Design Review Board — Agenda Packet
City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Oct 7, 2025 · Agenda packets
Open the original document More from City of Spartanburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Spartanburg | Design Review Board Agenda 1
AGENDA
October 7, 2025, at 5:30 P.M.
Dr. TK Gregg Community Center
650 Howard Street – Spartanburg, SC 29303
(Please Note: Items as they appear on the Docket may or may not be considered in the order as they are
presented. The Chairperson will announce any changes after the roll call).
I. Roll Call.
II. Freedom of Information Act Compliance – Public notification of the Design Review Board
meeting has been published, posted and mailed in compliance with the Freedom of Information
Act and the requirements of the City of Spartanburg Zoning Ordinance.
III. Rules and Procedures for Meeting Conduct.
IV. Approval of Agenda.
V. Disposition
of the Minutes of September 2, 2025 meeting.
VI. Old Business:
VII. New Business:
1. DRB-25-020-00011 – The Design Review Board (DRB) has received a request for
Preliminary Conceptual Approval for the proposed development, Spartanburg Mazda,
located at 500 E Daniel Morgan Ave (Tax Map Sheet: 7-12-03-115.00) with a zoning
designation of DT-5 (Downtown Urban Center). Owner: RP CGR SBG MAZ-SUB, LLC;
Applicant: Hudson Automotive; Agent: Riyad Brothers
VIII. Staff Announcements:
ACOG continued education training.
IX. Adjournment.
For more
information, please contact the City of Spartanburg Planning Department at
planning@cityofspartanburg.org or call (864) 596-2068.
The City of Spartanburg
Design Review Board
1 of 39
DRB – Meeting Minutes – 2025-09-02
Page 1 of 11
Meeting Minutes of the Design Review Board (DRB)
Tuesday, September 2, 2025, at 5:30 PM
Dr. TK Gregg Recreation Center
The Design Review Board (DRB) on Tuesday, September 2, 2025, at 5:30pm. The following Board
Members were in attendance: Danny Balon, Alexander Newman, Jean Crowther, Lauren Rogers,
and Lukas Hauser. Representing the City of Spartanburg’s Planning Department was Fredalyn
Frasier, Planning Director, Nan Zhou, Planner II, Dominick Calce, Planner I, and Oksana
Holbrooks, Sr. Administrative Assistant.
Roll Call:
Mr. Newman: Alexander Newman
Mr. Hauser: Lukas Hauser
Ms. Rogers: Lauren Rogers
Mr. Balon: Danny Balon
Ms. Crowther: Jean Crowther
Ms. Rogers: With the Freedom of Information Act Compliance, public notification of the Design
Review Board meeting has been published, posted and mailed in compliance with the Freedom of
Information Act and the requirements of the City of Spartanburg Zoning Ordinance.
Amend the Agenda:
On a motion by Mr. Hauser to approve and seconded by Mr. Balon the case has been moved to
the top of the agenda list by a vote of 5 to 0.
Approval of Meeting Minutes for August 5, 2025.
On a motion by Mr. Hauser n to approve and seconded by Mr. Newman, the amended minutes
were approved by a vote of 5 to 0.
Old Business:
DRB-24-020-00019 – The Design Review Board (DRB) has received a request for a Revision
to the previously granted Full and Final Approval for the proposed hotel/office development
at 189 W Main Street (Tax Map Sheet: 7-12-20-030.00) with a zoning designation of DT-6
Zone (Downtown Urban District). The request is limited to revisions of the ballroom facade
made after final approval; all other elements of the project previously approved remain
unchanged and are not up for review. Owner: OTO Development / Agent: McMillian
Pazdan Smith Architecture.
GENERAL PROJECT OVERVIEW
The proposed redevelopment includes a 6-story hotel, a ballroom, and a 4-story office building along
West Main Street in the block bound by Daniel Morgan Avenue to the west and Spring Street to the
east. It is a part of a larger development that includes shared parking in the block to the south of Broad
Street.
The project received Full and Final Approval on March 4, 2025. However, the recent modifications to
the ballroom façade along West Main Street warrant Board review.
PREVIOUS BOARD ACTION- MARCH 4, 2025
2 of 39
DRB – Meeting Minutes – 2025-09-02
Page 2 of 11
DRB Vote: Full and Final Approval
The hotel and office project at 189 W Main Street received full and final approval from the DRB.
AUTHORITY & APPLICABILITY
This project is zoned D-T6 and is a full site redevelopment. Formal design review and approval by the
Design Review Board is required. The only items for consideration are the changes made to the
ballroom facade.
DETERMINATION OF COMPLETENESS
• Application is complete.
EXCEPTIONS REQUIRED
• 6.4.4(b) Ground-Level Glazing: To permit the use of spandrel/black out glass in the kitchen
windows along Main Street.
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (office) is permitted by right in D-T6.
B. District Standards:
• 3.3.1 Lot Configuration: Frontage Build-Out: 60% except in Side Yard Parking Overlay –
Compliant
• 3.3.2 Primary Building Standards: Compliant
• 3.3.4.a Building Height: Exception required for 1 story element at mid-block. Minimum height is
two stories. Approved at the 3/4/25 DRB meeting.
• 3.3.5 Permitted Parking Location: Compliant
• 3.3.6 Building Frontage: Shopfront – Permitted
C. General Standards:
• 4.4. Main Street Height Overlay: Exception required to permit an encroachment into the Main
Street Height Overlay restricting the height within 60 feet of Main Street to 4 stories. Approved at
the 3/4/25 DRB meeting.
D. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian
entrances on a frontage line. - Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant
• 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable
E. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Compliant
• 5.2.2 Solid Waste Storage Areas: Compliant
• 5.2.3 Mechanical and Utility Equipment: Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: See note regarding ground level detailing
3 of 39
DRB – Meeting Minutes – 2025-09-02
Page 3 of 11
• 6.1.2 General Design Principles - Housing: Not applicable
• 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant
• 6.1.1 General Design Principles - Downtown Should be Urban: Compliant
• 6.1.5 General Design Principles - Put People First: Approved at the 3/4/25 DRB meeting.
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Compliant.
