0 meters above ground level Overall Structure: 86.3 meters above ground level Overall Height AMSL: 160.0 meters above mean sea level If you have any quesƟons or comments regarding this noƟce, please contact the FCC using the electronic Help Request form located on the FCC's website at: hƩps://urldefense.proofpoint.com/v2/url?u=hƩps-3A__www.fcc.gov_wireless_available-2Dsupport- 2Dservices&d=DwIFaQ&c=euGZstcaTDllvimEN8b7jXrwqOf- v5A_CdpgnVfiiMM&r=tVy9dfE6fJUkHc15_Itk39MNoGtgWe1vmeedh3_FbFk&m=xuiZwBxPrrSZc80Qlv-s_t4MZ3- 4W43LAQuZILpwSmamvP77ioLuOxWQSxov-Grt&s=7pP426Lnov_hso07F0PYDL9dZUmZSUhpCoajHchF3q4&e= You may also call the FCC Support Center at (877) 480-3201 (TTY 717-338-2824). Hours are from 8:00 a.m. to 6:00 p.m. Eastern Time, Monday through Friday (except Federal holidays). To provide quality service and ensure security, all telephone calls are recorded. Thank you, Federal CommunicaƟons Commission ---------- This email has been scanned for spam and viruses by Proofpoint EssenƟals. Visit the following link to report this email as spam: hƩps://us1.proofpointessenƟals.com/app/report_spam.php?mod_id=11&mod_opƟon=logitem&report=1&type=easysp am&k=k1&payload=53616c7465645f5f7c8c95c304975a1603a9de986fdea90adf0ĩcd871dad7a98ec00c339035a5c34f7a 76df77222347df7c3465237ab8fc46265ce14133d361f6cce50718162a0ea8c679559ccbc6ddf26aa1ed0f691d0e004979ce4 2de0733c4257e4c4cf71474817c8e1f4a74eddd5f580a008ac18bddd5d39f3afc95777642632cd41a6f10039b6f4b5b7aa31 62e312a8e8b3c100c584719b434eced4789 December 2, 2025 Catawba Indian Nation Dr. Wenonah G. Haire 1536 Tom Steven Road Tribal Historic Preservation Office Rock Hill, SC 29730 RE: Harmoni Towers LLC Trileaf Project # 772867 / SC0009812 / Borden Camden Highway, Rembert, Sumter County, SC 29128 Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W TCNS # 301523 Dear Dr. Haire: This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of completing a NEPA Review at the above referenced property. Our investigation includes determining if the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian Religious Site. Trileaf has learned your tribe has an interest in property located within this County. Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The form 620/621 submission packet is attached for your review. Please let us know if you have any objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard. Sincerely, Michael Romanoski Tribal Consultation Manager 1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com December 30, 2025 Attention: Michael Romanoski Trileaf 1515 Des Peres Road, Suite 200 Saint Louis, Missouri 63131 Re. THPO # TCNS # Project Description 2026-160-24 301523 Camden Highway, Rembert, Sumter Co., SC Dear Mr. Romanoski, The Catawba have no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas. However, the Catawba are to be notified if Native American artifacts and / or human remains are located during the ground disturbance phase of this project. If you have questions, please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail Caitlin.Rogers@catawba.com. Sincerely, Wenonah G. Haire Tribal Historic Preservation Officer Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road Rock Hill, South Carolina 29730 Office 803-328-2427 December 2, 2025 Cherokee Nation Ms. Gwen Terrapin P.O. Box 948 Tahlequah, OK 74465 RE: Harmoni Towers LLC Trileaf Project # 772867 / SC0009812 / Borden Camden Highway, Rembert, Sumter County, SC 29128 Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W TCNS # 301523 Dear Ms. Terrapin: This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of completing a NEPA Review at the above referenced property. Our investigation includes determining if the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian Religious Site. Trileaf has learned your tribe has an interest in property located within this County. Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The form 620/621 submission packet is attached for your review. Please let us know if you have any objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard. Sincerely, Michael Romanoski Tribal Consultation Manager 1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com 1 From: towernotifyinfo@fcc.gov Sent: Thursday, January 8, 2026 12:22 PM To: Tribal Cc: tcns.fccarchive@fcc.gov; historicpreservation@cherokee.org; gwen-terrapin@cherokee.org Subject: Reply to Proposed Tower Structure (Notification ID: 301523) - Email ID #9410656 Categories: CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you  recognize the sender and know the content is safe.  Dear Michael Romanoski,  Thank you for using the Federal Communications Commission's (FCC) Tower Construction Notification System (TCNS).   The purpose of this email is to inform you that an authorized user of the TCNS has replied to a proposed tower  construction notification that you had submitted through the TCNS.  The following message has been sent to you from Gwen Terrapin of the Cherokee Nation in reference to Notification ID  #301523:  The Cherokee Nation (Nation) is in receipt of your correspondence for tower project, TCNS No. 301523 located in  Sumter County, SC and appreciates the opportunity to provide comments upon this project.  