Water Sewer Highlights
PROPOSED
BUDGET FY22
5/19/2020
Expenses Assumptions
Salaries 12,913 $ Increase 12,913 $ Increase
Health Insurance (0) $ Increase (0) $ Same
Expenses Highlights
Debt Service - $ Same - $ Same
Water Delivery Capital Improvements 5,000$ Increase N/A
Capital Improvements - $ Same - $ Same
CWS H2O Purchase 17,242 $ Increase N/A
Lease Payments/Vehicle Replacement 1,870$ Increase - $ Same
Reserves - $ Same - $ Same
Operating Costs 1,184 $ Increase 3,693 $ Increase
Usage Demand Assumptions
Usage
Billed Usage (projections)
Revenue Requirements
Estimated Budget Increase 3.50% 1.36%
Estimated Revenue Requirements 38,209$ Increase 16,606 $ Increase
Avg 6,0 00 gallon user will actually see a 0.6% Combined Increase
All increases or decreases are referenced to budgeted numbers from FY21
Equipment replacements from reserves = 1-Dump Truck, 1-F250, 1-F350
? Million Gallons ? Million Gallons
Water Sewer
FY 2021 FY 2021
$ increase/decrease $ increase/decrease
FY22 WATER & SEWER BUDGET DRAFT.xlsx, HIGHLIGHTS
3/24/2021, 11:40 AM
4 OF 7
WATER EXPENDATURES
PROPOSED
BUDGET FY22
1 SEWER 114
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
BUDGET
(+/-) %
to
BUDGET
(+/-) $
Amount
to
Budget
2 DESCRIPTION
3 124.0100 Salaries 162,038.24 $ 200,337.94 $ 202,981.51 $ 260,394.94 $ 301,057.86 $ 307,387.47 $ 2.1% 6,330
4 124.0200 Social Security 11,709.33 $ 14,501.19 $ 14,599.61 $ 18,386.71 $ 23,030.93 $ 23,515.14 $ 2.1% 484
5 124.0210 Health Insurance 21,312.97 $ 27,530.90 $ 25,279.07 $ 35,857.89 $ 47,050.90 $ 47,050.90 $ 0.0% (0)
6 124.0220 Retirement 21,546.16 $ 28,824.15 $ 28,851.71 $ 42,785.40 $ 49,855.18 $ 53,977.24 $ 8.3% 4,122
7 124.0300 Gas & Oil Vehicles 3,118.47 $ 5,419.64 $ 4,831.51 $ 3,877.46 $ 7,000.00 $ 7,000.00 $ 0.0% -
8 124.0310 Diesel--Fuel 669.39 $ - $ - $ - $ 2,000.00$ 2,000.00 $ 0.0% -
9 124.0320 Diesel Equip Maint & Repairs 720.68 $ 1,498.76$ 5,477.59 $ 4,856.95 $ 2,000.00 $ 2,000.00 $ 0.0% -
10 124.0400 Maint & Repairs Vehicles 916.44 $ 2,079.92$ 5,554.97 $ 3,700.00 $ 5,000.00 $ 5,000.00 $ 0.0% -
11 124.0600 Supplies & Materials 14,332.05 $ 4,277.55 $ 5,535.79 $ 10,649.16 $ 12,000.00 $ 12,000.00 $ 0.0% -
12 124.0610 Tools 2,216.70 $ 919.78 $ 5,936.98$ 330.22 $ 1,600.00$ 1,600.00 $ 0.0% -
13 124.0620 Office Supplies 12,253.12 $ 9,113.00 $ 11,318.06 $ 8,545.72 $ 9,100.00 $ 9,100.00 $ 0.0% -
14 124.0630 Lab Supplies 2,761.74 $ 3,725.42 $ 2,912.74 $ 3,303.65 $ 2,600.00 $ 2,652.00 $ 2.0% 52
15 124.0700 Telephone 7,111.61 $ 7,894.84 $ 5,855.42 $ 6,518.93 $ 5,800.00 $ 5,916.00 $ 2.0% 116
16 124.0900 Power & Electricity 4,390.22 $ 3,540.50 $ 3,245.77 $ 3,379.92 $ 3,605.00 $ 3,677.00 $ 2.0% 72
17 124.1000 Insurance 22,382.08 $ 22,127.63 $ 24,865.26 $ 29,704.25 $ 17,510.00 $ 17,860.00 $ 2.0% 350
18 124.1100 Equipment Repairs - $ - $ - $ - $ - $ - $ -
19 124.1200 System Repairs&Main 50,143.48 $ 31,521.06 $ 33,331.03 $ 34,070.67 $ 41,200.00 $ 41,200.00 $ 0.0% -
20 124.1203 Uniforms and Clothing 4,542.81 $ 544.51 $ 1,121.81$ 618.15 $ 1,600.00$ 1,600.00 $ 0.0% -
21 124.1210 capital Improvements 22,558.07 $ 32,045.54 $ 94,161.52 $ 99,593.41 $ 100,500.00 $ 100,500.00 $ 0.0% -
22 124.1211 Admin. Bld. Expenses 30.00 $ 2,381.58$ 1,061.07 $ 256.00 $ 1,000.00$ 1,000.00 $ -
23 124.1220 Depreciation - $ - $ - $ - $ - $ - $ -
24 124.1300 Dues & Certifications 5,259.96 $ 5,479.36 $ 5,263.00 $ 8,588.85 $ 9,270.00 $ 9,270.00 $ 0.0% -
25 124.1400 Training & Seminars 3,311.40 $ 4,640.30 $ 4,440.62 $ 4,519.77 $ 4,700.00 $ 4,794.00 $ 2.0% 94
26 124.1900 Prof. Ser. - Audit 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 0.0% -
27 124.2000 Prof. Ser. - Eng. 40,979.86 $ 76,369.23 $ 25,277.10 $ 2,938.50 $ 105,000.00$ 105,000.00 $ 0.0% -
28 124.3000 Miscellaneous 3,989.42 $ 1,711.14 $ 60.53 $ - $ 1,564.35$ 1,564.35 $ 0.0% -
29 124.3100 Prop. & Equipment 13,080.50 $ - $ - $ 81,000.00$ 94,000.00 $ 94,000.00 $ 0.0% -
30 124.3110 Prop & Equip <$5,000 - $ 4,768.21$ - $ - $ - $ - $ -
