The City of Spartanburg
Board of Architectural Design
& Historic Review
City of Spartanburg | Board of Architectural Design & Historic Review 1
AGENDA
December 12th, 2024, at 5:30 P.M.
Spartanburg County Council Chambers
366 N. Church Street – Spartanburg, SC 29303
(
Please Note: Items as they appear on the Docket may or may not be considered in the order
as they are presented. The Chairman will announce any changes after the roll call)
I. Call To Order.
II. R
oll Call.
III. F
reedom of Information Act Compliance – Public notification of the City of Spartanburg’s Board of
Architectural Design & Historic Review meeting has been published, posted and mailed in
compliance with the Freedom of Information Act and the requirements of the City of Spartanburg’s
Zoning Ordinance.
I
V. Approval of Agenda.
V. D
isposition of Minutes from the November 14th, 2024, Meeting.
VI
. Old Business: None.
V
II. New Business:
1. COA: 24-004-00053: Certificate of Appropriateness for Major Works – 790 Southern St
(TMS: 7-08-15-276.00) in the Beaumont Mill Village Historic District. The applicant is
seeking approval to replace the siding, remove the side deck, and relocate the side door
.
T
he property is located in the R-6 (General Residential) zoning district.
Owner/Applicant: Sysouphand Phanhly Contractor: Vinicius Santos.
2. C
OA: 24-004-00058: Certificate of Appropriateness for Major Works – 593 S Irwin Ave
(
TMS: 7-16-06-013.00) in the Hampton Heights Historic District. The applicant is
seeking approval to replace the siding and gutters. The property is located in the R-8
(
General Residential Single Family District) zoning district. Owner/Applicant: Adam
an
d Angela Weber Contractor: Browns Roofing Company.
V
III. Staff Updates:
I
X. Adj ournment.
F
or more information, please contact the City of Spartanburg Planning Department at
planning@cityofspartanburg.org or call (864) 596-2068.
1 of 32
HARB – Meeting Minutes – 2024-11-14 Page 1 of 3
Meeting Minutes of the Board of Architectural Design and Historic Review
Thursday, November 14th, 2024, at 5:30 PM
Spartanburg County Council Chambers
The City of Spartanburg Board of Architectural Design and Historic Review (HARB ) met in County
Council Chambers on Thursday, November 14th, 2024, at 5:30 PM with the following members in
attendance: Bill Michels, Kenneth Brown, Sylvelie Franke, James Gaffney and Rod McCants
Representing the Planning Department - Fredalyn Frasier, Planning Director, Nan Zhou, Planner
II, and Oksana Holbrooks, Sr Administrative Assistant.
R
oll Call:
Mr. Michels: Bill Michels
Mr. Brown: Kenneth Brown
Ms. Franke: Sylvelie Franke
Mr. Gaffney: James Gaffney ( Late Arrival)
Mr. McCants: Rod McCants
Mr. Michels: This meeting has been published, posted, and mailed in compliance with the Freedom
of Information Act and the requirements of the City of Spartanburg Zoning Ordinance.
A
pproval of Agenda:
A
motion was made by Mr. Brown, seconded by Ms. Franke to approve the agenda. The motion
was approved with a vote of 5-0.
Approval of Meeting Minutes from August 8th, 2024.
A
motion was made by Mr. Brown, seconded by Mr. Gaffney to approve the agenda. The
motion was approved with a vote of 5-0.
Old
Business:
C
ertificate of Appropriateness for Major Works – 400 Hampton Dr. (TMS # 7-16-02-141.00) in
the Hampton Heights Neighborhood Historic District. The applicant is seeking approval to pave
the parking area for tenants. The property is located in the R-8 SFD (General Residential –
Single-Family District) zoning district. Owner/Applicant: Phuoc Do and Theresa Phan;
Contractor: Work, Inc.
A
pplicant:
Phuoc Do, Owner.
P
ublic Speakers:
Steve Battoccio, 175 W Hampton Avenue.
Sandy Battocchio, 175 W Hampton Avenue.
Niko Gilman, 460 Hampton Drive.
