RecordWell Data

Design Review Board — Agenda Packet

City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Oct 7, 2025 · Agenda packets

Open the original document More from City of Spartanburg

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Spartanburg | Design Review Board Agenda 1 AGENDA October 7, 2025, at 5:30 P.M. Dr. TK Gregg Community Center 650 Howard Street – Spartanburg, SC 29303 (Please Note: Items as they appear on the Docket may or may not be considered in the order as they are presented. The Chairperson will announce any changes after the roll call). I. Roll Call. II. Freedom of Information Act Compliance – Public notification of the Design Review Board meeting has been published, posted and mailed in compliance with the Freedom of Information Act and the requirements of the City of Spartanburg Zoning Ordinance. III. Rules and Procedures for Meeting Conduct. IV. Approval of Agenda. V. Disposition of the Minutes of September 2, 2025 meeting. VI. Old Business: VII. New Business: 1. DRB-25-020-00011 – The Design Review Board (DRB) has received a request for Preliminary Conceptual Approval for the proposed development, Spartanburg Mazda, located at 500 E Daniel Morgan Ave (Tax Map Sheet: 7-12-03-115.00) with a zoning designation of DT-5 (Downtown Urban Center). Owner: RP CGR SBG MAZ-SUB, LLC; Applicant: Hudson Automotive; Agent: Riyad Brothers VIII. Staff Announcements: ACOG continued education training. IX. Adjournment. For more information, please contact the City of Spartanburg Planning Department at planning@cityofspartanburg.org or call (864) 596-2068. The City of Spartanburg Design Review Board 1 of 39 DRB – Meeting Minutes – 2025-09-02 Page 1 of 11 Meeting Minutes of the Design Review Board (DRB) Tuesday, September 2, 2025, at 5:30 PM Dr. TK Gregg Recreation Center The Design Review Board (DRB) on Tuesday, September 2, 2025, at 5:30pm. The following Board Members were in attendance: Danny Balon, Alexander Newman, Jean Crowther, Lauren Rogers, and Lukas Hauser. Representing the City of Spartanburg’s Planning Department was Fredalyn Frasier, Planning Director, Nan Zhou, Planner II, Dominick Calce, Planner I, and Oksana Holbrooks, Sr. Administrative Assistant. Roll Call: Mr. Newman: Alexander Newman Mr. Hauser: Lukas Hauser Ms. Rogers: Lauren Rogers Mr. Balon: Danny Balon Ms. Crowther: Jean Crowther Ms. Rogers: With the Freedom of Information Act Compliance, public notification of the Design Review Board meeting has been published, posted and mailed in compliance with the Freedom of Information Act and the requirements of the City of Spartanburg Zoning Ordinance. Amend the Agenda: On a motion by Mr. Hauser to approve and seconded by Mr. Balon the case has been moved to the top of the agenda list by a vote of 5 to 0. Approval of Meeting Minutes for August 5, 2025. On a motion by Mr. Hauser n to approve and seconded by Mr. Newman, the amended minutes were approved by a vote of 5 to 0. Old Business: DRB-24-020-00019 – The Design Review Board (DRB) has received a request for a Revision to the previously granted Full and Final Approval for the proposed hotel/office development at 189 W Main Street (Tax Map Sheet: 7-12-20-030.00) with a zoning designation of DT-6 Zone (Downtown Urban District). The request is limited to revisions of the ballroom facade made after final approval; all other elements of the project previously approved remain unchanged and are not up for review. Owner: OTO Development / Agent: McMillian Pazdan Smith Architecture. GENERAL PROJECT OVERVIEW The proposed redevelopment includes a 6-story hotel, a ballroom, and a 4-story office building along West Main Street in the block bound by Daniel Morgan Avenue to the west and Spring Street to the east. It is a part of a larger development that includes shared parking in the block to the south of Broad Street. The project received Full and Final Approval on March 4, 2025. However, the recent modifications to the ballroom façade along West Main Street warrant Board review. PREVIOUS BOARD ACTION- MARCH 4, 2025 2 of 39 DRB – Meeting Minutes – 2025-09-02 Page 2 of 11 DRB Vote: Full and Final Approval The hotel and office project at 189 W Main Street received full and final approval from the DRB. AUTHORITY & APPLICABILITY This project is zoned D-T6 and is a full site redevelopment. Formal design review and approval by the Design Review Board is required. The only items for consideration are the changes made to the ballroom facade. DETERMINATION OF COMPLETENESS • Application is complete. EXCEPTIONS REQUIRED • 6.4.4(b) Ground-Level Glazing: To permit the use of spandrel/black out glass in the kitchen windows along Main Street. CODE REVIEW Deficiencies noted, or exceptions or deviations required, are noted in blue italics A. Use Standards: The proposed use (office) is permitted by right in D-T6. B. District Standards: • 3.3.1 Lot Configuration: Frontage Build-Out: 60% except in Side Yard Parking Overlay – Compliant • 3.3.2 Primary Building Standards: Compliant • 3.3.4.a Building Height: Exception required for 1 story element at mid-block. Minimum height is two stories. Approved at the 3/4/25 DRB meeting. • 3.3.5 Permitted Parking Location: Compliant • 3.3.6 Building Frontage: Shopfront – Permitted C. General Standards: • 4.4. Main Street Height Overlay: Exception required to permit an encroachment into the Main Street Height Overlay restricting the height within 60 feet of Main Street to 4 stories. Approved at the 3/4/25 DRB meeting. D. Lot/Site Standards: • 