31 124.3500 Water Bond pmt to general fund - $ - $ - $ - $ - $ - $ #DIV/0! -
32 124.3510 Lease Payments 50,441.72 $ 24,721.27 $ 14,088.44 $ 14,088.44 $ 36,998.85 $ 38,868.85 $ 5.1% 1,870
33 124.3600 Water analysis 2,075.00 $ 3,670.00 $ 875.00 $ 822.86 $ 1,300.00$ 1,300.00 $ 0.0% -
34 124.3700 Chemicals 7,854.61 $ 8,082.82 $ 8,918.76 $ 11,228.97 $ 8,400.00 $ 8,900.00 $ 6.0% 500
35 124.3800 Meter Lease Payment - $ - $ - $ - $ - $ - $ -
36 124.3900 H2O Payment, Operation 127,538.43 $ 151,433.76 $ 164,605.14 $ 166,899.45 $ 142,758.00 $ 160,000.00 $ 12.1% 17,242
37 124.4000 CPW Improvements - $ - $ - $ - $ 36,000.00$ - $ -100.0% (36,000)
38 124.8900 Bad Debt Expenses - $ - $ - $ - $ - $ - $ -
39 SUBTOTAL - WATER 803,784.46 $ 853,160.00 $ 874,450.01 $ 1,030,916.26$ 1,247,501.07 $ 1,283,732.95 $ 2.9% 36,232
40
41
42 ADMINISTRATIVE
43 ACCT # DESCRIPTION
44 129.0100 Admin. Salaries 43,364.71 $ 45,438.56 $ 49,230.77 $ 51,300.55 $ 47,859.07 $ 49,055.56 $ 2.5% 1,196
45 129.0200 Social Security 3,189.63 $ 3,326.75 $ 3,622.00 $ 3,727.08 $ 3,661.22 $ 3,752.75 $ 2.5% 92
46 129.0210 Hospital Insurance 3,055.85 $ 3,989.94 $ 4,138.81 $ 4,922.33 $ 5,071.21 $ 5,071.21 $ 0.0% -
47 129.0220 Retirement 5,872.54 $ 6,615.83 $ 7,579.33 $ 8,450.42 $ 7,925.46 $ 8,614.16 $ 8.7% 689
48 Admin-Office Supplies - $ - $ - $ - $
49 Bond Interest expense - $ - $ - $ - $
50 Transfer to Gen. Fund - $ - $ - $ - $
51 Transfer to Water Fund - $ - $ - $ - $
52 Transfer to Sewer Fund - $ - $ - $ - $
53 Transfer to Special Rev - $ - $ - $ - $
54 TOTAL ADMINISTRATIVE 55,482.73 $ 59,371.08 $ 64,570.91 $ 64,516.96 $ 64,516.96 $ 66,493.67 $ 3.1% 1,977
55
56 GRAND TOTAL - WATER 859,267.19 $ 912,531.08 $ 939,020.92 $ 1,312,018.03$ 1,312,018.03 $ 1,350,226.62 $ 2.9% 38,209
57
58 Reserve for Anticipated capital Outlays 105,500.00 $ 95,000.00 $ 95,000.00 $ 95,000.00 $ 95,000.00 $ 95,000.00 $ 0.0% -
59 Reserve for CWS capital Charge 74,000.00 $ 74,000.00 $ 74,000.00 $ 74,000.00 $ 74,000.00 $ 115,000.00 $ 55.4% 41,000
FY22 WATER & SEWER BUDGET DRAFT.xlsx, WATER BUDGET
3/24/2021, 11:40 AM
5 OF 7
WATER REVENUE
PROPOSED
BUDGET FY22
4 ACCT.# DESCRIPTION
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
REVENUES
(+/-) %
to
BUDGET
5 123-0005 Water Bond Transfer - $ - $ - $ - $ - $ - $
6 123-1000 Transfer From CIP Fund - $ - $ - $ 94,000.00$ 194,000.00 $ 194,000.00 $
7 123.2000 Transfer fr. Depreciation Fd. - $ - $ - $ - $ - $ - $
8 123.3300 Interest earned 2,490.34 $ 7,066.92 $ 15,402.22 $ 14,260.17 $ 2,060.00 $ 2,060.00 $ 0.0%
9 123.4110 Water Sales 1,026,601.00 $ 1,128,074.00 $ 1,137,303.84 $ 1,136,887.15 $ 1,092,758.03 $ 1,130,966.62 $ 3.5%
10 123.4111 Penalties 3,395.00 $ 3,585.00 $ 2,934.32 $ 4,482.86 $ 5,500.00 $ 5,500.00 $ 0.0%
11 123.4112 Administrative Account Fees 7,460.00$ 7,845.00 $ 6,465.00 $ 9,120.00 $ 8,240.00 $ 8,240.00 $ 0.0%
13 123.4114 Hydrant meter permits 297.34 $ - $ 1,477.53$ - $ 200.00$ 200.00 $ 0.0%
14 123.4300 Meter connect & renew 48,830.00$ 14,970.00 $ 46,175.00 $ 30,411.43 $ 7,210.00 $ 7,210.00 $ 0.0%
15 123.4400 Meter Repairs 1,660.00 $ 500.00 $ 750.00 $ 75.00 $ 500.00 $ 500.00 $ 0.0%
16 123.4500 Service Calls 6,290.00 $ 9,900.00 $ 1,200.00 $ 720.00 $ 500.00 $ 500.00 $ 0.0%
17 123.4600 Inspection Fees 3,120.00 $ 2,580.00 $ 3,000.00 $ 2,982.86 $ 250.00 $ 250.00 $ 0.0%
18 123.4610 Backflow Testing 1,200.00 $ 2,250.00 $ 2,580.00 $ 1,500.00 $ 700.00 $ 700.00 $ 0.0%
19 124.4611 Unmetered Fire Line Fees - $ - $ - $ - $ - $ - $
21 124.4612 Repairs Caused by Others - $ - $ - $ - $ - $ - $
22 123.4900 Miscellaneous 9,203.00 $ 27.10 $ 100.00 $ 50.00 $ 100.00 $ 100.00 $ 0.0%
23 123.9000 Transfer fr. Spec. Rev. - $ - $ - $ - $ - $ - $
24 123.9100 Transfer fr. Sewer Fd. - $ - $ - $ - $ - $ - $
25 123.9400 Transfer fr. Gen. Fd. - $ - $ - $ - $ - $ - $
26 123.9900 Advalorem Tax - $ - $ - $ - $ - $ - $
27 TOTAL 1,110,546.68$ 1,176,798.02 $ 1,217,387.91 $ 1,294,489.46 $ 1,312,018.03 $ 1,350,226.62 $ 1.4%