D
iscussion:
The proposed project does not meet the requirements of the Hampton Heights Design Guidelines.
2 of 32
HARB – Meeting Minutes – 2024-11-14 Page 2 of 3
A motion was made by Mr. Gaffney, seconded Ms. Franke to deny the Certificate of
Appropriateness as presented by a vote of 5-0.
N
ew Business:
Certificate of Appropriateness for Major Works – 651 Maywood St. (TMS # 7-12-03- 070.00) in the
Beaumont Mill Village Historic District. The applicant is seeking approval to replace a metal roof with
asphalt shingle roof. The property is located in the R -6 (General Residential District) zoning district.
Owner: Eric & Israel Shackley; Agent: Fraser Roofing.
Project Description and History
The project site is located on an approximately 5,960 square foot lot in the Beaumont Mill Village
Historic District. The site is located on the south side of Maywood Street. The site currently contains one
one-story single-family home that was constructed in 1890. This residential structure is a wood-framed
bungalow with a brick foundation. The structure has an open front porch with interior chimney and has a
gabled metal roof with long rear slope roof. The Beaumont Mill Village Historic Design Guidelines list
this structure as House Type One – Saddlebag circa 1890-1910.
A
nalysis
Zoning Ordinance and Historic Design Manual Consistency
The project site is located in the Beaumont Mill Village Historic District which has design guidelines for
development. These guidelines are outlined in the Beaumont Village Design Guidelines for the City of
Spartanburg Historic District Preservation Principles and Approaches. The purpose of the Guidelines is to
provide property owners guidance for the preservation and protection of historic and architecturally
valuable districts and sites in the City. The project is also subject to Section 510 of the City’s Zoning
Ordinance, Historic Preservation. This section allows the Board to review applications involving historic
structures and districts and issue a Certificate of Appropriateness subject to the Standards listed in the
Ordinance.
The project site has a zoning designation of R-6, General Residential District, which allows for single
family dwelling units. Section 510.6 of the City of Spartanburg Zoning Ordinance lists standards for
reviewing Certificate of Appropriateness. Specifically, Section 510.6 (C)(2) states that in reviewing
applications for new construction or alteration, the board shall consider the U.S. Secretary of the Interior’s
Standards for Rehabilitation and the five criteria listed in the findings.
F
indings
Certificate of Appropriateness, Section 510.6 (C)
a. T
he character and appropriateness of the design
Currently the structure has a metal roof that was original to the house. Beaumont Mill Design Guidelines
Section 3.7.5 Roof Pitches and Roofing Materials says “metal roofs are not appropriate roofing materials
for the Beaumont Mill Village. Architectural shingles may be appropriate for the earlier houses.” The
proposed architectural shingle roof meets the intent of Beaumont Mill Design Guidelines
.
b. T
he scale of the buildings
The scale of the structure will not be impacted by replacing metal shingles with architectural shingles.
c
. The texture and materials
T
he agent is proposing to install CertainTeed Landmark, a 40-year architectural shingles as the new roof
material.
d
. T
he relationship of such elements to similar features of structures in the immediate surroundings
Re
sidential properties in the vicinity of the project site all have architectural shingles. The proposed
a
rchitectural shingles will share similar features of structures in the immediate surroundings.
3 of 32
HARB – Meeting Minutes – 2024-11-14 Page 3 of 3
e. If the property is in a Histor ic District, the extent to which the alteration or construction would be
harmonious with the Historic District
The Beaumont Mill Village Design Guidelines clearly states that” metal roofs are not appropriate roofing
material for the Beaumont Mill Village. Architectural shingles may be appropriate for the earlier houses.”
The proposed alteration of the roof will be harmonious with the Beaumont Mill Village Historic District
and meets the intent of the Design Guidelines
.
B
ased on the Beaumont Mill Village Design Guidelines, it is recommended and appropriate to replace the
existing metal roof with architectural shingles for the project site that will be harmonious with the
immediate surroundings and with the Historic District.
A
pplicant:
Eric & Israel Shackley, Owner.
P
ublic Speakers:
None.
D
iscussion:
The proposed project is well presented and meets the requirements of the Hampton Heights Design
Guidelines. This will not be detrimental to the surrounding properties.
