WATER AND SEWER COMMITTEE MINUTES
Friday, October 2, 2015, 8:30 AM
Water & Sewer Department Office
1. Call to Order
The Freedom of Information Requirements having been met, the meeting was called to
order at 8:47 AM. Those present were Committee Members, Bachman Smith, Susan
Middaugh (Chair); Staff Members Greg Gress and Andy Benke; and Consultant Frank
Davis. Mark Howard and Jason Blanton were absent.
2. Rate Study Planning & Implementation
Frank Davis, of Raftelis Financial Consultants, reviewed the Town's current rate
structure and methodology for W&S charges and the proposed scope of work for the
planned Rate Study. For example, there was preliminary discussion of the current Base
Charge for all customers. Nationally, this is typically 30% of the W&S bill. The Town
determines the Base Charge on meter size. Mt. Pleasant bases this on REUs (Residential
Equivalent Usage) and also has an impact fee for new construction. The Rate Study goals
were discussed. The next step is data collection to identify how charges are distributed
under the current W&S rate structure using 2014 data, and how this distribution would
differ if the Town changed to an REU rate structure. The consultant will present this
information to the Committee when it is available.
3. I&I Phase II Planning continued.
a. Application for 1% SRF Green funds. The required study is being done to
determine whether the work proposed for Phase II will reduce power (electricity)
use by 20% to qualify for a 1% SRF loan.
b. Phase II cost estimate: This is being worked on.
c. Application for SRF funding: Once a cost estimate is available, the Town will be
ready to apply to the State Revolving Fund for the Revenue Bond needed to fund
this project. As in Phase I, a consultant will be engaged to prepare the application
and manage the considerable paperwork required.
4. Communications / other items from WWTF Manager, Greg Gress
a. Noise reduction at WWTP : Berm/plantings & sound shielding
There was discussion of methods for ameliorating the motor whine that has been
bothering homeowners across the park on Sta 22 for the past 18 months since the
trees were removed along the fenceline at the West end of the WWTP to make
room for plant improvements. The Committee decided to landscape along the
Approved Oetober 12, 2015
Approved at the October 12, 2015 Council Workshop
fence line with trees, selected to provide sound screening. Funding will be
requested from the Tree Bank and Park Landscaping funds. It was also decided to
construct a covering, with soundproofing, for the two motors. These motors will
be replaced in 2-3 years as part of planned improvements to the WTTP.
b. 1220 Cove Pumping Station: Not Discussed
c. Trimming fence line vegetation at water pumping station: Not Discussed
5. Executive Session: Contractual Matter
At 10:03 AM, a MOTION was made by Bachman Smith, seconded by Susan Middaugh,
and approved 2/0 to go into executive session to discuss the Charleston Water System
Contract for Purchase Capacity Water Agreement.
At 10:55 AM, a MOTION was made by Bachman Smith, seconded by Susan Middaugh,
and approved 2/0 to come out of executive session. No votes were taken in Executive
Session.
6. Next W&S Committee meeting is planned for Thursday, October 22, 2015, 8:30 AM.
7. Adjournment: The meeting was adjourned at 11:00 PM on a motion by Bachman
Smith, seconded by Susan Middaugh, approved 2/0.
Pending Items (To be considered in future meetings)
a. Pre-Disaster Mitigation Grant for submersible pumps
b. Update of W&S Policy on Sewer Laterals
c. ASR: Aquifer Storage and Recovery
d. Water Pumping Station Fencing & Site Improvements
Approved October 12, 2015