Tommy Dunn Chairman, District Five Brett Sanders V. Chairman, District Four PO Box 8002, Anderson, South Carolina 29622-8002 | www.andersoncountysc.org John B. Wright, Jr. District One Glenn Davis District Two Greg Elgin District Three Jimmy Davis District Six M. Cindy Wilson District Seven Renee Watts Clerk to Council Rusty Burns County Administrator AGENDA ANDERSON COUNTY COUNCIL SPECIAL CALLED MEETING Tuesday, July 23, 2024, at 6:00 p.m. Historic Courthouse 101 S. Main Street Anderson, South Carolina Chairman Tommy Dunn, Presiding 1. CALL TO ORDER 2. INVOCATION AND PLEDGE OF ALLEGIANCE Hon. Cindy Wilson 3. CITIZENS COMMENTS Agenda Matters Only 4. ORDINANCE SECOND READING: a. 2024-030: An Amended and restated ordinance providing for the imposition of a transportation sales and use tax, subject to a November 5, 2024 referendum, pursuant to Title 4, Chapter 37 of the Cod e of Laws of South Carolina 1976, as amended; ordering a referendum in connection therewith; and providing for matters relating thereto Mr. Tommy Dunn (allotted 5 minutes) 5. ANDERSON COUNTY DETENTION CENTER CMAR CONTRACT Mr. Rusty Burns 6. REMARKS FROM COUNCIL 7. ADJOURNMENT Anyone who requires an auxiliary aid or service for effective communication, or a modification of policies or procedures in order to participate in this program, service or activity please contact the office of the program, service or activity as soon as possible but no later than 24 hours before the scheduled event. For assistance, please contact the Clerk to Council at (864) 260-1036. AN AMENDED AND RESTATED ORDINANCE PROVIDING FOR THE IMPOSITION OF A TRANSPORTATION SALES AND USE TAX, SUBJECT TO A NOVEMBER 5, 2024 REFERENDUM, PURSUANT TO TITLE 4, CHAPTER 37 OF THE CODE OF LAWS OF SOUTH CAROLINA 1976, AS AMENDED; ORDERING A REFERENDUM IN CONNECTION THEREWITH; AND PROVIDING FOR MATTERS RELATING THERETO. TRANSPORTATION SALES TAX ORDINANCE Ordinance No. 2024-030 August 6, 2024 i TABLE OF CONTENTS ARTICLE I FINDINGS OF FACT Section 1.01 Findings ............................................................................................................1 ARTICLE II IMPOSITION OF SALES TAX SUBJECT TO REFERENDUM Section 2.01 Imposition, Term. .............................................................................................2 Section 2.02 Purposes. ...........................................................................................................3 Section 2.03 Election to Exempt Certain Unprepared Foot Items. ........................................3 ARTICLE III REFERENDUM Section 3.01 Ordering the Referendum, Form of Ballot Question. .......................................3 Section 3.02 Notice of Referendum. ......................................................................................3 Section 3.03 Public Hearing. .................................................................................................3 Section 3.04 Conduct of Referendum; Certification of Referendum. ...................................3 ARTICLE IV ADMINISTRATION OF THE SALES TAX Section 4.01 Administration. .................................................................................................4 Section 4.02 Budgeting and Appropriation of Sales Tax Proceeds. ......................................5 Section 4.03 Disposition of Excess Proceeds. .......................................................................5 ARTICLE V OTHER MATTERS Section 5.01 Transmittal and Notification Requirements. .....................................................5 Section 5.02 Authorization for Further Action. .....................................................................6 Section 5.03 No Establishment of Transportation Authority. ...............................................6 Section 5.04 Ordinance and Ballot Question are Severable. .................................................6 Section 5.05 General Repealer...............................................................................................6 Section 5.06 Effective Date. ..................................................................................................6 EXHIBIT A – FORM OF BALLOT EXHIBIT B – FORM OF NOTICE OF PUBLIC HEARING FOR REFERENDUM EXHIBIT C – FORM OF NOTICE OF PUBLIC HEARING FOR ORDINANCE 1 BE IT ORDAINED BY THE COUNTY COUNCIL OF ANDERSON COUNTY, SOUTH CAROLINA, AS FOLLOWS: ARTICLE I FINDINGS OF FACT Section 1.01 Findings. The County Council of Anderson County (the “County Council”), the governing body of Anderson County, South Carolina (the “County”), hereby finds and determines: (a) Pursuant to Title 4, Chapter 37 of the Code of Laws of South Carolina 1976, as amended (the “Act”), the County may impose by ordinance, subject to referendum, a sales and use tax in an amount not to exceed one percent within such county to finance, inter alia, transportation projects for a specific period of time to collect a limited amount of money. (b) The Act further provides that such sales and use tax (the “ Sales Tax ”) shall be subject to a referendum and that the ordinance imposing the Sales Tax specify (i) the proj ects to be funded from the Sales Tax; (ii) the maximum time of the imposition of the Sales Tax; ( iii) the estimated capital cost of the projects to be funded and the principal amount of any bonds payable from the Sales Tax; and (iv) the anticipated year the Sales Tax will end. (c) Projects eligible for funding under the Sale s Tax are limited to highways, roads, streets, bridges, mass transit systems, greenbelts, and other transportation-related projects facilities including, but not limited to, drainage facilities relating to the highways, roads, street s, bridges, and other transp ortation-related projects, and may be jointly operated by a county and another governmental entity. (d) The South Carolina Revenue and Fiscal Affairs Office , by letter dated May 11 , 2023, advised the County that, should the Sales Tax be imposed for fiscal year ending June 30, 2026, proceeds are anticipated to be $45,012,000, and grow over time with the growth of the State of South Carolina (the “State”). Based on the information provided by Revenue and Fiscal Affairs, the County finds that Sales Tax proceeds would total approximately $366,000,000 over seven years. (e) The County has undertaken an extensive inventory and assessment of its existing transportation infrastructure and finds that transportation infrastructure within the County is insufficient to meet the current and future needs of the County and requires the dedication of significant public resources from the State and the County, and that significant State resources are likely to become available should the County obtain and dedicate sufficient matching funds, which the County currently lacks. (f) County Council finds that addressing the findings set forth above through the construction, improvement, and development of transportation infrastructure in the County w ill serve a public purpose, will enhance economic development, and will promote the health, s afety, and welfare of the citizens of the County. 2 (g) County Council is minded to put the question of using a Sales Tax to meet the transportation needs of the County to the electors of the County on November 5, 2024 (the “Referendum”). County Council has reviewed the report extensively and has developed a form of ballot question (the “ Ballot Question ”) containing transportation projects (the “Transportation Projects” as further defined in Section 2.02 hereof) and the proposed use of bonds secured by the Sales Tax to submit to electors at the Referendum. (h) In accordance with Section 4 -37-30(A)(1) of the Act this ordinance specifies (i) that the proceeds of the Sales Tax will be used to defray the costs of the Transportation Projects described in Section 2.02 hereof and as set forth on the Ballot Question attached hereto as Exhibit A, (ii) that the Sales Tax shall not exceed the lesser of seven calendar years (consisting of seven 12-month periods from imposition) or the length of payment for the Transportation Projects , (iii) that the estimated capital cost of the Transportation Projects to be funded from the sales tax is $366,000,000 and the principal amount of bonds to be supported by the Sales Tax is $15,000,000, and (iv) that the Sales Tax is anticipated to end April 30, 2032. (i) On July 2, 2024 the Governor of the State of South Carolina signed Senate Bill S. 969, which allows the governing bodies of counties proposing Sales Taxes under the Act to exempt “unprepared food items eligible for purchase with United States Department of Agriculture food coupons” in the ordinance required by Section 4-37-30(A)(1) of the Act, and County Council is so minded to exempt such items. (i) Pursuant to the provisions of Section 4 -9-130 of the Code of Laws of South Carolina 1976, as amended , a public hearing, after giving reasonable notice, is required to be conducted prior to the third and final reading of this ordinance by the County Council. In accordance with this provision, a public hearing shall be conducted and due notice, in substantially the form provided at Exhibit C hereto, shall be provided all as required by said Section 4-9-130. ARTICLE II IMPOSITION OF SALES TAX SUBJECT TO REFERENDUM Section 2.01 Imposition, Term. The County Council hereby imposes the Sales Tax in the County, subject to approval at the Referendum, for the period beginning May 1, 2025, and ending the earlier of (i) April 30, 2032, or (ii) the end of the calendar month during which the South Carolina Department of Revenue (the “Department of Revenue”) determines that the Sales Tax has raised revenues sufficient to provide the greater of either the cost of the Transportation Projects as approved in the Referendum or the cost to amortize all debts related to the approved Transportation Projects. 3 Section 2.02 Purposes. The Sales Tax proceeds shall be applied for the purpose of funding the Transportation Projects set forth below in accordance with the Act and SC Revenue Ruling #22 -2 and any successor ruling. The Transportation Projects consist of the following: Project (1) For improvements to highways, roads (paved and unpaved), streets, intersections, and bridges within Anderson County, South Carolina, including related drainage system improvements. $366,000,000 Section 2.03 Election to Exempt Certain Unprepared Food Items. County Council hereby elects, pursuant to Section 4 -37-30(A)(9), as amended effective July 2, 2024 by S. 969, to exempt “unprepared food items eligible for purchase with United States Department of Agriculture food coupons” from the scope of the Sales Tax to be considered by the electors of the County at the Referendum. ARTICLE III REFERENDUM Section 3.01 Ordering the Referendum, Form of Ballot Question. The Referendum is hereby ordered. The Board of Elections and Voter Registration of the County shall conduct the Referendum on November 5, 2024. The form of the Ballot Question is set forth at Exhibit A. Section 3.02 Notice of Referendum. The Board of Voter Registration and Elections of the County shall publish in a newspape r of general circulation in the County the date and time of the Referendum once a week for four consecutive weeks immediately preceding November 5, 2024. Section 3.03 Public Hearing. Pursuant to Section 4-37-30(2), a public hearing shall be held at least 15 days prior to the Referendum after publication of notice of such public hearing setting forth the date, ti me, and location of such public hearing. Such notice is included as Exhibit B hereto, and may be revised as necessary or appropriate to comply with the Act and the election laws of the State. Section 3.04 Conduct of Referendum; Certification of Referendum. (a) The Board of Voter Registration and Elections of the County shall conduct the Referendum pursuant to the Act and under the election laws of this State, mutatis mutandis. 4 (b) At the Referendum with regard to the imposition of the Sales Tax, all qualified electors desiring to vote in favor of imposing the Sales Tax for the Transportation Proj ects shall vote “yes” and all qualified electors opposed to levying the Sales Tax shall vote “no.” If a majority of the electors voting in the Referendum vote in favor of the imposition of the Sales Tax, the Sales Tax is imposed as provided in the Act and this ordinance. (c) At the Referendum with regard to the authorization of general obligation bonds secured by Sales Tax receipts , all qualified electors desiring to vote in favor of the authorization of such bonds for the stated purposes shall vote “yes” and all qualified electors opposed to the issuance of such bonds shall vote “no.” If a majority of the electors voting in the Referendum vote in favor of the authorization of general obligation bonds secured by Sales Tax receipts, bonds may be issued in accordance with Article X, Section 14, Paragraph (6) of the Constitution of the State of South Carolina, 1895, as amended. (d) The Board of Voter Registration and Elections of the County shall certify the result no later than November 30, 2024 , to the County and to the Department of Revenue. Such certification shall include the maximum cost of the Transportation Projects, the maximum time for the imposition of the Sales Tax, and the principal amount of bonds, if any, to be supported by the Sales Tax. ARTICLE IV ADMINISTRATION OF THE SALES TAX Section 4.01 Administration. (a) The Sales Tax must be administered and collected by the Department of Revenue in accordance with the provisions of the Act. (b) The revenues of the Sales Tax collected under this ordinance must be remitted to the State Treasurer and credited to a fund separate and distinct from the general fund of the State. After deducting the amount of any refunds made and costs to the Department of Revenue of administrating the tax, not to exceed one percent of such revenues, the State Treasurer shall distribute the revenues quarterly to the Anderson County Treasurer and the revenues must be used only for the purposes stated herein. The State Treasurer may correct misallocat ions by adjusting subsequent distributions, but these distributions must be made in the same fiscal year as the misallocation. However, allocations made as a result of city or county code error s must be corrected prospectively. (c) The Department of Revenue shall furnish data to the State Treasurer and to the Anderson County Treasurer for the purpose of calculating distributions and estimating reve nues. The information which must be supplied to the County upon request includes, but i s not limited to, gross receipts, net taxable sales, and tax liability by taxpayers. Information about a specific taxpayer is considered confidential and is governed by the provisions of Section 12-54-240 of the Code of Laws of South Carolina 1976, as amended. Any person violating the provisions of this 5 section shall be subject to the penalties provided in Section 12 -54-240 of the Code of Laws of South Carolina 1976, as amended. Section 4.02 Budgeting and Appropriation of Sales Tax Proceeds. (a) County Council shall adopt annually and prior to the beginning of each fiscal year a budget for expenditures of Sales Tax revenues. County Council may make supplemental appropriations for the Sales Tax following the same procedures prescribed for the enact ment of other budget ordinances. The provisions of this section shall not be construed to prohibit the transfer of funds appropriated in the annual budget for the Sales Tax for purposes other than as specified in the annual budget when such transfers are approved by County Council. In the preparation of the annual budget, County Council may require any reports, estimates, and statistics from any county agency or department as may be necessary to perform its duties as the responsible fiscal body of the County. (b) Any outside agencies, political subdivisions or organizations designated to receive funding from the Sales Tax must annually submit requests for funding in accordance with procedures and schedules established by the County Administrator. The County Administrator shall prepare the proposed budget for the Sales Tax and submit it to the County Council at such time as the County Council determines. At the time of submitting the proposed budget, the County Administrator shall submit to the County Council a statement describing the important features of the proposed budget. (c) Except as specifically authorized by County Council, any outside agency or organization receiving an appropriation of the Sales Tax must provide to County Council an independent annual audit of such agency's or organization's financial records and transactions and such other and more frequent financial information as required by County Council, all in form satisfactory to County Council. Section 4.03 Disposition of Excess Proceeds. Amounts of Sales Tax collected in excess of the required proceeds must first be applied, if necessary, to complete each Transportation Project for which the Sales Tax was imposed. Any additional revenue collected above the specified amount must be applied to the reduction o f debt principal of the County on transportation infrastructure debts only. ARTICLE V OTHER MATTERS Section 5.01 Transmittal and Notification Requirements. (a) Upon enactment of this ordinance, the Clerk to County Council is directed to provide the same to the Anderson County Board of Voter Registration and Elections with direction to provide for the submission of the Ballot Question to the electors of the County at the Referendum. 6 (b) The Board of Voter Registration and Elections of the County is advised that Proviso 109.15 of the State’s 202 4-2025 General Appropriations Act provides that it must notify the Department of Revenue of the Referendum sixty days prior to the date thereof. Section 5.02 Authorization for Further Action. The County Council hereby authorizes the County Administrator to take all action necessary and convenient in connection with implementing this ordinance. Section 5.03 No Establishment of Transportation Authority. The County has elected to impose the Sales Tax subject to a favorable Referendum as provided at Section 4 -37-30(A) of the Act and elected not to create a transportation authority to use and impose tolls under Section 4-37-30(B) of the Act. Section 5.04 Ordinance and Ballot Question are Severable. It is hereby expressed to be the intent of County Council that if any one or more of the provisions or portions of this ordinance or the Ballot Question are determined by a court of competent jurisdiction to be contrary to law, then that specific provision or portion shall be severed from the remaining terms or portions hereof or thereof and the invalidity thereof shall in no way affect the validity of the other provisions of this ordinance or the Ballot Question. If any provisions of this ordinance or the Ballot Question shall be held or deemed to be or shall, in fact, be inoperative or unenforceable or invalid as applied to any particular case in any jurisdiction or in all cases because it conflicts with any constitution or statute or rule of public pol icy, or for any other reason, those circumstances shall not have the effect of rendering the provisi on in question inoperative or unenforceable or invalid in any other case or circumstance, or of rendering any other provision or provisions herein or therein inoperative or unenforceable or invalid to any extent whatever. Section 5.05 General Repealer. All prior ordinances or resolutions of County Council in conflict herewith are hereby superseded, amended, or repealed, in whole or in part, as applicable and only to the extent of such conflict. Specifically, that ordinance enacted on December 19, 2023 calling for a referendum under the Act is superseded in whole by this ordinance. Section 5.06 Effective Date. This ordinance shall take effect upon third and final reading thereof. * * * 7 ORDAINED in meeting duly assembled this 6th day of August 2024. ATTEST: ANDERSON COUNTY COUNCIL _____________________________ _____________________________ W. Russell Burns Tommy Dunn, Chairman Anderson County Administrator _____________________________ Renee Watts Anderson County Clerk to Council Approved as to form: _____________________________ Leon C. Harmon Anderson County Attorney First Reading: July 16, 2024 Second Reading: July 23, 2024 Public Hearing: August 6, 2024 Third Reading: August 6, 2024 A-1 EXHIBIT A FORM OF BALLOT Question 1 I approve a special sales and use tax in the amount of one percent to be imposed in Anderson County, South Carolina for not more than seven years to fund the following project or projects: Project (1) For improvements to highways, roads (paved and unpaved), streets, intersections, and bridges within Anderson County, South Carolina, including related drainage system improvements. $366,000,000 Yes ___ No ___ Question 2 I approve the issuance of not exceeding $ 15,000,000 of general obligation bonds of Anderson County payable from the special sales and use tax described in Question 1 above, maturing over a period not to exceed seven years, to fund a portion of the projects described in Question 1 above. Yes ___ No ___ EXHIBIT B FORM OF NOTICE OF PUBLIC HEARING FOR REFERENDUM NOTICE OF PUBLIC HEARING The Board of Voter Registration and Elections of Anderson County will conduct a sales tax referendum on November 5, 2024 ordered pursuant to that ordinance entitled “AN AMENDED AND RESTATED ORDINANCE PROVIDING FOR THE IMPOSITION OF A TRANSPORTATION SALES AND USE TAX, SUBJECT TO A NOVEMBER 5, 2024 REFERENDUM, PURSUANT TO TITLE 4, CHAPTER 37 OF THE CODE OF LAWS OF SOUTH CAROLINA 1976, AS AMENDED; ORDERING A REFERENDUM IN CONNECTION THEREWITH; AND PROVIDING FOR MATTERS RELATING THERETO ” enacted by the County Council of Anderson County, South Carolina on August 6, 2024. A public hearing will be held to receive oral or written comments on [Date Not Later than 15 days prior to Referendum], 2024 at 6:30 p.m. concerning the referendum. The public hearing will be held in the Council Chambers – 2nd Floor – Historic Courthouse, 101 S. Main Street, Anderson, SC 29624. ANDERSON COUNTY, SOUTH CAROLINA C-1 EXHIBIT C FORM OF NOTICE OF PUBLIC HEARING FOR ORDINANCE NOTICE OF PUBLIC HEARING The Anderson County Council will hold a public hearing to receive oral or written comments on Tuesday, August 6, 2024 at 6:30 p.m. concerning a proposed ordinance entitled “AN AMENDED AND RESTATED ORDINANCE PROVIDING FOR THE IMPOSITION OF A TRANSPORTATION SALES AND USE TAX, SUBJECT TO A NOVEMBER 5, 2024 REFERENDUM, PURSUANT TO TITLE 4, CHAPTER 37 OF THE CODE OF LAWS OF SOUTH CAROLINA 1976, AS AMENDED; ORDERING A REFERENDUM IN CONNECTION THEREWITH; AND PROVIDING FOR MATTERS RELATING THERETO.” The public hearing will be held in the Council Chambers – 2nd Floor – Historic Courthouse, 101 S. Main Street, Anderson, SC 29624. ANDERSON COUNTY, SOUTH CAROLINA AIA ® Document A133 ™ – 2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 1 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201™–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document. F AGREEMENT made as of the « » day of « » in the year « » (In words, indicate day, month, and year.) BETWEEN the Owner: (Name, legal status, address, and other information) « »« » Anderson County, South Carolina, as agent for the Anderson County Detention Facilities Corporation, a South Carolina Non-Profit Corporation; 101 South Main Stret, Anderson, SC 29624. Provided, however, that this Agreement, as hereinafter defined, is formed in furtherance of (1) the Base Lease Agreement dated October 12, 2022, between Anderson County, South Carolina, as lessor, and the Anderson County Detention Facilities Corporation, as lessee, filed on the same date with the Register of D eeds of Anderson County, South Carolina, and (2) the Installment Purchase and Use Agreement between Anderson County Detention Facilities Corporation, as seller, and Anderson County, South Carolina, as buyer, filed on October 12, 2022 and November 4, 2022 with the Register of Deeds of Anderson County, South Carolina, whereby the Owner designated in the Agreement is the agent for the Anderson County Detention Facilitie s Corporation, which has assigned certain rights in the same to the Trust Agreement dated October 12, 2022, between the Anderson County Detention Facilities Corporation and Regions Bank, as Trustee. Consequently, where “Owner” is used in this Agreement, it refers to Anderson County, South Carolina acting as agent for the Anderson County Detention Facilities Corporation. « » « » « » and the Construction Manager: (Name, legal status, address, and other information) « »«James R. Vannoy & Sons Construction Company, Inc. » «631 McGee Road » « Anderson, SC 29625» « » for the following Project: (Name, location, and detailed description) « » » Construction of a Detention Facility in Anderson County, South Carolina « » NOTICE THIS CONTRACT IS SUBJECT TO ARBITRATION PURSUANT TO SECTION 15-48-10, CODE OF LAWS OF SOUTH CAROLINA (1976). AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 2 The Architect: (Name, legal status, address, and other information) « Moseley Architects P.C. » « 6210 Ardrey Kell Rd. » « The Hub at Waverly » « Suite 425 » « Charlotte, NC 28277 » (704) 540-3755 The Owner and Construction Manager agree as follows. AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 3 TABLE OF ARTICLES 1 INITIAL INFORMATION 2 GENERAL PROVISIONS 3 CONSTRUCTION MANAGER’S RESPONSIBILITIES 4 OWNER’S RESPONSIBILITIES 5 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES 6 COMPENSATION FOR CONSTRUCTION PHASE SERVICES 7 COST OF THE WORK FOR CONSTRUCTION PHASE 8 DISCOUNTS, REBATES, AND REFUNDS 9 SUBCONTRACTS AND OTHER AGREEMENTS 10 ACCOUNTING RECORDS 11 PAYMENTS FOR CONSTRUCTION PHASE SERVICES 12 DISPUTE RESOLUTION 13 TERMINATION OR SUSPENSION 14 MISCELLANEOUS PROVISIONS 15 SCOPE OF THE AGREEMENT EXHIBIT A GUARANTEED MAXIMUM PRICE AMENDMENT EXHIBIT B INSURANCE AND BONDS EXHIBIT C PROJECT DOCUMENTS ARTICLE 1 INITIAL INFORMATION § 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. (For each item in this section, insert the information or a statement such as “not applicable” or “unknown at time of execution.”) This agreement is related to the construction of a new detention center within Anderson County, South Carolina. The Owner wishes to receive Construction Management At-Risk Services for the completion of the construction project. On March 11, 2024, Anderson County published RFP #24-028, herein incorporated by reference, which requested proposals for Construction Manager At-Risk preconstruction services and construction services for the new Anderson County Detention Center near David Lee Coffee Place, Anderson, SC 29625. § 1.1.1 The Owner’s program for the Project, as described in Section 4.1.1: (Insert the Owner’s program, identify documentation that establishes the Owner’s progr am, or state the manner in which the program will be developed.) « The program for the project consists of a detention center in Anderson SC of approxim ately 600 beds (core space for 1000 inmates) and supporting spaces such as Vehicular Sallyport, Intake/Booking, Prope rty Storage, Medical, Kitchen, Laundry, Administration, storage, and Public Lobby. » § 1.1.2 The Project’s physical characteristics: AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 4 (Identify or describe pertinent information about the Project’s physical characteri stics, such as size; location; dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and ut ility studies; availability of public and private utilities and services; legal description of the site, etc.) « » The Project’s physical characteristics are described in Exhibit C. § 1.1.3 The Owner’s budget for the Guaranteed Maximum Price, as defined in Article 6: (Provide total and, if known, a line item breakdown.) See attached Exhibit A “Guaranteed Maximum Price Amendment” and Section §6.2.1 below. § 1.1.4 The Owner’s anticipated design and construction milestone dates: .1 Design phase milestone dates, if any: « » .2 Construction commencement date: « » .3 Substantial Completion date or dates: « 862 days from date of commencement of the Work » .4 Other milestone dates: « » § 1.1.7 Other Project information: (Identify special characteristics or needs of the Project not provided elsewhere.) The Project requires specialized knowledge related to the construction of detention facilities, which may include but is not limited to additional security measures and systems, safety measures, and knowledge of any federal laws or regulations related to detention center facilities § 1.1.8 The Owner identifies the following representative in accordance with Section 4.2: (List name, address, and other contact information.) « Mitchell Stroud Facilities Assistant Manger Office (864)260-1039 Phone (864) 642-7818 mjstroud@andersoncountysc.org 1428 Pearman Dairy Road Anderson, SC 29625» § 1.1.9 The persons or entities, in addition to the Owner’s representative, who are requi red to review the Construction Manager’s submittals to the Owner are as follows: (List name, address and other contact information.) N/A AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 5 § 1.1.11 The Architect’s representative: (List name, address, and other contact information.) « Todd B. Davis, Managing Principal » « 6210 Ardrey Kell Rd » « The Hub at Waverly » « Suite 425 » « Charlotte NC, 28277 » § 1.1.12 The Construction Manager identifies the following representative in accordance with Article 3: (List name, address, and other contact information.) « » Andy Mosser « » 631 McGee Road « » Anderson, SC 29625 « » (864) 304-5713 § 1.1.13 The Owner’s requirements for the Construction Manager’s staffing plan for Pre construction Services, as required under Section 3.1.9: (List any Owner-specific requirements to be included in the staffing plan.) None § 1.1.14 The Owner’s requirements for subcontractor procurement for the performance of the Work: (List any Owner-specific requirements for subcontractor procurement.) Shall not be in violation of law. § 1.1.15 Other Initial Information on which this Agreement is based: See Exhibit C. § 1.2 The Owner and Construction Manager may rely on the Initial Information. Both parti es, however, recognize that such information may materially change and, in that event, the Owner and the Constructio n Manager shall appropriately adjust the Project schedule, the Construction Manager’s services, and the Construction Manager’s compensation. The Owner shall adjust the Owner’s budget for the Guaranteed Maximum Price and the Owne r’s anticipated design and construction milestones, as necessary, to accommodate material changes in the Initial Information. § 1.3 Neither the Owner’s nor the Construction Manager’s representative shall be change d without ten days’ prior notice to the other party, unless agreed upon by the parties. ARTICLE 2 GENERAL PROVISIONS § 2 .1 The Contract Documents The Contract Documents consist of this Agreement, Conditions of the Contract (General , Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agre ement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement , all of which form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein. Upon the Owner’s acceptance of the Construction Manager’s Guaranteed Maximum Price proposal, the Contract Documents will also include the documents described in Section 3.2.3 and identified in the Guaranteed Maximum Price Amendm ent and revisions prepared by the Architect and furnished by the Owner as described in Section 3.2.8. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, repres entations or agreements, either written or oral. If anything in the other Contract Documents, other than a Modification, is inconsistent with this Agreement, this Agreement shall govern. An enumeration of the Contract Documents, other than a Modification, appears in Arti cle 15. § 2 .2 Relationship of the Parties The Construction Manager accepts the relationship of trust and confidence establishe d by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Construction Mana ger’s skill and judgment in furthering the interests of the Owner to furnish efficient construction admini stration, management services, and AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 6 supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner’s interests. The Owner agrees to furnish or approve, in a timely manner, information required by the Construction Manager and to make payments to the Construction Manager in accordance with the requirements of the Contract Documents. § 2 .3 General Conditions § 2.3.1 For the Preconstruction Phase, AIA Document A201™–2017, General Conditions of the Contract for Construction, shall apply as follows: Section 1.5, Ownership and Use of Documents; S ection 1.7, Digital Data Use and Transmission; Section 1.8, Building Information Model Use and Reliance; Section 2.2.4, Confidential Information; Section 3.12.10, Professional Services; Section 10.3, Hazardous Materials; Section 13.1, Governing Law. The term “Contractor” as used in A201–2017 shall mean the Construction Manager. § 2.3.2 For the Construction Phase, the general conditions of the contract shall be as set fort h in A201–2017, which document is incorporated herein by reference. The term “Contractor” as used in A201–2017 shall mean the Construction Manager. ARTICLE 3 CONSTRUCTION MANAGER’S RESPONSIBILITIES The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 3.1 and 3.2, and in the applicable provisions of A201-2017 referenced in Section 2.3.1. The Construction Manager’s Construction Phase responsibilities are set forth in Section 3.3. The Owner and Construction Manager may agree, in consultation with the Architect, for the Construction Phase to commence prior to completion of the Prec onstruction Phase, in which case, both phases will proceed concurrently. The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect to the Project. § 3 .1 Preconstruction Phase § 3.1.1 Extent of Responsibility The Construction Manager shall exercise reasonable care in performing its Preconstruction Services. The Owner and Architect shall be entitled to rely on, and shall not be responsible for, the accuracy, completeness, and timeliness of services and information furnished by the Construction Manager. The Construction Manager, however, does not warrant or guarantee estimates and schedules except as may be included as part of the Guarant eed Maximum Price. The Construction Manager is not required to ascertain that the Drawings and Specifications are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Construction Manager shall promptly report to the Architect and Owner any nonconformi ty discovered by or made known to the Construction Manager as a request for information in such form as the Archi tect may require. § 3 .1.2 The Construction Manager shall provide a preliminary evaluation of the Owner’s progr am, schedule and construction budget requirements, each in terms of the other. § 3 .1.3 Consultation § 3.1.3.1 The Construction Manager shall schedule and conduct meetings with the Architect and Owne r to discuss such matters as procedures, progress, coordination, and scheduling of the Work. § 3.1.3.2 The Construction Manager shall advise the Owner and Architect on proposed site use and i mprovements, selection of materials, building systems, and equipment. The Construction Manager shall also provide recommendations to the Owner and Architect, consistent with the Project requirements, on constructability; availability of materials and labor; time requirements for procurement, installation and construction; prefabrication; and factors related to construction cost including, but not limited to, costs of alternative designs or mater ials, preliminary budgets, life-cycle data, and possible cost reductions. The Construction Manager shall consult with the Architect regarding professional services to be provided by the Construction Manager during the Construction Phase . § 3.1.3.3 The Construction Manager shall assist the Owner and Architect in establishing building information modeling and digital data protocols for the Project, using AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, to establish the protocols for the development, use, transm ission, and exchange of digital data. § 3.1.4 Project Schedule When Project requirements in Section 4.1.1 have been sufficiently identified, the Construction Manager shall prepare and periodically update a Project schedule for the Architect’s review and the Owner’s acceptance. The Construction Manager shall obtain the Architect’s approval for the portion of the Project schedule relating to the performance of the AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 7 Architect’s services. The Project schedule shall coordinate and integrate the Construction Manager’s services, the Architect’s services, other Owner consultants’ services, and the Owner’s responsibilities; and identify items that affect the Project’s timely completion. The updated Project schedule shall include the following: submission of the Guaranteed Maximum Price proposal; components of the Work; times of commencement a nd completion required of each Subcontractor; ordering and delivery of products, including those that must be ordered in advance of c onstruction; and the occupancy requirements of the Owner. § 3 .1.5 Phased Construction The Construction Manager, in consultation with the Architect, shall provide recommendations with regard to accelerated or fast-track scheduling, procurement, and sequencing for phased construction. The Construction Manager shall take into consideration cost reductions, cost information, constructability, provisions for temporary facilities, and procurement and construction scheduling issues. § 3 .1.6 Cost Estimates § 3 .1.6.1 Based on the preliminary design and other design criteria prepared by the Architect, the Construction Manager shall prepare, for the Architect’s review and the Owner’s approval, preliminary estimates of the Cost of the Work or the cost of program requirements using area, volume, or similar conceptual estimating techniques. If the Architect or Construction Manager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those alternative materials and systems. § 3 .1.6.2 As the Architect progresses with the preparation of the Schematic Design, Desi gn Development and Construction Documents, the Construction Manager shall prepare and update, at approp riate intervals agreed to by the Owner, Construction Manager and Architect, an estimate of the Cost of the Work with increasing detail and refinement. The Construction Manager shall include in the estimate those costs to allow for the further development of the design, price escalation, and market conditions, until such time as the Owner and Construction Manager agree on a Guaranteed Maximum Price for the Work. The estimate shall be provided for the Architect’s review and the Owner’s approval. The Construction Manager shall inform the Owner and Architect in the event that the estimate of the Cost of the Work exceeds the latest approved Project budget, and make recommendations for corrective action. § 3 .1.6.3 If the Architect is providing cost estimating services as a Supplemental Servi ce, and a discrepancy exists between the Construction Manager’s cost estimates and the Architect’s cost est imates, the Construction Manager and the Architect shall work together to reconcile the cost estimates. § 3 .1.7 As the Architect progresses with the preparation of the Schematic Design, Design Development and Construction Documents, the Construction Manager shall consult with the Owner and Arc hitect and make recommendations regarding constructability and schedules, for the Architect’s review and the Owner’s approval. § 3 .1.8 The Construction Manager shall provide recommendations and information to the Owne r and Architect regarding equipment, materials, services, and temporary Project facilities. § 3 .1.9 The Construction Manager shall provide a staffing plan for Preconstruction Phase services for the Owner’s review and approval. § 3 .1.11 Subcontractors and Suppliers § 3.1.11.1 If the Owner has provided requirements for subcontractor procurement in section 1. 1.14, the Construction Manager shall provide a subcontracting plan, addressing the Owner’s requirements , for the Owner’s review and approval. § 3.1.11.2 The Construction Manager shall develop bidders’ interest in the Project. § 3.1.11.3 The processes described in Article 9 shall apply if bid packages will be issued duri ng the Preconstruction Phase. § 3.1.12 Procurement The Construction Manager shall prepare, for the Architect’s review and the Owner’s acceptance, a procurement schedule for items that must be ordered in advance of construction. The Construction Ma nager shall expedite and coordinate the ordering and delivery of materials that must be ordered in advance of co nstruction. If the Owner agrees AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 8 to procure any items prior to the establishment of the Guaranteed Maximum Price, the Owner shall procure the items on terms and conditions acceptable to the Construction Manager. Upon the establishment of the Guaranteed Maximum Price, the Owner shall assign all contracts for these items to the Construction Manager and the Construction Ma nager shall thereafter accept responsibility for them. § 3 .1.13 Compliance with Laws The Construction Manager shall comply with applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to its performance under this Contract, and with equal employment opportunity programs, and other programs as may be required by governmental and quasi -governmental authorities. § 3.1.14 Other Preconstruction Services Insert a description of any other Preconstruction Phase services to be provided by the Construction Manager, or reference an exhibit attached to this document (Describe any other Preconstruction Phase services, such as providing cash flow projections, development of a project information management system, early selection or procurement of subcontractors, etc.) « Not applicable » § 3 .2 Guaranteed Maximum Price Proposal § 3 .2.1 At a time to be mutually agreed upon by the Owner and the Construction Manager, the Construct ion Manager shall prepare a Guaranteed Maximum Price proposal for the Owner’s and Architect’s review, and the Owner’s acceptance. The Guaranteed Maximum Price in the proposal shall be the sum of the Con struction Manager’s estimate of the Cost of the Work, the Construction Manager’s contingency described in Section 3.2.4, and the Construction Manager’s Fee described in Section 6.1.2. § 3 .2.2 To the extent that the Contract Documents are anticipated to require further development, the Guaranteed Maximum Price includes the costs attributable to such further development consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include changes in scope, systems, kinds and quality of materials, finishes, or equipment, all of which, if required, shall be incorporated by Change Order . § 3 .2.3 The Construction Manager shall include with the Guaranteed Maximum Price prop osal a written statement of its basis, which shall include the following: .1 A list of the Drawings and Specifications, including all Addenda thereto, and the Conditions of the Contract; .2 A list of the clarifications and assumptions made by the Construction Manager in the preparation of the Guaranteed Maximum Price proposal, including assumptions under Section 3.2.2; .3 A statement of the proposed Guaranteed Maximum Price, including a statement of the estimated Cost of the Work organized by trade categories or systems, including allowances; the Construction Manager’s contingency set forth in Section 3.2.4; and the Construction Manager’s Fee; .4 The anticipated date of Substantial Completion upon which the proposed Guaranteed Maxi mum Price is based; and .5 A date by which the Owner must accept the Guaranteed Maximum Price. § 3 .2.4 In preparing the Construction Manager’s Guaranteed Maximum Price proposal, the Construction Manager shall include a contingency for the Construction Manager’s exclusive use to cover those costs that are included in the Guaranteed Maximum Price but not otherwise allocated to another line item or included in a Change Order. § 3 .2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price proposal. In the event that the Owner or Architect discover any inconsistencies or inaccuracies in the information presented, they shall promptly notify the Construction Manager, who shall make appropr iate adjustments to the Guaranteed Maximum Price proposal, its basis, or both. § 3 .2.6 If the Owner notifies the Construction Manager that the Owner has accepted the Gu aranteed Maximum Price proposal in writing before the date specified in the Guaranteed Maximum Price pro posal, the Guaranteed Maximum Price proposal shall be deemed effective without further acceptance from the Construction Manager. Following acceptance of a Guaranteed Maximum Price, the Owner and Construction Manager shall execute the Guaranteed Maximum Price Amendment amending this Agreement, a copy of which the Owner shall provide to the Architect. The AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 9 Guaranteed Maximum Price Amendment shall set forth the agreed upon Guaranteed Maximum Price with the information and assumptions upon which it is based. § 3 .2.7 The Construction Manager shall not incur any cost to be reimbursed as part of the Cost of the Work prior to the execution of the Guaranteed Maximum Price Amendment, unless the Owner provides prior written authorization for such costs. § 3 .2.8 The Owner shall authorize preparation of revisions to the Contract Documents that incorporate the agreed-upon assumptions and clarifications contained in the Guaranteed Maximum Price Amendment. The Owner shall promptly furnish such revised Contract Documents to the Construction Manager. The Construction Manager shall notify the Owner and Architect of any inconsistencies between the agreed-upon assumptions and clarifications contained in the Guaranteed Maximum Price Amendment and the revised Contract Documents. § 3 .2.9 The Construction Manager shall include in the Guaranteed Maximum Price all sales, consumer, use and similar taxes for the Work provided by the Construction Manager that are legally enacted, whet her or not yet effective, at the time the Guaranteed Maximum Price Amendment is executed. § 3 .3 Construction Phase § 3 .3.1 General § 3 .3.1.1 For purposes of Section 8.1.2 of A201–2017, the date of commencement of the Work shall mean the date of commencement of the Construction Phase. § 3 .3.1.2 The Construction Phase shall commence upon the Owner’s execution of the Guaranteed Maximum Price Amendment or, prior to acceptance of the Guaranteed Maximum Price proposal, by wr itten agreement of the parties. The written agreement shall set forth a description of the Work to be performed by t he Construction Manager, and any insurance and bond requirements for Work performed prior to execution of the Guarantee d Maximum Price Amendment. § 3 .3.2 Administration § 3 .3.2.1 The Construction Manager shall schedule and conduct meetings to discuss such matters as pr ocedures, progress, coordination, scheduling, and status of the Work. The Construction Manager shall prepare and promptly distribute minutes of the meetings to the Owner and Architect. § 3 .3.2.2 Upon the execution of the Guaranteed Maximum Price Amendment, the Construction Manager shall prepare and submit to the Owner and Architect a construction schedule for the Work and a submittal schedule in accordance with Section 3.10 of A201–2017. § 3.3.2.3 Monthly Report The Construction Manager shall record the progress of the Project. On a monthly basis, or otherwise as agreed to by the Owner, the Construction Manager shall submit written progress reports to the Owne r and Architect, showing percentages of completion and other information required by the Owner . § 3.3.2.4 Daily Logs The Construction Manager shall keep, and make available to the Owner and Architect, a daily log containing a record for each day of weather, portions of the Work in progress, number of workers on site, identification of equipment on site, problems that might affect progress of the work, accidents, injuries, and other information required by the Owner. § 3.3.2.5 Cost Control The Construction Manager shall develop a system of cost control for the Work, including re gular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and propose d changes. The Construction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect , and shall provide this information in its monthly reports to the Owner and Architect, in ac cordance with Section 3.3.2.3 above. ARTICLE 4 OWNER’S RESPONSIBILITIES § 4 .1 Information and Services Required of the Owner § 4 .1.1 The Owner shall provide information with reasonable promptness, regarding requireme nts for and limitations on the Project, including a written program which shall set forth the Owner’s ob jectives, constraints, and criteria, including AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 10 schedule, space requirements and relationships, flexibility and expandability, special equipment, systems, sustainability and site requirements. § 4 .1.2 Prior to the execution of the Guaranteed Maximum Price Amendment, the Construction Manager may request in writing that the Owner provide reasonable evidence that the Owner has made financ ial arrangements to fulfill the Owner’s obligations under the Contract. After execution of the Guaranteed Maximum Price Amendment, the Construction Manager may request such information as set forth in A201-2017 Section 2.2. § 4 .1.3 The Owner shall establish and periodically update the Owner’s budget for the Project, including (1) the budget for the Cost of the Work as defined in Article 7, (2) the Owner’s other costs, and (3) reasonable contingencies related to all of these costs. If the Owner significantly increases or decreases the Owner ’s budget for the Cost of the Work, the Owner shall notify the Construction Manager and Architect. The Owner and the Archit ect, in consultation with the Construction Manager, shall thereafter agree to a corresponding change in the Project’s scope and quality. § 4 .1.4 Structural and Environmental Tests, Surveys and Reports. During the Preconstruction Phase, the Owner shall furnish the following information or services with reasonable promptness. The Owner s hall also furnish any other information or services under the Owner’s control and relevant to the Construction Manager’s performance of the Work with reasonable promptness after receiving the Construction Manager’s written r equest for such information or services. The Construction Manager shall be entitled to rely on the accuracy of information and s ervices furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. § 4 .1.4.1 The Owner shall furnish tests, inspections, and reports, required by law and as otherwise agreed to by the parties, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials. § 4 .1.4.2 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining propert y and structures; designated wetlands; adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and other necessary data with respect to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the surve y shall be referenced to a Project benchmark. § 4 .1.4.3 The Owner, when such services are requested, shall furnish services of geotechnical en gineers, which may include test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, seismic evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating subsoil conditions, with written reports and appropriate recommendations . § 4 .1.5 During the Construction Phase, the Owner shall furnish information or services required of the Owner by the Contract Documents with reasonable promptness. The Owner shall also furnish any oth er information or services under the Owner’s control and relevant to the Construction Manager’s performance of the Work with reasonable promptness after receiving the Construction Manager’s written request for such information or services. § 4 .2 Owner’s Designated Representative The Owner shall identify a representative authorized to act on behalf of the Owner wi th respect to the Project. The Owner’s representative shall render decisions promptly and furnish information expeditiously, so as to avoid unreasonable delay in the services or Work of the Construction Manager. Except as otherwise provided in Section 4.2.1 of A201–2017, the Architect does not have such authority. The term “Owner” means the Owner or the Owner’s authorized representative. § 4 .2.1 Legal Requirements. The Owner shall furnish all legal, insurance and accounting services, including audit ing services, that may be reasonably necessary at any time for the Project to meet the Owner ’s needs and interests. § 4 .3 Architect The Owner shall retain an Architect to provide services, duties and responsibilities as described in Contract For Professional Services dated October 11, 2022, in response to RFQ #23 -004, and incorporating all documents referenced AIA ® Document A201 TM – 2017 General Conditions of the Contract for Construction AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 1 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. For guidance in modifying this document to include supplementary conditions, see AIA Document A503™, Guide for Supplementary Conditions. ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document. for the following PROJECT: (Name and location or address) « Anderson County Detention Center » « » THE OWNER: (Name, legal status and address) « »« » « Anderson County, South Carolina, as agent for the Anderson County Detention Facilities Corporation, a South Carolina Non-Profit Corporation; 101 South Main Street, Anderson, SC 29624. Provided, however, that this Agreement, as hereinafter defined, is formed in furtherance of (1) the Base Lease Agreement dated October 12, 2022, between Anderson County, South Carolina, as lessor, and the Anderson County Detention Facilities Corporation, as lessee, filed on the same date with the Register of D eeds of Anderson County, South Carolina, and (2) the Installment Purchase and Use Agreement between Anderson County Detention Facilities Corporation, as seller, and Anderson County, South Carolina, as buyer, filed on October 12, 2022 and November 4, 2022 with the Register of Deeds of Anderson County, South Carolina, whereby the Owner designated in the Agreement is the agent for the Anderson County Detention Facilitie s Corporation, which has assigned certain rights in the same to the Trust Agreement dated October 12, 2022, between the Anderson County Detention Facilities Corporation and Regions Bank, as Trustee. Consequently, where “Owner” is used in this Agreement, it refers to Anderson County, South Carolina acting as agent for the Anderson County Detention Facilities Corporation. » THE CONSTRUCTION MANAGER: (Name, legal status and address) James R. Vannoy & Sons Construction Company, Inc. 631 McGee Road Anderson, SC 29625 THE ARCHITECT: (Name, legal status and address) « »« Moseley Architects P.C. 6210 Ardrey Kell Road The Hub at Waverly Suite 425 Charlotte, North Carolina 28277 Telephone Number: 704-540-3755» « » TABLE OF ARTICLES 1 GENERAL PROVISIONS AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 2 2 OWNER 3 CONTRACTOR 4 ARCHITECT 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT 15 CLAIMS AND DISPUTES AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 3 INDEX (Topics and numbers in bold are Section headings.) Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention 10 Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.3.2, 14.1, 15.1.2, 15.2 Addenda 1.1.1 Additional Costs, Claims for 3.7.4, 3.7.5, 10.3.2, 15.1.5 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.6 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13 Allowances 3.8 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.5.4, 9.6.3, 9.7, 9.10 Approvals 2.1.1, 2.3.1, 2.5, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10.1, 4.2.7, 9.3.2, 13.4.1 Arbitration 8.3.1, 15.3.2, 15.4 ARCHITECT 4 Architect, Definition of 4.1.1 Architect, Extent of Authority 2.5, 3.12.7, 4.1.2, 4.2, 5.2, 6.3, 7.1.2, 7.3.4, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.4.1, 13.4.2, 14.2.2, 14.2.4, 15.1.4, 15.2.1 Architect, Limitations of Authority and Responsibility 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4, 9.4.2, 9.5.4, 9.6.4, 15.1.4, 15.2 Architect’s Additional Services and Expenses 2.5, 12.2.1, 13.4.2, 13.4.3, 14.2.4 Architect’s Administration of the Contract 3.1.3, 3.7.4, 15.2, 9.4.1, 9.5 Architect’s Approvals 2.5, 3.1.3, 3.5, 3.10.2, 4.2.7 Architect’s Authority to Reject Work 3.5, 4.2.6, 12.1.2, 12.2.1 Architect’s Copyright 1.1.7, 1.5 Architect’s Decisions 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.4.2, 15.2 Architect’s Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.4 Architect’s Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.4.2 Architect’s Interpretations 4.2.11, 4.2.12 Architect’s Project Representative 4.2.10 Architect’s Relationship with Contractor 1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.3.2, 13.4, 15.2 Architect’s Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3 Architect’s Representations 9.4.2, 9.5.1, 9.10.1 Architect’s Site Visits 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4 Asbestos 10.3.1 Attorneys’ Fees 3.18.1, 9.6.8, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1 Binding Dispute Resolution 8.3.1, 9.7, 11.5, 13.1, 15.1.2, 15.1.3, 15.2.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.3.3, 15.4.1 Bonds, Lien 7.3.4.4, 9.6.8, 9.10.2, 9.10.3 Bonds, Performance, and Payment 7.3.4.4, 9.6.7, 9.10.3, 11.1.2, 11.1.3, 11.5 Building Information Models Use and Reliance 1.8 Building Permit 3.7.1 Capitalization 1.3 Certificate of Substantial Completion 9.8.3, 9.8.4, 9.8.5 Certificates for Payment 4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.4 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 4 Certificates of Inspection, Testing or Approval 13.4.4 Certificates of Insurance 9.10.2 Change Orders 1.1.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.7, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.2, 11.5, 12.1.2 Change Orders, Definition of 7.2.1 CHANGES IN THE WORK 2.2.2, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 8.3.1, 9.3.1.1, 11.5 Claims, Definition of 15.1.1 Claims, Notice of 1.6.2, 15.1.3 CLAIMS AND DISPUTES 3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims 15.4.1 Claims for Additional Cost 3.2.4, 3.3.1, 3.7.4, 7.3.9, 9.5.2, 10.2.5, 10.3.2, 15.1.5 Claims for Additional Time 3.2.4, 3.3.1, 3.7.4, 6.1.1, 8.3.2, 9.5.2, 10.3.2, 15.1.6 Concealed or Unknown Conditions, Claims for 3.7.4 Claims for Damages 3.2.4, 3.18, 8.3.3, 9.5.1, 9.6.7, 10.2.5, 10.3.3, 11.3, 11.3.2, 14.2.4, 15.1.7 Claims Subject to Arbitration 15.4.1 Cleaning Up 3.15, 6.3 Commencement of the Work, Conditions Relating to 2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.2, 15.1.5 Commencement of the Work, Definition of 8.1.2 Communications 3.9.1, 4.2.4 Completion, Conditions Relating to 3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 14.1.2, 15.1.2 COMPLETION, PAYMENTS AND 9 Completion, Substantial 3.10.1, 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 15.1.2 Compliance with Laws 2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3 Concealed or Unknown Conditions 3.7.4, 4.2.8, 8.3.1, 10.3 Conditions of the Contract 1.1.1, 6.1.1, 6.1.4 Consent, Written 3.4.2, 3.14.2, 4.1.