RecordWell Data

Special Workshop of Council with the Waterfront Advisory Committee — Agenda Packet

City of Beaufort · Beaufort County · General · meeting of Sep 24, 2025 · Agenda packets

Open the original document More from City of Beaufort

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF BEAUFORT Special Joint Workshop of Council with the Waterfront Advisory Committee City Hall, Planning Conference Room 1911 Boundary Street – 1st Floor September 24, 2025 – 9:00 am Meeting will be live streamed on the City of Beaufort’s Facebook Page STATEMENT OF MEDIA NOTIFICATION In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, all local media was duly notified of the time, date, place, and agenda of this meeting. Please click the link below to join the Webinar https://us02web.zoom.us/j/84516602251?pwd=H8FQ39roI7ZyAfBe2biWDeSPY7gbgL.1 Passcode:288501 +19292056099 Webinar ID: 845 1660 2251 I. Call to Order II. Pledge of Allegiance III. Engineer’s Presentation and Roundtable Discussion IV. City Council Comments V. Waterfront Advisory Committee Comments VI. Public Comment VII. Adjourn 1 Waterfront Park Relieving Platform Consulting Services Phases 1A, 1B, and 2 2 Project Team • Project Management • Structural Engineering • Inspections • Structural Engineering • Grant Facilitation/Research • Permitting • Adaptive Strategy Analysis • Site Civil Engineering • Surveying • Geotechnical Engineering • Materials Testing • Constructability Reviews • Cost Estimating 3 RELIEVING PLATFORM PROJECT MULTI-PHASE APPROACH: • PHASE 1 (TWO PARTS) • PHASE 1A – PRELIMINARY DATA COLLECTION – PHASE COMPLETE • PHASE 1B – FINAL DATA COLLECTION AND MODELING • PHASE 2 • DEVELOPMENT OF ALTERNATIVES AND GRANT INVESTIGATION • PHASE 3 • FINAL DESIGN AND PERMITTING • PHASE 4 • CONSTRUCTION 4 PHASE 1A – SUMMARY PHASE 1A - KEY TASKS • AS-BUILT SURVEY • 50 FT INLAND AND 100 FT SEAWARD OF PLATFORM • USED FOR PERMITTING, DESIGN, AND STRUCTURAL ANALYSIS • GEOTECHNICAL INVESTIGATION • FOUR SOIL BORINGS OBTAINED • USED FOR PILING STRUCTURAL ANALYSIS (EXISTING AND PROPOSED) • GEOSPACIAL AND REFERENCE INFORMATION • DETERMINED THAT AMPLE OPEN-SOURCE DATASETS ARE AVAILABLE FOR USE IN PERMITTING AND DESIGN. 5 PHASE 1A – SUMMARY (CONT.) • DESIGN WATER LEVEL ESTIMATION AND ANALYSIS • FLOODING AND OVERTOPPING BEGINS AT 6.0 FT (NAVD88) • INCREASING THE HEIGHT OF THE PLATFORM AND/OR ADDING PERIMETER PROTECTION WILL BE EFFECTIVE UP TO ELEVATION 9.05 FT • MITIGATION FOR FLOODING ABOVE ELEVATION 11.0 IS NOT FEASIBLE DUE TO FLANKING. • ALTERNATIVES SHOULD ANALYZE THE COST/BENEFIT OF PROTECTING THE AREA BETWEEN THE SEAWARD EDGE OF THE PLATFORM AND BAY STREET. • DYNAMIC ADAPTIVE POLICY PATHWAYS – AN APPROACH THAT AIDS IN MAKING SOUND NEAR-TERM DECISIONS TO OVERCOME UNCERTAINTY IN LONG-TERM ADAPTATION 6 PHASE 1A – SUMMARY (CONT.) PHASE 1A - KEY TASKS • RELIEVING PLATFORM STRUCTURAL ANALYSIS AND CAPACITY DETERMINATION • CONDUCTED MULTIPLE ITERATIONS OF THE STRUCTURAL ANALYSIS BASED ON VARIOUS LOAD COMBINATIONS AND PILE FIXITIES. • RESULTS INDICATED THAT PILE BUCKLING IS A CONCERN. • RECOMMENDED RESTRICTING THE PLATFORM FROM USE. 7 PHASE 1A - RECOMMENDATIONS 1. CONTINUE TO KEEP THE RELIEVING PLATFORM CLOSED FROM PUBLIC USE. 2. MODIFY AND BEGIN PHASE 1B. • EXPAND LAND SURVEY • SAVE MODELING EFFORTS FOR A LATER PHASE 3. IMPLEMENT MEASURES TO OPEN THE DAY DOCK • PERMITTING/DESIGN/CONSTRUCTION 4. BEGIN PHASE 2 • DEVELOPMENT OF ALTERNATIVES AND ALTERNATIVE ANALYSIS • GRANT INVESTIGATION 8 PHASE 1B – FINAL DATA COLLECTION • EXPAND LAND SURVEY TO BAY STREET. • DATA WILL BE USED TO EVALUATE THE COST AND BENEFIT OF DESIGNING A NEW FACILITY FOR A RANGE OF WATER LEVELS USING THE DYNAMIC ADAPTIVE POLICY PATHWAY . 9 PHASE 2 (2 PARTS) 1. GRANT INVESTIGATION 2. DEVELOPMENT OF ALTERNATIVES AND ALTERNATIVES ANALYSIS 10 PHASE 2 – PRELIMINARY LIST OF ALTERNATIVES 1. DO NOTHING 2. REPAIR STRUCTURE 3. REPLACE THE BACKFILL WITH LIGHTER MATERIAL 4. REBUILD A SAME SIZE AND SHAPE PLATFORM • EVALUATE VARIOUS WATER LEVELS (D.A.P .P .) 5. REBUILD TO A SMALLER SIZE (WIDTH) 6. REPLACE WITH SEAWALL AND BACKFILL • EVALUATE VARIOUS WATER LEVELS (D.A.P .P .) 7. REPLACE WITH FLOATING STRUCTURES 8. HYBRID STRUCTURE • FIXED AND FLOATING STRUCTURES TO MAXIMIZE USE AND ACCESS 11 PHASE 2: KICK-OFF MEETING • THE PROJECT TEAM REQUESTS A MEETING WITH THE WATERFRONT COMMITTEE AND CITY PERSONNEL TO FULLY DEFINE AND REFINE THE ALTERNATIVES FOR CONSIDERATION. • CITY AND PUBLIC INPUT IS NEEDED PRIOR TO CONDUCTING A THOROUGH EXAMINATION OF POSSIBLE ALTERNATIVES. 12 CITY AND PUBLIC INPUT FOR PHASE 2 • DAY DOCK • SHOULD THE DESIGN TEAM PROCEED WITH THE PERMITTING AND DESIGN WORK REQUIRED TO OPEN THE DAY DOCK? • CRUISE SHIPS • SHOULD THE NEW STRUCTURE BE DESIGNED FOR COMMERCIAL DOCKAGE? • ALTERNATIVES • ARE THERE OTHER ALTERNATIVES FOR CONSIDERATION OR ANY ALTERNATIVES THAT ARE NON-STARTERS? • VISION FOR THE FUTURE • DO WE STICK WITH THE STATUS QUO OR SHOULD WE BE VISIONARIES? 13 QUESTIONS? 14

Source: City of Beaufort website. First collected Oct 24, 2026.