A
motion was made by Mr. Brown, seconded Ms. Franke to approve the Certificate of
Appropriateness as presented by a vote of 5-0.
Staff Announcements: 642 Maywood Street, Demolition.
T
he meeting was adjourned at 6:07 PM.
______________________________
Bill Michels, Chairman
4 of 32
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • Phone: (864) 596-2068 • email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
December 12, 2024
TO:
The Board of Architectural Design and Historic Review
RE:
Certificate of Appropriateness for Major Works
Address: 790 Southern St. (TMS: 7-08-15-276.00)
District: Beaumont Mill Village Historic District
Zoning: R-6 (General Residential District)
Owner: Jessica Medina / Contractor: Vinicius Santos
R
equest- The applicant is seeking approval to rebuild the side deck and relocate the side door
towards the rear of the residence.
Project Description and History
The project site is located on an approximately 6,555 square foot lot in the Beaumont Mill Village
Historic District on the west side of Southern Street . The site currently comprises a one-story single-
family residence constructed in 1930. This residential structure is a vinyl- framed bungalow with a brick
foundation. The structure has a front partial porch – recessed under main roof with in terior brick
chimney and has a gable roof with composite shingle. The Beaumont Mill Village Historic Design
Guidelines list this structure as House Type Nine – Gabled with Partial Recessed Porch.
A
nalysis
Zoning Ordinance and Historic Design Manual Consistency
The design guidelines are outlined in the Beaumont Village Design Guidelines for the City of
Spartanburg Historic District Preservation Principles and Approaches . The purpose of the Guidelines is
to provide property owners guidance for the preservation and protection of historic and architecturally
valuable districts and sites in the City. The project is also subject to Section 510 of the City’s Zoning
Ordinance, Historic Preservation. This section allows the Board to review applications involving historic
structures and districts and issue a Certificate of Appropriateness subject to the Standards listed in the
Ordinance.
T
he project site has a zoning designation of R -6, General Residential District, which allows for single
family dwelling units. Section 510.6 of the City of Spartanburg Zoning Ordinance list standards for
reviewing Certificate of Appropriateness. Specifically, Section 510.6 (C)(2) states that in reviewing
applications for new construction or alteration, the board shall consider the U.S. Secretary of the
Interior’s Standards for Rehabilitation, and the five criteria listed in the findings.
F
indings
Certificate of Appropriateness, Section 510.6 (C)
a. T
he character and appropriateness of the design
Design Guidelines for Beaumont Mill Village states that “……porches are an important design features
on a house. They often have a lot of ornamental detailing such as posts and columns, brackets and
balustrades. If the porch is determined to be rebuilt, it should have the same features and materials.
Exterior renovations affecting houses with entry steps having four or more risers will require the
addition of handrails and/or guardrails in accordance with the International Residential Code.”
5 of 32
Page 2 of 15
• The applicant proposes to rebuild the side deck using the same material (wood) to match the
existing side deck material with guard rail around the deck.
• The Design Guidelines for the Beaumont Mill Village do not provide guidance for relocating the
door. The applicant proposes to relocate the side door two or three feet from its current place
towards the back based on the interior layout of the house.
b. T
he scale of the buildings
• Rebuilding the side deck and relocating the door will not impact the scale of the building.
c. T
he texture and materials
• The current side deck is a wood deck. The new proposed side deck would be a wood deck with
guard rail around it.
d
. The relationship of such elements to similar features of structures in the immediate surroundings –
• Properties in the immediate surroundings of the project site do not have a side deck or a side
door. They all either have two or three windows on the sides of the house.
e
. If the property is in a Historic District, the extent to which the alteration or construction would be
harmonious with the Historic District –
The Design Guidelines for Beaumont Mill Village states that “……porches are an important design
features on a house. They often have a lot of ornamental detailing such as posts and columns, brackets
and balustrades. If the porch is determined to be rebuilt, it should have the same features and materials.
Exterior renovations affecting houses with entry steps having four or more risers will require the
addition of handrails and/or guardrails in accordance with the International Residential Code.”
