ALTERNATIVES FOR THE
BEAUFORT WATERFRONT PLATFORM
SEPTEMBER 24, 2025
PRESENTED TO: BEAUFORT COUNTY COUNCIL / WATER COMMITTEE
DEFINING RESILIENCE &
SUSTAINABILITY
In essence, resilience is the Capacity to Recover…how’bout….,
“Resilient communities proactively build self-sufficiency for rapid recovery.”
NOAA – “Coastal resilience
means building the ability of
a community to "bounce back"
after hazardous events such as hurricanes,
coastal storms, and flooding – rather than
simply reacting to impact.”
USACE - "the ability to
anticipate, prepare for and
adapt to changing conditions and
withstand and recover from
disruptions….[through] four principles -
prepare, absorb, recover, and adapt.”
NIST – “Resilience is the ability to
adapt to changing conditions
and prepare for, withstand, and rapidly
recover from disruption caused by a
hazard.”
FEMA
-
“Instead of repeated
damage and continual
demands for federal disaster
assistance, resilient communities
proactively
protect
themselves against hazards,
build
self
-
sufficiency
, and become more
sustainable.”
DEFINING RESILIENCE
In essence, sustainability is the Capacity to Preserve…how’bout….,
“Sustainable communities achieve long-term resilience goals socially,
environmentally, and economically.”
NOAA – “A vision of the future
where ecosystems and societies
are healthy and resilient in the
face of change.”
USACE - “The capacity to endure;
i.e. the ability to sustain. When
applied to a community
infrastructure project, it refers to the ability
to sustain not just itself, but its users, its
community, and the ecology of its
environment.”
NIST – “To achieve sustainability,
products, processes, and services
should meet the challenges not only related
to their functions and performance but also
to environment, economy, and social
issues.”
FEMA
-
“Meeting the needs of the
present without compromising the
ability of future generations to
meet their own needs…Social, economic,
environmental, recreational, and other
community goals can be achieved during
recovery, resulting in a community that is a
better place to live, work, and play
than it
was before the disaster.”
DEFINING SUSTAINABILITY
BACKGROUND DATA
TIDE WATER LEVELS / DATUMS
Beaufort, SC - Tide Datums & Water Level Observations (NOAA
Station 8667999)
Datum /
Observation
Elevation
(feet,
NAVD88)
Description
Max Tide 7.01 Highest Observed Tide (9/3/1979
12:00:00 AM)
HAT 5.37 Highest Astronomical Tide
(10/16/1993 1:00:00 PM)
MHHW 3.55 Mean Higher-High Water
MHW 3.17 Mean High Water
NAVD88 0.00 North American Vertical Datum of
1988
MSL -0.11 Mean Sea Level
MLW -4.22 Mean Low Water
MLLW -4.43 Mean Lower-Low Water
LAT -5.78 Lowest Astronomical Tide
(2/8/1997 6:48:00 AM)
Min Tide -6.80 Lowest Observed Tide (1/9/1978
12:00:00 AM)
Ma Tide, . Ma Tide, .
AT, . AT, .
M , . M , . M , . M , .
A , A , MS , . MS , .
M , . M , . M , . M , .
AT, . AT, .
Min Tide, . Min Tide, .
HISTORIC FLOODING
Date Event Ranki
ng
Elevation
(feet,
MHHW)
Total
Storm
Tide
(feet)
NOAA V-Datum
Transformation
at Beaufort, SC
(feet, NAVD88)
10/8/2016 Hurricane
Matthew 1 5.06 12.56 8.63
09/11/2017 Tropical
Storm Irma 2 4.74 12.24 8.31
10/15/1947 Cape Sable
Hurricane 3 3.36 10.86 6.93
11/07/2021
November
2021 King
Tide
4 2.95 10.45 6.52
10/27/2015
October
2015 King
Tide
5 2.93 10.43 6.50
11/10/2021
November
2021 King
Tide
6 2.91 10.41 6.48
11/23/2018
November
2018 King
Tide
8 2.75 10.25 6.32
06/04/2023 June 2023
King Tide 10 2.70 10.20 6.27
HURRICANE MATHEW , 2016
SEA LEVEL RISE PROJECTIONS
Projections of Sea Level Heights for Fort Pulaski, GA (8670870)
Year Low
(feet)
Int-Low
(feet)
Int
(feet)
Int-High
(feet)
High
(feet)
2030 0.59 0.66 0.66 0.69 0.72
2040 0.82 0.89 0.95 1.05 1.12
2050 1.02 1.15 1.28 1.48 1.71
2060 1.21 1.41 1.64 2.03 2.40
2070 1.35 1.64 2.07 2.72 3.38
2080 1.48 1.90 2.56 3.51 4.53
2090 1.57 2.13 3.18 4.40 5.71
2100 1.77 2.40 3.90 5.35 6.99
FLOOD FREQUENCY ELEVATIONS (USACE)
Return Period
(N-year)
SWL-SLC0
(feet,
NAVD88)
SWL-SLC1
(feet,
NAVD88)
SWL-SLC2
(feet,
NAVD88)
0.5 5.18 7.85 12.41
1 6.52 9.25 13.85
2 7.48 10.15 14.71
5 8.59 11.17 15.66
10 9.25 11.76 16.21
20 9.76 12.23 16.64
50 10.30 12.73 17.09
100 10.95 13.39 17.49
200 12.34 14.72 18.65
500 13.88 16.24 20.02
.
