Design Review Board — Minutes
City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Mar 4, 2025 · Minutes
Open the original document More from City of Spartanburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
DRB – Meeting Minutes – 2025-03-04
Page 1 of 10
Meeting Minutes of the Design Review Board (DRB)
Tuesday, March 4, 2025, at 5:30 PM
Dr. TK Gregg Recreation Center
The Design Review Board (DRB) on Tuesday, March 4, 2025, at 5:30pm. The following Board
Members were in attendance: Lauren Rogers, Jean Crowther, Tori Babcock, Alexander Newman,
and Lukas Hauser. Representing the City of Spartanburg’s Planning Department was Fredalyn
Frasier, Planning Director, Nan Zhou, Planner II, and Oksana Holbrooks, Sr. Administrative
Assistant.
Roll Call:
Mr. Newman: Alexander Newman
Ms. Crowther: Jean Crowther
Mr. Hauser: Lukas Hauser
Ms. Babcock: Tori Babcock
Ms. Rogers: Lauren Rogers.
Ms. Rogers: With the Freedom of Information Act Compliance, public notification of the Design
Review Board meeting has been published, posted and mailed in compliance with the Freedom of
Information Act and the requirements of the City of Spartanburg Zoning Ordinance.
Amend the Agenda:
On a motion by Ms. Babcock to approve and seconded by Ms. Crowther the case has been
moved to the top of the agenda list by a vote of 5 to 0.
DRB-25-020-00002 – The Design Review Board (DRB) has received a request for Preliminary
Conceptual Approval for the proposed building, Townes of Howard, located at 535 Howard
Street (Tax Map Sheet: 7-12-05-113.00) with a zoning designation of DT-4 Zone (Downtown
Urban District). Owner: GVL Property Group, LLC / Agent: Bryan De Bruin, VanRock
Holdings.
Approval of Agenda
On a motion by Ms. Babcock to approve and seconded by Mr. Hauser, the amended agenda was
approved by a vote of 5 to 0.
Ms. Babcock: Motion to approve.
Mr. Hauser: Second.
Ms. Rogers: All in favor?
Attendees: Aye. Any opposed?
Approval of Meeting Minutes for February 4, 2025.
On a motion by Ms. Babcock to approve and seconded by Mr. Newman, the amended minutes
were approved by a vote of 5 to 0.
Old Business:
DRB – Meeting Minutes – 2025-03-04
Page 2 of 10
DRB-24-020-00019 – The Design Review Board (DRB) has received a request for Full and Final
Approval for the proposed building, 189 W Main Street Development, located at 189 W Main
Street (Tax Map Sheet: 7-12-20-030.00) with a zoning designation of DT-6 Zone (Downtown
Urban District). Owner: OTO Development / Agent: McMillian Pazdan Smith Architecture.
GENERAL PROJECT OVERVIEW
The proposed redevelopment includes a 6-story hotel, a ballroom, and a 4-story office building along
West Main Street in the block bound by Daniel Morgan Avenue to the west and Spring Street to the
east. It is a part of a larger development that includes shared parking in the block to the south of Broad
Street. The project received Preliminary Approval by the DRB on January 7, 2025.
AUTHORITY & APPLICABILITY
This project is zoned D-T6 and is a full site redevelopment. Formal design review and approval by the
Design Review Board is required.
DETERMINATION OF COMPLETENESS
• Application is complete.
FINDINGS- EXCEPTIONS
• 3.3.4.a Building Height: To permit a one (1) story building element – The minimum number of
stories is two (2).
• 4.4 Main Street Height Overlay: To permit a partial encroachment into the maximum 60-foot
building height.
• 6.4.3 Ground Level Detailing: To permit certain blank wall conditions along Daniel Morgan
Avenue, Broad Street, and Spring Street.
• 6.4.4.a Minimize Blank Walls & 4.4.4.c.2 Transparency Zone: To permit in excess of 20 feet of
building that lacks transparent windows or doors not exceeding maximum four (4) feet in height above
the sidewalk grade along the Daniel Morgan Avenue, Broad Street, and Spring Street frontages.
• 6.4.5 Materials: To permit the use of EIFS on walls visible from a public street.
• 8.1.a & b. Minimum Streetscape Zone: To permit a sidewalk zone along Spring Street that is less
than 16 feet in total width (shown as 14 ft 6 in between the retaining wall and the edge of curb) and
sidewalk that is less than 8 feet in total width (6 ft 3 in).
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (office) is permitted by right in D-T6.
B. District Standards:
• 3.3.1 Lot Configuration: Frontage Build-Out: 60% except in Side Yard Parking Overlay –
Compliant
• 3.3.2 Primary Building Standards: Compliant
DRB – Meeting Minutes – 2025-03-04
Page 3 of 10
• 3.3.4.a Building Height: Exception required for 1 story element at mid-block. Minimum height is
two stories.
