RecordWell Data

Agenda

City of Goose Creek · Berkeley County · meeting of Mar 19, 2018 · Agenda packets

Open the original document More from City of Goose Creek

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Architectural Review Board Monday, March19, 2018 6:30 p.m. City of Goose Creek Marguerite H. Brown Municipal Center 519 N. Goose Creek Blvd. Goose Creek, South Carolina MEMORANDUM TO: Members of the Architectural Review Board FROM: Brenda Moneer Planning and Zoning Specialist DATE: March 13, 2018 SUBJECT: Notification of ARB Meeting This is to inform you that the Architectural Review Board (ARB) will meet Monday, March 19, 2018, 6:30 p.m. at City Hall. Enclosed please find agenda material for the meeting. If you have any questions or comments, please don’t hesitate to contact me at 797 - 6220 ext. 1116, or Kara at ext. 1118. We look forward to seeing you Monday evening. Please note this Agenda was posted at City Hall and on the City Website prior to meeting. AGENDA CITY OF GOOSE CREEK ARCHITECTURAL REVIEW BOARD MEETING MONDAY, MARCH 19, 2018 6:30 P.M. MARGUERITE BROWN MUNICIPAL CENTER CITY HALL COUNCIL CHAMBERS 519 N. GOOSE CREEK BLVD. VISION STATEMENT: Goose Creek is a city that has achieved a balance between growth, the environment, and the preservation of its small town character. The city’s primary concern is for the lifelong needs of all its citizens. Goose Creek is a partnership between its government and its people in the determination of the city’s future. MISSION STATEMENT: Objectively guide the evolution of commercial and industrial projects creating a synergy between the business and residential community consistent with the city of Goose Creek’s vision statement. THE PROCEDURE FOR PARTICIPATION WILL BE AS FOLLOWS: Minor applications will be allotted three (3) minutes to present to the Board, major applications will be allotted five (5) minutes to present. Board members will be allowed to ask questions and to discuss merits of the application following the presentations. The question/discussion period by the Board will be limited to five (5) minutes for minor applications and ten (10) minutes for major applications. AGENDA: I. Call to Order – Chairperson Sharon Clopton II. Review of Minutes from February 19, 2018 III. Old Business – Major Applications A. Popeyes – Elevations, Colors, Materials B. E-Z Auto Now – Site, Landscaping, Elevations, Colors, Materials IV. Comments from Board V. Comments from Staff VI. Adjournment   MINUTES  CITY OF GOOSE CREEK  ARCHITECTURAL REVIEW BOARD MEETING  MONDAY, FEBRUARY 19, 2018, 6:30 P.M.  MARGUERITE H. BROWN MUNICIPAL CENTER  519 N. GOOSE CREEK BOULEVARD        I. Call to Order – Chairperson, Sharon Clopton  Motion:    at 6:28 pm,  Action: Called Meeting to Order, Moved by Sharon Clopton  Roll Call.  Present:  Joel Arenson, Gary Beck er, David Cantrill, Sharon Clopton, Tom Risso.  Absent:    Lisa Burdick  Staff Present:    Kara Browder, Brenda Moneer      II. Review of Minutes from December 18, 2017, and January 16, 2018  Motion:    Approve the minutes as presented.,  Moved by Joel Arenson,   Seconded by Gary Becker.  Discussion:  There was none.  Vote:      All voted in favor. ( summary: Yes = 5).      III. Old Business – Minor Applications    A. CiCis – Wall Mount Sign    The applicant was not present.      B. Splash‐N‐Dash Vacuum Systems    The applicant presented the revised application to the Board.   He mentioned the color of the  hoses  would  be  changed  to  black,  and  the  stantions  would  also  b e  b l a c k .   T h e  a p p l i c a n t   mentioned the coin vacuums would remain per the owner.  Chairperson Clopton inquired to the  applicant if the new system would consist of ten vacuuming arch es.  The applicant confirmed it  would,  and  stated  the  design  would  still  be  installed  at  an  angle  as  shown  in  the  submittal.   Chairperson Clopton inquired if the vacuums would have a cover over them.  The applicant stated  no.  There was discussion about the recoating of the equipment with a satin black.     Motion:   Approve  the  application  as  submitted  contingent  upon  the  arch es  and  hoses to be a black and satin color., Moved by Joel Arenson,   Seconded by Gary Becker.  Discussion:  Chairperson Clopton inquired about the location and color of the collection  container.  The applicant stated that it would be located at th e front left  corner of the property, and is a chrome color.  Mr. Arenson inquired if each  arch had individual pumps.  The applicant stated it would all be contained  in  the  one  vacuum  pump.    The  applicant  also  noted  they  could  provide  landscaping around the pump area along Red Bank Road if needed,  and  presented  a  landscaping  plan.    There  was  discussion  about  the  types  of  shrubs to be used for screening.  Mr. Cantrill inquired about t he height of  the pump.  The applicant stated it is approximately 3’ x 3’ x 5’ tall.  Vote:     All voted in favor. ( summary: Yes = 5).      