The National Historic Preservation Act (NHPA, 54 U.S.C. § 300101 et seq), and its implementing regulations (36 CFR part  800), provide that undertakings subject to the Section 106 review process are referred to in 54 U.S.C. § 306108, which  clarifies that historic properties may have religious and cultural significance to Indian tribes.  The Nation maintains proprietary databases and records of cultural, pre‐contact, and post‐contact archeological  resources in this area. Upon completion of our Section 106 review the Nation’s Historic Preservation Office researched  and cross‐referenced the project’s legal description against our information and found instances where this project  intersects or adjoins such resources.  However, the Nation does not object to the project proceeding as long as the  following mitigative procedures are followed:  • The Nation requests that Trileaf re‐contact this Office if there are any amendments or edits to this project; and • The Nation requests that Trileaf contact this Office if there are any pre‐contact or post‐contact artifacts located throughout the course of this project. Examples of pre‐contact artifacts may include but are not limited to arrowheads, stone‐ground tools, mortars, pestles, pottery shards, or fire pits. Post‐contact artifacts may include but are not limited to cellars, cabins, or ceramic vessels. If the above procedures are observed, the Nation does not object to this project proceeding.  Additionally, due to the historic presence of our people in the project area, inadvertent discoveries of human remains  and related NAGPRA items may occur, even in areas of existing or prior development.  Should this occur, we request all  2 work cease and Cherokee Nation be notified immediately at (918) 931‐7161.  In such discovery, other appropriate  agencies will need to be contacted immediately as well.    Should you have any further questions, please do not hesitate to call.    Wado,  Cherokee Nation        For your convenience, the information you submitted for this notification is deta iled below.          Notification Received: 09/16/2025    Notification ID: 301523    Tower Owner Individual or Entity Name: Harmoni Towers, LLC    Consultant Name: Michael Romanoski    Street Address: 1515 Des Peres Rd. Ste 200                    Suite 200    City: St. Louis    State: MISSOURI    Zip Code: 63131    Phone: 314‐997‐6111    Email: tribal@trileaf.com       Structure Type: LTOWER ‐ Lattice Tower    Latitude: 34 deg 4 min 2.6 sec N    Longitude: 80 deg 30 min 34.8 sec W    Location Description: Camden Highway    City: Rembert    State: SOUTH CAROLINA    County: SUMTER      Detailed Description of Project: Harmoni Towers LLC proposes to construct a 279‐ foot Self‐Support Communications  Tower, with an overall height of 283 feet and associated equipment within a 75‐foot by 75‐foot (5,625‐square‐foot)  lease area.    Ground Elevation: 73.7 meters    Support Structure: 85.0 meters above ground level    Overall Structure: 86.3 meters above ground level    Overall Height AMSL: 160.0 me ters above mean sea level    ‐‐‐‐‐‐‐‐‐‐    This email has been scanned for spam and viruses by Proofpoint Essentials. Visit the following link to report this email as  spam:  https://us1.proofpointessentials.com/app/report_spam.php?mod_id=11&mod_option=logitem&report=1&type=easysp am&k=k1&payload=53616c7465645f5f8e5de8511ef4e97fec5f597c5e1088806b981ef19935cfb53b70fd7864f3e582bf090 096c1fdd034d1a420e22460321b98df4a03d62fd4d59bcad9f7a700d95be9f40814ae4ec427f922d486a7ad306bc2b8b06e 603f9fcde132b06712a1b6cc8842fcece960ad23880120f4354b6f5236e6308dbe3e22de00c7b726e4f8249b9fdca32f791f9 1ce38019715d2f0d7812b466537f334b857    December 2, 2025 Trileaf Attn: Michael Romanoski VIA: Email: tribal@trileaf.com Re: TCNS 301523 The Cherokee Nation (Nation) is in receipt of your correspondence about TCNS 301523 and appreciates the opportunity to provide comment upon this proposed facility deployment. The Nation possesses, maintains, and updates databases and records of cultural, pre-contact, and post-contact historic and archeological resources in this area that are unique to the Nation and the removed Cherokees. In order to ensure that your project review is accurate and complete, the Nation can cross -reference your project and its associated activities against these databases and records. The Nation can provide this review and submit the documentation necessary for your project to move forward without delay. Please contact the Nation directly at the information provided below this letter to discuss this compensable service. If you require additional information or have any questions, please contact me at your convenience. Thank you for your time and attention to this matter. Wado, Elizabeth Toombs, Tribal Historic Preservation Officer Cherokee Nation Tribal Historic Preservation Office elizabeth-toombs@cherokee.org 918.453.5389 1 Michael Romanoski From: towernotifyinfo@fcc.gov Sent: Thursday, September 18, 2025 8:39 AM To: Tribal Cc: tcns.fccarchive@fcc.gov; celltower@estoo.net Subject: Reply to Proposed Tower Structure (Notification ID: 301523) - Email ID #9329251 Categories: Mike, Responses to File CAUTION: This email originated from outside of the organizaƟon. Do not click links or open aƩachments unless you recognize the sender and know the content is safe. Dear Michael Romanoski, Thank you for using the Federal CommunicaƟons Commission's (FCC) Tower ConstrucƟon NoƟficaı on System (TCNS). The purpose of this email is to inform you that an authorized user of the TCNS has replied to a proposed tower construcı on noƟficaı on that you had submiı ed through the TCNS. The following message has been sent to you from Director Lora Nuckolls of the Eastern Shawnee Tribe of Oklahoma in reference to Noı ficaı on ID #301523: We have no interest in this site. However, if the Applicant discovers archaeological remains or resources during construcı on, the Applicant should immediately stop construcı on and noı fy the appropriate Federal Agency and the Tribe. For your convenience, the informaı on you submiı ed for this noı ficaı on is detailed below. NoƟficaı on Received: 09/16/2025 Noı ficaı on ID: 301523 Tower Owner Individual or Enı ty Name: Harmoni Towers, LLC Consultant Name: Michael Romanoski Street Address: 1515 Des Peres Rd. Ste 200 Suite 200 City: St. Louis State: MISSOURI Zip Code: 63131 Phone: 314-997-6111 Email: tribal@trileaf.com Structure Type: LTOWER - Laı ce Tower Laı tude: 34 deg 4 min 2.6 sec N Longitude: 80 deg 30 min 34.8 sec W 2 LocaƟon DescripƟon: Camden Highway City: Rembert State: SOUTH CAROLINA County: SUMTER Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. Ground ElevaƟon: 73.7 meters Support Structure: 85.0 meters above ground level Overall Structure: 86.3 meters above ground level Overall Height AMSL: 160.0 meters above mean sea level ---------- This email has been scanned for spam and viruses by Proofpoint EssenƟals. Visit the following link to report this email as spam: hƩps://us1.proofpointessenƟals.com/app/report_spam.php?mod_id=11&mod_opƟon=logitem&report=1&type=easysp am&k=k1&payload=53616c7465645f5f450c6c336ecd4ae4c992e119abdf603b8bc39f1d8888a535d42da883e6995b10586 fa9b421a56c4f6e89f08982439d6888e63fd0559f9a4cebf9543d98aa6edd6ad446ccc728a5c3dac4dc755c6180cb470e96f0 e48a5bce67ae1413139023f0b7973cfdb76a8f5be0b53b210856adbcĩd0d9df5f3a12e2a2950a0d84056b67f486438d47d4 bcb6cad58a23aaf0cc40c8e0db3d81516944 December 2, 2025 Prairie Island Indian Community Mr. Noah White III 5636 Sturgeon Lake Road Welch, MN 55089 RE: Harmoni Towers LLC Trileaf Project # 772867 / SC0009812 / Borden Camden Highway, Rembert, Sumter County, SC 29128 Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W TCNS # 301523 Dear Mr. White III: This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of completing a NEPA Review at the above referenced property. Our investigation includes determining if the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian Religious Site. Trileaf has learned your tribe has an interest in property located within this County. Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The form 620/621 submission packet is attached for your review. Please let us know if you have any objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard. Sincerely, Michael Romanoski Tribal Consultation Manager 1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com December 2, 2025 Thlopthlocco Tribal Town Mekko Ryan Morrow P.O. Box 188 Okemah, OK 74859 RE: Harmoni Towers LLC Trileaf Project # 772867 / SC0009812 / Borden Camden Highway, Rembert, Sumter County, SC 29128 Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W TCNS # 301523 Dear Mekko Morrow: This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of completing a NEPA Review at the above referenced property. Our investigation includes determining if the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian Religious Site. Trileaf has learned your tribe has an interest in property located within this County. Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The form 620/621 submission packet is attached for your review. Please let us know if you have any objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard. Sincerely, Michael Romanoski Tribal Consultation Manager 1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com 1 Lee Castile From: towernotifyinfo@fcc.gov Sent: Thursday, January 8, 2026 8:03 AM To: Tribal Cc: tcnsweekly@fcc.gov Subject: Proposed Construction of Communications Facilities Notification of Final Contacts - Email ID #39087 CAUTION: This email originated from outside of the organiza. on. Do not click links or open aƩachments unless you recognize the sender and know the content is safe. Michael Romanoski 1515 Des Peres Rd. Ste 200 Suite 200 St. Louis, MO 63131 Dear Applicant: This leƩer addresses the proposed communicaƟons faciliƟes listed below that you have referred to the Federal CommunicaƟons Commission (Commission) for purposes of contacƟng federally recognized Indian Tribes, including Alaska NaƟve Villages (collecƟvely Indian Tribes), and NaƟve Hawaiian OrganizaƟons (NHOs), as