• 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings
o 6.4.1 Roof and Eaves: Compliant
o 6.4.2 Canopies/Awnings: Compliant
o 6.4.3 Encroachments: Compliant
o 6.4.4 Ground Level Detailing: 60% Glazing in Transparency. Compliant
o 6.4.5 Materials: Compliant
G. Parking:
• 7.1 Parking Area Access: Parking must be accessed from a rear alley or a secondary frontage unless
approved as a Discretionary Review. (D-T5 & D-T6) – Compliant
• 7.2 Bicycle Parking: Compliance to be confirmed with Final approval.
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape:
o D-T6: 16 ft zone with 16 ft wide sidewalk and trees in wells: Non-compliant along Spring
Street and Broad Street. Approved at the 3/4/25 DRB meeting.
• 8.2 Parking Area Landscaping: Not applicable
I. Signage: Staff level approval
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
The approved redevelopment of the block reestablishes the historic street alignment and reinforces the
continuity of the block face.
The revised façade design removes the previously elevated ballroom terrace, which was seen as a
feature that helped articulate the façade and had the potential to activate the street.
RECOMMENDATION
The following exception(s) are required for Full and Final Approval:
• 6.4.4(b) Ground-Level Glazing: To permit the use of spandrel/black out glass in the kitchen
windows along Main Street.
Applicant:
Mike Swartz, McMillian Pazdan Smith Architecture.
Public Comments: None.
Discussion:
4 of 39
DRB – Meeting Minutes – 2025-09-02
Page 4 of 11
The board appreciated the design changes, noting that the added elements give the project a more
grand look. They reviewed the roof design and expressed some disappointment about losing the
outdoor terrace, but agreed that having a larger ballroom downtown is a positive outcome. They also
acknowledged the extra outdoor space on Main Street.
A motion was made by Mr. Newman, seconded Mr. Balon for Full & Final approval by a vote of
5-0.
DRB-25-020-00008 – The Design Review Board (DRB) has received a request for Full & Final
Approval for the proposed development, City and Spartanburg County / Park Garage, located
at 145 W Broad St (Tax Map Sheet: 7-12-20-056.00, 7-12-24-001.00, 7-12-21-062.00, 7-12-24-
002.00, 7-12-21-063.00, 7-12-21-064.00, 7-12-21-066.00, 7-12-21-067.00, 7-12-21-069.01, 7-12-21-
069.00, 7-12-24-004.00, 7-12-24-003.00, and 7-12-24-003.01) with a zoning designation of DT-5
Zone (Downtown Urban District). Owner: City of Spartanburg / Agent: William Gray,
McMillan Pazdan Smith
GENERAL PROJECT OVERVIEW
The proposed 7-story, 950 space parking structure is the second of three phases in the redevelopment
of the city/county block bound by Broad Street, Spring Street, and Kennedy Street. The proposed
structure is expected to be completely lined by housing to be proposed in a subsequent phase. This
application is for Full and Final Review. As a part of the Preliminary Approval, the DRB had the
following requests for changes:
- Explore options for pedestrian refuge/safety along the Kennedy Street garage entrance,
including reducing lane widths and creating a curb island.
AUTHORITY & APPLICABILITY
This project is zoned D-T5 and is a full site redevelopment. The Kennedy Street frontage is subject to
the Sideyard Parking Overlay. Formal design review and approval by the Design Review Board is
required. Because this structure is proposed to be completely lined in a subsequent phase, the
consideration of the design of facades is functionally limited. As such, the only items for consideration
are the proposed driveways, entries, and the limited areas visible from the street.
DETERMINATION OF COMPLETENESS
• Application is complete.
EXCEPTIONS REQUIRED
• 7.1.4.d Driveway Width: The vehicular entrance of a parking lot or garage on a frontage must
be no wider than 24 feet. The proposed width of the Kennedy Street entrance is 63 feet
(reduced from 68 feet).
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (parking structure) is permitted by right in D-T5.
• 3.2.10 Parking Lot/Structure – Principal Use
i. Liner Buildings Required: Compliant
ii. High Quality Materials: Not Applicable
iii. Clear Entries: Presumed Compliant
iv. Vents and Utility Openings: Presumed Compliant
5 of 39
DRB – Meeting Minutes – 2025-09-02
Page 5 of 11
B. District Standards:
• 3.3.1 Lot Configuration: Frontage Build-Out: 60% except in Side Yard Parking
Overlay – Not Applicable
• 3.3.2 Primary Building Standards: Compliant
• 3.3.4.a Building Height: Compliant
• 3.3.5 Permitted Parking Location: Compliant
• 3.3.6 Building Frontage: Not Applicable
C. General Standards:
• 4.3. Sideyard Parking Overlay: Not Applicable
D. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space -
Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal
pedestrian entrances on a frontage line. - Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings.
- Not Applicable
• 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not
Applicable
E. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Presumed Compliant
• 5.2.2 Solid Waste Storage Areas: Presumed Compliant
• 5.2.3 Mechanical and Utility Equipment: Presumed Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: New development should not create
physical or visual gaps along the street frontage and should fill existing gaps to the
greatest extent possible with interesting and active frontages. – Exception Required for
Driveway Width – See 7.1.4.d
• 6.1.2 General Design Principles - Housing: Not Applicable
• 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Not
Applicable
• 6.1.1 General Design Principles - Downtown Should be Urban: Not Applicable
• 6.1.5 General Design Principles - Put People First: Ground floor activity is critical to
pedestrian comfort and activity. Long expanses of inactivity are strongly discouraged. -
Exception Required for Driveway Width – See 7.1.4.d
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Not Applicable
o 6.2.2 Compatibility: Not Applicable
o 6.2.3 Proportions: Not Applicable
o 6.2.4 Wall Materials: Not Applicable
o 6.2.5 Façade Treatment: Not Applicable
o 6.2.6 Building Entrances: Presumed Compliant
• 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial
Buildings
o 6.4.1 Roof and Eaves: Not Applicable
6 of 39
DRB – Meeting Minutes – 2025-09-02
Page 6 of 11
o 6.4.2 Canopies/Awnings: Not Applicable
o 6.4.3 Encroachments: Not Applicable
o 6.4.4 Ground Level Detailing: Not Applicable
o 6.4.5 Materials: Not Applicable
G. Parking:
• 7.1.4.d Parking Area Access: The vehicular entrance of a parking lot or garage on a
frontage must be no wider than 24 feet. – Exception Required to permit 63-foot-wide
garage entrance on Kennedy Street.