A. CiCis – Wall Mount Sign and Tenant Panel    The applicant presented the application to the Board with the modifications to the tenant panel.   Chairperson Clopton inquired to the applicant if the building s ignage had been installed, and if  the tenant panel would match the façade signage.  The applicant  stated that was correct.  Mr.  Becker inquired if the background would be red as submitted.  The applicant answered yes.  There  was a brief discussion about the condition of the building.  Th ere was also discussion about the  modified tenant panel not matching the façade signage.  Staff mentioned that the applicant and  the  owner  was  informed  that  the  Board  would  like  to  see  both  signs  match.    The  applicant  presented alternate options.  The Board discussed and chose Alternative “A”.        Motion:   Approve the application as submitted with the application mod ification of  the alternative “A” tenant panel.,  Moved by David Cantrill,  Seconded by  Gary Becker.  Discussion:  There was none .  Vote:     All voted in favor. ( summary: Yes = 5).      C. American Heritage Ambulance ‐ Signage    The representative presented the application to the Board.  The re was a brief discussion about  the location of the proposed and previous signage.  Staff noted  the applicant had amended the  application  for  the  freestanding  sign  to  meet  the  ordinance  cri teria.    Chairperson  Clopton  inquired about the frame on the building sign.  The applicant stated black.  It was confirmed this  would remain black.  There was discussion about the road signag e colors, and the panel on the  building to be replaced.  Mr. Cantrill inquired if it was lit.   The applicant stated no.  Chairperson  Clopton asked if the road signage was dual sided.  There was a detailed discussion about the road  sign  base,  landscaping  and  color,  lettering  font  to  be  a  navy  color  and  matching  on  both  the  building and road signage.    Motion:   Approve the application as submitted with the stipulation tha t the font and    color of the lettering match on the building and road signage w hich is a  dark blue., Moved by Joel Arenson, Seconded by Gary Becker.  Discussion:  There was none.   V o t e :      All voted in favor. ( summary: Yes = 5).      D. All State Insurance – Signage    The representative presented the application to the Board.  The re was discussion regarding the  criteria for maximum allowable tenant panels.  Staff stated that the tenant panels are within the  size of the shopping center signage      Motion:   Approve the application as submitted for the wall mounted sig n., Moved  by Joel Arenson, Seconded by Tom Risso.  Discussion:  Mr. Cantrill suggested the tenant panel be white with blue in  keeping with  the practice of matching the tenant panel and wall mount sign.  Motion:  Mr. Arenson amended his motion to add the stipulation that the  tenant  panel consist of a white panel with blue lettering, Seconded by Tom Risso   V o t e :      All voted in favor. ( summary: Yes = 5).       E. State Farm – Signage    The  representative  presented  the a p p l i c a t i o n  t o  t h e  B o a r d .   C h airperson  Clopton  verified  the  tenant panel would be white with red lettering.  The applicant agreed it would.    Motion:   Approve the application as submitted for the wall mounted sig n., Moved  by Tom Risso, Seconded by David Cantrill.  Discussion:  There was none.   V o t e :      All voted in favor. ( summary: Yes = 5).       F. MoMo ‐ Signage    The representative presented the application to the Board.  Cha irperson Clopton inquired if the  a w n i n g s  w e r e  e x i s t i n g .   T h e  a p p l i c a n t  s t a t e d  y e s .   T h e r e  w a s  d iscussion  about  the  type  of  business.      Motion:   Approve the application as submitted for the wall mounted sig n., Moved  by Tom Risso, Seconded by Joel Arenson.  Discussion:  Chairperson Clopton inquired if the previous signage was still  there, and  inquired about the condition of the façade of the building.  Th e applicant  stated he thought it was gone.  The applicant stated he would relay that to  the business.  Motion:  Mr. Risso amended his motion contingent upon refurbishing the  raceway  as necessary.  The applicant stat ed he would relay to the busin ess.  Mr.  Arneson seconded the amended motion.    Discussion:  Mr. Cantrill inquired about the height of the signage.  The ap plicant stated  it would be installed as shown in the proposal.   V o t e :      All voted in favor. ( summary: Yes = 5).       G. Pet Rest – Front Elevation Modifications    The representative presented the application, material and colo r samples to the Board.  There  was discussion about the scope of work, included the materials specifications and colors to match  the existing.  The applicant added the colors would match the existing.      Motion:   Approve the application as submitted for the wall mounted sig n., Moved  by Tom Risso, Seconded by David Cantrill.  