specified by SecƟon IV.G of the NaƟonwide ProgrammaƟc Agreement (NPA). Consistent with the procedures outlined in the Commission's Wireless Infrastructure Second Report and Order (1), we have contacted the Indian Tribes or NHOs idenƟfied in the aƩached Table for the projects listed in the aƩached Table. You referred these projects to us between 01/01/2026 and 01/08/2026. Our contact with these Tribal NaƟons or NHOs was sent on 01/08/2026. Thus, as described in the Wireless Infrastructure Second Report and Order (2), if you or Commission staff do not receive a statement of interest regarding a parƟcular project from any Tribe or NHO within 15 calendar days of 01/08/2026, your obligaƟons under SecƟon IV of the NPA with respect to these Tribal NaƟons or NHOs are complete. If a Tribal NaƟon or NHO responds that it has concerns about a historic property of tradiƟonal religious and cultural significance that may be affected by the proposed construcƟon within the 15 calendar day period, the Applicant must involve it in the review as set forth in the NPA, and may not begin construcƟon unƟl the process set forth in the NPA is completed. You are reminded that SecƟon IX of the NPA imposes independent obligaƟons on an Applicant when a previously unidenƟfied site that may be a historic pr opert y, including an archeological property, is discovered during construcƟon or aŌer the compleƟon of review. In such instances, the Applicant must cease construcƟon and promptly noƟfy, among others, any potenƟally affected Tribal NaƟon or NHO. A Tribal NaƟon's or NHO's failure to express interest in parƟcipaƟng in pre-construcƟon review of an undertaking does not necessarily mean it is not interested in archeological properƟes or human remains that may inadvertently be discovered during construcƟon. Hence, an Applicant is sƟll required to noƟfy any potenƟally affected Tribal NaƟon or NHO of any such finds pursuant to SecƟon IX or other applicable law. Sincerely, Ellen Saint Onge Federal PreservaƟon Officer Federal CommunicaƟons Commission ellen.saintonge@fcc.gov _______________________________________ 36 Tribe Name: Muscogee (Creek) NaƟon TCNS# 301523 Referred Date: 01/07/2026 LocaƟon: Camden Highway, Rembert, SC Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area. Tribe Name: Thlopthlocco Tribal Town TCNS# 301460 Referred Date: 01/07/2026 LocaƟon: W2655 US Highway 10, Granton, WI Detailed DescripƟon of Project: New wireless communicaƟons antennas at centerline height of 165Ō on a 180Ō-tall self- support laƫce communicaƟons tower with overall height of 189.3Ō. Equipment will be installed in a 10Ōx15Ō lease area within the exisƟng fenced compound. Tribe Name: Chippewa Cree Tribe of the Rocky Boy's ReservaƟon Tribe Name: Ho-Chunk NaƟon Tribe Name: Iowa Tribe of Oklahoma Tribe Name: Keweenaw Bay Indian Community Tribe Name: Kickapoo Tribe of Oklahoma Tribe Name: Lac Courte Oreilles Band of Lake Superior Chippewa Indians of Wisconsin Tribe Name: Lac Vieux Desert Band of Lake Superior Chippewa Indians Tribe Name: Lower Brule Sioux Tribe Tribe Name: Menominee Indian Tribe of Wisconsin Tribe Name: Mille Lacs Band of Ojibwe Indians Tribe Name: Omaha Tribe of Nebraska Tribe Name: Otoe-Missouria Tribe of Indians Tribe Name: OƩawa Tribe of Oklahoma Tribe Name: Ponca Tribe of Indians of Oklahoma Tribe Name: Red Cliff Band of Lake Superior Chippewa Indians of Wisconsin Tribe Name: Rosebud Sioux Tribe Tribe Name: Santee Sioux NaƟon of Nebraska Tribe Name: Sisseton-Wahpeton Oyate of the Lake Traverse ReservaƟon Tribe Name: WyandoƩe NaƟon TCNS# 301437 Referred Date: 01/07/2026 LocaƟon: Highway 89, Glen Canyon Rec Area, Greenehaven, AZ Detailed DescripƟon of Project: Our client proposes to build a 99-Ō. monopole in a 50-Ō.x50-Ō. lease area (LA). A 12-Ō.- wide easement will run approx. 490 Ō. E from the LA, then the fiber conduit will conƟnue approx. 450 Ō. NE. An exisƟng 1,580-Ō. power route will be used. Tribe Name: Apache Tribe of Oklahoma Tribe Name: Eastern Shoshone Tribe Tribe Name: Havasupai Tribe Tribe Name: Hualapai Tribe Tribe Name: Mescalero Apache Tribe Tribe Name: Navajo NaƟon Tribe Name: Pueblo of Zuni Tribe Name: San Carlos Apache Tribe TCNS# 301235 Referred Date: 01/07/2026 LocaƟon: 4698A Costa Bravo Drive, Orlando, FL Detailed DescripƟon of Project: Our client proposes to construct a 29Ō pole and associated wireless communicaƟons antennas with an overall height of 35Ō. Power/uƟliƟes will be routed approx. 138Ō southwest to a new Duke pole mounted transformer. Tribe Name: CoushaƩa Indian Tribe Tribe Name: Seminole Tribe of Florida Tribe Name: Thlopthlocco Tribal Town December 2, 2025 Tuscarora Nation Mr. Bryan Printup 5226 Walmore Rd Lewiston, NY 14092 RE: Harmoni Towers LLC Trileaf Project # 772867 / SC0009812 / Borden Camden Highway, Rembert, Sumter County, SC 29128 Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W TCNS # 301523 Dear Mr. Printup: This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of completing a NEPA Review at the above referenced property. Our investigation includes determining if the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian Religious Site. Trileaf has learned your tribe has an interest in property located within this County. Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed access/utility easement and tower compound lease area are located with an agricultural field. The form 620/621 submission packet is attached for your review. Please let us know if you have any objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard. Sincerely, Michael Romanoski Tribal Consultation Manager 1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com Appendix G Resumes HANNAH DELL ASSISTANT PROJECT MANAGER Education Biology, B. S. University of North Georgia / Gainesville, GA Areas of Expertise Ms. Dell has experience performing site inspections and conducting environmental due diligence pursuant to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for commercial real estate and lending projects. Additionally, Ms. Dell has experience performing National Environmental Policy Act (NEPA) reviews for wireless telecommunications projects. Environmental service expertise includes: Phase I Environmental Site Assessments Historical City Directories Information Section 7 Consultation National Wetland Inventory Maps Flood Insurance Rate Maps Critical Habitat Maps Environmental Evaluation Summaries Archaeological and Architectural Impacts Soil Characterization Field Reconnaissance Section 106 Compliance NEPA Environmental Assessments Migratory Bird Evaluations Form 620/621 Submittals Historical Topographic Maps and Aerial Imagery Local Government Consultation Native American Consultation Land Use History Certifications/Affiliations ANSI/FCC RF Radiation Safety Competent Person Basic Wetland Delineation (2023) Professional Resume LAURA ELSTON ASSISTANT PROJECT MANAGER II Education B.S. Marine Science Jacksonville University / Jacksonville, FL Areas of Expertise Ms. Laura Elston has experience performing site inspections and conducting environmental due diligence pursuant to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for commercial real estate and lending projects. Ms. Elston has experience performing National Environmental Policy Act (NEPA) reviews for wireless telecommunications projects. Environmental service expertise includes: Phase I Environmental Site Assessments Phase II Environmental Site Assessments Historical City Directories Indoor Air Quality Assessments Information Section 7 Consultation National Wetland Inventory Maps Flood Insurance Rate Maps Critical Habitat Maps Soil Characterization Field Reconnaissance Section 106 Compliance NEPA Environmental Assessments Migratory Bird Evaluations Form 620/621 Submittals Historical Topographic Maps and Aerial Imagery Local Government Consultation Native American Consultation Land Use History Certifications/Affiliations OSHA 40-Hour HAZWOPER ANSI/FCC RF Radiation Safety Competent Person Basic Wetland Delineation (2014) and Refresher Course (2019) Member – The Wildlife Society Professional Resume MORGAN RASMUSSEN SENIOR PROJECT MANAGER Education Environmental Science, B. S. Georgia College & State University / Milledgeville, GA Areas of Expertise Ms. Rasmussen has experience performing site inspections and conducting due diligence pursuant to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for commercial real estate and lending projects. Additionally, Ms. Rasmussen has experience performing National Environmental Policy Act (NEPA) reviews for wireless telecommunications projects. Environmental service expertise includes: Phase I Environmental Site Assessments Historical City Directories Information Section 7 Consultation National Wetland Inventory Maps Flood Insurance Rate Maps Critical Habitat Maps Environmental Evaluation Summaries Archaeological and Architectural Impacts Soil Characterization Field Reconnaissance Section 106 Compliance NEPA Environmental Assessments Migratory Bird Evaluations Form 620/621 Submittals Historical Topographic Maps and Aerial Imagery Local Government Consultation Native American Consultation Land Use History Certifications/Affiliations ANSI/FCC RF Radiation Safety Competent Person Professional Resume Exhibit 4 Exhibit 5 ASR Registration Search Registration 1332844 Map Registration Registration Detail Reg Number 1332844 Status Granted File Number A1352612 Constructed EMI No Dismantled NEPA Antenna Structure Structure Type LTOWER - Lattice Tower Location (in NAD83 Coordinates) Lat/Long 34-04-02.6 N 080-30-34.9 W Address Camden Highway City, State Sumter , SC Zip 29128 County SUMTER Center of AM Array Position of Tower in Array Heights (meters) Elevation of Site Above Mean Sea Level Overall Height Above Ground (AGL) 73.8 86.3 Overall Height Above Mean Sea Level Overall Height Above Ground w/o Appurtenances 160.1 85.0 Painting and Lighting Specifications FAA Chapters 4, 8, 15 Paint and Light in Accordance with FAA Circular Number 70/7460-1M FAA Notification FAA Study 2025-ASO-18996-OE FAA Issue Date 12/29/2025 Owner & Contact Information FRN 0025999053 Owner Entity Type Limited Liability Company Owner Harmoni Towers, LLC Attention To: SC0009812 6210 Ardrey Kell Road Suite 