• Rebuilding the side deck using same material would be harmonious with the Historic District
Design Guidelines.
• Based on the Design Guidelines for the Beaumont Mill Village, shifting the door two or three
feet over does not seem appropriate unless it will be covered by a window after the door is
shifted to the proposed location.
Submitted by:
N
an Zhou, AICP
City Planner II - Planning Department
A
ttachments:
Conditions of Approval
Application and Materials
Site Photos
6 of 32
Page 3 of 15
CONDITIONS OF APPROVAL FOR THE PROJECT ON PROPERTY AT:
790 Southern Street (TMS:7-08-15-276.00 ) - Beaumont Mill Village Historic District
Owner: Jessica Medina
Applicant/Contractor: Vinicius Santos
1. I
f one or more of the following conditions is not met with respect to all its terms, then this
approval may be revoked.
2. Al
l plans for future construction which are not covered by this review shall be submitted to
the City Planning Department for review and approval.
3. M
ajor modifications to plans or exceptions to completion may be granted only by the City
authority which approved the project.
4. This permit shall be exercised within six months of the date of final approval, or it shall
become null and void. Extensions may be granted with permission of the Board.
5. A b
uilding permit shall be obtained from the Building Department prior to commencemen t
of
work.
6. Th
e development of the site shall be in substantial accordance with the approved plans
submitted and on file in the Spartanburg City Planning Department. Major modifications to
plans or exceptions to completion may be granted only by the City authority which approved
the project. project.
7 of 32
Page 4 of 15
S ITE MAP – 790 Southern St.
8 of 32
Page 5 of 15
ZONING MAP – 790 Southern St.
9 of 32
Page 6 of 15
Photo – Front
10 of 32
Page 7 of 15
Photo – Le f t S id e
11 of 32
Page 8 of 15
Photo – Right Sid e (Current C onditions of the Side Deck and
Door)
12 of 32
Page 9 of 15
Photo – Property to the L eft of the Project Si te
13 of 32
Page 10 of 15
Photo – Property to the R ight of the Project Si te (Side
Picture )
14 of 32
Page 11 of 15
Photo – Property A cross from the Project Site
15 of 32
Page 12 of 15
Photo – Property A cross from the Project Site
16 of 32
Page 13 of 15
Photo – Property A cross from the Project Site
17 of 32
Page 14 of 15
Photo – Properti es in the Vicinity
18 of 32
Page 15 of 15
Photo – Properti es in the Vicinity
19 of 32
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • Phone: (864) 596-2068 • email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
December 12, 2024
TO: The Board of Architectural Design and Historic Review
RE: Certificate of Appropriateness for Major Work
Address: 593 S. Irwin Avenue
Historic District: Hampton Heights Historic District
Zoning: R-8 SFD (General Residential – Single Family) Zoning district
Owner/Applicant: Adam and Angela Weber / Contractor: Browns Roofing Company
Request: Applicant is seeking approval of a Certificate of Appropriateness to repair/replace
damaged sidings using like for like material (wood plank) due to hurricane damage and install gutter
on the house.
Project Description and History
The project site is located on an approximately 9,480 square foot lot in the Hampton Heights Historic
District on the east side of South Irwin Ave. The site currently includes one two-story single-family
home constructed in 1920. The residential structure is a wood-framed bungalow with a brick foundation
and an open front porch. This residential structure has a hip roof with composition shingle.
The applicant is seeking approval from the Board of Architectural Design and Historical Review to
repair/replace wood siding with wood plank siding due to Hurricane Helene and install gutters around
the house to protect molding on fascia and water runoff to foundation.
Analysis
Zoning Ordinance and Historic Design Manual Consistency
These Hampton Heights District guidelines are outlined in the Design Manual for the City of
Spartanburg Historic Districts and Landmarks . The purpose of the Manual is to provide property
owners guidance for the preservation and protection of historic and architecturally valuable districts
and sites in the City. The project is also subject to Section 510 of the City’s Zoning Ordinance, Historic
Preservation. This section allows the Board to review applications involving historic structures and
districts and issue a Certificate of Appropriateness subject to the Standards listed in the Ordinance.