Discussion:  There was none.   V o t e :      All voted in favor. ( summary: Yes = 5).       IV. New Business – Major Applications    H. Popeyes – Site, Landscaping, Elevations, Colors and Materials    Mr. David Banks presented the application to include the site, landscaping, elevations, colors and  materials to the Board.  There was discussion about the current building demo.  Mr. Banks stated  t h a t  t h e  l a n d s c a p i n g  w a s  a l t e r e d  a  b i t  d u e  t o  t h e  p o w e r  l i n e s  that  run  diagonally  across  the  property.  He added the signage would come later.  Chairperson Clopton inquired about buffers.   Staff added with like uses a buffer would not be required becau se of the like zoning at the side  and rear.  There was discussion about the fencing on the adjacent property.  Mr. Arenson inquired  about the HVAC system location, and the dumpster enclosure.  Mr. Banks stated the HVAC would  be a roof top system and the dumpster enclosure would match the building.  There was a lengthy  discussion about the colors as proposed, and the drive‐thru location.  Chairperson Clopton stated  concern for the yellow beige color.      Motion:   Approve the application as submitted.,  Moved by Joel Arenson, Seconded  by Tom Risso.  Discussion:  Mr. Cantrill asked for clarification on the green accents. The  representative  stated they were a fixed shutter.  Staff pointed out the render ing did not  show the roof top equipment completely screened.  The applicant  stated  the plans did address that, however, they had not incorporated  that into  the  color  rendering.    The  Board  requested  the  spacing  be  a  more e q u a l   space  between  each  shutter.    Mr.  Becker  asked  if  they  could  propose  a  different color in lieu of the gold.    Vote:   Chairperson  Clopton  requested  a  roll  call  vote.    Joel  Arenson ,  No;  Gary  Becker, No; David Cantrill, No; Sharon Clopton, No; Tom Risso, Yes.  Motion  Failed. (summary: Yes = 1; No 4).   Discussion:  Chairperson  Clopton  requested  that  the  applicant  bring  back  th e  application with an alternate color scheme.  Mr. Banks asked th e Board if  they would consider approval of site and landscaping, and review colors at  a future date.  Motion:  Approve the application as submitted minus the color scheme, a nd revisit  the  colors  at  a  later  date.    Moved  by  Tom  Risso,  Seconded  by D a v i d   Cantrill.  Vote:  All voted in favor. ( summary: Yes = 5).      I. E‐Z Auto Now – Site, Landscaping, Elevations, Colors and Materials    Ms. Ashley Blauser‐Silva presented the application to include t he site, landscaping, floorplans,  elevations, colors, and materials to the Board.  She detailed the location on Red Bank Road.  There  was a lengthy discussion about the landscaping, lighting, and lack of architectural interest in the  elevations.    There  was  additional  discussion  about  the  signage,  fencing,  landscaping  buffer,  easements  and  setbacks.    Chairperson  Clopton  stated  concern  for t h e  e l e v a t i o n s ,  a n d  l a c k  o f   architectural interest with materials or color.  The applicant  stated she was looking for a clean  look, and proposed an awning over the entry doors.    Motion:   Approve the application as submitted.,  Moved by Tom Risso, Seconded by  Joel Arenson.  Discussion:  T h e r e  w e r e  s u g g e s t i o n s  t o  a d d  s o m e  a r c h i t e c t u r a l  f e a t u r e s  t o  the  elevations.  Vote:   Chairperson  Clopton  requested  a  roll  call  vote.    Joel  Arenson ,  No;  Gary  Becker, No; David Cantrill, No; Sharon Clopton, No; Tom Risso, Yes.  Motion  Failed. (summary: Yes = 1; No 4).       J. Walmart ‐ Elevations, Colors and Signage    Mr. Chris Carlson presented the  application to include the elev ations, colors and signage to the  Board, along with color samples.  There was discussion about th e modifications to the signage  proposal to meet the sign ordinance regulations.  The Board sta ted concern for the use of the  orange on the entire corner.  Mr. Carlson stated he could box an area of orange behind the “pick‐ up”  signage.    The  Board  stated  favor  for  that  modification.    There  was  discussion  about  the  quantity of signage on the front elevation, and the sides to meet the zoning ordinance.  Staff also  mentioned the square footage exceeded the maximum allowance, ho wever if the calculations  were per channel letter, they would meet the requirements.  Mr. Cantrill inquired about the tree  l o c a t e d  i n  f r o n t  o f  t h e  P l a n t a t i o n  N o r t h  C o r n e r .   M r .  C a r l s o n  stated  they  would  propose  to  relocate the tree and freshen up the landscaping in that corner.  The applicant detailed the colors  with the color samples.    Motion:   Approve the application as submitted with the stipulation tha t the orange  be limited to a box around the pick‐up sign rather than the ent ire corner  portion of the facade., Moved by Tom Risso, Seconded by Joel Arenson.  