WATER AND SEWER COMMITTEE MINUTES
Thursday, July 21, 2016, 8:30 AM
Water & Sewer Department Office
1. Call to Order & Freedom of Information Requirements
The Freedom of Information Requirements having been met, the meeting was called to
order at 8:30 AM. Those present were Committee Members Mark Howard and Susan
Middaugh (Chair) and Staff Members Greg Gress, Andy Benke and Jason Blanton.
Bachman Smith was absent due to a schedule conflict.
2. Approval of Minutes from W&S Committee Meeting on June 23, 2016
The minutes were approved, pending the addition of a statement reflecting the opposition
of the Facility Manager, Greg Gress, to the action taken by the W&S Committee in
allowing a 5 foot setback, instead of the required 10 foot setback, from the Town water
line for Poe Park. Susan Middaugh will make this correction and circulate the corrected
minutes for final approval.
3. SRF Loan Application for Phase II: On track, waiting for packet from SRF needed to
finalize the loan/bond.
4. FEMA grant: update
FEMA has agreed to the Town’s request to provide the required Jurisdictional
Determination by the Army Corps of Engineers after the grant award instead of making it
a prerequisite of the award. At present, the FEMA Grant has not cleared the Historic and
Environmental review section. Greg Gress has been provided the contact information for
the SC State Historical Preservation Office to see about completion of this section.
5. Review of FY17 Planning & Pending Items:
Items Currently in Progress
a. Rate Study: This should be completed in August.
b. CWS contract revisions: There is a conference call with Town staff, Raftelis
consultant and Attorney Sheedy to discuss the Town’s water rates charged by
CWS under the terms of our contract.
c. Poe Ave (Hennessy to Palmetto) Sewer line relocations: Greg Gress is meeting
today with the four homeowners who are being impacted by the sewer line
improvement in the easement located between their properties. This is the fourth
such meeting to answer all questions and gain approval of a defined easement
Approved at the August 16, 2016 Regular Council Meeting
although the Town has full authority, as written in their deeds, to conduct this
utility work.
d. Water pumping station fencing and site improvements: Work has commenced
and should be completed in August. This includes vegetation and tree removal as
needed, removal of an old concrete clarifier and installation of an 8 ft. wood,
shadowbox fence with landscaping as needed after installation.
e. W&S billing software replacement: Bids are being obtained by the Town.
Items to be Considered in FY2017, Starting with the August Meeting .
f. Revision of Appeals Policy and Procedures: This will be the next item the W&S
Committee will take up, starting with the August 25, 2016 meeting. Mr. Gress
will email to Committee members Section 20-12 of the Ordinances that describe
the current policy.
g. Update of Private Sewer Lateral Policy relevant to I&I Phase II: After item f.
above is completed, this will be the next item to be taken up by the Committee.
Mr. Gress is updating information on Lateral Policy based on leak-free
certification programs from a conference he attended in Atlanta.
h. Development of a Cost Recovery Program: Third in line will be consideration of a
CRP and a future Asset Management Plan. This is an on-going and long-term
process. Mr. Gress will provide an outline of the overall process, review the
current status of the CRP and suggest the next steps to be taken.
Items to be Considered as FEMA funding and other financial considerations are known.
i. ASR: Aquifer Storage and Recovery: Funding will be needed for a feasibility
study to determine whether ASR is viable using Town’s existing deep well. If so,
this would provide extensive water storage for back-up emergency use.
j. Pre-Disaster Mitigation Grant for submersible pumps: Funding will be needed for
the engineering study that is required to develop a FEMA grant application to
provide 75% funding for replacing and flood-proofing the Town’s five aging
sewer line pumps.
6. Communications / Additional Items from WWTF Manager, Greg Gress
Manda Poletti emailed a revised plan for Poe Park with 5 ft. setbacks from the Town
water line and 5 ft. setbacks from the lateral water line to one of two houses served by
this line. The drawing also shows the location of proposed playground equipment. The
remaining problems are: (1) the submitted drawing does not show the location of the
DOT 18” storm water pipeline or the location of the lateral water line that runs to the
second house served by this line and (2) the drawing is not based on a formal survey as
Approved at the August 16, 2016 Regular Council Meeting
previously requested, showing property pins and the Town property lines and DOT
ROWs. Greg provided the W&S Committee with a copy of the Poletti sketch with the
approximate location of the storm water pipeline and the second water line. The chair
will communicate with Manda Poletti and request the remaining information.
Mr. Gress also updated the committee on maintenance and repair of the two clarifiers and
gear boxes and plans to work on 100 ft. of water main at Sta. 10.
7. Next W&S Committee meeting will be Thursday, August 25, 2016, at 8:30 AM.
8. Adjournment at 9:40 AM on a motion by Mark Howard, second by Susan Middaugh
and unanimous approval 2/0.
Approved at the August 16, 2016 Regular Council Meeting
Source: Town of Sullivan's Island website. First collected Oct 24, 2026.