FY22 WATER & SEWER BUDGET DRAFT.xlsx, WATER REV
3/24/2021, 11:40 AM
6 OF 7
WATER CAPITAL
PROPOSED
BUDGET FY22
124.3100
ACCT.# DESCRIPTION
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
BUDGET 4.1200 System Repairs & Maintenance
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
BUDGET
6 EXISTING DEBT SERVICE 50,441.72 $ 24,721.27 $ 14,088.44 $ 14,088.44 $ 13,218.00 $ 14,088.00 $
7 Equipment/Vehicle Capital Reserves 22,910.41 $ 22,910.41 $ 23,780.85 $ 24,780.85 $ General System Improvements 50,143.00 $ 31,521.00 $ 33,331.03 $ 34,070.67 $ 41,200.00 $ 41,200.00 $
8
9 Utility Van Total 50,143.00 $ 31,521.00 $ 33,331.03 $ 34,070.67 $ 41,200.00 $ 41,200.00 $
10 Meter Reader Utility Vehicle
11 4.1210 Capital Improvements Program
12 Irrigation meter installes 30,411.43$
13 2 - F150 xlt cew cab 33,000.00$ 33,000.00 $ - $ Meter Replacement Program 33,886.00 $
14 Dump Truck 5 - 6 yd -$ 41,000.00$ 41,000.00 $ Building Repairs 10,500.00$ 10,500.00 $
15 Towable Air Compressor 180cfm 20,000.00 $ 20,000.00 $ - $ Pipe Replacement Program 2,000.00 $ 90,000.00 $ 90,000.00 $
1- F250 W/Utility Bed and pipe rack 19,000.00 $ 19,000.00 $ Total 22,558.00 $ 32,045.00 $ 94,151.00 $ 99,593.41 $ 100,500.00 $ 100,500.00 $
16 1- F350 W/crane 34,000.00$
17 4.1220 Deprecation Fund/Reserves
18 Reserve for Anticipated capital Outlays 105,500.00$ 95,000.00 $ 95,000.00 $ 95,000.00 $ 95,000.00 $ 95,000.00 $
19 Water Delivery Capital Reserves 74,000.00$ 74,000.00 $ 74,000.00 $ 74,000.00 $ 74,000.00 $ 115,000.00 $
20 Total 179,500.00 $ 169,000.00 $ 169,000.00 $ 169,000.00 $ 169,000.00 $ 210,000.00 $
21
22
23 4.2000 Professional Services - Engineering
24 Rate Study - $ - $ - $ - $
25 ASR Study - $ - $ 100,000.00$ 100,000.00 $
26 Legal -$ - $ - $
27 Water System Modeling/Design -$ - $ - $
28 TOTAL PROPERTY & EQUIPMENT 72,000.00 $ 94,000.00 $ 94,000.00 $ Design future years water line replacement - $ - $ - $
29 Miscellaneous Engineering 2,521.40 $ 5,000.00 $ 5,000.00 $
30 12.4.3100 Property & Equipment 94,000.00$ 94,000.00$ 94,000.00 $ GIS Mapping -$ - $
31 12.4.3110 Property & Equipment <$5,000 -$ Total 40,980.00 $ 76,369.00 $ 25,277.10 $ 2,938.50 $ 105,000.00$ 105,000.00 $
32 12.4.3510 Lease Payments/Vehicle replacements 36,998.85$ 36,998.85 $ 36,998.85 $ 38,868.85 $ Reserve Offsets -$ 100,000.00$ 100,000.00 $
33 Total 305,602.58$ 315,700.00 $ 356,700.00 $
JUSTIFICATION OF .3100, 3110, 3500
This equipment to be paid from reserves
FY22 WATER & SEWER BUDGET DRAFT.xlsx, Water Capital
3/24/2021, 11:40 AM
7 OF 7
SEWER EXPENDATURES
PROPOSED
BUDGET FY22
1 SEWER 114
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
BUDGET
(+/-) %
to
BUDGET
(+/-) $
Amount to
Budget
2 DESCRIPTION
3 114.0100 Salaries 162,216.37 $ 200,431.82 $ 202,919.07 $ 260,413.35 $ 301,057.86 $ 307,387.47 $ 2.1% 6,330 $
4 114.0200 Social Security 11,712.50 $ 14,503.09 $ 14,586.96 $ 18,389.25 $ 23,030.93 $ 23,515.14 $ 2.1% 484 $
5 114.0210 Health Insurance 21,315.89 $ 27,534.20 $ 25,284.91 $ 35,862.31 $ 47,050.90 $ 47,050.90 $ 0.0% (0) $
6 114.0220 Retirement 21,546.87 $ 28,825.37 $ 28,858.04 $ 42,787.29 $ 49,855.18 $ 53,977.24 $ 8.3% 4,122 $
7 114.0300 Gas & Oil Vehicles 3,141.05 $ 5,424.73 $ 4,782.07 $ 3,040.66 $ 7,000.00 $ 7,000.00 $ 0.0% - $
8 114.0310 Diesel--Fuel 5,200.93 $ 2,118.76 $ - $ 3,000.00$ 3,400.00 $ 3,800.00 $ 11.8% 400 $
9 114.0320 Diesel Equip Maint & Repairs 1,189.39 $ 1,696.78 $ 9,272.21 $ 2,185.20 $ 5,500.00 $ 5,700.00 $ 3.6% 200 $
10 114.0400 Maint & Repairs Vehicles 936.43 $ 5,384.76$ 5,698.87 $ 3,700.00 $ 5,000.00 $ 5,000.00 $ 0.0% - $
11 114.0600 Supplies & Materials 12,213.26 $ 12,211.78 $ 11,834.38 $ 9,355.37 $ 10,300.00 $ 10,500.00 $ 1.9% 200 $
12 114.0610 Tools 1,919.00 $ 642.18 $ 7,376.14$ 1,286.25 $ 2,100.00 $ 2,150.00 $ 2.4% 50 $
13 114.0620 Office Supplies 12,121.74 $ 8,631.07 $ 11,289.01 $ 5,739.03 $ 8,961.00 $ 8,961.00 $ 0.0% - $
