WATER AND SEWER COMMITTEE MINUTES
Thursday, June 23, 2016, 8:30 AM
Water & Sewer Department Office
1. Call to Order & Freedom of Information Requirements
The Freedom of Information Requirements having been met, the meeting was called to
order at 8:35 AM. Those present were Committee Members, Mark Howard, Bachman
Smith, Susan Middaugh (Chair) and Staff Members Greg Gress, Andy Benke and Jason
Blanton. Also attending were Recreation Committee Chair Sarah Church and two Park
Foundation members Manda Poletti and Kaye Smith.
2. Poe Avenue Playground plans & location of water and storm water pipelines
There has long been a well-used and valued Town playground in this area. At present, the
Park Foundation has developed plans to upgrade the play equipment. The basic problem
is that the Poe playground is essentially within an extensive DOT Right of Way along
Poe Ave and both a water main and an 18” storm water pipeline run through this area as
well as water lines to adjacent houses. Some of the existing, old play equipment lie on
top of these utility pipelines and have underground stabilizing components located inches
away. Current requirements are for a 10 foot clearance on either side of pipelines. This
requirement substantially limits the location for installation of new playground
equipment, which cannot be relocated in the old, non-compliant location.
After thorough discussion, a reduction of the setback requirement from 10 ft. to 5 ft. was
arrived at on the grounds that (1) this was Town property and this decision would not
constitute a precedent for private property and (2) this would be an improvement in the
current situation where current encroachment is within 5 ft.
MOTION: to reduce the required setback from pipelines in Poe Park from 10 feet
to 5 feet. Motion was made by Bachman Smith, second by Mark Howard, passed
unanimously 3/0.
NOTE (added at 7/25/2016 Water & Sewer Committee Meeting): This decision was
made against the advice of Staff. Greg Gress, as the W&S Utilities Manager, opposed
this departure from the 10 ft. setbacks that are standard for Sullivan’s Island and in
accordance with nationally recognized Best Practices.
Approved at the July 25, 2016 Water & Sewer Committe Meeting
3. Sta. 19 & 22 contract and cost of relocating W&S utilities due to road work.
There was discussion about whether the contractor or the Town should pay Charleston
County for utility costs associated with storm drain work performed by the contractor for
the County at Stations 19 and 22. The Town paid for this item at Sta. 24, but the contract
for Sta. 19 and 22 states that the contractor is responsible. After discussion it was decided
that the Town would ask the County for 50/50 cost sharing for the $15,486 cost. The
Town portion is to come from the Town General Fund. In the future, the Town will
discuss this with the County in advance of work that will require follow-up road repairs.
4. Poe Ave (Hennessy to Palmetto) sewer line easements.
The Town will be replacing the sewer line in this location and the lateral lines from the
homes to the new sewer line will also need to be replaced. There was discussion of two
options for lateral replacement. (1) The Town can contract with a plumber to carry out,
and pay for, the work for all the lots to take advantage of economy of scale. (2) Each
homeowner can hire their own plumber to carry out the work, with the Town providing
reimbursement to the homeowner up to a specified dollar amount, with stated time frame
for reconnection. This will be a staff decision with consideration of homeowner input.
5. FEMA grant update
If the FEMA Grand is awarded, there may be residual funds available with a potential
25/75 funding formula. Accordingly, the W&S Committee reviewed Town funds from
the previous lot sales that could be used for a 25% match for the following items. It was
determined that should additional FEMA funds become available, the Town would be
able to provide a 25% match for these items that are all related to the WWTP upgrade.
a. updated cost estimate of WWTP
b. on-site project inspector
c. generator/sludge press building enclosure
d. Chlorine system upgrade from gas to tablet
e. SCADA Monitoring System upgrade
f. Pole barn
The expected Timeline for this project, if awarded, will be 9 months for engineering followed
by RFP, Bid and 18 months for construction.
6. Proposed new billing software: This will be discussed in Town Council meetings.
7. Communications / Additional Items from WWTF Manager, Greg Gress
Pending Items a, c and d (below) were briefly discussed.
Water pumping station fencing and site improvements: This work is scheduled to begin
in July and completed by end of August, to include required vegetation and tree removal,
demolition of concrete from an old clarifier and installation of an 8 ft. shadowbox fence.
Approved at the July 25, 2016 Water & Sewer Committe Meeting
Rate Study and CWS contract revisions: It is anticipated that the Rate Study will be
completed in August. The consultants were asked to include additional work (1) to
compare the water rates that the Town currently pays to CWS with the rates paid to CWS
by neighboring communities and (2) reviewing the rates the Town is contractually
obligated to pay CWS.
8. Next W&S Committee meeting will be Thursday, July 21, 2016, at 8:30 AM.
9. Adjourn: The meeting was adjourned at 10:30 AM on a motion by Bachman Smith,
second by Mark Howard, passed by unanimous vote 3/0.
FY17 Planning & Review of Pending Items
a. Rate Study – in progress
b. Poe Ave / Hennessy Sewer line relocations – in progress
c. Water pumping station fencing and site improvements – in progress
d. CWS contract revisions – in progress
e. W&S billing software replacement - in progress
f. Revision of Appeals Policy and Procedures
g. Update of Private Sewer Lateral I&I Reduction Policy
h. Development of a Cost Recovery Program
i. ASR: Aquifer Storage and Recovery
j. Pre-Disaster Mitigation Grant for submersible pumps
Approved at the July 25, 2016 Water & Sewer Committe Meeting