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 13.2, 15.4.4.2 Consolidation or Joinder 15.4.4 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 1.1.4, 6 Construction Change Directive, Definition of 7.3.1 Construction Change Directives 1.1.1, 3.4.2, 3.11, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1 Construction Schedules, Contractor’s 3.10, 3.11, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2 Contingent Assignment of Subcontracts 5.4, 14.2.2.2 Continuing Contract Performance 15.1.4 Contract, Definition of 1.1.2 CONTRACT, TERMINATION OR SUSPENSION OF THE 5.4.1.1, 5.4.2, 11.5, 14 Contract Administration 3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to 3.7.1, 3.10, 5.2, 6.1 Contract Documents, Copies Furnished and Use of 1.5.2, 2.3.6, 5.3 Contract Documents, Definition of 1.1.1 Contract Sum 2.2.2, 2.2.4, 3.7.4, 3.7.5, 3.8, 3.10.2, 5.2.3, 7.3, 7.4, 9.1, 9.2, 9.4.2, 9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.5, 12.1.2, 12.3, 14.2.4, 14.3.2, 15.1.4.2, 15.1.5, 15.2.5 Contract Sum, Definition of 9.1 Contract Time 1.1.4, 2.2.1, 2.2.2, 3.7.4, 3.7.5, 3.10.2, 5.2.3, 6.1.5, 7.2.1.3, 7.3.1, 7.3.5, 7.3.6, 7, 7, 7.3.10, 7.4, 8.1.1, 8.2.1, 8.2.3, 8.3.1, 9.5.1, 9.7, 10.3.2, 12.1.1, 12.1.2, 14.3.2, 15.1.4.2, 15.1.6.1, 15.2.5 Contract Time, Definition of 8.1.1 CONTRACTOR 3 Contractor, Definition of 3.1, 6.1.2 Contractor’s Construction and Submittal Schedules 3.10, 3.12.1, 3.12.2, 4.2.3, 6.1.3, 15.1.6.2 Contractor’s Employees 2.2.4, 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 11.3, 14.1, 14.2.1.1 Contractor’s Liability Insurance 11.1 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 5 Contractor’s Relationship with Separate Contractors and Owner’s Forces 3.12.5, 3.14.2, 4.2.4, 6, 11.3, 12.2.4 Contractor’s Relationship with Subcontractors 1.2.2, 2.2.4, 3.3.2, 3.18.1, 3.18.2, 4.2.4, 5, 9.6.2, 9.6.7, 9.10.2, 11.2, 11.3, 11.4 Contractor’s Relationship with the Architect 1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.4, 15.1.3, 15.2.1 Contractor’s Representations 3.2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2 Contractor’s Responsibility for Those Performing the Work 3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8 Contractor’s Review of Contract Documents 3.2 Contractor’s Right to Stop the Work 2.2.2, 9.7 Contractor’s Right to Terminate the Contract 14.1 Contractor’s Submittals 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3 Contractor’s Superintendent 3.9, 10.2.6 Contractor’s Supervision and Construction Procedures 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.4, 7.3.6, 8.2, 10, 12, 14, 15.1.4 Coordination and Correlation 1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 Copies Furnished of Drawings and Specifications 1.5, 2.3.6, 3.11 Copyrights 1.5, 3.17 Correction of Work 2.5, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2, 12.3, 15.1.3.1, 15.1.3.2, 15.2.1 Correlation and Intent of the Contract Documents 1.2 Cost, Definition of 7.3.4 Costs 2.5, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3, 7.3.3.3, 7.3.4, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.2, 12.1.2, 12.2.1, 12.2.4, 13.4, 14 Cutting and Patching 3.14, 6.2.5 Damage to Construction of Owner or Separate Contractors 3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 12.2.4 Damage to the Work 3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4, 12.2.4 Damages, Claims for 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.3.2, 11.3, 14.2.4, 15.1.7 Damages for Delay 6.2.3, 8.3.3, 9.5.1.6, 9.7, 10.3.2, 14.3.2 Date of Commencement of the Work, Definition of 8.1.2 Date of Substantial Completion, Definition of 8.1.3 Day, Definition of 8.1.4 Decisions of the Architect 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1, 13.4.2, 14.2.2, 14.2.4, 15.1, 15.2 Decisions to Withhold Certification 9.4.1, 9.5, 9.7, 14.1.1.3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of 2.5, 3.5, 4.2.6, 6.2.3, 9.5.1, 9.5.3, 9.6.6, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Definitions 1.1, 2.1.1, 3.1.1, 3.5, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1, 8.1, 9.1, 9.8.1, 15.1.1 Delays and Extensions of Time 3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, 10.3.2, 10.4, 14.3.2, 15.1.6, 15.2.5 Digital Data Use and Transmission 1.7 Disputes 6.3, 7.3.9, 15.1, 15.2 Documents and Samples at the Site 3.11 Drawings, Definition of 1.1.5 Drawings and Specifications, Use and Ownership of 3.11 Effective Date of Insurance 8.2.2 Emergencies 10.4, 14.1.1.2, 15.1.5 Employees, Contractor’s 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3.3, 11.3, 14.1, 14.2.1.1 Equipment, Labor, or Materials 1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Execution and Progress of the Work 1.1.3, 1.2.1, 1.2.2, 2.3.4, 2.3.6, 3.1, 3.3.1, 3.4.1, 3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.6, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.1, 12.2, 14.2, 14.3.1, 15.1.4 Extensions of Time 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4, 9.5.1, 9.7, 10.3.2, 10.4, 14.3, 15.1.6, 15.2.5 Failure of Payment 9.5.1.3, 9.7, 9.10.2, 13.5, 14.1.1.3, 14.2.1.2 Faulty Work (See Defective or Nonconforming Work) Final Completion and Final Payment 4.2.1, 4.2.9, 9.8.2, 9.10, 12.3, 14.2.4, 14.4.3 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 6 Financial Arrangements, Owner’s 2.2.1, 13.2.2, 14.1.1.4 GENERAL PROVISIONS 1 Governing Law 13.1 Guarantees (See Warranty) Hazardous Materials and Substances 10.2.4, 10.3 Identification of Subcontractors and Suppliers 5.2.1 Indemnification 3.17, 3.18, 9.6.8, 9.10.2, 10.3.3, 11.3 Information and Services Required of the Owner 2.1.2, 2.2, 2.3, 3.2.2, 3.12.10.1, 6.1.3, 6.1.4, 6.2.5, 9.6.1, 9.9.2, 9.10.3, 10.3.3, 11.2, 13.4.1, 13.4.2, 14.1.1.4, 14.1.4, 15.1.4 Initial Decision 15.2 Initial Decision Maker, Definition of 1.1.8 Initial Decision Maker, Decisions 14.2.4, 15.1.4.2, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Initial Decision Maker, Extent of Authority 14.2.4, 15.1.4.2, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Injury or Damage to Person or Property 10.2.8, 10.4 Inspections 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.4 Instructions to Bidders 1.1.1 Instructions to the Contractor 3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.4.2 Instruments of Service, Definition of 1.1.7 Insurance 6.1.1, 7.3.4, 8.2.2, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 10.2.5, 11 Insurance, Notice of Cancellation or Expiration 11.1.4, 11.2.3 Insurance, Contractor’s Liability 11.1 Insurance, Effective Date of 8.2.2, 14.4.2 Insurance, Owner’s Liability 11.2 Insurance, Property 10.2.5, 11.2, 11.4, 11.5 Insurance, Stored Materials 9.3.2 INSURANCE AND BONDS 11 Insurance Companies, Consent to Partial Occupancy 9.9.1 Insured loss, Adjustment and Settlement of 11.5 Intent of the Contract Documents 1.2.1, 4.2.7, 4.2.12, 4.2.13 Interest 13.5 Interpretation 1.1.8, 1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1 Interpretations, Written 4.2.11, 4.2.12 Judgment on Final Award 15.4.2 Labor and Materials, Equipment 1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Labor Disputes 8.3.1 Laws and Regulations 1.5, 2.3.2, 3.2.3, 3.2.4, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 9.9.1, 10.2.2, 13.1, 13.3.1, 13.4.2, 13.5, 14, 15.2.8, 15.4 Liens 2.1.2, 9.3.1, 9.3.3, 9.6.8, 9.10.2, 9.10.4, 15.2.8 Limitations, Statutes of 12.2.5, 15.1.2, 15.4.1.1 Limitations of Liability 3.2.2, 3.5, 3.12.10, 3.12.10.1, 3.17, 3.18.1, 4.2.6, 4.2.7, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 9.6.8, 10.2.5, 10.3.3, 11.3, 12.2.5, 13.3.1 Limitations of Time 2.1.2, 2.2, 2.5, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.7, 5.2, 5.3, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 12.2, 13.4, 14, 15, 15.1.2, 15.1.3, 15.1.5 Materials, Hazardous 10.2.4, 10.3 Materials, Labor, Equipment and 1.1.3, 1.1.6, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1, 14.2.1.2 Means, Methods, Techniques, Sequences and Procedures of Construction 3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 Mechanic’s Lien 2.1.2, 9.3.1, 9.3.3, 9.6.8, 9.10.2, 9.10.4, 15.2.8 Mediation 8.3.1, 15.1.3.2, 15.2.1, 15.2.5, 15.2.6, 15.3, 15.4.1, 15.4.1.1 Minor Changes in the Work 1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1, 7.4 MISCELLANEOUS PROVISIONS 13 Modifications, Definition of 1.1.1 Modifications to the Contract 1.1.1, 1.1.2, 2.5, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7, 10.3.2 Mutual Responsibility 6.2 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 7 Nonconforming Work, Acceptance of 9.6.6, 9.9.3, 12.3 Nonconforming Work, Rejection and Correction of 2.4, 2.5, 3.5, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2 Notice 1.6, 1.6.1, 1.6.2, 2.1.2, 2.2.2., 2.2.3, 2.2.4, 2.5, 3.2.4, 3.3.1, 3.7.4, 3.7.5, 3.9.2, 3.12.9, 3.12.10, 5.2.1, 7.4, 8.2.2 9.6.8, 9.7, 9.10.1, 10.2.8, 10.3.2, 11.5, 12.2.2.1, 13.4.1, 13.4.2, 14.1, 14.2.2, 14.4.2, 15.1.3, 15.1.5, 15.1.6, 15.4.1 Notice of Cancellation or Expiration of Insurance 11.1.4, 11.2.3 Notice of Claims 1.6.2, 2.1.2, 3.7.4, 9.6.8, 10.2.8, 15.1.3, 15.1.5, 15.1.6, 15.2.8, 15.3.2, 15.4.1 Notice of Testing and Inspections 13.4.1, 13.4.2 Observations, Contractor’s 3.2, 3.7.4 Occupancy 2.3.1, 9.6.6, 9.8 Orders, Written 1.1.1, 2.4, 3.9.2, 7, 8.2.2, 11.5, 12.1, 12.2.2.1, 13.4.2, 14.3.1 OWNER 2 Owner, Definition of 2.1.1 Owner, Evidence of Financial Arrangements 2.2, 13.2.2, 14.1.1.4 Owner, Information and Services Required of the 2.1.2, 2.2, 2.3, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2, 13.4.1, 13.4.2, 14.1.1.4, 14.1.4, 15.1.4 Owner’s Authority 1.5, 2.1.1, 2.3.32.4, 2.5, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, 9.10.2, 10.3.2, 11.4, 11.5, 12.2.2, 12.3, 13.2.2, 14.3, 14.4, 15.2.7 Owner’s Insurance 11.2 Owner’s Relationship with Subcontractors 1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 Owner’s Right to Carry Out the Work 2.5, 14.2.2 Owner’s Right to Clean Up 6.3 Owner’s Right to Perform Construction and to Award Separate Contracts 6.1 Owner’s Right to Stop the Work 2.4 Owner’s Right to Suspend the Work 14.3 Owner’s Right to Terminate the Contract 14.2, 14.4 Ownership and Use of Drawings, Specifications and Other Instruments of Service 1.1.1, 1.1.6, 1.1.7, 1.5, 2.3.6, 3.2.2, 3.11, 3.17, 4.2.12, 5.3 Partial Occupancy or Use 9.6.6, 9.9 Patching, Cutting and 3.14, 6.2.5 Patents 3.17 Payment, Applications for 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5, 9.6.3, 9.7, 9.8.5, 9.10.1, 14.2.3, 14.2.4, 14.4.3 Payment, Certificates for 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4 Payment, Failure of 9.5.1.3, 9.7, 9.10.2, 13.5, 14.1.1.3, 14.2.1.2 Payment, Final 4.2.1, 4.2.9, 9.10, 12.3, 14.2.4, 14.4.3 Payment Bond, Performance Bond and 7.3.4.4, 9.6.7, 9.10.3, 11.1.2 Payments, Progress 9.3, 9.6, 9.8.5, 9.10.3, 14.2.3, 15.1.4 PAYMENTS AND COMPLETION 9 Payments to Subcontractors 5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 14.2.1.2 PCB 10.3.1 Performance Bond and Payment Bond 7.3.4.4, 9.6.7, 9.10.3, 11.1.2 Permits, Fees, Notices and Compliance with Laws 2.3.1, 3.7, 3.13, 7.3.4.4, 10.2.2 PERSONS AND PROPERTY, PROTECTION OF 10 Polychlorinated Biphenyl 10.3.1 Product Data, Definition of 3.12.2 Product Data and Samples, Shop Drawings 3.11, 3.12, 4.2.7 Progress and Completion 4.2.2, 8.2, 9.8, 9.9.1, 14.1.4, 15.1.4 Progress Payments 9.3, 9.6, 9.8.5, 9.10.3, 14.2.3, 15.1.4 Project, Definition of 1.1.4 Project Representatives 4.2.10 Property Insurance 10.2.5, 11.2 Proposal Requirements 1.1.1 PROTECTION OF PERSONS AND PROPERTY 10 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 8 Regulations and Laws 1.5, 2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 9.9.1, 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14, 15.2.8, 15.4 Rejection of Work 4.2.6, 12.2.1 Releases and Waivers of Liens 9.3.1, 9.10.2 Representations 3.2.1, 3.5, 3.12.6, 8.2.1, 9.3.3, 9.4.2, 9.5.1, 9.10.1 Representatives 2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.10, 13.2.1 Responsibility for Those Performing the Work 3.3.2, 3.18, 4.2.2, 4.2.3, 5.3, 6.1.3, 6.2, 6.3, 9.5.1, 10 Retainage 9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3 Review of Contract Documents and Field Conditions by Contractor 3.2, 3.12.7, 6.1.3 Review of Contractor’s Submittals by Owner and Architect 3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2 Review of Shop Drawings, Product Data and Samples by Contractor 3.12 Rights and Remedies 1.1.2, 2.4, 2.5, 3.5, 3.7.4, 3.15.2, 4.2.6, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.1, 12.2.2, 12.2.4, 13.3, 14, 15.4 Royalties, Patents and Copyrights 3.17 Rules and Notices for Arbitration 15.4.1 Safety of Persons and Property 10.2, 10.4 Safety Precautions and Programs 3.3.1, 4.2.2, 4.2.7, 5.3, 10.1, 10.2, 10.4 Samples, Definition of 3.12.3 Samples, Shop Drawings, Product Data and 3.11, 3.12, 4.2.7 Samples at the Site, Documents and 3.11 Schedule of Values 9.2, 9.3.1 Schedules, Construction 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2 Separate Contracts and Contractors 1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2 Separate Contractors, Definition of 6.1.1 Shop Drawings, Definition of 3.12.1 Shop Drawings, Product Data and Samples 3.11, 3.12, 4.2.7 Site, Use of 3.13, 6.1.1, 6.2.1 Site Inspections 3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.9.2, 9.4.2, 9.10.1, 13.4 Site Visits, Architect’s 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4 Special Inspections and Testing 4.2.6, 12.2.1, 13.4 Specifications, Definition of 1.1.6 Specifications 1.1.1, 1.1.6, 1.2.2, 1.5, 3.12.10, 3.17, 4.2.14 Statute of Limitations 15.1.2, 15.4.1.1 Stopping the Work 2.2.2, 2.4, 9.7, 10.3, 14.1 Stored Materials 6.2.1, 9.3.2, 10.2.1.2, 10.2.4 Subcontractor, Definition of 5.1.1 SUBCONTRACTORS 5 Subcontractors, Work by 1.2.2, 3.3.2, 3.12.1, 3.18, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 9.6.7 Subcontractual Relations 5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 14.1, 14.2.1 Submittals 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.4, 9.2, 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3 Submittal Schedule 3.10.2, 3.12.5, 4.2.7 Subrogation, Waivers of 6.1.1, 11.3 Substances, Hazardous 10.3 Substantial Completion 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 15.1.2 Substantial Completion, Definition of 9.8.1 Substitution of Subcontractors 5.2.3, 5.2.4 Substitution of Architect 2.3.3 Substitutions of Materials 3.4.2, 3.5, 7.3.8 Sub-subcontractor, Definition of 5.1.2 Subsurface Conditions 3.7.4 Successors and Assigns 13.2 Superintendent 3.9, 10.2.6 Supervision and Construction Procedures 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.4, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.4 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 9 Suppliers 1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.5.4, 9.6, 9.10.5, 14.2.1 Surety 5.4.1.2, 9.6.8, 9.8.5, 9.10.2, 9.10.3, 11.1.2, 14.2.2, 15.2.7 Surety, Consent of 9.8.5, 9.10.2, 9.10.3 Surveys 1.1.7, 2.3.4 Suspension by the Owner for Convenience 14.3 Suspension of the Work 3.7.5, 5.4.2, 14.3 Suspension or Termination of the Contract 5.4.1.1, 14 Taxes 3.6, 3.8.2.1, 7.3.4.4 Termination by the Contractor 14.1, 15.1.7 Termination by the Owner for Cause 5.4.1.1, 14.2, 15.1.7 Termination by the Owner for Convenience 14.4 Termination of the Architect 2.3.3 Termination of the Contractor Employment 14.2.2 TERMINATION OR SUSPENSION OF THE CONTRACT 14 Tests and Inspections 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 10.3.2, 12.2.1, 13.4 TIME 8 Time, Delays and Extensions of 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, 10.3.2, 10.4, 14.3.2, 15.1.6, 15.2.5 Time Limits 2.1.2, 2.2, 2.5, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 12.2, 13.4, 14, 15.1.2, 15.1.3, 15.4 Time Limits on Claims 3.7.4, 10.2.8, 15.1.2, 15.1.3 Title to Work 9.3.2, 9.3.3 UNCOVERING AND CORRECTION OF WORK 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 9.1.2 Use of Documents 1.1.1, 1.5, 2.3.6, 3.12.6, 5.3 Use of Site 3.13, 6.1.1, 6.2.1 Values, Schedule of 9.2, 9.3.1 Waiver of Claims by the Architect 13.3.2 Waiver of Claims by the Contractor 9.10.5, 13.3.2, 15.1.7 Waiver of Claims by the Owner 9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.3.2, 14.2.4, 15.1.7 Waiver of Consequential Damages 14.2.4, 15.1.7 Waiver of Liens 9.3, 9.10.2, 9.10.4 Waivers of Subrogation 6.1.1, 11.3 Warranty 3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, 9.10.2, 9.10.4, 12.2.2, 15.1.2 Weather Delays 8.3, 15.1.6.2 Work, Definition of 1.1.3 Written Consent 1.5.2, 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.10.3, 13.2, 13.3.2, 15.4.4.2 Written Interpretations 4.2.11, 4.2.12 Written Orders 1.1.1, 2.4, 3.9, 7, 8.2.2, 12.1, 12.2, 13.4.2, 14.3.1 AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 10 ARTICLE 1 GENERAL PROVISIONS § 1.1 Basic Definitions § 1.1.1 The Contract Documents The Contract Documents are enumerated in the Agreement between the Owner and Contr actor (hereinafter the Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contra ct, other documents listed in the Agreement, and Modifications issued after execution of the Contract. A Modific ation is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive, or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract Documents do not include the advertisement or invitation to bid, Instructi ons to Bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids or proposal s, the Contractor’s bid or proposal, or portions of Addenda relating to bidding or proposal requirements. § 1.1.2 The Contract The Contract Documents form the Contract for Construction. The Contract represent s the entire and integrated agreement between the parties hereto and supersedes prior negotiations, repres entations, or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Contra ctor and the Architect or the Architect’s consultants, (2) between the Owner and a Subcontractor or a Sub-subcontractor, (3) between the Owner and the Architect or the Architect’s consultants, or (4) between any persons or entit ies other than the Owner and the Contractor. The Architect shall, however, be entitled to performance and enforc ement of obligations under the Contract intended to facilitate performance of the Architect’s duties. § 1.1.3 The Work The term “Work” means the construction and services required by the Contract Docume nts, whether completed or partially completed, and includes all other labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Projec t. § 1.1.4 The Project The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner and by Separate Contractors . § 1.1.5 The Drawings The Drawings are the graphic and pictorial portions of the Contract Documents showi ng the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules, and diagrams. § 1.1.6 The Specifications The Specifications are that portion of the Project Manual and Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services. § 1.1.7 Instruments of Service Instruments of Service are representations, in any medium of expression now know n or later developed, of the tangible and intangible creative work performed by the Architect and the Architec t’s consultants under their respective professional services agreements. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, and other similar materials. § 1.1.8 Initial Decision Maker The Initial Decision Maker is the person identified in the Agreement to render ini tial decisions on Claims in accordance with Section 15.2. The Initial Decision Maker shall not show partiality to the Owner or Contract or and shall not be liable for results of interpretations or decisions rendered in good fai th. § 1.2 Correlation and Intent of the Contract Documents § 1.2.1 The intent of the Contract Documents is to include all items necessary for the prope r execution and completion of the Work by the Contractor. The Contract Documents are complementar y, and what is required by one shall be as binding as if required by all. Performance by the Contractor shall be c onsistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indica ted results. Notwithstanding such performance, in case of a conflict, disagreem ent, or ambiguity, AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 11 provide the better quality of Work. § 1.2.1.1 The invalidity of any provision of the Contract Documents shall not invalidate the Contrac t or its remaining provisions. If it is determined that any provision of the Contract Documents violate s any law, or is otherwise invalid or unenforceable, then that provision shall be revised to the extent necessary to make that provision legal and enforceable. In such case the Contract Documents shall be construed, to the fullest extent permitted by law , to give effect to the parties’ intentions and purposes in executing the Contract. 1.2.1.2 Plumbing, Mechanical, Fire Protection and Electrical drawings are diagramma tic, showing general locations and arrangements of piping, wiring, equipment, security and technology, and specia lties; not necessarily showing all required offsets, conditions and appurtenances required for maximum pract ical accessibility for operation, maintenance and clearances. Coordinate this Work in order to ac hieve the required and intended Work and notify the Architect immediately of conditions which do not com ply or will not allow for this condition. § 1.2.2 Organization of the Specifications into divisions, sections and articles, and ar rangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. § 1.2.3 Unless otherwise stated in the Contract Documents, words that have well -known technical or construction industry meanings are used in the Contract Documents in accordance with such recognize d meanings. § 1.3 Capitalization Terms capitalized in these General Conditions include those that are (1) specifically defined, (2) the titles of numbered articles, or (3) the titles of other documents published by the American I nstitute of Architects. § 1.4 Interpretation In the interest of brevity the Contract Documents frequently omit modifying words suc h as “all” and “any” and articles such as “the” and “an,” but the fact that a modifier or an article is absent from on e statement and appears in another is not intended to affect the interpretation of either statement. § 1.5 Ownership and Use of Drawings, Specifications, and Other Instruments of Service § 1.5.1 Unless otherwise required by the Owner and Architect Agreement, the Architect and the Architect’s consultants shall be deemed the authors and owners of their respective Instruments of Service, including the Drawings and Specifications, and retain all common law, statutory, and other re served rights in their Instruments of Service, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to mee t official regulatory requirements or for other purposes in connection with the Project is not to be construed as publication in derogation of the Architect’s or Architect’s consultants’ reserved rights. § 1.5.2 The Contractor, Subcontractors, Sub-subcontractors, and suppliers are authorized to use and reproduce the Instruments of Service provided to them, subject to any protocols established pursuant to Sections 1.8 and 1.9 solely and exclusively for execution of the Work. All copies made under this authorization s hall bear the copyright notice, if any, shown on the Instruments of Service. The Contractor, Subcontractors, Sub -subcontractors, and suppliers may not use the Instruments of Service on other projects or for additions to the Project outsi de the scope of the Work without the specific written consent of the Owner, Architect, and the Architect’ s consultants. § 1.6 Notice § 1.6.1 Except as otherwise provided in Section 1.6.2, where the Contract Documents require one pa rty to notify or give notice to the other party, such notice shall be provided in writing to the designated re presentative of the party to whom the notice is addressed and shall be deemed to have been duly served if delivere d in person, by mail, by courier, or by electronic transmission if a method for electronic transmission is set forth in the Agreement. § 1.6.2 Notice of Claims as provided in Section 15.1.3 shall be provided in writing and shall be deeme d to have been duly served only if delivered to the designated representative of the party to whom the notice is addressed by certified or registered mail, or by courier providing proof of delivery, including signature of receiver of such notices . AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 12 § 1.8 Building Information Models Use and Reliance Any use of, or reliance on, all or a portion of a building information model without a greement to protocols governing the use of, and reliance on, the information contained in the model and without having thos e protocols set forth in AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, and the requisite AIA Document G202™–2013, Project Building Information Modeling Protocol Form, shall be at the using or relying party’s sole risk and without liability to the other party and its contractors or consultants, the authors of, or contributors to, the building information model, and each of their agents and employe es. § 1.9 If such Exhibits are not included in the Agreement, the Architect may, with the c oncurrence of the Owner, furnish to the Contractor versions of the Instruments of Service in electronic form. The Contract Documents executed or identified in accordance with Section 1.1.1 shall prevail in ca se of an inconsistency with subsequent versions made through manipulatable electronic operations involving com puters. The Contractor shall not transfer or reuse Instruments of Service in electronic or machine readable form withou t the prior written consent of the Architect. ARTICLE 2 OWNER § 2.1 General § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred t o throughout the Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have express authority to bind the Owner with respect to all matters requiring the Ow ner’s approval or authorization. The Architect does not have such authority. The term “Owner” means the Owner or the Owne r’s authorized representative, regardless of whether the representative designated by Owner is directly employed by Owner. For the avoidance of doubt, the fact that Owner’s designated representative is an employee of Anderson County does not limit the representative’s authority to act on behalf of and bind the Owner. § 2.1.2 The Owner shall furnish to the Contractor, within fifteen days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of, or enforce mechanic’s lien rights. Such information shall include a correct statement of the record legal title to the property on which the Project is locate d, usually referred to as the site, and the Owner’s interest therein. § 2.2 Evidence of the Owner’s Financial Arrangements § 2.2.1 Prior to commencement of the Work and upon written request by the Contractor, the Owner s hall furnish to the Contractor reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Contract. The Contractor shall have no obligation to commence the Work until the Owner provides such evidence. If commencement of the Work is delayed under this Section 2. 