14 114.0630 Lab Supplies 8,418.48 $ 6,017.93 $ 6,618.30 $ 3,874.68 $ 7,500.00 $ 7,650.00 $ 2.0% 150 $
15 114.0700 Telephone 7,111.86 $ 7,895.01 $ 5,855.48 $ 6,518.91 $ 5,768.00 $ 5,941.00 $ 3.0% 173 $
16 114.0900 Power & Electricity 56,930.27 $ 42,617.11 $ 45,711.16 $ 46,491.34 $ 59,740.00 $ 59,740.00 $ 0.0% - $
17 114.1000 Insurance 24,928.35 $ 25,209.87 $ 28,426.09 $ 28,839.75 $ 25,000.00 $ 26,000.00 $ 4.0% 1,000 $
18 114.1100 Equipment Repairs - $ - $ - $ - $ - $ - $ - $
19 114.1200 System Repairs&Main 75,946.14 $ 56,552.00 $ 74,715.95 $ 33,701.59 $ 77,250.00 $ 77,250.00 $ 0.0% - $
20 114.1201 Sludge Disposal 28,107.06 $ 25,776.31 $ 71,075.57 $ 39,105.89 $ 52,000.00 $ 52,000.00 $ 0.0% - $
21 114.1202 Grit Disposal 1,158.74 $ 2,859.10 $ 1,207.35 $ 3,333.83 $ 1,500.00 $ 1,550.00 $ 3.3% 50 $
22 114.1203 Uniforms and Clothing 4,464.03 $ 544.51 $ 1,148.66$ 237.96 $ 2,100.00$ 2,200.00 $ 4.8% 100 $
23 114.1210 capital Improvements 118,948.86 $ 57,156.85 $ 25,210.30 $ 18,795.39 $ 100,000.00 $ 100,000.00 $ 0.0% - $
24 114.1211 Admin. Bld. Expenses 30.00 $ 2,374.55$ 761.06 $ 336.00 $ 1,000.00$ 1,000.00 $ - $
25 114.1220 Depreciation - $ - $ - $ - $ - $ - $ - $
26 114.1230 Collection System I&I Monitoring - $ - $ - $ - $ - $ - $ - $
27 114.1300 Dues & Certifications 4,133.95 $ 3,322.35 $ 2,105.00 $ 6,068.83 $ 8,000.00 $ 8,100.00 $ 1.3% 100 $
28 114.1400 Training & Seminars 3,021.48 $ 4,815.01 $ 4,940.22 $ 797.23 $ 6,000.00$ 6,000.00 $ 0.0% - $
29 114.1900 Prof. Ser. - Audit 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 0.0% - $
30 114.2000 Prof. Ser. - Eng. 271,300.62 $ 14,862.48 $ 42,305.50 $ 1,470.00 $ 5,000.00 $ 5,000.00 $ 0.0% - $
31 114.3000 Miscellaneous 4,015.31 $ 653,480.75$ 303,201.36 $ - $ 1,124.82$ 1,124.82 $ 0.0% - $
32 114.3100 Prop. & Equipment 45,094.35 $ 1,513.11 $ 102.83 $ 88,500.00$ 100,000.00 $ 94,000.00 $ -6.0% (6,000) $
33 114.3110 Prop & Equip <$5,000 - $ 2,266.11$ 77,424.00 $ - $ - $ - $ - $
34 114.3500 Admin. of Sewer bond 147,228.72 $ 137,034.25 $ 2,639,553.02$ 65,215.72 $ 87,000.00 $ 87,000.00 $ 0.0% - $
35 114.3510 Lease Payments 18,427.87 $ 2,314,514.20$ 358,482.35 $ 101,672.15 $ 115,475.00 $ 115,475.00 $ 0.0% - $
36 114.3600 Wastewater analysis 15,428.99 $ 723,734.20 $ 2,600.00 $ 9,282.31 $ 11,330.00 $ 12,000.00 $ 5.9% 670 $
37 114.3700 Chemicals (cl2,so2,) 18,557.43 $ - $ - $ 18,800.07$ 20,000.00 $ 20,600.00 $ 3.0% 600 $
38 114.8900 Bad Debt Expense - $ 163,411.51$ 88,257.96 $ - $ - $ - $ - $
39 112,305.49$ 101,672.15 $ - $ - $ - $
41 SUBTOTAL - SEWER 1,148,765.94 $ 4,667,361.75 $ 4,218,603.82 $ 972,800.37 $ 1,266,043.69$ 1,274,672.57 $ 0.7% 8,629$
42 -$
43 -$
44 ADMINISTRATIVE -$
45 ACCT # DESCRIPTION -$
46 119.0100 Admin. Salaries 43,363.92 $ 45,437.59 $ 49,183.58 $ 51,299.62 $ 47,859.07 $ 49,055.56 $ 2.5% 1,196 $
47 119.0200 Social Security 3,189.52 $ 3,326.50 $ 3,618.00 $ 3,727.17 $ 3,661.22 $ 3,752.75 $ 2.5% 92 $
48 119.0210 Hospital Insurance 3,055.76 $ 3,989.68 $ 4,138.33 $ 4,922.02 $ 5,071.21 $ 5,071.21 $ 0.0% - $
49 119.0220 Retirement 5,872.56 $ 6,615.92 $ 7,579.34 $ 8,450.37 $ 7,925.46 $ 8,614.16 $ 8.7% 689 $
50 Admin-Office Supplies -$
51 Bond Interest expense -$
52 Transfer to Gen. Fund -$
53 Transfer to Water Fund -$
54 Transfer to Special Rev -$
55 TOTAL ADMINISTRATIVE 55,481.76 $ 59,369.69 $ 64,519.25 $ 68,399.18 $ 64,516.96 $ 66,493.67 $ 3.1% 1,977$
56 -$
57 GRAND TOTAL - SEWER 1,204,247.70 $ 4,726,731.44 $ 4,283,123.07 $ 1,041,199.54 $ 1,330,560.65 $ 1,341,166.24 $ 0.8% 10,606$
58
59 Reserve for Anticipated capital Outlays 37,000.00 $ 109,000.00 $ 112,000.00 $ 109,000.00 $ 112,000.00 $ 112,000.00 $ 0.0% - $
FY22 WATER & SEWER BUDGET DRAFT.xlsx, SEWER BUDGET
3/24/2021, 11:40 AM
1 OF 7
SEWER REVENUE
PROPOSED
BUDGET FY22
4 ACCT.# DESCRIPTION
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
REVENUES
(+/-) %
to
BUDGET
5 113-0005 Sewer Bond Transfer -$ - $ - $ - $ - $ - $
6 113-1000 Transfer From CIP Fund - $ - $ - $ - $ - $ - $ #DIV/0!
