Minutes
City of Goose Creek · Berkeley County · meeting of Oct 20, 2020 · Minutes
Open the original document More from City of Goose Creek
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MINUTES
CITY OF GOOSE CREEK
ARCHITECTURAL REVIEW BOARD MEETING
MONDAY, OCTOBER 19, 2020, 6:30 P.M.
MARGUERITE H. BROWN MUNICIPAL CENTER
519 N. GOOSE CREEK BOULEVARD
I. CALL TO ORDER
Chairperson Clopton called the meeting to order at 6:30 p.m.
II. ROLL CALL
Present: Gary Becker ; Sharon Clopton, Ricky Dresel ; Jen Wise; Lisa
Burdick; David Cantrill
Absent: None
Staff Present: Director of Planning and Zoning Mark Brodeur; Administrative
Assistant Lili Ortiz-Ludlum
III. REVIEW OF MINUTES – SEPTEMBER 21, 2020
Motion: A motion was made to accept the minutes as presented. Moved
by Board Member Cantrill, Seconded by Board Member Dresel.
Discussion: It was stated there were two spelling errors.
Vote: All voted in favor (6-0). Motion carried.
IV. MINOR APPLICATIONS – NEW BUSINESS
A) REV: 201 ST. JAMES AVE, SIGNAGE
Mr. Hugh Welch of Carolina Sign Company presented the application. He stated the
applicant is requesting a face change on the roadside from Heritage Trust to REV Credit
Union. He stated they painted the pylon black to go with the brand. It was stated that the
sign has already been installed prior to ARB approval. There was confusion regarding if
this was a temporary or permanent sign. Mr. Welch stated this sign will be there for a
year. The board inquired to City staff the definition of a temporary sign. Mr . Brodeur
stated a temporary sign is a sign that is up for ninety days or less. He stated this sign will
be up for 365 days and they applied for a full sign permit. It was noted that this sign was
installed prior to a permit being issued. Mr. Welch stated due to the length of time it
takes to get a permit issued (once a month) the applicant needed the sign installed
sooner. The board stated that all businesses have to wait until ARB approval. Discussion
regarding this sign being a pole signed ensued. Mr. Brodeur stated per the advice of the
City Attorney, any existing sign in the City that is nonconforming is a vested right and
they can reuse and reface a pole sign. Board Member Dresel stated the board requests
that addresses be added to monument signs and would like to see that the address is
added to this sign.
Motion: A motion was made to accept the application with the addition
that the address is added to the pillar to keep it consistent with
the other signs the ARB has approved. Moved by Board Member
Dresel, Seconded by Board Member Burdick.
Discussion: Board Member Cantrill inquired if there is a City standard for
size of street numbers. Mr. Brodeur stated eight inches. The
Board requested the address be located on both sides of the
pylon.
Amended Motion: The motion was amended that the address numbers be added to
the black post in white, and a minimum of eight inches tall on
both sides.
Roll Call Vote: Board Member Dresel, Board Member Cantrill and Board
Member Burdick voted in favor . Board Member Becker,
Chairperson Clopton and Board Member Wise opposed. Motion
did not pass (3 to 3).
Mr. Welch inquired as to why it did not pass. Chairperson Clopton stated he is welcome to
stay until after all the applicants have presented to discuss this further.
B) CREEKSIDE CHURCH: 506 ST. JAMES AVE., SIGNAGE
Mr. Welch of Carolina Sign presented the application. He stated the applicant would like to
black out the yellow and stain glass design on the current sign and paint it all black. It was
stated the structure will remain and the Creekside Church panel will be installed in the
structure. It was stated the current structure is made of aluminum. There was some concern
with the board as to how the paint will adhere to the aluminum.
Motion: A motion was made to accept the application as submitted.
Moved by Board Member Cantrill, Seconded by Board Member
Becker.
Discussion: There was concern about how the background of the sign will
look painted black.
Roll Call Vote: Board Member Becker, Board Member Cantrill, Chairperson
Clopton, Board Member Burdick and Board Member Wise all
voted in favor. Board Member Dresel opposed. Motion passed
(5-1).
V. MAJOR APPLICATIONS – OLD BUSINESS
C) CHAO GOYANO/SHOPPING CENTER: 408 RED BANK RD., ELEVATIONS, COLORS
AND MATERIALS.