Discussion:  There was none.   V o t e :      All voted in favor. ( summary: Yes = 5).       V. Comments from the Board     Chairperson Clopton mentioned the shopping center signage on Red Bank Road still did not have  the landscaping installed as per the approval.  She also mentioned the Mattress Firm was using a  waving balloon on weekends, and that there was a banner with permanent wording information  located at the First Baptist Church that needed Staff to check into.  She mentioned it was hanging  over their LED sign.  Chairperson Clopton inquired to staff about the number of shopping center  signage  for  the  Crowfield  Village.    Staff  stated  they  would  add ress  this  with  the  owners.   C h a i r p e r s o n  C l o p t o n  i n f o r m e d  s t a f f  t h a t  t h e  M e x i c a n  T e q u i l e r i a  had  been  painted  a  different  color with no ARB review.  Mr. Cantrill inquired about the Star bucks.  Staff noted the applicant  was approved to remove the asbestos from DHEC, however they are waiting on Corporate.  There  was a brief discussion about the pumps at the Time to Shine, an d how Staff is currently working  with the owner to resolve the screening issue around the pumps.    VI. Comments from Staff      Ms. Browder had no additional comments.    VII. Adjournment    Motion:   Motion  to  adjourn  at  8:16  pm.,  Action: A d j o u r n ,  Moved  by  Tom  Risso,  Seconded by Joel Arenson.    Discussion:  There was none.    Vote:    All voted in favor. ( summary: Yes = 5).          ________________________________________     Date_____________________________  Sharon Clopton, Chairperson   Page 1 of 1 ARCHITECTURAL REVIEW BOARD: SCOPE OF WORK P ROJECT: Popeyes L OCATION: 135 St James Ave This commercial development is located on the corner lot at St. James Ave. and Etling Ave. where the Berchador was located years ago. The applicant will be presenting plans to build a Popeyes sitdown restaurant with drive thru. The applicant has been working in conjunction with SCDOT to configure the access/egress for this property as shown on the civil plans submitted to Planning. Site – Street View – Existing Berchador Building provided by Google™ “ street view January 2017 ” 1.0 SUBMITTALS SPECIFICATIONS: DIVISION 7: THERMAL AND MOISTURE PROTECTION SECTION 7C: SHEET METAL WORKGENERAL PROVISION 1. SCOPE: FURNISH AND INSTALL GRAVEL STOPS, FLASHING, PARAPET CAP, DOWNSPOUTS, AND GUTTERS. A. ROOFING MEMBRANE FLASHING IS INCLUDED IN SECTION 7B: MEMBRANE ROOFING. MATERIALS 1. MATERIALS SHEET METAL: .032 ALUMINUM. 2. NAIL FASTENERS: 1 3/4" X 11 GAUGE GALVANIZED, STAINLESS STEEL, OR ALUMINUM ROOFING NAILS MAY BE USED FOR FASTENERS INTO WOOD WHEN CONCEALED ONLY. 3. WASHERS: NEOPRENE 4. SCREW FASTENERS: CORROSION-RESISTANT, SELF-TAPPING, HEX HEAD SCREW, 1/4" MINIMUM DIAMETER WITH SUFFICIENT LENGTH TO PENETRATE 1" MINIMUM INTO WOOD OR 1/2" MINIMUM INTO STEEL. PROVIDE NEOPRENE SEALING WASHER FOR EXPOSED FASTENING. PERFORMANCE 1. INSTALLATION: EXPOSED FLASHINGS SHALL BE PAINTED TO MATCH ADJACENT MATERIALS. VERIFY WITH POPEYES' REPRESENTATIVE. SECTION 7D: STANDING SEAM CANOPYPART 1 - GENERAL A. SUBMIT FOR APPROVAL SAMPLES, SHOP DRAWINGS, PRODUCT DATA. QUALITY ASSURANCE A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.WARRANTY METAL ROOF SYSTEM MANUFACTURER, UPON FINAL ACCEPTANCE FOR PROJECT, FURNISH A WARRANTY COVERING BARE METAL AGAINST RUPTURE, STRUCTURAL FAILURE AND PERFORATION DUE TO NORMAL ATMOSPHERIC CORROSION EXPOSURE FOR A PERIOD OF 20 YEARS. PART 2 - PRODUCTS (UC-4 SERIES, AS MANUFACTURED AND SPECIFIED BY UNA-CLAD., METAL ROOF SYSTEMS.) 2.0 MATERIALS A. METAL ROOF SYSTEM PROFILE: 1. UC-4 "NO CLIP", 1 1/2" HIGH BATTENS x 12" RIB TO RIB. (SMALL BATTEN-SB) 2. CONCEALED FASTENER B. GAUGE: 1. .026 GAUGE - STEEL C. TEXTURE: 1. SMOOTH. D. FINISH: 1. PREMIUM FLUOROCARBON COATING PRODUCED WITH KYNAR 500 OR HYLAR 5000 RESIN (20 YEAR WARRANTY.) E. MANUFACTURER: 1. UNA-CLAD OR EQUAL. PART 3 - EXECUTION 3.0 INSTALLATION A. COMPLY WITH SMACNA SHEET METAL MANUAL RECOMMENDATIONS. COMPLY WITH ACCESSORY MANUFACTURERS' INSTRUCTIONS AND RECOMMENDATIONS. COORDINATE INSTALLATION WITH ROOFING SYSTEM TO ENSURE WEATHERTIGHT PERFORMANCE. B. ANCHOR SECURELY TO STRUCTURE TO WITHSTAND INWARD AND OUTWARD LOADS. C. ISOLATE DISSIMILAR METALS TO PREVENT GALVANIC CORROSION. DIVISION 9: FINISHES SECTION 9G: EIFS PART 1 GENERAL 1.01 DESCRIPTION A. DESIGN REQUIREMENTS: THE STRUCTURAL WALL SYSTEM TO WHICH THE EIFS IS ATTACHED SHALL MEET L/240 MAXIMUM ALLOWABLE DEFLECTION CRITERIA AND APPLICABLE BUILDING CODE REQUIREMENTS. 1.02 SUBMITTALS A. SUBMIT SAMPLES FOR APPROVAL AS DIRECTED BY OWNER. 