RecordWell Data

Council Meeting

Town of Fort Mill · York County · meeting of Oct 26, 2026 · Agendas

Open the original document More from Town of Fort Mill

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Fort Mill Town Council Meeting Monday, October 26, 2026 Council Chambers 205 N. White Street Fort Mill, SC 29715 Agenda Page 1 | 1 6:00 PM Call to Order, Pledge of Allegiance and Invocation ITEM 1 Public Hearing * As duly published in the aforesaid newspaper, Rock Hill - The Herald, and as evidenced by Affidavit No. IPL0379503 A. Public Hearing regarding An Ordinance Annexing and Rezoning York County Tax Map Numbers 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00-062, containing approximately 8.254 +/- acres ITEM 2 Approval of Minutes A. October 12th, Council Workshop ITEM 3 Public Comments *Pursuant to Section 2-46 of the Code of Ordinances for the Town of Fort Mill, any citizen of the Town may appear before Council for the purpose of providing public comments on any municipal matter (except personnel matters). Those who wish to speak must sign in outside of the Council Chambers prior to the start of the meeting. Citizens will be given 3 minutes each to speak. ITEM 4 New Business A. Consideration of the 1st Reading of An Ordinance to Annex and Rezone York County Tax Map Numbers 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00- 062, containing approximately 8.254 +/- acres Penelope Karagounis ITEM 5 Executive Session *Council may take action on Executive Session Items listed on the agenda when they come back into Public Session A. Discussion of Potential Purchase or Sale of Land ITEM 6 Council Comments ITEM 7 Adjourn The following press was notified of the meeting by email or fax in accordance of the Freedom of Information Act: The Herald; CN2; WRHI, WSOC, Queen City News , WBTV, and Post & Courier. The agenda was also posted on the board outside of the entrance to Town Hall the required length of time and on the Town website. The Town of Fort Mill is committed to assuring accessibility with reasonable accommodation, of Town services and facilities for all individuals, in compliance with federal law. Please contact the Town Manager’s Office at 803-547-2116 if you need assistance. 1 Public Hearing * As duly published in the aforesaid newspaper, Rock Hill - The Herald, and as evidenced by Affidavit No. IPL0379503 A. Public Hearing regarding An Ordinance Annexing and Rezoning York County Tax Map Numbers 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00-062, containing approximately 8.254 +/- acres STATE OF SOUTH CAROLINA ) Ordinance 2026-___ COUNTY OF YORK ) TOWN OF FORT MILL ) AN ORDINANCE ANNEXING YORK COUNTY TAX MAP PARCELS 738-00-00- 063, 738-00-00-097, 738-00-00-004, AND A PORTION OF 738 -00-00-062, LOCATED AT THE INTERSECTION OF FORT MILL PARKWAY AND HOLBROOK ROAD CONTAINING APPROXIMATELY 8.254 +/- ACRES WHEREAS, a proper petition was submitted to the Fort Mill Town Council on April 20, 2026, by Ashok Patel (the “Property Owner”), requesting that York County Tax Map Parcels 738- 00-00-063 and 738-00-00-097, such parcels being owned fully by the Property Owner, be annexed to and included within the corporate limits of the Town of Fort Mill under the provisions of S.C. Code Section 5-3-150(3); WHEREAS, the proper petition submitted to the Fort Mill Town Council on April 20, 2026, also identified Ashok Patel as the authorized agent to represent Susan Haire Harnishfeger and Dena Haire, owners of York County Tax Parcel Number 738- 00-00-004, as well as Charles A. Wilson, owner of York County Tax Percel Number 738-00-00-062. WHEREAS, the Planning Commission of the Town of Fort Mill, in a duly called meeting on October 26, 2026, made its recommendation in favor of annexation, and that upon annexation, the aforesaid area shall be zoned under the Town’s Zoning Ordinance, as follows: HC Highway Commercial; WHEREAS, a public hearing was advertised and held at 6:00 p.m. on October 26, 2026, during a duly called regular meeting of the Town Council of the Town of Fort Mill; WHEREAS, Section 5-3-150(3) of the Code of Laws of the State of South Carolina, as amended, provides that any area or property which is contiguous to a municipality may be annexed to the municipality by filing with the municipal governing body a petition signed by all persons owning real estate in the area requesting annexation. Upon the agreement of the governing body to accept the petition and annex the area, and the enactment of an ordinance declaring the area annexed to the municipality, the annexation is complete; WHEREAS, using the definition of “contiguous” as outlined in S.C. Code Section 5- 3- 305, the Town Council has determined that the above -referenced property is contiguous to property that was previously annexed into the corporate limits of the Town of Fort Mill; and WHEREAS, the Town Council has determined that annexation would be in the best interest of both the Property Owner and the Town of Fort Mill. NOW, THEREFORE , pursuant to the authority granted by the Constitution and the General Assembly of the State of South Carolina, BE IT ORDAINED by the Mayor and Town Council of the Town of Fort Mill, South Carolina, in meeting duly assembled, as follows: 2 SECTION I. Annexation. It is hereby declared by the Town Council of the Town of Fort Mill, in Council assembled, that the incorporated limits of the Town of Fort Mill shall be extended so as to include, annex and make a part of said Town, the described area of territory above referred to, being more or less 8.254 +/- acres, the same being fully described in Exhibit “A” and Exhibit “B” attached hereto, and contiguous to land already within the Town of Fort Mill. Pursuant to S.C. Code Section 5- 3-110, this annexation shall include the whole or any part of any street, roadway, or highway abutting the above referenced property, not exceeding the width thereof, provided such street, roadway or highway has been accepte d for and is under permanent public maintenance by the Town of Fort Mill, York County, or the South Carolina Department of Transportation. SECTION II. Zoning Classification of Annexed Property. The above-described property, upon annexation into the corporate limits of the Town of Fort Mill, shall be zoned, as follows: HC Highway Commercial. SECTION III. Voting District. For the purpose of municipal elections, the above-described property, upon annexation into the incorporated limits of the Town of Fort Mill, shall be assigned to and made a part of Ward Four (4). SECTION IV. Notification. Notice of the annexation of the above-described area and the inclusion thereof within the incorporated limits of the Town of Fort Mill shall forthwith be filed with the Secretary of State of South Carolina (SCSOS), the South Carolina Department of Public Safety (SCDPS), and the South Carolina Department of Transportation (SCDOT), pursuant to S.C. Code § 5-3-90(E). SECTION V. Severability. If any section, subsection, or clause of this ordinance shall be deemed to be unconstitutional or otherwise invalid, the validity of the remaining sections, subsections, and clauses shall not be affected thereby. SECTION VI. Effective Date. This ordinance shall be effective from and after the date of adoption. FIRST READING: October 26, 2026, Approved, Held Public Hearing SECOND READING: _______________ SIGNED: Mayor Guynn H. Savage Cary B. Vargo, Town Manager Enacted this ________ day of ________________, 2026, by a majority vote of the duly elected Town Council of the Town of Fort Mill. ATTEST: __________________________ Casey O’Brien, Municipal Clerk 3 EXHIBIT A Property Description All those certain pieces, parcels or tracts of land lying, being and situate in Fort Mill Township, County of York, State of South Carolina, containing 8.254 +/- acres, more or less, containing all the property shown in the map attached as Exhibit B, and being more particularly describe d as York County Tax Map Parcels 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00-062 located at the intersection of Fort Mill Parkway and Holbrook Road. Pursuant to S.C. Code Section 5-3-110, this annexation shall include the whole or any part of any street, roadway, or highway abutting the above referenced property, not exceeding the width thereof, provided such street, roadway or highway has been accepte d for and is under permanent public maintenance by the Town of Fort Mill, York County, or the South Carolina Department of Transportation. 4 EXHIBIT B Property Maps 5 Tax Parcels 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00-062– An Annexation Exhibit Showing Property Along Fort Mill Parkway (At intersection with N. Dobys Bridge Rd & Holbrook Rd) prepared by Thomas E. White, dated 7-28-26, attached hereto Vicinity Map Zoning Map Holbrook Commercial Development Transportation Impact Analysis Update Fort Mill, South Carolina Prepared for: Town of Fort Mill March 2026 © Kimley-Horn and Associates, Inc., 2026 i TABLE OF CONTENTS Page No. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION 5 3.0 EXISTING TRAFFIC CONDITIONS 9 3.1 STUDY AREA 9 3.2 EXISTING TRAFFIC 10 4.0 FUTURE BACKGROUND CONDITIONS 13 4.1 HISTORICAL GROWTH TRAFFIC 13 4.2 APPROVED OFF-SITE DEVELOPMENTS 13 4.3 PLANNED TRANSPORTATION PROJECTS 15 5.0 FUTURE BUILD-OUT CONDITIONS 18 5.1 SITE ACCESS 18 5.2 TRAFFIC GENERATION 18 5.3 SITE TRAFFIC DISTRIBUTION AND ASSIGNMENT 19 5.4 2029 BUILD-OUT TRAFFIC VOLUMES 19 6.0 VEHICULAR CAPACITY ANALYSIS 23 6.1 FORT MILL PARKWAY AND WHITES ROAD/HARRIS TEETER CENTER ACCESS 1 27 6.2 FORT MILL PARKWAY AND S DOBYS BRIDGE ROAD/HARRIS TEETER CENTER ACCESS 2 28 6.3 FORT MILL PARKWAY AND HOLBROOK ROAD/N DOBYS BRIDGE ROAD 29 6.4 FORT MILL PARKWAY AND HAIRE ROAD 31 6.5 FORT MILL PARKWAY AND WILLIAMS ROAD 33 6.6 WILLIAMS ROAD AND N DOBYS BRIDGE ROAD 34 6.7 HOLBROOK ROAD AND PUBLIC STORAGE DRIVEWAY/EXISTING DRIVEWAY (ACCESS 1) 35 6.8 FORT MILL PARKWAY AND N DOBYS COMMERCIAL ACCESS 2/ACCESS 2 36 7.0 AUXILIARY TURN-LANE WARRANTS 38 8.0 PEDESTRIAN AND BICYCLE OPERATIONS ANALYSIS 39 9.0 TRAFFIC SIGNAL WARRANTS 45 10.0 COMPLIANCE WITH ADOPTED TRANSPORTATION PLANS 45 11.0 MITIGATION IMPROVEMENTS 46 APPENDIX 49 ii List of Figures Page No. FIGURE 1.1 – IDENTIFIED MITIGATION IMPROVEMENTS 4 FIGURE 2.1 – STUDY AREA/SITE LOCATION 7 FIGURE 2.2 – PROPOSED SITE PLAN 8 FIGURE 3.1 – EXISTING ROADWAY LANEAGE 11 FIGURE 3.2 – 2025 EXISTING PEAK HOUR TRAFFIC VOLUMES 12 FIGURE 4.1 – 2029 BACKGROUND AM PEAK-HOUR TRAFFIC VOLUMES 16 FIGURE 4.2 – 2029 BACKGROUND PM PEAK-HOUR TRAFFIC VOLUMES 17 FIGURE 5.1 – SITE TRAFFIC DISTRIBUTION AND ASSIGNMENT 20 FIGURE 5.2 – 2029 BUILD-OUT AM PEAK-HOUR TRAFFIC VOLUMES 21 FIGURE 5.3 – 2029 BUILD-OUT PM PEAK-HOUR TRAFFIC VOLUMES 22 FIGURE 6.1 – BACKGROUND AND BUILD-OUT/BUILD-OUT IMPROVED LOS 26 FIGURE 11.1 – IDENTIFIED MITIGATION IMPROVEMENTS 47 List of Tables Page No. TABLE 3.1- STUDY AREA ROADWAYS 9 TABLE 4.1 – APPROVED OFF-SITE DEVELOPMENTS 14 TABLE 5.1 – TRIP GENERATION 19 TABLE 6.0-A –VEHICULAR LOS CONTROL DELAY THRESHOLDS FOR INTERSECTIONS 24 TABLE 6.0-B – ADOPTED LOS STANDARD 25 TABLE 6.1 – FORT MILL PARKWAY AND WHITES ROAD/HARRIS TEETER CENTER ACCESS 1 27 TABLE 6.2 – FORT MILL PARKWAY AND S DOBYS BRIDGE ROAD/HARRIS TEETER CENTER ACCESS 2 28 TABLE 6.3 – FORT MILL PARKWAY AND HOLBROOK ROAD/N DOBYS BRIDGE ROAD 29 TABLE 6.4 – FORT MILL PARKWAY AND HAIRE ROAD 31 TABLE 6.5 – FORT MILL PARKWAY AND WILLIAMS ROAD 33 TABLE 6.6 – WILLIAMS ROAD AND N DOBYS BRIDGE ROAD 34 TABLE 6.7 – HOLBROOK ROAD AND PUBLIC STORAGE DRIVEWAY/EXISTING DRIVEWAY (ACCESS 1) 35 TABLE 6.8 – FORT MILL PARKWAY AND N DOBYS COMMERCIAL ACCESS 2/ACCESS 2 36 TABLE 6.9 – HAIRE ROAD AND ACCESS 3 37 TABLE 8.0 – PEDESTRIAN LOS THRESHOLDS FOR INTERSECTIONS 39 TABLE 8.1 – PEDESTRIAN OPERATIONS 40 TABLE 8.2 – BICYCLE LOS THRESHOLDS 42 TABLE 8.3 – BICYCLE OPERATIONS 43 Holbrook Commercial Development Transportation Impact Analysis Update 1 1.0 Executive Summary The purpose of this Transportation Impact Analysis (TIA) Update is to evaluate the impacts on the surrounding transportation infrastructure as a result of the updated Holbrook Commercial development proposed by Ashok Patel. The primary objectives of the study are: ⚫ To estimate trip generation and distribution for the proposed development. ⚫ To perform vehicular, pedestrian, and bicycle operations analyses for each of the identified study intersections. ⚫ To determine the potential transportation impacts of the proposed development. ⚫ To identify improvements to mitigate the proposed development’s transportation impacts. The proposed Holbrook Commercial development is located in the southeast