450 Charlotte , NC 28277 P: (800)821-5825 F: (501)537-0769 E: regulatory@harmonitowers.com Contact Harmoni Towers, LLC Charlotte , NC 28277 P: (800)821-5825 F: (501)537-0769 E: regulatory@harmonitowers.com Last Action Status Status Granted Received 03/09/2026 Purpose Amendment Entered 03/09/2026 Mode Interactive Related Applications 9/3/26, 12:11 PM ASR Registration 1332844 https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2733355&printable 1/2 03/09/2026 A1352612 - Amendment (AM) Comments Comments None History Date Event None Pleadings Pleading Type Filer Name Description Date Entered None Automated Letters None 9/3/26, 12:11 PM ASR Registration 1332844 https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2733355&printable 2/2 Exhibit 6 ULS License PCS Broadband License - KNLH718 - Cellco Partnership Call Sign KNLH718 Radio Service CW - PCS Broadband Status Active Auth Type Regular Rural Service Provider Bidding Credit Is the Applicant seeking a Rural Service Provider (RSP) bidding credit? Reserved Spectrum Reserved Spectrum Market Market BTA436 - Sumter, SC Channel Block F Submarket 0 Associated Frequencies (MHz) 001890.00000000- 001895.00000000 001970.00000000- 001975.00000000 3.7 GHz License Type 3.7 GHz Linked License Dates Grant 04/04/2017 Expiration 04/28/2027 Effective 04/04/2017 Cancellation Buildout Deadlines 1st 04/28/2002 2nd Discontinuance Dates 1st 2nd Notification Dates 1st 11/16/2004 2nd ECIP Information ECIP Flag Small Carrier or Tribal Nation Transaction Rural-Focused Transaction ECIP Dates 5-Year Holding Period Begins 5-Year Holding Period Ends Required Operational Filing Dates IORN Operation Begin Date FORN Deadline Date FORN Filed Date Licensee FRN 0003290673 Type General Partnership 6/11/26, 9:34 AM ULS License - PCS Broadband License - KNLH718 - Cellco Partnership https://wireless2.fcc.gov/UlsApp/UlsSearch/license.jsp?licKey=10887&printable 1/2 Licensee Cellco Partnership 5055 North Point Pkwy, NP2NE Network Engineering Alpharetta, GA 30022 ATTN Regulatory P:(770)797-1070 F:(770)797-1036 E:LicensingCompliance@VerizonWireless.com Contact Cellco Partnership Licensing Manager 5055 North Point Pkwy, NP2NE Network Engineering Alpharetta, GA 30022 ATTN Regulatory P:(770)797-1070 F:(770)797-1036 E:LicensingCompliance@VerizonWireless.com Ownership and Qualifications Radio Service Type Mobile Regulatory Status Common Carrier Interconnected Yes Alien Ownership Is the applicant a foreign government or the representative of any foreign government? No Is the applicant an alien or the representative of an alien? No Is the applicant a corporation organized under the laws of any foreign government? No Is the applicant a corporation of which more than one-fifth of the capital stock is owned of record or voted by aliens or their representatives or by a foreign government or representative thereof or by any corporation organized under the laws of a foreign country? No Is the applicant directly or indirectly controlled by any other corporation of which more than one-fourth of the capital stock is owned of record or voted by aliens, their representatives, or by a foreign government or representative thereof, or by any corporation organized under the laws of a foreign country? Yes If the answer to the above question is 'Yes', has the applicant received a ruling(s) under Section 310(b)(4) of the Communications Act with respect to the same radio service involved in this application? Yes Basic Qualifications The Applicant answered "No" to each of the Basic Qualification questions. Tribal Land Bidding Credits This license did not have tribal land bidding credits. Demographics Race Ethnicity Sex 6/11/26, 9:34 AM ULS License - PCS Broadband License - KNLH718 - Cellco Partnership https://wireless2.fcc.gov/UlsApp/UlsSearch/license.jsp?licKey=10887&printable 2/2 Exhibit 7 Connecting America Harmoni Towers Gateway LLC 6210 Ardrey Kell Rd. Suite 375 Charlotte, NC 28277 501.621.0521 | harmonitowers.com June 8, 2026 Sumter City-County Planning PO Box 1449 Sumter, SC 29151 RE: Harmoni Towers Gateway LLC (CELL TOWER) located at 7056 Camden Highway, REMBERT, SC 29128 Dear Planning Dept. Harmoni Towers Gateway LLC, as the owner of the proposed communications tower to be located at the above referenced property, hereby affirms that if the tower is no longer being used it will be removed within 180 days of the cessation of operation. Regards, Evelyn Radowicz Evelyn Radowicz, Director, Project Management 413-658-4815 Evelyn.radowicz@harmonitowers.com Exhibit 8 April 1, 2026 Sumter County 13 East Canal Street Sumter, S.C. 29150 To Whom it May Concern: Harmoni Towers Gateway LLC, as applicant, and to the extent permitted by the law, shall at all times defend, indemnify, protect, save, hold harmless, and exempt Sumter County, and its officers, boards, employees, committee members, attorneys, agents, and consultants from any and all damages, costs, or charges arising out of any and all third party claims, suits, demands, causes of action or expenses arising there from, either at law or in equity, which might arise out of, or are caused by, the