1.03 DELIVERY, STORAGE AND HANDLING A. ALL EIFS MATERIALS SHALL BE DELIVERED IN THEIR ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S NAME AND IDENTIFICATION OF PRODUCT WITH WRITTEN APPLICATION INSTRUCTIONS AND APPROPRIATE HEALTH, HAZARD, AND SAFETY DATA. B. ALL EIFS READY-MIXED MATERIALS SHALL BE PROTECTED FROM EXTREME HEAT, SUN AND FROST. FACTORY PROPORTIONED BAGGED MATERIALS SHALL BE STORED OFF THE GROUND AND PROTECTED FROM MOISTURE. 1.04 JOB CONDITIONS A. ALL EIFS MATERIALS SHALL NEVER BE APPLIED IF AMBIENT AND SURFACE TEMPERATURES CANNOT BE KEPT ABOVE 40° F DURING APPLICATION AND DRYING PERIOD. FOR INSTALLATION IN TEMPERATURES LESS THAN 40° F SUPPLEMENTARY HEAT SHALL BE PROVIDED. THE INSTALLED EIFS MATERIALS SHALL BE PROTECTED FROM EXPOSURE TO RAIN AND FREEZING UNTIL DRY. C. AFTER SATISFACTORY INSPECTION OF SURFACES AND CORRECTION OF ANY DEVIATIONS FROM SPECIFICATION REQUIREMENTS, THE EIFS INSTALLATION MAY BEGIN PER MANUFACTURER'S INSTRUCTIONS. D. THE STARTER STRIP OF MESH SHALL BE WIDE ENOUGH TO ADHERE 4" OF MESH ONTO THE WALL, BE ABLE TO WRAP AROUND THE BOARD EDGE AND COVER APPROXIMATELY 4" ON THE OUTSIDE SURFACE OF THE BOARD. THIS "BACKWRAP" PROCEDURE SHALL BE FOLLOWED AT ALL EXPOSED BOARD EDGES IN ACCORDANCE WITH DETAILS (EXAMPLE-WINDOW AND DOOR HEADS AND JAMBS). ALL AREAS WHERE THE EIFS MEETS DISSIMILAR MATERIAL OR TERMINATES (FOR EXAMPLE, WINDOW AND DOOR FRAMES) SHALL HAVE THE INSULATION BOARD CUT BACK FROM THE ADJOINING MATERIAL A MINIMUM OF 1/4" TO FORM AN ISOLATION JOINT. E. APPLY THE ADHESIVE TO THE BACK OF THE INSULATION BOARD. STAGGER VERTICAL JOINTS AND INTERLOCK BOARDS AT ALL INSIDE AND OUTSIDE CORNERS. APPLY FIRM PRESSURE OVER ENTIRE SURFACE OF THE BOARDS TO INSURE UNIFORM CONTACT. BOARDS SHALL BRIDGE SHEATHING JOINTS BY A MINIMUM OF 8". ALL BOARD JOINTS SHALL BE BUTTED TIGHTLY TOGETHER TO ELIMINATE ANY THERMAL BREAKS IN THE EIFS. CARE MUST BE TAKEN TO PREVENT ANY ADHESIVE FROM GETTING BETWEEN THE JOINTS OF THE BOARDS. ALL OPEN JOINTS IN THE INSULATION BOARD LAYER SHALL BE FILLED WITH SLIVERS OF INSULATION OR AN APPROVED SPRAY FOAM. F. NAILS, SCREWS, OR ANY OTHER TYPE OF NONTHERMAL MECHANICAL FASTENER SHALL NOT BE USED. G. EXPANSION JOINTS ARE REQUIRED IN THE EIFS WHERE THEY EXIST IN THE SUBSTRATE, WHERE THE EIFS ADJOINS DISSIMILAR CONSTRUCTION, AND AT FLOOR LINES IN MULTILEVEL WOOD FRAME CONSTRUCTION. THE EIFS SHALL TERMINATE AT THE EXPANSION JOINT TO PROVIDE APPROPRIATE JOINT SIZE (SEE DETAILS) AND ALL BOARD EDGES SHALL BE COATED WITH APPROPRIATE GROUND COAT AND MESH IN ACCORDANCE WITH STANDARD "BACKWRAPPING" PROCEDURE. APPROPRIATE SEALANT/PRIMER AND BACKER SHALL BE INSTALLED AFTER GROUND COAT IS FULLY DRY TO PREVENT ANY WATER FORM GETTING INTO OR BEHIND THE SYSTEM. H. USE OF PLASTIC OR METAL CORNER BEADS, STOPBEADS, ETC., IS FORBIDDEN. I. APPLY APPROPRIATE GROUND COAT OVER THE INSULATION BOARD WITH PROPER SPRAY EQUIPMENT OR A STAINLESS STEEL TROWEL TO A UNIFORM THICKNESS OF APPROXIMATELY 1/16". WORK HORIZONTALLY OR VERTICALLY IN STRIPS OF 40", AND IMMEDIATELY EMBED STANDARD REINFORCING MESH INTO THE WET GROUND COAT. THE MESH SHALL BE DOUBLE WRAPPED AT ALL CORNERS AND OVERLAPPED NOT LESS THAN 2-1/2" AT MESH JOINTS.AVOID WRINKLES IN THE MESH. THE FINISH THICKNESS OF THE GROUND COAT SHALL BE SUCH THAT THE MESH IS FULLY EMBEDDED. ALLOW GROUND COAT TO THOROUGHLY DRY BEFORE APPLYING PRIMER OR FINISH. J. DUPLICATE INSTALLATION PROCESS NOTED IN 3.01 M USING STANDARD MESH CREATING SECOND MESH LAYER AND ADDITIONAL IMPACT RESISTANCE. ALLOW TO DRY BEFORE APPLICATION OF EITHER STO PRIMER (OPTIONAL) OR STO FINISH. K. IF A PRIMER IS USED, APPLY WITH BRUSH, ROLLER OR PROPER SPRAY EQUIPMENT OVER CLEAN, DRY GROUND COAT AND ALLOW TO DRY THOROUGHLY BEFORE APPLYING FINISH. P. APPLY FINISH DIRECTLY OVER THE GROUND COAT (OR PRIMED GROUND COAT) ONLY AFTER THE GROUND COAT/PRIMER HAS THOROUGHLY DRIED. THE FINISH SHALL BE APPLIED BY SPRAYING, ROLLING OR TROWELING WITH A STAINLESS STEEL TROWEL, DEPENDING ON FINISH SPECIFIED. GENERAL RULES FOR APPLICATION OF FINISHES ARE AS FOLLOWS: 1. USE A CLEAN, RUST-FREE, HIGH-SPEED MIXER TO THOROUGHLY STIR THE FINISH TO A UNIFORM CONSISTENCY (SMALL AMOUNTS OF CLEAN WATER MAY BE ADDED TO AID WORKABILITY). 2. AVOID APPLICATION IN DIRECT SUNLIGHT. 3. APPLY FINISH IN A CONTINUOUS APPLICATION, ALWAYS WORKING TO A WET EDGE. 4. WEATHER CONDITIONS AFFECT APPLICATION AND DRYING TIME. HOT OR DRY CONDITIONS LIMIT WORKING TIME AND ACCELERATE DRYING AND MAY REQUIRE ADJUSTMENTS IN THE SCHEDULING OF WORK TO ACHIEVE DESIRED RESULTS; COOL OR DAMP CONDITIONS EXTEND WORKING TIME AND RETARD DRYING AND MAY REQUIRE ADDED MEASURES OF PROTECTION AGAINST WIND, DUST, DIRT, RAIN AND FREEZING. 5. AESTHETIC "U"-GROOVES MAY BE DESIGNED INTO THE SYSTEM. (A MINIMUM OF 3/4" INSULATION BOARD MUST BE LEFT AFTER ANY GROOVES ARE CUT). 6. "R" (RILLED TEXTURE) FINISHES MUST BE FLOATED WITH A PLASTIC TROWEL TO ACHIEVE THEIR RILLED TEXTURE. 