The project site has a zoning designation of R -8/SFD, General Residential Single Family Zon ing
District, which allows for single family dwelling units. Section 510.6 of the City of Spartanburg Zoning
Ordinance list s standards for reviewing Certificate of Appropriateness. Specifically, Section 510.6
(C)(2) states that in reviewing applications for new construction or alteration, the board shall consider
the U.S. Secretary of the Interior’s Standards for Rehabilitation and the five criteria listed in the
findings.
Findings
Certificate of Appropriateness, Section 510.6 (C)
20 of 32
Page 2 of 13
1. The character and appropriateness of the design
The Hampton Heights Residential Rehabilitation Guidelines states “ ……retain original wood
siding and repair rather than replace damaged material whenever possible. When replacement is
necessary, replace only deteriorated materials and match the original material in size, shape, texture,
and materials. Paint removal and repainting shall be done using appropriate techniques that do not
damage the historic material.”
• The applicant proposes to repair damaged siding using like materials (wood plank) and color
(yellow for siding, white for trim), with sheathing and vapor barrier underneath the siding
that will not be visible from exterior.
2. The scale of the buildings
• Replacing siding and installing gutter systems will not impact the scale of the building.
3. The texture and materials
• The texture of the siding would be wood plank.
4. The relationship of such elements to similar features of structures in the immediate surroundings
• The structures in the immediate surroundings share mixed types of exterior sidings in terms
of texture and materials.
• Houses directly across from the project site and to the right side of the project site have
vinyl exterior sidings, while the rest of the houses in the vicinity of the project site all have
wood exterior sidings.
5. If the property is in a Historic District, the extent to which the alteration or construction would
be harmonious with the Historic District
Hampton Heights Residential Rehabilitation Guidelines states “……retain original wood siding
and repair rather than replace damaged material whenever possible. When replacement is necessary,
replace only deteriorated materials and match the original material in size, shape, texture, and
materials.”
• The proposed work is to repair the damaged siding using like materials (wood plank) and
color (yellow for siding, white for trim), with sheathing and vapor barrier underneath the
siding to protect the siding for a sustainable future and installing gutter systems to the rest
of the house to protect the house from water damage to the foundation would be harmonious
with the Historic District.
Submitted by:
Nan Zhou, AICP
City Planner II, Planning Department
Attachments:
Conditions of Approval
Photos – Site Photos
Application
CONDITIONS OF APPROVAL FOR THE PROJECT ON PROPERTY AT:
21 of 32
Page 3 of 13
593 S. Irwin Ave., Hampton Heights Historic District
Certificate of Appropriateness for Major Works
Zoning District: R-8/SFD/ Landowner: Adam and Angela Weber
1. If one or more of the following conditions is not met with respect to all its terms, then this
approval may be revoked.
2. All plans for future construction which are not covered by this review shall be submitted to
the City Planning Department for review and approval.
3. Major modifications to plans or exceptions to completion may be granted only by the City
authority which approved the project.
4. Th
is permit shall be exercised within six months of the date of final approval, or it shall
become null and void. Extensions may be granted with permission of the Board.
5. A b
uilding permit shall be obtained from the Building Department prior to commencement
of work.
6. The development of the site shall be in substantial accordance with the approved plans
submitted and on file in the Spartanburg City Planning Department. Major modifications to
plans or exceptions to completion may be granted only by the City authority which approved
the project.
22 of 32
Page 4 of 13
SITE MAP – 593 S. Irwin Ave.
23 of 32
Page 5 of 13
ZONING MAP – 593 S. Irwin Ave.
24 of 32
Page 6 of 13
Photo – Front
25 of 32
Page 7 of 13
Photo – Left Side
26 of 32
Page 8 of 13
Photo – Right Side
27 of 32
Page 9 of 13
Photo – Property to the Left
28 of 32
Page 10 of 13
Photo – Properties to the Right
29 of 32
Page 11 of 13
Photo – Property Directly Across from the Project Site
30 of 32
Page 12 of 13
Photo – Properties in the Vicinity
31 of 32
Page 13 of 13
Photo – Properties in the Vicinity
32 of 32