• 7.2 Bicycle Parking: More detail requested for overall bicycle parking on the block.
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape:
o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells: Unable to
determine at this time
• 8.2 Parking Area Landscaping: Not applicable
I. Signage: Staff level approval
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
Kennedy Street Parking Structure Driveway: The proposed driveway width on the Kennedy Street
frontage has been revised to a total width of 63 feet, including four lanes separated by 3-foot medians.
The outside lanes are designed at 13 feet each and the two inside speed ramp lanes are 12 feet each.
Although the width remains substantially larger than the Downtown Code maximum, the reduction
from the original 68-foot proposal helps to minimize the overall crossing distance.
An 8-foot-wide pedestrian refuge island has been incorporated in the center of the driveway, which
allows pedestrians a protected space to cross in two stages. This design balances the functional needs
of the parking garage with pedestrian considerations, although it still requires pedestrians to cross
greater distances than typical standards.
RECOMMENDATION
The following exception(s) are required for Full and Final Approval:
• 7.1.4.d Driveway Width: To permit an increase in the maximum driveway width from 24 feet
to 63 feet.
Applicant:
William Gray, McMillian Pazdan Smith Architecture.
Public Comments: None.
Discussion:
The board appreciated the eight-foot width of the refuge, noting it was needed and helpful. They also
valued the addition of lights along the crosswalk or a passive activation bollard system, which was
confirmed to appear in the civil drawings though still undetermined at this time. The board suggested
enhancing passageway visibility, pointing out that stamped concrete is not always the most effective
7 of 39
DRB – Meeting Minutes – 2025-09-02
Page 7 of 11
treatment. The presenter confirmed the project was presented for approval as shown, but the board
noted that lighting remains the preferred and recommended option, as it appeared in earlier plans.
A motion was made by Ms. Crowther, seconded Mr. Balon for Full & Final approval by a vote
of 5-0.
DRB-25-020-00009 – The Design Review Board (DRB) has received a request for Full &
Final Approval for the proposed development, Howard Townes at Northside, located at 535
Howard St (Tax Map Sheet: 7-12-05-113.00) with a zoning designation of DT-4 Zone
(Downtown Urban District). Owner: GVL Property Group, LLC Agent: Jay Cox, Red
Cedar Homes SC.
Case Deferred.
A motion was made by Ms. Crowther, seconded Mr. Balon case deferred by a vote of 5-0.
New Business:
DRB-25-020-00010 – The Design Review Board (DRB) has received a request for Preliminary
Conceptual Approval for the proposed development, Project Wrap Multifamily, located at 145
W Broad St (Tax Map Sheet: 7-12-20-056.00, 7-12-24-001.00, 7-12-21-062.00, 7-12-24-002.00, 7-
12-21-063.00, 7-12-21-064.00, 7-12-21-066.00, 7-12-21-067.00, 7-12-21-069.01, 7-12-21-069.00, 7-
12-24-004.00, 7-12-24-003.00, and 7-12-24-003.01) with a zoning designation of DT-5 Zone
(Downtown Urban District). Owner: Barrett Realty Investments, Inc / Agent: Anastasia
Kostrominova, McMillan Pazdan Smith.
GENERAL PROJECT OVERVIEW
The proposed 6-story multi-family apartment building is the final of three phases in the redevelopment
of the city block bound by Broad Street, Spring Street, and Kennedy Street. The proposed structure
completely lines the parking garage proposed in the previous phase with 162 multi-family units,
11,000 square feet of commercial space, and a public plaza. The application is for Preliminary Review.
AUTHORITY & APPLICABILITY
This project is zoned D-T5 and is a full site redevelopment. The Kennedy Street frontage is subject to
the Sideyard Parking Overlay. The Spring Street frontage is designated as a required shopfront.
Formal design review and approval by the Design Review Board is required.
DETERMINATION OF COMPLETENESS
Application is complete.
EXCEPTIONS REQUIRED
• 4.2 Required Shopfront Designation: The frontage on Spring Street is required to have
ground-floor commercial frontages supported by Shopfront & Awning, Gallery, or Arcade
frontages.
• 6.4.4(a) Minimize Blank Walls: To permit blank walls in excess of 20 feet at three locations:
Trash and Pump Room on Spring Street (37 feet 2 inches), Pool Deck at the corner of Spring
Street and Kennedy Street (56 feet 6 inches on Spring St and 68 feet on Kennedy St).
8 of 39
DRB – Meeting Minutes – 2025-09-02
Page 8 of 11
• 6.4.4(c) Transparency Zone: To reduce the transparency zone from 60% to 35% along Spring
Street and from 60% to 40% on Kennedy Street.
• 7.1.4.b Parking Area Access: To permit vehicle access on a primary frontage (Broad Street).
• 7.1.4.d Driveway Width: To permit an increase in the maximum driveway width from 24 feet
to 63 feet.
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (Dwelling, Multi-Family) is permitted by right in D-T5.
J. District Standards:
• 3.3.1 Lot Configuration: Compliant
• 3.3.2 Primary Building Standards: Frontage Build-Out: 60% except in Side Yard
Parking Overlay – Compliant
• 3.3.4.a Building Height: Compliant
• 3.3.5 Permitted Parking Location: Compliant
• 3.3.6 Building Frontage: Shopfront – Permitted
K. General Standards:
• 4.2 Required Shopfront Designation: Exception Required – The frontage on Spring
Street is required to have a shopfront & awning, gallery, or arcade frontage.
Retail/restaurant uses are not required, but the intent is that the frontage type would
not preclude those uses at some point in the future.
• 4.3 Sideyard Parking Overlay: Not Applicable
L. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space -
Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal
pedestrian entrances on a frontage line. - Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings.