7. AVOID INSTALLING SEPARATE BATCHES OF FINISH SIDE-BY-SIDE. 8 . APPLY FINISH COLOR TO EIFS MIX AND APPLY TO WALL. COLOR TO MATCH EXTERIOR FINISH SCHEDULE COLORS. ELEC. C.T. CABINET, (VERIFY W/ LOCAL CODE THE REQ'D. LOCATION & MOUNTING HEIGHT) WALL PACK LIGHT FIXTURE L. STO EXTERIOR INSULATION AND FINISH TEXTURE SYSTEM: APPLY HIGH IMPACT SYSTEM ADJACENT TO DOORS FOR ADDITIONAL IMPACT RESISTANCE, USING STO INTERMEDIATE MESH. USE THE STANDARD SYSTEM SPECIFICATIONS AT ALL OTHER LOCATIONS. A. PROVIDE MANUFACTURERE'S STANDARD LABOR AND MATERIAL WARRANTY. 1.11 WARRANTY PART 2 PRODUCTS 2.01 MANUFACTURERS A. STO CORP. B. DRYVIT SYSTEMS, INC. 2.02 ADHESIVES A. DISPERSION ADHESIVE - NONCEMENTITIOUS, ACRYLIC BASED ADHESIVE. A. NOMINAL 1.0 lb/cubic feet (16 kg/cubic meter) EXPANDED POLYSTYRENE (EPS) INSULATION BOARD IN COMPLIANCE WITH ASTM C 578 TYPE I REQUIREMENTS, AND EIMA GUIDELINE SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS) INSULATION BOARD. 2.03 INSULATION BOARD 2.04 BASECOAT A. ONE-COMPONENT POLYMER MODIFIED CEMENTITIOUS BASE COAT WITH FIBER REINFORCEMENT AND LESS THAN 33% PORTLAND CEMENT CONTENT BY WEIGHT. 2.05 REINFORCING MESHES A. STANDARD MESH 1. STO MESH - NOMINAL 4.5 oz/sq.yd. (163 g/sq.meter), SYMMETRICAL, INTERLACED OPEN-WEAVE GLASS FIBER FABRIC MADE WITH MINIMUM 25 PERCENT BY WEIGHT ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH STO MATERIALS. B. HIGH IMPACT MESH 1. STO INTERMEDIATE MESH (MESH C) - NOMINAL 11.0 oz/sq.yd. HIGH IMPACT, INTERWOVEN, OPEN WEAVE GLASS FIBER FABRIC WITH ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH STO MATERIALS. 2.06 PRIMER A. STO PRIMER ACRYLIC BASED PRIMER (FOR STO ACRYLIC BASED FINISHES) B. WATER: CLEAN AND POTABLE. 2.08 JOB MIXED INGREDIENTS A. PORTLAND CEMENT: ASTM C 150, TYPE I. A. STO ACRYLIC BASED TEXTURED WALL COATING. SEE E.I.F.S. FORMULAS FOR FINISH COLOR. 2.07 FINISH COAT 2. CONCRETE, MASONRY OR PLASTER SURFACES SHALL BE PROPERLY CURED AND FREE OF DIRT, DUST, OIL, GREASE, MILDEW, FUNGUS, LATENCY, PAINT, EFFLORESCENCE AND ANY OTHER CONTAMINANT. ANY SURFACES NOT IN COMPLIANCE SHALL BE CORRECTED PER MANUFACT. RECOMMENDATIONS PRIOR TO INSTALLATION OF THE EIFS. 1. PLYWOOD SHEATHING SHALL MEET A.P.A. (AMERICAN PLYWOOD ASSOCIATION) REQUIREMENTS FOR EXTERIOR OR EXPOSURE 1 CLASSIFICATION. APA DESIGN AND CONSTRUCTION GUIDELINES SHALL BE FOLLOWED FOR STORAGE, HANDLING AND INSTALLATION. MANUFACTURER'S PUBLISHED RECOMMENDATIONS SHALL BE FOLLOWED FOR SHALL BE FOLLOWED FOR STORAGE, HANDLING, STORAGE, HANDLING, INSTALLATION AND PROTECTION. ANY SHEATHING NOT IN COMPLIANCE SHALL BE REPLACED TO CONFORM WITH SPECIFICATION REQUIREMENTS PRIOR TO INSTALLATION OF THE EIFS. B. THE SURFACE TO RECEIVE THE EIFS SHALL BE STRUCTURALLY SOUND, CLEAN, DRY AND FREE OF WARPAGE, RESIDUAL MOISTURE OR DAMAGE FROM MOISTURE. SURFACES SHALL BE UNIFORM, WITH NO IRREGULARITIES GREATER THAN 1/8" in 4'-0". SURFACES SHALL BE INSPECTED FOR COMPLIANCE WITH THE FOLLOWING REQUIREMENTS PRIOR TO INSTALLATION OF THE EIFS: A. UNDER NO CIRCUMSTANCES SHALL ANY OF THE PRODUCTS BE ALTERED BY ADDING ANY ADDITIVES, EXCEPT FOR SMALL AMOUNTS OF CLEAN WATER AS DIRECTED ON LABEL. ANTIFREEZE, ACCELERATORS, RAPID BINDERS, ETC., ARE FORBIDDEN. PART 3 EXECUTION EP-7 EP-2 EP-1 ACCENT BAND SW-1 EP-2 EP-1 ACCENT BAND SW-1 EP-2 EP-2 EP-2 EP-2 EP-3 EP-3 EP-3 FINISHED FLOOR 0'-0" AFF. T.O. PARAPET 16'-8" AFF T.O. PARAPET 19'-4" AFF 7'-8" 6'-4" 8'-4" J-BOX FOR OPTIONAL SIGN LADDER, PAINT BRONZETONE TO MATCH STORE FRONT EP-1 GREASE & C02 ENCLOSURE BY VENDOR INSULATED GREASE REMOVAL PIPE 3'-6" 6'-0" T.O. WINDOW 6'-2" AFF B.O. BALCONY 9'-4" AFF T.O. PARAPET 18'-0" AFF. PROVIDE QUICK COUPLE HOSE CONNECTOR & DRAIN VALVE AT FRYERS. RUN SELF-DRAINING PIPE FROM FRYERS TO OUTSIDE COLLECTION UNIT. AWNING SUPPORTS AT 4'-0" O.C. AND AT EACH END EP-2 EP-2 EP-2 EP-2 SW-1 EP-1 EP-1 EP-2 EP-1 EP-1 SW-1 SW-1 FINISHED FLOOR 0'-0" AFF. B.O. AWNING 9'-4" AFF T.O. PARAPET 16'-8" AFF T.O. PARAPET 19'-4" AFF C-1 2'-10" EP-7 ACCENT BAND T.O. PARAPET 18'-0" AFF. EP-1 C-1 TOTAL OF 3 EQ. WINDOWS W/ MULLIONS EP-8 EP-1 EP-1 11" 5'-0" 5'-0" C-1 EP-10 EP-6 (2) DOUBLE LOUVER VINYL SHUTTER 1" SPACE GAP E.I.F.S. WALL TEXTURE FINISH STO COLORS Manuf. Texture NA10-0036 - DELIGHTFUL GOLDEN STO STO ESSENCE SWIRL for GOLDEN, BROWN COLOR NA10-0038 - EXOTIC RED DRYVIT QUARTZ PUTZ NA10-0037 - MOCHA BROWN FINISH NOTES DRYVIT COLORS POPE051020 - DELIGHTFUL GOLDEN POPE021028S - EXOTIC RED POPE031020S - MOCHA BROWN* STANDING SEAM ROOF * D/T WINDOW CANOPY RAILING * CLEARANCE BAR * MENU CANOPY * GUARD RAIL * AWNINGS * SHUTTERS THE FOLLOWING COMPONENTS CAN BE PURCHASED FROM THE APPROVED SIGN VENDORS: EXTERIOR FINISH NOTES STO STOLIT 130D, FINE SAND for RED COLOR EIFS FRAME, PAINTED EP-1 WALL MOUNTED SIGN AND FRAMING AS SHOWN: IL-27 ILLUMINATED LETTERS BUILDING SIGN COORD. W/ CIVIL DRAWINGS FOR CONTINUATION COORD. W/ CIVIL DRAWINGS FOR CONTINUATION A5 1 A5 2 A5 3 A5 SECTION 8A: ALUMINUM ENTRANCE, STOREFRONT MATERIALS SECTION 8D: GLAZING MATERIALS PERFORMANCE GENERAL PROVISIONS SPECIFICATIONS GENERAL PROVISIONS SCOPE: FURNISH AND INSTALL THE ALUMINUM ENTRANCE AND STOREFRONT SYSTEMS PER NATIONAL ACCOUNTS AND APPLICABLE DRAWINGS. 1. ALUMINUM STOREFRONT AND ENTRANCE FRAMES: REFER TO CONSTRUCTION DRAWINGS AND SPECIFICATIONS. 