quadrant of the intersection of Fort Mill Parkway and N Dobys Bridge Road/Holbrook Road in Fort Mill , South Carolina. Based on the site plan provided by the developer, the proposed development is currently envisioned to include of the following land uses and intensities: ⚫ 13,600 square-foot (SF) strip retail plaza ⚫ 9,000 SF high-turnover sit-down restaurant ⚫ 2,500 SF fast-food restaurant with drive through ⚫ 600 SF fast-food restaurant with drive through and no indoor seating ⚫ 2,500 SF coffee/donut shop with drive through The site is planned to be completed (built -out) in 2029. Based on the provided site plan, the proposed development will be accessed as follows: ⚫ Access 1 – Full-movement connection to Holbrook Road aligned with Public Storage Driveway approximately 340 feet south of Fort Mill Parkway. ⚫ Access 2 – Right-in/right-out (RIRO) connection to Fort Mill Parkway aligned with the future N Dobys Commercial Access 2 approximately 575 feet east of Holbrook Road. ⚫ Access 3 – Entrance-only connection to Haire Road approximately 120 feet south of Fort Mill Parkway. A TIA Scoping Meeting was held on November 6, 2025 with the Town and developer, and the scope and parameters to be included in this TIA were finalized December 17, 2025. A TIA Scoping Document was developed based on agency and developer coordination prior to, during, and after this meeting that outlined the scoping parameters to be used for the TIA and was reviewed and agreed upon by the Town of Fort Mill, South Carolina Department of Transportation (SCDOT), York County, and the developer. The following AM and PM peak -hour scenarios were analyzed to determine the proposed development’s transportation impacts on the surrounding network: ⚫ 2025 Existing Conditions ⚫ 2029 Background Conditions ⚫ 2029 Build-out Conditions This TIA evaluates the vehicular, pedestrian, and bicycle operations in each of the scenarios above for the following study area intersections: 1. Fort Mill Parkway and Whites Road 2. Fort Mill Parkway and S Dobys Bridge Road 3. Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road 4. Fort Mill Parkway and Haire Road Holbrook Commercial Development Transportation Impact Analysis Update 2 5. Fort Mill Parkway and Williams Road 6. N Dobys Bridge Road and Williams Road 7. Holbrook Road and Public Storage Driveway/Access 1 8. Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 9. Haire Road and Access 3 For purposes of this study, Fort Mill Parkway was assumed with east -west orientation between Whites Road and Haire Road and with north-south orientation at Williams Road. Transportation impacts and mitigation requirements were determined in accordance with the traffic study guidelines in the SCDOT Access & Roadside Management Standards (ARMS) Manual and Town of Fort Mill TIA Ordinance. As such, this report presents trip generation, distribution, vehicular capacity analysis, auxiliary turn lane warrant review, and multimodal capacity analyses. Based on the analyses contained herein, the following improvements are identified to mitigate the impact of the proposed development on the surrounding transportation infrastructure: Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road ⚫ Construct a northbound right-turn lane along Holbrook Road with 100 feet of storage and appropriate taper. ⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage and appropriate taper. Fort Mill Parkway and Haire Road ⚫ Construct a southbound right-turn lane on Haire Road with 75 feet of storage and appropriate taper. Cost sharing with other area projects should be considered as applicable for this improvement. ⚫ Construct a westbound left-lane with 150 feet of storage and appropriate taper. Fort Mill Parkway and Williams Road ⚫ Construct a westbound right-turn lane with 100 feet of storage and appropriate taper. Cost sharing with other area projects should be considered as applicable for this improvement. Holbrook Road and Access 1 ⚫ Construct Access 1 to include a single ingress lane, single egress lane, stop control, and a 70-foot internal protected stem (IPS). ⚫ Per SCDOT, construction of a southbound left -turn lane along Holbrook Road is required. This lane is recommended to be constructed with 150 feet of storage and appropriate taper. ⚫ Install Do Not Block Intersection signage/striping along the northbound approach of Holbrook Road. Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 ⚫ Construct Access 2 to include a single right-in ingress lane, a single right-out egress lane, and a 30-foot IPS . Per coordination with SCDOT, an acceleration lane along Fort Mill Parkway would be involved, with presumed yield control. ⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage and appropriate taper. Haire Road and Access 3 ⚫ Construct Access 3 to include a single ingress lane. Holbrook Commercial Development Transportation Impact Analysis Update 3 Study Area Pedestrian and Bicycle Improvements ⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage and in the development’s roadway improvement areas along Fort Mill Parkway and Holbrook Road (within 500 feet), and five -foot-wide sidewalks along the site’s frontage otherwise. ⚫ Install crosswalks /markings and pedestrian ramps/truncated dome mats across the site accesses as appropriate. The mitigation improvements should be coordinated with the other improvements planned at the study intersections to the extent possible. The mitigation improvements identified within the study area are shown in Figure 1.1 . The improvements shown on this figure are subject to approval by SCDOT, Town of Fort Mill, and York County as applicable. All additions and attachments to the public roadway system shall be properly permitted, designed, and constructed in conformance to standards maintained by the agencies. It is noted that the site -civil engineer is responsible for confirming that the proposed access points meet current sight distance standards. Figure 1.1Holbrook Commercial Development Transportation Impact Analysis Update Identified Mitigation Improvements NOT TO SCALE Williams Road N Dobys Bridge Road Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND Existing Lane Storage Length Stop Control Traffic Signal X' Fort Mill Parkway 225' 425'300' 525' 350' 250' 350' 325' 150' 525' 275' 350' Harris Teeter Center Access 2 Harris Teeter Center Access 1 Access 3 Access 2 N Dobys Comm. Access 2 Access 1 150' 100' 100' 100' 150' Maximize Study Area Pedestrian and Bicycle Improvements - Incorporate a minimum 8’ multi-use path along the site’s Fort Mill Parkway frontage and in roadway improvement areas along Fort Mill Parkway and Holbrook Road (within 500’), and 5’ wide sidewalks along the site’s frontage otherwise. - Install crosswalks/markings and pedestrian ramps/truncated dome mats across the site accesses as appropriate. Background Improvements Recommended Improvements Internal Protected StemIPS SITE 100' 50' 100' 100' 75' 100' 150' 150' Recommended Cost Sharing Install "Do Not Block Intersection" signage/striping 70' IPS 30' IPS 100' Holbrook Commercial Development Transportation Impact Analysis Update 5 2.0 Introduction The purpose of this TIA Update is to evaluate the impacts on the surrounding transportation infrastructure as a result of the updated Holbrook Commercial development proposed by Ashok Patel. The primary objectives of the study are: ⚫ To estimate trip generation and distribution for the proposed development. ⚫ To perform vehicular, pedestrian, and bicycle operations analyses for each of the identified study intersections. ⚫ To determine the potential transportation impacts of the proposed development. ⚫ To identify improvements to mitigate the proposed development’s transportation impacts. The proposed Holbrook Commercial development is located in the southeast quadrant of the intersection of Fort Mill Parkway and N Dobys Bridge Road/Holbrook Road in Fort Mill, South Carolina. Figure 2.1 shows the site location. Based on the site plan provided by the developer, the proposed development is currently envisioned to include of the following land uses and intensities: ⚫ 13,600 square-foot (SF) strip retail plaza ⚫ 9,000 SF high-turnover sit-down restaurant ⚫ 2,500 SF fast-food restaurant with drive through ⚫ 600 SF fast-food restaurant with drive through and no indoor seating ⚫ 2,500 SF coffee/donut shop with drive through The site is planned to be built -out in 2029. Figure 2.2 shows the proposed site plan provided by the developer. Based on the provided site plan, the proposed development will be accessed as follows: ⚫ Access 1 – Full-movement connection to Holbrook Road aligned with Public Storage Driveway approximately 340 feet south of Fort Mill Parkway. ⚫ Access 2 – Right-in/right-out (RIRO) connection to Fort Mill Parkway aligned with the future N Dobys Commercial Access 2 approximately 575 feet east of Holbrook Road. ⚫ Access 3 – Entrance-only connection to Haire Road approximately 120 feet south of Fort Mill Parkway. The 5.90-acre site currently features a residential usage and is not zoned within the Town of Fort Mill, requiring an annexation/rezoning request, Town Commercial Appearance Review , and SCDOT encroachment permit approval. A TIA Scoping Meeting was held on November 6 , 2025 with the Town and developer, and the scope and parameters to be included in this TIA were finalized December 17, 2025. A TIA Scoping Document was developed based on agency and developer coordination prior to, during, and after this meeting that outlined the scoping parameters to be used for the TIA and was reviewed and agreed upon by the Town of Fort Mill, SCDOT, York County, and the developer. The approved TIA Scoping Document is included in the Appendix. The following AM and PM peak -hour scenarios were analyzed to determine the proposed development’s transportation impacts on the surrounding network: ⚫ 2025 Existing Conditions ⚫ 2029 Background Conditions ⚫ 2029 Build-out Conditions Holbrook Commercial Development Transportation Impact Analysis Update 6 Based on coordination prior to and at the scoping meeting, this TIA evaluates the vehicular, pedestrian, and bicycle operations in each of the scenarios above for the following study area intersections: 1. Fort Mill Parkway and Whites Road 2. Fort Mill Parkway and S Dobys Bridge Road 3. Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road 4. Fort Mill Parkway and Haire Road 5. Fort Mill Parkway and Williams Road 6. N Dobys Bridge Road and Williams Road 7. Holbrook Road and Public Storage Driveway/Access 1 8. Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 9. Haire Road and Access 3 For purposes of this study, Fort Mill Parkway was assumed with east -west orientation between Whites Road and Haire Road and with north-south orientation at Williams Road. The study area was based on the Town of Fort Mill TIA Ordinance (Section 8, No. 2019-03), which states “At a minimum, the study area shall include all streets and signalized intersections within a one-mile radius of the proposed site and/or where site traffic estimated for build -out of the project will constitute 10% or more of any signalized intersection approach during one or both peak hours. During the Scoping Meeting, staff may reduce the radius due to conditions specific to the site based on request by developer and supported with valid reasoning. Unsignalized intersections between the required signalized intersections will be added to the scope as directed by the Town.” Kimley-Horn was retained to determine the potential transportation impacts of this development in accordance with the traffic study guidelines in the SCDOT ARMS and the Town of Fort Mill TIA Ordinance; and to identify transportation improvements that may be required to mitigate these impacts. This report presents trip generation, distribution, vehicular and multimodal analyses, and identified transportation improvemen ts required to mitigate anticipated transportation demands produced by the subject development. Figure 2.1Holbrook Commercial Development Transportation Impact Analysis Update Study Area/Site Location NOT TO SCALE Williams Road N Dobys Bridge Road Construction Driveway Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND Existing Lane Storage Length Stop Control Traffic Signal X' Fort Mill Parkway 325' 425'300' 525' 350' 250' 350' 325' 150' 525' 275' 350' 1 2 3 5 6 9 SITE 8 4 7 1.Fort Mill Parkway and Whites Road 2.Fort Mill Parkway and S Dobys Bridge Road 3.Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road 4.Fort Mill Parkway and Haire Road 5.Fort Mill Parkway and Williams Road 6.N Dobys Bridge Road and Williams Road 7.Holbrook Road and Public Storage Driveway/Access 1 8.Fort Mill Parkway and N Doby Commercial Access 2/Access 2 9.Haire Road and Access 3 Legend - Study Area Intersections -Site NOT TO SCALE Figure 2.2Holbrook Commercial Development Transportation Impact Analysis Update Proposed Site Plan NOT TO SCALE Williams Road N Dobys Bridge Road Construction Driveway Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND Existing Lane Storage Length Stop Control Traffic Signal X' Fort Mill Parkway 325' 425'300' 525' 350' 250' 350' 325' 150' 525' 275' 350' Holbrook Commercial Development Transportation Impact Analysis Update 9 3.0 Existing Traffic Conditions Existing traffic conditions were coordinated with Town of Fort Mill and SCDOT staff and collected through field observations and turning -movement counts to establish the existing conditions baseline analysis. 3.1 STUDY AREA Figure 3.1 shows the current roadway geometry at the existing study intersections. The primary roadways in the vicinity of the site are: ⚫ N Dobys Bridge Road – classified by SCDOT as a minor arterial ⚫ Fort Mill Parkway, Williams Road, S Dobys Bridge Road, and Holbrook Road – classified by SCDOT as major collectors Table 3.1 describes existing conditions for portions of the se roadways within the vicinity of the study area as well as on -line data research including section type, 2024 SCDOT annual average daily traffic (AADT) in vehicles per day (vpd), and posted speed limit in miles per hour (mph). Table 3.1- Study Area Roadways Roadway Section type 2024 AADT Posted speed limit Fort Mill Parkway 2-lane undivided 18,500 W of Whites Road 45 mph Williams Road 2-lane undivided 1,950 35 mph N Dobys Bridge Road 2-lane undivided 6,800 N of Fort Mill Pkwy 35 mph S Dobys Bridge Road 2-lane undivided 15,400 40 mph Holbrook Road 2-lane undivided Not Available 40 mph Haire Road 2-lane undivided Not Available 25 mph The following is a description of existing pedestrian and bicycle accommodations at the study area intersections: Fort Mill Parkway • Sidewalk along the south side of Fort Mill Parkway between S Dobys Bridge Road and Holbrook Road/N Dobys Bridge Road N Dobys Bridge Road • Sidewalk along the east side of N Dobys Bridge Road between Williams Road and just north of Nims Lake Road • Sidewalk along the west side of N Dobys Bridge Road between Doby Bridge Park and just south of Williams Road Fort Mill Parkway and S Dobys Bridge Road • Pedestrian signal heads and push buttons for each approach, but no marked crosswalks . Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road • Pedestrian signal heads and push buttons for each approach, but no marked crosswalks. Fort Mill Parkway and Williams Road • Push buttons to facilitate crossing the eastbound and westbound approaches, but no pedestrian signal heads or marked crosswalks. Holbrook Commercial Development Transportation Impact Analysis Update 10 Pedestrian and bicycle needs have been identified within the Rock Hill-Fort Mill Area Transportation Study (RFATS) Bike Walk Plan as later discussed in Section 4.3. 3.2 EXISTING TRAFFIC Turning movement counts (TMCs) were collected on Thursday, April 10, 2025 from 6:30-9:00 AM and 3:00-7:00 PM at the following intersections: ⚫ Fort Mill Parkway and Whites Road ⚫ Fort Mill Parkway and S Dobys Bridge Road ⚫ Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road ⚫ Fort Mill Parkway and Williams Road TMCs were collected on Wednesday, December 10, 2025 from 6:30-9:00 AM and 3:00-7:00 PM at the following intersections: ⚫ N Dobys Bridge Road and Williams Road ⚫ Fort Mill Parkway and Haire Road ⚫ Holbrook Road and Public Storage Driveway The observed AM and PM peak hour of each individual intersection was used as the baseline data to represent the highest collected traffic volumes within the specified count timeframes. Note that the Town’s TIA Ordinance requires counts to be collected from 6:30 -9:00 AM and 3:00 -7:00 PM, stating ‘The PM count timeframe is expected to cover peaking characteristics caused by local Middle and High School dismissal times, as well as typical employment peaking characteristics.’ It should be noted that construction traffic for the Catawba Ridge Market (Harris Teeter) development was recorded along future HT Access 1 aligned with Whites Road and future HT Access 2 aligned with S Dobys Bridge Road. Access 1 construction traffic was not considered for this analysis since signal heads to control the movements in/out of the construction access were not in place at the time of the counts. The construction traffic recorded at HT Access 2 was considered for the existing analysis as signal heads were observed to be in place and operating. The construction traffic was removed for the future year analysis and only the approved Catawba Ridge Market site trips are considered in 2029 Background and 2029 Build -out conditions. Additionally, construction traffic at the intersection of Fort Mill Parkway and Haire Road was observed during the AM and PM peak periods. Based on review of the TMCs, this traffic was removed from the existing conditions. This volume modification is included in the Appendix, with the existing TMC data for reference. Volume balancing was performed along the following segments: ⚫ Fort Mill Parkway between Whites Road and Williams Road, excluding the section between S Dobys Bridge and N Dobys Bridge due to the presence of a driveway. ⚫ Holbrook Road between Fort Mill Parkway and Public Storage Driveway. ⚫ Williams Road between N Dobys Bridge Road and Fort Mill Parkway. Volume balancing was not performed between the remaining study area intersections d ue to the presence of streets/driveways. Figure 3.2 shows the 2025 existing AM and PM peak -hour traffic volumes. Raw peak -hour intersection TMC data is provided in the Appendix. Figure 3.1Holbrook Commercial Development Transportation Impact Analysis Update Existing Roadway Laneage NOT TO SCALE Williams Road N Dobys Bridge Road Construction Driveway Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND Existing Lane Storage Length Stop Control Traffic Signal X' Fort Mill Parkway 325' 425'300' 525' 350' 250' 350' 325' 150' 525' 275' 350' 6 5 1 2 3 4 7 4 562 54 2 35 421 30 28 (90) (594) (2) (307) (18) 5 (10) 777 499 51 (68) (555) 252 22 4 0 0 2 2 18 0 14 14 369 2 3265 191 (525) 622 168 291 (608) (252) (578) (576) (0) 582 514 543 0 416 (113) (416) (0)119 397(136) 604 3 3 4(1) 297 157 40 61 (228) (66) (77) (27) (1) (0) (1) 45 89 9 14 18364 (926) (239) (676) (4) (0) (4) (349) (388) (56) (7) (105) 334 (495) (0) (11) (26) (23) (92) (117) (164) 10 (2) (51) (25) 41 (103) (35) (18) (678) (13) 2 50 28 98 34 (23) (56) (30) (3) (7) (1) (602) (18) 280 39 17 286 11 15 (20) (516) (34) (425) (51) Figure 3.2Holbrook Commercial Development Transportation Impact Analysis Update 2025 Existing Peak-Hour Traffic Volumes NOT TO SCALE Williams Road N Dobys Bridge Road Construction Driveway Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND AM Peak-Hour Traffic Volumes PM Peak-Hour Traffic Volumes Stop Control Traffic Signal (XX) XX Fort Mill Parkway Holbrook Commercial Development Transportation Impact Analysis Update 13 4.0 Future Background Conditions Projected background (non -project) traffic is defined as the expected growth or change in traffic volumes on the surrounding roadway network between the year the existing counts were collected and the expected build -out year ( 2029) absent the construction and opening of the proposed project. This includes both non-specific general growth based on historical increases in local traffic volumes (historical growth), and specific growth and/or change in traffic volumes caused by future off-site developments that are not yet fully -constructed; and/or planned transportation projects specifically identified within the horizon year and vicinity of the proposed development. 4.1 HISTORICAL GROWTH TRAFFIC Historical growth is the increase in existing traffic volumes due to usage increases and non-specific growth throughout the area, and accounts for growth that is independent of specific off-site developments or planned transportation projects . Historical growth traffic is calculated using an annual growth rate, which is applied to the existing traffic volumes up to the future horizon year. As shown in the approved TIA Scoping Document, an annual growth rate of 2.1% was applied to the 2025 peak-hour traffic volumes over four years to calculate 2029 historical growth traffic volumes. 4.2 APPROVED OFF -SITE DEVELOPMENT S Based on the TIA Scoping Document, five approved offsite developments within the vicinity of this study area were included in the 2029 background traffic. These developments, land uses and intensities, and build-out percentages are outlined in Table 4.1. Offsite approved development traffic volumes were taken directly from each respective TIA . Existing intersection splits were used to carry and assign volumes appropriately at study area intersections that were not included in the approved TIAs listed in Table 4.1. Holbrook Commercial Development Transportation Impact Analysis Update 14 Table 4.1 – Approved Off-Site Developments Development Land Use/Intensity (per TIA) Approx % Built-out 2025/2029 portion^ Build-out year per TIA TIA Required Improvements Catawba Ridge Market Ref: 014007043 10k SF Vet Clinic 19.7k SF Strip Retail 61k SF Supermarket 7k SF Small Strip Outlot 4.59k SF Fast Food with Drive-Thru 4.6k SF Fast Food with Drive-Thru 14 VFP C-Store/Gas Station 4k HTSD Restaurant 1.9k Drive-In Bank 0%/100% 2026 2-24 Fort Mill Parkway/Whites Road: -EBL w/150’ -SBL w/100’ and SBR w/100’ (HT D/W) -Addl WBT that drops at HS DW #2 Fort Mill Parkway/S Dobys Bridge Road: -EBL w/150’ -SBL w/100’ and SBTR (Harris Teeter D/W) -Addl NBL w/525’ -Addl WBT that drops at HS DW#2 N Dobys Commercial Ref: 014007027 3.6k SF Medical-Dental Office 9.6k SF Shopping Center 7.2k SF restaurant 2.5k SF fast food 0%/100% 2027 05-22 None in study area Catawba Ridge HS (FKA FMHS #3) Ref: 018577001 1,600 student high school 100%/100%* 2019 4-16 None in study area Cresswind Fort Milll Ref: 014007046 645 detached senior homes 0%/50% 2033 12-24 Fort Mill Parkway and Whites Road/HT Access 1: -EBR w/ 225’ -EBTR restriped to a through lane Fort Mill Parkway and S Dobys Bridge/HT Access 2: -NBR w/ storage maximized ~250’ between Fort Mill Parkway and existing driveway Banks Road Development Ref: 014007009 12,500 SF daycare 0%/100% 2022 9-21 None in study area ^Based on January 2025 aerial imagery. *FMHS #3 plans to have 1,600 students upon 2019 opening and gradually increase until it reaches full occupancy of 2,400 stude nts in 2031. Approximately 67 students will be added to the high school per year. **Arden Mill Phase 2 excluded as currently recommended for denial by PC, and Williams Reserve (Mattamy) excluded due to Counc il denial and potential for offsite improvements impacting this TIA. It is noted that the southbound approach of N Dobys Commercial Access 2 is recommended to be modified from what was previously recommended by SCDOT as feedback on the N Dobys Commercial TIA and as recorded in the N Dobys Commercial Transportation Mitigation Agreement (TMA). Figures 4.1 and 4.2 show the projected 2029 background AM and PM peak -hour traffic volumes, respectively, which include the existing plus historical growth traffic and future off-site development trips. Holbrook Commercial Development Transportation Impact Analysis Update 15 4.3 PLANNED TRANSPORTATION PROJECTS Based on review of online information regarding SCDOT and York County transportation projects for the area, there are no known public projects funded/committed within the study area. However, private development commitments are noted in Table 4.1. The RFATS Bike Walk Plan shows th e following unfunded pedestrian and bicycle projects within the study area: ⚫ Fort Mill Parkway/S Dobys Bridge Road - Spot Improvement ⚫ Fort Mill Parkway between Spratt Street and Holbrook Road – shared-use path ⚫ Fort Mill Parkway between Holbrook Road and Tom Hall Street – bike lane and sidewalk ⚫ N Dobys Bridge Road between Fort Mill Parkway and Tom Hall Street – shared-use path ⚫ Dobys Bridge Road between Fort Mill Parkway and US 521 – bike lane and sidewalk The Fort Mill Parkway/S Dobys Bridge Road spot improvements are assumed to include high - visibility crosswalks, median refuge, and pedestrian signalization as applicable (per Bike Walk RFATS page 79). Due to the extent of the Harris Teeter Center/Catawba Ridge Market committed improvements at Fort Mill Parkway/S Dobys Bridge Road, the spot improvements would be anticipated to be incorporated into that project. Town of Fort Mill Trails Master Plan shows the following recommended pedestrian and bicycle projects within the study area: ⚫ Whites Road south of Fort Mill Parkway – side path ⚫ Dobys Bridge Road north of Fort Mill Parkway – side path Town of Fort Mill Corridor Overlay District (COD) guidelines listed in Article II., Section 24.10 of the Fort Mill Zoning Ord inance requires installation of eight -foot-wide shared use paths along lots abutting public roads and roadway improvement areas (Fort Mill Parkway and along Holbrook Road within 500 feet), and five-foot-wide sidewalks along the site’s frontage otherwise. 