- Compliant
• 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not
Applicable
M. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Presumed Compliant
• 5.2.2 Solid Waste Storage Areas: Presumed Compliant
• 5.2.3 Mechanical and Utility Equipment: Presumed Compliant
N. Building Standards:
• 6.1.1 General Design Principles - Connectivity: New development should not create
physical or visual gaps along the street frontage and should fill existing gaps to the
greatest extent possible with interesting and active frontages. – Exception Required –
See 6.4.4
• 6.1.2 General Design Principles - Housing: Compliant
• 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant
9 of 39
DRB – Meeting Minutes – 2025-09-02
Page 9 of 11
• 6.1.4 General Design Principles - Downtown Should be Urban: Compliant
• 6.1.5 General Design Principles - Put People First: Ground floor activity is critical to
pedestrian comfort and activity. Long expanses of inactivity are strongly discouraged. -
Exception Required – See 6.4.4
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Presumed Compliant
• 6.3 Specific Building Design Standards: All DT-4 and Residential
Structures/Frontages in DT-5 & DT-6
o 6.3.1 Roof and Eaves: Compliant
o 6.3.2 Facade Design: Compliant
o 6.3.3 Building Entrances: Compliant
o 6.3.4 Garages: Compliant
o 6.3.5 Materials: Compliant
o 6.3.6 Construction Method: Not Applicable
• 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial
Buildings
o 6.4.1 Roof and Eaves: Compliant
o 6.4.2 Canopies/Awnings: Compliant
o 6.4.3 Encroachments: Compliant
o 6.4.4 Ground Level Detailing: Exception to 6.4.4(a) required to permit the
blank wall in excess of 20 feet at three locations: Trash and Pump Room on
Spring Street (37 feet 2 inches), Pool Deck at the corner of Spring Street and
Kennedy Street (56 feet 6 inches on Spring St and 68 feet on Kennedy St).
Exception to 6.4.4(c) required to reduce the transparency zone from 60% to
35% along Spring Street and from 60% to 40% on Kennedy Street.
o 6.4.5 Materials: Compliant
O. Parking:
• 7.1.2 On-Street Parking: Compliant
• 7.1.4.b Parking Area Access: Parking must be accessed from a rear alley or secondary
frontage unless approved as a discretionary review – Exception required for vehicle
access on Broad Street.
• 7.1.4.d Parking Area Access: The vehicular entrance of a parking lot or garage on a
frontage must be no wider than 24 feet. – Exception Required - To be addressed with
the Parking Garage review.
• 7.2 Bicycle Parking: More detail requested for overall bicycle parking on the block.
P. Streetscape and Site Landscaping:
• 8.1 Required Streetscape:
o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells: Sidewalks
Compliant. More detail requested for tree well measurements.
10 of 39
DRB – Meeting Minutes – 2025-09-02
Page 10 of 11
• 8.2 Parking Area Landscaping: Not applicable
• 8.3 Streetscreens: Compliant
Q. Signage: Staff level approval
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
Green Wall
Given the high visibility and prominence of the corner from the Kennedy driveway access, a more
permanent and architecturally integrated design intervention should be considered in place of—or in
addition to—the proposed green wall. While green walls provide visual interest and environmental
benefits, their effectiveness is dependent on plant maturity, ongoing maintenance, and climate
conditions. These factors can result in periods where the wall appears sparse or deteriorated, especially
during droughts or extreme weather.
The current design shows textured concrete and plantings; however, the applicant is encouraged to
explore a solution that could provide year-round impact and better reflect the corner’s importance in
the overall site design.
RECOMMENDATION
The following exceptions are required for Preliminary Approval:
• 4.2 Required Shopfront Designation: The frontage on Spring Street is required to have
ground-floor commercial frontages supported by Shopfront & Awning, Gallery, or Arcade
frontages.
• 6.4.4(a) Minimize Blank Walls: To permit blank walls in excess of 20 feet at three locations:
Trash and Pump Room on Spring Street (37 feet 2 inches), Pool Deck at the corner of Spring
Street and Kennedy Street (56 feet 6 inches on Spring St and 68 feet on Kennedy St).
• 6.4.4(c) Transparency Zone: To reduce the transparency zone from 60% to 35% along Spring
Street and from 60% to 40% on Kennedy Street.
• 7.1.4.b Parking Area Access: To permit vehicle access on a primary frontage (Broad Street).
• 7.1.4.d Driveway Width: To permit an increase in the maximum driveway width from 24 feet
to 63 feet.
Applicant:
William Gray & Anastasia Kostrominova, McMillan Pazdan Smith.
Public Comments:
None.
Discussion:
The board confirmed that the required shopfront designation is compliant. They discussed the minimal
blank wall and asked for assurance that greenery will remain year round or that another element, such
as a textured wall or artwork, can be added during winter months. The board appreciated the Spring
Street variance since it mirrors the frontage across the street, as well as the inclusion of the lower floor
unit, tree elements, and sidewalk variance. They noted that while materials and colors are not
finalized, the proposal is already at a strong level. They also reviewed access points from the garage,
elevator connections, and window design.
11 of 39
DRB – Meeting Minutes – 2025-09-02
Page 11 of 11
A motion was made by Mr. Newman, seconded by Mr. Hauser, for conceptual preliminary
approval including three variances and Springs Street Shopfront glazing and Blank Wall by
motion with a vote of 5–0.
Staff Announcements:
The board elected officers for 2025–2026, with Lauren Rogers continuing as Chair and Jean Crowther
serving as Vice Chair by a unanimous 5-0 vote. Staff also noted the continuation of ACOG training.
Adjourned meeting at 7:00 P.M.
_________________________________
Lauren Rogers, Chair
12 of 39
Planning Department
Design Review Board Meeting
10.07.2025
Spartanburg Mazda – 500 E Daniel Morgan Ave
DRB Preliminary Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
DATE
September 29, 2025
PROJECT/ADDRESS/ TAX ID
Spartanburg Mazda / 500 E Daniel Morgan Ave /
7-12-03-115.00
TO
Design Review Board Members
PROJECT NUMBER
DRB- 25-02000011
REVIEW STATUS – Preliminary Review
COPIES TO
City Departments/Applicant
STAFF
Fredalyn M. Frasier, Planning Director
Dominick Calace, Planner I
GENERAL PROJECT OVERVIEW
The existing Spartanburg Mazda is proposing a renovation of the building facade. The project also includes
landscaping and streetscape improvements. The application is for Preliminary Review.