2. ALUMINUM ENTRANCE DOORS: REFER TO CONSTRUCTION DRAWINGS AND SPECIFICATIONS. 3. PANIC HARDWARE:WHEN PANIC HARDWARE IS REQUIRED ON EXTERIOR DOORS. THE PANIC DEVICE IS ON EXTERIOR ENTRY DOORS WHEN SPECIFIED IN HARDWARE SCHEDULE. 4. DRIVE-THRU SERVICE WINDOW: THE DRIVE-THRU SERVICE WINDOW WILL BE SUPPLIED & INSTALLED BY G.C. VERIFY EXACT TYPE OF WINDOW WITH PLANS. BRONZE FINISH. WINDOW TO BE: A. BASE BID - 'QUICK SERV' M.C.E. WINDOW FLUSH MOUNT. B. OPTION (VERIFY WITH OWNER) - READY ACCESS 5. MISCELLANEOUS FLASHING/TRIM: ALUMINUM HEAD, SILL, COLUMN AND WALL TRIM. SEE EXTERIOR ELEVATIONS FOR FINISH. PERFORMANCE 1. INSTALLATION: INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTION. PLACE IN CORRECT LOCATION AS SHOWN IN THE DETAILS. LEVEL, SQUARE, AND PLUMB AT PROPER ELEVATIONS AND IN ALIGNMENT WITH OTHER WORK. MAINTAIN SPACE IN HEAD POCKET FOR 1/4" HEAD DEFLECTION. INSURE FRAMING PROFILES MEET INSTALLATION REQUIREMENTS OF GLAZING UNITS TO MAINTAIN WARRANTY. SEE SECTION 8-D: GLAZING. 1. SCOPE: FURNISH AND INSTALL GLASS IN STOREFRONT AND DRIVE-THRU SERVICE WINDOW. 2. QUALITY CONTROL: ALL GLASS BROKEN DURING INSTALLATION OR DURING CONSTRUCTION PRIOR TO FINAL DELIVERY OF THE BUILDING TO THE OWNER SHALL BE REPLACED AT NO ADDITIONAL EXPENSE TO THE OWNER. GLASS SHOULD BE DELIVERED WITH LABELS PROMINENTLY DISPLAYED AND THEY SHALL BE LEFT IN PLACE UNTIL THE OWNER'S REPRESENTATIVE INSPECTS IT. 1. STOREFRONT GLAZING - REFER TO CONSTRUCTION DRAWINGS AND NOTES. 1. INSTALLATION: INSTALL GLAZING WITH MANUFACTURER'S INSTRUCTIONS TO PROVIDE COMPLIANCE WITH LOCAL CODE REQUIREMENTS INCLUDING WIND RESISTANCE, 25 PSF MIN., SNOW LOAD, 20 PSF MIN. GLAZING PANELS SHALL BE INSTALLED. ULTRA VIOLET DEGRADATION LEVELS ARE TO MEET MANUFACTURER'S REQUIREMENTS TO VALIDATE MATERIALS REPLACEMENT WARRANTY. 2. ALLOW FOR 1/4" MINIMUM HEAD DEFLECTION DUE TO LIVE LOAD. 3. GUARANTEES AND WARRANTIES: AT THE COMPLETION OF THE GLAZING, PROVE THE INSTALLATION WATERTIGHT BY SPRAYING ALL JOINTS WITH A GARDEN HOSE WITH NOZZLE SET FOR MAXIMUM PRESSURE. PROVIDE ADDITIONAL CAULKING OR SEALANT, OR RESET GLASS AS NECESSARY TO EFFECT A WATERTIGHT JOB. EXTERIOR FINISH NOTES E.I.F.S. WALL TEXTURE FINISH STO COLORS Manuf. Texture NA10-0016 - DELIGHTFUL GOLDEN STO STO ESSENCE SWIRL NA01-0061 - EXOTIC RED DRYVIT QUARTZ PUTZ NA10-0017 - MOCHA BROWN FINISH NOTES DRYVIT COLORS THE FOLLOWING COMPONENTS CAN BE PURCHASED FROM THE APPROVED SIGN VENDORS: POPE051020 - DELIGHTFUL GOLDEN POPE021028S - EXOTIC RED POPE031020S - MOCHA BROWN* STANDING SEAM ROOF * D/T WINDOW CANOPY RAILING * CLEARANCE BAR * MENU CANOPY * GUARD RAIL * AWNINGS THE FOLOWING COMPONENTS TO BE MANUFACTURED AND INSTALLED BY THE GENERAL CONTRACTOR * LADDER * DUMPSTER GATES * SHUTTERS GREASE & CO2 ENCLOSURE BY VENDOR BLACK MASTIC SEALANT CONT. TYP. AT ENTIRE PERIMETER OF BUILDING BASE SCORED LINE (TYP) 6"Ø STEEL BOLLARD TOP @ 4'-6" A.F.F. SEE DET. A/SD3, PAINT SAFETY YELLOW (EP-9) ACCENT BAND GREASE REMOVAL PIPE INSULATE EXPOSED PIPE EP-2 EP-2 6'-412" C-1 EP-3 2'-10" 6'-6" 6'-7" SPEAKER 10'-612" 12'-1" 4'-6" 12'-1" 12'-1" 4'-6" 15'-8" EP-5 EP-2 EP-1 ACCENT BAND SW-1 EP-2 EP-2 EP-4 EP-4 FINISHED FLOOR 0'-0" AFF. B.O. AWNING 9'-4" AFF T.O. PARAPET 16'-8" AFF T.O. PARAPET 19'-4" AFF T.O. PARAPET 18'-0" AFF. SW-1SW-1SW-1 EP-1 EP-1 EP-6 LADDER, PAINT MOCHA BROWN TO MATCH STORE FRONT C-1 BUILDING SIGN EP-5 3'-11" 10'-8" 5'-0" EP-1 EP-1 EP-1 EFIS TRIM PTD. EP-1 12'-0"13'-0"13'-0" 5'-6"13'-0"13'-0"13'-0"11'-712" 6'-412" C-1 EP-6 FINISHED FLOOR 0'-0" AFF. B.O. AWNING 9'-4" AFF T.O. PARAPET 16'-8" AFF T.O. PARAPET 19'-4" AFF EP-2 EP-1 ACCENT BAND SW-1 C-1 BUILDING SIGN IL-27 SCORED LINE (TYP) EP-2 EP-2 EP-2 SPEAKER SW-1SW-1 BLACK MASTIC SEALANT CONT. TYP. AT ENTIRE PERIMETER OF BUILDING BASE 15'-8" 2'-10" 6'-6" 6'-7" EP-1 EP-1 4'-9" 10'-9"3'-10" EP-1 EP-1 EP-1 EFIS TRIM PTD. C-1 EP-6 3'-1012" EP-5 INCLUDE IN METAL PACKAGE AND INSTALLED BY G.C.NOTE: USE QUIKSERV BP-7241E DRIVE THRU WINDOW AT 120 M.P.H. OR HIGHER WIND ZONES. CHECK DIMENSIONS WITH MANUFACTURER'S DRAWINGS. COLOR TO BE DARK BRONZE - REVISE FRAMING PLAN FOR BP-7241E WINDOW. GUTTER & DOWNSPOUT PAINT MOCHA BROWN -SEE ROOF PLAN GREASE & CO2 ENCLOSURE BY VENDOR LADDER, PAINT MOCHA BROWN TO MATCH STORE FRONT 3" x 5" DOWNSPOUT TIED INTO STORM DRAIN, PAINT EP-3 EP-3 S-36 SEAL BUILDING SIGN CL OF SHUTTER CL OF SHUTTER CL OF SHUTTER CL OF SUPPORT RODCL OF SUPPORT ROD GUTTER & DOWNSPOUT PAINT MOCHA BROWN -SEE ROOF PLAN 3" x 5" DOWNSPOUT TIED INTO STORM DRAIN, PAINT EP-3 S-36 SEAL BUILDING SIGN NOTE: CONTRACTOR TO FIELD VERIFY DIMENSIONS. CORE DRILLED POST W/ SOCKETS AND CAPS 2"x2" STEEL TUBE POST 1/2"x1/2" PICKETS 1"x1" STEEL TUBE POST 1"x1" STEEL TUBE POST MOLDED COVER RAIL NOTE: SEE 6/A12 FOR ADDITIONAL INFORMATION DOOR ELEVATION A6 1 LEFT SIDE ELEVATION 1/4"=1'-0" A6 2 RIGHT SIDE ELEVATION 1/4"=1'-0" A6 3 GUARD RAIL DETAIL 1/2"=1'-0" A6 4 STOREFRONT DETAIL 1/2"=1'-0" A6 D Y H ETLING AVE. 50' R/W (S-435) ST. JAMES AVE. 100' R/W (SC 