6 5 1 2 3 8 4 7 304 42 18 311 12 16 <411> <42> <18> <383> <12> (107) (0) (0) (72) (0) (20) <126> (0) <16> 45 (0) <45> 37 (0) <37> 457 33 <33> (3) 30 11 (0) <11> 106 4 611 58 <28> (26) 2 <38> (0) 38 (76) (3) (0) (63) (12) <533> <36> <4> <674> <70> <15> (42) (36) (40) (16) (56) (59) <295> <28> <15> <50> <28> <42> <36> <40> <16> <56> <59> (0) 5 (4) (11) (50) 0 0 0 0 (24) <24> <36> <22> <0> (36) (2) (0) (46) 424 (46) 274 24 4 0 363 (71) (0) <5> (21) (28) 20 0 15 15 (0) <470> 401 (44) <46><434> 0 0 0 (63) <907> 542 (45) <587> 55 (3) <58> 4 (0) <4> <445> 288 (15) <303> 208 (6) <214> 0 0 2 2 (62) <62> <15> 844 <32> (2) 30 <684> (8) 676 183 0 316 <592> <37> (37) 0<77> (77) 0 <17> (17) 2 (27) 323 171 43 54 (65) 632 (33) 559 590 0 452 <350> <697> <730> (39) 691 <693> (37) 656 3 3 2 <4> (0) 4 (23) (41) (74) (7)<146> (17) 129 <452> (21) 431 (0) <209> <51> <339> <631> <74> <459> <192> <45> (0) (0) (0)<73> (7) 66 (21) (2) (26) (51) <2> <54> <106> <54> <3> <3> (5) (9) 49 97 <76> (6) 70 <10> (0) 10 15 199 (0) (17) <15> <216> [-2] [-2] [-2] Figure 4.1Holbrook Commercial Development Transportation Impact Analysis Update 2029 Background AM Peak-Hour Traffic Volumes NOT TO SCALE Williams Road N Dobys Bridge Road Harris Teeter Center Access 2 Harris Teeter Center Access 1 Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway N Dobys Comm. Access 2 Haire Road LEGEND Existing + Historical Growth Traffic Approved Development Trips Background Traffic Volumes Stop Control Traffic Signal (XX) <XX> XX Fort Mill Parkway Removal of Construction Traffic[XX] 6 5 1 2 3 8 4 7 9 462 55 37 561 22 20 <580> <55> <37> <642> <22> (118) (0) (0) (81) (0) (23) <135> (0) <20> 61 (0) <61> 38 (0) <38> 334 20 <57> (2) 55 25 (0) <25> 112 2 645 98 <2> (0) 2 <27> (0) 27 (114) (2) (0) (74) (19) <448> <22> <2> <719> <117> <8> (68) (63) (43) (23) (94) (85) <433> <69> <22> <77> <27> <68> <63> <43> <27> <94> <89> (0) 11 (8) (14) (77) 0 0 0 0 (30) <30> <33> <35> <3> (33) (2) (0) (42) 688 (62) 422 61 8 0 603 (87) (0) <11> (11) (27) 33 3 8 20 (0) <750> 654 (60) <42><690> 0 0 0 (23) <757> 538 (32) <570> 73 (2) <75> 1 (0) <1> <714> 260 (24) <284> 571 (5) <576> 4 0 4 0 (82) <82> <20> 734 <15> (1) 14 <1,026> (20) 1,006 123 0 248 <661> <33> (33) 0<90> (90) 0 <16> (16) 0 (36) 274 114 29 84 (78) 661 (35) 626 452 0 379 <310> <739> <812> (60) 752 <796> (59) 737 1 0 1 <1> (0) 1 (17) (22) (97) (6)<179> (31) 148 <657> (29) 628 (0) <140> <62> <265> <474> <97> <385> <135> <31> (0) (0) (0)<84> (12) 72 (21) (2) (17) (62) <1> <31> <197> <84> <1> <0> (3) (19) 28 178 <108> (8) 100 <25> (0) 25 12 127 (0) (15) <12> <142> Figure 4.2Holbrook Commercial Development Transportation Impact Analysis Update 2029 Background PM Peak-Hour Traffic Volumes NOT TO SCALE Williams Road N Dobys Bridge Road Harris Teeter Center Access 2 Harris Teeter Center Access 1 Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway N Dobys Comm. Access 2 Haire Road LEGEND Existing + Historical Growth Traffic Approved Development Trips Background Traffic Volumes Stop Control Traffic Signal (XX) <XX> XX Fort Mill Parkway Holbrook Commercial Development Transportation Impact Analysis Update 18 5.0 Future Build-Out Conditions Site traffic developed for this TIA is defined as the site-generated trips expected to be added to the study area by the proposed development, and the distribution and assignment of that traffic to the identified study area intersections. 5.1 SITE ACCESS Based on the provided site plan, the proposed development will be accessed as follows: ⚫ Access 1 – Full-movement connection to Holbrook Road aligned with Public Storage Driveway approximately 340 feet south of Fort Mill Parkway. ⚫ Access 2 – RIRO connection to Fort Mill Parkway aligned with the future N Dobys Commercial Access 2 approximately 575 feet east of Holbrook Road. ⚫ Access 3 – Entrance-only connection to Haire Road approximately 120 feet south of Fort Mill Parkway. As shown in the SCDOT ARMS Manual, the minimum driveway spacing is 325 feet for roadways with a posted speed limit of 45 mph (Fort Mill Parkway) and 275 feet for roadways with a posted speed limit of 40 mph (Holbrook Road). 75 feet is required by York County for 30 mph with AADT less than 2000 vpd (Haire Road). It is noted that the site-civil engineer is responsible for confirming that the proposed access points meet current sight distance standards. 5.2 TRAFFIC GENERATION The traffic generation potential of the proposed development was determined using the trip generation rates published in Trip Generation (Institute of Transportation Engineers, Eleventh Edition, 2021). Based on the provided site plan, the proposed development is envisioned to consist of the following land uses and intensities: ⚫ 13,600 square-foot (SF) strip retail plaza ⚫ 9,000 SF high-turnover sit-down restaurant ⚫ 2,500 SF fast-food restaurant with drive through ⚫ 600 SF fast-food restaurant with drive through and no indoor seating ⚫ 2,500 SF coffee/donut shop with drive through Table 5.1 summarizes the projected trip generation for the proposed development. During a typical weekday, the proposed development has the potential to generate 426 and 259 net new external trips during the AM and PM peak hours, respectively. Internally captured trips are trips that begin and end within the project site and do not access the external roadway network. The National Cooperative Highway Research Program (NCHRP) Report 684 Enhancing Internal Trip Capture Estimation for Mixed -Use Developments, produced by the Transportation Research Board, was used to calculate the internal capture, applied between the office and retail components of the site. Internal capture calculations are included in the Appendix. Pass-by trips are trips already on the roadway network that turn into and out of the site as they pass by on the adjacent street. Pass-by volumes were calculated based on the equations and data presented in the ITE Trip Generation Handbook. Pass-by volumes were limited to ten percent of the adjacent street traffic. Pass-by calculations are included in the Appendix. Holbrook Commercial Development Transportation Impact Analysis Update 19 Table 5.1 – Trip Generation 5.3 SITE TRAFFIC DISTRIBUTION AND ASSIGNMENT The proposed development’s trips were assigned to the surrounding network based on available ADTs, prior studies, and surrounding land uses. The site traffic distribution and assignment shown in Figure 5.1 was reviewed and approved by the Town of Fort Mill, SCDOT, York County, and the developer. 5.4 2029 BUILD -OUT TRAFFIC VOLUMES The 2029 build-out traffic volumes include the assignment of the projected site traffic generation added to the 2029 background traffic volumes. Figures 5.2 and 5.3 show the projected 2029 build- out traffic volumes for the AM and PM peak hours, respectively. Intersection volume development worksheets for the identified study intersections are provided in the Appendix. AM Peak Hour PM Peak Hour Total In Out Total In Out Retail Land Uses 741 32 19 13 90 45 45 822 - Strip Retail Plaza (<40k) 13.6 KSF 741 32 19 13 90 45 45 Restaurant Land Uses 3,983 456 234 222 321 172 149 934 - Fast-Food Restaurant with Drive-Through Window 2.5 KSF 1,169 112 57 55 83 43 40 935 - Fast-Food Restaurant with Drive-Through Window and No Indoor Seating 1.0 LANE 515 43 20 23 60 31 29 932 - High-Turnover (Sit-Down) Restaurant 9.0 KSF 965 86 47 39 81 49 32 937 - Coffee/Donut Shop with Drive-Through Window 2.5 KSF 1,334 215 110 105 97 49 48 Subtotal 4,724 488 253 235 411 217 194 Internal Capture 372 8 4 4 74 37 37 ITE 934 Pass-By - 50% AM / 55% PM 614 54 27 27 38 19 19 ITE 935 Pass-By - 0% AM / 31% PM 80 0 0 0 16 8 8 ITE 932 Pass-By - 0% AM / 43% PM 207 0 0 0 24 12 12 ITE Pass-By 901 54 27 27 78 39 39 Adjacent Street Traffic 35,614 1,614 1,947 10% Adjacent Street Traffic 3,561 162 81 81 196 98 98 Pass-By 901 54 27 27 78 39 39 Total Net New External Trips 3,451 426 222 204 259 141 118 *ITE 935 does not provide daily rates; therefore, the average of the total AM and PM peak-hour trips was assumed to account for 10% of the daily trips. Land Use Table 5.1 - Holbrook Trip Generation DailyIntensity Units * 6 5 1 2 3 8 4 7 9 15% 45% 5% (15%) (5%) (45%) 50% 5% 10% (50%) (50%) (5%) (45%) 15% 50% 5% 15% 10%20% 10% 20% (15%) (30%) (5%) (15%)5% (10%) (20%) 30% Figure 5.1Holbrook Commercial Development Transportation Impact Analysis Update Site Traffic Distribution and Assignment NOT TO SCALE Williams Road N Dobys Bridge Road Harris Teeter Center Access 2 Harris Teeter Center Access 1 Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Access 3 Access 2 N Dobys Comm. Access 2 Haire Road SITE LEGEND Site Traffic Distribution Inbound Assignment 2024 SCDOT AADT Stop Control Traffic Signal XX% Outbound Assignment (XX%) Access 1 Fort Mill Parkway XX% XX 15% 5% 10% 5% 5% 45% 15% 18,500 18,900 6,800 15,400 7,600 10,600 11,800 6 5 1 2 3 8 4 7 9 (0) 411 42 18 383 12 16 (34) (0) (0) (100) (0) <42> <36> <40> <16> (31) (0) (0) (92) (10) <295> <39> <38> <50> <22> <0> <15> (11) (23) (0) (0) (0) (0) (0) (0) (0) (0) (0) 5 (0) 0 36 16 56 59 62 (0) 42 36 40 24 (0) <24> <62> 303 (10) 214 (20) 907 (31) 587 (41) 58 (0) <313> <938> <234> <628> 0 (44) 592 631 74 459 (0) 32(0) 37(0) 17 (0) 452 (102) 693 <37> <12> 0 80 (0) <0> <105> 54 106 0 0 (92) {13} {2}(10) (0) (0) (11) (0) (0) <16> <211> <15> <452> <636> <17> <350> <51> <209> <146> <717> <77> (0) (0) (11)(0) 146 (33) 684 209 51 339(0) 77 <10> <0> <76> <54> <104> <35> <56> <59> <631> <74> <481> (0) 10 (0) 0 (0) (0) (33) (22) 73<95> (0) (0) (22) 15 216 0 0 (61) (31)697 295 28 15 50 434 (0) 76 (0) 350 192 45 (44) <261> <445> <42> <11> <45> <564> <36> <58> <426> <5> (0) (0) 533 36 11 (0) 45 (0) {-8} <0> <0> <114> <0> <741> <350> <54> <76> (0) (0) (0) (102) 0 (0) {8} <79> 54 <718> (0) 730 0 0 (67) <8> <119> <46> <28> <0> <36> <4> <795> <32> 46 (0) 470 (0) (0) (0) 4 0 22 0 15 <462> 28 (0) (0) 4 {-8} {8} (0) (0) (0) <0> <9> 3 3 2 (111) 15 (0) 445 (0) <18> <483> <12> <38> <4> <766> <80> <137> <37> 4 674 70 (0) 28 (0) 38 (0) 33 <28> <33> 126 (11) (0) 37 {5} {-5) {-2} {2} {12} {-8} {-12} {12} <16> <123> <437> <15> 0 9 (111) (0) <3> <3> <2> (0) Figure 5.2Holbrook Commercial Development Transportation Impact Analysis Update 2029 Build-Out AM Peak-Hour Traffic Volumes NOT TO SCALE Williams Road N Dobys Bridge Road Harris Teeter Center Access 2 Harris Teeter Center Access 1 Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Access 3 Access 2 N Dobys Comm. Access 2 Haire Road SITE LEGEND Background Traffic Volumes Site Trips Build-out Traffic Volumes Stop Control Traffic Signal (XX) <XX> XX Pass-By Trips {XX} Access 1 Fort Mill Parkway 6 5 1 2 3 8 4 7 9 580 55 37 642 22 20 <601> <55> <37> <706> <22> (21) (0) (0) (64) (0) (7) <142> (0) <20> 61 (0) <61> 38 (0) <38> 448 22 <57> (0) 57 25 (0) <25> 135 2 719 117 <2> (0) 2 <27> (0) 27 (18) (0) (0) (53) (6) <466> <22> <2> <772> <123> <33> <35> <3> <8> (0) (0) (0) (0) (0) (0) <433> <76> <36> <77> <27> <0> <68> <63> <43> <27> <94> <89> (0) 11 (0) <11> (0) (7) (14) (0) (0) (0) 68 63 43 30 (0) <30> <675> 27 0 (0) (0) (0) (0) 750 (0) <42> 35 3 8 20 (0) <735> 714 (0)757 (18) <775> 570 (24) <594> 75 (0) <75> 433 69 22 77 690 (0) 33 42 1 (71) <87> <699> 284 (6) <290> 576 (11) <587> 27 94 89 82 (0) <82> {-15} {-15} {15} {-15} <20> <90> (0) 90 <16> (0) 16 0 (0) <0> 15 (21) 1,026 140 62 265 <689> <33> (0) 33 (0) 310 135 31 84 (28) 739 (28) 97 385 0 1 <1> (0) 1 0 0 <855> (59) 796661 474 <310> <767> <797> (0) 812 <15> (0) <179> (0) 179 <657> (0) 657 (0) <140> <62> <272> <474> <97> <399> <49> (0) (0) (0) (59) (0) (0)<98> (14) 1 (0) (0) <1> <31> <194> <24> <86> <5> <84> <0> <0> <75> <1> <0> {15}<185> (7) (0) (0) (14) 84 (35) (18) 0 50 (0) <0> (0) (0) (21) (71) (0) 31 197 0 0 (53) 0 2 <25> (0) 25 <0> (0) 0 12 142 0<108> (0) 108 (0) (0) (7) (0) (0) <12> <137> <12> <0> <2> <1,047> {5} {-5} {3} {20} {-3} {3} {-15} {15} {16} 0 (6) <9> <73> 0 <57> (42) 0 Figure 5.3Holbrook Commercial Development Transportation Impact Analysis Update 2029 