Mr. Schumm presented the application for 408 Red Bank Road . He presented the
elevation, colors, and materials on a poster board to the ARB . He stated the colors are
Moth Wing, China Doll and Tricorn Black and presented color swatches to th e board. He
proposed to paint the bottom six feet the darker color and the top will be the lighter color.
He stated there will be an awning over the private entrance into the private party room,
another over the storage area, and a gable type entrance over the main entry. He stated
signage will be presented at a future meeting. He stated the HVAC unit is already screened
with a parapet. He stated all the supports and post will be timber and the roofs will be
black. He stated the dumpster will be located behind the building and the enclosure
material is natural timber. The lumber for the awning is also natural timber and sealed
to protect it. Mr. Brodeur presented a status update regarding this project. The board
stated they would like the exposed wood on the dumpster enclosure and front awning to
be sealed.
Motion: A motion was made to accept the application as submitted with
the addition that sealer be applied to all exposed wood. Moved
by Board Member Becker, Seconded by Board Member
Cantrill.
Discussion: There was none.
Vote: All voted in favor (6-0). Motion carried.
VI. MAJOR APPLICATIONS – NEW BUSINESS
D) WEEKS & IRVINE OFFICE BUILDING: 503 N. GOOSE CREEK BLVD., SITE,
PARKING, LANDSCAPING, ELEVATIONS, COLORS, MATERIALS
Mr. David Shook presented the application. He stated this is a 7 ,800 square foot office
building for Weeks and Irvine. He stated the building will consolidate their operations
and administrative groups into one location.
A second representative stated this is a heavily wooded site in which he proposed to wrap
a sizeable tree barrier along with landscape buffers against the single- family neighbors
and Carol Drive. He stated the parking lighting will be 14’ poles with acorn fixtures and
located in the tree island. He stated screening of mechanicals is located in the rear using
a hardy plank screening which will also be the same material used for the dumpster.
Mr. Shook read a letter written by Robert L. Irvine, III that explains th e use, proposed
parking requirements, and hours of operations. He presented a sample to the board with
paint colors and materials.
It was stated that the HVAC is over the setback line on the site plan. The representative
stated they will relocate them. Discussion regarding the number of parking spaces
ensued. Mr. Brodeur stated currently there is no restriction on the upper limit of parking
spaces.
Motion: A motion was made to accept the application with the
amendment that the HVAC, as well as the screening , is brought
into the setback, and would like to see the parking cut down.
Moved by Board Member Dresel, Seconded by Board Member
Becker.
Discussion: Chairperson Clopton stated the excessive parking is a major
concern. Board Memb er Burdick shared her concerns with
exiting the parking lot after meetings.
Vote: All voted in favor (6-0). Motion carried.
E) 7 ELEVEN/ROOST: HWY 176 & MYERS RD SITE, LANDSCAPING, ELEVATIONS
Mr. Pat Budronis presented the application. He stated this property was recently annexed
into the City last week with a G eneral Commercial (GC) zoning. He presented the
landscape, site plan, building elevations, and materials. Concerns regarding entrance
from Myers was stated from the board. Additional buffering with evergreens was
suggested by the board. Board Member Wise inquired about a water retention pond. Mr.
Budronis stated it will be managed underground with the storm water system.
Motion: A motion was made to accept the application with additional
buffering and the use of evergreens in the buffer area. Moved
by Board Member Burdick , Seconded by Board Member Wise.
Discussion: Chairperson Clopton stated she will not approve materials as
samples and colors were not provided.
Amended Motion: The motion was amended to allow City Staff to approve the
materials. Moved by Board Member Burdick , Seconded by
Board Member Wise.
Discussion: Multiple Board Member s stated they preferred to see the
materials.
Roll Call Vote: Board Member Dresel, Board Member Burdick and Board
Member Wise voted in favor. Board Member Becker, Board
Member Cantrill and Chairperson Clopton opposed. Motion did
not pass (3-3).
Amended Motion: A motion was made to approve the proposal only including the
site plan and landscaping. Moved by Board Member Cantrill,
Seconded by Board Member Becker.