176) GV GV GM GM 20' REAR SETBACK 20' FRONT SETBACK 10' FRONT SETBACK 20' FRONT SETBACK POPEYES 46-SEAT BLDG 2268 S.F. GROSS ~ EX ASPHALT ~ - EVANS GRACE - TN 2430804020 DB 11135, Pg 181 PB L, Pg 270C - CHAMPANERIA ASHESH - TN 2430804018 DB 5895, Pg 0336 PB L, Pg 62 -SLATON DARLENE - TN 2430804002 DB 0696, Pg 0093 PB L, Pg 57 ZONED: GC ZONED: GC ZONED: GC 9 7 8 10 7 0 Date:2/14/2018 Footcandles calculated at grade 1200 92nd Street - Sturtevant, WI 53177 www.cree.com - (800) 236-6800 Illumination results shown on this lighting design are based on project parameters provided to Cree, Inc. used in conjunction with luminaire test procedures conducted under laboratory conditions. Actual project conditions differing from these design parameters may affect field results. The customer is responsible for verifying dimensional accuracy along with compliance with any applicable electrical, lighting, or energy code. 60 120 Scale: 1"=30' Layout by: JACOB EDLER 30 Filename: POP-180214GCSCJEE.AGI Project Name: POPEYES - GOOSE CREEK, SC SR No. 28638 FIXTURE MOUNTING HEIGHT: 27' AFG (25' POLE + 2' BASE) ADDITIONAL EQUIPMENT REQUIRED: (5) CL-SSP-4011-25-OT-BZ (25' x 4" STEEL SQUARE POLE, TENON MOUNT) (5) PB-2A4BZ TWIN TENON (10) OSQ-AABZ ADJUSTABLE ARM MOUNT PROPOSED POLES MEET 120MPH SUSTAINED WIND LOADS ***CUSTOMER TO VERIFY MOUNTING, VOLTAGE, AND COLOR PRIOR TO PLACING ORDER MH: 27 Tilt: 0 OSQ-4ME-2a MH: 27 OSQ-4ME-2a Tilt: 0 Tilt: 0 MH: 27 OSQ-4ME-2a OSQ-4ME-2a MH: 27 Tilt: 0 OSQ-4ME-2a MH: 27 Tilt: 0 1.9 1.8 1.7 3.2 2.5 2.2 2.0 2.0 2.2 3.0 4.7 5.6 6.7 8.3 6.7 6.1 4.9 5.1 3.7 2.6 2.2 1.9 1.9 2.3 3.9 5.4 5.8 7.7 6.6 5.4 4.5 7.3 6.3 5.7 5.0 3.5 2.7 2.3 2.2 2.4 3.4 4.9 5.5 7.2 6.0 5.1 3.8 2.3 1.8 8.8 8.5 7.3 7.5 5.8 4.6 3.4 2.7 2.6 2.8 3.4 4.4 6.8 5.3 3.6 2.8 2.2 1.9 1.6 8.5 8.5 7.1 7.1 5.2 4.2 3.3 2.7 2.3 2.2 2.2 2.9 5.1 3.6 2.6 2.4 2.3 2.1 1.9 2.0 2.9 8.0 7.2 7.1 5.9 4.4 4.0 3.4 2.2 1.1 1.2 1.4 2.0 3.6 2.5 2.1 2.1 2.3 2.4 2.7 3.1 4.5 7.7 7.8 7.5 5.8 5.2 5.5 3.4 1.5 2.4 3.3 4.5 4.8 5.3 8.5 7.8 7.4 7.2 7.6 4.9 3.0 1.4 2.8 4.3 5.3 5.5 6.6 8.1 7.2 7.2 8.8 7.1 4.3 2.8 2.2 3.3 4.3 6.1 6.1 7.4 7.5 8.3 7.9 8.9 7.3 6.2 4.6 3.3 2.9 2.9 4.1 3.1 2.2 2.0 2.2 3.0 4.1 5.2 6.9 6.6 7.9 8.1 9.1 8.0 6.7 6.2 4.9 3.7 3.4 3.6 5.4 3.9 2.6 2.3 2.2 2.3 2.6 3.2 4.6 5.3 5.9 6.9 7.2 7.2 6.5 5.6 4.4 3.8 4.1 4.8 7.0 5.5 3.7 2.8 2.2 2.0 2.1 2.5 3.5 4.9 5.1 5.6 4.5 5.1 5.1 5.8 5.4 3.7 4.2 5.5 5.8 7.3 6.1 5.2 4.0 2.4 2.0 1.9 2.1 2.3 3.0 3.5 4.8 5.2 5.1 4.8 5.2 3.9 4.7 5.8 6.0 7.8 6.8 5.5 4.7 2.8 1.9 1.8 1.8 1.8 3.8 4.9 5.7 6.1 6.9 8.4 6.8 6.2 5.1 3.8 2.4 2.0 1.7 1.5 Luminaire Schedule / "Did you know that utility rebates can cover 25% or more of a products cost? Email rebates@cree.com to get help on your project!" Symbol Qty Label Arrangement Lumens/Lamp LLF Lum. Watts Description 5 OSQ-4ME-2a 2 @ 90 DEGREES 22330 1.000 166 OSQ-A-NM-4ME-T-57K-UL-BZ Calculation Summary; LMF = 1.00 Label Units Avg Max Min Avg/Min Max/Min Popeyes Lot Fc 4.50 9.1 1.1 4.09 8.27 STAFF REPORT ARCHITECTURAL REVIEW BOARD APPLICATION FOR PROPERTY LOCATED AT 207 RED BANK ROAD TMS # 244-13-03-008, 244-13-03-009, 244-13-03-010, 244-13-03-011 Date of Meeting: 02/19/2018 Subject: New Construction, Bldg. Elev., Site, Landscaping, Lighting Proposal: The applicant Ashley Blauser- Silva, E -Z Auto Now will be presenting an application for a new commercial building consisting of plans for building to include elevations, colors, materials, landscaping, site, and photometrics. Background:The .084 acre site will be the result of combining the four parcels currently addressed as 207, 209, 211 and 213 Red Bank Rd. E-Z Auto Designer Date 2/2/2018 Scale Not to Scale Drawing No. Summary 1.7 1.4 2.3 2.0 1.4 2.7 2.3 1.9 1.6 5.8 4.8 3.1 2.8 2.7 2.5 5.2 4.6 3.4 3.1 3.6 3.6 4.0 4.1 3.7 3.4 4.1 5.2 4.0 4.1 3.7 3.5 4.0 4.7 5.1 4.7 3.6 3.3 3.3 3.0 5.2 3.5 3.1 2.6 2.2 3.4 2.9 2.2 1.7 1.5 3.6 3.8 3.4 2.9 2.0 1.4 1.4 3.2 3.4 3.3 2.9 2.1 1.5 3.4 3.0 2.3 1.7 4.4 4.2 3.5 3.1 2.7 2.4 6.0 5.0 3.4 3.3 5.6 4.8 3.5 3.3 4.0 5.0 4.1 4.2 3.7 3.4 4.0 5.1 4.0 4.0 3.6 3.4 3.6 3.3 4.6 4.4 3.5 3.0 2.7 2.3 5.9 4.8 3.1 2.5 2.0 1.5 5.0 4.1 2.6 2.0 1.4 2.2 1.6 1.0 1.0 6.1 A-1 A-3A-4 A-5 A-6 A-7 Plan View Scale - 1" = 20ft Schedule Symbol Label Quantity Manufactur er Catalog Number Description Lamp Number Lamps Filename Lumens Per Lamp Light Loss Factor Wattage A 6A m e r i c a n Electric Lighting ATB2 40BLEDE70 XXXXX R3 4K/5K ATB2 SERIES LED 700MA TYPE 3 4000K/5000K CCT LED Array 1 ATB2_40BLE DE70_XXXXX _R3_4K_5K.i es 11551 0.9 88 Statistics Description Symbol Avg Max Min Max/Min Avg/Min E-Z Auto 3.3 fc 6.1 fc 1.0 fc 6.1:1 3.3:1 RED BANK ROAD PARISH ROAD .#0&5%#2'2.#0 5%*'&7.' .Ä 4'8+5+105 Ä PERMIT SET REVIEW 886 Johnnie Dodds Boulevard Suite 200 Mt.Pleasant, SC 29464 Office: 843.881.0525 www.earthsourceeng.com branchgn@earthsourceeng.com berryk@earthsourceeng.com PLANT LEGEND UNDERSTORY TREES SHRUBS, GROUNDCOVERS AND GRASSES CANOPY TREES SOD (ZOYSIA)

Source: City of Goose Creek website. First collected Oct 24, 2026.