.
.
.
.
.
S S C
feet, A
S S C
feet, A
S S C
feet, A
DESIGN WATER LEVEL CONSIDERATIONS
Return
Period
(N-year)
USACE SLC0
Scenario
USACE SLC1
Scenario
USACE SLC2
Scenario
Stillwate
r
Elevatio
n
(feet,
NAVD88
)
Flood
Depth at
Platform
(feet)
Stillwater
Elevation
(feet,
NAVD88)
Flood
Depth at
Platform
(feet)
Stillwate
r
Elevatio
n
(feet,
NAVD88
)
Flood
Depth
at
Platfor
m
(feet)
0.5 5.18 0.00 7.85 1.85 12.41 6.41
1 6.52 0.52 9.25 3.25 13.85 7.85
2 7.48 1.48 10.15 4.15 14.71 8.71
5 8.59 2.59 11.17 5.17 15.66 9.66
10 9.25 3.25 11.76 5.76 16.21 10.21
20 9.76 3.76 12.23 6.23 16.64 10.64
50 10.30 4.30 12.73 6.73 17.09 11.09
100 10.95 4.95 13.39 7.39 17.49 11.49
200 12.34 6.34 14.72 8.72 18.65 12.65
500 13.88 7.88 16.24 10.24 20.02 14.02
FLOODING PATHWAYS
DESIGN CONSIDERATIONS
• Overtopping of the platform begins on the west end of the platform near Safe Harbor Marina at an elevation of approximately 6.00 feet,
NAVD88 (see Figure 9, top left image). This will happen during extreme King Tide events as demonstrated in Table 4. For example, five of the eight extreme
flood events that overtopped the platform since 2015 were due to King Tides.
• A perimeter protection approach or future platform elevation approach could be feasible up to an elevation of approximately 9.05 feet, NAVD88
(see bottom left image of Figure 9) at which point increasing water levels would begin flanking the platform (and require additional measures to mitigate
flanking).
• At increasing levels of flooding above 9.05 feet, NAVD88, flanking of the platform area would occur via several roadway corridors on the east
side such as Cartel Street and Scott Street and would require additional measures to mitigate this flanking (see bottom right image, Figure 9).
• Regarding the footprint of areas to protect against future flooding such as for benefit-cost analyses of alternatives, considering the eventual
enormity of flanking about the platform, the physical scope for feasible flood alternatives for the platform appears to be bound by the platform and upland
to Bay Street. Attempts to mitigate flooding above levels of approximately 11 feet (NAVD88) may become infeasible given measures required to prevent
flanking from The Point, connected roadway corridors, and widespread flooding of the City.
• Above these extreme flood levels (11 feet, NAVD88), a much larger boundary beyond the platform for flood mitigation measures would be
considered for alternatives. As an example, solutions for City-wide flood protection would be the type proposed in a USACE Coastal Storm Risk Management
study involving a City-wide integrated flood defense system such as the proposed peninsula seawall system for the City of Charleston. Such a study for
Beaufort, SC has been identified by the USACE in the SACS – South Carolina Engineering Appendix, which recommends a Beaufort Peninsula Coastal
Storm/Flood Risk Management Study (3 x 3 x 3) funded by a USACE General Investigation (if appropriated).
ALTERNATIVES CONSIDERED
PHASE 2 – PRELIMINARY LIST OF ALTERNATIVES
1. DO NOTHING
2. REPAIR STRUCTURE
3. REPLACE THE BACKFILL WITH LIGHTER MATERIAL
4. REBUILD A SAME SIZE AND SHAPE PLATFORM
• EVALUATE VARIOUS WATER LEVELS (D.A.P .P .)
5. REBUILD TO A SMALLER SIZE (WIDTH)
6. REPLACE WITH SEAWALL AND BACKFILL
• EVALUATE VARIOUS WATER LEVELS (D.A.P .P .)
7. REPLACE WITH FLOATING STRUCTURES
8. HYBRID STRUCTURE
• FIXED AND FLOATING STRUCTURES TO MAXIMIZE USE
AND ACCESS
1. DO NOTHING
2. STRUCTURAL REPAIRS
3. REPLACE THE BACKFILL WITH LIGHTER MATERIAL
4. REBUILD A SAME SIZE AND SHAPE PLATFORM
(VARY ELEVATIONS)
+9 feet
+8 feet
+7 feet
+6 feet
5. REBUILD TO A SMALLER SIZE (WIDTH)
6. REPLACE WITH SEAWALL AND BACKFILL
7. REPLACE WITH FLOATING STRUCTURES
8. HYBRID STRUCTURE - FIXED & FLOATING STRUCTURES
UNION PIER WATERFRONTLOWER MANHATTAN
RESILIENCE PLANNING APPROACHES
Reduced Damages
Damage Curve Shifted
Low High
MITIGATION
DAMAGE
Low $ High $$$
Cost of
Ignoring
Risks
Cost of
reducing
Risk
Low High
INVESTMENTS IN MITIGATION
COST
Low $ High $$$
Total Cost of
Mitigation
You want to
be here!