AUTHORITY & APPLICABILITY
This parcel is zoned D-T5. The proposed project is considered an exterior renovation without expansion in
accordance with Section 2.2. The following elements are required to come into full compliance: Solid Waste
Storage Areas and Signage Standards. Full streetscape and building design elements are also required for
compliance. Formal design review and approval by the Design Review Board is required. A special exception is
required in accordance with Section 3.1.3.
DETERMINATION OF COMPLETENESS
Application is complete.
EXCEPTIONS REQUIRED
• 6.4.5 Building Materials: To permit the use of metal paneling
• 8.1.1 Streetscape: To provide a code minimum level of streetscape enhancement
• 8.2.1 Required Plantings: To provide a code minimum level of parking area landscaping
• 8.2.2 Parking Area Screening: To provide a code minimum level of parking area screening
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (Vehicle Sales) requires a Special Exception and is subject to the
additional standards in Section 3.2.11.
• All renovations to the existing showroom shall not have to meet the maximum setbacks
requirements or minimum height restrictions (Compliant). However, all physical lot expansions into
any existing Vehicle Sales site shall require all such expansions on the new parcel only to come into
full compliance (Not Applicable).
B. District Standards:
• 3.3.1 Lot Configuration: Not Applicable
• 3.3.2 Primary Building Standards: – Compliant
13 of 39
Planning Department
Design Review Board Meeting
10.07.2025
Spartanburg Mazda – 500 E Daniel Morgan Ave
DRB Preliminary Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
• 3.3.4.a Building Height: Not Applicable per Section 3.2.11
• 3.3.5 Permitted Parking Location: Existing non-conformity – No expansion requested
• 3.3.6 Building Frontage: Shopfront/Awning (setback behind parking lot) -- Legal non-conformity
C. General Standards:
• Not Applicable
D. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian
entrances on a frontage line. - Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant
• 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable
E. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Presumed Compliant
• 5.2.2 Solid Waste Storage Areas: Full screening of all solid waste enclosures required - Compliant
• 5.2.3 Mechanical and Utility Equipment: Presumed Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: Compliant
• 6.1.2 General Design Principles - Housing: Not Applicable
• 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Not Applicable
• 6.1.4 General Design Principles - Downtown Should be Urban: Existing non-conformity – Not
Applicable
• 6.1.5 General Design Principles - Put People First: Compliant
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Compliant
• 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings
o 6.4.1 Roof and Eaves: Compliant; Rooftop equipment screening to be confirmed with Final
Approval
o 6.4.2 Canopies/Awnings: Not Applicable
o 6.4.3 Encroachments: Not Applicable
o 6.4.4 Ground Level Detailing: Compliant
o 6.4.5 Materials: Exception Required – The proposed project uses a metal paneling system
similar to the adjacent car dealership. The stucco finish will match what is on the existing
building.
G. Parking:
• 7.1 Parking Area Access: Existing front yard parking is a non-conformity
14 of 39
Planning Department
Design Review Board Meeting
10.07.2025
Spartanburg Mazda – 500 E Daniel Morgan Ave
DRB Preliminary Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
• 7.2 Bicycle Parking: 4 spaces provided - Compliant
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape:
o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells: Compliance Required
• 8.2 Parking Area Landscaping: Compliance Required
• 8.2.1 Required Plantings:
o One (10 Shade Tree and Eight (8) Shrubs required per 10 parking spaces: Compliant
o No parking space shall be further than 60 feet from the trunk of a canopy tree: Not
Compliant – 42 parking spaces along E Daniel Morgan Ave outside required range
• 8.2.2 Parking Area Screening: Not Compliant – landscape plan lists shrubs maintained at 2 feet
high. Parking areas must have a 3-foot-high screen along the street.
I. Signage: Freestanding Sign is non-compliant. Existing pole sign would need to be modified to not exceed 5
feet in height and 32 square feet in area
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
Streetscape Requirements
Required Plantings
There are approximately 32 spaces across the frontage that are not covered by the minimum 60-foot radius
from a canopy tree. The non-compliant parking spaces are outlined in the image below:
RECOMMENDATION
The following exceptions are required for Preliminary Approval:
• 6.4.5 Building Materials: To permit the use of metal paneling
• 8.1.1 Streetscape: To provide a code minimum level of streetscape enhancement
• 8.2.1 Required Plantings: To provide a code minimum level of parking area landscaping
• 8.2.2 Parking Area Screening: To provide a code minimum level of parking area screening
15 of 39
Mazda of Spartanburg DRB presentation
© 2023 All Rights Reserved.
16 of 39
Context plan
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
17 of 39
Aerial site plan
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
18 of 39
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Site Photos 1
19 of 39
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Site Photos 2
20 of 39
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Survey
21 of 39
HVAC
UP
UP
TRANS.
TRANS.
ALS
1LEFT ELEVATION
SCALE: 1/4" = 1'-0"
3RIGHT ELEVATION
SCALE: 1/4" = 1'-0"
Xref .\Mazda of Spartanburg Floor Plan.dwg
NEW VEHICLE DISPLAY
(27)
SALES/
SERVICE
ENTRANCE/
EXITSALES/
SERVICE
ENTRANCE/
EXIT
CUSTOMER PARKING
(10)
VEHICLE DISPLAY
(26)
VEHICLE
DISPLAY
(9)
SERVICE
PARKING
(25)
VEHICLE
INVENTORY
(11)
CUSTOMER PARKING
(13)
EMPLOYEE PARKING
(35) VEHICLE INVENTORY
(9)
VEHICLE
DISPLAY
(21)
VEHICLE
DISPLAY
(16)
NEW VEHICLE DISPLAY
(6)
NEW VEHICLE DISPLAY
(9)
NEW
VEHICLE
DISPLAY
(9)
SALES/
SERVICE
ENTRANCE/
EXIT
EXISTING MAZDA
SALES AND
SERVICE FACILITY
DELIVERY
NEW
VEHICLE
DISPLAY
(5)
NEW
VEHICLE
DISPLAY
(3)
VEHICLE INVENTORY
(8)
VEHICLE
DISPLAY
(17)
NEW
MONUMENT
SIGN
EV
CHARGER
EV
CHARGER
EV
CHARGER
WASTE
THIS PLAN IS FOR COORDINATION OF SIDEWALK JOINTS, SCORES, AND FINISHES IN
REGARDS TO THE SITE WORK IMMEDIATELY ADJACENT TO THE BUILDING. DO NOT
SCALE DRAWING TO DETERMINE DISTANCES, CURB CUTS, AND SLOPES. SEE CIVIL
PACKAGE FOR ALL SITE WORK.