construction, use, operation, maintenance, replacement, removal, or restoration of the proposed telecommunications facility, excepting, however, any portion of such claims, suits, demands, causes of action or award of damages as may be attributable to the gross negligent or intentional acts or omissions of Sumter County, or its servants or agents. Additionally, Harmoni Towers Gateway LLC warrants that the proposed telecommunications facility shall, at all times, comply with all applicable, local, state and governmental rules and regulations including all FCC rules and regulations. Moreover, Harmoni Towers Gateway LLC shall at all times maintain commercial general liability insurance with limits of not less than $1,000,000 aggregate for the duration of the proposed telecommunications facility. Harmoni Towers Gateway LLC By: Riken Patel Its: Assistant General Counsel Dated: April 1, 2026 Page 1 of 1 Building and Operating Mission Critical Telecom Infrastructure Harmoni Towers LLC 6210 Adrey Kell Drive, Suite 375 Charlotte, NC 28277 harmonitowers.com Exhibit 9 INSR ADDL SUBR LTR INSR WVD DATE (MM/DD/YYYY) PRODUCER CONTACT NAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? EACH OCCURRENCE $ DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ PRO- OTHER: LOCJECT COMBINED SINGLE LIMIT $(Ea accident) BODILY INJURY (Per person) $ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS AUTOS ONLY HIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ PER OTH- STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below POLICY NON-OWNED SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03) ACORDTM CERTIFICATE OF LIABILITY INSURANCE Hanover Insurance Company The Continental Insurance Company Allmerica Financial Benefits 3/20/2026 McGriff, a MMA LLC Company 5850 Waterloo Road, Suite 240 Columbia, MD 21045 410 480-4400 mcg.coi@marshmma.com Harmoni Towers LLC 6210 Ardrey Kell Road Suite 375 Charlotte, NC 28277 22292 35289 41840 A X X X X ZHQH39487607 12/02/2025 12/02/2026 1,000,000 1,000,000 10,000 1,000,000 2,000,000 2,000,000 C X X X AWQJ29289103 12/02/2025 12/02/2026 1,000,000 A B X X X X 0 X X UHQH39506406 7036404314 12/02/2025 12/02/2025 12/02/2026 12/02/2026 10,000,000 10,000,000 Ea Occ/Agg 16,000,000 Evidence of Coverage * *ADDITIONAL NAMED INSUREDS** Alpha Towers HoldCo III LLC Alpha Towers PropCo III LLC Harmoni Completed Towers, LLC Harmoni Network Services, LLC Harmoni Towers Gateway LLC 11101 Anderson Dr, Ste 200 Little Rock, AR 72212 1 of 2 #S39403031/M38982164 140PALISCOMClient#: 2209128 JMBU 1 of 2 #S39403031/M38982164 SAGITTA 25.3 (2016/03) DESCRIPTIONS (Continued from Page 1) Harmoni Towers Assetco II, LLC Har moni Towers Assetco, LLC Harmoni Towers Development Company Holdings I, LLC Harmoni Towers Development Company Holdings II, LLC Harmoni Towers Development Company, LLC Harmoni Towers Gateway LLC Harmoni Towers Holdings, LLC Harmoni Towers Infrastructure, LLC Harmoni Towers Management, LLC Harmoni Towers, L.P. 2 of 2 #S39403031/M38982164 Exhibit 10 Exhibit 11 1201 S Sheridan St South Bend, IN 46619 Phone: 574-288-3632 Fax: 574-288-5860 www.nelloinc.com June 5, 2026 Harmoni Towers, LLC 11101 Anderson Dr. Suite 200 Little Rock, AR 72212 Re: Nello Tower Fall Radius – Nello 280’ NSX Lattice Self-Sup port Tower Project Name: Borden Nello Job #: SO35537 Tower Drawing #: 857811 To Whom It May Concern: This letter is regarding your inquiry about the expected performance of your proposed tower designed by Nello based on site-specific criteria. Our towers are designed to meet or exceed industry standards defined by TIA-222-H, “Structural Standards for Antenna Supporting Structures and Antennas” (TIA Standard). It is our opinion that the possibility of a tower collapse is very unlikely. The tower is designed using extreme wind and ice conditions. In fact, wind speeds specified by the TIA Standard are 50-year wind speeds. That is, they have only a 2% statistical chance of occurring in any given year. This tower has been designed using the following wind conditions as a minimum: a 119 mph 3-second gust wind speed with no ice and a 30 mph 3-second gust wind with 1” ice. The TIA Standard specifies 119 mph as the wind speed required for this site in Sumter County, South Carolina. The “3-second gust wind speed” refers to a wind measured at 33 feet above the ground. Equations in the TIA Standard take into account that wind speed escalates with increasing height of the tower. Although we cannot guarantee exactly how a tower would fall if it were to fail, the most likely mode of failure would be a buckling failure of one of the tower sections due to excessive wind loading. The tower leg with the highest stress ratio is located at the 220’ – 240’ level. The stress ratio in that leg is calculated to be 91% of the code- permitted design loading. Given that the tower section with the highest stress ratio will most likely fail first, the proposed tower would fail at the 220’ level with the top 60’ of the tower collapsing. Depending on the conditions at the time of failure and the stress levels in structural material below, the top 60’ of the