• 3.3.5 Permitted Parking Location: Compliant
• 3.3.6 Building Frontage: Shopfront – Permitted
C. General Standards:
4.4. Main Street Height Overlay: Exception required to permit an encroachment into the Main Street
Height Overlay restricting the height within 60 feet of Main Street to 4 stories.
D. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian
entrances on a frontage line. - Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant
• 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable
E. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Compliant
• 5.2.2 Solid Waste Storage Areas: Compliant
• 5.2.3 Mechanical and Utility Equipment: Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: See note regarding façade transparency.
o 6.1.2 General Design Principles - Housing: Not applicable
o 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant
o 6.1.1 General Design Principles - Downtown Should be Urban: Compliant
o 6.1.5 General Design Principles - Put People First: See note regarding ground floor
activity 6.1.5.B) and wide sidewalks (6.1.5.C)
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Compliant. However, corner buildings are encouraged to have a
corner entrance.
• 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings
o 6.4.1 Roof and Eaves: Compliant
o 6.4.2 Canopies/Awnings: Compliant
o 6.4.3 Encroachments: Compliant
o 6.4.4 Ground Level Detailing: 60% Glazing in Transparency. Please provide dimensions to the
facades to be able to calculate the frontage transparency. Exception required for elevations along
Daniel Morgan Avenue, Broad Street, and Spring Street.
o 6.4.5 Materials: Exception required for the use of EIFS on elevations that are visible from public
streets.
DRB – Meeting Minutes – 2025-03-04
Page 4 of 10
G. Parking:
• 7.1 Parking Area Access: Parking must be accessed from a rear alley or a secondary frontage unless
approved as a Discretionary Review. (D-T5 & D-T6) – Compliant
• 7.2 Bicycle Parking: Compliance to be confirmed with Final approval.
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape:
o D-T6: 16 ft zone with 16 ft wide sidewalk and trees in wells: Non-compliant along Spring
Street and Broad Street. Exception required.
• 8.2 Parking Area Landscaping: Not applicable
I. Signage: Staff level approval
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
Broad Street & Spring Street: As discussed in previous meetings and reviews, the redevelopment in
the core of downtown presents an opportunity to take a comprehensive look at the streetscape along
Broad Street and Spring Street. The City has coordinated a review with design teams for 189 W. Main
Hotel, W. Broad/Magnolia Block residences, the Joint Government Center, and Morgan Square to
ensure a cohesive streetscape that meets DT standards.
RECOMMENDATION
A Final Approval by the DRB is recommended.
Applicant:
McMillian Pazdan Smith Architecture.
Public Comments: None.
Discussion:
The board discussed the proposed artwork rendering, noting that a final decision has not yet been
made. The Board expressed a preference for artwork that is inviting and complementary to both the
hotel and the Eastside, avoiding a design that would compete or appear too busy. The artwork should
have a statement of its own while maintaining harmony with the surrounding area. Regarding the
sidewalk width on Broad Street, the Board reviewed the tree wells and confirmed that a minimum
width of 12 feet, with an 8-foot pedestrian zone, was established. The city has confirmed that the full
design team has met and discussed these specifications. However, the Board suggested exploring the
possibility of smaller tree wells as an option. The streetscape design has been fully addressed, and staff
has recommended full and final approval for the plan.
A motion was made by Ms. Rogers, seconded Ms. Babcock for Full & Final approval, with the
variance request accepted by a vote of 5-0.
DRB-24-020-00020 – The Design Review Board (DRB) has received a request for Full and Final
Approval for the proposed Building, Magnolia Block Apartments located at 187 W Broad Street
(Tax Map Sheet: 7-12-20-048.00, 7-12-20-049.02, 7-12-20-049.00, and 7-12-20-050.00) with a
DRB – Meeting Minutes – 2025-03-04
Page 5 of 10
zoning designation of DT-5 Zone (Downtown Urban District) Owner: Haven at West Broad,
LLC. /Applicant: Chris Van Kley, Dwell Design Studio.
GENERAL PROJECT OVERVIEW
The proposed redevelopment includes a 5 story apartment building and shared parking structure, with
primary frontage along West Broad Street and bound by Daniel Morgan Avenue to the west and
Spring Street to the east. It is a part of a larger development that includes 189 West Main Street to the
north of Broad Street. The project received Preliminary Approval at the January 7, 2025 meeting.
AUTHORITY & APPLICABILITY
This project is zoned D-T5 and is a full site redevelopment. Formal design review and approval by the
Design Review Board is required.
DETERMINATION OF COMPLETENESS
Application is complete.
FINDINGS- EXCEPTIONS
• 4.2 Required Shopfront designation: To exclude these frontages from compliance with the
required shopfront designations (proposed as exclusively residential frontage conditions). – Approved
at the 1/7/25 DRB Meeting.