Build-Out PM Peak-Hour Traffic Volumes NOT TO SCALE Williams Road N Dobys Bridge Road Harris Teeter Center Access 2 Harris Teeter Center Access 1 Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Access 3 Access 2 N Dobys Comm. Access 2 Haire Road SITE LEGEND Background Traffic Volumes Site Trips Build-out Traffic Volumes Stop Control Traffic Signal (XX) <XX> XX Pass-By Trips {XX} Access 1 Fort Mill Parkway Holbrook Commercial Development Transportation Impact Analysis Update 23 6.0 Vehicular Capacity Analysis Based on the requirements set forth by the Town of Fort Mill TIA Ordinance and in accordance with the traffic study guidelines in the SCDOT ARMS manual, vehicular capacity analyses were performed at the study area intersections for each of the following AM and PM peak-hour scenarios: ⚫ 2025 Existing Conditions ⚫ 2029 Background Conditions ⚫ 2029 Build-out Conditions Vehicular capacity analyses were performed for the AM and PM peak hours using the Synchro Version 12 software to determine the operating characteristics at the signalized and stop-controlled intersections of the adjacent street network and to evaluate the impacts of the proposed development. Capacity is defined as the maximum number of vehicles that can pass over a particular road segment, or through a particular intersection, within a specified period of time under prevailing operational, geometric and controlling conditions within a set time duration. The Highway Capacity Manual (HCM) defines level-of-service (LOS) as a “quantitative stratification of a performance measure or measures representing quality of service ” and is used to “translate complex numerical performance results into a simple A -F system representative of travelers’ perceptions of the quality of service provided by a facility or service”. The HCM defines six levels of service, LOS A through LOS F, with A having the best operating conditions from the traveler’s perspective and F having the worst. However, it must be understood that “the LOS letter result hides much of the complexity of facility performance”, and that “the appropriate LOS for a given system element in the community is a decision for local policy makers”. According to the HCM, “for cost, environmental impact, and other reasons, roadways are typically designed not to provide LOS A conditions during peak periods but instead to provide some lower LOS that balances individual travelers’ desires against society’s desires and financial resources. Nevertheless, during low - volume periods of the day, a system element may operate at LOS A.” LOS for a two -way stop-controlled (TWSC) intersection is determined by the control delay and is reported for the side-street approaches, typically during the highest volume periods of the day, the AM and PM peak periods. Control delay includes initial deceleration delay, queue move -up time, stopped delay, and final acceleration delay. With respect to field measur ements, control delay is defined as the total elapsed time from the time a vehicle stops at the end of the queue to the time the vehicle departs from the stop line. It is typical for stop sign-controlled side streets and driveways intersecting major streets to experience long delays during peak hours, particularly for left -turn movements. The majority of the traffic moving through the intersection on the major street experiences little or no delay. LOS for signalized intersections is reported for the intersection as a whole, and typically during the highest volume periods of the day, the AM and PM peak periods. One or more movements at an intersection may experience a low level -of-service, while the intersection as a whole may operate acceptably. Table 6.0 -A lists LOS control delay thresholds published i n the HCM for unsignalized and signalized intersections, respectively, as well as the unsignalized operational descriptions assumed herein. Holbrook Commercial Development Transportation Impact Analysis Update 24 Table 6.0-A – LOS/Delay Thresholds [sec/veh] LOS Signalized Unsignalized A ≤ 10 ≤10 Short Delays B > 10 – 20 >10-15 C > 20 – 35 >15-25 D > 35 – 55 >25-35 Moderate Delays E > 55 – 80 >35-50 F > 80 >50 Long Delays Traffic signal geometric plans were obtained from SCDOT for the intersections of Fort Mill Parkway/S Dobys Bridge Road and Fort Mill Parkway/Holbrook Road/N Dobys Bridge Road, which were used in the development of the existing conditions Synchro network. S ignal plans were not available for the intersections of Fort Mill Parkway/Whites Road or Fort Mill Parkway/Williams Road; therefore, SCDOT’s Synchro V11 defaults were used in the development of the existing conditions Synchro network at these intersections . Available signal geometric plans are included in the Appendix. Cycle lengths, splits and offsets for the coordinated Fort Mill Parkway intersections with Whites Road, S Dobys Bridge Road, and Holbrook Road/N Dobys Bridge Road were optimized in existing conditions given the timing and volume inputs. Cycle lengths, spli ts, and offsets were optimized again under background conditions to account for the additional laneage and approaches from the Catawba Ridge Market and Cresswind Fort Mill approved developments. Under build -out conditions, cycle lengths, splits, and offsets were maintained from background conditions. Cycle lengths and splits were optimized under all studied conditions for the uncoordinated intersection of Fort Mill Parkway and Williams Road. Field-observed peak hour factors (PHFs) were used under existing conditions, while a PHF of 0.9 was used in future year analyses. Heavy-vehicle percentages collected with the counts were used for existing conditions, subject to a two -percent minimum. A weighted heavy -vehicle percentage was determined for future year conditions, subject to a two-percent minimum. It is noted that overall intersection delay may decrease slightly from existing conditions to background conditions. This can be attributed to the following: • Signal timing optimization from existing time-of-day plans. • The assumption of a PHF of 0.9 for future -year scenarios. The observed PHFs were generally lower than 0.9; therefore, increasing them to 0.9 represents a more normal distribution of vehicles over time, leading to less delay. It is also noted that overall intersection delay may decrease slightly from background conditions to build-out conditions. This can be attributed to the following: • Signal timing optimization from background conditions. • The addition of only major street through and right -turning traffic, which experiences less delay than side street approaches and left -turn movements. Therefore, the increase in through and right-turn movement trips drops the weighted average of delay. Mitigation for vehicular traffic impacts caused by the proposed development were identified based on Town of Fort Mill and SCDOT mitigation requirements. When determining the proposed development’s traffic impact to the study area intersections, the 2029 build-out conditions were Holbrook Commercial Development Transportation Impact Analysis Update 25 compared to the 2029 background conditions. Based on the Town of Fort Mill TIA Ordinance , developer mitigation shall be required ‘if at least one of the following conditions exists when comparing the multimodal operations of future year background conditions to future year build -out conditions: a. the total average delay at an intersection or individual approach increases by 25% or greater, while maintaining the same LOS, b. the LOS degrades by at least one level, c. or the LOS does not meet the identified standard (as shown in Table 6.0-B) in background conditions, and the proposed project shows a negative impact on the intersection or approach.’ Table 6.0-C – Adopted LOS Standard Table 6.0-B Adopted LOS Standard Intersection Type LOS Threshold Involving only Collector or Local streets LOS C or better Involving one or more Arterial or Higher Order streets LOS D or better If the background LOS (intersection or approach) is inadequate, developer improvements are expected to mitigate only the impact caused by the proposed site. In addition, based on the SCDOT ARMS Manual, the TIA ‘should include proposed improvements or access management techniques that will mitigate any significant changes in the levels of service. For the purposes of this TIA, “significant changes” were assumed where the overall intersection or stop-controlled approach delay increases by more than 25% or drops by one or more LOS grade between 2029 background and 2029 build -out conditions. The District Traffic Engineer will be responsible for final determination of mitigation improvements required to be constructed by the applicant.’ Capacity analysis reports generated by Synchro Version 12 software are included in the Appendix along with queuing and blocking reports generated by the SimTraffic microsimulation model. Figure 6.1 shows the resulting LOS of each studied intersection under background and build-out/improved conditions as applicable. Pedestrian and bicycle operations analyses are discussed in Section 8.0. Figure 6.1Holbrook Commercial Development Transportation Impact Analysis Update Background and Build-Out Improved LOS NOT TO SCALE Williams Road N Dobys Bridge Road Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND Stop Control Traffic Signal X (X) Fort Mill Parkway Harris Teeter Center Access 2 Harris Teeter Center Access 1 Access 3 Access 2 N Dobys Comm. Access 2 Access 1 Background LOS AM (PM) Build/Build Improved LOS AM (PM) SITE X (X) C (C) C (C) D (E) D (E) C (D) C (D) D (F) F (F) B (C) B (C) D (E) D (E) C (C) C (C) B (B) C (C) B (A) B (C) C (D) C (D) Holbrook Commercial Development Transportation Impact Analysis Update 27 6.1 FORT MILL P ARKWAY AND WHITES ROAD/ HT ACCESS 1 Table 6.1 summarizes the LOS, control delay (seconds), and 95th percentile queue lengths at the signalized intersection of Fort Mill Parkway and Whites Road/HT Access 1. Table 6.1 – Fort Mill Parkway and Whites Road/HT Access 1 As shown in Table 6.1, the overall intersection is projected to operate at LOS C or better under all conditions analyzed. It should be noted that the southbound approach is projected to degrade from LOS D to E during the AM peak hour and LOS E to F in PM peak hour. However, adjusting the signal timing to provide 3 additional seconds of green time to HT Access 1 resolves this issue and creates a slightly better delay overall as shown in the Build-out IMP row. Based on review of the Synchro 95 th percentile queues, the southbound left -turn queues are expected to exceed the available storage during the PM peak hour under background and build - out conditions. Since the storage lengths are exceeded under both background and build -out conditions and th e proposed site is not expected to significantly increase the queue lengths, the turn lane is not recommended to be extended as developer responsibility. EBL EBT EBR WBL WBTR NBL NBT NBR SBL SBT SBR LOS (Delay) AM Peak Hour LOS (Delay) B (18.2) Synchro 95th Q - 298' - m37' m101' 361' - 230' - - - LOS (Delay) C (23.3) Synchro 95th Q 123' 401' 53' m230' m471' 264' 281' - 83' 73' 0' LOS (Delay) C (26.6) Synchro 95th Q 125' 425' 58' m252' m362' 261' 289' - #85' 72' 0' LOS (Delay) C (25.7) Synchro 95th Q 121' 411' 60' m253' m363' 252' 249' - 82' 72' 0' PM Peak Hour LOS (Delay) B (17.4) Synchro 95th Q - 397' - m80' m219' 235' - 244' - - - LOS (Delay) C (30.0) Synchro 95th Q 128' 605' 95' m254' m314' 209' 361' - #124' 121' 26' LOS (Delay) C (30.9) Synchro 95th Q 128' 623' 97' m273' m314' 209' 369' - #128' 121' 26' LOS (Delay) C (31.6) Synchro 95th Q 134' 648' 108' m281' m317' 206' 358' - #122' 121' 26' 150' 225' 425' 325' 100' 100' Table 6.1 - Fort Mill Parkway and Whites Road/HT Access 1 Condition Measure EB (Fort Mill Parkway) WB (Fort Mill Parkway) NB (Whites Road) SB (HT Access 1) Intersection 2025 Existing B (11.1) A (3.6) E (63.1) - 2029 Background C (26.4) B (11.3) D (37.7) D (52.5) 2029 Build-out C (27.5) B (17.2) D (38.8) E (58.1) 2029 Build-out IMP C (27.9) B (18.2) C (33.1) D (52.2) 2025 Existing B (10.3) A (6.6) E (68.9) - 2029 Background C (26.7) B (14.4) E (56.6) E (78.6) 2029 Build-out C (28.0) B (15.2) E (56.6) F (80.8) 2029 Build-out IMP C (30.1) B (15.7) D (54.4) E (79.8) Background Storage Exceeds storage # 95th percentile volume exceeds capacity, queue may be longer m Volume for 95th percentile queue is metered by upstream signal Holbrook Commercial Development Transportation Impact Analysis Update 28 6. 