tower would likely fall within a 60’ fall radius. The fall radius statement above assumes proper foundation construction and tower installation. The foundation design should be reviewed to ensure that no foundation limit state governs the entire structural system and negates the fall radius design. The fall radius expectancy requires that the foundation be designed with a capacity greater than that of the tower capacity. If the foundation design used in association with this tower is performed by a third party, Nello must be provided the opportunity to review the design in order to confirm that the fall radius remains satisfactory. If for some reason Nello does not provide the tower design, or is not given the opportunity to design or review the foundation for this specific project, the content of this letter becomes void. If you have any other questions or concerns regarding the design of your site-specific tower, please contact our engineering or sales department. Sincerely, 06/09/2026 Exhibit 12 Exhibit 13 Norton Rose Fulbright US LLP is a limited liability partnership registered under the laws of Texas. Norton Rose Fulbright LLP, Norton Rose Fulbright Canada LLP, and Norton Rose Fulbright US LLP are separate legal entities and all of them are members of Norton Rose Fulbright Verein, a Swiss verein. Norton Rose Fulbright Verein helps coordinate the activities of the members but does not itself provide legal services to clients. Details of each entity, with certain regulatory information, are available at nortonrosefulbright.com/le gal-notices. Norton Rose Fulbright US LLP 8001 Forsyth Boulevard, Suite 800 St. Louis, Missouri 63105 Direct line +1 314 505 8871 sasha.riedisser@nortonrosefulbright.com Tel +1 314 505 8800 Fax +1 314 505 8899 nortonrosefulbright.com October 5, 2026 Re: BZA Case No. BOA-26-29 Dear Mr. Bryan: Thank you very much for taking the time to speak with me on Friday. I appreciated your willingness to talk through the issues in advance of the next hearing. As we discussed, I am writing to set out our position regarding approval of Harmoni Gateway Towers , LLC ’s (“Harmoni”) application for a communications facility at 7056 Camden Highway, which the Sumter City - County Board of Zoning Appeals deferred at its September 9, 2026 hearing. I want to be clear at the outset that our goal is not to create friction with the County. Our goal is to work cooperatively with you, the Zoning Administrator, and the Board to deliver reliable wireless coverage to this part of the County. We understand that concerns have been raised about the proximity of the facility to the road, and that the deferral at the September hearing was prompted by questions about the engineered fall zone rather than by any staff finding of noncompliance. As we understand it, the underlying worry is that the structure could fall onto the highway during a storm, and that the highway serves as an evacuation route. The County’s ordinance sets the rule that both Harmoni and the County are bound to follow, and Harmoni meets it. Article 5.b.4.e.10 of the Sumter County Zoning and Development Standards Ordinance requires that a tower be set back from all lot lines by a distance equa l to the district setback requirement or the tower’s fall zone, whichever is greater, and it expressly provides that a fall zone less than the full height of the tower is to be determined by an engineer licensed in South Carolina in a letter bearing the engineer’s signature and seal. That is precisely the mechanism the ordinance contemplates for exactly this question, and it is the mechanism we have followed. Our fall-zone letter is signed and sealed by an engineer licensed in South Carolina and confirms the structural integrity of the structure and the radius within which it is designed to fall. Moreover, a generalized concern of this kind is not a lawful basis for denying the application, particularly where the concern has been answered by a stamped engineering analysis. Under the Telecommunications Act of 1996, any decision denying a request to place or construct a personal wireless service facility must be in writing and supported by substantial evidence contained in a written record. John Bryan October 5, 2026 Page 2 The Fourth Circuit ’s decision in Petersburg Cellular Partnership v. Board of Supervisors of Nottoway County, 205 F.3d 688 (4th Cir. 2000), is closely on point and we believe it controls the analysis here. There, a county denied a permit for a 199 -foot tower on a U.S. highway after a handful of residents voiced speculative safety fears, including the fear that t he tower would collapse onto people or homes and that debris might land on the adjacent federal highway. The court held the denial was not supported by substantial evidence. It explained that where “the concerns expressed by a community are objectively unr easonable, such as concerns based upon conjecture or speculation, then they lack probative value and will not amount to substantial evidence,

Text truncated. Open the original for the full document.

Source: City of Sumter website. First collected Oct 24, 2026.