7 113-2000 Transfer fr. Depreciation Fd. - $ - $ - $ 78,000.00$ 100,000.00 $ 94,000.00$
8 113-3300 Intrest earned 3,072.42 $ 5,492.31 $ 7,936.73 $ 6,613.94 $ 1,000.00 $ 1,000.00 $ 0.0%
9 113-4110 Sewer Service Charges 1,026,601.00$ 1,128,074.00 $ 1,137,303.84 $ 1,221,622.98 $ 1,221,560.65 $ 1,238,166.24 $ 1.4%
10 113-4111 Penalties 3,395.00 $ 3,585.00 $ 2,934.32 $ 4,482.86 $ 5,500.00 $ 5,500.00 $ 0.0%
11 113-4112 Administrative Account Fees 1,000.00$ 350.00 $ 350.00 $ 342.86 $ 1,300.00$ 1,300.00 $ 0.0%
12 113-4300 Tie-in fees & Installations 2,100.00$ 760.00 $ 3,550.00$ 1,200.00 $ - $ - $
13 113-4500 Service Calls - $ - $ - $ 68.57$ 500.00 $ 500.00 $ 0.0%
14 113-4600 Inspection Fees 3,050.00 $ 3,657.50 $ 2,600.00 $ 3,171.43 $ 1,500.00 $ 1,500.00 $ 0.0%
15 113-4610 Repairs Caused by Others - $ 134.00$ - $ - $ - $ - $
113.4800 Federal Grant Revenue 2.00 $ - $ - $
16 113-4900 Miscellaneous - $ - $ - $ - $ 200.00$ 200.00 $ 0.0%
17 113-9100 Transfer fr. Water Fd. - $ - $ - $ - $ - $ - $
18 113-9200 Transfer fr. Gen. Fd. - $ 3,617,806.32$ 115,697.16 $ - $ - $ - $ #DIV/0!
19 113-9300 Transfer fr. Spec. Rev. - $ - $ 4,156,993.08$ 9,137,866.45 $ - $ - $
20 113-9900 Advalorem Tax - $ - $ - $ - $ - $ - $
123.9901 Proceeds-Sale of Assets 2.00 $ 34,100.00$ - $ - $ - $ - $
21 SRF Bond Reserve - $ - $ - $ - $ - $ - $
22 TOTAL 1,039,222.42$ 4,793,959.13 $ 5,427,365.13 $ 1,331,560.65 $ 1,331,560.65 $ 1,342,166.24 $ 0.8%
FY22 WATER & SEWER BUDGET DRAFT.xlsx, SEWER REV
3/24/2021, 11:40 AM
2 OF 7
SEWER CAPITAL
PROPOSED
BUDGET FY22
ACCT.# DESCRIPTION
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
BUDGET
(+/-) $ to
BUDGET 4.1200 System Repairs&Main
FY18
ACTUAL
FY19
ACTUAL
FY20
ACTUAL
FY21
PROJECTED
ACTUAL
FY21
BUDGETED
FY22
PROPOSED
BUDGET
6 EXISTING DEBT SERVICE 18,427.87$ 112,305.49 $ 101,672.15 $ 101,672.15 $ 102,257.00 $ 102,257.00 $ 585$
7 Equipment/Vhicle Capital Reserves 13,802.85 $ 13,802.85 $ 13,218.00 $ 13,218.00 $ (585)$ -$ - $ - $
8 -$ General System Repairs 75,946.14 $ 56,552.00 $ 74,115.00 $ 33,701.59 $ 75,000.00 $ 75,000.00 $
9 Utility Van #REF! TOTAL 75,946.14 $ 56,552.00 $ 74,115.00 $ 33,701.59 $ 75,000.00 $ 75,000.00 $
10 Meter Reader Utility vehicle #REF! 4.1210 capital Improvements Program
11 -$ Building and Grounds Repairs 4,600.00$ 5,000.00 $ 5,000.00 $
12 * 2 - F150 xlt cew cab 33,000.00 $ 33,000.00 $ -$ Repairs to lift stations
13 Sewer lateral camera 26,000.00 $ 26,000.00 $ (26,000)$ -$ - $ - $
14 Dump Truck 5 - 6 yd -$ 41,000.00$ 41,000.00 $ 41,000$
15 1- F250 W/Utility Bed and pipe rack 19,000.00 $ 19,000.00 $ -$ -$
16 * 1- F350 W/crane 34,000.00$ 34,000$ I & I Monitoring
17 -$ On Going Collection Sys Rehab and/or Replacement s 85,000.00 $ 95,000.00 $ 95,000.00 $
18 -$ Service Lateral Rehab & Replacement -$ - $
19 -$ Manhole Rehabilitation -$ - $
20 -$ -$ - $
21 -$ -$ - $
22 -$ -$ - $
23 -$ -$ - $
24 -$ TOTAL 118,948.00 $ 57,156.00 $ 25,210.00 $ 18,795.39 $ 100,000.00 $ 100,000.00 $
25 -$
26 -$ 4.1220 Deprecation Fund/Reserves -$
27 -$ Reserve for Anticipated capital Outlays 37,000.00 $ 109,000.00 $ 112,000.00 $ 109,000.00 $ 109,000.00 $ 112,000.00 $
28 -$ -$
29 TOTAL PROPERTY & EQUIPMENT 78,000.00$ 100,000.00 $ 94,000.00 $ 16,000$ TOTAL 37,000.00 $ 109,000.00 $ 112,000.00 $ 109,000.00 $ 109,000.00 $ 112,000.00 $
30 -$
31 -$ 4.2000 Professional Services - Engineering
32 11.4.3100 Property & Equipment 100,000.00$ 100,000.00$ 94,000.00 $ #REF! Rate Study 36,370.00$ - $ - $
33 11.4.3110 Property & Equipment <$5,000 -$ 94,000$ NPDES Renewal 19,500.00$ - $ - $
34 11.4.3510 Lease Payments/Vehicle replacements 115,475.00$ 115,475.00 $ 115,475.00 $ -$ WWTF Design
35 WWTF FEMA 21,500.00$
36 GIS Mapping
37 Sewer Pump Station Design 80,000.00$ - $
38 Miscellaneous Engineering 1,470.00$ 5,000.00 $ 5,000.00 $
39 TOTAL 271,300.00 $ 14,852.00 $ 42,305.00 $ 85,000.00 $ 5,000.00 $
40 Reserve Offsets -$ (80,000.00)$
41 Totals 503,194.14 $ 237,560.00 $ 253,630.00 $ 161,496.98 $ 289,000.00 $ 292,000.00 $
42
43
44
JUSTIFICATION OF .3100, 3110, 3500
This equipment to be paid from reserves
FY22 WATER & SEWER BUDGET DRAFT.xlsx, Sewer Capital
3/24/2021, 11:40 AM
3 OF 7
www.charlestontreeexperts.com
marshall@charlestontreeexperts.com
(843) 952-8300
Tree Report
1423 Middle Street
Sullivan’s Island, SC 29482
Prepared for:
Natanya O’Donnell
Prepared By:
Marshall Badeaux, Consulting Arborist
International Society of Arboriculture Certified Arborist SO-7159A
Member, American Society of Consulting Arborists
TRAQ, Tree Risk Assessment Qualified
TPAQ, Tree and Plant Appraisal Qualified
CTSP, Certified Treecare Safety Professional #03122
EHAP, Electrical Hazards Awareness Program
March 5, 2021
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 3 of 14
Table of Contents
SUMMARY ............................................................................................................................................ 4
INTRODUCTION. .........................................................................................................4
Background ............................................................................................................................. 4