2.1, the Contract Time shall be extended appropriately. This provision is subject to the terms of §6.2.1 of the parties’ modified AIA A133 -2019. § 2.2.2 See §6.2.1 of the parties’ modified AIA A133-2019. § 2.2.3 After the Owner furnishes evidence of financial arrangements under this Section 2.2 acceptable to Contractor, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. This provision is subject to §6.2.1 of the parties’ modified AIA A133-2019. § 2.2.4 Where the Owner has designated information furnished under this Section 2.2 as “confi dential,” the Contractor shall keep the information confidential and shall not disclose it to any ot her person. However, the Contractor may disclose “confidential” information, after seven (7) days’ not ice to the Owner, where disclosure is required by law, including a subpoena or other form of compulsory legal process issued by a cour t or governmental entity, or by court or arbitrator(s) order. The Contractor may also disclose “confidential” information to its employees, consultants, sureties, Subcontractors and their employees, Sub -subcontractors, and others who need to know the content of such information solely and exclusively for the Project and who agree to maintain the confidentiality of such information. § 2.3 Information and Services Required of the Owner § 2.3.1 Except for permits and fees that are the responsibility of the Contractor under t he Contract Documents, including those required under Section 3.7.1, the Owner shall secure and pay for necessary approvals, easements, assessments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 13 § 2.3.2 The Owner shall retain an architect lawfully licensed to practice architecture, or an entity lawfully practicing architecture, in the jurisdiction where the Project is located. That person or entity is identified as the Architect in the Agreement and is referred to throughout the Contract Documents as if singular in number. § 2.3.3 If the employment of the Architect terminates, the Owner shall employ a succes sor to whom the Contractor has no reasonable objection and whose status under the Contract Documents shall be that o f the Architect. § 2.3.4 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. The Contractor sha ll be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions rela ting to the safe performance of the Work. § 2.3.5 The Owner shall furnish information or services required of the Owner by the Contr act Documents with reasonable promptness. The Owner shall also furnish any other information or services under the Owner’s control and relevant to the Contractor’s performance of the Work with reasonable promptness af ter receiving the Contractor’s written request for such information or services. § 2.3.6 Unless otherwise provided in the Contract Documents, the Owner shall furnish to the Contr actor one electronic copy of the Drawings, Specifications, and Addenda issued, for the purposes of making reproductions pursuant to Section 1.5.2. § 2.3.6.1 At the Architect’s sole discretion, selected electronic (CAD) Drawing files may be made available for use by the Contractor after execution of the Contract for Construction, wit h the exception of civil grading and layout plans, if authorized by the civil consultant. Such electronic files are not pa rt of the Contract Documents. If available, the Architect shall release them to the Contractor subject to the terms and conditions established by the Architect, to which the Contractor must agree without exception prio r to release of the electronic files. Refer to www.moseleyarchitects.com for the Architect's current Request for Electronic (CAD) Files form, which defines the applicable terms and conditions. § 2.4 Owner’s Right to Stop the Work If the Contractor fails to correct Work that is not in accordance with the require ments of the Contract Documents as required by Section 12.2 or repeatedly fails to carry out Work in accordance with the Contract Documents, the Owner may issue a written order to the Contractor to stop the Work, or any portion the reof, until the cause for such order has been eliminated; however, the right of the Owner to stop the Work shall not giv e rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent required by Section 6.1.3. § 2.5 Owner’s Right to Carry Out the Work If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a ten-day period after receipt of notice from the Owner to commence and continue correct ion of such default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies the Owner may have , correct such default or neglect. Amounts charged to the Contractor may, pursuant to Section 9.5.1, nullify a Certificate for Payment in whole or in part, to the extent reasonably necessary to reimburse the Owner for the reasonable cost of correcting such deficiencies, including Owner’s expenses and c ompensation for the Architect’s additional services made necessary by such default, neglect, or failure. If current and future payments are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owne r. If the Contractor disagrees with the actions of the Owner or the Architect, or the amounts claimed as costs to the Owner, the Contractor may file a Claim pursuant to Article 15. ARTICLE 3 CONTRACTOR § 3.1 General § 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is r eferred to throughout the Contract Documents as if singular in number. The Contractor shall be lawfully li censed, if required in the jurisdiction where the Project is located. The Contractor shall designate in writing a representative who shall have express authority to bind the Contractor with respect to all matters under this C ontract. The term “Contractor” means the Contractor or the Contractor’s authorized representative. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 14 § 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. § 3.1.3 The Contractor shall not be relieved of its obligations to perform the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect’s adminis tration of the Contract, or by tests, inspections or approvals required or performed by persons or entities other than the C ontractor. § 3.1.4 During the performance of this Contract, the Contractor will include the provisions of the foregoing Sections 3.1.4.1 and 3.1.4.2 in every Subcontract or purchase order of over t en thousand dollars ($10,000.), so that the provisions will be binding upon each Subcontractor or vendor; and furthermore, the Contractor agrees as follows: .1 The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, except where religion, sex or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants f or employment, notices setting forth the provisions of this non-discrimination clause. .2 The Contractor, in all solicitations or advertisements for employees plac ed by or on behalf of the Contractor, will state that such Contractor is an equal opportunity employer. .3 Notices, advertisements, and solicitations placed in accordan ce with federal law, rule, or regulation shall be deemed sufficient for the purpose of meeting requirements of this section. .4 The Contractor does not, and shall not during the performance of this Contract, knowingly employ an unauthorized alien as defined in the Federal Immigration Reform and Control A ct of 1986. .5 Contractor hereby represents it is organized as a stock or non-stock corporation, limited liability company, business trust, or limited partnership or registered as a registered limited liability partnership and is authorized to transact business in the jurisdiction where the Project is located as a domestic or foreign business entity. § 3.2 Review of Contract Documents and Field Conditions by Contractor § 3.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generally familiar with local conditions under which the Work is to be perform ed, and correlated personal observations with requirements of the Contract Documents. § 3.2.2 Because the Contract Documents are complementary, the Contractor shall, before st arting each portion of the Work, carefully study and compare the various Contract Documents relative to that po rtion of the Work, as well as the information furnished by the Owner pursuant to Section 2.3 shall take field measurements of any existing conditions related to that portion of the Work, and shall observe any conditions at the sit e affecting it. These obligations are for the purpose of facilitating coordination and construction by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the Contract Document s; however, the Contractor shall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the Contractor as a request for information in such form as the Architect may requ ire. It is recognized that the Contractor’s review is made in the Contractor’s capacity as a contractor and not as a licensed design professional, unless otherwise specifically provided in the Contract Documents. § 3.2.3 The Contractor is not required to ascertain that the Contract Documents are in acco rdance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor shall promptly report to the Architect any nonconformity discovered by or made known to t he Contractor as a request for information in such form as the Architect may require. If the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regula tions, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility fo r such Work and shall bear the costs attributable to correction. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 15 § 3.2.4 If the Contractor believes that additional cost or time is involved because of c larifications or instructions the Architect issues in response to the Contractor’s notices or requests for informa tion pursuant to Sections 3.2.2 or 3.2.3, the Contractor shall submit Claims as provided in Article 15. If the Contractor fails to perform the obligations of Sections 3.2.2 or 3.2.3, the Contractor shall pay such costs and damages to the Owner, subject to Se ction 15.1.7, as would have been avoided if the Contractor had performed such obligations. If the Contr actor performs those obligations, the Contractor shall not be liable to the Owner or Architect for damages resulting from errors, inconsistencies or omissions in the Contract Documents, for differences between field measurements or conditions and the Contract Documents, or for nonconformities of the Contract Documents to ap plicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities. § 3.3 Supervision and Construction Procedures § 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor’s best ski ll and attention. The Contractor shall be solely responsible for, and have control over, construction mea ns, methods, techniques, sequences, and procedures, and for coordinating all portions of the Work under the Contrac t. If the Contract Documents give specific instructions concerning construction means, methods, techni ques, sequences, or procedures, the Contractor shall evaluate the jobsite safety thereof and shall be solely responsible for the jobsite safety of such means, methods, techniques, sequences, or procedures. If the Contra ctor determines that such means, methods, techniques, sequences or procedures may not be appropriate, the Contractor shall give timely notice to the Owner and Architect, and shall propose alternative means, methods, techniques, s equences, or procedures. The Architect shall evaluate the proposed alternative solely for conformance with the de sign intent for the completed construction. Unless the Architect objects to the Contractor’s proposed alternative in writing, the Contractor shall perform the Work using its alternative means, methods, techniques, sequences, or procedures. § 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contr actor’s employees, Subcontractors and their agents and employees, and other persons or entities perform ing portions of the Work for, or on behalf of, the Contractor or any of its Subcontractors. § 3.3.3 The Contractor shall be responsible for inspection of portions of Work already perf ormed to determine that such portions are in proper condition to receive subsequent Work. § 3.4 Labor and Materials § 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay fo r labor, materials, equipment, tools, construction equipment and machinery, water, heat , utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. § 3.4.2 Except in the case of minor changes in the Work found to be acceptable by the Architect in accordance with Section 3.12.8 or ordered by the Architect in accordance with Section 7.4, the Contractor may make substitutions only with the consent of the Owner, after review by the Architect and in accordance with a Change Order or Construction Change Directive. § 3.4.2.1 After the Contract has been executed, the Owner and the Architect will consi der a formal request for substitution in lieu of those required by the Contract Documents only under and in additi on to, the conditions set forth in the Contract Documents. By making requests for substitutions, the Contractor: .1 represents that the Contractor has personally investigated the propose d substitute product and determined that it is equal or superior in all respects to requirements of the Contrac t Documents; .2 represents that the Contractor will provide the same warranty for the s ubstitution that the Contractor is required to provide under the Contract Documents; .3 certifies that the cost data presented is complete and includes all rel ated costs under this Contract including the Architect's redesign costs, and waives all cla ims for additional costs and time related to the substitution which subsequently become apparent; and .4 will coordinate and perform the installation of the accepted substitute, making such changes to the Work as may be required for the Work to be complete in all respects. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 16 § 3.4.3 The Contractor shall enforce strict discipline and good order among the Contractor’s employees and other persons carrying out the Work. The Contractor shall not permit employment of unfit pers ons or persons not properly skilled in tasks assigned to them. §3.4.4 Omitted (Cost of Architect Review of Substitutions) § 3.5 Warranty § 3.5.1 The Contractor warrants to the Owner and Architect that materials and equipme nt furnished under the Contract will be of good quality and new unless the Contract Documents require or permi t otherwise. The Contractor further warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects, except for those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or equipment not conforming to these requirements may be consid ered defective. The Contractor’s warranty excludes remedy for damage or defect caused by abuse, alterations to t he Work not executed by the Contractor, improper or insufficient maintenance, improper operation, or norma l wear and tear and normal usage. If required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. § 3.5.2 All material, equipment, or other special warranties required by the Contra ct Documents shall be issued in the name of the Owner, or shall be transferable to the Owner, and shall commence in a ccordance with Section 9.8.4. § 3.6 Taxes The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor that are legally enacted when bids are received or negotiations concluded, whether or not yet e ffective or merely scheduled to go into effect. § 3.6.1 The 179D tax deduction incentivizes building owners and design ers for designing energy-efficient building systems, including lighting, HVAC, and building envelope components. Since gove rnment entities do not pay taxes, this deduction is not available to the Owner. Current tax code allows for t his deduction to be allocated to the Architect by the Owner on eligible projects to help incentivize energy-efficient building design. § 3.6.2 The Contractor recognizes that the Architect is the only entit y eligible to pursue such allocations in accordance with 26 U.S. Code §179D, which reads in part, “The allocation o f the deduction [is] to the person primarily responsible for designing the property in lieu of the owner of such proper ty.” The Contractor further acknowledges the Architect as the primary designer of the project for the pur poses of 179D and agrees not to pursue the deduction or to request any portion thereof from the Architect or Owne r. § 3.7 Permits, Fees, Notices and Compliance with Laws § 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pa y for the building permit as well as for other permits, fees, licenses, and inspections by governm ent agencies necessary for proper execution and completion of the Work that are customarily secured after execution of the Contract and legally required at the time bids are received or negotiations concluded. § 3.7.1.1 Unless otherwise provided in the Contract Documents, the Contractor is responsible for obtaining utilities for the Project and providing the Work relating to Project utilities as indicated. Responsibility for payment of fees associated with providing utilities to the Project shall be as follows: .1 Any fees assessed by entities for providing permanent utilities to the Proje ct shall be paid directly to the utility entities by Owner. These include “tap fees” and “electrical connection and service fee.” Contractor shall coordinate the permanent utilities and the entity’s related work to comply with the construction schedule. .2 Any fees assessed by entities for providing temporary utilities to the Proj ect for use by Contractor during construction of the Project shall be paid by the Contractor. The Contractor’s payment of fees for temporary utilities shall be included in the Base Bid and Contract Sum and will not be reimburs ed by the Owner. § 3.7.2 The Contractor shall comply with and give notices required by applicable laws, statut es, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to perfo rmance of the Work. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 17 § 3.7.3 If the Contractor performs Work knowing it to be contrary to applicable laws, st atutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Contractor sha ll assume appropriate responsibility for such Work and shall bear the costs attributable to correction. § 3.7.4 Concealed or Unknown Conditions If the Contractor encounters conditions at the site that are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or (2) unk nown physical conditions of an unusual nature that differ materially from those ordinarily found to exist and generally recognized as inherent i n construction activities of the character provided for in the Contract Documents, the Contractor shall promptly provide notice to the Owner and the Architect before conditions are disturbed and in no event later than 14 days after first observance of the conditions. The Architect will promptly review such conditions and, if the Architect determines that they differ materially and cause an increase or decrease in the Contr actor’s cost of, or time required for, performance of any part of the Work, will determine that an equitable adjustment should be made in the Contract Sum or Contract Time, or both. If the Architect determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the t erms of the Contract is justified, the Architect shall promptly notify the Owner and Contractor, stating the reasons . If either party disputes the Architect’s determination, that party may submit a Claim as provided in Article 15. § 3.7.5 If, in the course of the Work, the Contractor encounters human remains or recogni zes the existence of burial markers, archaeological sites or wetlands not indicated in the Contract Documen ts, the Contractor shall immediately suspend any operations that would affect them and shall notify the Owner and Architect. Upon receipt of such notice, the Owner shall promptly take any action necessary to obtain governmental aut horization required to resume the operations. The Contractor shall continue to suspend such operations until otherwise instructed by the Owner but shall continue with all other operations that do not affect those remains or featu res. Requests for adjustments in the Contract Sum and Contract Time arising from the existence of such remains or featur es may be made as provided in Article 15. § 3.8 Allowances § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Co ntract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities to whom the Contract or has reasonable objection. § 3.8.2 Unless otherwise provided in the Contract Documents, .1 allowances shall cover the cost to the Contractor of materials and equipment deli vered at the site and all required taxes, less applicable trade discounts; .2 Contractor’s costs for unloading and handling at the site, labor, installation costs , overhead, profit, and other expenses contemplated for stated allowance amounts shall be included in the Cont ract Sum but not in the allowances; and .3 whenever costs are more than or less than allowances, the Contract Sum shall be adj usted accordingly by Change Order. The amount of the Change Order shall reflect (1) the differen ce between actual costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor’s costs under Section 3.8.2.2. § 3.8.3 Materials and equipment under an allowance shall be selected by the Owner with reasona ble promptness. The Contractor shall identify the date for Owner’s selection on the critic al path of the Contractor’s Construction Schedule and provide the Owner a minimum of two weeks notice before this date. § 3.9 Superintendent § 3.9.1 The Contractor shall employ a competent superintendent and project manager and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superintendent and project manager shall represent the Contractor, and communications given to the superintendent or project manager shall be as binding as if given to the Contractor. § 3.9.2 The Contractor, as soon as practicable after award of the Contract, shall notify th e Owner and Architect of the name and qualifications of a proposed superintendent and project manager. Within 14 days of receipt of the information, the Owner may notify the Contractor, stating whether the Owner (1) has reasonable object ion to the AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 18 proposed superintendent or project manager or (2) requires additional time for review. Failure of the Owner to provide notice within the 14-day period shall constitute notice of no reasonable objection. § 3.9.3 The Contractor shall not employ a proposed superintendent or project manager to whom the Owner has made reasonable and timely objection. The Contractor shall not change the superintendent or project manager without the Owner’s consent, which shall not unreasonably be withheld or delayed. § 3.9.4 The Superintendent employed by the Contractor shall have a minimum of five (5) yea rs commercial experience as the primary Superintendent on projects of similar size and compl exity as the Work. The superintendent shall speak fluent English and clearly understand the English languag e. The Contractor shall submit to the Owner a resume and other supporting documentation showing that the proposed S uperintendent is competent and has the minimum work experience required to execute the Work. Th e Owner reserves the right to request additional supporting documentation regarding the proposed Superintendent' s qualifications and to require the Contractor to propose an alternate Superintendent who better meet s the requirements contained in this Article, as may reasonably be determined by the Owner. The Contractor shal l notify the Architect and Owner in writing of any proposed replacement of the Superintendent. The Contractor sha ll not replace a competent Superintendent without prior written approval from the Owner. The requirements contained in this Article shall apply to any proposed replacement Superintendent, regardless if the proposed tenure is to be temporary or permanent. § 3.9.5 The Contractor shall employ a Project Manager to be assigned to the Work. The P roject Manager employed by the Contractor shall have a minimum of five (5) years commercial experienc e as Project Manager on projects of similar size and complexity as the Work. The project manager shall speak fluent English and clearly understand the English language. The Contractor shall submit to the Owner a resume and other supporting documentation showing that the proposed Project Manager is competent and has the minimum wo rk experience required to execute the Work. The Owner reserves the right to request additional supporting documentation regarding the proposed Project Manager's qualifications and to require the Contractor t o propose an alternate Project Manager who better meets the requirements contained in this Article, as may reasona bly be determined by the Owner. The Contractor shall notify the Architect and Owner in writing of any proposed repla cement of the Project Manager. The Contractor shall not replace a competent Project Manager without p rior written approval from the Owner. The requirements contained in this Article shall apply to any proposed replacem ent Project Manager, regardless if the proposed tenure is to be temporary or permanent. The Project Manager sha ll not act as the Superintendent or replacement for the Superintendent without written approval from the Owner. § 3.10 Contractor’s Construction and Submittal Schedules § 3.10.1 The Contractor, promptly after being awarded the Contract, shall submit for the Owner ’s and Architect’s information a Contractor’s construction schedule for the Work. Unless otherwise required by the Contract Documents; the schedule shall contain details appropriate for the Project, including (1) the date of commencement of the Work, interim schedule milestone dates, and the dat e of Substantial Completion; (2) an apportionment of the Work by construction activity; and (3) the time required for comple tion of each portion of the Work. The schedule shall provide for the orderly progression of the Work to the Substantial Completion date and final completion date indicated in the Contract Documents. The schedule shall be revised at appropriate intervals as required by the conditions of the Work and Project. § 3.10.2 The Contractor, promptly after being awarded the Contract and thereafter as necessary to maintain a current submittal schedule, shall submit a submittal schedule in accordance with section 3.12. Unless otherwise required by the Contract Documents, the submittal schedule shall (1) be coordinated with the Contractor’s construction schedule, and (2) allow the Architect reasonable time to review submittals. If the Contractor fails to submit a submittal schedule, or fails to provide submittals in accordance with the accepted submittal schedule, the Contractor shall not be entitled to any increase in Contract Sum or extension of Contract Time base d on the time required for review of submittals. § 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to the Owner and Architect. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 19 § 3.11 Documents and Samples at the Site The Contractor shall make available, at the Project site, the Contract Documen ts, including Change Orders, Construction Change Directives, and other modifications, in good order and marked currently to indicate field changes and selections made during construction, and the approved Shop Drawings, Product D ata, Samples, and similar required submittals. These shall be in electronic form or paper copy, a vailable to the Architect and Owner, and delivered to the Architect for submittal to the Owner upon completion of the Work a s a record of the Work as constructed. § 3.12 Shop Drawings, Product Data and Samples § 3.12.1 Shop Drawings are drawings, diagrams, schedules, and other data specially prepar ed for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier, or distributor to illustrate some portion of the Work. § 3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams, and other information furnished by the Contractor to illustrate materials or equipm ent for some portion of the Work. § 3.12.3 Samples are physical examples that illustrate materials, equipment, or work manship, and establish standards by which the Work will be judged. § 3.12.4 Shop Drawings, Product Data, Samples, and similar submittals are not Contract Documents. Their purpose is to demonstrate how the Contractor proposes to conform to the information given and the de sign concept expressed in the Contract Documents for those portions of the Work for which the Cont ract Documents require submittals. Review by the Architect is subject to the limitations of Section 4.2.7. Informational submittals upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents. Submittals that are not required by the Contract Documents may be returned by the Architect without act ion. § 3.12.5 The Contractor shall review for compliance with the Contract Documents, approve, and submit to the Architect, Shop Drawings, Product Data, Samples, and similar submittals r equired by the Contract Documents, in accordance with the submittal schedule accepted by the Architect or, in the absence of an accepted submittal schedule, with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of Separate Contractors. § 3.12.6 By submitting Shop Drawings, Product Data, Samples, and similar submittals, the Contractor represents to the Owner and Architect that the Contractor has (1) reviewed and approved them, (2) de termined and verified materials, field measurements and field construction criteria related thereto, or will do so, and (3) checked and coordinated the information contained within such submittals with the requirements o f the Work and of the Contract Documents. § 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents re quire submittal and review of Shop Drawings, Product Data, Samples, or similar submittals, until the respective submittal has been accepted by the Architect. § 3.12.8 The Work shall be in accordance with accepted submittals except that the Contractor shall not be relieved of responsibility for deviations from the requirements of the Contract Documents by the Architect’s acceptance of Shop Drawings, Product Data, Samples, or similar submittals, unless the Contractor has specifically notified the Architect of such deviation at the time of submittal and (1) the Architect has g iven written acceptance to the specific deviation in accordance with 3.12.9 as a minor change in the Work, or (2) a Change Order or Construction Change Directive has been issued authorizing the deviation. The Contractor shall not be rel ieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples, or similar submittals, by the Architect’s acceptance thereof. § 3.12.9 The Contractor shall direct specific attention, in writing on a cover letter attached to the original or in the case of a resubmittal, on resubmitted Shop Drawings, Product Data, Samples, or similar submittals , to all revisions or deviations other than those requested by the Architect on previous submittals. I n the absence of such notice, the Architect’s acceptance of a resubmission shall not apply to such revisions or deviations. § 3.12.10 The Contractor shall not be required to provide professional services that constitute the practice of architecture or engineering unless such services are specifically required by the Contract Documents for a portion of the Work or unless the Contractor needs to provide such services in order to carry out the Contractor’s AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 20 responsibilities for construction means, methods, techniques, sequences, and proc edures. The Contractor shall not be required to provide professional services in violation of applicable law. § 3.12.10.1 If such delegated professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required of the Contractor by the Contract Documents, the Owner and the Architect will provide all performance and design criteria that such services must satisfy. The Cont ractor shall be entitled to rely upon the adequacy and accuracy of the performance and design cr iteria provided in the Contract Documents. The Contractor shall cause such services or certifications to be provided by an appropriately licensed design professional, licensed in the state where the Project is located, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, Shop Drawings, and other submittals prepared by such professional. Shop Drawings, and other submittals related to the Work, designe d or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to the Architect. The Owner and the Architect shall be entitled to rely upon the adequacy and accuracy of the services, certifications, and approvals performed or provided by such design professionals, provided the Owner and Archi tect have provided to the Contractor the performance and design criteria that such services must sa tisfy. Pursuant to this Section 3.12.10, the Architect will review and take appropriate action on submittals onl y for the limited purpose of checking for conformance with information given and the design concept expressed in the Contr act Documents. § 3.12.10.2 If the Contract Documents require the Contractor’s design professional to certi fy that the Work has been performed in accordance with the design criteria, the Contractor shall furnish such certifications to the Architect at the time and in the form specified by the Architect. § 3.12.11 The Architect’s review of Contractor’s submittals will be limited to examination of an initial submittal and one (1) resubmittal. The Architect’s review of additional resubmitt als will be made only with the consent of the Owner after notification by the Architect. The Owner shall deduct from the Contract Sum amounts paid to the Architect for evaluation of such additional resubmittals. § 3.13 Use of Site The Contractor shall confine operations at the site to areas permitted by applic able laws, statutes, ordinances, codes, rules and regulations, lawful orders of public authorities, and the Contract Docum ents and shall not unreasonably encumber the site with materials or equipment. § 3.14 Cutting and Patching § 3.14.1 The Contractor shall be responsible for cutting, fitting, or patching required to co mplete the Work or to make its parts fit together properly. All areas requiring cutting, fitting, or p atching shall be restored to the condition existing prior to the cutting, fitting, or patching, unless otherwise required by the C ontract Documents. § 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially com pleted construction of the Owner or Separate Contractors by cutting, patching, or otherwi se altering such construction, or by excavation. The Contractor shall not cut or otherwise alter construction by the Owner or a Separate Contractor except with written consent of the Owner and of the Separate Contractor. Consent sha ll not be unreasonably withheld. The Contractor shall not unreasonably withhold, from the Owner or a Separat e Contractor, its consent to cutting or otherwise altering the Work. § 3.15 Cleaning Up § 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulat ion of waste materials and rubbish caused by operations under the Contract. At completion of the Work, the Contractor s hall remove waste materials, rubbish, the Contractor’s tools, construction equipment, machinery, and surplus materials from and about the Project. § 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Own er may do so and the Owner shall be entitled to reimbursement from the Contractor. § 3.16 Access to Work The Contractor shall provide the Owner and Architect with access to the Work in pre paration and progress wherever located. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 21 § 3.17 Royalties, Patents and Copyrights The Contractor shall pay all royalties and license fees. The Contractor shall de fend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for defense or loss when a particular design, process, or product of a particular ma nufacturer or manufacturers is required by the Contract Documents, or where the copyright vi olations are contained in Drawings, Specifications, or other documents prepared by the Owner or Architect. However, if an infringement of a copyright or patent is discovered by, or made known to, the Contractor, the Contractor sha ll be responsible for the loss unless the information is promptly furnished to the Architect. § 3.18 Indemnification § 3.18.1 To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Owner, Architect, Architect’s consultants, and agents and employees of any of them from and a gainst claims, damages, losses, and expenses, including but not limited to attorneys’ fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss, or expense is attributable to bodily injur y, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), but onl y to the extent caused by the negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them, or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss, or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed t o negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist as to a party or pers on described in this Section 3.18. § 3.18.2 In claims against any person or entity indemnified under this Section 3.18 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them, or anyone for whose acts they may be liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of damages, compensation, or benefits payable by or for the Contractor or a Subcontractor under workers’ compensation acts, disability benefit acts, or other employee benefit ac ts. ARTICLE 4 ARCHITECT § 4.1 General § 4.1.1 The Architect is the person or entity retained by the Owner pursuant to Section 2.3.2 a nd identified as such in the Agreement. Such terms as ‘Architect-Engineer,’ ‘Engineer,’ and ‘A-E,’ if used in these Contract Documents, is intended to mean the Architect and its consultants unless otherwise intended by the c ontext or usage of such terms. Such terms do not mean or include any design professional of the Contract or, Subcontractor, or Owner. § 4.1.2 Duties, responsibilities, and limitations of authority of the Architect as set forth in the Contract Document s shall not be restricted, modified, or extended without written consent of the Owner, Contractor, and Architect. Consent shall not be unreasonably withheld. § 4.1.3 Subject to the standard of care for applying professional judgment to informat ion used or relied upon, Architect and its Consultants may use and rely upon design elements, technical standards, test results, and all other information ordinarily or customarily furnished or published by others, inc luding, but not limited to, specialty contractors, manufacturers, fabricators, and suppliers. § 4.2 Administration of the Contract § 4.2.1 The Architect will provide administration of the Contract as described in the Contract Documents and will be an Owner’s representative during construction until the date the Architect issues the final Certificate for Payment. The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents. § 4.2.2 The Architect will visit the site agreed with the Owner, to become generally familiar with the progress and quality of the portion of the Work completed, and to determine in general if the Work observe d is being performed in a manner indicating that the Work, when fully completed, will be in general compliance with the Contract Documents. However, the Architect will not be required to make exhaustive or conti nuous on-site inspections to check the quality or quantity of the Work. The Architect will not have control over, charge of, or responsibility for the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work, since these are solely the Contractor’s rights and respons ibilities under the Contract Documents. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 22 § 4.2.2.1 The Contractor shall reimburse the Owner for compensation paid to the Archit ect for additional site visits made necessary by the fault, neglect or request of the Contractor. § 4.2.3 On the basis of the site visits, the Architect will keep the Owner reasonably infor med about the progress and quality of the portion of the Work completed, and endeavor to report to the Owner (1) known deviations from the Contract Documents, (2) known deviations from the most recent construction schedule submitted by the Contractor, and (3) known defects and deficiencies observed in the Work. The Architect will not be responsible for the Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents. The Architect will not have control over or charge of, and will not be responsible for ac ts or omissions of, the Contractor, Subcontractors, or their agents or employees, or any other persons or entities perfor ming portions of the Work. § 4.2.4 Communications The Owner and Contractor shall include the Architect in all communications that r elate to or affect the Architect’s services or professional responsibilities. The Owner shall promptly notify the Architect of the substance of any direct communications between the Owner and the Contractor otherwise relating to the Project. Communications by and with the Architect’s consultants shall be through the Architect. Communicati ons by and with Subcontractors and suppliers shall be through the Contractor. Communications by and with Separate Contr actors shall be through the Owner. The Contract Documents may specify other communication protocols. § 4.2.5 Based on the Architect’s evaluations of the Contractor’s Applications for P ayment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts. § 4.2.6 The Architect has authority to reject Work that does not conform to the Contract Doc uments. Whenever the Architect considers it necessary or advisable, the Architect will have author ity to require inspection or testing of the Work in accordance with Sections 13.4.2 and 13.4.3, whether or not the Work is fabricated, installed or completed. However, neither this authority of the Architect nor a decision made in good faith ei ther to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect to the Contractor, Subcontractors, suppliers, their agents or employees, or other persons or entities performing port ions of the Work. § 4.2.7 The Architect will review and approve, or take other appropriate action upon, the Contractor’s submittals such as Shop Drawings, Product Data, and Samples, but only for the limited purpose of che cking for general conformance with information given and the design concept expressed in the Contract D ocuments. The Architect’s action will be taken with reasonable promptness while allowing sufficient time in the Architect’s professional judgment to permit adequate review. Review of such submittals is not conducted for the p urpose of determining the accuracy and completeness of details such as dimensions and quantities, or for subst antiating instructions for installation or performance of equipment or systems, all of which remain the res ponsibility of the Contractor. The Architect’s review of the Contractor’s submittals shall not relieve the Cont ractor of the obligations under Sections 3.3, 3.5, and 3.12. The Architect’s review shall not constitute acceptance of safety precautions or of any construction means, methods, techniques, sequences, or procedures. The Architect’s acceptance of a specific item shall not indicate acceptance of an assembly of which the item is a component. § 4.2.8 The Architect will prepare Change Orders and Construction Change Directives, a nd may order minor changes in the Work as provided in Section 7.4. The Architect will review and make determinations regarding concealed and unknown conditions as provided in Section 3.7.4. § 4.2.9 The Architect will conduct inspections to determine the date or dates of Substant ial Completion and the date of final completion; issue Certificates of Substantial Completion pursuant to Sec tion 9.8; receive and forward to the Owner, for the Owner’s review and records, written warranties and related d ocuments required by the Contract and assembled by the Contractor pursuant to Section 9.10; and issue a final Certificate for Payment pursuant to Section 9.10. § 4.2.10 If the Owner and Architect agree, the Architect will provide one or more Project representatives to assist in carrying out the Architect’s responsibilities at the site. The Owner shall notify the Contractor of any change in the duties, responsibilities and limitations of authority of the Project representative s. § 4.2.11 The Architect will interpret and decide matters concerning performance unde r, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The Ar chitect’s response to such requests will be made in writing within any time limits agreed upon or otherwise with reasonable promptness. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 23 § 4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of, and reasonably inferable from, the Contract Documents and will be in writing or in the form of drawings. Whe n making such interpretations and decisions, the Architect will endeavor to secure faithful performance by bot h Owner and Contractor, will not show partiality to either, and will not be liable for results of interpretations or decisions rendered in good faith. § 4.2.13 The Architect’s decisions on matters relating to aesthetic effect will be final if co nsistent with the intent expressed in the Contract Documents. § 4.2.14 The Architect will review and respond to requests for information about the Contract Documents. The Architect’s response to such requests will be made in writing within any time limits a greed upon or otherwise with reasonable promptness. If appropriate, the Architect will prepare and issue supplemental Drawings and Specifications in response to the requests for information. ARTICLE 5 SUBCONTRACTORS § 5.1 Definitions § 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term “Subcontractor” is referred to throughout the Contr act Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor . The term “Subcontractor” does not include a Separate Contractor or the subcontractors of a Separate Contract or. § 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term “Sub-subcontractor” is referred to throughout the Contract Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub- subcontractor. § 5.2 Award of Subcontracts and Other Contracts for Portions of the Work § 5.2.1 Unless otherwise stated in the Contract Documents, the Contractor, as soon as practicable after award of the Contract, shall submit to the Owner and Architect of the persons or entities proposed for each principal portion of the Work, a list of proposed subcontractors, including those who are to furnish materials or equipment fabricated to a special design no later than two days prior to the date of the Pre-construction Conference. Include Contractor's License number and Class for each proposed S ubcontractor. Within 14 days of receipt of the information, the Owner may notify the Contractor whether the Owner (1) has reasonable objection to any such proposed person or entity or (2) requires additional time for review. Failure of the Owner to provide notice within the 14-day period shall constitute notice of no reasonable objection. § 5.2.2 The Contractor shall not contract with a proposed person or entity to whom the Owner or A rchitect has made reasonable and timely objection. The Contractor shall not be required to contrac t with anyone to whom the Contractor has made reasonable objection. § 5.2.3 If the Owner has reasonable objection to a person or entity proposed by the Contractor , the Contractor shall propose another to whom the Owner has no reasonable objection. If the proposed but reject ed Subcontractor was reasonably capable of performing the Work, the Contract Sum and Contract Time shall be increased or decreased by the difference, if any, occasioned by such change, and an appropriate Change Order shall be issued before commencement of the substitute Subcontractor’s Work. However, no increase in the Contract Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsive ly in submitting names as required. § 5.2.4 The Contractor shall not substitute a Subcontractor, person, or entity for one previously selected if the Owner makes reasonable objection to such substitution. § 5.3 Subcontractual Relations By appropriate written agreement, the Contractor shall require each Subcontrac tor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract D ocuments, and to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor’s Work that the Contractor, by these Contract Documents, assumes toward the Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontra cting thereof will not AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 24 prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies, and redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall re quire each Subcontractor to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed Subcontractor , prior to the execution of the subcontract agreement, copies of the Contract Document s to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontra ctor terms and conditions of the proposed subcontract agreement that may be at variance with the Contract Docum ents. Subcontractors shall similarly make available copies of the complete Contract Documents to their respective proposed Sub- subcontractors. § 5.4 Contingent Assignment of Subcontracts § 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided that .1 assignment is effective only after termination of the Contract by the Owner for c ause pursuant to Section 14.2 and only for those subcontract agreements that the Owner accepts by notifying the Subcontractor and Contractor; and .2 assignment is subject to the prior rights of the surety, if any, obligated under bond re lating to the Contract. When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor’s rights and obligations under the subcontract. § 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontract or’s compensation shall be equitably adjusted for increases in cost resulting from the s uspension. § 5.4.3 Upon assignment to the Owner under this Section 5.4, the Owner may further assign the subcontract to a successor contractor or other entity. If the Owner assigns the subcontract to a suc cessor contractor or other entity, the Owner shall nevertheless remain legally responsible for all of the successo r contractor’s obligations under the subcontract. ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS § 6.1 Owner’s Right to Perform Construction and to Award Separate Contracts § 6.1.1 The term “Separate Contractor(s)” shall mean other contractors retained by the Ow ner under separate agreements. The Owner reserves the right to perform construction or operat ions related to the Project with the Owner’s own forces, and with Separate Contractors retained under Conditions of the Contract substantially similar to those of this Contract, including those provisions of the Conditions of the Contract rela ted to insurance. § 6.1.2 When separate contracts are awarded for different portions of the Project or ot her construction or operations on the site, the term “Contractor” in the Contract Documents in each case shall mean th e Contractor who executes each separate Owner-Contractor Agreement. § 6.1.3 The Owner shall provide for coordination of the activities of the Owner’s own forces and of each Separate Contractor with the Work of the Contractor, who shall cooperate with them. The Contr actor shall participate with any Separate Contractors and the Owner in reviewing their construction schedules. The Contractor shall make any revisions to its construction schedule deemed necessary after a joint review and mut ual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor, Separate C ontractors, and the Owner until subsequently revised. § 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs constr uction or operations related to the Project with the Owner’s own forces or with Separate Contracto rs, the Owner or its Separate Contractors shall have the same obligations and rights that the Contractor has under t he Conditions of the Contract, including, without excluding others, those stated in Article 3, this Article 6, and Ar ticles 10, 11, and 12. § 6.2 Mutual Responsibility § 6.2.1 The Contractor shall afford the Owner and Separate Contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor’s construction and operations with theirs as required by the Contract Documents. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 25 § 6.2.2 If part of the Contractor’s Work depends for proper execution or results upon construc tion or operations by the Owner or a Separate Contractor, the Contractor shall, prior to proceeding wit h that portion of the Work, promptly notify the Owner and Architect of apparent discrepancies or defects in the construction or operations by the Owner or Separate Contractor that would render it unsuitable for proper executi on and results of the Contractor’s Work. Failure of the Contractor to notify the Owner and Architect of apparent discrepancies or defects prior to proceeding with the Work shall constitute an acknowledgment that the Owner’s or Separ ate Contractor’s completed or partially completed construction is fit and proper to receive the Contractor’s W ork. The Contractor shall not be responsible for discrepancies or defects in the construction or operations by the Ow ner or Separate Contractor that are not apparent. § 6.2.3 The Contractor shall reimburse the Owner for costs the Owner incurs that are payable to a Separate Contractor because of the Contractor’s delays, improperly timed activities or defective construction. The Owner shall be responsible to the Contractor for costs the Contractor incurs because of a Separate Contractor’s delays, improperly timed activities, damage to the Work or defective construction. § 6.2.4 The Contractor shall promptly remedy damage that the Contractor wrongfully causes to completed or partially completed construction or to property of the Owner or Separate Contractor as provided in Section 10.2.5. § 6.2.5 The Owner and each Separate Contractor shall have the same responsibilities for cutt ing and patching as are described for the Contractor in Section 3.14. § 6.3 Owner’s Right to Clean Up If a dispute arises among the Contractor, Separate Contractors, and the Owner as to the responsibility under their respective contracts for maintaining the premises and surrounding area free f rom waste materials and rubbish, the Owner may clean up and the Architect will allocate the cost among those responsible between the Owner, Separate Contractors, and Contractor. ARTICLE 7 CHANGES IN THE WORK § 7.1 General § 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invali dating the Contract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents. 7.1.1.1 A Change Order is a written instrument prepared by the Architect and signed by the Ow ner, Contractor, and Architect stating their agreement upon all of the following: .1 The change in the Work; .2 The amount of the adjustment, if any, in the Contract Sum; and .3 The extent of the adjustment, if any, in the Contract Time. 7.1.1.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Chang e Order. A Construction Change Directive is a written order prepared by the Architect a nd signed by the Owner and Architect, directing a change in the Work prior to agreement on adjustment, if any, in t he Contract Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating t he Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions, or other revisions, provided that the changes do not materially alter the Guaranteed Maximum Price or the schedul e. For any changes that would alter the Guaranteed Maximum Price or the schedule, Owner may only issue a Const ruction Change Directive after providing assurances of financing for any changes acceptable to Construction Manager. For any Construction Change Directive, the Contract Sum and Contract Time must be adjusted accordingly. 7.1.1.2.1 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be based on one of the following methods: .1 Mutual acceptance of a lump sum properly itemized and supported by sufficient substa ntiating data to permit evaluation; .2 Unit prices stated in the Contract Documents or subsequently agreed upon; .3 Cost to be determined in a manner agreed upon by the parties and a mutually acceptable fi xed or percentage fee; or .4 As provided in Section 7.2. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 26 § 7.1.1.2.2 Upon receipt of a Construction Change Directive, the Contractor shall pro mptly proceed with the change in the Work involved and advise the Architect of the Contractor’s ag reement or disagreement with the method, if any, provided in the Construction Change Directive for determining the proposed adjustment in the Contract Sum or Contract Time. § 7.1.1.2.3 A Construction Change Directive signed by the Contractor indicates the Contr actor’s agreement therewith, including adjustment in Contract Sum and Contract Time or the method f or determining them. Such agreement shall be effective immediately and shall be recorded as a Cha nge Order. § 7.1.1.2.4 Pending final determination of the total cost of a Construction Change Dire ctive to the Owner, the Contractor may request payment for Work completed under the Construction Change Directive in Applications for Payment. The Architect will make an interim determination for purposes of mo nthly certification for payment for those costs and certify for payment the amount that the Architect determines, in the Architect’s professional opinion, to be reasonably justified. The Architect’s interim determination of cost shall adjust the Contract Sum on the same basis as a Change Order, subject to the right of either party to disagree and assert a Claim in accordance with Article 15. § 7.1.2 A Change Order shall be based upon agreement among the Owner, Contractor, and Arc hitect. A Construction Change Directive requires agreement by the Owner and Architect and may or may not be agreed to by the Contractor. An order for a minor change in the Work that does not materially increase the Guaranteed Maximum Price or extend the schedule may be issued by the Architect alone. 