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant • 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian entrances on a frontage line. - Compliant • 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant • 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable E. Utilities and Trash Containment: • 5.2.1 Underground Utilities: Compliant • 5.2.2 Solid Waste Storage Areas: Compliant • 5.2.3 Mechanical and Utility Equipment: Compliant F. Building Standards: • 6.1.1 General Design Principles - Connectivity: See note regarding ground level detailing 3 of 39 DRB – Meeting Minutes – 2025-09-02 Page 3 of 11 • 6.1.2 General Design Principles - Housing: Not applicable • 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant • 6.1.1 General Design Principles - Downtown Should be Urban: Compliant • 6.1.5 General Design Principles - Put People First: Approved at the 3/4/25 DRB meeting. • 6.2 Required Building Design Standards: o 6.2.1 Architectural Style: Compliant o 6.2.2 Compatibility: Compliant o 6.2.3 Proportions: Compliant o 6.2.4 Wall Materials: Compliant o 6.2.5 Façade Treatment: Compliant o 6.2.6 Building Entrances: Compliant. • 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings o 6.4.1 Roof and Eaves: Compliant o 6.4.2 Canopies/Awnings: Compliant o 6.4.3 Encroachments: Compliant o 6.4.4 Ground Level Detailing: 60% Glazing in Transparency. Compliant o 6.4.5 Materials: Compliant G. Parking: • 7.1 Parking Area Access: Parking must be accessed from a rear alley or a secondary frontage unless approved as a Discretionary Review. (D-T5 & D-T6) – Compliant • 7.2 Bicycle Parking: Compliance to be confirmed with Final approval. H. Streetscape and Site Landscaping: • 8.1 Required Streetscape: o D-T6: 16 ft zone with 16 ft wide sidewalk and trees in wells: Non-compliant along Spring Street and Broad Street. Approved at the 3/4/25 DRB meeting. • 8.2 Parking Area Landscaping: Not applicable I. Signage: Staff level approval ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION The approved redevelopment of the block reestablishes the historic street alignment and reinforces the continuity of the block face. The revised façade design removes the previously elevated ballroom terrace, which was seen as a feature that helped articulate the façade and had the potential to activate the street. RECOMMENDATION The following exception(s) are required for Full and Final Approval: • 6.4.4(b) Ground-Level Glazing: To permit the use of spandrel/black out glass in the kitchen windows along Main Street. Applicant: Mike Swartz, McMillian Pazdan Smith Architecture. Public Comments: None. Discussion: 4 of 39 DRB – Meeting Minutes – 2025-09-02 Page 4 of 11 The board appreciated the design changes, noting that the added elements give the project a more grand look. They reviewed the roof design and expressed some disappointment about losing the outdoor terrace, but agreed that having a larger ballroom downtown is a positive outcome. They also acknowledged the extra outdoor space on Main Street. A motion was made by Mr. Newman, seconded Mr. Balon for Full & Final approval by a vote of 5-0. DRB-25-020-00008 – The Design Review Board (DRB) has received a request for Full & Final Approval for the proposed development, City and Spartanburg County / Park Garage, located at 145 W Broad St (Tax Map Sheet: 7-12-20-056.00, 7-12-24-001.00, 7-12-21-062.00, 7-12-24- 002.00, 7-12-21-063.00, 7-12-21-064.00, 7-12-21-066.00, 7-12-21-067.00, 7-12-21-069.01, 7-12-21- 069.00, 7-12-24-004.00, 7-12-24-003.00, and 7-12-24-003.01) with a zoning designation of DT-5 Zone (Downtown Urban District). Owner: City of Spartanburg / Agent: William Gray, McMillan Pazdan Smith GENERAL PROJECT OVERVIEW The proposed 7-story, 950 space parking structure is the second of three phases in the redevelopment of the city/county block bound by Broad Street, Spring Street, and Kennedy Street. The proposed structure is expected to be completely lined by housing to be proposed in a subsequent phase. This application is for Full and Final Review. As a part of the Preliminary Approval, the DRB had the following requests for changes: - Explore options for pedestrian refuge/safety along the Kennedy Street garage entrance, including reducing lane widths and creating a curb island. AUTHORITY & APPLICABILITY This project is zoned D-T5 and is a full site redevelopment. The Kennedy Street frontage is subject to the Sideyard Parking Overlay. Formal design review and approval by the Design Review Board is required. Because this structure is proposed to be completely lined in a subsequent phase, the consideration of the design of facades is functionally limited. As such, the only items for consideration are the proposed driveways, entries, and the limited areas visible from the street. DETERMINATION OF COMPLETENESS • Application is complete. EXCEPTIONS REQUIRED • 7.1.4.d Driveway Width: The vehicular entrance of a parking lot or garage on a frontage must be no wider than 24 feet. The proposed width of the Kennedy Street entrance is 63 feet (reduced from 68 feet). CODE REVIEW Deficiencies noted, or exceptions or deviations required, are noted in blue italics A. Use Standards: The proposed use (parking structure) is permitted by right in D-T5. • 3.2.10 Parking Lot/Structure – Principal Use i. Liner Buildings Required: Compliant ii. High Quality Materials: Not Applicable iii. Clear Entries: Presumed Compliant iv. Vents and Utility Openings: Presumed Compliant 5 of 39 DRB – Meeting Minutes – 2025-09-02 Page 5 of 11 B. District Standards: • 3.3.1 Lot Configuration: Frontage Build-Out: 60% except in Side Yard Parking Overlay – Not Applicable • 3.3.2 Primary Building Standards: Compliant • 3.3.4.a Building Height: Compliant • 3.3.5 Permitted Parking Location: Compliant • 3.3.6 Building Frontage: Not Applicable C. General Standards: • 4.3. Sideyard Parking Overlay: Not Applicable D. Lot/Site Standards: • 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant • 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian entrances on a frontage line. - Compliant • 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Not Applicable • 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable E. Utilities and Trash Containment: • 5.2.1 Underground Utilities: Presumed Compliant • 5.2.2 Solid Waste Storage Areas: Presumed Compliant • 5.2.3 Mechanical and Utility Equipment: Presumed Compliant F. Building Standards: • 6.1.1 General Design Principles - Connectivity: New development should not create physical or visual gaps along the street frontage and should fill existing gaps to the greatest extent possible with interesting and active frontages. – Exception Required for Driveway Width – See 7.1.4.d • 6.1.2 General Design Principles - Housing: Not Applicable • 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Not Applicable • 6.1.1 General Design Principles - Downtown Should be Urban: Not Applicable • 6.1.5 General Design Principles - Put People First: Ground floor activity is critical to pedestrian comfort and activity. Long expanses of inactivity are strongly discouraged. - Exception Required for Driveway Width – See 7.1.4.d • 6.2 Required Building Design Standards: o 6.2.1 Architectural Style: Not Applicable o 6.2.2 Compatibility: Not Applicable o 6.2.3 Proportions: Not Applicable o 6.2.4 Wall Materials: Not Applicable o 6.2.5 Façade Treatment: Not Applicable o 6.2.6 Building Entrances: Presumed Compliant • 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings o 6.4.1 Roof and Eaves: Not Applicable 6 of 39 DRB – Meeting Minutes – 2025-09-02 Page 6 of 11 o 6.4.2 Canopies/Awnings: Not Applicable o 6.4.3 Encroachments: Not Applicable o 6.4.4 Ground Level Detailing: Not Applicable o 6.4.5 Materials: Not Applicable G. Parking: • 7.1.4.d Parking Area Access: The vehicular entrance of a parking lot or garage on a frontage must be no wider than 24 feet. – Exception Required to permit 63-foot-wide garage entrance on Kennedy Street. • 7.2 Bicycle Parking: More detail requested for overall bicycle parking on the block. H. Streetscape and Site Landscaping: • 8.1 Required Streetscape: o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells: Unable to determine at this time • 8.2 Parking Area Landscaping: Not applicable I. Signage: Staff level approval ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION Kennedy Street Parking Structure Driveway: The proposed driveway width on the Kennedy Street frontage has been revised to a total width of 63 feet, including four lanes separated by 3-foot medians. The outside lanes are designed at 13 feet each and the two inside speed ramp lanes are 12 feet each. Although the width remains substantially larger than the Downtown Code maximum, the reduction from the original 68-foot proposal helps to minimize the overall crossing distance. An 8-foot-wide pedestrian refuge island has been incorporated in the center of the driveway, which allows pedestrians a protected space to cross in two stages. This design balances the functional needs of the parking garage with pedestrian considerations, although it still requires pedestrians to cross greater distances than typical standards. RECOMMENDATION The following exception(s) are required for Full and Final Approval: • 7.1.4.d Driveway Width: To permit an increase in the maximum driveway width from 24 feet to 63 feet. Applicant: William Gray, McMillian Pazdan Smith Architecture. Public Comments: None. Discussion: The board appreciated the eight-foot width of the refuge, noting it was needed and helpful. They also valued the addition of lights along the crosswalk or a passive activation bollard system, which was confirmed to appear in the civil drawings though still undetermined at this time. The board suggested enhancing passageway visibility, pointing out that stamped concrete is not always the most effective 7 of 39 DRB – Meeting Minutes – 2025-09-02 Page 7 of 11 treatment. The presenter confirmed the project was presented for approval as shown, but the board noted that lighting remains the preferred and recommended option, as it appeared in earlier plans. A motion was made by Ms. Crowther, seconded Mr. Balon for Full & Final approval by a vote of 5-0. DRB-25-020-00009 – The Design Review Board (DRB) has received a request for Full & Final Approval for the proposed development, Howard Townes at Northside, located at 535 Howard St (Tax Map Sheet: 7-12-05-113.00) with a zoning designation of DT-4 Zone (Downtown Urban District). Owner: GVL Property Group, LLC Agent: Jay Cox, Red Cedar Homes SC. Case Deferred. A motion was made by Ms. Crowther, seconded Mr. Balon case deferred by a vote of 5-0. New Business: DRB-25-020-00010 – The Design Review Board (DRB) has received a request for Preliminary Conceptual Approval for the proposed development, Project Wrap Multifamily, located at 145 W Broad St (Tax Map Sheet: 7-12-20-056.00, 7-12-24-001.00, 7-12-21-062.00, 7-12-24-002.00, 7- 12-21-063.00, 7-12-21-064.00, 7-12-21-066.00, 7-12-21-067.00, 7-12-21-069.01, 7-12-21-069.00, 7- 12-24-004.00, 7-12-24-003.00, and 7-12-24-003.01) with