Assignment ................................................................................................................................... 4
Limits of Assignment. .................................................................................................................. 4
Purpose and Use of the Report. .................................................................................................... 4
OBSERVATIONS. ................................................................................................................................. 5
Site. ............................................................................................................................................... 5
ANALYSIS AND TESTING. .......................................................................................................... 5
Tree Inventory ............................................................................................................................... 5
DISCUSSION. .................................................................................................................................................... 5
Tree Grading System. ................................................................................................................... 8
CONCLUSION. ................................................................................................................. 8
RECOMMENDATIONS ........................................................................................................ 8
GLOSSARY ..................................................................................................................................... 9
Appendix A - Map. ......................................................................................................................... 10
Appendix B - Tree #1. .................................................................................................................... 11
Appendix C – During and Post Construction Evidence. ................................................................ 16
Appendix D - Assumptions and Limiting Conditions. ................................................................... 20
Appendix E - Certification of Performance. ................................................................................... 21
Work Cited. .................................................................................................................................... 22
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 4 of 14
SUMMARY
After Natanya O’Donnell had become concerned with the condition of a 21.25” Sugarberry growing
to the rear right side of the home, my firm was contacted to provide an independent, objective
opinion regarding the health and structural stability of the tree located on the site. I performed a
Level 2: Basic Tree Risk Assessment (BTRA).
Based on this level 2 evaluation, I have determined that the tree outlined in this report is
hazardous, beyond repair and should be removed as soon as possible to reduce unnecessary
risk or spread of disease and pest and/or damage or injury to people or property.
INTRODUCTION
Background
In February 2021, Natanya O’Donnell contacted my firm and expressed concerns after observing a
high-risk tree on the rear right side of the home. She first became concerned about the tree’s
wellbeing in advance of and in connection with the Town of Sullivan’s Island’s Wastewater
Treatment Plant Seismic and Flood Hazard Upgrade Project commencement. Prior to the sewage
easement installation, Natanya O’Donnell expressed her concerns regarding the wellbeing of their,
at that time, healthy trees in regard to the scope of work projected. She was not advised of any
concern voiced by the arborist used by the Sullivan’s Island Water & Sewer Department regarding
the health of the trees in close proximity to the easement associated with the project. Natanya
O’Donnell continued to express her growing concerns with this tree as the project commenced,
continued, concluded, and afterwards as she observed the tree declining. Upon request, my
Qualified Arborist, Ashley Connelly, inspected and felt the tree was beyond repair and provided a
proposal to assess the tree further. She discussed the terms of our engagement and upon approval
of the Arborist Report line item, I was scheduled for site inspection to perform a BTRA.
Assignment
After discussing the terms of my engagement and the levels of assessment with Natanya O’Donnell,
they agreed that I would conduct the following:
1. Identify the tree species.
2. Measure and determine the diameter at breast height (DBH).
3. Assess and provide a health grade and risk rating to the tree.
4. Provide my expert opinion on the cause of the tree failure.
5. Provide my findings in a booklet style report.
Limits of Assignment
My inspection was performed at ground level using visual observations, and my knowledge of the
site history was limited to the past-history details provided by Natanya O’Donnell. These were my
only limitations in addition to the normal restrictions of a Level 2: BTRA.