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contrac t Documents. The Contractor shall proceed promptly with changes in the Work, unless otherwise provided in the Change Order, Construction Change Directive, or order for a minor change in the Wo rk. 7.2 If a change in the Work results in an adjustment to the Contract Sum, the adjust ment (increase or decrease) shall be based on the following, unless noted otherwise: .1 Material quantities and unit prices (separated into trades; include sales ta x). .2 Labor costs (raw cost). .3 Labor burden, applied to labor only, including but not limited to, worker’s compe nsation and public liability, social security tax, old age and unemployment insurance, union welfa re fund and fringe benefits. Contractor shall be required to substantiate the labor burden percenta ge applied to any change in contract amount. Labor burden percentage shall not exceed 30% in any case. .4 Construction equipment cost. .5 Overhead and profit combined (on Claims for net increase only), as defined in Sec tion 7.3.11. .6 Cost of Premiums for Bonds (for Contractor only). Evidence of additional pr emium for bond shall be submitted with Claim. .7 Extended Overhead Costs (if applicable) which shall be established by pro -rating the value of supervision, temporary facility, and General Conditions and all other direct and indirect c osts of Contractor included in the Contract Sum over the number of days included in the Contract Time. §7.2.1 If the Contractor does not respond promptly or disagrees with the method for adjustment i n the Contract Sum, the Architect shall determine the adjustment on the basis of reasonable expenditur es and savings of those performing the Work attributable to the change, including, in case of an increase in the Contract S um, an amount for overhead AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 27 and profit as set forth in the Agreement, or if no such amount is set, forth, a reasonable amount. In such case, and also under Section 7.1.1.2.1.3,, the Contractor shall keep and present, in such form as the Architect may prescr ibe, an itemized accounting together with appropriate supporting data which shall include, at the Architect's sole discretion, a cost breakdown itemized in accordance with the current app ropriate Data Book and edition of R. S. Means Company, Inc., or other source of construction industry cost data acceptable to the Architect. For the purposes of such accounting: .1 Overhead shall include, but not be limited to, project management, field office personnel including supervision, superintendence, wages of timekeepers, watchmen and clerks, small tools, in cidentals, general office expenses, insurance premiums, and all other expenses not included in “costs.” .2 If the net value of the change results in a credit, the credit given shall be the net cost without overhead or profit (for Contractor, Subcontractor, or Sub-subcontractor). The cost as used herein shall include all items of labor, materials, equip ment, and bonds. § 7.2.2 If the Contractor disagrees with the adjustment in the Contract Time, the Contractor may make a Claim in accordance with applicable provisions of Article 15. § 7.2.3 The amount of credit to be allowed by the Contractor to the Owner for a deletion or cha nge that results in a net decrease in the Contract Sum shall be actual net cost as confirmed by the Archit ect. When both additions and credits covering related Work or substitutions are involved in a change, the allowanc e for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change. § 7.2.4 When the Owner and Contractor agree with a determination made by the Architect conce rning the adjustments in the Contract Sum and Contract Time, or otherwise reach agreement upon the adjustments, such agreement shall be effective immediately and the Architect will prepare a Change Ord er. Change Orders may be issued for all or any part of a Construction Change Directive. §7.3. In Sections 7.2 and 7.2.1, the amount for overhead and profit combined, included i n the total cost to the Owner, shall be based on the following schedule: .1 for the Contractor, for Work performed by the Contractor's own forces, 15 percent of the cost. .2 for the Contractor, for Work performed by the Contractor’s Subcontractors, 5 p ercent of the amount due the Subcontractors. .3 for each Subcontractor involved, for Work performed by that Subcontractor's own forces, 15 percent of the cost. .4 for each Subcontractor involved, for Work performed by the Subcontractor’s Sub-subcontractor, 5 percent of the amount due the Sub-subcontractor. .5 cost to which overhead and profit is to be applied shall be determined in accorda nce with Section 7.2. .6 In order to facilitate checking of quotations for extras or credits, all prop osals, except those so minor that their propriety can be seen by inspection, shall be accompanied by a complete it emization of costs in the manner prescribed above. Where major cost items are changes to Subcontracts, they shall be itemized also. In no case will a change involving over $500.00 be approv ed without such itemization. § 7.4 Minor Changes in the Work In the Architect’s opinion, Architect may order minor changes in the Work that are consistent with the intent of the Contract Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. The Architect’s order for minor changes shall be in writing. If the Contractor believes that the proposed minor change in the Work will affect the Contract Sum or Contract Time, the Contract or shall notify the Architect and AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 28 shall not proceed to implement the change in the Work. If the Contractor performs the W ork set forth in the Architect’s order for a minor change without prior notice to the Architect that such change will affect the Contract Sum or Contract Time, the Contractor waives any adjustment to the Contract Sum or extension of the Contract Time. ARTICLE 8 TIME § 8.1 Definitions § 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized a djustments, allotted in the Contract Documents for Substantial Completion of the Work. § 8.1.2 The date of commencement of the Work is the date established in the Agreement. § 8.1.3 The date of Substantial Completion is the date certified by the Architect in accor dance with Section 9.8. § 8.1.4 The term “day” as used in the Contract Documents shall mean calendar day unless otherwi se specifically defined. § 8.2 Progress and Completion § 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. B y executing the Agreement, the Contractor confirms that the Contract Time is a reasonable period for performing the Work. § 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, commence the Work prior to the effective date of insurance required to be furnished by the Contrac tor and Owner. § 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion within the Contract Time. § 8.3 Delays and Extensions of Time § 8.3.1 If the Contractor is delayed at any time in the commencement or progress of the Work by ( 1) an act or neglect of the Owner or Architect, of an employee of either, or of a Separate Cont ractor; (2) by changes ordered in the Work; (3) by labor disputes, fire, , unavoidable casualties, adverse weather c onditions documented in accordance with Section 15.1.6.2, or other causes beyond the Contractor’s control; (4) by delay autho rized by the Owner pending mediation and binding dispute resolution; or (5) by other causes that the Contractor asserts, and the Architect determines, justify delay, then the Contract Time shall be extended f or such reasonable time as the Architect may determine and Owner approves. § 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Article 15. § 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either party under other provisions of the Contract Documents. ARTICLE 9 PAYMENTS AND COMPLETION § 9.1 Contract Sum § 9.1.1 The Contract Sum is stated in the Agreement and, including authorized adjustments, i s the total amount payable by the Owner to the Contractor for performance of the Work under the Contract D ocuments. § 9.1.2 If unit prices are stated in the Contract Documents or subsequently agreed upon, an d if quantities originally contemplated are materially changed so that application of such unit prices to the actual quantities causes substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted. § 9.2 Schedule of Values Where the Contract is based on a stipulated sum or Guaranteed Maximum Price, the C ontractor shall submit a schedule of values to the Architect before the first Application for Payment, allocating the entire Contract Sum to the various portions of the Work. The schedule of values shall be prepared in the form, a nd supported by the data to substantiate its accuracy, required by the Architect. This schedule, unless obj ected to by the Architect, shall be used as a basis for reviewing the Contractor’s Applications for Payment. Any changes to the schedule of values shall be submitted to the Architect and supported by such data to substantiate its accuracy as the Architect may require, and AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 29 unless objected to by the Architect, shall be used as a basis for reviewing the Contr actor’s subsequent Applications for Payment. § 9.3 Applications for Payment § 9.3.1 At least ten days before the date established for each progress payment, the Contr actor shall submit to the Architect an itemized Application for Payment prepared in accordance with the sc hedule of values, if required under Section 9.2, for completed portions of the Work. The application shall be notarized, if requir ed, and supported by all data substantiating the Contractor’s right to payment that the Owner or Architect require, such as copies of requisitions, and releases and waivers of liens from Subcontractors and suppliers, and shall reflect retainage if provided for in the Contract Documents. § 9.3.1.1 As provided in Section , 7.1.1.2.4, such applications may include requests for payment on account of changes in the Work that have been properly authorized by Construction Change Directives, or by interim determinations of the Architect, but not yet included in Change Orders. § 9.3.1.2 Applications for Payment shall not include requests for payment for portions of the Work for which the Contractor does not intend to pay a Subcontractor or supplier, unless such Work has been pe rformed by others whom the Contractor intends to pay. § 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the W ork. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the sit e shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner’s title to such materials and equipment or otherwise protect the Owner’s interest, and shall include the costs of applicable insurance, storage, and transportation to the site, for such materials and equipment stored off the site. § 9.3.2.1 Contractor shall provide invoices, package slips, or other form of supportin g data for materials stored onsite claimed on the progress payment, unless it can be verified through on -site observations. Maintain concise bill of materials and label materials stored on-site for ready identification and verification. § 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon subm ittal of an Application for Payment all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor’s knowledge, information, and belief, be free and clear of liens, claims, security interests, or encumbrances, in favor of the Contractor, Subcontract ors, suppliers, or other persons or entities that provided labor, materials, and equipment relating to the Work. § 9.4 Certificates for Payment § 9.4.1 The Architect will, unless otherwise agreed upon, within seven working days after receipt of the Contractor’s Application for Payment, either (1) issue to the Owner a Certificate for Payment in the full amount of the Application for Payment, with a copy to the Contractor; or (2) issue to the Owner a Certificate for Payment for such amount as the Architect determines is properly due, and notify the Contractor and Owner of the Architect’s reasons for withholding certification in part as provided in Section 9.5.1; or (3) withhold certification of the entire Application for Payment, and notify the Contractor and Owner of the Architect’s r eason for withholding certification in whole as provided in Section 9.5.1. § 9.4.2 The issuance of a Certificate for Payment will constitute a representation by th e Architect to the Owner, based on the Architect’s evaluation of the Work and the data in the Application for Payment, that, to the best of the Architect’s knowledge, information, and belief, the Work has progressed to the point indicated, the quality of the Work is in general conformance with the Contract Documents, and that the Contractor is entitled to payment in the amount certified. The foregoing representations are subject to an evaluation of the Work for general conformance with the Contract Documents upon Substantial Completion, to results of subsequent test s and inspections, to correction of minor deviations from the Contract Documents prior to completion , and to specific qualifications expressed by the Architect. However, the issuance of a Certificate for Payment is not a representation that the Architect has (1) made exhaustive or continuous on-site inspections to check the quality or quantity of the Work; (2) reviewed construction means, methods, techniques, sequences, or procedures; (3) reviewed copies of requisitions received from Subcontractors and suppliers and other data requested by the Owner to subst antiate the Contractor’s AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 30 right to payment; or (4) made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum. § 9.5 Decisions to Withhold Certification § 9.5.1 The Architect may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to protect the Owner, if in the Architect’s opinion the representations to the Ow ner required by Section 9.4.2 cannot be made. If the Architect is unable to certify payment in the amount of the Application, the Architect will notify the Contractor and Owner as provided in Section 9.4.1. If the Contractor and Architect cannot agree on a revised amount, the Architect will promptly issue a Certificate for Payment for the amount for which the Architect is able to make such representations to the Owner. The Architect may also withhold a Certif icate for Payment or, because of subsequently discovered evidence, may nullify the whole or a part of a Certificate f or Payment previously issued, to such extent as may be necessary in the Architect’s opinion to protect the Owner from l oss for which the Contractor is responsible, including loss resulting from acts and omissions described in Sect ion 3.3.2, because of .1 defective Work not remedied; .2 third party claims filed or reasonable evidence indicating probable filing of such c laims, unless security acceptable to the Owner is provided by the Contractor; .3 failure of the Contractor to make payments properly to Subcontractors or suppliers fo r labor, materials or equipment; .4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contra ct Sum; .5 damage to the Owner or a Separate Contractor; .6 reasonable evidence that the Work will not be completed within the Contract Time, a nd that the unpaid balance would not be adequate to cover actual or liquidated damages for the antici pated delay; or .7 repeated failure to carry out the Work in accordance with the Contract Documents. § 9.5.2 When either party disputes the Architect’s decision regarding a Certificate for Payment under Section 9.5.1, in whole or in part, that party may submit a Claim in accordance with Article 15. § 9.5.3 When the reasons for withholding certification are removed, certification will be made for amounts previously withheld. § 9.5.4 If the Architect withholds certification for payment under Section 9.5.1.3, the Owner may, at its sole option, issue joint checks to the Contractor and to any Subcontractor or supplier to whom the Contrac tor failed to make payment for Work properly performed or material or equipment suitably delivered. If t he Owner makes payments by joint check, the Owner shall notify the Architect and the Contractor shall refle ct such payment on its next Application for Payment. § 9.6 Progress Payments § 9.6.1 After the Architect has issued a Certificate for Payment, the Owner shall make paym ent in the manner and within the time provided in the Contract Documents, and shall so notify the Architec t. § 9.6.1.1 The Owner may withhold payments to the Contractor notwithstanding the Architec t’s certification if it is necessary, in the Owner’s opinion, to do so to protect the Owner from loss due to any of the reasons set forth in Sections 9.5.1.1 through 9.5.1.7. § 9.6.2 Payment of Subcontractors §9.6.2.1 The Contractor shall pay each Subcontractor, no later than seven days after receipt of payment from the Owner, the amount to which the Subcontractor is entitled, reflecting percentages a ctually retained from payments to the Contractor on account of the Subcontractor’s portion of the Work. The Contractor sha ll, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar manner. §9.6.2.2 Within seven (7) working days after receipt of amounts paid to the Contract or by the Owner for Work performed under this Agreement, the Contractor shall do one of the following : a. Pay each Subcontractor for the proportional share of the total payment received from the Owner attributable to the Work performed by the respective Subcontractor under This A greement; or AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 31 b. Notify the Owner and Architect, and Subcontractor, in writing, of the Contract or's intention to withhold all or part of the Subcontractor's payment with the reason for nonpayment. §9.6.2.3 The Contractor shall pay interest to each Subcontractor on all amounts owed b y the Contractor that remain unpaid after seven (7) days following receipt by the Contractor of payment from the Owner for Work performed by the affected Subcontractor under this Agreement, except for amo unts withheld as allowed in Section 9.6.8.1. Unless otherwise provided under the terms of this Agreement , for purposes solely of these prompt payment provisions, interest shall accrue at the rate of one percent (1%) per month. §9.6.2.4 In each Subcontract, the Contractor shall include a provision requiring each S ubcontractor to include or otherwise be subject to the same payment and interest requirements with respect to each lower-tier Subcontractor (Sub-Subcontractor). §9.6.2.5 The Contractor’s obligation to pay interest to a Subcontractor pursuant to the prompt payment provisions is not an obligation of the Owner, and no modification shall be made to this Agre ement and no cost reimbursements claim shall be made for the purpose of providing reimbursement by Owner for such interest charge. § 9.6.3 The Architect will, on request, furnish to a Subcontractor, if practicable, information regarding percentages of completion or amounts applied for by the Contractor and action taken thereon by the Archite ct and Owner on account of portions of the Work done by such Subcontractor. § 9.6.4 The Owner has the right to request written evidence from the Contractor that the C ontractor has properly paid Subcontractors and suppliers amounts paid by the Owner to the Contractor for subco ntracted Work. If the Contractor fails to furnish such evidence within seven days, the Owner shall have the right to contact Subcontractors and suppliers to ascertain whether they have been properly paid. Neither the Owner nor A rchitect shall have an obligation to pay, or to see to the payment of money to, a Subcontractor or supplier, except as may otherwise be required by law. § 9.6.5 The Contractor’s payments to suppliers shall be treated in a manner similar to that provided in Sections 9.6.2, 9.6.3 and 9.6.4. § 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occupa ncy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract Doc uments. § 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contr act Sum, payments received by the Contractor for Work properly performed by Subcontractors or p rovided by suppliers shall be held by the Contractor for those Subcontractors or suppliers who performed Work or furnis hed materials, or both, under contract with the Contractor for which payment was made by the Owner. Nothing containe d herein shall require money to be placed in a separate account and not commingled with money of the Cont ractor, create any fiduciary liability or tort liability on the part of the Contractor for breach of trust, or entitle any person or entity to an award of punitive damages against the Contractor for breach of the requirement s of this provision. § 9.6.8 Provided the Owner has fulfilled its payment obligations under the Contract Documents, the Contractor shall defend and indemnify the Owner from all loss, liability, damage or expense, including re asonable attorney’s fees and litigation expenses, arising out of any lien claim or other claim for payment by a ny Subcontractor or supplier of any tier. Upon receipt of notice of a lien claim or other claim for payment, the O wner shall notify the Contractor. If approved by the applicable court, when required, the Contractor may substitute a sur ety bond for the property against which the lien or other claim for payment has been asserted. § 9.7 Failure of Payment If, unless otherwise agreed upon, the Architect does not issue a Certificate for Payment, through no fault of the Contractor, within seven working days after receipt of the Contractor’s Application for Payment, or if the Owner does not pay the Contractor within seven working days after the date established in the Contract Documents, the amount certified by the Architect or awarded by binding dispute resolution, then the Contra ctor may, upon seven additional working days’ notice to the Owner and Architect, stop the Work until payment of the amount owin g has AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 32 been received. The Contract Time shall be extended appropriately and the Contract Su m shall be increased by the amount of the Contractor’s reasonable costs of shutdown, delay and start -up, plus interest as provided for in the Contract Documents. § 9.8 Substantial Completion § 9.8.1 Substantial Completion is the stage when the Building is sufficiently complete in accordance with the Contract Documents so that the Owner can fully utilize it for its intended purpose, with all of the Building’s parts and systems operable as required by the Contract Documents. , with only minor punch list items remaining. § 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall prepare and submi t to the Architect a comprehensive list of items to be completed or corrected. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. § 9.8.3 Upon receipt of the Contractor’s list, the Architect will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the Architect discloses any item, whether or not included on the Contractor’s list, which is not sufficiently complete in accordance with the C ontract Documents so that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by the Architect. In such case, the Contractor shall then submit a request for another inspection by the Archite ct to determine Substantial Completion. §9.8.3.1 The Architect will provide no more than one (1) inspection to determine whe ther the Work or a designated portion thereof has attained Substantial Completion in accordance with the Contract Documents. The Owner shall deduct from the Contract Sum amounts paid to the Architect for any a dditional inspections. § 9.8.4 When the Work or designated portion thereof is substantially complete, the Architect will prepare a Certificate of Substantial Completion that shall establish the date of Substantial Co mpletion; establish responsibilities of the Owner and Contractor for security, maintenance, heat, uti lities, damage to the Work and insurance; and fix the time within which the Contractor shall finish all items on the lis t accompanying the Certificate. Warranties required by the Contract Documents shall commence on th e date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certific ate of Substantial Completion. § 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Con tractor for their written acceptance of responsibilities assigned to them in the Certificate. Upon such acceptance, and consent of surety if any, the Owner shall make payment of retainage applying to the Work or designated portion thereof. Such payment shall be adjusted for Work that is incomplete or not in accordance with the requirement s of the Contract Documents. § 9.9 Partial Occupancy or Use § 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work a t any stage when such portion is designated by separate agreement with the Contractor, provided such occ upancy or use is consented to by the insurer and authorized by public authorities having jurisdiction over the Project. S uch partial occupancy or use may commence whether or not the portion is substantially complete, provided the O wner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agree d in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and submit a list to the Architect as provided under Section 9.8.2. Consent of the Contractor to partial occupancy or use shall not be unreasonabl y withheld. The stage of the progress of the Work shall be determined by written agreement betwe en the Owner and Contractor or, if no agreement is reached, by decision of the Architect. § 9.9.2 Immediately prior to such partial occupancy or use, the Owner, Contractor, and A rchitect shall jointly review the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. § 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Wor k shall not constitute acceptance of Work not complying with the requirements of the Contract Doc uments. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 33 § 9.10 Final Completion and Final Payment § 9.10.1 Upon receipt of the Contractor’s notice that the Work is ready for final inspection and a cceptance and upon receipt of a final Application for Payment, the Architect will promptly make su ch inspection. When the Architect finds the Work acceptable under the Contract Documents and the Contract fully perfor med, the Architect will promptly issue a final Certificate for Payment stating that to the best of the Arch itect’s knowledge, information and belief, and on the basis of the Architect’s on-site visits and inspections, the Work has been completed in general compliance with the Contract Documents and that the entire balance found to be due the Contractor a nd noted in the final Certificate is due and payable. The Architect’s final Certificate for Payment will constitute a further representation that conditions listed in Section 9.10.2 as precedent to the Contractor’s being entitled to final payment have been fulfilled. §9.10.1.1 Omitted (Payment of Architect for Additional Inspections) § 9.10.2 Neither final payment nor any remaining retained percentage shall become due until t he Contractor submits to the Architect for the record (1) an affidavit that payrolls, bills for materials and equipment, and other inde btedness connected with the Work for which the Owner or the Owner’s property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect, (3) a written statement that the Contractor knows of no reason that the insurance will not be re newable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final payment , (5) documentation of any special warranties, such as manufacturers’ warranties or specific Subcontracto r warranties, and (6) if required by the Owner, other data establishing payment or satisfaction of obligations, such as r eceipts and releases and waivers of liens, claims, security interests, or encumbrances arising out of the Contra ct, to the extent and in such form as may be designated by the Owner. If a Subcontractor refuses to furnish a release or wa iver required by the Owner, the Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner agai nst such lien, claim, security interest, or encumbrance. If a lien, claim, security interest, or encumbrance rem ains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compell ed to pay in discharging the lien, claim, security interest, or encumbrance, including all costs and rea sonable attorneys’ fees. § 9.10.3 If, after Substantial Completion of the Work, final completion thereof is mate rially delayed through no fault of the Contractor or by issuance of Change Orders affecting final completion, an d the Architect so confirms, the Owner shall, upon application by the Contractor and certification by the Architect, and without terminating the Contract, make payment of the balance due for that portion of the Work fully complet ed, corrected, and accepted. If the remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract Documents, and if bonds have been furnished, the written consent of the surety to payment of t he balance due for that portion of the Work fully completed and accepted shall be submitted by the C ontractor to the Architect prior to certification of such payment. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of Claims. § 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from .1 liens, Claims, security interests, or encumbrances arising out of the Contrac t and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; .3 terms of special warranties required by the Contract Documents; or .4 audits performed by the Owner, if permitted by the Contract Documents, after final payment. § 9.10.5 Acceptance of final payment by the Contractor, a Subcontractor, or a supplier, shall constitute a waiver of claims by that payee except those previously made in writing and identified by that paye e as unsettled at the time of final Application for Payment. §9.11 LIQUIDATED DAMAGES §9.11.1 The Contractor shall be liable for and shall pay the Owner the sum of $1,000.00 per day as liqui dated damages for each working day of delay after the date established for Substantial Completion in the Contra ct Documents until the Work is Substantially Complete. Once Substantial Completion has been obtained, the Contractor shall have 60 additional working days to complete any remaining punch list items, and the Contractor shall pay the Owner the sum of $1,000.00 per day as liquidated damages for eac h working day of delay after 60 days that the Contractor fails to achieve Final Completion. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 34 §9.11.2 The Owner and Contractor have established this amount as a reasonable and proper measure of liquidated damages which the Owner will sustain per day by the failure of the Contractor to substantially complete the Work at the stipulated time and it is not to be construed in any sense as a penalty. §9.11.3 Omitted (Architect Fees in addition to Liquidated Damages) ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY § 10.1 Safety Precautions and Programs The Contractor shall be responsible for initiating, maintaining, and supervising al l safety precautions and programs in connection with the performance of the Contract. § 10.2 Safety of Persons and Property § 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide r easonable protection to prevent damage, injury, or loss to .1 employees on the Work and other persons who may be affected thereby; .2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody, or control of the Contractor, a Subcontractor, or a Sub -subcontractor; and .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designated for removal, relocation, or r eplacement in the course of construction. § 10.2.2 The Contractor shall comply with, and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities, bearing on safety of persons or property or their protection from damage, injury, or loss. § 10.2.3 The Contractor shall implement, erect, and maintain, as required by existing c onditions and performance of the Contract, reasonable safeguards for safety and protection, including posting da nger signs and other warnings against hazards; promulgating safety regulations; and notifying the owners and users of adjacent sites and utilities of the safeguards. § 10.2.4 When use or storage of explosives or other hazardous materials or equipment , or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. § 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Secti ons 10.2.1.2 and 10.2.1.3 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor i s responsible under Sections 10.2.1.2 and 10.2.1.3. The Contractor may make a Claim for the cost to remedy the damage or loss to the extent such damage or loss is attributable to acts or omissions of the Owner or Archi tect or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them ma y be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contrac tor are in addition to the Contractor’s obligations under Section 3.18. § 10.2.6 The Contractor shall designate a responsible member of the Contractor’s organiz ation at the site whose duty shall be the prevention of accidents. This person shall be the Contractor’s superintende nt unless otherwise designated by the Contractor in writing to the Owner. § 10.2.7 The Contractor shall not permit any part of the construction or site to be loaded so as to c ause damage or create an unsafe condition. § 10.2.8 Injury or Damage to Person or Property If either party suffers injury or damage to person or property because of an act or omission of the other party, or of others for whose acts such party is legally responsible, notice of the injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice shall provide sufficient detail to enable the other party to investigate the matter. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 35 § 10.3 Hazardous Materials and Substances § 10.3.1 The Contractor is responsible for compliance with any requirements included in the Contract Documents regarding hazardous materials or substances. If the Contractor encounters a hazar dous material or substance not addressed in the Contract Documents and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including but not li mited to asbestos or polychlorinated biphenyl (PCB), encountered on the site by the Contractor, the Contract or shall, upon recognizing the condition, immediately stop Work in the affected area and notify the Owner and Ar chitect of the condition. § 10.3.2 Upon receipt of the Contractor’s notice, the Owner may obtain the services of a licensed laboratory to verify the presence or absence of the material or substance reported by the Contra ctor and, in the event such material or substance is found to be present, to cause it to be rendered harmless. Unless othe rwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor the names and qualifi cations of persons or entities who are to perform tests verifying the presence or absence of the material or substance or who are to perform the task of removal or safe containment of the material or substance. The Contractor will promptly reply to the Owner in writing stating whether or not either has reasonable objection to the persons or e ntities proposed by the Owner. If the Contractor has an objection to a person or entity proposed by the Owner, the Owner shall propose another to whom the Contractor has no reasonable objection. When the material or substance has been rendered harmless, Work in the affected area shall resume upon written agreement of the Owner and Contractor. By Change Order, the Contract Time shall be extended appropriately and the Contract Sum shall be increased by the a mount of the Contractor’s reasonable additional costs of shutdown, delay, and start-up. § 10.3.4 The Owner shall not be responsible under this Section 10.3 for hazardous materials or substances the Contractor brings to the site unless such materials or substances are required by t he Contract Documents. The Owner shall be responsible for hazardous materials or substances required by the Cont ract Documents, except to the extent of the Contractor’s fault or negligence in the use and handling of such material s or substances. § 10.3.5 The Contractor shall reimburse the Owner for the cost and expense the Owner incurs (1) for remediation of hazardous materials or substances the Contractor brings to the site and negligently ha ndles, or (2) where the Contractor fails to perform its obligations under Section 10.3.1, except to the extent that the cost and expense are due to the Owner’s fault or negligence. § 10.4 Emergencies In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor’s discretion, to prevent threatened damage, injury, or loss. Additional compensation or extension o f time claimed by the Contractor on account of an emergency shall be determined as provided in Article 15 and Article 7. ARTICLE 11 INSURANCE AND BONDS § 11.1 Contractor’s Insurance and Bonds § 11.1.1 The Contractor shall purchase and maintain insurance of the types and limits of li ability, containing the endorsements, and subject to the terms and conditions, as described in the Agreement or elsewhere in the Contract Documents. The Contractor shall purchase and maintain the required insurance f rom an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located. The Owner, Architect, and Architect’s consultants shall be named as additional insureds under the Contractor’s commercial general liability policy or as otherwise described in the Contract Documents. § 11.1.2 The Contractor shall provide surety bonds of the types, for such penal sums, and subject to such terms and conditions as required by the Contract Documents. The Contractor shall purchase and m aintain the required bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdicti on where the Project is located. § 11.1.3 Upon the request of any person or entity appearing to be a potential beneficiary of bonds co vering payment of obligations arising under the Contract, the Contractor shall promptly furnish a co py of the bonds or shall authorize a copy to be furnished. § 11.1.4 Notice of Cancellation or Expiration of Contractor’s Required Insurance. Within three (3) working days of the date the Contractor becomes aware of an impending or actual cancellation or expira tion of any insurance required by the Contract Documents, the Contractor shall provide notice to the Owner of such impending or actual cance llation AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 36 or expiration. Upon receipt of notice from the Contractor, the Owner shall, unle ss the lapse in coverage arises from an act or omission of the Owner, have the right to stop the Work until the lapse in coverage ha s been cured by the procurement of replacement coverage by the Contractor. The furnishing of notice by the Contractor shall not rel ieve the Contractor of any contractual obligation to provide any required coverage. § 11.2 Owner’s Insurance § 11.2.1 The Owner shall purchase and maintain insurance of the types and limits of liabil ity, containing the endorsements, and subject to the terms and conditions, as described in the Agreement or elsewhere in the Contract Documents. The Owner shall purchase and maintain the required insurance from an insur ance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Proje ct is located. § 11.2.2 Property Insurance. The Contractor shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, pr operty insurance written on a builder’s risk “all-risk” or equivalent policy form in the amount of the initial Contract Sum as w ell as subsequent Contract modifications thereto for the entire Work at the site on a replacem ent cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise agre ed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has bee n made as provided in Section 9.10 or until no person or entity other than the Owner has an insurable interest in the propert y required by this Section 11.3 to be covered, whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub-subcontractors in the Project. § 11.2.3 Property insurance shall be on an “all-risk” or equivalent policy form and shall insure against the pe rils of fire and extended coverage and physical loss or damage including, without duplic ation of coverage, theft, vandalism, malicious mischief, collapse, collapse, earthquake, flood, windstorm, false work, testing and startup, temporary buildings, and debris removal, including demolition occasioned by enfo rcement of any applicable legal requirements, and shall cover reasonable compensation for Architect's services and expenses required as a result of such insured loss. Coverage for other perils shall not be required unless ot herwise provided in the Contract Documents. §11.2.4 If the property insurance requires minimum deductibles and such deductibles are identi fied in the Contract Documents, the Contractor shall pay costs not covered because of such deductibl es. § 11.2.5 This property insurance shall cover portions of the Work stored off the s ite, and also portions of the Work in transit. §11.2.6 Partial occupancy or use in accordance with Section 9.9 shall not commen ce until the insurance company or companies providing property insurance have consented to such partial occupancy o r use by endorsement or otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with re spect to partial occupancy or use that would cause cancellation, lapse, or reduction of insurance. ARTICLE 12 UNCOVERING AND CORRECTION OF WORK § 12.1 Uncovering of Work § 12.1.1 If a portion of the Work is covered contrary to the Architect’s request or to requir ements specifically expressed in the Contract Documents, it must, if requested in writing by the Archite ct, be uncovered for the Architect’s review and be replaced at the Contractor’s expense without change in the Contract Time. § 12.1.2 If a portion of the Work has been covered that the Architect has not specifically re quested to review prior to its being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor. If such Work is in accordance with the Contract Documents, the Contractor shall be entitl ed to an equitable adjustment to the Contract Sum and Contract Time as may be appropriate. If such Work is not in acc ordance with the Contract Documents, the costs of uncovering the Work, and the cost of correction, shall be at the Cont ractor’s expense without change to the contract time.. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 37 § 12.2 Correction of Work § 12.2.1 Before Substantial Completion The Contractor shall promptly correct Work rejected by the Architect or Owner or failing to conform to the requirements of the Contract Documents, discovered before Substantial Completion a nd whether or not fabricated, installed or completed. Costs of correcting such rejected Work, including additiona l testing and inspections, the cost of uncovering and replacement, and compensation for the Architect’s services and e xpenses made necessary thereby, shall be at the Contractor’s expense without change to the contract time. § 12.2.2 After Substantial Completion § 12.2.2.1 In addition to the Contractor’s obligations under Section 3.5, if, within one year after the date of Substantial Completion of the Work or designated portion thereof or after the date f or commencement of warranties established under Section 9.9.1, or by terms of any applicable special warranty required by the Contract Docume nts, any of the Work is found to be not in accordance with the requirements of the Contract Document s, the Contractor shall correct it promptly after receipt of notice from the Owner to do so, unless the Owner has previously given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after discovery of the condition. During the one-year period for correction of Work, if the Owner fails to notify the Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to r equire correction by the Contractor and to make a claim for breach of warranty. If the Contractor fai ls to correct nonconforming Work within a reasonable time during that period after receipt of notice from the Owner or Architect, the Owner may correct it in accordance with Section 2.5. § 12.2.2.2 The one-year period for correction of Work shall be extended with respect to portions of Wor k first performed after Substantial Completion by the period of time between Substantial Completion and the actual completion of that portion of the Work. § 12.2.2.3 The one-year period for correction of Work shall not be extended by corrective Work perfor med by the Contractor pursuant to this Section 12.2. §12.2.2.4 If required by the Owner and the Architect and, upon request by the Owner and prior to the expir ation of one year from the date of Substantial Completion, the Architect will conduct and the Contractor shall attend a meeting with the Owner to review the facility operations and performance and t he Work. § 12.2.3 The Contractor shall remove from the site portions of the Work that are not in accordanc e with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner. § 12.2.4 The Contractor shall bear the cost of correcting destroyed or damaged construction of the Owner or Separate Contractors, whether completed or partially completed, caused by the C ontractor’s correction or removal of Work that is not in accordance with the requirements of the Contract Documents. § 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to other obligations the Contractor has under the Contract Documents. Establishment of t he one-year period for correction of Work as described in Section 12.2.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenc ed to establish the Contractor’s liability with respect to the Contractor’s obligations other than spe cifically to correct the Work. § 12.3 Acceptance of Nonconforming Work If the Owner prefers to accept Work that is not in accordance with the requireme nts of the Contract Documents, the Owner may do so instead of requiring its removal and correction, in which case the Cont ract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made. ARTICLE 13 MISCELLANEOUS PROVISIONS § 13.1 Governing Law The Contract shall be governed by South Carolina law. § 13.2 Successors and Assigns § 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns, and legal representatives to covenants, agreements, and obligations contained in the Contrac t Documents. Except as provided AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 38 in Section 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make an assignment without such consent, that par ty shall nevertheless remain legally responsible for all obligations under the Contract. § 13.2.2 The Owner may, without consent of the Contractor, assign the Contract to a lender provi ding construction financing for the Project, if the lender assumes the Owner’s rights and obligat ions under the Contract Documents. The Contractor shall execute all consents reasonably required to facilitate the assignment. § 13.3 Rights and Remedies § 13.3.1 Duties and obligations imposed by the Contract Documents and rights and remedies avai lable thereunder shall be in addition to and not a limitation of duties, obligations, rights, and remedi es otherwise imposed or available by law. § 13.3.2 No action or failure to act by the Owner, Architect, or Contractor shall constit ute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder, except as may be specifically agreed upon in writing. § 13.4 Tests and Inspections § 13.4.1 Tests, inspections, and approvals of portions of the Work shall be made as required by the Contract Documents and by applicable laws, statutes, ordinances, codes, rules, and regula tions or lawful orders of public authorities. Unless otherwise provided, the Contractor shall make arrangement s for such tests, inspections, and approvals with an independent testing laboratory or entity acceptable to the Owner, or wit h the appropriate public authority, and shall bear all related costs of tests, inspections, and approvals. The Contractor shall give the Architect timely notice of when and where tests and inspections are to be made so that the Archi tect may be present for such procedures. The Owner shall bear costs of tests, inspections, or approvals that do not become requirements until after bids are received or negotiations concluded. § 13.4.2 If the Architect, Owner, or public authorities having jurisdiction determine tha t portions of the Work require additional testing, inspection, or approval not included under Section 13.4.1, the Architect will, upon written authorization from the Owner, instruct the Contractor to make arrangements for s uch additional testing, inspection, or approval, by an entity acceptable to the Owner, and the Contractor shall give timely notice to the Architect of when and where tests and inspections are to be made so that the Architect may be pres ent for such procedures. Such costs, except as provided in Section 13.4.3, shall be at the Owner’s expense. § 13.4.3 If procedures for testing, inspection, or approval under Sections 13.4.1 and 13.4.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary by such failure, including those of repeated procedures and compensation for the Architec t’s services and expenses, shall be at the Contractor’s expense without change to contract time. § 13.4.4 Required certificates of testing, inspection, or approval shall, unless otherwi se required by the Contract Documents, be secured by the Contractor and submitted to the Architect. § 13.4.5 If the Architect is to observe tests, inspections, or approvals required by the Cont ract Documents, the Architect will do so in a timely manner and, where practicable, at the normal place of testing. § 13.4.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to a void unreasonable delay in the Work. § 13.5 Interest Payments due and unpaid under the Contract Documents shall bear interest from the da te payment is due at the rate the parties agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT § 14.1 Termination by the Contractor § 14.1.1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 c onsecutive days through no act or fault of the Contractor, a Subcontractor, a Sub-subcontractor, their agents or employees, or any other persons or entities performing portions of the Work, for any of the following reas ons: AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 39 .1 Issuance of an order of a court or other public authority having jurisdiction that requires all Work to be stopped; .2 An act of government, such as a declaration of national emergency, that requires al l Work to be stopped; .3 Because the Architect has not issued a Certificate for Payment and has not notif ied the Contractor of the reason for withholding certification as provided in Section 9.4.1, or because the Owner has not made payment on a Certificate for Payment within the time stated in the Contract Do cuments; or .4 The Owner has failed to furnish to the Contractor reasonable evidence as required by S ection 2.2. § 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor, a Subcontractor, a Sub-subcontractor, their agents or employees, or any other persons or entities perfor ming portions of the Work, repeated suspensions, delays, or interruptions of the entire Work by the Owner as descr ibed in Section 14.3, constitute in the aggregate more than 100 percent of the total number of days scheduled f or completion, or 120 days in any 365-day period, whichever is less. § 14.1.3 If one of the reasons described in Section 14.1.1 or 14.1.2 exists, the Contractor may, upon seven working days’ notice to the Owner and Architect, terminate the Contract and recover fr om the Owner payment for Work executed, as well as reasonable overhead and profit on Work not executed, and costs incurre d by reason of such termination, including de-mobilization expenses. § 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contra ctor, a Subcontractor, a Sub-subcontractor, or their agents or employees or any other persons or entities performi ng portions of the Work because the Owner has repeatedly failed to fulfill the Owner’ s obligations under the Contract Documents with respect to matters important to the progress of the Work, the Contr actor may, upon seven additional working days’ notice to the Owner and the Architect, terminate the Contract and recover fr om the Owner as provided in Section 14.1.3. § 14.2 Termination by the Owner for Cause § 14.2.1 The Owner may terminate the Contract if the Contractor .1 repeatedly refuses or fails to supply enough properly skilled workers or proper mater ials; .2 fails to make payment to Subcontractors or suppliers in accordance with the respective agreements between the Contractor and the Subcontractors or Suppliers; .3 repeatedly disregards applicable laws, statutes, ordinances, codes, rules and r egulations, or lawful orders of a public authority; or .4 otherwise is guilty of substantial breach of a provision of the Contract Documents. § 14.2.2 When any of the reasons described in Section 14.2.1 exist, and upon determination by the Architect that sufficient cause exists to justify such action, the Owner may, without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor’s surety, if any, seven days’ notice, terminate employment of the Contractor and may, subject to any prior rights of the surety: .1 Exclude the Contractor from the site and take possession of all materials, equipm ent, tools, and construction equipment and machinery thereon owned by the Contractor; .2 Accept assignment of subcontracts pursuant to Section 5.4; and .3 Finish the Work by whatever reasonable method the Owner may deem expedient. Upon writte n request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs incurred by the Owner in finishing the Work. § 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2.1, the Contractor shall not be entitled to receive further payment until the Work is finished. § 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including com pensation for the Architect’s services and expenses made necessary thereby, and other dama ges incurred by the Owner and not expressly waived, such excess shall be paid to the Contractor. If such costs and damage s exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The amount to be paid to the Contra ctor or Owner, as the case may be, shall be determined by the Initial Decision Maker, upon application, and this obligation for payment shall survive termination of the Contract. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 40 § 14.3 Suspension by the Owner for Convenience § 14.3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work, in whole or in part for such period of time as the Owner may determine. § 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and t ime caused by suspension, delay, or interruption under Section 14.3.1. Adjustment of the Contract Sum shall include profit. No adjustment shall be made to the extent .1 that performance is, was, or would have been, so suspended, delayed, or interrupted, by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of the Contract. § 14.4 Termination by the Owner for Convenience § 14.4.1 The Owner may, at any time, terminate the Contract for the Owner’s convenience a nd without cause. § 14.4.2 Upon receipt of notice from the Owner of such termination for the Owner’s convenienc e, the Contractor shall .1 cease operations as directed by the Owner in the notice; .2 take actions necessary, or that the Owner may direct, for the protection and pre servation of the Work; and .3 except for Work directed to be performed prior to the effective date of terminat ion stated in the notice, terminate all existing subcontracts and purchase orders and enter into no fu rther subcontracts and purchase orders. § 14.4.3 In case of such termination for the Owner’s convenience, the Owner shall pay the C ontractor for Work properly executed; costs incurred by reason of the termination, including costs attributable to termination of Subcontracts; and the termination fee, if any, set forth in the Agreement. ARTICLE 15 CLAIMS AND DISPUTES § 15.1 Claims § 15.1.1 Definition A Claim is a demand or assertion by one of the parties seeking, as a matter of ri ght, payment of money, a change in the Contract Time, or other relief with respect to the terms of the Contract. Th e term “Claim” also includes other disputes and matters in question between the Owner and Contractor arising out of or r elating to the Contract. The responsibility to substantiate Claims shall rest with the party making the Clai m. This Section 15.1.1 does not require the Owner to file a Claim in order to impose liquidated damages in accordance with the Contract Documents. § 15.1.2 Time Limits on Claims The Owner and Contractor shall commence all Claims and causes of action against the other and arising out of or related to the Contract, whether in contract, tort, breach of warranty or ot herwise, in accordance with the requirements of the binding dispute resolution method selected in the Agreement and w ithin the period specified by applicable law, but in any case not more than 10 years after the date of Substantial Completion of the Work. The Owner and Contractor waive all Claims and causes of action not commenced in accordance with this Section 15.1.2. § 15.1.3 Notice of Claims § 15.1.3.1 Claims by either the Owner or Contractor, where the condition giving rise to the Claim is first discovered prior to expiration of the period for correction of the Work set forth in Section 12.2.2, shall be initiated by notice to the other party and to the Initial Decision Maker with a copy sent to the Architect, i f the Architect is not serving as the Initial Decision Maker. Claims by either party under this Section 15.1.3.1 shal l be initiated within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. § 15.1.3.2 Claims by either the Owner or Contractor, where the condition giving rise to the Claim is first disc overed after expiration of the period for correction of the Work set forth in Section 12.2.2, shall be initiated by no tice to the other party. In such event, no decision by the Initial Decision Maker is required. AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 41 § 15.1.4 Continuing Contract Performance § 15.1.4.1 Pending final resolution of a Claim, except as otherwise agreed in writing or as pr ovided in Section 9.7 and Article 14, the Contractor shall proceed diligently with performance of the C ontract and the Owner shall continue to make payments in accordance with the Contract Documents. § 15.1.4.2 The Contract Sum, Contract Time, or both shall be adjusted in accordance with the Initial Decision Maker’s decision, subject to the right of either party to proceed in accordance wit h this Article 15. The Architect will issue Certificates for Payment in accordance with the decision of the Initia l Decision Maker. § 15.1.5 Claims for Additional Cost If the Contractor wishes to make a Claim for an increase in the Contract Sum, notice as provided in Section 15.1.3 shall be given before proceeding to execute the portion of the Work that is the subject of the Claim. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Section 10.4. § 15.1.6 Claims for Additional Time § 15.1.6.1 If the Contractor wishes to make a Claim for an increase in the Contract Time, no tice as provided in Section 15.1.3 shall be given. The Contractor’s Claim shall include an estimat e of cost and of probable effect of delay on progress of the Work. In the case of a continuing delay, only one Claim is neces sary. § 15.1.6.