Discussion: None
Roll Call Vote: Board Member Dresel, Board Member Becker, Board Member
Cantrill, Chairperson Clopton, and Board Member Wise voted in
favor. Board Member Burdick opposed. Motion carried (5-1).
Mr. Budronis inquired when he comes back to present materials, will it be okay to include
signage. Chairperson Clopton stated yes.
The board decided to revisit Rev and addressed Mr. Hugh Welch of Carolina Sign
Company. Chairperson Clopton stated the issue is that the sign was installed prior to ARB
approval and is not permitted. Mr. Welch stated there are a lot of signs in the City that
are up and not permitted. Chairperson Clopton stated we take care of them as we can.
She stated she does not have a problem with the sign, but she does not know what the
remedy should be and inquired if City staff could provide insight.
Mr. Brodeur stated the board can take any action they would like. They can deny the
permit or approve the permit. Board Member Cantrill stated this has happened before
with a shopping center in the C ity. He stated it is frustrating for the board to go through
this repeatedly but he thinks in the end Mr. Welch is doing what his customer asked him
to do and the customer is the one who is under our jurisdiction. Board Member Cantrill
stated if the customer were here, we could chastise them, but in the end, we are limited,
and we are here to approve the sign. He inquired if the board wants to punish Rev or does
the board want to be pro-business for the City. He stated i t is a catch 22. Mr. Brodeur
stated we could get together in a work session to discuss how to handle situations like
this; however, with this application this evening , the choices are to approve the sign as
presented, deny the sign as presented or recommend a new sign. Board Member Cantrill
stated that Mr. Welch mentioned earlier that other municipalities are quicker to approve
signs and inquired if the City is an outlier. Mr. Brodeur stated the City is an outlier. He
stated that m ost Cities do not require signage to come through their ARB for review,
unless it is part of an overall larger project with the architecture. He stated having to wait
thirty days for ARB approval does hinder some businesses. Board Member Cantrill stated
the alternative is a temporary banner sign that could be up for ninety days. Board
Member Wise stated we do need to be business friendly, and we do not need to be petty;
however, Mr. Welch knows the rules and the rules are in place for a reason.
Motion: A motion was made to accept the application as submitted .
Moved by Board Member Dresel, Seconded by Board Member
Burdick.
Discussion: Chairperson Clopton stated maybe we all learned a lesson
tonight that this will not happen again between staff and sign
companies.
Roll Call Vote: Board Member Dresel, Board Member Cantrill, Chairperson
Clopton, Board Member Burdick and Board Member Wise voted
in favor. Board Member Becker opposed. Motion carried (5-1).
VI. COMMENTS FROM THE BOARD
Board Member Wise stated the Smile Dentist in the Goose Creek Village window sign is
still up. Mr. Brodeur stated City staff has had a conversation with the developer of Goose
Creek Village and we are asking the developer to please inform his tenants, new and old,
of what the sign requirements are. Mr. Brodeur shared the political sign regulations with
the board.
Chairperson Clopton stated she would like clarification regarding Tom Risso leaving the
ARB. Mr. Brodeur stated Mayor and City Council would like to interview everyone
interested in applying or reapplying for a position on the City’s Boards and Commissions
and if the board would like more of an explanation they can contact the City Clerk.
Chairperson Clopton inquired if anything is planned for Mr. Risso as he was a volunteer
on the ARB for 28 years. Mr. Brodeur asked the board to send suggestions via e -mail as
to how they would like to see Mr. Risso recognized.
VII. COMMENTS FROM STAFF
No comments from staff.
Chairperson Clopton asked if anyone in the audience would like to speak. Councilmember
McSwain introduced herself. Chairperson Clopton inquired if she was the
Councilmember liaison assigned to the ARB. Councilmember McSwain stated no, Mayor
Pro Tem Condon and Councilmember Green-Fletcher are the City Council liaisons for the
ARB. Chairperson Clopton stated she appreciates Councilmember McSwain being
present.
VIII. ADJOURNMENT
Motion: A m otion was made to adjourn ( 7:55p.m.) Moved By: Board
Member Cantrill, Seconded By: Board Member Wise.
Discussion: There was none.
Vote: All voted in favor (6-0). Motion carried.
__________________________________________________________________ Date_____________________________
Sharon Clopton, Chairperson
Source: City of Goose Creek website. First collected Oct 24, 2026.