• 7.1.4.b. Parking Area Access: To permit access to parking from the primary frontage. – Approved
at the 1/7/25 DRB Meeting.
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (office) is permitted by right in D-T6.
B. District Standards:
• 3.3.1 Lot Configuration: Frontage Build-Out: 60% except in Side Yard Parking Overlay – Compliant
• 3.3.2 Primary Building Standards: Compliant
• 3.3.4.a Building Height: Compliant
• 3.3.5 Permitted Parking Location: Compliant
• 3.3.6 Building Frontage: Shopfront – Permitted
C. General Standards:
• 4.2 Required Shopfront Designation: The frontages of Daniel Morgan Avenue and Spring Street are
required to have ground-floor commercial frontages supported by Shopfront & Awning, Gallery, or
Arcade frontages. Exception approved at the 1/7/25 DRB Meeting.
D. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space - Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian
entrances on a frontage line. - Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with surrounding buildings. - Compliant
• 5.1.5 Adjacent Lots: Grading between lots to be sensitively considered. – Not Applicable
E. Utilities and Trash Containment:
DRB – Meeting Minutes – 2025-03-04
Page 6 of 10
• 5.2.1 Underground Utilities: Compliant
• 5.2.2 Solid Waste Storage Areas: Compliant
• 5.2.3 Mechanical and Utility Equipment: Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: Compliant
• 6.1.2 General Design Principles - Housing: Not applicable
• 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant
• 6.1.1 General Design Principles - Downtown Should be Urban: Compliant
• 6.1.5 General Design Principles - Put People First: Compliant
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Compliant.
• 6.4 Specific Building Design Standards for all D-T5 Mixed-Use and Commercial Buildings
o 6.4.1 Roof and Eaves: Compliant
o 6.4.2 Canopies/Awnings: Compliant
o 6.4.3 Encroachments: Compliant
o 6.4.4 Ground Level Detailing: 60% Glazing in Transparency. Compliant
o 6.4.5 Materials: Compliant
G. Parking:
• 7.1 Parking Area Access: Parking must be accessed from a rear alley or a secondary frontage unless
approved as a Discretionary Review. (D-T5 & D-T6) – There is a parking access from the primary
frontage of Broad Street. – Exception approved at the 1/7/25 DRB Meeting.
• 7.2 Bicycle Parking: Compliance to be confirmed with Final approval.
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape:
o D-T6: 12 ft zone with 8 ft wide sidewalk and trees in wells: Compliant
• 8.2 Parking Area Landscaping: Not applicable
I. Signage: Staff level approval
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
Broad Street & Spring Street: As discussed in previous meetings and reviews the redevelopment in
the core of downtown presents an opportunity to take a comprehensive look at the streetscape along
Broad Street and Spring Street. The City has coordinated a review with design teams for W.
Broad/Magnolia Block residences, the Joint Government Center, 189 W. Main Hotel, and Morgan
Square to ensure a cohesive streetscape that meets DT standards.
RECOMMENDATION
DRB – Meeting Minutes – 2025-03-04
Page 7 of 10
A Final Approval by the DRB is recommended.
Applicant:
Chris Van Kley, Dwell Design Studio.
Public Comments:
Julia Keanor
Discussion:
The DRB reviewed the proposed two large residential buildings, discussing the following key points:
• Entrances: Appreciated the Spring Street porches and townhome entrances on Daniel Morgan.
• First Floor Use: Concern over lack of retail or mixed-use potential on the first floor.
Suggested exploring residential amenities or retail space to better integrate the project into
downtown.
• Shed Roof & Materials: Recommended further refinement of material choices, particularly
for the white windows.
• Retaining Walls & Transitions: Suggested breaking down the retaining walls and
incorporating vertical detailing or material changes where the side meets the wall to soften
transitions.
• Tree Placement: Preferred trees along the curbside for pedestrian protection and increased
sidewalk space, with consideration of the viewshed and courtyard tree placement.
A motion was made by Ms. Babcock, seconded Ms. Crowther by a vote of 5-0 to defer the case to
the April meeting in order to address the following:
• Activate the first-floor shopfront intent.
• Regulate residential elements to the courtyard, including white railings and columns
preferred on the public right of way.
• Address concerns regarding the white windows.
• Refine design style transitions.
• Move trees at the corner of Broad and Daniel Morgan to the curbside, considering
viewshed from the street.
• Address the transition from red brick to the townhome and unit design, making the
transition more uniform around the corner of the building.
• Clarify design for the back courtyard, cantilever decks, and additional renderings for the
back corner.