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the peri od of time, could not have been reasonably anticipated, and had an adverse effect on the scheduled construction. Time extensions from adverse weather conditions shall not entitle the Contractor to “extended overhead” recovery. § 15.1.6.2.1 Weather data utilized to support claims for adverse weather conditions sh all be that obtained from the National Oceanic and Atmospheric Administration (NOAA) for the nearest weather station to the Project. Adverse weather conditions are defined as measurable precipitation (MP) of 0.1 " or more, or 1.0" or more of snow or ice pellets, or freezing temperature (FT) for a day (24 hours) when t he temperature remains at 32 degrees Fahrenheit or below. Only measurable precipitation (MP) or freezing te mperature (FT) shall be permitted to be claimed for any one calendar day. Time extensions for adverse weather condit ions shall be cumulative over the duration of the Project time and claims shall not be permitted for days for dryi ng out of rain-soaked soil, snow accumulation, or similar weather-related conditions or resulting Project conditions. .1 The Contractor agrees that it shall not be entitled to a time extension for normal inclement weather (weather conditions other than “adverse weather conditions”) which could hav e been expected at the Project locale due to precipitation or temperature, based upon actual data from the National Oceanic and Atmospheric Administration (NOAA) for the locality closest to the Project for a five-year period preceding the date of the Contract. The Contractor acknowledges and warrants that in m aking its proposal or bid and Construction Schedule for the Work, it gave due care and consideration to thi s expected number of calendar days of inclement weather for the locale of the Project and allowed for the impact of normal inclement weather on subsequent Work. During the time of performance, should the expected number of calendar days of normal inclement weather for the locale of the Project be less than originally anticipated by the Contractor and the Owner, at the time of contracting, those days not so affected by normal inclement weather shall be considered float time in the Construction Schedul e. .2 The Contractor agrees that the measure of adverse weather conditions due t o MP or FT during the period covered by this Contract shall be the number of days where adverse weather c onditions comply with the weather data referenced in subparagraph 15.1.6.2.1 . .3 Extensions of time will be made only for days in which abnormal adverse weather criteria cited in subparagraph 15.1.6.2.1 occur. .4 If the total calendar days lost due to adverse weather conditions, from the start of the Work at the Project by the Contractor until the principal portions of the Work are enclo sed, exceeds the total number of days to be expected to be lost for the same time period, a time extension, if gran ted, shall only be for AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 42 the number of calendar days needed to equal the excess number of calendar days lost to such adverse weather conditions. § 15.1.7 Waiver of Claims for Consequential Damages The Contractor and Owner waive Claims against each other for consequential damage s arising out of or relating to this Contract. This mutual waiver includes .1 damages incurred by the Owner for rental expenses, for losses of use, income, prof it, financing, business and reputation, and for loss of management or employee productivity or of the se rvices of such persons; and .2 damages incurred by the Contractor for principal office expenses including the compensat ion of personnel stationed there, for losses of financing, business and reputation, and for loss of profit, except anticipated profit arising directly from the Work. This mutual waiver is applicable, without limitation, to all consequential damages du e to either party’s termination in accordance with Article 14. Nothing contained in this Section 15.1.7 shall be deemed to preclude assessment of liquidated damages, when applicable, in accordance with the requirements of the Contract Documents. § 15.2 Initial Decision § 15.2.1 Claims, excluding those where the condition giving rise to the Claim is first discovered after expiration of the period for correction of the Work set forth in Section 12.2.2 or arising under Sections 10.3, 10.4, and 11.5, shall be referred to the Initial Decision Maker for initial decision. The Architect will serve as the Initial Decision Maker, unless otherwise indicated in the Agreement. Except for those Claims excluded by this Section 15.2.1, an initial decision shall be required as a condition precedent to mediation of any Claim. If an initial decision has not been rendered within 30 days after the Claim has been referred to the Initial Decision Maker, subject to Section 15.2.6 the party asserting the Claim may demand mediation without a decision having been re ndered. The Initial Decision Maker will not decide disputes between the Contractor and persons or entit ies other than the Owner. § 15.2.2 The Initial Decision Maker will review Claims and within ten working days of the receipt of a Claim take one or more of the following actions: (1) request additional supporting data from the clai mant or a response with supporting data from the other party, (2) reject the Claim in whole or in part, (3) approve the Claim, (4) suggest a compromise, or (5) advise the parties that the Initial Decision Maker is unab le to resolve the Claim if the Initial Decision Maker lacks sufficient information to evaluate the merits of the Claim or if the Initial Decision Maker concludes that, in the Initial Decision Maker’s sole discretion, it would be inappropriate for the Initial Decision Maker to resolve the Claim. § 15.2.3 In evaluating Claims, the Initial Decision Maker may, but shall not be obligated to , consult with or seek information from either party or from persons with special knowledge or expert ise who may assist the Initial Decision Maker in rendering a decision. The Initial Decision Maker may request the Owner to authorize retention of such persons at the Owner’s expense. § 15.2.4 If the Initial Decision Maker requests a party to provide a response to a Claim or to furnish additional supporting data, such party shall respond, within ten working days after receipt of the request, and shall either (1) provide a response on the requested supporting data, (2) advise the Initial Decision M aker when the response or supporting data will be furnished, or (3) advise the Initial Decision Maker that no supporting data will be furnished. Upon receipt of the response or supporting data, if any, the Initial Decision Maker will either reject or approve the Claim in whole or in part. § 15.2.5 The Initial Decision Maker will render an initial decision approving or rejecting the Claim, or indicating that the Initial Decision Maker is unable to resolve the Claim. This initial decision sha ll (1) be in writing; (2) state the reasons therefor; and (3) notify the parties and the Architect, if the Architect is not serving as the Initial D ecision Maker, of any change in the Contract Sum or Contract Time or both. The initial decision s hall be final and binding on the parties but subject to mediation and, if the parties fail to resolve their dispute through mediation, to binding dispute resolution. § 15.2.6 Either party may file for mediation at any time, subject to the terms of Section 15.2.6.1. § 15.2.6.1 Either party may, within 30 working days from the date of receipt of an initial decision, or if no decision has been rendered in accordance with Section 15.2.1, demand in writing that the ot her party file for mediation. If AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:16:06 on 06/14/2018 under Order No.8949848052 which expires on 02/09/2019, and is not for resale. User Notes: (2002924374) 43 such a demand is made and the party receiving the demand fails to file for mediati on within 30 working days after receipt thereof, then both parties waive their rights to mediate or pursue bi nding dispute resolution proceedings with respect to the initial decision. § 15.2.7 In the event of a Claim against the Contractor, the Owner may, but is not obligated to, notify the surety, if any, of the nature and amount of the Claim. If the Claim relates to a possibility of a Contractor’s default, the Owner may, but is not obligated to, notify the surety and request the surety’s assistance in resolving the controversy. § 15.2.8 If a Claim relates to or is the subject of a mechanic’s lien, the party asserting su ch Claim may proceed in accordance with applicable law to comply with the lien notice or filing deadlines. § 15.3 Mediation § 15.3.1 Claims, disputes, or other matters in controversy arising out of or related to the Contract, except those waived as provided for in Sections 9.10.4, 9.10.5, and 15.1.7, shall be subject to mediation as a condition precedent to binding dispute resolution. § 15.3.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Construction Industry Mediation Procedures in effect on the date of the Agreement. A request for mediation shall be made in writing, delivered to the other party to the Contract, and filed with the person or e ntity administering the mediation. The request may be made concurrently with the filing of binding dispute resolution proc eedings but, in such event, mediation shall proceed in advance of binding dispute resolution proceedings, which shall be stayed pending mediation for a period of 60 working days from the date of filing, unless stayed for a longer period by agreement of the parties or court order. § 15.3.3 Either party may, within 30 working days from the date that mediation has been concluded without resolution of the dispute or 60 working days after mediation has been demanded without resolution of the dispute, demand in writing that the other party file for binding dispute resolution. If such a demand is made and the party receiving the demand fails to file for binding dispute resolution within 60 working days after written receipt thereof, then both parties waive their rights to binding dispute resolution proceedings with respect t o the initial decision. § 15.3.4 The parties shall share the mediator’s fee and any filing fees equally. The medi ation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. § 15.4 Arbitration Any claim not resolved by mediation shall be resolved by Arbitration as provided in section 12.2 of the incorporated A133. AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 11 therein, including any additional services requested by the Construction Manager that are nece ssary for the Preconstruction and Construction Phase services under this Agreement. The Owner shall provide the Construction Manager with a copy of the scope of services in the executed agreement between the Owner and the Architect, and any further modifications to the Architect’s scope of services in the agreement. ARTICLE 5 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES § 5 .1 Compensation § 5 .1.1 For the Construction Manager’s Preconstruction Phase services described in Sections 3.1 and 3.2, the Owner shall compensate the Construction Manager as follows: (Insert amount of, or basis for, compensation and include a list of reimbursable cost items, as applicable.) Invoice for $30,000. § 5.1.2 The hourly billing rates for Preconstruction Phase services of the Construction M anager and the Construction Manager’s Consultants and Subcontractors, if any, are set forth below. (If applicable, attach an exhibit of hourly billing rates or insert them below.) « » Individual or Position Rate § 5.1.2.1 Hourly billing rates for Preconstruction Phase services include all costs to be pa id or incurred by the Construction Manager, as required by law or collective bargaining agreements, for taxes, insurance, contributions, assessments and benefits and, for personnel not covered by collective bargaining agr eements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, and shal l remain unchanged unless the parties execute a Modification. § 5 .1.3 If the Preconstruction Phase services covered by this Agreement have not been com pleted within « » ( « » ) months of the date of this Agreement, through no fault of the Construction Manager, the Construction Manager’s compensation for Preconstruction Phase services shall be equitably adjusted. § 5 .2 Payments § 5 .2.1 Unless otherwise agreed, payments for services shall be made monthly in proportio n to services performed. § 5 .2.2 Payments are due and payable upon presentation of the Construction Manager’s invoice. A mounts unpaid « » ( « » ) days after the invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Constructi on Manager. (Insert rate of monthly or annual interest agreed upon.) « » % « » ARTICLE 6 COMPENSATION FOR CONSTRUCTION PHASE SERVICES § 6.1 Contract Sum § 6.1.1 The Owner shall pay the Construction Manager the Contract Sum in current funds for the Const ruction Manager’s performance of the Contract after execution of the Guaranteed Maximu m Price Amendment. The Contract Sum is the Cost of the Work as defined in Article 7 plus the Construction Manager’s Fee. § 6 .1.2 The Construction Manager’s Fee: (State a lump sum, percentage of Cost of the Work or other provision for determining the Constr uction Manager’s Fee.) « » 2.75% of GMP. § 6 .1.3 The method of adjustment of the Construction Manager’s Fee for changes in the Work: « » AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 12 § 6 .1.4 Limitations, if any, on a Subcontractor’s overhead and profit for increases in t he cost of its portion of the Work: « » § 6 .1.5 Rental rates for Construction Manager-owned equipment shall not exceed « ten » percent (10 %) of the standard rental rate paid at the place of the Project. § 6.1.6 Liquidated damages, if any: (Insert terms and conditions for liquidated damages, if any.) « See §9.11 (“Liquidated Damages”) of the modified AIA - A201 General Conditions of the parties’ Agreement. » § 6.1.7 Other: (Insert provisions for bonus, cost savings or other incentives, if any, that might result in a change to the Contract Sum.) « » § 6 .2 Guaranteed Maximum Price The Construction Manager guarantees that the Contract Sum shall not exceed the Guarante ed Maximum Price set forth in the Guaranteed Maximum Price Amendment, subject to additions and deductions by Change Order as provided in the Contract Documents. Costs which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Construction Manager without reimbursement by the Owner. §6.2.1 PROJECT FINANCING The parties understand and agree to the following: A. Although the Parties have agreed to a GMP of $83,2 56,893 for the scope of this Project, the Owner has currently obtained the approval of only $ 50,000,000 in funding (the “Initial Funding”). Accordingly, the parties will execut e “Attachment A - GMP Amendment” establishing the GMP as $83,2 56,893 at the time of the mutual execution of this Agreement, but (1) the Owner is not obligated under th is Agreement to pay any more than the Initial Funding to the Contractor for work properly completed, and (2) the Contractor is not obligated to perform any work the value of which would, in the aggregate, exceed the value of the Initial Funding, unless and until (3) the Owner obtains approval of the additional funding needed to cover the GMP (the “Additional Funding”). B. In light of the foregoing, the Contractor agrees that it shall not have the contractua l right to delay the commencement of the work, to stop work, or to issue any other complaint, protest, or contractual r ight, whether pursuant to Section §2.2 of the A201 (“Evidence of the Owner’s Financial Arrangements”), Section §4.1.2 of t he A133 (under §4.1 “Information and Services Required by the Owner”), or any other provision in the Agre ement, based on the fact that the GMP is $83,256,893 yet the Owner’s approved Initial Funding is only $50,000,000. C. The parties contemplate that the Owner should have approval of the Additional Fundi ng needed to cover the balance of the GMP by January of 2025. If the Owner has not obtained approval for the Additional Funding by t hat date, and the parties have not mutually agreed to extend that deadline, then the Contractor may stop work im mediately upon written notice, and, if the Owner cannot provide the Contractor with adequate assurances that it has obtained the Additional Funding within fourteen (14) working days thereafter, the Contractor may terminate the Agreement and recover the costs set forth in Subsection F below. Nothing in this subsection shall prevent the parties from mutually agreeing to extend the foregoing deadline, and the Contractor agrees to negotiate the same in good faith, especially if the amount of Work completed by that time is not close to the amount of the Initial Funding and/or if the Owner is able to obtain some but not all of the Additional Funding in the interim. D. If the sum of the value of the Work properly completed by the Contractor plus the Term ination Costs that Contractor will incur if it terminates the Agreement pursuant to the preceding Subsection exceed the Initial Funding (or whatever funding is then -currently available to the Owner, if the Owner obtains approval for some but not all of the Additional Funding in the interim), then Contractor may stop work upon seven (7) working days notice. O wner shall then have fourteen (14) working days thereafter to arrange for the Additional Funding and pr ovide adequate assurances to the Contractor of the same. If the Owner is unable to do so, then Contractor shall be entitled to terminate this Agreement and AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 13 recover the costs set forth in Subsection F below. E. If, at any point, the Owner is able to provide adequate assurances to the Contractor that is has made arrangements for the Additional Funding required to cover the remainder of the GMP, then the Parties wi ll continue to honor the GMP initially agreed to by the parties (subject to any additions and deletions to the GMP that have been properly agr eed to by the parties via Change Order in the interim), and the parties’ $50,000,000 limitation set forth in Subsection A above will no longer apply. F. The parties understand that in order for Contractor to lock in pricing for the mate rials required for this Project, it wil l have to immediately enter into Subcontracts that in the aggregate will exceed the Initial Funding that has been approved at the time of the signing of this Agreement. Contractor will be able to terminate th ose subcontracts if the Agreement is terminated pursuant to Subsection C or D above, but it will incur substantial subcontract termination costs which will likely include such ite ms as subcontractor termination fees, subcontractor demobilization costs, a nd costs of materials specifically fabricated for the Project but not yet installed (collectively “Termin ation Costs”). Accordingly, the Owner agrees that in the event that Contract or properly cancels the Agreement pursuant to Subsection C or D above, Owner agrees to pay, as the Contractor’s sole remedy, in addition to the compensation for Work properly completed but not yet paid for, the actual Termination Costs incurred by Contract or as well as the Contractor’s own reasonable demobilization costs. The Contractor understands and acknowledges that the Owner cannot release more funds than are approved for the Project. Contractor agrees that the foregoing remedy shall be capped such that the Owner is not required to release any more funds than those that remain in the Initial Funding at that time (or that remain in the Initial F unding plus whatever additional sums have been approved in the interim, if the Owner has been able to obtain the approval of some but not all of the Additional Funding in the interim). G. In the event that Contractor properly stops work pursuant to Subsections C or D above, but is able to resume work because the Owner is able to obtain the Additional Funding in the interim, Contract or shall be entitled to reasonable demobilization and remobilization costs and an appropriate extension of Contract Time. H. Nothing in this Section §6.2.1 shall prevent the Contractor from exercising its right to stop work as per §9.7 of the A201 (“Failure of Payment”) for the Owner’s failure to make payments that are due for work completed. Likewise, all other respective rights of the parties under the Agreement shall remain unaffect ed unless specifically addressed in this Section, including each party’s contractual right to declare the other in Default for reasons not relating to the project financing situation addressed in this Section. § 6 .3 Changes in the Work § 6 .3.1 The Owner may, without invalidating the Contract, order changes in the Work within the gener al scope of the Contract consisting of additions, deletions or other revisions. The Owner shall is sue such changes in writing. The Construction Manager may be entitled to an equitable adjustment in the Contract Time as a result of changes in t he Work. Subject to Section §6.2.1 above, any change in the Work that would increase the Guarantee d Maximum Price or extend the schedule is subject to Construction Manager’s right to request assurances of financing and to terminate if adequate assurances are not provided as per Section 2.2 of the parties A201 General Conditions.. § 6.3.1.1 The Architect may order minor changes in the Work as provided in Article 7 of AIA Document A201–2017, General Conditions of the Contract for Construction that do not materially modify the schedule or the Guaranteed Maximum Price. § 6 .3.2 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the exec ution of the Guaranteed Maximum Price Amendment may be determined by any of the methods listed in Article 7 of AIA Document A201–2017, General Conditions of the Contract for Construction. § 6 .3.3 Adjustments to subcontracts awarded on the basis of a stipulated sum shall be determ ined in accordance with Article 7 of A201–2017, as they refer to “cost” and “fee,” and not by Articles 6 and 7 of this Agreement . Adjustments to subcontracts awarded with the Owner’s prior written consent on the basis of cost plus a fee shall be calculate d in accordance with the terms of those subcontracts. § 6 .3.4 In calculating adjustments to the Guaranteed Maximum Price, the terms “cost” and “costs” as used in Article 7 of AIA Document A201–2017 shall mean the Cost of the Work as defined in Article 7 of this Agreement and the term “fee” shall mean the Construction Manager’s Fee as defined in Section 6.1.2 of this Agreement. AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 14 ARTICLE 7 COST OF THE WORK FOR CONSTRUCTION PHASE § 7 .1 Costs to Be Reimbursed § 7 .1.1 The term Cost of the Work shall mean costs necessarily incurred by the Construction Mana ger in the proper performance of the Work. The Cost of the Work shall include only the items set forth in S ections 7.1 through 7.7. § 7 .1.2 Where, pursuant to the Contract Documents, any cost is subject to the Owner’s prior approval, the Construction Manager shall obtain such approval in writing prior to incurring the cost. § 7 .1.3 Costs shall be at rates not higher than the standard rates paid at the place of the P roject, except with prior approval of the Owner. § 7 .2 Labor Costs § 7 .2.1 Wages or salaries of construction workers directly employed by the Construction Manager to perform the construction of the Work at the site or, with the Owner’s prior approval, at off -site workshops. § 7 .2.2 Wages or salaries of the Construction Manager’s supervisory and administrative personnel when stationed at the site and performing Work, with the Owner’s prior approval. § 7.2.2.1 Wages or salaries of the Construction Manager’s supervisory and administrative pe rsonnel when performing Work and stationed at a location other than the site, but only for that portion of time re quired for the Work, and limited to the personnel and activities listed below: (Identify the personnel, type of activity and, if applicable, any agreed upon percent age of time to be devoted to the Work.) « » § 7 .2.3 Wages and salaries of the Construction Manager’s supervisory or administrative personnel engaged at factories, workshops or while traveling, in expediting the production or transportation of materials or equipment require d for the Work, but only for that portion of their time required for the Work. § 7 .2.4 Costs paid or incurred by the Construction Manager, as required by law or collective bargaining agreements, for taxes, insurance, contributions, assessments and benefits and, for personnel not covered by collective bargaining agreements, customary benefits such as sick leave, medical and health benefits , holidays, vacations and pensions, provided such costs are based on wages and salaries included in the Cost of the Work under Se ctions 7.2.1 through 7.2.3. § 7 .2.5 If agreed rates for labor costs, in lieu of actual costs, are provided in this A greement, the rates shall remain unchanged throughout the duration of this Agreement, unless the parties execute a Modi fication. § 7 .3 Subcontract Costs Payments made by the Construction Manager to Subcontractors in accordance with the requirement s of the subcontracts and this Agreement. § 7 .4 Costs of Materials and Equipment Incorporated in the Completed Construction § 7 .4.1 Costs, including transportation and storage at the site, of materials and equipment incorporated, or to be incorporated, in the completed construction. § 7 .4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Ow ner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sale s shall be credited to the Owner as a deduction from the Cost of the Work. § 7 .5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 7 .5.1 Costs of transportation, storage, installation, dismantling, maintenance, and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by cons truction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 15 materials, supplies, temporary facilities, machinery, equipment, and tools, that are not fully consumed, shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction M anager shall mean fair market value. § 7 .5.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site, and the costs of transportation, installation, dismantling, minor repairs, and removal of such temporary facilities, machinery, equipment, and hand tools. Rates and quantities of equipment owned by the Construction Manager, or a related part y as defined in Section 7.8, shall be subject to the Owner’s prior approval. The total rental cost of any such equipment may not exceed the purchase price of any comparable item. § 7 .5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal . § 7 .5.4 Costs of the Construction Manager’s site office, including general office equipment and suppl ies. § 7 .5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval. § 7 .6 Miscellaneous Costs § 7.6.1.3 The parties have agreed that for the insurance coverages provided by the Contractor for this project (other than Builder’s Risk, which is addressed separately), Owner shall pay Contractor a s um equal to .5% of the GMP. § 7 .6.2 Sales, use, or similar taxes, imposed by a governmental authority, that are related to the Work and for which the Construction Manager is liable. § 7 .6.3 Fees and assessments for the building permit, and for other permits, licenses, and inspections, for which the Construction Manager is required by the Contract Documents to pay. § 7 .6.4 Fees of laboratories for tests required by the Contract Documents; except those related to defective or nonconforming Work for which reimbursement is excluded under Article 13 of AIA Document A201–2017 or by other provisions of the Contract Documents, and which do not fall within the scope of Section 7.7.3. § 7.6.5 Royalties and license fees paid for the use of a particular design, process, or product, required by the Contract Documents. § 7.6.5.1 The cost of defending suits or claims for infringement of patent rights arising from requirements of the Contract Documents, payments made in accordance with legal judgments against the Cons truction Manager resulting from such suits or claims, and payments of settlements made with the Owner’s c onsent, unless the Construction Manager had reason to believe that the required design, process, or product was an infr ingement of a copyright or a patent, and the Construction Manager failed to promptly furnish such information to the Architect as required by Article 3 of AIA Document A201–2017. The costs of legal defenses, judgments, and settlements shall not be included in the Cost of the Work used to calculate the Construction Manager’s Fee or subject to the Guaranteed Maximum Price. § 7 .6.6 Costs for communications services, electronic equipment, and software, directly related to the Work and located at the site, with the Owner’s prior approval. § 7 .6.7 Costs of document reproductions and delivery charges. § 7 .6.8 Deposits lost for causes other than the Construction Manager’s negligence or failure to fulfill a specific responsibility in the Contract Documents. § 7 .6.9 Legal, mediation and arbitration costs, including attorneys’ fees, other than those arising from disputes between the Owner and Construction Manager, reasonably incurred by the Construction Manager after the execution of this Agreement in the performance of the Work and with the Owner’s prior approval, which shall not be unreasonably withheld. AIA Document A133™ – 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:46:33 ET on 09/16/2020 under Order No.5395131485 which expires on 02/08/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1883518563) 16 § 7.6.10 Expenses incurred in accordance with the Construction Manager’s standard written per sonnel policy for relocation and temporary living allowances of the Construction Manager’s personnel required for the Work, with the Owner’s prior approval. § 7.6.11 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 7 .7 Other Costs and Emergencies § 7 .7.1 Other costs incurred in the performance of the Work, with the Owner’s prior approval. § 7 .7.2 Costs incurred in taking action to prevent threatened damage, injury, or loss, in case of an emergency affecting the safety of persons and property, as provided in Article 10 of AIA Document A201–2017. § 7 .7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Construction Manager , Subcontractors, or suppliers, provided that such damaged or nonconforming Work was not caused by the negligence of, or failure to fulfill a specific responsibility by, the Construction Manager, and only to the extent that the cost of repair or correction is not recovered by the Construction Manager from insurance, suretie s, Subcontractors, suppliers, or others. § 7 .7.4 The costs described in Sections 7.1 through 7.7 shall be included in the Cost of the Work, notwithstanding any provision of AIA Document A201–2017 or other Conditions of the Contract which may require the Construction Manager to pay such costs, unless such costs are excluded by the provisions of Section 7.9. § 7.8 Related Party Transactions § 7.8.1 For purposes of this Section 7.8, the term “related party” shall mean (1) a parent, subsidiary, affiliate, or other entity having common ownership of, or sharing common management with, the Construction Mana ger; (2) any entity in which any stockholder in, or management employee of, the Construction Manager holds an equity i nterest in excess of ten percent in the aggregate; (3) any entity which has the right to control the busines s or affairs of the Construction Manager; or (4) any person, or any member of the immediate family of any person, who has the right to control the business or affairs of the Construction Manager. § 7.8.2 If any of the costs to be reimbursed arise from a transaction between the Construc tion Manager and a related party, the Construction Manager shall notify the Owner of the specific nature of the contemplated transaction, including the identity of the related party and the anticipated cost to be incurred, before any such transaction is consummate d or cost incurred. If the Owner, after such notification, authorizes the proposed tr ansaction in writing, then the cost incurred shall be included as a cost to be reimbursed, and the Construction Manager shall procure t he Work, equipment, goods, or service, from the related party, as a Subcontractor, according to the terms o f Article 9. If the Owner fails to authorize the transaction in writing, the Construction Manager shall procure the Work, equipment, goods, or service from some person or entity other than a related party according to the terms of Article 9. § 7.9 Costs Not To Be Reimbursed § 7.9.1 The Cost of the Work shall not include the items listed below: .1 Salaries and other compensation of the Construction Manager’s personnel stationed at the Constr uction Manager’s principal office or offices other than the site office, except as specifi cally provided in Section 7.2, or as may be provided in Article 14; .2 Bonuses, profit sharing, incentive compensation, and any other discretionary payment s, paid to anyone hired by the Construction Manager or paid to any Subcontractor or vendor, unless the Owne r has provided prior approval; .3 Expenses of the Construction Manager’s principal office and

Text truncated. Open the original for the full document.

Source: Anderson County website. First collected Oct 24, 2026.