Reactive Proactive
Investing in Resilience
• Phased Approach - decision
process and points are
iterative,
• Plausible Scenarios - choice of
bounding scenarios should be
robust for the desired
timeframe,
• Decision Points - should
support future response
options, and
• Lead Times - facilitate the
appropriate timing of the next
decision.
Adaptive Risk Design/Management for Resilience
Defining What Matters Most
o High Risk Tolerance:
• Use lower scenarios (low-moderate proj’ns).
• Projects with a short lifespan.
• Planning areas with flexibility to make
alternative choices within the near-term.
• Low criticality (e.g., a recreational field)
o Low Risk Tolerance:
• Use higher scenarios (moderate-high proj’ns).
• Projects or assets with a long lifespan, in which
losses would be catastrophic.
• Planning areas with limited flexibility to adapt
in the near or long term.
• Assets that serve critical functions (e.g., ports,
roads, bridges, hospitals and associated
infrastructure).
Dynamic Adaptive Policy Pathway (DAPP)
RESILIENCE SOLUTIONS TOOLBOX
Green to Grey
• Site Specific – offshore vs inshore (geology, winds, waves, water levels vary).
• Regulatory – state/federal permits, building codes, municipal ordinances.
• Cost Drivers – a function of risks, funding, and timelines.
• Resilience & Sustainability – material adequacy, operation, & maintenance.
Nonstructural Examples
Elevation/Relocation Flood Warning System
Hybrid Nature-based Examples
Hybrid Engineering with Nature
Hard Engineered Examples
Seawall w/Wave Deflector Mixed Active/Passive
LOW BATTERY SEAWALL PROJECT
NowThen
Historical Background - 1909
Picture from the Evening Post
• 30-70 foot long wooden pile supporting timber deck foundation.
• Cobble stones, oyster shells, and granite rubble laid at toe of the wall.
• Started construction 1909.
• Approximately 667,000 cubic yards of dredged fill to create 47 acres of
developable land 8.5 feet above MLW
Historical Background - 1911
• Ashley River Water Front
Corporation sold 191
residential building lots by
end of 1911.
• Promenade was built along
with oyster shell roadways;
the southern peninsula was
tied to White Point Gardens
and the East Battery
Boulevard stopped at
White Point Garden
Rutledge St
Limehouse St
Tradd St
Chisolm’s Mill
Raising the seawall to
combat rising sea levels
Low Battery Seawall Height
7 ft Existing
US Army Corp Study
12 ft Preferred
Alternative
Nov 2013 - July 2014 / $2.6 Million / 121 LF
ow did the ow Battery Seawall project develop….”The Turn”?
~ 6 ft per month / $22,500/foot
asted longer than intended…
LOW BATTERY – CONDITION
• Deterioration behind concrete veil (seaward wall)
• Timber support piles subjected to marine borers
• Timber beams and platform have collapsed in places
• Supporting hardware is severely corroded
• Platform and support beams were saturated (landside wall)
Challenges
• Cracking
• Spaulding
• Voids
• Settlement
• Public Health & Safety
• Frequent Wave Runup
& Overtopping (King
Tides)
The Solution
Micropile Design
• 1,620 piles
• 75 to 90 ft long / 6 to 10 inches in diameter
• 5% of piles load tested (compression or tension)
Micropiles
Glass Fiber Reinforced Polymer (GFRP)
One Section at a Time
Shotcrete Seawall Repair
9.50 ft
Raising the Low Battery Seawall
Adaptive Capacity
Resiliency Sustainability
Capacity to Recover
Capacity to Preserve
Resiliency is the ability to
anticipate, prepare for, and
adapt to changing conditions and
withstand, respond to, and
recover rapidly from disruptions
Sustainability involves
developing infrastructure with
consideration to economic, social
and environmental implications
Sustainable Outcomes
Adapt to Future
Sea Level Rise
Built-in Capacity
for ” igher all
Social
Endurance
Connecting
People with Water
Material
Longevity
Here Today....
Here Tomorrow
Adaptable
Reuse &
Innovation
Retain & Repurpose
"Leave No Waste
Behind"
Reduce Flooding
Risk
Resilient Outcomes
Social Impact Material
Resilience Hold the Line
Nov 2013 - July 2014 / $2.6 Million / 121 LF
~ 6 ft per month / $22,500/foot
2020 - 2024 / $65M Million / 1 mile
~ 110 ft per month / $12,300/foot
Resilient & Sustainable - People-Planet-Profit
QUESTIONS & ANSWERS
“The ow Battery Seawall’s innovative built
-
in
adaptive capacity is audacious! It sets the
resilience bar for Charleston that is dynamically
prepared for future flood risks such as sea level
rise!”
Chris Mack, P .E., D.CE
Director of Climate Resilience
& Coastal Solutions, JMT
Scan to learn more!