a zoning designation of DT-5 Zone (Downtown Urban District). Owner: Barrett Realty Investments, Inc / Agent: Anastasia Kostrominova, McMillan Pazdan Smith. GENERAL PROJECT OVERVIEW The proposed 6-story multi-family apartment building is the final of three phases in the redevelopment of the city block bound by Broad Street, Spring Street, and Kennedy Street. The proposed structure completely lines the parking garage proposed in the previous phase with 162 multi-family units, 11,000 square feet of commercial space, and a public plaza. The application is for Preliminary Review. AUTHORITY & APPLICABILITY This project is zoned D-T5 and is a full site redevelopment. The Kennedy Street frontage is subject to the Sideyard Parking Overlay. The Spring Street frontage is designated as a required shopfront. Formal design review and approval by the Design Review Board is required. DETERMINATION OF COMPLETENESS Application is complete. EXCEPTIONS REQUIRED • 4.2 Required Shopfront Designation: The frontage on Spring Street is required to have ground-floor commercial frontages supported by Shopfront & Awning, Gallery, or Arcade frontages. • 6.4.4(a) Minimize Blank Walls: To permit blank walls in excess of 20 feet at three locations: Trash and Pump Room on Spring Street (37 feet 2 inches), Pool Deck at the corner of Spring Street and Kennedy Street (56 feet 6 inches on Spring St and 68 feet on Kennedy St). 8 of 39 DRB – Meeting Minutes – 2025-09-02 Page 8 of 11 • 6.4.4(c) Transparency Zone: To reduce the transparency zone from 60% to 35% along Spring Street and from 60% to 40% on Kennedy Street. • 7.1.4.b Parking Area Access: To permit vehicle access on a primary frontage (Broad Street). • 7.1.4.d Driveway Width: To permit an increase in the maximum driveway width from 24 feet to 63 feet. CODE REVIEW Deficiencies noted, or exceptions or deviations required, are noted in blue italics A. Use Standards: The proposed use (Dwelling, Multi-Family) is permitted by right in D-T5. J. District Standards: • 3.3.1 Lot Configuration: Compliant • 3.3.2 Primary Building Standards: Frontage Build-Out: 60% except in Side Yard Parking Overlay – Compliant • 3.3.4.a Building Height: Compliant • 3.3.5 Permitted Parking Location: Compliant • 3.3.6 Building Frontage: Shopfront – Permitted K. General Standards: • 4.2 Required Shopfront Designation: Exception Required – The frontage on Spring Street is required to have a shopfront & awning, gallery, or arcade frontage. Retail/restaurant uses are not required, but the intent is that the frontage type would not preclude those uses at some point in the future. • 4.3 Sideyard Parking Overlay: Not Applicable L. Lot/Site Standards: • 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant • 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian entrances on a frontage line. - Compliant • 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant • 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable M. Utilities and Trash Containment: • 5.2.1 Underground Utilities: Presumed Compliant • 5.2.2 Solid Waste Storage Areas: Presumed Compliant • 5.2.3 Mechanical and Utility Equipment: Presumed Compliant N. Building Standards: • 6.1.1 General Design Principles - Connectivity: New development should not create physical or visual gaps along the street frontage and should fill existing gaps to the greatest extent possible with interesting and active frontages. – Exception Required – See 6.4.4 • 6.1.2 General Design Principles - Housing: Compliant • 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant 9 of 39 DRB – Meeting Minutes – 2025-09-02 Page 9 of 11 • 6.1.4 General Design Principles - Downtown Should be Urban: Compliant • 6.1.5 General Design Principles - Put People First: Ground floor activity is critical to pedestrian comfort and activity. Long expanses of inactivity are strongly discouraged. - Exception Required – See 6.4.4 • 6.2 Required Building Design Standards: o 6.2.1 Architectural Style: Compliant o 6.2.2 Compatibility: Compliant o 6.2.3 Proportions: Compliant o 6.2.4 Wall Materials: Compliant o 6.2.5 Façade Treatment: Compliant o 6.2.6 Building Entrances: Presumed Compliant • 6.3 Specific Building Design Standards: All DT-4 and Residential Structures/Frontages in DT-5 & DT-6 o 6.3.1 Roof and Eaves: Compliant o 6.3.2 Facade Design: Compliant o 6.3.3 Building Entrances: Compliant o 6.3.4 Garages: Compliant o 6.3.5 Materials: Compliant o 6.3.6 Construction Method: Not Applicable • 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings o 6.4.1 Roof and Eaves: Compliant o 6.4.2 Canopies/Awnings: Compliant o 6.4.3 Encroachments: Compliant o 6.4.4 Ground Level Detailing: Exception to 6.4.4(a) required to permit the blank wall in excess of 20 feet at three locations: Trash and Pump Room on Spring Street (37 feet 2 inches), Pool Deck at the corner of Spring Street and Kennedy Street (56 feet 6 inches on Spring St and 68 feet on Kennedy St). Exception to 6.4.4(c) required to reduce the transparency zone from 60% to 35% along Spring Street and from 60% to 40% on Kennedy Street. o 6.4.5 Materials: Compliant O. Parking: • 7.1.2 On-Street Parking: Compliant • 7.1.4.b Parking Area Access: Parking must be accessed from a rear alley or secondary frontage unless approved as a discretionary review – Exception required for vehicle access on Broad Street. • 7.1.4.d Parking Area Access: The vehicular entrance of a parking lot or garage on a frontage must be no wider than 24 feet. – Exception Required - To be addressed with the Parking Garage review. • 7.2 Bicycle Parking: More detail requested for overall bicycle parking on the block. P. Streetscape and Site Landscaping: • 8.1 Required Streetscape: o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells: Sidewalks Compliant. More detail requested for tree well measurements. 