HANDICAP PARKING SPOT WITH ACCESS ISLE TO COMPLY WITH ADA SIZING AND
ACCESS REQUIREMENTS. PROVIDE REQUIRED SIGNAGE AND CURB STOP.
SEE CIVIL DOCUMENTS.
FOR ALL EXTERIOR SIGNAGE: COORDINATION REQUIRED WITH VENDOR AND
ARCHITECT PRIOR TO FABRICATION.
ELECTRIC VEHICLE (EV) PARKING SPOT AND CHARGER, PROVIDE DUAL PEDESTAL
CHARGING STATION AND POWER AS REQUIRED - SEE ELECTRICAL DWG.
EV
PLANTER, SEE CIVIL DOCUMENTS.
BROOM FINISH CONCRETE WITH SCORE JOINTS, SEE CIVIL DOCUMENTS.
ASPHALT PAVING, SEE CIVIL DOCUMENTS.
COORDINATE ALL REQUIRED ROLL CURBS TO PROVIDE VEHICLE ACCESS TO VEHICLE
ENTRY DOUBLE DOORS AS DESIGNATED ON PLANS. SEE CIVIL DOCUMENTS FOR FURTHER
CLARIFICATION.
GENERAL NOTES
1
2
3
SITE FINISH LEGEND:
EXISTING SIGNAGE TO REMAIN
4
6DUMPSTER ENCLOSURE PLAN
SWING GATES, SEE ELEV.
MASONRY WALL,
10'-8" T.O. MASONRY
TOP OF PRECAST
@ 10'-8" AFF
GATE PANELS TO BE SYNTHETIC DECKING OVER STEEL TUBE
FRAME, FINISH TO MATCH ADJ. FINISHES
PREFINISHED ALUMINUM PARAPET CAP, COLOR TO
MATCH ADJACENT WALL.
TOP OF PRECAST
@ 10'-8" AFF
PREFINISHED ALUMINUM PARAPET CAP,
COLOR TO MATCH ADJACENT WALL.
2BACK ELEVATION
4FRONT ELEVATION
TOP OF CMU
@ 10'-8" AFF
PREFINISHED ALUMINUM PARAPET CAP,
COLOR TO MATCH ADJACENT WALL.
SPLIT FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
1LEFT ELEVATION
3RIGHT ELEVATION
SLOPE SLAB
TO DRAIN
PREFINISHED SHOP FABRICATED METAL
THRU-WALL OVERFLOW SCUPPER
SLEEVE & CONDUCTOR HEAD. PROVIDE
2" DRIP FLANGE.
PREFINISHED SHOP FABRICATED METAL
THRU-WALL CONDUCTOR HEAD AND
DOWNSPOUT.
TOP OF PRECAST
@ 10'-8" AFF V.I.F.
TOP OF PRECAST
@ 10'-8" AFF
PRE-CAST CONCRETE. SMOOTH FACE PRECAST
CONCRETE PANELS W 1-1/2" NOMINAL REVEALS.
COLOR TO MATCH EP-2
PAINT P-2 COVENTRY GRAY.
SMOOTH FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
SMOOTH FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
PREFINISHED ALUMINUM PARAPET CAP,
COLOR TO MATCH ADJACENT WALL.
SPLIT FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
SMOOTH FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
SMOOTH FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
SPLIT FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
SMOOTH FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
SMOOTH FACE CMU, PAINT TO
MATCH ADJACENT BUILDING
STORAGE
100
DUMPSTERS
101
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Site plan
22 of 39
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Landscape plan
23 of 39
NEW VEHICLE DISPLAY
(27)
SALES/
SERVICE
ENTRANCE/
EXITSALES/
SERVICE
ENTRANCE/
EXIT
CUSTOMER PARKING
(10)
VEHICLE DISPLAY
(26)
VEHICLE
DISPLAY
(9)
SERVICE
PARKING
(25)
VEHICLE
INVENTORY
(11)
CUSTOMER PARKING
(13)
EMPLOYEE PARKING
(35) VEHICLE INVENTORY
(9)
VEHICLE
DISPLAY
(21)
VEHICLE
DISPLAY
(16)
NEW VEHICLE DISPLAY
(6)
NEW VEHICLE DISPLAY
(9)
NEW
VEHICLE
DISPLAY
(9)
SALES/
SERVICE
ENTRANCE/
EXIT
EXISTING MAZDA
SALES AND
SERVICE FACILITY
DELIVERY
NEW
VEHICLE
DISPLAY
(5)
NEW
VEHICLE
DISPLAY
(3)
VEHICLE INVENTORY
(8)
VEHICLE
DISPLAY
(17)
NEW
MONUMENT
SIGN
EV
CHARGER
EV
CHARGER
EV
CHARGER
WASTE
Existing site lighting plan
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
24 of 39
25 of 39
UP
UP
TRANS.
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Demo floor plan
26 of 39
UP
UP
TRANS.