2 FORT MILL PARKWAY AND S DOBYS BRIDGE ROAD/ HT ACCESS 2 Table 6.2 summarizes the LOS, control delay (seconds), and 95th percentile queue lengths at the signalized intersection of Fort Mill Parkway and S Dobys Bridge Road/HT Access 2. Table 6.2 – Fort Mill Parkway and S Dobys Bridge Road/HT Access 2 As shown in Table 6.2, the overall intersection is projected to operate at LOS D during the AM peak hour and LOS E during the PM peak hour under future year conditions analyzed. Given the addition of site traffic is not projected to significantly increase delays during the peak hours, no improvements are recommended for capacity purposes. It is noted that based on review of the existing conditions, an overlap phase for the eastbound right- turn is currently in operation. This overlap phase was modeled in all scenarios. Based on review of the Synchro 95 th percentile queues, the westbound and southbound left -turn lanes are projected to exceed the available storage during the PM peak hour under background and build-out conditions. Since the storage lengths are exceeded under both background and build- out conditions and the proposed site is not expected to significantly increase the queue lengths, the turn lane is not recommended to be extended as developer responsibility. EBL EBT EBR WBL WBTR NBL NBT NBR SBL SBTR LOS (Delay) AM Peak Hour LOS (Delay) D (51.0) Synchro 95th Q - 774' 103' 213' 539' #1067' 172' - 15' - LOS (Delay) D (43.6) Synchro 95th Q m17' #857' 374' m#197' m660' #490' 101' 276' 72' 112' LOS (Delay) D (45.5) Synchro 95th Q m15' #970' 6' m#210' m#736' #490' 97' 312' 69' 108' PM Peak Hour LOS (Delay) D (50.2) Synchro 95th Q - 573' 55' 454' 367' #756' 0' - 0' - LOS (Delay) E (56.3) Synchro 95th Q m9' #1084' 716' m#525' m652' #455' 156' 112' 129' 202' LOS (Delay) E (58.7) Synchro 95th Q m8' #1157' 717' m#537' m691' #455' 156' 141' 129' 202' 150' 350' 750' 250' 100'Background Storage Exceeds storage # 95th percentile volume exceeds capacity, queue may be longer m Volume for 95th percentile queue is metered by upstream signal 2029 Background C (29.3) E (67.3) E (77.7) E (67.2) 2029 Build-out C (33.8) E (69.5) E (77.6) E (67.2) 2025 Existing B (17.5) D (53.5) F (95.5) A (1.1) 2029 Background C (21.9) D (42.4) E (63.9) D (47.8) 2029 Build-out C (21.3) D (49.9) E (64.5) D (45.1) 2025 Existing C (22.6) D (43.7) F (83.2) F (109.5) Table 6.2 - Fort Mill Parkway and S Dodys Bridge Road/HT Access 2 Condition Measure EB (Fort Mill Parkway) WB (Fort Mill Parkway) NB (S Dobys Bridge Road) SB (HT Access 2) Intersection Holbrook Commercial Development Transportation Impact Analysis Update 29 6. 3 FORT MILL P AR KW AY AND HOLBROOK R OA D/N DOBYS BRI DGE R OA D Table 6.3 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the signalized intersection of Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road . Table 6.3 – Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road As shown in T able 6.3, the overall intersection is projected to operate at LOS C in the AM peak hour and LOS D in the PM peak hour under background conditions. With the addition of site traffic, the intersection is projected to degrade to LOS D during the AM peak hour. Given the overall intersection LOS degradation during the AM peak hour and degradation from E to F and D to E on the northbound approach, the following improvement was identified: • Construct a northbound right-turn lane along Holbrook Road With this improvement in place, the degradations are resolved. Based on Synchro 95 th percentile queues, the SCDOT minimum 100 feet of storage is recommended. Based on review of the Synchro 95 th percentile queues, the southbound and eastbound left-turn queues are projected to exceed the available storage during the PM peak hour under background and build-out improved conditions. Since the storage lengths are exceeded under both background and build-out improved conditions, the turn lane is not recommended to be extended as developer responsibility. It is noted that the northbound left -turn lane is projected to exceed storage in build-out improved conditions. Additionally, based on review of SimTraffic queues for build-out improved conditions, the queu e along the northbound approach (caused by northbound left -turn demand at the intersection) was shown to extend beyond the Holbrook Road/Public Storage Driveway/Access 1 intersection, therefore causing extensive queueing along Access 1. To improve the queue on the northbound approach, the following alternative build improvements were identified: • Construct a northbound right-turn lane along Holbrook Road • Construct an eastbound right-turn lane along Fort Mill Parkway EBL EBT EBR WBL WBTR NBL NBT NBR SBL SBT SBR LOS (Delay) AM Peak Hour LOS (Delay) C (21.9) Synchro 95th Q 83' 38' 353' 345' 19' 67' 81' LOS (Delay) C (26.8) Synchro 95th Q m214' 39' 503' 254' 117' 59' 164' LOS (Delay) D (37.1) Synchro 95th Q m262' 43' 519' #380' 146' 73' 164' LOS (Delay) C (34.2) Synchro 95th Q m270' 45' 487' #339' 103' 0' 146' 74' 158' LOS (Delay) C (33.1) Synchro 95th Q m#334' m#1049' m11' 53' 532' 299' 94' 0' 146' 74' 173' PM Peak Hour LOS (Delay) C (24.4) Synchro 95th Q 43' 35' 560' 231' 30' 131' 386' LOS (Delay) D (41.2) Synchro 95th Q m371' 50' #1078' 203' 183' 128' 425' LOS (Delay) D (44.4) Synchro 95th Q m363' 50' #1051' 274' #217' 138' 418' LOS (Delay) D (44.0) Synchro 95th Q m367' 52' #1078' 269' 84' 32' 204' 137' 467' LOS (Delay) D (41.7) Synchro 95th Q m362' m352' m5' 53' #1064' 267' 83' 31' 203' 136' 468' 350' 325' 250' 150' 525' m417' #433' #1157' m#1180' 156' m368' m393' 103' 148' Exceeds storage # 95th percentile volume exceeds capacity, queue may be longer m Volume for 95th percentile queue is metered by upstream signal Background Storage 2029 Build-out IMP (Alternative) C (28.9) D (46.5) D (51.8) 2029 Build-out C (32.7) D (47.7) E (59.3) D (55.0) 2029 Build-out IMP C (33.3) D (48.1) D (52.4) D (54.8) D (53.1) 2029 Background C (30.7) D (45.6) D (44.6) D (53.7) 98' 141' 2029 Build-out IMP (Alternative) C (29.7) D (35.3) D (41.1) C (33.0) 2029 Build-out IMP C (27.3) C (28.0) E (65.4) C (32.0) 2029 Background B (15.0) C (25.8) E (69.9) C (29.5) 2029 Build-out C (24.5) C (29.1) F (89.7) C (32.8) A (6.1) B (14.3) F (102.2) B (14.6) 162'219' 151' Table 6.3 - Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road Condition Measure EB (Fort Mill Parkway) WB (Fort Mill Parkway) NB (Holbrook Road) SB (N Dobys Bridge Road) Intersection 2025 Existing D (54.8) 2025 Existing A (4.3) B (13.6) F (83.9) Holbrook Commercial Development Transportation Impact Analysis Update 30 With these improvements in place, the overall intersection is projected to continue operating at LOS C during the AM peak hour and LOS D during the PM peak hour . Based on review of the Synchro 95th percentile queues, the SCDOT minimum 100 feet of storage is recommended for both the northbound and eastbound right-turn lanes. It is noted that with these improvements in place, the northbound left -turn queue is projected to exceed available storage by less than two car lengths during the peak hours. As shown in the image to the right, the northbound left - turn lane and taper area are currently maximized to the existing Public Storage Driveway, and additional storage is available within the taper area . Additionally, a northbound left -turn lane is available for the Public Storage Driveway. Therefore, Do Not Block striping and signing is recommended on Holbrook Road in the Public Storage Driveway/Access 1 area. It is noted that the additional lane (eastbound right) in the alternative scenario also resolves the SimTraffic queueing on Access 1 projected in the build - improved scenario; therefore, the alternative mitigation is recommended. Holbrook Commercial Development Transportation Impact Analysis Update 31 6.4 FORT MILL PARKWAY AND HAIRE ROAD Table 6.4 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the unsignalized intersection of Fort Mill Parkway and Haire Road. Table 6.4 – Fort Mill Parkway and Haire Road Table 6.4 shows that the stop -controlled northbound and southbound approaches of Haire Road are expected to operate with moderate delays during the AM peak hour, and moderate-long delays during the PM peak hour under background conditions. When the proposed site traffic is added to the 2029 background conditions, the stop -controlled northbound and southbound approaches are projected to operate with long delays during both peak hours. Given the projected degradation in LOS and associated long delays , identification of mitigation improvements is required. The following improvement is recommended to mitigate the impact of the proposed site: • Construction of a southbound right-turn lane along Haire Road • Construction of a westbound left-turn lane along Fort Mill Parkway With these improvements in place, the southbound approach is projected to operate with moderate delays during both peak hours, while the northbound approach is projected to continue to operate with long delays during both peak hours . Given the low volumes on the northbound approach at this intersection the addition of a turn lane is not recommended. An additional scenario, considering the interconnectivity between Haire Road and Holbrook Road provided by the site, was also considered. This scenario considers the redistribution of northbound left-turning and through traffic from Haire Road (6 vehicles in the AM peak and 1 vehicle in the PM peak) to Holbrook Road, where access to a traffic signal is provided under the assumption that northbound left-turn movements from Haire Road can utilize Access 3. It is noted that this an isolated scenario for this intersection given the minimal volumes being redistributed. EBLTR WBL WBTR NBLTR SBLT SBR AM Peak Hour LOS (Delay) Synchro 95th Q 3' 5' LOS (Delay) Synchro 95th Q 3' 0' LOS (Delay) Synchro 95th Q 3' 13' LOS (Delay) Synchro 95th Q 3' 18' 0' 13' 28' 8' LOS (Delay) Synchro 95th Q 3' 18' 0' 0' 25' 3' PM Peak Hour LOS (Delay) Synchro 95th Q 0' 3' LOS (Delay) Synchro 95th Q 3' 3' LOS (Delay) Synchro 95th Q 3' 5' LOS (Delay) Synchro 95th Q 3' 13' 0' 5' 25' 8' LOS (Delay) Synchro 95th Q 3' 13' 0' 0' 25' 8' A (1.2) C (22.1) E (40.9)2029 Build-out IMP (Redistribution) F (121.8) A (0.2) A (0.3)2029 Build-out IMP 2025 Existing 2029 Build-out IMP (Redistribution) A (0.3) A (2.3) C (15.5) Table 6.4 - Fort Mill Parkway and Haire Road IntersectionNB (Haire Road) E (44.3) F (70.1) E (47.0) A (0.2) 2029 Background Condition SB (Haire Road) A (0.4) D (26.7) C (20.2) 2029 Build-out Measure EB (Fort Mill Parkway) A (0.4) D (34.5) A (0.3) F (76.6) 2025 Existing A (0.2) D (25.1) F (56.8) 2029 Background A (0.2) 2029 Build-out IMP 2029 Build-out F (69.5) F (129.9) F (55.6) A (0.2) E (45.6) C (23.3) A (2.3) A (0.1) A (0.1) 18' 5' 0' WB (Fort Mill Parkway) A (2.3) 38' 18' 10' A (1.2) 13' A (1.2) 0' A (0.0) 0' A (0.0) E (40.9) 45' 28' 18' D (32.3) Holbrook Commercial Development Transportation Impact Analysis Update 32 Based on review of the SimTraffic maximum queues , the southbound right-turn lane is recommended to be constructed with 75 feet of storage , and the westbound left -turn lane is recommended to be constructed with the SCDOT minimum 150 feet of storage . It is noted that the recommended southbound right -turn lane along Haire Road was also an identified mitigation for the Williams Reserve development. However, this improvement was not assumed part of background conditions given that Williams Reserve was not included in this TIA due to Council denial at the time of scoping . Therefore, cost-sharing of the southbound right -turn lane improvement should be considered as applicable. Holbrook Commercial Development Transportation Impact Analysis Update 33 6. 