10 of 39 DRB – Meeting Minutes – 2025-09-02 Page 10 of 11 • 8.2 Parking Area Landscaping: Not applicable • 8.3 Streetscreens: Compliant Q. Signage: Staff level approval ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION Green Wall Given the high visibility and prominence of the corner from the Kennedy driveway access, a more permanent and architecturally integrated design intervention should be considered in place of—or in addition to—the proposed green wall. While green walls provide visual interest and environmental benefits, their effectiveness is dependent on plant maturity, ongoing maintenance, and climate conditions. These factors can result in periods where the wall appears sparse or deteriorated, especially during droughts or extreme weather. The current design shows textured concrete and plantings; however, the applicant is encouraged to explore a solution that could provide year-round impact and better reflect the corner’s importance in the overall site design. RECOMMENDATION The following exceptions are required for Preliminary Approval: • 4.2 Required Shopfront Designation: The frontage on Spring Street is required to have ground-floor commercial frontages supported by Shopfront & Awning, Gallery, or Arcade frontages. • 6.4.4(a) Minimize Blank Walls: To permit blank walls in excess of 20 feet at three locations: Trash and Pump Room on Spring Street (37 feet 2 inches), Pool Deck at the corner of Spring Street and Kennedy Street (56 feet 6 inches on Spring St and 68 feet on Kennedy St). • 6.4.4(c) Transparency Zone: To reduce the transparency zone from 60% to 35% along Spring Street and from 60% to 40% on Kennedy Street. • 7.1.4.b Parking Area Access: To permit vehicle access on a primary frontage (Broad Street). • 7.1.4.d Driveway Width: To permit an increase in the maximum driveway width from 24 feet to 63 feet. Applicant: William Gray & Anastasia Kostrominova, McMillan Pazdan Smith. Public Comments: None. Discussion: The board confirmed that the required shopfront designation is compliant. They discussed the minimal blank wall and asked for assurance that greenery will remain year round or that another element, such as a textured wall or artwork, can be added during winter months. The board appreciated the Spring Street variance since it mirrors the frontage across the street, as well as the inclusion of the lower floor unit, tree elements, and sidewalk variance. They noted that while materials and colors are not finalized, the proposal is already at a strong level. They also reviewed access points from the garage, elevator connections, and window design. 11 of 39 DRB – Meeting Minutes – 2025-09-02 Page 11 of 11 A motion was made by Mr. Newman, seconded by Mr. Hauser, for conceptual preliminary approval including three variances and Springs Street Shopfront glazing and Blank Wall by motion with a vote of 5–0. Staff Announcements: The board elected officers for 2025–2026, with Lauren Rogers continuing as Chair and Jean Crowther serving as Vice Chair by a unanimous 5-0 vote. Staff also noted the continuation of ACOG training. Adjourned meeting at 7:00 P.M. _________________________________ Lauren Rogers, Chair 12 of 39 Planning Department Design Review Board Meeting 10.07.2025 Spartanburg Mazda – 500 E Daniel Morgan Ave DRB Preliminary Review Planning Department Phone: (864) 596-2068 | email: planning@cityofspartanburg.org website: www.cityofspartanburg.org DATE September 29, 2025 PROJECT/ADDRESS/ TAX ID Spartanburg Mazda / 500 E Daniel Morgan Ave / 7-12-03-115.00 TO Design Review Board Members PROJECT NUMBER DRB- 25-02000011 REVIEW STATUS – Preliminary Review COPIES TO City Departments/Applicant STAFF Fredalyn M. Frasier, Planning Director Dominick Calace, Planner I GENERAL PROJECT OVERVIEW The existing Spartanburg Mazda is proposing a renovation of the building facade. The project also includes landscaping and streetscape improvements. The application is for Preliminary Review. AUTHORITY & APPLICABILITY This parcel is zoned D-T5. The proposed project is considered an exterior renovation without expansion in accordance with Section 2.2. The following elements are required to come into full compliance: Solid Waste Storage Areas and Signage Standards. Full streetscape and building design elements are also required for compliance. Formal design review and approval by the Design Review Board is required. A special exception is required in accordance with Section 3.1.3. DETERMINATION OF COMPLETENESS Application is complete. EXCEPTIONS REQUIRED • 6.4.5 Building Materials: To permit the use of metal paneling • 8.1.1 Streetscape: To provide a code minimum level of streetscape enhancement • 8.2.1 Required Plantings: To provide a code minimum level of parking area landscaping • 8.2.2 Parking Area Screening: To provide a code minimum level of parking area screening CODE REVIEW Deficiencies noted, or exceptions or deviations required, are noted in blue italics A. Use Standards: The proposed use (Vehicle Sales) requires a Special Exception and is subject to the additional standards in Section 3.2.11. • All renovations to the existing showroom shall not have to meet the maximum setbacks requirements or minimum height restrictions (Compliant). However, all