Purpose and Use of the Report
The purpose of this report is to provide an accurate depiction of defective or hazardous conditions
of the tree and site, and develop recommendations based on that data. This report is intended to be
used by Natanya O’Donnell. Upon submission, this report will become the property of Natanya
O’Donnell and its use will be at her discretion. Reproduction or making of additional copies without
explicit consent by the preparing Arborist is strictly prohibited.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 5 of 14
OBSERVATIONS
Site
The tree is growing on the right rear side of the home near the back and right fence lines.
The tree poses a threat to Natanya O’Donnell’s home and yard, the neighboring home and yard, and
individuals enjoying leisure activities in the yards. These are the only targets within 1x the height of the
trees. Most of these targets are constant and cannot be moved or mitigated.
ANALYSIS AND TESTING
The tree is approximately 50 feet in height with a crown spread of 35 feet.
Tree Inventory
Tree # DBH Species Health Risk Rating Comment
1
21.25” Sugarberry, Celtis
laevigata
F
High Dead
DISCUSSION
Trees provide numerous benefits to the urban environment. These benefits increase as the age and
size of the trees increase. However, as trees becomes larger and more mature, they are likely to shed
branches or develop decay or other conditions that can predispose it to failure. In assessing and
managing trees, we strive to strike a balance between the risk that a tree poses and the benefits that
individuals and communities derive from trees.
Tree risk assessment (TRA) is the systematic approach used to identify, analyze and evaluate tree
risk. By identifying the tree risk, mitigation can be conducted to reduce risk while preserving the
tree that meet acceptable levels of risk.
A primary goal of TRA is to provide the tree owner with resourceful information about the level of
risk posed by a tree over a period of time. This is accomplished by conducting a qualitative analysis
and determining the likelihood and consequences of a tree failure. If the risk rating defined for a
tree exceeds the level of acceptable risk, mitigation is recommended.
Upon inspection of this tree, it was apparent that the tree was no longer living. It lacked any canopy,
displayed large amounts of bark loss, and showed no visible signs of remaining life. I also noted
decay on the buttress roots, which are important to the structural stability of the tree. This tree is an
obvious hazard and will only become a greater hazard as time goes on. Natanya O’Donnell reported
large branch drop beginning in September of 2020. It is appropriate to anticipate a growing amount
of branch drop as time progresses. As is evident in the photographs in Appendix B, there is still a
significant number of large leaders on the tree. This is a hazardous condition that should be
eradicated at the earliest possible convenience.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 6 of 14
The Town of Sullivan’s Island’s Wastewater Treatment Plant Seismic and Flood Hazard Upgrade
Project began between July 2018 and November 2018. Prior to its commencement, no illness or
decline in the subject tree was noted or reported and it appeared apparently healthy. As stated within
the Ordinance to Amend Chapter 21 of the Zoning Ordinances for the Town of Sullivan’s Island, a
Category I tree, also known as a “significant” tree is a “tree [that] has a DBH of at least sixteen (16)
inches or a height of at least forty (40) feet. A Category I tree has the highest level of protection
based on its total value to the Island environment. (Island, 2005) The subject tree has a DBH of
21.25” and is therefore considered a significant, or Category 1, tree by the Town of Sullivan’s
Island standards and should have received the highest level of protection.
According to Lindsey Purcell, an Urban Forestry Specialist with Purdue University, “Tree roots
usually are considered as ‘out of sight, out of mind.’ However, this underground system is one
of the most vital and easily damaged parts of the plant, making roots the leading cause of
decline and death of injured trees. Any encroachment, disturbance or compaction of the soil
around the tree can lead to harm, destroying these fine absorbing roots. Injury caused by
activities such as improper cutting, crushing, suffocation or poisoning can result in slow
decline, dieback and, eventually, the death of the tree. Trees damaged during construction
projects may take years to exhibit symptoms. “ (Purcell) The subject tree’s critical root zone
was unquestionably impacted during construction. The critical root zone is the area of soil
around a tree where the minimum amount of roots considered critical to the structural
stability or health of the tree are located. The critical root zone is usually based on the dripline
or 1.5 feet per inch in DBH, whichever is greater. This is just the area considered critical, the
actual tree roots extend out 2-3 times the dripline. The dripline is the area on the ground
below the tree with a boundary designated by the edge of the tree’s crown. Based on this
information, the critical root zone for the subject tree would have been approximately 32 feet
or to the dripline, whichever is greater.
In the photographs labeled Appendix C, there is a privacy fence that was installed in the
middle of the construction area, post construction. Also visible in the photographs, as marked,
are the subject tree’s limbs extending out past the fence line. Additionally, based on the
history provided by the property owner, trenching occurred in the area that was replaced by
sod. As depicted in the last photograph of Appendix C, the sod was installed within the critical
root zone, and up to the base of the tree. This verifies that the clearing and excavation would
have impacted the critical root zone by impeding the dripline of the tree. This also increases
the likelihood of damage to the branches of the tree caused by the machinery, which would
also contribute to its failure. Since the area was cleared and excavated within the critical root
zone it is appropriate to assume that the critical root area suffered from root compaction first
then subsequently damage from cutting/excavation.
The root damage would be sufficient enough to cause overall tree failure. It can take multiple
years for a tree to fail once negatively impacted by construction. Sugarberry trees tend to
decline slightly quicker once damaged due to their soft wood which decays more rapidly than
most, especially in humid environments. This coincides with the signs of decline noted by
Natanya O’Donnell post construction. The timeline of the construction, the tree’s decline and
ultimate failure, along with the tree’s apparently healthy status prior to construction indicates
that the construction is the most probable cause of tree failure. It is also understood that no
tree protection zone “TPZ” or tree protection/preservation plan was established during
construction. Lack of the same left the tree extremely vulnerable to the many damaging
activities associated with construction.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 7 of 14
According to the Town of Sullivan’s Island Tree Protection Standards: ANSI A300, A “’Tree
Protection Zone’ is an Arborist defined area surrounding the trunk intended to protect the
roots and soil to ensure future tree health and stability. A TPZ consists, at a minimum, of Zone
A or B, whichever is greater, or may be another area (typically larger) as defined by the
Arborist.” Zone A being the Critical Root Zone (CRZ), and Zone B being the Drip Line. A TPZ is
defined in a Tree Protection or Preservation Plan prior to the commencement of construction
activities such as excavation, filling, tunneling, trenching, compacting, demolition, utility work,
or other land disturbing activity. A Tree Protection Plan is extremely important before, during,
and after construction to ensure the current and future health of the tree(s). On this project,
regarding the subject tree, the Tree Protection Zone should have been approximately 32 feet
at a minimum, marked with tree protection fencing. There should also have been tree
protection signs affixed to the fencing. The photographs included in Appendix C show no signs
of a marked TPZ or tree protection fencing throughout the project’s construction.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 8 of 14
Tree Grading System
A - Specimen tree exhibiting vigorous growth and showing little or no sign of disease or storm
damage.