New Business:
DRB-25-020-00001 – The Design Review Board (DRB) has received a request for Preliminary
Conceptual Approval for the proposed development, Homes of Hope, located at 770 Howard St
(Tax Map Sheet: 7-11-04-206.01) with a zoning designation of DT-4 Zone (Downtown Urban
District). Owner: Northside Development Corp / Agent: Jeffrey B Randolph, The Randolph
Group.
GENERAL PROJECT OVERVIEW
DRB – Meeting Minutes – 2025-03-04
Page 8 of 10
The 2.77 acre site is bound by Fairgrounds Road, Howard Street, and West Fremont Avenue. The
existing site is cleared of the previous structures and has several trees on the site.
The proposed 26-unit townhome buildings are proposed in seven (7) buildings and will include
parking to the rear and a new detention pond.
AUTHORITY & APPLICABILITY
The project is zoned DT-4. Formal design review and approval by the Design Review Board is
required.
DETERMINATION OF COMPLETENESS
Application is complete.
FINDINGS- EXCEPTIONS
• None requested
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use (multi-family) is permitted by right.
B. District Standards:
• 3.3.1 Lot Configuration: Compliant
• 3.3.2 Primary Building Standards: Requires confirmation of compliance – please show setbacks on
drawings to confirm a maximum setback of 18 feet as measured from a current or proposed public
right-of-way.
• 3.3.4 Building Height: Compliant
• 3.3.5 Permitted Parking Location: Compliant
• 3.3.6 Building Frontage: Stoop – permitted
C. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space. Compliant – Lots
14-26 front on a green space.
• 5.1.2 Corner Lots: Buildings located at street intersections must place the main building, or part of
the building, at the corner. Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their principal pedestrian
entrances on a frontage line. Compliant
• 5.1.4 Setbacks: Front and side setbacks must be consistent with those of surrounding buildings.
Provide adjacent buildings to confirm.
D. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Compliance Presumed – to be confirmed prior for Final Approval
• 5.2.2 Solid Waste Storage Areas: Compliance Presumed – to be confirmed prior for Final
Approval
• 5.2.3 Mechanical and Utility Equipment: Compliant
E. Building Standards:
• 6.1.1 General Design Principles - Connectivity: Compliant
• 6.1.1 General Design Principles - Downtown Should be Urban: Compliant
• 6.1.5 General Design Principles - Put People First: Compliant
DRB – Meeting Minutes – 2025-03-04
Page 9 of 10
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Compliant
• 6.3 Specific Building Design Standards for Mixed-Use and Commercial Buildings in D-T5
o 6.3.1 Roof and Eaves: Main roofs shall have a pitch between 8:12 and 12:12. Either a
design adjustment or a design exception is required. – Applicant adjusted. Compliant
o 6.3.2 Façade Design: Please confirm that the corner elevation transparency along public
streets is at least 15%. It appears to be a little blank. - – Applicant adjusted. Compliant
o 6.3.3 Building Entrances: Please confirm raised entries heights for each building with
finished floor elevations and sidewalk elevations. Please provide dimensions for front porches.
o 6.3.4 Garages: Not Applicable
o 6.3.5 Materials: Compliant
F. Parking:
• 7.1.4 Parking Area Access: Compliant
• 7.2 Bicycle Parking: Compliance Presumed – to be confirmed prior for Final Approval
G. Streetscape and Site Landscaping:
• 8.1 Required Streetscape: 11 ft streetscape zone with a minimum 5 ft sidewalk and street trees in a
6 ft wide planting strip. Proposed 14 foot streetscape section exceeds current standards. Compliant
H. Signage: Not applicable.
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
• Alley: Alley A only needs to be 12 feet in total width – 10 feet of asphalt with a 1 foot ribbon curb
on each side.
• Howard Street Streetscape: Please provide an existing survey to confirm the location of the
existing trees. If these trees are to be used, a sidewalk between them and the street is permitted though
a small planting strip between the sidewalk and the curb is preferred. The sidewalk shall be a
minimum of 5 feet and we recommend a minimum 2 foot grass strip.
• Detention Area: Please relocate the detention area from the Howard Street frontage. We recommend
consideration of a dry detention solution using the proposed green area. While the low point is at the
northeast corner, most of the impervious surface can easily be directed to flow towards the west with
some thoughtful grading
• West Fremont Avenue Streetscape: The existing street trees can be transplanted to be between the
curb and the sidewalk in a grass strip a minimum of 6 feet in width.
• Buffer Landscaping: The buffer landscape along and behind Alley C and along Lot 1 appears to be
over planted. Over time the lower branches of the Magnolias will crowd out the Loropetalum below.
We recommend remove of the understory shrubs to allow the trees to flourish.
RECOMMENDATION
The Applicant is aware there are several deficiencies that will require correction prior to consideration
for Preliminary Approval and plans to address prior to Board review.
Applicant:
Source: City of Spartanburg website. First collected Oct 24, 2026.