MAIN
STUDIO
101
JEWEL
BOX
102
CUSTOMER
LOUNGE
103
RECEPTION
100
MIDDLE
STUDIO
ACCESSORY
STUDIO
CONSULT
105
SALES
MANAGERS
104
CONSULT
106
CONSULT
108
CONSULT
107
CONSULT
109
JC
110
F&I
111
F&I
112
FLEX
113
WOMENS
114
MENS
115
SALES
116
SERVICE
ADVISORS
117
SERVICE
RECEPTION
118
SERVICE
MANAGER
119
RETAIL
PARTS
120
PARTS
121
PARTS
MANAGER
122
TECH
PARTS
123
SERVICE
125
STORAGE
126
MEN
127
COMPRESSOR/
TANKS
131
STAIR
124
NEW CAR
DELIVERY
132
100B
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
First floor plan
27 of 39
OFFICE
208
STORAGE
202
MEETING
ROOM
205
OFFICE
207
DN
DN
MAIN MDP
GM
OFFICE
206 WOMENS
203
BREAK
ROOM
201
IT
200
MENS
204
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Second floor plan
28 of 39
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Roof plan
29 of 39
Floor Plan - Lighting
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
UPDATE PDF
30 of 39
Lighting Schedule
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
31 of 39
EXISTING SLAB, VERIFY
EXTENTS & CONDITIONS IN
FIELD
PAN SILL FLASHING AT
SYSTEM SILL
6" COLD-FORMED METAL
FRAMING, SECURE BACK TO
EXISTING EXTERIOR WALL
ASSEMBLY
TOP OF 1ST FLOOR
@ 0'-0" AFF
TOP OF EXIST. WALL
@ 26'-0" AFF VIF
1WALL SECTION
SCALE: 3/4" = 1'-0"2WALL SECTION
SCALE: 3/4" = 1'-0"3WALL SECTION
SCALE: 3/4" = 1'-0"
1'-0" 12'-0"
SIX (6) EQUAL PANELS
3'-0"7'-11"2'-1"
3'-0"23'-0"
FIVE (5) EQUAL PANELS
SCHEDULED CEILING, SEE
REFLECTED CEILING PLAN FOR
HEIGHT & DETAILS
WALL BEYOND
WRAP GWB INTO CURTAIN
WALL HEADER
6"
MIN.
3'-0"12'-0"1'-0"10'-0"
10"
F.O. STUD
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
1/2" ACM REVEAL
CONTINUOUS WEATHER
BARRIER OVER EXISTING
EXTERIOR WALL ASSEMBLY
NEW TPO ROOF MEMBRANE
OVER EXISTING ROOF
ASSEMBLY, SEE ROOF PLAN
FOR DETAILS
LAP ROOF MEMBRANE UP
BACKSIDE OF WALL AND
EXTEND OVER TOP OF
PARAPET UNDERNEATH
COPING. SECURELY FASTEN
TO BLOCKING AS REQUIRED
2x PRESSURE-TREATED WOOD
BLOCKING
SCHEDULED CEILING OVER
3-5/8" METAL STUD FRAMING,
SEE REFLECTED CEILING PLAN
FOR DETAILS
5/8" GYPSUM WALL BOARD
PREFINISHED METAL FLASHING
WITH DRIP EDGE
PREFINISHED METAL FLASHING
WITH HEMMED EDGE, COLOR
TO MATCH ACM
2" DRAINABLE EIFS SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
EXTERIOR CURTAIN WALL /
STOREFRONT SYSTEM, SEE
EXTERIOR ELEVATIONS FOR
DETAILS
PRE-FINISHED METAL COPING
CAP WITH SPLICE PLATES &
CONTINUOUS CLEAT. SLOPE
TOWARDS ROOF
EXISTING SLAB, VERIFY
EXTENTS & CONDITIONS IN
FIELD
5/8" GYPSUM WALL BOARD
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
1/2" ACM REVEAL
CONTINUOUS WEATHER
BARRIER OVER EXTERIOR
GRADE SHEATHING
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
TOP OF EXIST. WALL
@ 26'-0" AFF VIF
TOP OF EXIST. WALL
@ 26'-0" AFF VIF
2x PRESSURE-TREATED WOOD
BLOCKING
WRAP EXTERIOR SHEATHING &
WEATHER BARRIER OVER
BLOCKING TO BACKSIDE OF
PARAPET
PRE-FINISHED METAL COPING
CAP WITH SPLICE PLATES &
CONTINUOUS CLEAT. SLOPE
TOWARDS ROOF
NEW TPO ROOF MEMBRANE
OVER EXISTING ROOF
ASSEMBLY, SEE ROOF PLAN
FOR DETAILS
LAP ROOF MEMBRANE UP
BACKSIDE OF WALL AND
EXTEND OVER TOP OF
PARAPET UNDERNEATH
COPING. SECURELY FASTEN
TO BLOCKING AS REQUIRED
TOP OF 1ST FLOOR
@ 0'-0" AFF
EXISTING EXTERIOR WALL
ASSEMBLY
11 1/2"
F.O. WALL
SCHEDULED CEILING OVER
3-5/8" METAL STUD FRAMING,
SEE REFLECTED CEILING PLAN
FOR DETAILS
WALL BEYOND
EXTERIOR CURTAIN WALL /
STOREFRONT SYSTEM, SEE
EXTERIOR ELEVATIONS FOR
DETAILS
EXTERIOR CURTAIN WALL /
STOREFRONT SYSTEM, SEE
EXTERIOR ELEVATIONS FOR
DETAILS
SPANDREL PANEL, SEE
EXTERIOR ELEVATIONS FOR
DETAILS
NEW TPO ROOF MEMBRANE
OVER EXISTING ROOF
ASSEMBLY, SEE ROOF PLAN
FOR DETAILS
LAP ROOF MEMBRANE UP
BACKSIDE OF WALL AND
EXTEND OVER TOP OF
PARAPET UNDERNEATH
COPING. SECURELY FASTEN
TO BLOCKING AS REQUIRED
2x PRESSURE-TREATED WOOD
BLOCKING
WRAP EXTERIOR SHEATHING &
WEATHER BARRIER OVER
BLOCKING TO BACKSIDE OF
PARAPET
PRE-FINISHED METAL COPING
CAP WITH SPLICE PLATES &
CONTINUOUS CLEAT. SLOPE
TOWARDS ROOF
10"
F.O. STUD
6" COLD-FORMED METAL
FRAMING, SECURE BACK TO
EXISTING EXTERIOR WALL
ASSEMBLY
CONTINUOUS WEATHER
BARRIER OVER EXTERIOR
GRADE SHEATHING
TOP OF 1ST FLOOR
@ 0'-0" AFF
5/8" GYPSUM WALL BOARD.