5 FORT MILL P ARKWAY AND WILLIAMS ROAD Table 6.5 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the signalized intersection of Fort Mill Parkway and Williams Road. Table 6.5 – Fort Mill Parkway and Williams Road Table 6.5 shows that the signalized intersection is projected to operate at LOS B and C during the AM and PM peak hours, respectively, under 2029 background conditions. When the proposed site traffic is added to the 2029 background conditions, the overall intersection is projected to operate at LOS C during both peak hours, with westbound approach delay increasing by more than 25% during the AM peak hour. Additionally, the northbound approach is projected to degrade LOS during the AM peak hour. Given the projected LOS degradations and delay increases, the following improvement was identified: • Construction of a westbound right-turn lane along Williams Road With this improvement in place, the overall intersection is expected to operate at LOS B in the AM peak hour and LOS C in the PM peak hour. Based on Synchro 95th percentile queues, the SCDOT minimum 100 feet of storage is recommended for the right-turn lane. It is noted that the recommended westbound right-turn lane along Williams Road was also an identified mitigation for the Williams Reserve development. However, this improvement was not assumed part of background conditions given that Williams Reserve was not included in this TIA due to Council denial at the time of scoping. Therefore, cost -sharing of the westbound right-turn lane improvement should be considered as applicable. EBLTR WBLT WBR NBL NBTR SBL SBTR LOS (Delay) AM Peak Hour LOS (Delay) B (11.0) Synchro 95th Q 42' 3' 188' 6' 77' LOS (Delay) B (17.4) Synchro 95th Q 66' 4' #376' 8' 137' LOS (Delay) C (20.8) Synchro 95th Q 68' 3' #526' 9' 174' LOS (Delay) B (19.3) Synchro 95th Q 84' #184' 6' 4' #489' 9' 190' PM Peak Hour LOS (Delay) B (11.6) Synchro 95th Q 50' 2' 221' 10' 161' LOS (Delay) C (20.4) Synchro 95th Q 62' 2' #480' 14' 268' LOS (Delay) C (22.8) Synchro 95th Q 66' 2' #558' 15' 328' LOS (Delay) C (21.7) Synchro 95th Q 66' #166' 6' 2' #558' 16' 328' 275' 350' Table 6.5 - Fort Mill Parkway and Williams Road Condition Measure EB (Williams Road) WB (Williams Road) NB (Fort Mill Parkway) SB (Fort Mill Parkway) Intersection 2025 Existing B (15.6) B (19.7) B (10.5) A (6.9) #90' 2029 Background B (17.7) D (35.2) B (17.9) A (8.6) 2029 Build-out B (19.6) D (46.8) C (22.3) A (9.1) 2029 Build-out IMP C (23.7) D (37.1) C (20.9) 2025 Existing B (16.7) C (22.0) B (10.9) A (8.9) 2029 Background C (21.2) D (43.3) C (21.4) B (12.6) 2029 Build-out C (23.0) D (49.6) C (24.4) Background Storage # 95th percentile volume exceeds capacity, queue may be longer 2029 Build-out IMP C (23.4) D (42.7) C (23.6) B (13.7) #159' #182' #185' #165' #101' A (9.2) B (14.0) Holbrook Commercial Development Transportation Impact Analysis Update 34 6. 6 WILLIAMS R OAD AND N DOBYS BRIDGE ROAD Table 6.6 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the unsignalized intersection of Williams Road and N Dobys Bridge Road. Table 6.6 – Williams Road and N Dobys Bridge Road Table 6.6 shows that the stop-controlled westbound approach is projected to operate with short delays under all conditions analyzed. Therefore, no improvements are recommended for capacity purposes. WBLR NBTL SBLT AM Peak Hour LOS (Delay) Synchro 95th Q 8' 0' 3' LOS (Delay) Synchro 95th Q 15' 0' 5' LOS (Delay) Synchro 95th Q 15' 0' 5' PM Peak Hour LOS (Delay) Synchro 95th Q 15' 0' 3' LOS (Delay) Synchro 95th Q 30' 0' 5' LOS (Delay) Synchro 95th Q 30' 0' 5' 2029 Background C (20.1) A (0.0) A (0.8) 2029 Build-out C (21.1) A (0.0) A (0.7) 2025 Existing B (13.4) A (0.0) A (0.9) 2029 Background C (16.3) A (0.0) A (0.8) 2029 Build-out C (17.2) A (0.0) A (0.8) 2025 Existing B (12.8) A (0.0) A (1.0) Table 6.6 - N Dobys Bridge Road and Williams Road Condition Measure WB (Williams Road) NB (N Dobys Bridge Road) SB (N Dobys Bridge Road)Intersection Holbrook Commercial Development Transportation Impact Analysis Update 35 6. 7 HOLBROOK ROAD AND PUBLIC STORAGE DRIVEWAY/ ACCESS 1 Table 6.7 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the unsignalized intersection of Holbrook Road and Public Storage Driveway/Access 1. Table 6.7 – Holbrook Road and Public Storage Driveway/Existing Driveway (Access 1) Table 6.7 shows that the stop-controlled approaches operate with short delays under all conditions analyzed. Therefore, no improvements are recommended for capacity purposes beyond the construction of Access 1 with a single ingress and egress lane, as well as a stop sign and stop bar. It is noted that per SCDOT, construction of a southbound left-turn lane along Holbrook Road is required to maintain full-movement access at this location. This lane is shown in the site plan and therefore modeled in build conditions. Based on review of SimTraffic maximum queues, this lane is recommended to be constructed with the SCDOT minimum 150 feet of storage and appropriate taper. Based on the SCDOT ARMS Manual, the minimum throat length for unsignalized intersections with one exit lane is 30 feet. Based on review of the Synchro 95 th percentile queues, SimTraffic maximum queues, and SCDOT ARMS Manual minimums, a 70-foot internal protected stem (IPS) is recommended along Access 1. It is noted the southbound left -turn lane storage length and Access 1 IPS length are based on SimTraffic max queues reported for the Fort Mill Parkway/Holbrook Road/N Dobys Bridge intersection build-improved alternative scenario. This scenario is not represented in Table 6.7 since those improvements are not necessary for Synchro capacity purposes at this intersection. WB (Access 1) EBLTR WBLTR NBLTR SBL SBTR AM Peak Hour LOS (Delay) - Synchro 95th Q 10' - 0' 0' 0' LOS (Delay) - Synchro 95th Q 13' - 0' 0' 0' LOS (Delay) B (10.9) Synchro 95th Q 23' 15' 0' 3' 0' PM Peak Hour LOS (Delay) - Synchro 95th Q 15' - 0' 0' 0' LOS (Delay) - Synchro 95th Q 20' - 0' 0' 0' LOS (Delay) A (9.9) Synchro 95th Q 30' 10' 0' 3' 0' A (0.5) A (0.0) Table 6.7 - Holbrook Road and Public Storage Driveway/Access 1 Condition Measure EB (Public Storage Driveway) NB (Holbrook Road) SB (Holbrook Road)Intersection 2025 Existing B (11.0) 2029 Background B (11.7) A (0.5) A (0.0) 2029 Build-out C (16.9) A (0.5) A (1.4) 2025 Existing B (11.0) A (0.7) A (0.0) 2029 Background B (11.9) A (0.6) A (0.0) 2029 Build-out C (15.2) A (0.6) A (0.7) Holbrook Commercial Development Transportation Impact Analysis Update 36 6. 8 FORT MILL PARKWAY AND N DOBYS COMMERCIAL ACCESS 2/ACCESS 2 Table 6.8 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the unsignalized intersection of Fort Mill Parkway and N Dobys Commercial Access 2/Access 2. Table 6.8 – Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 As noted in Section 4.1, the N Dobys Commercial Development plans to construct its site access as the southbound approach with Fort Mill Parkway. As shown in Table 6.8, under 2029 background conditions, with the addition of this leg and associated background improvements along with background traffic, the southbound approach is expected to operate with short and moderate delays during the AM and PM peak hours, respectively. It is noted that t he site plan includes an eastbound right -turn lane and a northbound right -turn acceleration lane, as shown in the image. These improvements have been incorporated into the build conditions. Per the Manual on Uniform Traffic Control Devices (MUTCD), Section 2B.10.03, the northbound right-turn lane would operate as a yield control. With these improvements, the northbound approach is projected to operate with short delays, while the stop - controlled southbound approach is projected to continue operating with short to moderate delays. Based on the SCDOT ARMS Manual, the minimum throat length for unsignalized intersections with one exit lane is 30 feet. Based on review of the Synchro 95 th percentile queues, SimTraffic maximum queues, and SCDOT minimum, a 30-foot IPS is recommended along Access 2. EBL EBTR WBLT WBR NBR SBLR AM Peak Hour LOS (Delay) Synchro 95th Q 3' 0' 0' 0' - 20' LOS (Delay) Synchro 95th Q 3' 0' 0' 0' 25' 28' PM Peak Hour LOS (Delay) Synchro 95th Q 2' 0' 0' 0' - 30' LOS (Delay) Synchro 95th Q 3' 0' 0' 0' 18' 35' 2029 Background A (0.4) A (0.0) - D (26.9) 2029 Build-out A (0.4) C (15.4) D (32.3)A (0.0) 2029 Background A (0.4) A (0.0) - C (19.2) 2029 Build-out A (0.4) B (14.9) C (23.7)A (0.0) Table 6.8 - Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 Condition Measure EB (Fort Mill Parkway) NB (Access 2) SB (N Dobys Commercial Access 2)IntersectionWB (Fort Mill Parkway) Holbrook Commercial Development Transportation Impact Analysis Update 37 6. 9 HAIRE ROAD AND ACCESS 3 Table 6.9 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the proposed ingress-only intersection of Haire Road and Access 3. Table 6.9 – Haire Road and Access 3 Based on the projected results, no improvements are recommended for capacity purposes beyond the construction of Access 3 with a single ingress lane. EB (Access 3) EB NBLT SBTR AM Peak Hour LOS (Delay) - Synchro 95th Q - 0' 0' PM Peak Hour LOS (Delay) - Synchro 95th Q - 0' 0' 2029 Build-out A (0.0) A (0.0) 2029 Build-out A (0.0) A (0.0) Table 6.9 - Haire Road and Access 3 Condition Measure NB (Haire Road) SB (Haire Road)Intersection Holbrook Commercial Development Transportation Impact Analysis Update 38 7.0 Auxiliary Turn-Lane Warrants Warrants for additional turn -lane improvements for unsignalized intersections beyond those necessary for capacity were determined based on a review of the figures 9.5-A through 9.5-G found on pages 9.5 -2 through 9.5 -9 in the 2021 SCDOT Roadway Design Manual . SCDOT turn-lane warrant graphs are included in the Appendix. The following turn lanes are warranted under 2029 build-out conditions: Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 • Eastbound right-turn lane (AM peak hour) This turn lane was modeled under build conditions as it’s identified on the current site plan. Fort Mill Parkway and Haire Road • Westbound left-turn lane (both peak hours) This turn lane was identified for capacity purposes as well. While not warranted, a southbound left-turn lane along Holbrook Road at Access 1 is being required by SCDOT as a condition for full movement access. Holbrook Commercial Development Transportation Impact Analysis Update 39 8.0 Pedestrian and Bicycle Operations Analysis In addition to vehicular capacity analyses, the Town of Fort Mill also requires non -vehicular operations analyses, including pedestrian and bicycle analyses, to allow for the safe and convenient travel for all modes. Pedestrian Operations Analysis The Highway Capacity Manual 6th Edition was used to evaluate the pedestrian LOS at the study intersections. The HCM provides methodology for calculating the pedestrian LOS for TWSC intersections and signalized intersections based on geometric data, demand data , and signal control data including, but not limited to: ⚫ Number of lanes on the major street ⚫ Crossing distance ⚫ Traffic volumes ⚫ Motorist yielding rates to pedestrians ⚫ Cycle length ⚫ Walk time ⚫ Presence of pedestrian phase It should be noted that pedestrian delay and LOS calculation methodology for TWSC intersections in the HCM only applies to the major street, free -flow crossings. It is stated in the HCM that “approaches where conflicting traffic is stop-controlled are assumed to result in negligible delay for pedestrians, as vehicles are required to stop and wait for conflicting vehicle and pedestrian traffic before proceeding.” Table 8.0 lists pedestrian LOS thresholds published in the HCM. The pedestrian LOS calculation worksheets are included in the Appendix. Table 8.0 – Pedestrian LOS Thresholds LOS Average Control Delay (seconds per pedestrian) LOS Score A 0 – 5  1.50 B 5 – 10 > 1.50 – 2.50 C 10 – 20 > 2.50 – 3.50 D 20 – 30 > 3.50 – 4.50 E 30 – 45 > 4.50 – 5.50 F > 45 > 5.50 Table 8.1 summarizes the LOS and control delay (seconds per pedestrian) for the unsignalized intersections, and the LOS and LOS score for the signalized study area intersections. The LOS and delay are reported for pedestrians crossing the free -flow approaches only at the TWSC intersection, and the LOS and LOS score are reported for all approaches at the signalized intersections. Holbrook Commercial Development Transportation Impact Analysis Update 40 Table 8.1 – Pedestrian Operations As shown in Table 8.1, the study area intersections are expected to operate at LOS D or better during both peak hours under 2029 build -out/improved conditions, with the exception of the following unsignalized intersections: ⚫ Fort Mill Parkway and Haire Road ⚫ N Dobys Bridge Road and Williams Road ⚫ Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 These delays are primarily attributed to long crossing distances, relatively high vehicular travel speeds (Fort Mill Parkway 45 mph posted), and/or high traffic volumes along Fort Mill Parkway and N Dobys Bridge Road during the peak hours. It is noted that identified developer improvements for the intersection of Fort Mill Parkway and Haire Road are projected to improve pedestrian LOS crossing the eastbound approach given the median area that pedestrians may use to cross this leg. It is also noted that the site is not projected to significantly increase delays beyond background conditions at the intersection of N Dobys Bridge Road and Williams Road. The following pedestrian and bicycle accommodations are recommended by the development: ⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage and in the development’s