B - Healthy tree, exhibiting vigorous growth, showing minimal signs of disease, but having
suffered notable storm damage.
C - Semi-healthy tree, showing some signs of decline which are perhaps correctable (i.e., some
insect infestations, some diseases, root compaction, etc.); still shows signs of growth, but suffered
significant storm damage.
D - Tree in declining health; has suffered extensive storm damage; tree may still live for many
years without posing a hazard but may not be successfully treated to again become a healthy,
specimen tree.
F - Tree which is determined to be irreparably damaged, diseased or hazardous.
CONCLUSION
Due to the size and current condition, this tree will continue to become a greater hazard and should
be removed at earliest possibility.
With lack of a tree protection zone, or tree protection/preservation plan, during construction
it is apparent that the construction project and the substantial damage it caused to the tree
are the most probable cause of the decline and ultimate failure of this tree. As is evidenced by
the photographs provided hereinbelow, there was an obvious lack of regard and care for this
tree in connection with the The Town of Sullivan’s Island’s Wastewater Treatment Plant Seismic
and Flood Hazard Upgrade Project. The Sullivan’s Island Tree Protection Standards: ANSI A300
prohibits “excavating for utility or building construction” (Town of Sullivan's Island Tree
Protection Standards: ANSI A300) within the Critical Root Zone and the Town’s project
negligently violated the same at every phase.
RECOMMENDATIONS
1. Complete removal utilizing ANSI A300 Standards for Tree Care Operations.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 9 of 14
GLOSSARY
Acceptable risk--The degree or amount of risk that the owner, manager, or controlling authority is
willing to accept.
ANSI A300 Standards for Tree Care Operations--In the United States, industry-developed,
national consensus safety standards of practice for tree care.
Booklet style report--Booklet reports present information in an abbreviated book form. Booklet
reports are probably the most commonly used and readily recognizable report format.
Canopy--Upper portion of the tree consisting of scaffolding branches, smaller limbs, and twigs.
Diameter--The length of a straight line through the center of a circle.
Failure--Breakage of a stem, branch, or roots, or loss of mechanical support in the root system.
Hazard--Situation or condition that is likely to lead to a loss, personal injury, property damage, or
disruption of activities; a likely source of harm. Tree part identified as likely source of harm.
Levels of assessment--Categorization of the breadth and depth of analysis used in an assessment.
Likelihood of failure--The chance of tree failure occurring within the specified time frame.
Likelihood of impact--The chance of a tree failure impacting the target in the specified time frame.
Targets--People, property, or activities that could be injured, damaged, or disrupted by a tree.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 10 of 14
Appendix A - Tree Map
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 11 of 14
Appendix B - Tree #1
Depiction of the tree’s proximity to the home resulting in a serious hazard.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 12 of 22
Note the loss of bark along the entirety of the trunk.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 13 of 22
Depiction of the peeling bark throughout the entirety of the trunk and leaders.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 14 of 22
Note the decay present on the buttress roots which compromises the structural stability of the tree.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 15 of 22
Depiction of the proximity of the construction area to the base of the subject tree. The privacy fence
was installed in the middle of the land clearing and excavation site for the project.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 20 of 22
Appendix D - Assumptions and Limiting Conditions
1. Any legal description provided to the consultant/appraiser is assumed to be correct. Any titles
and ownerships to any property are assumed to be good and marketable.
2. Care has been taken to obtain all information from reliable sources. All data has been verified
insofar as possible for the accuracy of information provided by others.
3. The consultant/appraiser shall not be required to give testimony or attend court by reason of this
report unless subsequent contractual arrangements are made, including payment of an additional
fee for such services described in the fee schedule and contract of engagement.
4. Loss or alteration of any report invalidates the entire report.
5. Possession of this report of a copy thereof does not imply right of publication or use for any
purpose by any person other than to whom it is addressed, without the prior expressed written
consent of the consultant/appraiser.
6. This report and values expressed herein represent the opinion of the consultant/appraiser, and the
consultant’s/appraiser’s fee is in no way contingent upon the reporting of a specified value, a
stipulated result, the occurrence of a subsequent event, nor upon any finding to be reported.
7. Sketches, diagrams, graphs, and photographs in this report, being intended as visual aids, are not
necessarily to scale and should not be construed as engineering or architectural reports.
8. Unless expressed otherwise: 1) information contained in this report covers only those items that
were examined and reflects the condition of those items at the time of inspection; and 2) the
inspection is limited to visual examination of accessible items without dissection, excavation,
probing, or coring. There is no warranty or guarantee, expressed or implied, that problems or
deficiencies of the tree or property in question may not arise in the future.
March 5, 2021 Marshall Badeaux - Consulting Arborist
Tree Report: 1423 Middle Street Page 22 of 22
Works Cited
Department, T. o. (n.d.). Town of Sullivan's Island Tree Protection Standards: ANSI A300.
Sullivan's Island, South Carolina, United States of America.
Island, T. C. (2005). ORDINANCE TO AMEND CHAPTER 21 OF THE ZONING ORDINANCES
FOR THE TOWN OF SULLIVAN'S ISLAND. Retrieved from Sullivansisland.sc.gov:
https://sullivansisland.sc.gov/sites/default/files/Documents/Town%20Codes%20%26%20Or
dinances/Sec21%20Zoning%20AMENDED%20111720%20With%20Bookmarks.pdf
Purcell, L. (n.d.). Construction and Trees: Guidelines for Protection. Retrieved from Purdue