WRAP GWB INTO CURTAIN
WALL HEADER & SILL
WALL BEYOND
EXISTING EXISTING
ALIGN CEILING POCKET WITH
CENTER OF MULLION
PAN SILL FLASHING AT
SYSTEM SILL
CONTINUOUS WEATHER
BARRIER OVER EXTERIOR
GRADE SHEATHING. WRAP
WEATHER BARRIER INTO
SYSTEM HEAD & SILL
EXISTING SLAB, VERIFY
EXTENTS & CONDITIONS IN
FIELD
PAN SILL FLASHING AT
SYSTEM SILL
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Wall sections 6.0
32 of 39
THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER
THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER
TOP OF XXXXXXX
@ XX'-XX" AFF
TOP OF XXXXXXX
@ XX'-XX" AFF
1WALL SECTION
SCALE: 3/4" = 1'-0"2WALL SECTION
SCALE: 3/4" = 1'-0"3WALL SECTION
SCALE: 3/4" = 1'-0"
3'-0"12'-0"11'-0"
NEW TPO ROOF MEMBRANE
OVER EXISTING ROOF
ASSEMBLY, SEE ROOF PLAN
FOR DETAILS
LAP ROOF MEMBRANE UP
BACKSIDE OF WALL AND
EXTEND OVER TOP OF
PARAPET UNDERNEATH
COPING. SECURELY FASTEN
TO BLOCKING AS REQUIRED
3'-0"12'-0"1'-0"10'-0"
10"
F.O. STUD
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
TOP OF EXIST. WALL
@ 26'-0" AFF VIF
2x PRESSURE-TREATED WOOD
BLOCKING
WRAP EXTERIOR SHEATHING &
WEATHER BARRIER OVER
BLOCKING TO BACKSIDE OF
PARAPET
PRE-FINISHED METAL COPING
CAP WITH SPLICE PLATES &
CONTINUOUS CLEAT. SLOPE
TOWARDS ROOF
6" COLD-FORMED METAL
FRAMING, SECURE BACK TO
EXISTING EXTERIOR WALL
ASSEMBLY
CONTINUOUS WEATHER
BARRIER OVER EXTERIOR
GRADE SHEATHING
EXISTING
SCHEDULED CEILING, SEE
REFLECTED CEILING PLAN FOR
HEIGHT & DETAILS
EXISTING SLAB, VERIFY
EXTENTS & CONDITIONS IN
FIELD
5/8" GYPSUM WALL BOARD.
WRAP GWB INTO CURTAIN
WALL HEADER & SILL
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
EXTERIOR CURTAIN WALL /
STOREFRONT SYSTEM, SEE
EXTERIOR ELEVATIONS FOR
DETAILS
EXTERIOR CURTAIN WALL /
STOREFRONT SYSTEM, SEE
EXTERIOR ELEVATIONS FOR
DETAILS
PAN SILL FLASHING AT
SYSTEM SILL
CONTINUOUS WEATHER
BARRIER OVER EXTERIOR
GRADE SHEATHING. WRAP
WEATHER BARRIER INTO
SYSTEM HEAD & SILL
PAN SILL FLASHING AT
SYSTEM SILL
TOP OF 1ST FLOOR
@ 0'-0" AFF
WALL BEYOND
5/8" GYPSUM WALL BOARD.
EXTEND TO DECK & WRAP
GWB INTO CURTAIN WALL
HEADER
WALL BEYOND
5/8" GYPSUM WALL BOARD
OVER 3-5/8" METAL STUD
FRAMING. SECURE METAL
STUD FRAMING BACK TO
EXISTING EXTERIOR WALL
ASSEMBLY
EXISTING SLAB, VERIFY
EXTENTS & CONDITIONS IN
FIELD
SCHEDULED CEILING OVER
3-5/8" METAL STUD FRAMING,
SEE REFLECTED CEILING PLAN
FOR DETAILS
TOP OF 1ST FLOOR
@ 0'-0" AFF
NEW TPO ROOF MEMBRANE
OVER EXISTING ROOF
ASSEMBLY, SEE ROOF PLAN
FOR DETAILS
LAP ROOF MEMBRANE UP
BACKSIDE OF WALL AND
EXTEND OVER TOP OF
PARAPET UNDERNEATH
COPING. SECURELY FASTEN
TO BLOCKING AS REQUIRED
ACM RAINSCREEN SYSTEM,
SEE EXTERIOR ELEVATIONS
FOR DETAILS
1/2" ACM REVEAL
6" COLD-FORMED METAL
FRAMING, SECURE BACK TO
EXISTING EXTERIOR WALL
ASSEMBLY
CONTINUOUS WEATHER
BARRIER OVER EXTERIOR
GRADE SHEATHING
EXISTING EXTERIOR WALL
ASSEMBLY
METAL FRAMING BEYOND
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Wall sections 6.1
33 of 39
THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER
THIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDERTHIS IS A TEXT PLACEHOLDER
TOP OF XXXXXXX
@ XX'-XX" AFF
TOP OF XXXXXXX
@ XX'-XX" AFF
TOP OF XXXXXXX
@ XX'-XX" AFF
TOP OF XXXXXXX
@ XX'-XX" AFF
TOP OF XXXXXXX
@ XX'-XX" AFF
TOP OF XXXXXXX
@ XX'-XX" AFF
1WALL SECTION
SCALE: 3/4" = 1'-0"2WALL SECTION
SCALE: 3/4" = 1'-0"3WALL SECTION
SCALE: 3/4" = 1'-0"
1'-0" 12'-0" 3'-0"7'-11"2'-1"
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
Wall sections 6.2
34 of 39
Rendering 1
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
35 of 39
Rendering 2
Mazda of Spartanburg DRB presentation
©2023 All Rights Reserved.
36 of 39
37 of 39
38 of 39
39 of 39
Source: City of Spartanburg website. First collected Oct 24, 2026.