roadway improvement areas (Fort Mill Parkway and along Holbrook Road within 500 feet), and five -foot-wide sidewalks along the site’s frontage otherwise. ⚫ Installation of crosswalks/markings and pedestrian ramps/truncated dome mats across the site accesses as appropriate. Condition Peak EB WB NB SB Condition Peak EB WB NB SB 5 - Fort Mill Parkway and Williams Road AM C (2.83) C (2.91) B (2.31) - AM B (1.77) B (1.84) B (2.42) B (2.38) PM C (2.91) C (2.95) B (2.26) - PM B (1.79) B (1.88) C (2.58) C (2.53) AM C (3.00) C (3.07) B (2.42) B (2.22) AM B (1.81) B (1.89) C (2.63) C (2.55) PM C (3.07) C (3.11) B (2.39) B (2.24) PM B (1.81) B (1.95) C (2.81) C (2.72) AM C (3.02) C (3.10) B (2.43) B (2.22) AM B (1.81) B (1.91) C (2.75) C (2.66) PM C (3.08) C (3.13) B (2.40) B (2.24) PM B (1.81) B (1.96) C (2.88) C (2.79) 2 - Fort Mill Parkway & S Dobys Bridge Road/HT Access 2 AM B (1.82) B (2.08) C (2.75) C (2.66) AM C (2.95) C (2.78) C (2.69) B (1.76) PM B (1.81) B (2.10) C (2.88) C (2.79) PM C (3.00) C (2.89) C (2.79) B (1.76) 6 - N Dobys Bridge Road & Williams Road AM C (3.07) C (2.96) C (2.93) B (2.05) AM - - F F PM C (3.11) C (3.12) C (3.04) B (2.10) PM - - F F AM C (3.10) C (3.01) C (2.94) B (2.05) AM - - F F PM C (3.13) C (3.16) C (3.04) B (2.10) PM - - F F 3 - Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road AM - - F F AM C (2.87) C (2.52) B (2.16) B (2.36) PM - - F F PM C (3.01) C (2.67) B (2.17) B (2.40) 7 - Holbrook Road and Public Storage Driveway/Access 1 AM C (3.06) C (2.64) B (2.17) B (2.41) AM - - B (9.6) A (1.7) PM C (3.26) C (2.85) B (2.20) B (2.48) PM - - C (10.0) A (1.8) AM C (3.14) C (2.68) B (2.24) B (2.44) AM - - C (12.2) A (2.1) PM C (3.30) C (2.86) B (2.24) B (2.50) PM - - C (13.2) A (2.2) AM C (3.14) C (2.68) B (2.36) B (2.44) AM - - D (20.4) A (3.0) PM C (3.30) C (2.86) B (2.36) B (2.50) PM - - C (19.1) A (4.0) AM C (3.03) C (2.68) B (2.36) B (2.44) 8 - Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 PM C (3.16) C (2.86) B (2.36) B (2.50) AM - - - - 4 - Fort Mill Parkway and Haire Road PM - - - - AM F F - - AM D (25.2) C (18.1) - - PM F F - - PM E (32.6) E (32.6) - - AM F F - - 9 - Haire Road and Access 3 PM F F - - AM - - A (0.2) A (0.4) AM F F - - PM - - A (0.1) A (0.1) PM F F - - AM C (13.7) F - - PM C (16.9) F - - 2029 Build-out 2029 Build-out 2029 Build-out IMP 2029 Build-out 2025 Existing 2029 Build-out 2029 Build-out IMP 2029 Background Table 8.1 - Pedestrian Operations 1 - Fort Mill Parkway & Whites Road/HT Access 1 2025 Existing 2025 Existing 2029 Build-out 2029 Build-out 2029 Build-out 2029 Background 2029 Background 2029 Build-out 2029 Background 2025 Existing 2025 Existing 2025 Existing 2029 Background 2029 Background 2029 Background 2029 Build-out2029 Build-out IMP 2029 Build-out (Alternative) 2029 Background 2025 Existing Holbrook Commercial Development Transportation Impact Analysis Update 41 It is noted that the current LOS methodology does not consider improvements made along the roadway or site frontage. Therefore, the multi-use paths and sidewalk improvements do not show improved pedestrian LOS in Table 8. 1. These improvements would be expected to improve pedestrian and bicycle connectivity within the study area, however. Holbrook Commercial Development Transportation Impact Analysis Update 42 Bicycle Operations Analysis The HCM does not provide methodology to analyze the operations of bicyclists at unsignalized intersections. As listed in the approved TIA Scoping Document , the Charlotte Department of Transportations’ (CDOT) Bicycle LOS Worksheet was used to determine the bicycle LOS. The CDOT Bicycle LOS Worksheet assesses bicyclists’ comfort based on geometric and traffic signal features including, but not limited to: ⚫ Number of lanes crossed ⚫ Presence of conflicting turning movements ⚫ Presence of bike lanes ⚫ Left-turn phase treatment (permitted green, protected green, leading green) Intersection features are assigned points, as identified by CDOT in the worksheet. LOS for each approach is calculated based on the accumulation of points for each geometric and traffic signal feature identified in the worksheet. A higher number of points correlates to a better LOS. The LOS thresholds for CDOT’s Bicycle LOS Worksheet are shown in Table 8.2. Table 8.2 Bicycle LOS Thresholds Level-of-Service Points A 93+ B 74 – 92 C 55 – 73 D 37 – 54 E 19 – 36 F 0 – 18 CDOT’s Bicycle LOS Worksheet was originally developed to assess the operations of bicycles at signalized intersections. Based on review of the inputs related to traffic signals, the worksheet was used to evaluate bicycle LOS at the unsignalized intersections in this study using the following assumptions to better reflect unsignalized operations: ⚫ Opposing vehicle left-turns were permitted (made on Green Ball only) ⚫ Right turn on red was permitted Table 8.3 summarizes the LOS for bicyclists at the study area intersections. CDOT’s Bicycle LOS Worksheet does not consider demand volumes; therefore, the bicycle LOS does not adjust or differ between AM and PM peak hours, nor does it differ for future-year scenarios unless the intersection laneage is modified. The bicycle LOS calculation worksheets are included in the Appendix. Holbrook Commercial Development Transportation Impact Analysis Update 43 Table 8.3 – Bicycle Operations Table 8.3 shows that the study area intersections are expected to operate with an overall bicycle LOS E or better under build-out/improved conditions with the exception of the Fort Mill Parkway intersections with N Dobys Bridge Road/Holbrook Road and Williams Road, which are expected to operate at LOS F under all conditions studied . This is primarily attributed to left- and right-turn conflicts, speed limits, and lack of bicycle facilities. The following pedestrian and bicycle accommodations are recommended to be constructed along the site’s frontages and along the development’s roadway improvement areas: ⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage and in the development’s roadway improvement areas (Fort Mill Parkway and along Holbrook Road within 500 feet), and five -foot-wide sidewalks along the site’s fronta ge otherwise. ⚫ Installation of crosswalks/markings and pedestrian ramps/truncated dome mats across the site accesses as appropriate. It is noted that the current LOS methodology does not consider improvements outside of the roadway pavement area. Therefore, the shared use path improvements do not show improved bicycle LOS in Table 8.3 . These improvements would be expected to improve pedestrian and bicycle connectivity within the study area, however. Condition Condition EB WB NB SB Intersection Existing F(10) D- (40) D (45) - E (32) Background & Build-out F (10) F (10) E (25) D (45) E- (23) Existing F (15) E- (20) F (15) E+ (35) E- (21) Background & Build-out F (15) F (5) F (5) C (60) E- (21) Existing & Background F (10) F (5) F (5) E (30) F (13) Build-out IMP F (5) F (5) F (5) E (30) F (11) Build-out IMP (ALT) F (5) F (5) F (5) E (25) F (10) Existing, Background, & Build-out F (5) F (5) D (50) D (50) E (28) Build-out IMP F (5) F (5) D (50) D (50) E (28) Existing, Background, & Build-out E (30) E (30) F (5) F (5) F (18) Build-out IMP E (30) E (30) F (5) F (5) F (18) 6 - N Dobys Bridge Road and Williams Road Existing, Background, & Build-out E (30) C (65) - D (50) D (48) Existing, Background, Build-out B (85) - D- (40) F (5) D (43) Build-out D (50) D (50) F (5) F (5) E+ (35) Existing & Background D- (40) F (5) - B (85) D (43) Build-out F (5) F (5) D (50) D (50) E (28) 9 - Haire Road and Access 3 Build-out B (85) - D- (40) F (5) D (43) 7 - Holbrook Road and Public Storage Driveway/Access 1 3 - Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road Table 8.3 - Bicycle Operations 1 - Fort Mill Parkway and Whites Road/Access 1 2 - Fort Mill Parkway and S Dobys Bridge Road/HT Access 2 4 - Fort Mill Parkway and Haire Road 5 - Fort Mill Parkway & Williams Road 8 - Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 Holbrook Commercial Development Transportation Impact Analysis Update 44 9.0 Traffic Signal Warrants Full traffic signal warrants were not analyzed as part of this TIA. 10.0 Compliance with Adopted Transportation Plans This TIA has been prepared in compliance with plans, programs, and policies adopted by the Town of Fort Mill and SCDOT. Holbrook Commercial Development Transportation Impact Analysis Update 46 11.0 Mitigation Improvements Based on the vehicular, pedestrian , and bicycle operations analyses performed at each of the identified study intersections, along with review of SCDOT turn-lane warrants contained herein, the following improvements are identified to mitigate the impact of the proposed development on the surrounding transportation infrastructure: Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road ⚫ Construct a northbound right -turn lane along Holbrook Road with 100 feet of storage and appropriate taper. ⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage and appropriate taper. Fort Mill Parkway and Haire Road ⚫ Construct a southbound right -turn lane on Haire Road with 75 feet of storage and appropriate taper. Cost sharing with other area projects should be considered as applicable for this improvement. ⚫ Construct a westbound left-lane with 150 feet of storage and appropriate taper. Fort Mill Parkway and Williams Road ⚫ Construct a westbound right-turn lane with 100 feet of storage and appropriate taper. Cost sharing with other area projects should be considered as applicable for this improvement. Holbrook Road and Access 1 ⚫ Construct Access 1 to include a single ingress lane, single egress lane, stop control, and a 70-foot internal protected stem (IPS). ⚫ Per SCDOT, construction of a southbound left -turn lane along Holbrook Road is required. This lane is recommended to be constructed with 150 feet of storage and appropriate taper. ⚫ Install Do Not Block Intersection signage/striping along the northbound approach of Holbrook Road. Fort Mill Parkway and N Dobys Commercial Access 2/Access 2 ⚫ Construct Access 2 to include a single right-in ingress lane, a single right-out egress lane, and a 30 -foot IPS . Per coordination with SCDOT, an acceleration lane along Fort Mill Parkway would be involved, with presumed yield control. ⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage and appropriate taper. Haire Road and Access 3 ⚫ Construct Access 3 to include a single ingress lane. Study Area Pedestrian and Bicycle Improvements ⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage and in the development’s roadway improvement areas along Fort Mill Parkway and Holbrook Road (within 500 feet), and five -foot-wide sidewalks along the site’s fronta ge otherwise. ⚫ Install crosswalks/markings and pedestrian ramps/truncated dome mats across the site accesses as appropriate. The mitigation improvements identified within the study area are shown in Figure 1 1.1. The improvements shown on this figure are subject to approval by SCDOT, Town of Fort Mill, and York Holbrook Commercial Development Transportation Impact Analysis Update 47 County as applicable. All additions and attachments to the public roadway system shall be properly permitted, designed and constructed in conformance to standards maintained by the agencies. It is noted that the site-civil engineer is responsible for confirming that the proposed access point s meet current sight distance standards. Figure 11.1Holbrook Commercial Development Transportation Impact Analysis Update Identified Mitigation Improvements NOT TO SCALE Williams Road N Dobys Bridge Road Whites Road S Dobys Bridge Road Holbrook Road Public Storage Driveway Haire Road LEGEND Existing Lane Storage Length Stop Control Traffic Signal X' Fort Mill Parkway 225' 425'300' 525' 350' 250' 350' 325' 150' 525' 275' 350' Harris Teeter Center Access 2 Harris Teeter Center Access 1 Access 3 Access 2 N Dobys Comm. Access 2 Access 1 150' 100' 100' 100' 150' Maximize Study Area Pedestrian and Bicycle Improvements - Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage and in the development’s roadway improvement areas along Fort Mill Parkway and Holbrook Road (within 500 feet), and five-foot-wide sidewalks along the site’s frontage otherwise. - Install crosswalks/markings and pedestrian ramps/truncated dome mats across the site accesses as appropriate. Background Improvements Recommended Improvements Internal Protected StemIPS SITE 100' 50' 100' 100' 75' 100' 150' 150' Recommended Cost Sharing Install "Do Not Block Intersection" signage/striping 70' IPS 30' IPS 100'

Source: Town of Fort Mill website. First collected Oct 24, 2026.