physical lot expansions into any existing Vehicle Sales site shall require all such expansions on the new parcel only to come into full compliance (Not Applicable). B. District Standards: • 3.3.1 Lot Configuration: Not Applicable • 3.3.2 Primary Building Standards: – Compliant 13 of 39 Planning Department Design Review Board Meeting 10.07.2025 Spartanburg Mazda – 500 E Daniel Morgan Ave DRB Preliminary Review Planning Department Phone: (864) 596-2068 | email: planning@cityofspartanburg.org website: www.cityofspartanburg.org • 3.3.4.a Building Height: Not Applicable per Section 3.2.11 • 3.3.5 Permitted Parking Location: Existing non-conformity – No expansion requested • 3.3.6 Building Frontage: Shopfront/Awning (setback behind parking lot) -- Legal non-conformity C. General Standards: • Not Applicable D. Lot/Site Standards: • 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant • 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian entrances on a frontage line. - Compliant • 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant • 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable E. Utilities and Trash Containment: • 5.2.1 Underground Utilities: Presumed Compliant • 5.2.2 Solid Waste Storage Areas: Full screening of all solid waste enclosures required - Compliant • 5.2.3 Mechanical and Utility Equipment: Presumed Compliant F. Building Standards: • 6.1.1 General Design Principles - Connectivity: Compliant • 6.1.2 General Design Principles - Housing: Not Applicable • 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Not Applicable • 6.1.4 General Design Principles - Downtown Should be Urban: Existing non-conformity – Not Applicable • 6.1.5 General Design Principles - Put People First: Compliant • 6.2 Required Building Design Standards: o 6.2.1 Architectural Style: Compliant o 6.2.2 Compatibility: Compliant o 6.2.3 Proportions: Compliant o 6.2.4 Wall Materials: Compliant o 6.2.5 Façade Treatment: Compliant o 6.2.6 Building Entrances: Compliant • 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings o 6.4.1 Roof and Eaves: Compliant; Rooftop equipment screening to be confirmed with Final Approval o 6.4.2 Canopies/Awnings: Not Applicable o 6.4.3 Encroachments: Not Applicable o 6.4.4 Ground Level Detailing: Compliant o 6.4.5 Materials: Exception Required – The proposed project uses a metal paneling system similar to the adjacent car dealership. The stucco finish will match what is on the existing building. G. Parking: • 7.1 Parking Area Access: Existing front yard parking is a non-conformity 14 of 39 Planning Department Design Review Board Meeting 10.07.2025 Spartanburg Mazda – 500 E Daniel Morgan Ave DRB Preliminary Review Planning Department Phone: (864) 596-2068 | email: planning@cityofspartanburg.org website: www.cityofspartanburg.org • 7.2 Bicycle Parking: 4 spaces provided - Compliant H. Streetscape and Site Landscaping: • 8.1 Required Streetscape: o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells: Compliance Required • 8.2 Parking Area Landscaping: Compliance Required • 8.2.1 Required Plantings: o One (10 Shade Tree and Eight (8) Shrubs required per 10 parking spaces: Compliant o No parking space shall be further than 60 feet from the trunk of a canopy tree: Not Compliant – 42 parking spaces along E Daniel Morgan Ave outside required range • 8.2.2 Parking Area Screening: Not Compliant – landscape plan lists shrubs maintained at 2 feet high. Parking areas must have a 3-foot-high screen along the street. I. Signage: Freestanding Sign is non-compliant. Existing pole sign would need to be modified to not exceed 5 feet in height and 32 square feet in area ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION Streetscape Requirements Required Plantings There are approximately 32 spaces across the frontage that are not covered by the minimum 60-foot radius from a canopy tree. The non-compliant parking spaces are outlined in the image below: RECOMMENDATION The following exceptions are required for Preliminary Approval: • 6.4.5 Building Materials: To permit the use of metal paneling • 8.1.1 Streetscape: To provide a code minimum level of streetscape enhancement • 8.2.1 Required Plantings: To provide a code minimum level of parking area landscaping • 8.2.2 Parking Area Screening: To provide a code minimum level of parking area screening 15 of 39 Mazda of Spartanburg DRB presentation © 2023 All Rights Reserved. 16 of 39 Context plan Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. 17 of 39 Aerial site plan Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. 18 of 39 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Site Photos 1 19 of 39 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Site Photos 2 20 of 39 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Survey 21 of 39 HVAC UP UP TRANS. TRANS. ALS 1LEFT ELEVATION SCALE: 1/4" = 1'-0" 3RIGHT ELEVATION SCALE: 1/4" = 1'-0" Xref .\Mazda of Spartanburg Floor Plan.dwg NEW VEHICLE DISPLAY (27) SALES/ SERVICE ENTRANCE/ EXITSALES/ SERVICE ENTRANCE/ EXIT CUSTOMER PARKING (10) VEHICLE DISPLAY (26) VEHICLE DISPLAY (9) SERVICE PARKING (25) VEHICLE INVENTORY (11) CUSTOMER PARKING (13) EMPLOYEE PARKING (35) VEHICLE INVENTORY (9) VEHICLE DISPLAY (21) VEHICLE DISPLAY (16) NEW VEHICLE DISPLAY (6) NEW VEHICLE DISPLAY (9) NEW VEHICLE DISPLAY (9) SALES/ SERVICE ENTRANCE/ EXIT EXISTING MAZDA SALES AND SERVICE FACILITY DELIVERY NEW VEHICLE DISPLAY (5) NEW VEHICLE DISPLAY (3) VEHICLE INVENTORY (8) VEHICLE DISPLAY (17) NEW MONUMENT SIGN EV CHARGER EV CHARGER EV CHARGER WASTE THIS PLAN IS FOR COORDINATION OF SIDEWALK JOINTS, SCORES, AND FINISHES IN REGARDS TO THE SITE WORK IMMEDIATELY ADJACENT TO THE BUILDING. DO NOT SCALE DRAWING TO DETERMINE DISTANCES, CURB CUTS, AND SLOPES. SEE CIVIL PACKAGE FOR ALL SITE WORK. HANDICAP PARKING SPOT WITH ACCESS ISLE TO COMPLY WITH ADA SIZING AND ACCESS REQUIREMENTS. PROVIDE REQUIRED SIGNAGE AND CURB STOP. SEE CIVIL DOCUMENTS. FOR ALL EXTERIOR SIGNAGE: COORDINATION REQUIRED WITH VENDOR AND ARCHITECT PRIOR TO FABRICATION. ELECTRIC VEHICLE (EV) PARKING SPOT AND CHARGER, PROVIDE DUAL PEDESTAL CHARGING STATION AND POWER AS REQUIRED - SEE ELECTRICAL DWG. EV PLANTER, SEE CIVIL DOCUMENTS. BROOM FINISH CONCRETE WITH SCORE JOINTS, SEE CIVIL DOCUMENTS. ASPHALT PAVING, SEE CIVIL DOCUMENTS. COORDINATE ALL REQUIRED ROLL CURBS TO PROVIDE VEHICLE ACCESS TO VEHICLE ENTRY DOUBLE DOORS AS DESIGNATED ON PLANS. SEE CIVIL DOCUMENTS FOR FURTHER CLARIFICATION. GENERAL NOTES 1 2 3 SITE FINISH LEGEND: EXISTING SIGNAGE TO REMAIN 4 6DUMPSTER ENCLOSURE PLAN SWING GATES, SEE ELEV. MASONRY WALL, 10'-8" T.O. MASONRY TOP OF PRECAST @ 10'-8" AFF GATE PANELS TO BE SYNTHETIC DECKING OVER STEEL TUBE FRAME, FINISH TO MATCH ADJ. FINISHES PREFINISHED ALUMINUM PARAPET CAP, COLOR TO MATCH ADJACENT WALL. TOP OF PRECAST @ 10'-8" AFF PREFINISHED ALUMINUM PARAPET CAP, COLOR TO MATCH ADJACENT WALL. 2BACK ELEVATION 4FRONT ELEVATION TOP OF CMU @ 10'-8" AFF PREFINISHED ALUMINUM PARAPET CAP, COLOR TO MATCH ADJACENT WALL. SPLIT FACE CMU, PAINT TO MATCH ADJACENT BUILDING 1LEFT ELEVATION 3RIGHT ELEVATION SLOPE SLAB TO DRAIN PREFINISHED SHOP FABRICATED METAL THRU-WALL OVERFLOW SCUPPER SLEEVE & CONDUCTOR HEAD. PROVIDE 2" DRIP FLANGE. PREFINISHED SHOP FABRICATED METAL THRU-WALL CONDUCTOR HEAD AND DOWNSPOUT. TOP OF PRECAST @ 10'-8" AFF V.I.F. TOP OF PRECAST @ 10'-8" AFF PRE-CAST CONCRETE. SMOOTH FACE PRECAST CONCRETE PANELS W 1-1/2" NOMINAL REVEALS. COLOR TO MATCH EP-2 PAINT P-2 COVENTRY GRAY. SMOOTH FACE CMU, PAINT TO MATCH ADJACENT BUILDING SMOOTH FACE CMU, PAINT TO MATCH ADJACENT BUILDING PREFINISHED ALUMINUM PARAPET CAP, COLOR TO MATCH ADJACENT WALL. SPLIT FACE CMU, PAINT TO MATCH ADJACENT BUILDING SMOOTH FACE CMU, PAINT TO MATCH ADJACENT BUILDING SMOOTH FACE CMU, PAINT TO MATCH ADJACENT BUILDING SPLIT FACE CMU, PAINT TO MATCH ADJACENT BUILDING SMOOTH FACE CMU, PAINT TO MATCH ADJACENT BUILDING SMOOTH FACE CMU, PAINT TO MATCH ADJACENT BUILDING STORAGE 100 DUMPSTERS 101 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Site plan 22 of 39 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Landscape plan 23 of 39 NEW VEHICLE DISPLAY (27) SALES/ SERVICE ENTRANCE/ EXITSALES/ SERVICE ENTRANCE/ EXIT CUSTOMER PARKING (10) VEHICLE DISPLAY (26) VEHICLE DISPLAY (9) SERVICE PARKING (25) VEHICLE INVENTORY (11) CUSTOMER PARKING (13) EMPLOYEE PARKING (35) VEHICLE INVENTORY (9) VEHICLE DISPLAY (21) VEHICLE DISPLAY (16) NEW VEHICLE DISPLAY (6) NEW VEHICLE DISPLAY (9) NEW VEHICLE DISPLAY (9) SALES/ SERVICE ENTRANCE/ EXIT EXISTING MAZDA SALES AND SERVICE FACILITY DELIVERY NEW VEHICLE DISPLAY (5) NEW VEHICLE DISPLAY (3) VEHICLE INVENTORY (8) VEHICLE DISPLAY (17) NEW MONUMENT SIGN EV CHARGER EV CHARGER EV CHARGER WASTE Existing site lighting plan Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. 24 of 39 25 of 39 UP UP TRANS. Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Demo floor plan 26 of 39 UP UP TRANS. MAIN STUDIO 101 JEWEL BOX 102 CUSTOMER LOUNGE 103 RECEPTION 100 MIDDLE STUDIO ACCESSORY STUDIO CONSULT 105 SALES MANAGERS 104 CONSULT 106 CONSULT 108 CONSULT 107 CONSULT 109 JC 110 F&I 111 F&I 112 FLEX 113 WOMENS 114 MENS 115 SALES 116 SERVICE ADVISORS 117 SERVICE RECEPTION 118 SERVICE MANAGER 119 RETAIL PARTS 120 PARTS 121 PARTS MANAGER 122 TECH PARTS 123 SERVICE 125 STORAGE 126 MEN 127 COMPRESSOR/ TANKS 131 STAIR 124 NEW CAR DELIVERY 132 100B Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. First floor plan 27 of 39 OFFICE 208 STORAGE 202 MEETING ROOM 205 OFFICE 207 DN DN MAIN MDP GM OFFICE 206 WOMENS 203 BREAK ROOM 201 IT 200 MENS 204 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Second floor plan 28 of 39 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Roof plan 29 of 39 Floor Plan - Lighting Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. UPDATE PDF 30 of 39 Lighting Schedule Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. 31 of 39 EXISTING SLAB, VERIFY EXTENTS & CONDITIONS IN FIELD PAN SILL FLASHING AT SYSTEM SILL 6" COLD-FORMED METAL FRAMING, SECURE BACK TO EXISTING EXTERIOR WALL ASSEMBLY TOP OF 1ST FLOOR @ 0'-0" AFF TOP OF EXIST. WALL @ 26'-0" AFF VIF 1WALL SECTION SCALE: 3/4" = 1'-0"2WALL SECTION SCALE: 3/4" = 1'-0"3WALL SECTION SCALE: 3/4" = 1'-0" 1'-0" 12'-0" SIX (6) EQUAL PANELS 3'-0"7'-11"2'-1" 3'-0"23'-0" FIVE (5) EQUAL PANELS SCHEDULED CEILING, SEE REFLECTED CEILING PLAN FOR HEIGHT & DETAILS WALL BEYOND WRAP GWB INTO CURTAIN WALL HEADER 6" MIN. 3'-0"12'-0"1'-0"10'-0" 10" F.O. STUD ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS 1/2" ACM REVEAL CONTINUOUS WEATHER BARRIER OVER EXISTING EXTERIOR WALL ASSEMBLY NEW TPO ROOF MEMBRANE OVER EXISTING ROOF ASSEMBLY, SEE ROOF PLAN FOR DETAILS LAP ROOF MEMBRANE UP BACKSIDE OF WALL AND EXTEND OVER TOP OF PARAPET UNDERNEATH COPING. SECURELY FASTEN TO BLOCKING AS REQUIRED 2x PRESSURE-TREATED WOOD BLOCKING SCHEDULED CEILING OVER 3-5/8" METAL STUD FRAMING, SEE REFLECTED CEILING PLAN FOR DETAILS 5/8" GYPSUM WALL BOARD PREFINISHED METAL FLASHING WITH DRIP EDGE PREFINISHED METAL FLASHING WITH HEMMED EDGE, COLOR TO MATCH ACM 2" DRAINABLE EIFS SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS EXTERIOR CURTAIN WALL / STOREFRONT SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS PRE-FINISHED METAL COPING CAP WITH SPLICE PLATES & CONTINUOUS CLEAT. SLOPE TOWARDS ROOF EXISTING SLAB, VERIFY EXTENTS & CONDITIONS IN FIELD 5/8" GYPSUM WALL BOARD ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS 1/2" ACM REVEAL CONTINUOUS WEATHER BARRIER OVER EXTERIOR GRADE SHEATHING ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS TOP OF EXIST. WALL @ 26'-0" AFF VIF TOP OF EXIST. WALL @ 26'-0" AFF VIF 2x PRESSURE-TREATED WOOD BLOCKING WRAP EXTERIOR SHEATHING & WEATHER BARRIER OVER BLOCKING TO BACKSIDE OF PARAPET PRE-FINISHED METAL COPING CAP WITH SPLICE PLATES & CONTINUOUS CLEAT. SLOPE TOWARDS ROOF NEW TPO ROOF MEMBRANE OVER EXISTING ROOF ASSEMBLY, SEE ROOF PLAN FOR DETAILS LAP ROOF MEMBRANE UP BACKSIDE OF WALL AND EXTEND OVER TOP OF PARAPET UNDERNEATH COPING. SECURELY FASTEN TO BLOCKING AS REQUIRED TOP OF 1ST FLOOR @ 0'-0" AFF EXISTING EXTERIOR WALL ASSEMBLY 11 1/2" F.O. WALL SCHEDULED CEILING OVER 3-5/8" METAL STUD FRAMING, SEE REFLECTED CEILING PLAN FOR DETAILS WALL BEYOND EXTERIOR CURTAIN WALL / STOREFRONT SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS EXTERIOR CURTAIN WALL / STOREFRONT SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS SPANDREL PANEL, SEE EXTERIOR ELEVATIONS FOR DETAILS NEW TPO ROOF MEMBRANE OVER EXISTING ROOF ASSEMBLY, SEE ROOF PLAN FOR DETAILS LAP ROOF MEMBRANE UP BACKSIDE OF WALL AND EXTEND OVER TOP OF PARAPET UNDERNEATH COPING. SECURELY FASTEN TO BLOCKING AS REQUIRED 2x PRESSURE-TREATED WOOD BLOCKING WRAP EXTERIOR SHEATHING & WEATHER BARRIER OVER BLOCKING TO BACKSIDE OF PARAPET PRE-FINISHED METAL COPING CAP WITH SPLICE PLATES & CONTINUOUS CLEAT. SLOPE TOWARDS ROOF 10" F.O. STUD 6" COLD-FORMED METAL FRAMING, SECURE BACK TO EXISTING EXTERIOR WALL ASSEMBLY CONTINUOUS WEATHER BARRIER OVER EXTERIOR GRADE SHEATHING TOP OF 1ST FLOOR @ 0'-0" AFF 5/8" GYPSUM WALL BOARD. WRAP GWB INTO CURTAIN WALL HEADER & SILL WALL BEYOND EXISTING EXISTING ALIGN CEILING POCKET WITH CENTER OF MULLION PAN SILL FLASHING AT SYSTEM SILL CONTINUOUS WEATHER BARRIER OVER EXTERIOR GRADE SHEATHING. WRAP WEATHER BARRIER INTO SYSTEM HEAD & SILL EXISTING SLAB, VERIFY EXTENTS & CONDITIONS IN FIELD PAN SILL FLASHING AT SYSTEM SILL Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Wall sections 6.0 32 of 39 THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER TOP OF XXXXXXX @ XX'-XX" AFF TOP OF XXXXXXX @ XX'-XX" AFF 1WALL SECTION SCALE: 3/4" = 1'-0"2WALL SECTION SCALE: 3/4" = 1'-0"3WALL SECTION SCALE: 3/4" = 1'-0" 3'-0"12'-0"11'-0" NEW TPO ROOF MEMBRANE OVER EXISTING ROOF ASSEMBLY, SEE ROOF PLAN FOR DETAILS LAP ROOF MEMBRANE UP BACKSIDE OF WALL AND EXTEND OVER TOP OF PARAPET UNDERNEATH COPING. SECURELY FASTEN TO BLOCKING AS REQUIRED 3'-0"12'-0"1'-0"10'-0" 10" F.O. STUD ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS TOP OF EXIST. WALL @ 26'-0" AFF VIF 2x PRESSURE-TREATED WOOD BLOCKING WRAP EXTERIOR SHEATHING & WEATHER BARRIER OVER BLOCKING TO BACKSIDE OF PARAPET PRE-FINISHED METAL COPING CAP WITH SPLICE PLATES & CONTINUOUS CLEAT. SLOPE TOWARDS ROOF 6" COLD-FORMED METAL FRAMING, SECURE BACK TO EXISTING EXTERIOR WALL ASSEMBLY CONTINUOUS WEATHER BARRIER OVER EXTERIOR GRADE SHEATHING EXISTING SCHEDULED CEILING, SEE REFLECTED CEILING PLAN FOR HEIGHT & DETAILS EXISTING SLAB, VERIFY EXTENTS & CONDITIONS IN FIELD 5/8" GYPSUM WALL BOARD. WRAP GWB INTO CURTAIN WALL HEADER & SILL ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS EXTERIOR CURTAIN WALL / STOREFRONT SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS EXTERIOR CURTAIN WALL / STOREFRONT SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS PAN SILL FLASHING AT SYSTEM SILL CONTINUOUS WEATHER BARRIER OVER EXTERIOR GRADE SHEATHING. WRAP WEATHER BARRIER INTO SYSTEM HEAD & SILL PAN SILL FLASHING AT SYSTEM SILL TOP OF 1ST FLOOR @ 0'-0" AFF WALL BEYOND 5/8" GYPSUM WALL BOARD. EXTEND TO DECK & WRAP GWB INTO CURTAIN WALL HEADER WALL BEYOND 5/8" GYPSUM WALL BOARD OVER 3-5/8" METAL STUD FRAMING. SECURE METAL STUD FRAMING BACK TO EXISTING EXTERIOR WALL ASSEMBLY EXISTING SLAB, VERIFY EXTENTS & CONDITIONS IN FIELD SCHEDULED CEILING OVER 3-5/8" METAL STUD FRAMING, SEE REFLECTED CEILING PLAN FOR DETAILS TOP OF 1ST FLOOR @ 0'-0" AFF NEW TPO ROOF MEMBRANE OVER EXISTING ROOF ASSEMBLY, SEE ROOF PLAN FOR DETAILS LAP ROOF MEMBRANE UP BACKSIDE OF WALL AND EXTEND OVER TOP OF PARAPET UNDERNEATH COPING. SECURELY FASTEN TO BLOCKING AS REQUIRED ACM RAINSCREEN SYSTEM, SEE EXTERIOR ELEVATIONS FOR DETAILS 1/2" ACM REVEAL 6" COLD-FORMED METAL FRAMING, SECURE BACK TO EXISTING EXTERIOR WALL ASSEMBLY CONTINUOUS WEATHER BARRIER OVER EXTERIOR GRADE SHEATHING EXISTING EXTERIOR WALL ASSEMBLY METAL FRAMING BEYOND Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Wall sections 6.1 33 of 39 THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER TOP OF XXXXXXX @ XX'-XX" AFF TOP OF XXXXXXX @ XX'-XX" AFF TOP OF XXXXXXX @ XX'-XX" AFF TOP OF XXXXXXX @ XX'-XX" AFF TOP OF XXXXXXX @ XX'-XX" AFF TOP OF XXXXXXX @ XX'-XX" AFF 1WALL SECTION SCALE: 3/4" = 1'-0"2WALL SECTION SCALE: 3/4" = 1'-0"3WALL SECTION SCALE: 3/4" = 1'-0" 1'-0" 12'-0" 3'-0"7'-11"2'-1" Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. Wall sections 6.2 34 of 39 Rendering 1 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. 35 of 39 Rendering 2 Mazda of Spartanburg DRB presentation ©2023 All Rights Reserved. 36 of 39 37 of 39 38 of 39 39 of 39

Source: City of Spartanburg website. First collected Oct 24, 2026.